MIRE is the Model Inventory of Roadway Elements

Concerned largely with road safety

Provides guidelines for detailed descriptions of roadway attributes◦ Pavement and road descriptors, intersection

signalization, sidewalks and curbs, ramps

RIDOT wants MIRE data◦ HPMS reporting, Safety Analyst, Roads and

Highways integration and maintenance

ESRI’s Roads and Highways integration◦ RIDOT is looking to integrate MIRE data

◦ Using RCE to edit and maintain

◦ Storing MIRE Elements as events

Vans drive along predefined routes

Directionality is considered (primary vs secondary)

Various data sets with priorities (NHS vs Non-NHS vs local)

GPS tracks used to track collection

Data comes from various sources◦ Aerial imagery

◦ ROW van imagery

◦ LiDAR

Use GPS van tracks to track data collection◦ Date, run, van number entered into centerline file to

reference appropriate imagery for each segment

Recommended listing and

data dictionary of

traffic data elements

• 202 elements

Developed by the FHWA

Supports states’ HSIP

and other safety

programs

Michael Baker International

• MIRE Data Quality Control

- 5 Dataset Types

- 26 Datasets Delivered

Perform a Thorough Review of the MIRE Data Collection Guide

Define Areas with Potential for Data Inconsistencies

Evaluate Data using Manual and Automated Validation Techniques

Document and Report Conclusions / Recommendations

~26,000 Segments

~ 2,300 Miles

Interstate, U.S., and State Routes

105 Total Attributes:

Total Paved Surface Width (024)

Number of Through Lanes (031)

Outside Through Lane Width (032)

Inside Through Lane Width (033)

Many others…

~66,000 Segments

~ 4,600 Miles

105 Total Attributes:

Auxiliary Lane Presence/Type (035)

Presence/Type of Bicycle Facility (040)

Right Shoulder Type (043)

Median Barrier Type (056)

Right Sideslope (063)

Many others…

~16,200 Intersections

Intersections Associated with Approaches

17 Total Attributes:

Intersecting Angle (126)

Intersection Offset Distance (130)

Intersection Traffic Control (131)

Signalization Presence/Type (132)

Intersection Lighting (133)

Many others…

~49,000 Intersection

Approaches

Non-Spatial Geodatabase

Table

40 Total Attributes:

Approach Directional Flow (143)

Approach Mode (142)

Number of Approach Through Lanes (144)

Approach Traffic Control (154)

Ramp Dataset ~445 Ramps

25 Total Attributes:

Ramp Acceleration Lane Length (188)

Ramp Number of Lane (190)

Ramp Advisory Speed Limit (194)

Several others…

Quality Control Procedures

Manual Symbolization Techniques

Automated Validation via Customized Application

Manual Symbolization

Symbolize to detect large fluctuations in speed limit.

Speed Limit

Symbolize to detect changes in sidewalk presence.

Manual SymbolizationSidewalk Presence

Validate Against Guiderail Layer

1. Query opposing scenarios in guiderail layer and mainline layer.

2. Select by Location to detect segments with conflicting attributes.

Median Barrier Presence/Type

W-beam, Thrie Beam, Box Beam, and Rustic Beam guiderails that are defined as Semi-Rigid.

Locate these guiderails within 200 feet of a segment where Median Barrier Presence/Typedoes NOT equal Semi-Rigid. Median Barrier Type should be Semi-Rigid Barrier instead of

Rigid Barrier System.

Query mainline dataset for segment with Median Barrier Type equal to Unprotected.

Select by Location on unprotected segments within 200 feet of any existing guiderail. Median Barrier Type should be Semi-Rigid Barrier instead of

Unprotected.

Manual Symbolization

Median Barrier Presence/Type

Validation ReportsMIRE Local QCSeptember 29, 2015

Number of Through Lanes (031)

Description of Issue: Segments should have 1 lane instead of 2 lanes. Confirmed with Google Street View.

Example of Issue: The 15 segments listed in the attribute table below should all be 1 lane instead of 2 lanes.

The aerial below only shows 5 segments but the geometry for each segment is duplicated 3 times, totaling 15 segments.

Additional Issue: These 15 segments also have an incorrect Median Barrier Type (056). They are recorded as having an

“unprotected” median barrier type, and they should have a “curbed” median barrier type.

MIRE Local QCSeptember 29, 2015

One/Two-Way Operation (091)

Median Type (054)

Description of Issue: If a route is “One Direction of Travel for Divided Roadways” you cannot have an “undivided” median

type.

Query for: OTWOper = 'OD' AND MedTyp = 'UD' yields 4 segments that are “One Direction of Travel for Divided Roadways”

with an undivided median type.

1.) Segment 49688 – Majority of segment is undivided; however, if linework is going to be divided, then segment should

have a raised Median Type (054) instead of undivided. It should also have a curbed Median Barrier type (056), and Median

Width (055) needs to be updated accordingly.

RIDOT Data Validation Tool

Developed validation rules based on MIRE Data Collection Guide

Checks may be run independently or grouped by type (cross, domain) or

dataset

Includes Checks for:

• Local

• Mainline

• Ramps

• Intersection

Approaches

• Intersections

• Intersection Join

RIDOT Data Validation Tool

Validation Types

• Cross

- 80 total

• Domain

- 90 total

Export to CSV

Filter based on

dataset, validation

type, validation

name, etc.

Delivered to DTS

RIDOT Data Validation Tool

If Number of Through Lanes = 2 AND Operation = Two-Way, then Inside Through Lane Width must be 0 or NULL.

MIRE Guide states, “For a two-lane road, leave this element (Inside Through Lane Width) blank.”

Inside Through Lane

Inside Through Lane

Outside Through Lane

Outside Through Lane

Outside Through Lane

Outside Through Lane

Operation = 2 WayLanes = 2

No Inside Through Lanes

Operation = 2 WayLanes = 4

Valid Inside Through Lanes

Cross

ValidationLocal Dataset

If Intersection Junction Geometry equals T-

Intersection or Y-Intersection then

Intersection Number of Legs must equal 3.

If Intersection Junction Geometry equals Cross-

Intersection then Intersection Number of Legs must

equal 4.

If Intersection Junction Geometry equals Five or More

Legs then Intersection Number of Legs must equal > 5.

Cross

ValidationIntersection Dataset

If Approach Traffic Control equals…

• Stop Sign

• Yield Sign

• Uncontrolled

• Railroad Crossing Stop Sign Only

• Railroad Crossing Crossbucks Only

… then Signal Progression must equal No Signal.

Cross

Validation

Intersection Approach Dataset

Join the Intersection and Intersection Approach

tables on Intersection ID to query between

attribute tables.

If Intersection/Junction Traffic Control

equals Signalized (with ped signal) or

Signalized (w/o ped signal) then Approach

Traffic Control must equal Signalized.

Cross

ValidationIntersection & Approach Dataset

Benefits of Quality Data Consistency

• Compatible with Safety Analysis tools

Compare safety and non-safety data

Compare Data Over Time

Document

Assumptions

examples of interpretation

Anomalies

Reliability

Confidence in Data Driven Decisions

DOTs vs Consulting◦ Timelines and sense of urgency vary between

government and contractors

◦ Various iterations of centerline data from various sources within RIDOT

No standard data model for MIRE◦ Had to develop data model

◦ Numerous iterations to work out best geometric and attribute representations

◦ Built GDB with domains for all MIRE Elements that could be coded

Baseline MIRE data model for national standard consideration

Only agency to complete full MIRE data population

Full dataset for entire state of Rhode Island, consisting of over 6500 centerline miles

◦ RIDOT integration into R&H with RCE interface for maintenance and updates

◦ RIDOT needs to create event tables from MIRE Elements

◦ Contribute to standardized data model

RIDOT Team◦ Sean Raymond

HSIP Program Manager

◦ Shane White

Supervising GIS Specialist

◦ Stephen Kut

Asset Information Systems

Rafiq Basaria, GISP

Sr. GIS Analyst, DTS

(407) 382-5222

[email protected]

Tom Tiner, CP, GISP

Michael Baker International, Inc.

Dir of Transportation Asset Mgmt

609-807-9521

[email protected]