Minutes of the 80 th meeting of the State Level Expert Appraisal Committee, West Bengal held on 18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. Page 1 of 26 Name of the members who were present in the meeting are as follows: - 1. Prof. (Dr.) Sudarsan Neogi Chairman, SEAC 2. Dr. Kalyan Rudra Member, SEAC 3. Dr. Satya Kinkar Pal Member, SEAC 4. Prof. Bhabatosh Biswas Member, SEAC 5. Dr. Arunkanti Biswas Member, SEAC 6. Prof.(Dr) S.R Roychoudhuri Member, SEAC 7. Dr. Amitava Roy Member, SEAC 8. Prof. Jayanta Bhattacharya Member, SEAC 9. Sri P. K. Sarkar Secretary, SEAC & Member Secretary, WBPCB In the beginning of the 80 th meeting of SEAC, which was held on 18.01.2014 at 11:30 hrs at the Conference Room, Paribesh Bhawan, Bidhan Nagar, the Secretary, SEAC welcome all the members. After introductory session, five cases were discussed under 'Miscellaneous' section. Seven cases were placed for reconsideration. Eleven applicants were requested to make their presentation before the committee. All the eleven applicants made their presentations before the committee. SESSION I A. Miscellaneous 1. Proposed Residential project “Town House” by M/s. Bengal Shristi Infrastructure Developme nt Ltd., at Mouza Ganrui, Gobindapur, Kumarpur, Gopalpur, PS Kanyapur, Asansol Municipal Corporation Ward No. 2, 30 & 31, Dist Burdwan. Chronology: M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before the SEIAA on 03.01.2012. The SEAC has considered the project proposal in the 77 th meeting held on 26.03.2013. But the MoEF as per OM No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case to SEIAA on 18.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF. As per MoEF circular dated 22.01.2010 the SEIAA returned the project proposal on 20.05.2013. The project proponent has again requested vide their letters dated 31.10.2013 and 02.01.2014 to consider the project in the SEAC meeting since moratorium imposed by MoEF has been lifted for Asansol industrial cluster in West Bengal. The case was put up for consideration. The SEAC reviewed the case and after detailed discussion, SEAC recommended to forward the case to the SEIAA for taking necessary action. 2. Proposed Residential project “Tarang” by M/s. Bengal Shristi Infrastructure Development Ltd., at Mouza Ganrui, Gobindapur, Kumarpur, Gopalpur, PS Kanyapur, Asansol Municipal Corporation Ward No. 2, 30 & 31, Dist Burdwan. Chronology: M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before the SEIAA on 20.02.2012. The SEAC has considered the project proposal in the 77 th meeting held on 26.03.2013. But the MoEF as per OM No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case to SEIAA on 12.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF.

Upload: others

Post on 19-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 1 of 26

Name of the members who were present in the meeting are as follows: -

1. Prof. (Dr.) Sudarsan Neogi Chairman, SEAC

2. Dr. Kalyan Rudra Member, SEAC

3. Dr. Satya Kinkar Pal Member, SEAC

4. Prof. Bhabatosh Biswas Member, SEAC

5. Dr. Arunkanti Biswas Member, SEAC

6. Prof.(Dr) S.R Roychoudhuri Member, SEAC

7. Dr. Amitava Roy Member, SEAC

8. Prof. Jayanta Bhattacharya Member, SEAC

9. Sri P. K. Sarkar Secretary, SEAC & Member Secretary, WBPCB

In the beginning of the 80th

meeting of SEAC, which was held on 18.01.2014 at 11:30 hrs at the Conference Room,

Paribesh Bhawan, Bidhan Nagar, the Secretary, SEAC welcome all the members. After introductory session, five

cases were discussed under 'Miscellaneous' section. Seven cases were placed for reconsideration. Eleven applicants

were requested to make their presentation before the committee. All the eleven applicants made their presentations

before the committee.

SESSION I

A. Miscellaneous

1. Proposed Residential project “Town House” by M/s. Bengal Shristi Infrastructure Development Ltd., at

Mouza – Ganrui, Gobindapur, Kumarpur, Gopalpur, PS – Kanyapur, Asansol Municipal Corporation

Ward No. 2, 30 & 31, Dist – Burdwan.

Chronology:

M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before

the SEIAA on 03.01.2012.

The SEAC has considered the project proposal in the 77th

meeting held on 26.03.2013. But the MoEF as per OM

No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of

developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case

to SEIAA on 18.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF.

As per MoEF circular dated 22.01.2010 the SEIAA returned the project proposal on 20.05.2013.

The project proponent has again requested vide their letters dated 31.10.2013 and 02.01.2014 to consider the

project in the SEAC meeting since moratorium imposed by MoEF has been lifted for Asansol industrial cluster in

West Bengal.

The case was put up for consideration. The SEAC reviewed the case and after detailed discussion, SEAC

recommended to forward the case to the SEIAA for taking necessary action.

2. Proposed Residential project “Tarang” by M/s. Bengal Shristi Infrastructure Development Ltd., at Mouza

– Ganrui, Gobindapur, Kumarpur, Gopalpur, PS – Kanyapur, Asansol Municipal Corporation Ward No.

2, 30 & 31, Dist – Burdwan.

Chronology:

M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before

the SEIAA on 20.02.2012.

The SEAC has considered the project proposal in the 77th

meeting held on 26.03.2013. But the MoEF as per OM

No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of

developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case

to SEIAA on 12.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF.

Page 2: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 2 of 26

As per MoEF circular dated 22.01.2010 the SEIAA returned the project proposal on 20.05.2013.

The project proponent has again requested vide their letters dated 31.10.2013 and 02.01.2014 to consider the

project in the SEAC meeting since moratorium imposed by MoEF has been lifted for Asansole industrial clusters

in West Bengal.

The case was put up for information. The SEAC reviewed the submission of the project proponent and recommended

to forward the case to the SEIAA for taking necessary action.

3. Proposed Application for amendment of Environmental Clearance from 3x135 MW TPP to 3x150 MW

TPP by M/s. India Power Corporation (Haldia) Ltd. at Jl. No. – 94, Mouza – Kismatshibrampur, Jl. No. –

170, Mouza – Tentulberia, Jl. No. – 147, Mouza – Sovarampur, Jl. No. – 146, Mouza – Kashbere, PS –

Bhabanipur, Haldia, Dist. – Purba Medinipur, West Bengal.

The proponent earlier applied for environmental clearance on 31.12.2008 for the proposed Coal based Thermal

Power Plant (3x135 MW) at Haldia for the captive energy requirement of Bhaskar Silicon Ltd. for the proposed

Poly Silicon Solar PV project. The proponent obtained EC from SEIAA on 12.04.2010.

The proponent has again applied for environmental clearance on 20.04.2011 for 450 MW TPP instead of 405

MW TPP. Earlier proposal was for AFBC Boiler, present proposal is for PF Boiler.

The SEAC has considered the project proposal in the 57th

meeting held on 25.07.2011. SEAC decided that since

CEPI related moratorium in Haldia is still in force the SEAC is not in a position to consider the case and

accordingly informed to SEIAA dated 27.07.2011.

Accordingly, SEIAA informed the project proponent on 11.08.2011 that this proposal which involve expansion

in capacity cannot be processed at a state level.

The project proponent has again requested vide their letters dated 26.12.2013 to consider the proposal in the

SEAC meeting since moratorium imposed by MoEF has been lifted for Haldia industrial clusters in West Bengal.

The case was put up consideration. The SEAC after detailed discussion recommended to forward the case to the

SEIAA for taking necessary action as moratorium imposed by MoEF has been lifted for Haldia industrial clusters in

West Bengal still Haldia industrial cluster is considered as Critically Polluted Areas and attract general conditions as

per EIA Notification, 2006 and its amendment thereafter.

4. Proposed expansion project for 3x20 MT Induction Furnace with caster and 2000 TPM Wire Drawing

unit by M/s. Gagan Ferro Tech Ltd. at Jamuria Industrial Estate, Vill & PO – Ikra, Dist – Burdwan.

Activity:

This is a proposal for expansion of 3x20 MT Induction Furnace with caster and 2000 TPM Wire Drawing unit.

Chronology:

Salient features of the proposed project are –

Existing Proposed

Sponge Iron 4x100 TPD --

Induction Furnace 2x20 MT with CCM 3x20 MT with CCM

Captive Power Plant 12 MW --

Wire Drawing Unit -- 2000 TPM

The case was put up for consideration. The SEAC noted that this is an expansion proposal for Category „A‟ project

having Sponge Iron manufacturing capacity > 200 TPD and as per EIA notification 2006 and its amendment the case

may be appraised at MoEF. During the meeting SEAC has recommended to forward the case to the SEIAA for

opinion and taking necessary action.

Page 3: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 3 of 26

5. Proposed expansion project for 0.9 MTPA Coal Washery by M/s. Shakambhari Ispat & Power Ltd. at Vill

– Madandih, PO – Bartoria, Dist – Purulia, PIN – 723 121.

Activity:

This is an expansion proposal of 0.9 MTPA Coal Washery.

Chronology:

Salient features of the proposed project are –

Existing Proposed

Sponge Iron 3x100 TPD --

Induction Furnace 2x12 MT with CCM --

Captive Power Plant 12 MW --

Coal Washery -- 0.9 TPA

The case was put up for consideration. The SEAC noted that this is an expansion proposal for Category „A‟ project

having Sponge Iron manufacturing capacity > 200 TPD and as per EIA notification 2006 and its amendment the case

may be appraised at MoEF. During the meeting SEAC has recommended to forward the case to the SEIAA for

opinion and taking necessary action.

B. Note on Reconsideration Proposals

Industry Sector :-

1. Proposed expansion of the Cement Grinding Unit by M/s. Burdwan Super Cement Pvt. Ltd. at JL No. 36,

Plot No. 72, 73, 141, Vill & Mouza – Sarpi, GP – Ichapur, PS – Faridpur, Dist – Burdwan, West Bengal.

Activity:

This is a proposal for expansion of the existing Cement Grinding unit. It is noted that clinker will not be

manufactured at the site. The manufacturing process will involve grinding of Cement Clinker with Slag / Flyash

and Gypsum. The existing and the proposed facilities are as follows :-

Installations Existing Capacity Proposed Capacity

Ball Mill 1x75 TPD, Portland Slag

Cement (15000 TPA)

1x100 TPD, Portland Pozzolana

Cement (30000 TPA)

Slag Drier (Coal fired) - 1x8 TPH

Chronology:

The State Level Expert Appraisal Committee (SEAC) made the following recommendations in the 78th

meeting

held on 08.05.2013 and the subsequent response from the unit submitted on 30.12.2013, is given below :-

Directions of the Committee issued on 21.05.2013 Response of the Proponent dated 30.12.2013

1. List of trees to be planted at project site. 1. The proponent has submitted the detailed list

of plantation.

Page 4: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 4 of 26

Directions of the Committee issued on 21.05.2013 Response of the Proponent dated 30.12.2013

2. Revised CSR proposal to be submitted with focus

on underprivileged community as discussed during

the presentation.

2. The proponent has submitted the details of

CSR proposal alongwith financial planning of

Rs. 8,44,000/-.

3. Compliance status and stack monitoring reports of

the existing unit

3. The proponent has submitted the details of

stack monitoring report of the existing unit.

The case was put up for reconsideration. The SEAC, after careful consideration, recommended ToR (Annexure – I)

for the proposed project as per MoEF office memorandum no. J-13012/12/2013-IA-II (I) dated 24.12.2013 for

conducting draft EIA/EMP reports and the project proponent should submit the final EIA/EMP before SEAC after

conducting public hearing as per EIA notifications and its amendment thereafter.

Construction Sector :-

2. Proposed Commercial Complex Cum Hotel by M/s. Soonerio Hotels Pvt. Ltd. & Beekay Plaza Pvt. Ltd. at

Plot No. 378,111,420 and 421/931 Mouza – Dabgram, J.L No – 2, P.S – Bhaktinagar, P.O – Sevoke Road,

Ward No. 44 under Siliguri Municipal Corporation, Dist – Jalpaiguri, Pin – 734 001.

Activity:

This is a proposal for construction of commercial complex cum hotel with 84 rooms (2B+G+8 storied building).

Chronology:

The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 68th

meeting

held on 14.06.2012.

Now the unit has submitted the copy of the building plan sanctioned by the Siliguri Municipal Corporation for

the proposed project on 02.01.2014. The modified features of the proposed project are as follows: -

As per SCEC dated 13.07.2012 As per sanctioned plan submitted on

02.01.2014

Land Area : 2.61 acres (10564.72 sq.m) : 2.61 acres (10564.72 sq.m)

Expected Population : 4377 persons (during operation) : 4377 persons (during operation)

Total Water requirement : 291 KLD : 291 KLD

Fresh water requirement : 184 KLD. (Source- Ground water

supply)

: 184 KLD. (Source- Ground water

supply)

Wastewater generated : 138 KLD (to be treated in STP) : 138 KLD (to be treated in STP)

Wastewater treated : 138 KLD. : 138 KLD.

Wastewater recycled : 107 KLD : 107 KLD

Wastewater discharged : 31 KLD to SMC drain : 31 KLD to SMC drain

Rain water harvesting : surface storage-100 KL& recharge -

2495 KL/ annum through 02 nos.

recharge wells .

: surface storage-100 KL & recharge -

2495 KL/ annum through 02 nos.

recharge wells .

Solid waste disposal : 0.72 TPD : 0.72 TPD

Total Built-up Area : 37514. 39 sq.m (including parking) : 37514. 39 sq.m (including parking)

Page 5: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 5 of 26

As per SCEC dated 13.07.2012 As per sanctioned plan submitted on

02.01.2014

Ground Coverage : 4221.03 sq.m (39.96% of land area) : 4221.03 sq.m (39.96% of land area)

Exclusive tree plantation

area

: 2328.75 sq.m (22.04% of land area) : 2328.75 sq.m (22.04% of land area)

Total Green Area : 3742.25 sq.m (35.42% of land area

including exclusive tree plantation

area)

: 3742.25 sq.m (35.42% of land area

including exclusive tree plantation area)

Paved area : 2601.14 sq.m (24.26 % of land area) : 2601.14 sq.m (24.26 % of land area)

Height of the building : 36 m : 36 m

Right of way : 30 m : 30 m

No. of plantation proposed : 150 nos. : 150 nos.

No. of Solar Street lights

proposed

: 10 nos : 10 nos

No. of Parking spaces

proposed

: 280 nos.(Open-48 nos., Covered-

232 nos)

: 272 nos.(Open-47 nos., Covered- 225

nos)

Total Power requirement : 4375 KVA, WBSEDCL : 4375 KVA, WBSEDCL

Backup Power : DG Sets ( 3x1150 KVA, 1x 250

KVA)

: DG Sets ( 4x400 KVA)

The case was put up for reconsideration. After carefully considering the submission, the committee recommended

the project for Environmental Clearance.

3. Proposed expansion of Office Building (Phase – II) by M/s. Cognizant Technology Solutions India Pvt.

Ltd. at JL No. 35, Mouza – Gangapur, PS – Kolkata Leather Complex, Dist – 24 Parganas (South), West

Bengal.

Activity:

This is a proposal for expansion of Office Complex (Phase – II) SDB 2 extension consisting of 1 Block of G+8

Storied Building and Dormitory G storied.

Chronology:

The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 77th

meeting

held on 26.03.2013.

Now the unit has submitted the copy of the sanctioned building plan for the proposed project on 31.12.2013. The

modified features of the proposed project are as follows: -

As per SCEC dated 13.05.2013 As per sanctioned plan submitted on

31.12.2013

Total Land Area : 81139.543 sqm. (20.05 acres) : 81139.543 sqm. (20.05 acres)

Expected Population : Office – 1557, Service – 30,

Floating – 156 = Total 1743

persons

: Office – 1557, Service – 30, Floating

– 156 = Total 1743 persons

Page 6: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 6 of 26

As per SCEC dated 13.05.2013 As per sanctioned plan submitted on

31.12.2013

Total water requirement : 133 KLD (Operation stage) : 133 KLD (Operation stage)

Fresh water requirement : 89 KLD (M L Dalmiya supply) : 89 KLD (M L Dalmiya supply)

Domestic water requirement : 74 KLD : 74 KLD

Wastewater generated : 59 KLD (treated in existing STP) : 59 KLD (treated in existing STP)

Waste water discharged (after

treatment in STP)

: 15 KLD : 15 KLD

Wastewater recycled : 44 KLD (for HVAC and dual

flushing)

: 44 KLD (for HVAC and dual

flushing)

Solid waste disposal : 0.225 ton per day : 0.225 ton per day

Total Built-up Area : 16964.10 sqm. (including

parking)

: 16901.00 sqm. (including parking)

Ground Coverage (for phase II) : 2142.00 sqm. (2.64% of land

area)

: 981.79 sqm. (1.21% of land area)

Total green area (for phase I & II) : 29810.33 (36.74% of land area) : 28183.50 (34.73% of land area)

Service Area (for phase I & II) : 1316.3 sqm. (1.62% of land

area)

: 2583.63 sqm. (3.18% of land area)

Exclusive Tree Plantation Area (for

phase I & II)

: 16291.48 sqm. (20.08% of land

area)

: 16291.48 sqm. (20.08% of land area)

Water feature : 386.55 sqm. (0.48% of land area) : 386.55 sqm. (0.48% of land area)

Open Parking Area(for phase I & II) : 10332.43 sqm. (12.73% of land

area)

: 10332.43 sqm. (12.73% of land area)

Area for future expansion : 9041.4 sqm. (11.14% of land

area)

: 10566.82 sqm. (13.02% of land

area)

Total Paved Area (for phase I & II) : 20186.68 sqm. (24.88% of land

area)

: 20186.68 sqm. (24.88% of land area)

No. of trees proposed to be planted : 2881 (for phase I & II) : 3000 (for phase I & II)

No. of solar lights : 80 nos. (for phase I & II) : 80 nos. (for phase I & II)

No. of Parking spaces proposed : Cars - 211, Bus – 1 (for phase II) : Cars - 750, Bus – 46 (for Phase I &

phase II)

Total Power requirement (for phase

II)

: 2322 KVA, WBSEDCL : 2322 KVA, WBSEDCL

Backup Power (for phase II) : DG Sets (1x2000 KVA) : DG Sets (1x2000 KVA)

The case was put up for reconsideration. After careful scrutiny, the committee recommended the project for

Environmental Clearance.

Page 7: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 7 of 26

4. Proposed Residential Complex by M/s. Ajna Commercial Pvt. Ltd. & Others at Jl. No. - 12, Mouza –

Raigachi, Rajarhat Bishnupur Gram Panchayat 1, PS – Rajarhat, Dist. – 24 Parganas (North), West

Bengal.

Activity:

This is a proposal for construction of a Residential complex comprising of 408 dwelling units in 4nos. B+G+12

storied buildings along with Club & Community Block (1no. G+2 storied building).

Chronology:

The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 71st meeting

held on 24.09.2012.

Now the unit has submitted the copy of the building plan sanctioned by Rajarhat Bishnupur Gram Panchayat &

North 24 Pargana Zilla Parishad for the proposed project on 30.12.2013. The modified features of the proposed

project are as follows: -

As per Provisional Environmental

Clearance dated 19.10.2012

As per Sanctioned Plan submitted

on 30.12.2013

Land Area : 10089.943 sqm. : 10089.943 sqm.

Expected Population : 2040 (fixed), 250 (floating) : 2040 (fixed), 250 (floating)

Total Water requirement : 360 KLD (Operation stage) : 360 KLD (Operation stage)

Domestic Water requirement : 311 KLD : 311 KLD

Fresh Water requirement : 240 KLD (Groundwater) : 240 KLD (Groundwater)

Wastewater generated : 248.8 KLD (to be treated in STP) : 248.8 KLD (to be treated in STP)

Wastewater recycled : 108 KLD (to be reused after

treatment in STP)

: 108 KLD (to be reused after

treatment in STP)

Wastewater discharged : 140.8 KLD (to be discharged to

road side panchayet drain leading to

HIDCO periphery canal after

treatment in STP)

: 140.8 KLD (to be discharged to road

side panchayet drain leading to

HIDCO periphery canal after

treatment in STP)

Solid waste disposal : 1.17 tonne per day : 1.17 tonne per day

Total Built-up Area : 46128.76 sqm. : 46947.04 sqm.

Ground Coverage : 3382.14 sqm. (33.52% of land

area)

: 3757.06 sqm. (37.24% of land

area)

Exclusive Tree Plantation

Area

: 2352.19 sqm. (23.31% of land

area)

: 2075.78 sqm. (20.57% of land area)

Total Paved Area : 2522.48 sqm. (24.99% of land

area)

: 2120.73 sqm. (21.02% of land area)

Soft Area (other than

plantation)

: - : 230.35 sqm. (2.28% of land area)

Soft Area (soft portion of

semi-paved surface)

: - : 1906.02 sqm. (18.89% of land area)

No. of Parking Spaces

proposed

: 413 (covered – 273, open – 140) : 406 (covered – 283, open – 123)

No. of Trees : 200 (existing – 12, proposed – 188) : 200 (existing – 12, proposed – 188)

Page 8: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 8 of 26

As per Provisional Environmental

Clearance dated 19.10.2012

As per Sanctioned Plan submitted

on 30.12.2013

Daily Power requirement : 1000 KW, WBSEDCL : 1000 KW, WBSEDCL

Backup Power : DG Sets (4x125 KVA) : DG Sets (4x125 KVA)

Height of the building : B+G+12 storied (Residential)

alongwith Club & Community G+2

storied

: B+G+12 storied (Residential)

alongwith Club & Community G+3

storied

The case was placed for reconsideration. After careful consideration, the committee recommended the project for

Environmental Clearance.

5. Proposed Residential Complex by M/s. Display Vinimay Pvt. Ltd. & 72 Ors. at Mouza – Atghara, JL No.

10, R.S. No. 133, Touzi No. 172, PS – Rajarhat, Rajarhat-Gopalpur Municipality Ward No. 9, Dist – 24

Parganas (North), West Bengal.

Activity:

This is a proposal for construction of a Residential Complex comprising of 4 Blocks [Block 1, Block 2 (L1 &

L2), Block 3, Block 4 (L1 & L2) ] of B+G+7 storied buildings having 196 nos. residential flats.

Chronology:

Salient features of the proposed project are –

Land Area : 7815.91 sqm. (1.92 acres)

Expected Population : 1100 (980 – residents, 100 – floating, 20 – service)

Total Water requirement : 170 KLD (Operation stage)

Fresh Water requirement : 99 KLD (Groundwater supply)

Domestic Water requirement : 149 KLD

Wastewater generated : 120 KLD (to be treated in STP)

Wastewater recycled : 66 KLD (toilet flushing, landscaping, road washing etc.)

Wastewater discharged : 42 KLD (to be discharged to municipal drainage)

Solid waste disposal : 0.56 tons per day (to be disposed off through Municipal Waste

disposal system)

Total Built-up Area : 26750.686 sqm.

Ground Coverage : 3058.03 sqm. (39.12% of land area)

Internal Road & Pavement (Paved

Area)

: 1583.17 sqm. (20.26% of land area)

Green Area for plantation : 2230.01 sqm. (28.53% of land area)

Semi Paved Area (grass paved) : 641.32 sqm. (8.20% of land area)

Soft Area : 303.38 sqm. (3.89% of land area)

Page 9: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 9 of 26

Total Paved Area : 1903.83 sqm. (24.36% of land area)

No. of Parking Spaces proposed : covered-165 (basement – 77, ground – 88)

No. of Trees to be planted : 125 nos.

Daily Power requirement : 1.4 MW, WBSEDCL

Backup Power : DG Sets (2x250 KVA)

The unit presented their proposal before SEAC on 78th

SEAC meeting held on 08.05.2013. The State Level

Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 78th

SEAC

meeting and subsequent response submitted on 30.12.2013 from the unit is given below :-

Directions of the Committee dated

23.05.2013

Response of the Proponent 30.12.2013

1. Proposal for in-house MSW

management.

1) Inhouse MSW management plan alongwith

vermicomposting facilities submitted.

2. Depth of groundwater recharges well to

be checked.

2) The proponent mentioned that the depth of recharge well

will be 145m. The schematic section of proposed

recharge well is submitted.

3. Revised CSR proposal. 3) The proponent mentioned that the CSR commitment will

be Rs. 60 lakhs for three years.

4. Revised plantation list 4) The pp has submitted the revised species wise plantation

list of 125 nos.

5. Legal status of the M/s. Display Vinimay

Pvt. Ltd. & 72 Ors.

5) The proponent has submitted the notarial certificate of

agreement of understanding among Display Vinimay

Pvt. Ltd and 72 ors.

The case was put up for reconsideration. After careful consideration the SEAC recommended stipulated conditions

for environmental clearance for the project.

6. Proposed Residential Complex by M/s. BKS Infraprojects LLP & 15 Ors. at 130, Rishi Bankim Chandra

Road, Holding No. 184, South Dumdum Municipality Ward No. 7, PS – Dumdum, Dist – 24 Parganas

(North), West Bengal.

Activity:

This is a proposal for construction of a residential complex having 154 nos. of flats (3 block of G+11 storied).

Chronology:

Salient features of the proposed project are –

Land Area : 7531.87 sq.m

Expected Population : 870 persons (Residential – 770, Service Staff – 20, Visitors – 80)

Total Water requirement : 139 KLD

Domestic Water requirement : 118 KLD

Fresh water requirement : 83 KLD (Source SDDM supply, Treated wastewater and rooftop

rainwater)

Wastewater generated : 94 KLD (to be treated in STP)

Page 10: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 10 of 26

Wastewater recycled : 53 KLD (flushing, landscaping and road cleaning)

Wastewater discharged : 38 KLD to Municipal drain

Solid waste disposal : 0.44 TPD

Total Built-up Area : 23080.38 sq.m

Ground Coverage : 2395.75 sq.m (31.81% of land area)

Internal Road & Pavement (Paved

area)

: 1855.89 sq.m (24.64 % of land area)

Soft Area other than Plantation : 60.21 sq.m (0.8 % of land area)

Exclusive tree plantation area : 1612.14 sq.m (21.4% of land area)

Semi soft area in grass grid

portion

: 1607.88 sq.m (21.35% of land area)

No. of plantation proposed : 120 nos.

No. of Parking spaces proposed : 170 nos.(Open-122 nos., Covered- 48 nos)

Total Power requirement : 900 KW, CESC

Height of building : 36.0 m

Width of abutting road : 21.0 m

Backup Power : DG Sets ( 3x125 KVA)

Rain water harvesting : surface storage-100 KL & sub surface recharge -1016 KL

1 recharge well which can provide recharge upto 10 KL per day and having

a depth 80 m.

The unit presented their proposal before SEAC on 74th

SEAC meeting held on 20.12.2012. The State Level

Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 74th

SEAC

meeting and subsequent response submitted on 01.10.2013 from the unit is given below :-

Directions of the Committee dated 02.01.2013 Response of the Proponent 01.10.2013

1. Provision for Solar Water Heating System

should be considered as discussed.

1. As per recommendation of SEAC, provision for

solar heating system will be made to partially fulfil

the hot water requirement of residents.

2. Revised CSR proposal based on need

assessment of the local people to be

submitted and the budgetary allocation for

CSR to be spread over a span of three years.

2. Revised CSR proposal with budgetary allocation to

be dispensed within a span of three years has been

submitted.

3. Contour map of the proposed site to be

submitted.

3. Contour map of the proposed site has been

submitted.

4. Character of the land to be submitted. 4. Land character details have been submitted.

The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for

environmental clearance for the project.

Page 11: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 11 of 26

7. Proposed Residential Complex by M/s. South City Projects (Kolkata) Limited at 88, B. L. Saha Road, JL

No. 10, Khatian Nos. 36, 38, 81 & 90, Borough No. XIII, PO & PS – Behala, KMC Ward No. 116, Kolkata

– 700 053, West Bengal.

Activity:

This is a proposal for Residential Complex comprising of Block A1 & A2 (G+19), Block B1 and B2 (G+17),

Block A3 and A4 (G+18) storied Residential Building and Club.

Chronology:

Salient features of the proposed project are –

Land Area : 21165.738 sqm. (5.23 acres)

Expected Population : 2414 (operational phase)

Total water requirement : 418 KLD

Fresh water requirement : 225 KLD (KMC supply)

Domestic Water Requirement : 225 KLD

Wastewater generated : 303 KLD

Wastewater discharged : 98 KLD (to be discharged to KMC drainage)

Waste water treated : 291 KLD

Wastewater recycled : 193 KLD (for flushing, landscaping and greenbelt)

Solid waste disposal : 1.733 Tonnes per day (through KMC)

Total Built-up Area : 54977.692 sqm. (excluding services)

Ground Coverage : 3869.877 sqm. (18.284% of land area)

Total Paved Area : 4881.821 sqm. (23.065 % of land area)

Semi Soft Area : 596.789 sqm. (2.820 % of land area)

Exclusive Tree Plantation Area : 5696.659 sqm. (26.915 % of land area)

Waterbody (Swimming Pool) : 159.397 sqm. (0.753% of land area)

Gifted area to Road : 260.623 sqm. (1.231% of land area)

Extended Basement : 5288.909 sqm. (24.988% of land area)

STP & UGR : 411.663 sqm. (1.945% of land area)

No. of plantation proposed : 441 nos. (Existing trees 5 nos.)

No. of Parking spaces proposed : 436 (covered – 316, open – 120)

Total Power requirement : 3031.25 KVA, CESC

Backup Power : DG Sets (1X750 KVA & 2x1200 KVA)

Rainwater Harvesting : Surface Storage Capacity 220 KL, 218 KL storage for use &

Sub-Surface Recharge capacity 2939 KL, 6 nos. pits 3m dia, 2 m effective

depth. Depth of aquifer 60-100 mt.

Corporate Social Responsibility : Rs. 71 lacs

Page 12: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 12 of 26

Chronology:

The unit presented their proposal before SEAC on 76th

SEAC meeting held on 19.02.2013. The State Level

Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 76th

SEAC

meeting and subsequent response submitted on 09.04.2013 from the unit is given below :–

Directions of the Committee dated 28.02.2013 Response of the Proponent 09.04.2013

1. Modified plantation plan with the list of

plantation species should be submitted.

1. The pp has submitted the revised tree plantation

proposal. They also mentioned that total 441 nos. of

trees to be planted at the project site. (list submitted)

The number of trees existing at project site is 5.

2. Corporate Social Responsibility (CSR) Plan

with specific programmes based on need

assessment of local people and financial

commitment to be submitted.

2. The pp submitted revised CSR proposal with

financial commitment of Rs. 71 lacs for 4 years.

Detailed break of activities submitted.

3. Traffic Management Plan as discussed during

the presentation should be submitted.

3. The pp has submitted the traffic management plan.

4. The characteristics of the influent to the STP

to be specified and the method of effluent

treatment to be adopted in the STP should be

modified accordingly.

4. The pp submitted characteristics of the influent to the

STP and the method of effluent treatment to be

adopted in the STP is fluidized aerobic bio reactor

technology followed by tertiary treatment.

The letter dated 09.04.2013 has been considered in the 78th

SEAC meeting held on 08.05.2013. SEAC

recommended that

Directions of the Committee dated 21.05.2013 Response of the Proponent 09.01.2014

1. Information about specific Corporate Social

Responsibility (CSR) Plan.

1. The pp submitted revised CSR proposal with

financial commitment of Rs. 72 lacs for 4 years.

Detailed break of activities submitted.

2. Revised plantation list to be submitted. 2. The pp has submitted the revised plantation list of

441 nos. of trees and details of the proposed

plantation. Existing trees at project site 5 nos. to be

retained.

The case was put up for reconsideration. After careful consideration the SEAC recommended stipulated conditions

for environmental clearance for the project.

C. Note on Technical presentations

Industry Sector:-

1. ToR presentation for the proposed proposal for setting up a chemical/bulk drug manufacturing unit by

M/s. West Bengal Chemical Industries Ltd. on lease hold area land at SI area in Durgapur, Burdwan,

West Bengal.

Activity:

This is a proposal for chemical/bulk drug manufacturing unit on lease hold area in Durgapur, Burdwan.

Chronology:

Salient features of the proposed project are:

Page 13: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 13 of 26

i) Location of the Site – Durgapur (near PCBL), Mouza – Gopinathpur, JL no. 85, PS – Faridpur, Dist -

Burdwan

ii) Land Area - 8 acres Lease hold area.

iii) Raw Materials – Different organic acids and inorganic salts

iv) Production Capacity – 4800 TPA (proposed)

v) Emission Sources – process and DG sets.

vi) Air Pollution Control System – Wet scrubber.

vii) Water Requirement – 15m3/day (Durgapur Projects Limited Supply from Damodar river after treatment)

viii) Wastewater – Process - 5m3/day (to be treated in ETP), Domestic - 3m

3/day ( to be treated in septic tank and

disposed to soak pit

ix) Power Source – 200 KW( from DPL)

x) Back up Power – DG Set, 2X125 KVA

The case was put up for consideration. After presentation, SEAC recommended ToR (Annexure -II) for conducting

draft EIA/EMP reports and the project proponent should submit the final EIA/EMP before SEAC after conducting

public hearing as per EIA notifications and its amendment thereafter.

2. Proposed Stone quarry by M/s. Kadampur Stone Mine at Mouza – Kadampur, JL no. 175, Plot No. CS

324, RS 1030, PS – Barabazar, Dist – Purulia, West Bengal.

Activity:

This is a proposal for stone quarry / mining of capacity 3000 ton/year of lease area 1.39 acres in Mouza –

Kadampur, JL no. 175, Plot No. CS 324, RS 1030, PS – Barabazar, Dist – Purulia, West Bengal. The mining will

be executed in a small hillock. After excavation the hillock will be levelled. Drilling is required to loosen the rock

exposed. The rock will be excavated by open cast method of mining by manually and excavated will be crushed

into different size as per requirement. No effluent will be generated as excavation will be restricted above water

table. There will not be any solid waste generation as whatever material will be produced will be consumed in

construction of road.

Name of the Environmental Consultant M/s. Centre Institute of Mining and Fuel Research. The case is put up

for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.

3. Proposed Stone quarry by M/s. Kadampur Stone Mine at Kadampur, Plot No. JL No. CS 526 & 527, RS

1003 & 1004, Mouza – Kadampur, Thana Barabazar, Dist - Purulia, West Bengal.

Activity:

This is a proposal for stone quarry / mining of capacity 1926 m3/year of lease area 3.50 acres in Kadampur, Plot

No. JL No. CS 526 & 527, RS 1003 & 1004, Mouza – Kadampur, Thana Barabazar, Dist - Purulia, West Bengal.

The rock will be excavated by open cast method of mining by manually and excavated will be crushed into

different size as per requirement. No effluent will be generated as excavation will be restricted above water table.

There will not be any solid waste generation as whatever material will be produced will be consumed in

construction of road.

Name of the Environmental Consultant M/s. Centre Institute of Mining and Fuel Research. The case is put up

for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.

Page 14: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 14 of 26

4. Proposed Stone quary by M/s. R S Mineral Pvt. Ltd. at Baradihi, Plot JL No. 308, Mouza – Baradihi, PS –

Manbazar II, Dist – Purulia, West Bengal.

Activity:

This is a proposal for quarz mining of capacity 50000 Ton/year of lease area 7.90 acres in Baradihi, Plot No. 1(P)

JL No. 308, Mouza – Baradihi, Thana Manbazar II, Dist - Purulia, West Bengal. The mine will be excavated by

open cast method of mining by semi-mechanized method. Drilling will be done by jack hammer drill and blasting

by explosives will be done. OB will be utilized in repairing of road, landfilling and suitable OB dump site is to be

arranged.

Name of the Environmental Consultant is M/s. Centre Institute of Mining and Fuel Research. The case is put up

for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.

5. Proposed standalone cement grinding unit of capacity-1.60 MTPA and CPP 10 MW by M/s. Cement

Manufacturing Company Ltd. at Mohit Nagar railway crossing, Mouza – Kharia & Patkala, Dist-

Jalpaiguri, West Bengal.

Activity:

This is a proposal for installation of a standalone Cement Grinding unit (1.6 MTPA) with Coal fired TPP -10

MW. It is noted that clinker will not be manufactured at the site. The manufacturing process will involve grinding

of Cement Clinker with fly ash/slag and Gypsum.

Chronology:

This has reference to the application for environmental clearance dated 27.04.2009 along with FORM I, Project

Report and other documents to the MoEF. This also refers to the ToR issued by MoEF vide F.no J-

11011/292/2009-IA II(I) dated 09.10.2009 to the project proponent and dated 31.05.2012 to the Chief

Environment Officer, GoWB for consideration of the project from SEIAA/SEAC of West Bengal. This also has

reference to the letter dated 07.01.2014 for submission of additional clarification.

Salient features of the proposed project are :

i) Location of the Site – Mohit Nagar Railway Crossing, Mouza – Kharia & Patkala, Dist-Jalpaiguri, West

Bengal.

ii) Land Area – 50 acre.

iii) Green area - 33% of land area

iv) Raw Materials – PPC: Clinker (63%), Fly ash (35%), Gypsum (2%), PSC: Clinker (38%), slag(60%),

Gypsum (2%); OPC-Clinker (98%), Gypsum-(2%) .

v) Total : Clinker-2603 TPD, Fly ash-792 TPD, Gypsum-96 TPD, Slag-1357 TPD, Coal-180 TPD

vi) Production Capacity – PPC-0.746 MTPA, PSC-0.746 MTPA, OPC-0.106 MTPA & CPP-10 MW.

vii) No. of working days per annum – 300 days.

viii) Emission Sources -

ix) Cement Vertical Roller mill, Cement mill stack, Coal mill, Packing section,Transfer points, Fly ash storage

silo ,Cement silo, hot air generator .

x) CPP-AFBC boiler of capacity-50 TPH

xi) Air Pollution Control System – Individual pulse jet bag filter & ESP for AFBC boiler.

xii) Water Requirement – Cement Plant-250 KLD, CPP- 1650 KLD, Source – Groundwater.

xiii) Wastewater – Domestic wastewater will be treated through STP, Process waste water- to be treated in ETP.

xiv) Power Source – 8.8 MW (source WBSEB)

Page 15: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 15 of 26

The case was put up for consideration. During the presentation the committee recommended that the project

proponent should submit the following:-

1) Permission for holding the entire land required for the proposed project from the concerned authority along

with the summary details of said land schedule.

2) Results of fresh ground water sampling with details of number and location of sampling points.

3) Copy of permission for abstraction of ground water from the appropriate authority.

4) Information on the source and coal quality parameters in terms of MoEF OM vide no. J-11013/41/2006-

IA.II(I) dated 19.04.2012 & 05.02.2013.

5) Necessary certification from the proponent as well as the EIA Consultant as per relevant OM of MoEF.

The committee shall consider this application only after submission of the above mentioned clarifications.

Construction Sector:-

6. Proposed construction of a state of the art office building namely „Ecospace Tower‟ consisting of IT and

ITES offices by M/s Bengal Ambuja Housing Development Ltd. at Mouza – Chakpachuria, JL no. 33, Plot

no. II/F/13, Action area – II, New Town, Rajarhat, North 24 Pgns, West Bengal.

Activity:

This is a revised proposal for construction of a IT & ITES building (B+G+12) having Green Building

certification. Earlier SEAC has issued SCEC for an Office Building during 66th

SEAC meeting held on

25.04.2012. Now the unit has modified the proposal and submitted fresh FORM-I, FORM – IA and other

relevant documents.

Chronology:

Salient features of the proposed project are –

As per SCEC issued on 23.05.2012

for “Sri Viswakarma”

Revised proposal for “Ecospace

Tower”

Land Area : 20234 sqm. : 20234.738 sq. m.

Expected Population : 4043 (floating) : Total 4676 persons

Total Water requirement : 374 KLD (Operation stage) : 493 KLD (Operation Stage)

Fresh water requirement : 251 KLD (WBHIDCO supply) : 313 KLD (municipality supply)

Domestic Water requirement : 177 KLD (WBHIDCO supply) : 237 KLD

Wastewater generated : 129 KLD (to be treated in STP) : 190 KLD (to be treated in STP)

Wastewater recycled : 123 KLD (to be reused after

treatment in STP)

: 180 KLD (no break up)

Wastewater discharged Nil : Nil

Solid waste disposal : 1010.75 kg per day (4043X0.25

kg/day)

: 1.169 TPD, to be disposed by

WBHIDCO

Total Built-up Area : 60418.757 sqm. (as per MoEF

guidelines)

: 73455.50 sq.m

Page 16: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 16 of 26

As per SCEC issued on 23.05.2012

for “Sri Viswakarma”

Revised proposal for “Ecospace

Tower”

Ground Coverage : 8072 sqm. (39.89% of land area) : 8073.31 sq.m (39.898% of land

area)

Total Paved Area : 4131 sqm. (20.42% of land area) : 4705.42 sqm. (23.25% of land

area)

Created Water body : 134 sqm (0.66% of land area) : Nil

Plantation area : 4097 sqm. (20.25% of land area) : 4046.95 sq.m (20% of land area)

Services and utilities : 333 sqm. (1.65% of land area) : 419.26 sq.m (2.072% of land

area)

No. of plantation proposed : 1040 : 1030

Generation of non-conventional

energy

: 4-7 KW : 4-7 KW

No. of Parking spaces proposed : 772 nos.

[cars – 618, LCV- 116 and Bus -

38 (621 – covered & 151 – open)]

: 765 nos.

Car – 612, LCV – 112, Bus - 38

Total Power requirement : 6100 KVA : 5672 KVA, New Town Electric

Supply Corporation Ltd.

Backup Power : DG Sets (2X2000 KVA and

2X1250 KVA)

: DG Sets ( 3x2000 KVA &

1X1800 KVA)

Usage of the project : Ambuja Corporate Office & Multi

user business park

: IT & ITES office

The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for

environmental clearance for the project with suggestion of incorporating proposal for roof top garden for reducing

heat load and CSR with financial commitment.

7. Proposed expansion of IT & ITES Office “ECOCENTRE” by M/s. Ambuja Realty Development Limited

at Plot No. 4, Block-EM, Sector-V, Kolkata – 700091, Dist. – 24 Parganas (North).

Activity:

This is a proposal for vertical expansion of an IT & ITES office “ECOCENTRE” having 1 block of B+G+19

storied to B+G+21 storied and having Green building rating.

Chronology:

Salient features of the proposed project are –

Existing Project

(Phase I)

Expansion Project

(Phase II)

Proposal after expansion

(Phase I +Phase II)

Total Land Area 7599.975 sq.m 7599.975 sq.m

Building profile 1 block of B+G+19

storied

Vertical expansion 1 block of B+G+21 storied

Page 17: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 17 of 26

Existing Project

(Phase I)

Expansion Project

(Phase II)

Proposal after expansion

(Phase I +Phase II)

Total Land Area 7599.975 sq.m 7599.975 sq.m

Expected Population 8665 persons 6381 persons

Total Water requirement 619 KLD 478 KLD

Fresh Water requirement 377 KLD 279 KLD (NDITA supply)

Domestic water requirement 366 KLD 270 KLD

Wastewater generated 293 KLD 216 KLD

Wastewater treated 194 KLD

Wastewater recycled 194 KLD

Wastewater discharged Zero Nil

Solid waste disposal 2.83 TPD 3.14 TPD

Total Built-up Area 59452.26 sq.m 3480.921 sq.m 62933.181 sq.m

Ground Coverage 2940.36 sq.m (38.69%) 2982.69 sq.m (39.24%)

Exclusive tree plantation Area 1605.98sq.m (21.13%) 1617.09 sq.m(21.29%)

Other green area 1408.51sq.m (18.6%) 964.54 sq.m (12.69%)

Paved Area 1645.12 sq.m (21.65%) 1784.41 sq.m (23.47%)

Semi paved area 0 231.52 sq.m (3.04%)

No. of Parking Spaces

proposed

514 464 (covered-447, open-17)

Nos. of trees to be planted Existing-20, Retained-5,

Cut-15, Proposed--175

Power requirement 7 MVA 5.8 MVA

Backup Power DG sets-4x2000 KVA DG sets-3x1800 KVA

No. of solar street light 10 nos.

The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for

environmental clearance.

8. Proposed construction of Logistic Centre by M/s. N. K. Plaza Pvt. Ltd. & Ors. at Mouza – Ankurhati &

Bipannapara, JL No. 30 & 27, Mohiary No. 1 Gram Panchayat, PS – Domjur, Dist – Howrah, West

Bengal.

Activity:

This is a proposal for construction of logistic centre having 4 nos. G+3 storied logistic blocks and 1 no. G+1

storied facility block.

Chronology:

Salient features of the proposed project are –

Page 18: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 18 of 26

Land Area : 60670.81 sq.m

Expected Population : 1353 persons (during operation)

Total Water requirement : 125 KLD (operational stage)

Fresh water requirement : 73 KLD. (Source- ground water supply)

Wastewater generated : 52KLD (to be treated in STP)

Wastewater treated : 52 KLD.

Wastewater recycled : 52 KLD

Wastewater discharged : Nil

Rain water harvesting : Storage tank- 100 KL. recharge- 04 nos. recharge pit of capacity-28.35

KL/day each

Solid waste disposal : 250 kg/day

Total Built-up Area : 120940.92 sq.m (including parking)

Ground Coverage : 30335.23 sq.m (49.99 % of land area)

Exclusive tree plantation area : 13094.88 sq.m (21.59 % of land area)

Total green area :15314.50 sq.m (25.25% of land area)

Total Paved area : 13989.83 sq.m (23.06 % of land area)

Water body area : 161.88 sq.m(0.27% of land area)

Service area : 869.37 sq.m(1.43% of land area)

No. of plantation proposed : Proposed- 850 nos.

No. of Solar Street lights proposed : 55 nos.

No. of Parking spaces proposed : 50 nos. truck

Total Power requirement : 2500 KVA(WBSEDCL)

Backup Power : DG Sets ( 1x 1000 KVA & 1x1500 KVA)

The case was put up for consideration. During the presentation the committee recommended that the project

proponent should submit the following:-

1. Legal status of the entire land on which the project is proposed.

2. Details of storm water drainage system and concurrence from the concerned authority for discharge.

3. Detailed plan of solid waste management

4. Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said

meeting.

The committee shall consider this application only after submission of the above mentioned clarifications.

Page 19: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 19 of 26

9. Proposed Integrated Industrial Township by M/s. Kanchan Janga Integrated Infrastructure Development

Pvt. Ltd. (A Joint Venture Company of M/s. Shristi Infrastructure Development Corporation Ltd. & M/s.

West Bengal Industrial Infrastructure Development Corporation Ltd.) at Fatapukur, Jl. No. – 9, Mouza –

Chhat Gujrimari, Jl. No. – 10, Mouza – Kismat Sukani, PS - Rajganj, Dist. – Jalpaiguri, West Bengal.

Activity:

This is a proposal for development of an Integrated Industrial Township. The proposed Township shall include

small scale & green category industries; Retail, Hotel and Social Infrastructure like School, Educational

Institutes, Nursing Home, Health Care Centre etc. Further, Residential apartments along with individual plots are

also proposed.

Chronology:

ToR for conducting EIA studies has been accorded by SEAC during 63rd

SEAC meeting held on 31.01.2012

Salient features of the proposed project as per EIA/EMP submitted –

Total Land Area : 124.5 acres / 50.38 ha. Industrial Area – 63.95 acres (51.4%), Residential / Institutional

/ Commercial – 29.41 acres (23.6%), Infrastructure (Roads / STP) – 31.14 acres (25%)

Expected Population : Total- 25035, Industrial Zone – 14940 , Retail – 1335, Hotel – 500, Institutional &

Others – 800, Residential– 7460

Total Water requirement : 2481 KLD (Operation stage)[Residential-1119 KLD, Industrial-591 KLD,

Commercial-146 KLD, Landscaping-625 KLD]

Fresh Water requirement : 1483 KLD (Ground water: Permission obtained from SWID )

Wastewater generated : 1139 KLD (to be treated in modular STP in two locations)

Wastewater recycled : 998 KLD (to be reused after treatment in STP) (for flushing, green belt development)

Wastewater discharged : 94 KLD (to be discharged to natural drain / sewer after treatment in STP)

Solid waste disposal : 8930 kg per day (to be disposed off through panchayat) (biodegradable waste to be

processed in mechanized composting system)

[Industrial-4482 kg/day, retail-267 Kg/day, hotel-250 kg/day,residential-3730 kg/day,

institution and other -200 kg/day]

Total Built-up Area : Commercial, retail & social Complex – Total- 46450 sqm. including hotel – 9290

sqm., Social Infrastructure – 18580 sqm. (school, nursing house, health care)

&retail/shopping complex-18580 sq.m

Residential Complex (1846 flats) – 141515.6 sqm.

Individual Plots – 119110.5 sqm.

Building blocks Residential complex

Type Type of flat No. of block Total no. of flats TBUA

G+2 2 BHK 57 342 24465.09 sq.m

3 BHK 68 408 34265.60 sq.m

G+4 2 BHK 15 240 17018 sq.m

3 BHK 15 120 13879.7 sq.m

G+8 2 BHK 10 320 22690.6 sq.m

3 BHK 10 160 18506.20 sq.m

1 BHK 16 256 10690.54 sq.m

Page 20: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 20 of 26

Individual Plot

Type of

plot

Plot area No. of plots Total area TBUA

A 267.5 sq.m 90 24075 sq.m 66222 sq.m

B 167.2 sq.m 115 19228 sq.m 52888.5 sq.m

Total Ground Coverage : 37.64 acres (30.23% of land area)

[Industrial-19.33 acres, Residential-8.89 acres]

Landscaped green area : 61.58 acres (49.45% of land area)

[Industrial-31.62 acres, Residential-14.5 acres]

Total Paved Area : 25.28 acres (20.31% of land area)

[industrial-12.98 acres, Residential-5.97 acres]

Total No. of plantation : 17451 approx.

No. of Parking spaces

proposed

: Total-3090, Commercial – 465,Industrial – 1209, Residential – 1416

Total Power requirement : Commercial – 2817 KW, Industrial – 6840 KW, Residential – 4229 KW, WBSEDCL

Backup Power : 2 DG Sets for every alternate street lighting (1x320 KVA, 1x600 KVA)

Commercial Area – 3x500 KVA

Industrial Area – 1x400 KVA and 17x175 KVA)

The case was put up for consideration. During the presentation the committee recommended that the project

proponent should submit the following:-

1. Details of industrial activities mentioning nos. of units, CETP etc. to be undertaken within the project.

2. Provision of waste water treatment facility and recycle of treated waste water to minimise fresh water

consumption.

3. Details of sewage and storm water drainage system.

4. Long term solid waste management plan including disposal of industrial waste.

5. Details of proper sludge disposal facility.

6. Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said

meeting.

The committee shall consider this application only after submission of the above mentioned clarifications.

10. Proposed Residential Complex by M/s. Muktamani Vanijya Pvt. Ltd. at 34B, B. T. Road, KMC Ward

No.1, Borough No. 1 Kolkata – 700 034, West Bengal.

Activity:

This is a proposal for construction of a Residential Complex having 3 nos. of B+18 storied Residential Blocks, 1

no. of B+G Podium, 1 no. of G+3 storied Assembly Block.

Chronology:

Salient features of the proposed project are -

Land Area : 9342.44 sqm.

Expected Population : Total – 1353 persons (Residents- 990, Club - 64, service -200, Floating –

99)

Page 21: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 21 of 26

Total Water requirement : 205 KLD (Operation stage)

Fresh Water requirement : 179 KLD (KMC supply)

Domestic Water requirement : 170 KLD

Wastewater generated : 145 KLD (to be treated in STP)

Wastewater recycled : 26 KLD (Landscaping and car washing)

Wastewater discharged : 119 KLD (to be discharged to KMC sewer after treatment in STP)

Solid waste disposal : 710 kg per day (to be disposed off through KMC)

Total Built-up Area : 35344.88 qm.

Ground Coverage : 3531.37 sqm. (37.8% of land area)

Road / Paved Area : 1727.34 sqm. (18.49% of land area)

Other Green Area : 682.71 sqm. (7.31 % of land area)

Exclusive Tree Plantation

Area

: 1934.2 sqm. (20.7% of land area)

Semi paved area : 365.95 sq.m (3.92 % of land area)

Service area : 478.68 sq.m (5.12 % of land area)

Open parking area : 622.19 sq.m (6.66 % of land area)

Solar lights : 22 nos. (50%)

Total No. of plantation

proposed

: 135 nos.

No. of Parking spaces

proposed

: 231 nos. (Covered -172, Open -62)

Total Power requirement : 1500 KVA, CESC

Backup Power : DG Sets (4 nos. x 325 KVA)

RWH proposal : Surface storage : 1 storage tank 40 cum

Subsurface recharge : 1623 cum

Depth of recharge well : 1 recharge well 8m x 2.5 m x 2m, 115-127 m deep

CSR : Rs. 22 lakhs in 3 years

The case is put up for consideration. During the presentation the committee recommended that the project proponent

should submit the following:-

1) Provision for dual flushing etc. to increase recycle of treated waste water.

2) Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said

meeting.

The committee shall consider this application only after submission of the above mentioned clarifications.

Page 22: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 22 of 26

11. Proposed residential complex „Eternia‟ by M/s. Concast Infrastructure Pvt. Ltd. at JL No. 07, Ward no.

58 under KMC, Borough – VII, P.S-Tiljala, Kolkata-700046.

Activity:

This is a proposal for construction of a Residential Complex having 110 flats (1 block of B+G+31 storied).

Chronology:

Salient features of the proposed project are -

Land Area : 8105.85 sq.m (2.003 acre)

Expected Population : 1005 (Permanent- 660, temporary-345)

Total Water requirement : 156 KLD (KMC supply)

Fresh Water requirement : 156 KLD (KMC supply)

Wastewater generated : 106 KLD

Treated Wastewater : Nil

Wastewater recycled : Nil

Wastewater discharged : 106 KLD

Solid waste disposal : 0.52 TPD

Total Built-up Area : 29829.22 sq.m

Ground Coverage (basement area) : 2886.155 sq.m (35.61% of land area)

Total Paved Area (beyond basement) : 2013.462 sq.m (24.83% of land area)

Exclusive Tree Plantation Area : 1686.058 sq.m (20.8% of land area)

Total Green area : 2840.863 sq.m (35.05% of land area)

Service area : 365.37 sq.m (4.51% of land area)

Open parking area (beyond basement) : 969.35 sq.m (11.96% of land area)

Semi paved area : 1340.260 sq.m (16.54% of land area)

No. of solar street lights proposed : 31 nos.

Total No. of plantation proposed : 114 nos.

No. of Parking spaces proposed : 220 nos.(Open-93, Covered at ground floor-27, Basement-100)

Total Power requirement : 1099 KVA

Backup Power : 2x500 KVA

The case was put up for consideration.. After carefully considering the proposal the committee recommended that the

project proponent should submit the following:-

1) Provision of waste water treatment facility and recycle of treated waste water to minimise fresh water

consumption.

2) Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said

meeting.

Page 23: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 23 of 26

The committee shall consider this application only after submission of the above mentioned clarifications.

Summaries of above decisions are also provided in Table-1.

Table-1 : List of the projects which were placed before the SEAC in the eightieth meeting held on

18.01.2014 at 11:30 hrs. and the Summary Decisions thereof:

A Miscellaneous cases

Sl.

No.

Name of the unit & Project address Summary Decision

1. M/s. Bengal Shristi Infrastructure Development Ltd.

Proposed Residential project “Town House” at Mouza –

Ganrui, Gobindapur, Kumarpur, Gopalpur, PS –

Kanyapur, Asansol Municipal Corporation Ward No. 2,

30 & 31, Dist – Burdwan.

Referred to SEIAA for necessary action

2. M/s. Bengal Shristi Infrastructure Development Ltd.

Proposed Residential project “Tarang” at Mouza –

Ganrui, Gobindapur, Kumarpur, Gopalpur, PS –

Kanyapur, Asansol Municipal Corporation Ward No. 2,

30 & 31, Dist – Burdwan.

Referred to SEIAA for necessary action

3. M/s. India Power Corporation (Haldia) Ltd.

Application for amendment of Environmental Clearance

from 3x135 MW TPP to 3x150 MW TPP at Jl. No. – 94,

Mouza – Kismatshibrampur, Jl. No. – 170, Mouza –

Tentulberia, Jl. No. – 147, Mouza – Sovarampur, Jl. No.

– 146, Mouza – Kashbere, PS – Bhabanipur, Haldia, Dist.

– Purba Medinipur, West Bengal.

Referred to SEIAA for necessary action

4. M/s. Gagan Ferro Tech Ltd.

Proposed expansion project for 3x20 MT Induction

Furnace with caster and 2000 TPM Wire Drawing unit at

Jamuria Industrial Estate, Vill & PO – Ikra, Dist –

Burdwan.

Referred to SEIAA for necessary action

5. M/s. Shakambhari Ispat & Power Ltd.

Proposed expansion project for 0.9 MTPA Coal Washery

at Vill – Madandih, PO – Bartoria, Dist – Purulia, PIN –

723 121.

Referred to SEIAA for necessary action

B Cases placed for consideration of Environment

Clearance

Sl.

No.

Name of the unit & Project address Summary Decision

1. M/s. Burdwan Super Cement Pvt. Ltd.

Proposed expansion of the Cement Grinding Unit at JL

No. 36, Plot No. 72, 73, 141, Vill & Mouza – Sarpi, GP

– Ichapur, PS – Faridpur, Dist – Burdwan, West Bengal.

Recommended ToR as per MoEF OM No.

J-13012/12/2013-IA-II(I) dated 24.12.2013

Page 24: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 24 of 26

B Cases placed for consideration of Environment

Clearance

Sl.

No.

Name of the unit & Project address Summary Decision

2. M/s. Soonerio Hotels Pvt. Ltd. & Beekay Plaza Pvt. Ltd.

Proposed Commercial Complex Cum Hotel at Plot No.

378,111,420 and 421/931 Mouza – Dabgram, J.L No –

2, P.S – Bhaktinagar,P.O – Sevoke Road, Ward No. 44

under Siliguri Municipal Corporation, Dist – Jalpaiguri,

Pin – 734 001.

Recommended to SEIAA for

Environmental Clearance

3. M/s. Cognizant Technology Solutions India Pvt. Ltd.

Proposed expansion of Office Building (Phase – II) at JL

No. 35, Mouza – Gangapur, PS – Kolkata Leather

Complex, Dist – 24 Parganas (South), West Bengal.

Recommended to SEIAA for

Environmental Clearance

4. M/s. Ajna Commercial Pvt. Ltd. & Others

Proposed Residential Complex at Jl. No. - 12, Mouza –

Raigachi, Rajarhat Bishnupur Gram Panchayat 1, PS –

Rajarhat, Dist. – 24 Parganas (North), West Bengal.

Recommended to SEIAA for

Environmental Clearance

5. M/s. Display Vinimay Pvt. Ltd. & 72 Ors.

Proposed Residential Complex at Mouza – Atghara, JL

No. 10, R.S. No. 133, Touzi No. 172, PS – Rajarhat,

Rajarhat-Gopalpur Municipality Ward No. 9, Dist – 24

Parganas (North), West Bengal.

Recommended for Stipulated Conditions

for Environmental Clearance

6. M/s. BKS Infraprojects LLP & 15 Ors.

Proposed Residential Complex at 130, Rishi Bankim

Chandra Road, Holding No. 184, South Dumdum

Municipality Ward No. 7, PS – Dumdum, Dist – 24

Parganas (North), West Bengal.

Recommended for Stipulated Conditions

for Environmental Clearance

7. M/s. South City Projects (Kolkata) Limited

Proposed Residential Complex at 88, B. L. Saha Road,

JL No. 10, Khatian Nos. 36, 38, 81 & 90, Borough No.

XIII, PO & PS – Behala, KMC Ward No. 116, Kolkata –

700 053, West Bengal.

Recommended for Stipulated Conditions

for Environmental Clearance with 2% of

the project cost for CSR

C Cases placed for presentation

Sl.

No.

Name of the unit & Project address Summary Decision

1. M/s. West Bengal Chemical Industries Ltd.

Proposed proposal for setting up a chemical/bulk drug

manufacturing unit on lease hold area land at SI area in

Durgapur, Burdwan, West Bengal.

Recommended modified ToR

2. M/s. Kadampur Stone Mine

Proposed Stone quarry at Mouza – Kadampur, JL no.

175, Plot No. CS 324, RS 1030, PS – Barabazar, Dist –

Purulia, West Bengal.

Asked for Additional Submission

Page 25: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 25 of 26

C Cases placed for presentation

Sl.

No.

Name of the unit & Project address Summary Decision

3. M/s. Kadampur Stone Mine

Proposed Stone quarry at Kadampur, Plot No. JL No. CS

526 & 527, RS 1003 & 1004, Mouza - Kadampur,

Thana Barabazar, Dist Purulia, West Bengal.

Asked for Additional Submission

4. M/s. R. S. Minerals Pvt. Ltd.

Proposed Stone quarry at Baradihi, Plot JL No. 308,

Mouza – Baradihi, PS – Manbazar II, Dist – Purulia,

West Bengal.

Asked for Additional Submission

5. M/s. Cement Manufacturing Company Ltd.

Proposed stand alone cement grinding unit of capacity-

1.60 MTPA and CPP 10 MW at Mohit nagar railway

crossing, Mouza – Kharia & Patkala, Dist – Jalpaiguri,

West Bengal.

Asked for Additional Submission

6. M/s Bengal Ambuja Housing Development Ltd.

Proposed construction of a state of the art office building

namely „Ecospace Tower‟ consisting of IT and ITES

offices at Mouza – Chakpachuria, JL no. 33, Plot no.

II/F/13, Action area – II, New Town, Rajarhat, North 24

Pgns, West Bengal.

Recommended Stipulated Condition for

Environmental Clearance

7. M/s. Ambuja Realty Development Ltd.

Proposed expansion of IT & ITES Office

“ECOCENTRE” at Plot No. 4, Block-EM, Sector-V,

Kolkata – 700091, Dist. – 24 Parganas (North), West

Bengal.

Recommended Stipulated Condition for

Environmental Clearance

8. M/s. N. K. Plaza Pvt. Ltd. & Ors.

Proposed construction of Logistic Centre at Mouza –

Ankurhati & Bipannapara, JL No. 30 & 27, PS –

Domjur, Dist – Howrah, West Bengal.

Asked for Additional Submission

9. M/s. Kanchan Janga Integrated Infrastructure

Development Pvt. Ltd. (A Joint Venture Company of

M/s. Shristi Infrastructure Development Corporation

Ltd. & M/s. West Bengal Industrial Infrastructure

Development Corporation Ltd.)

Proposed Integrated Industrial Township at Fatapukur,

Jl. No. – 9, Mouza – Chhat Gujrimari, Jl. No. – 10,

Mouza – Kismat Sukani, PS - Rajganj, Dist. –

Jalpaiguri, West Bengal.

Asked for Additional Submission

10. M/s. Muktamani Vanijya Pvt. Ltd.

Proposed Residential Complex at 34B, B. T. Road,

KMC Ward No.1, Borough No. 1 Kolkata – 700 034,

West Bengal.

Asked for Additional Submission

Page 26: Minutes of the 80th meeting of the State Level Expert

Minutes of the 80th

meeting of the State Level Expert Appraisal Committee, West Bengal held on

18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.

Page 26 of 26

C Cases placed for presentation

Sl.

No.

Name of the unit & Project address Summary Decision

11. M/s. Concast Infrastructure Pvt. Ltd.

Proposed residential complex „Eternia‟ at JL No. 07,

Ward no. 58 under KMC, Borough – VII, P.S-Tiljala,

Kolkata – 700 046.

Asked for Additional Submission

The meeting ended with a note of thanks to the Chair.

(Prof. (Dr.) Sudarshan Neogi)

Chairman

State Expert Appraisal Committee, West Bengal

(Shri Jayanta Bhattacharya)

Member

State Expert Appraisal Committee, West Bengal

(Dr. Kalyan Rudra)

Member

State Expert Appraisal Committee, West Bengal

(Dr. Satya Kinkar Pal)

Member

State Expert Appraisal Committee, West Bengal

(Prof. Bhabatosh Biswas)

Member

State Expert Appraisal Committee, West Bengal

(Prof. (Dr.) Swadesh Ranjan Raychaudhuri)

Member

State Expert Appraisal Committee, West Bengal

(Dr. Amitava Roy)

Member

State Expert Appraisal Committee, West Bengal

(Dr. Arunkanti Biswas)

Member

State Expert Appraisal Committee, West Bengal

_________________________________

(Shri P. K. Sarkar)

Secretary

State Expert Appraisal Committee, West Bengal