Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 1 of 26
Name of the members who were present in the meeting are as follows: -
1. Prof. (Dr.) Sudarsan Neogi Chairman, SEAC
2. Dr. Kalyan Rudra Member, SEAC
3. Dr. Satya Kinkar Pal Member, SEAC
4. Prof. Bhabatosh Biswas Member, SEAC
5. Dr. Arunkanti Biswas Member, SEAC
6. Prof.(Dr) S.R Roychoudhuri Member, SEAC
7. Dr. Amitava Roy Member, SEAC
8. Prof. Jayanta Bhattacharya Member, SEAC
9. Sri P. K. Sarkar Secretary, SEAC & Member Secretary, WBPCB
In the beginning of the 80th
meeting of SEAC, which was held on 18.01.2014 at 11:30 hrs at the Conference Room,
Paribesh Bhawan, Bidhan Nagar, the Secretary, SEAC welcome all the members. After introductory session, five
cases were discussed under 'Miscellaneous' section. Seven cases were placed for reconsideration. Eleven applicants
were requested to make their presentation before the committee. All the eleven applicants made their presentations
before the committee.
SESSION I
A. Miscellaneous
1. Proposed Residential project “Town House” by M/s. Bengal Shristi Infrastructure Development Ltd., at
Mouza – Ganrui, Gobindapur, Kumarpur, Gopalpur, PS – Kanyapur, Asansol Municipal Corporation
Ward No. 2, 30 & 31, Dist – Burdwan.
Chronology:
M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before
the SEIAA on 03.01.2012.
The SEAC has considered the project proposal in the 77th
meeting held on 26.03.2013. But the MoEF as per OM
No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of
developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case
to SEIAA on 18.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF.
As per MoEF circular dated 22.01.2010 the SEIAA returned the project proposal on 20.05.2013.
The project proponent has again requested vide their letters dated 31.10.2013 and 02.01.2014 to consider the
project in the SEAC meeting since moratorium imposed by MoEF has been lifted for Asansol industrial cluster in
West Bengal.
The case was put up for consideration. The SEAC reviewed the case and after detailed discussion, SEAC
recommended to forward the case to the SEIAA for taking necessary action.
2. Proposed Residential project “Tarang” by M/s. Bengal Shristi Infrastructure Development Ltd., at Mouza
– Ganrui, Gobindapur, Kumarpur, Gopalpur, PS – Kanyapur, Asansol Municipal Corporation Ward No.
2, 30 & 31, Dist – Burdwan.
Chronology:
M/s. Bengal Shristi Infrastructure Development Ltd. has applied for EC for the abovementioned projects before
the SEIAA on 20.02.2012.
The SEAC has considered the project proposal in the 77th
meeting held on 26.03.2013. But the MoEF as per OM
No. J-11013-5-2010-IA.II (I) dated 13.01.2010 has imposed temporary restriction on consideration of
developmental projects in critically polluted industrial clusters, the SEAC has recommended to forward this case
to SEIAA on 12.04.2013 for taking necessary action in terms of OM dated 13.01.2010 and 22.01.2010 of MoEF.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 2 of 26
As per MoEF circular dated 22.01.2010 the SEIAA returned the project proposal on 20.05.2013.
The project proponent has again requested vide their letters dated 31.10.2013 and 02.01.2014 to consider the
project in the SEAC meeting since moratorium imposed by MoEF has been lifted for Asansole industrial clusters
in West Bengal.
The case was put up for information. The SEAC reviewed the submission of the project proponent and recommended
to forward the case to the SEIAA for taking necessary action.
3. Proposed Application for amendment of Environmental Clearance from 3x135 MW TPP to 3x150 MW
TPP by M/s. India Power Corporation (Haldia) Ltd. at Jl. No. – 94, Mouza – Kismatshibrampur, Jl. No. –
170, Mouza – Tentulberia, Jl. No. – 147, Mouza – Sovarampur, Jl. No. – 146, Mouza – Kashbere, PS –
Bhabanipur, Haldia, Dist. – Purba Medinipur, West Bengal.
The proponent earlier applied for environmental clearance on 31.12.2008 for the proposed Coal based Thermal
Power Plant (3x135 MW) at Haldia for the captive energy requirement of Bhaskar Silicon Ltd. for the proposed
Poly Silicon Solar PV project. The proponent obtained EC from SEIAA on 12.04.2010.
The proponent has again applied for environmental clearance on 20.04.2011 for 450 MW TPP instead of 405
MW TPP. Earlier proposal was for AFBC Boiler, present proposal is for PF Boiler.
The SEAC has considered the project proposal in the 57th
meeting held on 25.07.2011. SEAC decided that since
CEPI related moratorium in Haldia is still in force the SEAC is not in a position to consider the case and
accordingly informed to SEIAA dated 27.07.2011.
Accordingly, SEIAA informed the project proponent on 11.08.2011 that this proposal which involve expansion
in capacity cannot be processed at a state level.
The project proponent has again requested vide their letters dated 26.12.2013 to consider the proposal in the
SEAC meeting since moratorium imposed by MoEF has been lifted for Haldia industrial clusters in West Bengal.
The case was put up consideration. The SEAC after detailed discussion recommended to forward the case to the
SEIAA for taking necessary action as moratorium imposed by MoEF has been lifted for Haldia industrial clusters in
West Bengal still Haldia industrial cluster is considered as Critically Polluted Areas and attract general conditions as
per EIA Notification, 2006 and its amendment thereafter.
4. Proposed expansion project for 3x20 MT Induction Furnace with caster and 2000 TPM Wire Drawing
unit by M/s. Gagan Ferro Tech Ltd. at Jamuria Industrial Estate, Vill & PO – Ikra, Dist – Burdwan.
Activity:
This is a proposal for expansion of 3x20 MT Induction Furnace with caster and 2000 TPM Wire Drawing unit.
Chronology:
Salient features of the proposed project are –
Existing Proposed
Sponge Iron 4x100 TPD --
Induction Furnace 2x20 MT with CCM 3x20 MT with CCM
Captive Power Plant 12 MW --
Wire Drawing Unit -- 2000 TPM
The case was put up for consideration. The SEAC noted that this is an expansion proposal for Category „A‟ project
having Sponge Iron manufacturing capacity > 200 TPD and as per EIA notification 2006 and its amendment the case
may be appraised at MoEF. During the meeting SEAC has recommended to forward the case to the SEIAA for
opinion and taking necessary action.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 3 of 26
5. Proposed expansion project for 0.9 MTPA Coal Washery by M/s. Shakambhari Ispat & Power Ltd. at Vill
– Madandih, PO – Bartoria, Dist – Purulia, PIN – 723 121.
Activity:
This is an expansion proposal of 0.9 MTPA Coal Washery.
Chronology:
Salient features of the proposed project are –
Existing Proposed
Sponge Iron 3x100 TPD --
Induction Furnace 2x12 MT with CCM --
Captive Power Plant 12 MW --
Coal Washery -- 0.9 TPA
The case was put up for consideration. The SEAC noted that this is an expansion proposal for Category „A‟ project
having Sponge Iron manufacturing capacity > 200 TPD and as per EIA notification 2006 and its amendment the case
may be appraised at MoEF. During the meeting SEAC has recommended to forward the case to the SEIAA for
opinion and taking necessary action.
B. Note on Reconsideration Proposals
Industry Sector :-
1. Proposed expansion of the Cement Grinding Unit by M/s. Burdwan Super Cement Pvt. Ltd. at JL No. 36,
Plot No. 72, 73, 141, Vill & Mouza – Sarpi, GP – Ichapur, PS – Faridpur, Dist – Burdwan, West Bengal.
Activity:
This is a proposal for expansion of the existing Cement Grinding unit. It is noted that clinker will not be
manufactured at the site. The manufacturing process will involve grinding of Cement Clinker with Slag / Flyash
and Gypsum. The existing and the proposed facilities are as follows :-
Installations Existing Capacity Proposed Capacity
Ball Mill 1x75 TPD, Portland Slag
Cement (15000 TPA)
1x100 TPD, Portland Pozzolana
Cement (30000 TPA)
Slag Drier (Coal fired) - 1x8 TPH
Chronology:
The State Level Expert Appraisal Committee (SEAC) made the following recommendations in the 78th
meeting
held on 08.05.2013 and the subsequent response from the unit submitted on 30.12.2013, is given below :-
Directions of the Committee issued on 21.05.2013 Response of the Proponent dated 30.12.2013
1. List of trees to be planted at project site. 1. The proponent has submitted the detailed list
of plantation.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 4 of 26
Directions of the Committee issued on 21.05.2013 Response of the Proponent dated 30.12.2013
2. Revised CSR proposal to be submitted with focus
on underprivileged community as discussed during
the presentation.
2. The proponent has submitted the details of
CSR proposal alongwith financial planning of
Rs. 8,44,000/-.
3. Compliance status and stack monitoring reports of
the existing unit
3. The proponent has submitted the details of
stack monitoring report of the existing unit.
The case was put up for reconsideration. The SEAC, after careful consideration, recommended ToR (Annexure – I)
for the proposed project as per MoEF office memorandum no. J-13012/12/2013-IA-II (I) dated 24.12.2013 for
conducting draft EIA/EMP reports and the project proponent should submit the final EIA/EMP before SEAC after
conducting public hearing as per EIA notifications and its amendment thereafter.
Construction Sector :-
2. Proposed Commercial Complex Cum Hotel by M/s. Soonerio Hotels Pvt. Ltd. & Beekay Plaza Pvt. Ltd. at
Plot No. 378,111,420 and 421/931 Mouza – Dabgram, J.L No – 2, P.S – Bhaktinagar, P.O – Sevoke Road,
Ward No. 44 under Siliguri Municipal Corporation, Dist – Jalpaiguri, Pin – 734 001.
Activity:
This is a proposal for construction of commercial complex cum hotel with 84 rooms (2B+G+8 storied building).
Chronology:
The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 68th
meeting
held on 14.06.2012.
Now the unit has submitted the copy of the building plan sanctioned by the Siliguri Municipal Corporation for
the proposed project on 02.01.2014. The modified features of the proposed project are as follows: -
As per SCEC dated 13.07.2012 As per sanctioned plan submitted on
02.01.2014
Land Area : 2.61 acres (10564.72 sq.m) : 2.61 acres (10564.72 sq.m)
Expected Population : 4377 persons (during operation) : 4377 persons (during operation)
Total Water requirement : 291 KLD : 291 KLD
Fresh water requirement : 184 KLD. (Source- Ground water
supply)
: 184 KLD. (Source- Ground water
supply)
Wastewater generated : 138 KLD (to be treated in STP) : 138 KLD (to be treated in STP)
Wastewater treated : 138 KLD. : 138 KLD.
Wastewater recycled : 107 KLD : 107 KLD
Wastewater discharged : 31 KLD to SMC drain : 31 KLD to SMC drain
Rain water harvesting : surface storage-100 KL& recharge -
2495 KL/ annum through 02 nos.
recharge wells .
: surface storage-100 KL & recharge -
2495 KL/ annum through 02 nos.
recharge wells .
Solid waste disposal : 0.72 TPD : 0.72 TPD
Total Built-up Area : 37514. 39 sq.m (including parking) : 37514. 39 sq.m (including parking)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 5 of 26
As per SCEC dated 13.07.2012 As per sanctioned plan submitted on
02.01.2014
Ground Coverage : 4221.03 sq.m (39.96% of land area) : 4221.03 sq.m (39.96% of land area)
Exclusive tree plantation
area
: 2328.75 sq.m (22.04% of land area) : 2328.75 sq.m (22.04% of land area)
Total Green Area : 3742.25 sq.m (35.42% of land area
including exclusive tree plantation
area)
: 3742.25 sq.m (35.42% of land area
including exclusive tree plantation area)
Paved area : 2601.14 sq.m (24.26 % of land area) : 2601.14 sq.m (24.26 % of land area)
Height of the building : 36 m : 36 m
Right of way : 30 m : 30 m
No. of plantation proposed : 150 nos. : 150 nos.
No. of Solar Street lights
proposed
: 10 nos : 10 nos
No. of Parking spaces
proposed
: 280 nos.(Open-48 nos., Covered-
232 nos)
: 272 nos.(Open-47 nos., Covered- 225
nos)
Total Power requirement : 4375 KVA, WBSEDCL : 4375 KVA, WBSEDCL
Backup Power : DG Sets ( 3x1150 KVA, 1x 250
KVA)
: DG Sets ( 4x400 KVA)
The case was put up for reconsideration. After carefully considering the submission, the committee recommended
the project for Environmental Clearance.
3. Proposed expansion of Office Building (Phase – II) by M/s. Cognizant Technology Solutions India Pvt.
Ltd. at JL No. 35, Mouza – Gangapur, PS – Kolkata Leather Complex, Dist – 24 Parganas (South), West
Bengal.
Activity:
This is a proposal for expansion of Office Complex (Phase – II) SDB 2 extension consisting of 1 Block of G+8
Storied Building and Dormitory G storied.
Chronology:
The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 77th
meeting
held on 26.03.2013.
Now the unit has submitted the copy of the sanctioned building plan for the proposed project on 31.12.2013. The
modified features of the proposed project are as follows: -
As per SCEC dated 13.05.2013 As per sanctioned plan submitted on
31.12.2013
Total Land Area : 81139.543 sqm. (20.05 acres) : 81139.543 sqm. (20.05 acres)
Expected Population : Office – 1557, Service – 30,
Floating – 156 = Total 1743
persons
: Office – 1557, Service – 30, Floating
– 156 = Total 1743 persons
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 6 of 26
As per SCEC dated 13.05.2013 As per sanctioned plan submitted on
31.12.2013
Total water requirement : 133 KLD (Operation stage) : 133 KLD (Operation stage)
Fresh water requirement : 89 KLD (M L Dalmiya supply) : 89 KLD (M L Dalmiya supply)
Domestic water requirement : 74 KLD : 74 KLD
Wastewater generated : 59 KLD (treated in existing STP) : 59 KLD (treated in existing STP)
Waste water discharged (after
treatment in STP)
: 15 KLD : 15 KLD
Wastewater recycled : 44 KLD (for HVAC and dual
flushing)
: 44 KLD (for HVAC and dual
flushing)
Solid waste disposal : 0.225 ton per day : 0.225 ton per day
Total Built-up Area : 16964.10 sqm. (including
parking)
: 16901.00 sqm. (including parking)
Ground Coverage (for phase II) : 2142.00 sqm. (2.64% of land
area)
: 981.79 sqm. (1.21% of land area)
Total green area (for phase I & II) : 29810.33 (36.74% of land area) : 28183.50 (34.73% of land area)
Service Area (for phase I & II) : 1316.3 sqm. (1.62% of land
area)
: 2583.63 sqm. (3.18% of land area)
Exclusive Tree Plantation Area (for
phase I & II)
: 16291.48 sqm. (20.08% of land
area)
: 16291.48 sqm. (20.08% of land area)
Water feature : 386.55 sqm. (0.48% of land area) : 386.55 sqm. (0.48% of land area)
Open Parking Area(for phase I & II) : 10332.43 sqm. (12.73% of land
area)
: 10332.43 sqm. (12.73% of land area)
Area for future expansion : 9041.4 sqm. (11.14% of land
area)
: 10566.82 sqm. (13.02% of land
area)
Total Paved Area (for phase I & II) : 20186.68 sqm. (24.88% of land
area)
: 20186.68 sqm. (24.88% of land area)
No. of trees proposed to be planted : 2881 (for phase I & II) : 3000 (for phase I & II)
No. of solar lights : 80 nos. (for phase I & II) : 80 nos. (for phase I & II)
No. of Parking spaces proposed : Cars - 211, Bus – 1 (for phase II) : Cars - 750, Bus – 46 (for Phase I &
phase II)
Total Power requirement (for phase
II)
: 2322 KVA, WBSEDCL : 2322 KVA, WBSEDCL
Backup Power (for phase II) : DG Sets (1x2000 KVA) : DG Sets (1x2000 KVA)
The case was put up for reconsideration. After careful scrutiny, the committee recommended the project for
Environmental Clearance.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 7 of 26
4. Proposed Residential Complex by M/s. Ajna Commercial Pvt. Ltd. & Others at Jl. No. - 12, Mouza –
Raigachi, Rajarhat Bishnupur Gram Panchayat 1, PS – Rajarhat, Dist. – 24 Parganas (North), West
Bengal.
Activity:
This is a proposal for construction of a Residential complex comprising of 408 dwelling units in 4nos. B+G+12
storied buildings along with Club & Community Block (1no. G+2 storied building).
Chronology:
The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 71st meeting
held on 24.09.2012.
Now the unit has submitted the copy of the building plan sanctioned by Rajarhat Bishnupur Gram Panchayat &
North 24 Pargana Zilla Parishad for the proposed project on 30.12.2013. The modified features of the proposed
project are as follows: -
As per Provisional Environmental
Clearance dated 19.10.2012
As per Sanctioned Plan submitted
on 30.12.2013
Land Area : 10089.943 sqm. : 10089.943 sqm.
Expected Population : 2040 (fixed), 250 (floating) : 2040 (fixed), 250 (floating)
Total Water requirement : 360 KLD (Operation stage) : 360 KLD (Operation stage)
Domestic Water requirement : 311 KLD : 311 KLD
Fresh Water requirement : 240 KLD (Groundwater) : 240 KLD (Groundwater)
Wastewater generated : 248.8 KLD (to be treated in STP) : 248.8 KLD (to be treated in STP)
Wastewater recycled : 108 KLD (to be reused after
treatment in STP)
: 108 KLD (to be reused after
treatment in STP)
Wastewater discharged : 140.8 KLD (to be discharged to
road side panchayet drain leading to
HIDCO periphery canal after
treatment in STP)
: 140.8 KLD (to be discharged to road
side panchayet drain leading to
HIDCO periphery canal after
treatment in STP)
Solid waste disposal : 1.17 tonne per day : 1.17 tonne per day
Total Built-up Area : 46128.76 sqm. : 46947.04 sqm.
Ground Coverage : 3382.14 sqm. (33.52% of land
area)
: 3757.06 sqm. (37.24% of land
area)
Exclusive Tree Plantation
Area
: 2352.19 sqm. (23.31% of land
area)
: 2075.78 sqm. (20.57% of land area)
Total Paved Area : 2522.48 sqm. (24.99% of land
area)
: 2120.73 sqm. (21.02% of land area)
Soft Area (other than
plantation)
: - : 230.35 sqm. (2.28% of land area)
Soft Area (soft portion of
semi-paved surface)
: - : 1906.02 sqm. (18.89% of land area)
No. of Parking Spaces
proposed
: 413 (covered – 273, open – 140) : 406 (covered – 283, open – 123)
No. of Trees : 200 (existing – 12, proposed – 188) : 200 (existing – 12, proposed – 188)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 8 of 26
As per Provisional Environmental
Clearance dated 19.10.2012
As per Sanctioned Plan submitted
on 30.12.2013
Daily Power requirement : 1000 KW, WBSEDCL : 1000 KW, WBSEDCL
Backup Power : DG Sets (4x125 KVA) : DG Sets (4x125 KVA)
Height of the building : B+G+12 storied (Residential)
alongwith Club & Community G+2
storied
: B+G+12 storied (Residential)
alongwith Club & Community G+3
storied
The case was placed for reconsideration. After careful consideration, the committee recommended the project for
Environmental Clearance.
5. Proposed Residential Complex by M/s. Display Vinimay Pvt. Ltd. & 72 Ors. at Mouza – Atghara, JL No.
10, R.S. No. 133, Touzi No. 172, PS – Rajarhat, Rajarhat-Gopalpur Municipality Ward No. 9, Dist – 24
Parganas (North), West Bengal.
Activity:
This is a proposal for construction of a Residential Complex comprising of 4 Blocks [Block 1, Block 2 (L1 &
L2), Block 3, Block 4 (L1 & L2) ] of B+G+7 storied buildings having 196 nos. residential flats.
Chronology:
Salient features of the proposed project are –
Land Area : 7815.91 sqm. (1.92 acres)
Expected Population : 1100 (980 – residents, 100 – floating, 20 – service)
Total Water requirement : 170 KLD (Operation stage)
Fresh Water requirement : 99 KLD (Groundwater supply)
Domestic Water requirement : 149 KLD
Wastewater generated : 120 KLD (to be treated in STP)
Wastewater recycled : 66 KLD (toilet flushing, landscaping, road washing etc.)
Wastewater discharged : 42 KLD (to be discharged to municipal drainage)
Solid waste disposal : 0.56 tons per day (to be disposed off through Municipal Waste
disposal system)
Total Built-up Area : 26750.686 sqm.
Ground Coverage : 3058.03 sqm. (39.12% of land area)
Internal Road & Pavement (Paved
Area)
: 1583.17 sqm. (20.26% of land area)
Green Area for plantation : 2230.01 sqm. (28.53% of land area)
Semi Paved Area (grass paved) : 641.32 sqm. (8.20% of land area)
Soft Area : 303.38 sqm. (3.89% of land area)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 9 of 26
Total Paved Area : 1903.83 sqm. (24.36% of land area)
No. of Parking Spaces proposed : covered-165 (basement – 77, ground – 88)
No. of Trees to be planted : 125 nos.
Daily Power requirement : 1.4 MW, WBSEDCL
Backup Power : DG Sets (2x250 KVA)
The unit presented their proposal before SEAC on 78th
SEAC meeting held on 08.05.2013. The State Level
Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 78th
SEAC
meeting and subsequent response submitted on 30.12.2013 from the unit is given below :-
Directions of the Committee dated
23.05.2013
Response of the Proponent 30.12.2013
1. Proposal for in-house MSW
management.
1) Inhouse MSW management plan alongwith
vermicomposting facilities submitted.
2. Depth of groundwater recharges well to
be checked.
2) The proponent mentioned that the depth of recharge well
will be 145m. The schematic section of proposed
recharge well is submitted.
3. Revised CSR proposal. 3) The proponent mentioned that the CSR commitment will
be Rs. 60 lakhs for three years.
4. Revised plantation list 4) The pp has submitted the revised species wise plantation
list of 125 nos.
5. Legal status of the M/s. Display Vinimay
Pvt. Ltd. & 72 Ors.
5) The proponent has submitted the notarial certificate of
agreement of understanding among Display Vinimay
Pvt. Ltd and 72 ors.
The case was put up for reconsideration. After careful consideration the SEAC recommended stipulated conditions
for environmental clearance for the project.
6. Proposed Residential Complex by M/s. BKS Infraprojects LLP & 15 Ors. at 130, Rishi Bankim Chandra
Road, Holding No. 184, South Dumdum Municipality Ward No. 7, PS – Dumdum, Dist – 24 Parganas
(North), West Bengal.
Activity:
This is a proposal for construction of a residential complex having 154 nos. of flats (3 block of G+11 storied).
Chronology:
Salient features of the proposed project are –
Land Area : 7531.87 sq.m
Expected Population : 870 persons (Residential – 770, Service Staff – 20, Visitors – 80)
Total Water requirement : 139 KLD
Domestic Water requirement : 118 KLD
Fresh water requirement : 83 KLD (Source SDDM supply, Treated wastewater and rooftop
rainwater)
Wastewater generated : 94 KLD (to be treated in STP)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 10 of 26
Wastewater recycled : 53 KLD (flushing, landscaping and road cleaning)
Wastewater discharged : 38 KLD to Municipal drain
Solid waste disposal : 0.44 TPD
Total Built-up Area : 23080.38 sq.m
Ground Coverage : 2395.75 sq.m (31.81% of land area)
Internal Road & Pavement (Paved
area)
: 1855.89 sq.m (24.64 % of land area)
Soft Area other than Plantation : 60.21 sq.m (0.8 % of land area)
Exclusive tree plantation area : 1612.14 sq.m (21.4% of land area)
Semi soft area in grass grid
portion
: 1607.88 sq.m (21.35% of land area)
No. of plantation proposed : 120 nos.
No. of Parking spaces proposed : 170 nos.(Open-122 nos., Covered- 48 nos)
Total Power requirement : 900 KW, CESC
Height of building : 36.0 m
Width of abutting road : 21.0 m
Backup Power : DG Sets ( 3x125 KVA)
Rain water harvesting : surface storage-100 KL & sub surface recharge -1016 KL
1 recharge well which can provide recharge upto 10 KL per day and having
a depth 80 m.
The unit presented their proposal before SEAC on 74th
SEAC meeting held on 20.12.2012. The State Level
Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 74th
SEAC
meeting and subsequent response submitted on 01.10.2013 from the unit is given below :-
Directions of the Committee dated 02.01.2013 Response of the Proponent 01.10.2013
1. Provision for Solar Water Heating System
should be considered as discussed.
1. As per recommendation of SEAC, provision for
solar heating system will be made to partially fulfil
the hot water requirement of residents.
2. Revised CSR proposal based on need
assessment of the local people to be
submitted and the budgetary allocation for
CSR to be spread over a span of three years.
2. Revised CSR proposal with budgetary allocation to
be dispensed within a span of three years has been
submitted.
3. Contour map of the proposed site to be
submitted.
3. Contour map of the proposed site has been
submitted.
4. Character of the land to be submitted. 4. Land character details have been submitted.
The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for
environmental clearance for the project.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 11 of 26
7. Proposed Residential Complex by M/s. South City Projects (Kolkata) Limited at 88, B. L. Saha Road, JL
No. 10, Khatian Nos. 36, 38, 81 & 90, Borough No. XIII, PO & PS – Behala, KMC Ward No. 116, Kolkata
– 700 053, West Bengal.
Activity:
This is a proposal for Residential Complex comprising of Block A1 & A2 (G+19), Block B1 and B2 (G+17),
Block A3 and A4 (G+18) storied Residential Building and Club.
Chronology:
Salient features of the proposed project are –
Land Area : 21165.738 sqm. (5.23 acres)
Expected Population : 2414 (operational phase)
Total water requirement : 418 KLD
Fresh water requirement : 225 KLD (KMC supply)
Domestic Water Requirement : 225 KLD
Wastewater generated : 303 KLD
Wastewater discharged : 98 KLD (to be discharged to KMC drainage)
Waste water treated : 291 KLD
Wastewater recycled : 193 KLD (for flushing, landscaping and greenbelt)
Solid waste disposal : 1.733 Tonnes per day (through KMC)
Total Built-up Area : 54977.692 sqm. (excluding services)
Ground Coverage : 3869.877 sqm. (18.284% of land area)
Total Paved Area : 4881.821 sqm. (23.065 % of land area)
Semi Soft Area : 596.789 sqm. (2.820 % of land area)
Exclusive Tree Plantation Area : 5696.659 sqm. (26.915 % of land area)
Waterbody (Swimming Pool) : 159.397 sqm. (0.753% of land area)
Gifted area to Road : 260.623 sqm. (1.231% of land area)
Extended Basement : 5288.909 sqm. (24.988% of land area)
STP & UGR : 411.663 sqm. (1.945% of land area)
No. of plantation proposed : 441 nos. (Existing trees 5 nos.)
No. of Parking spaces proposed : 436 (covered – 316, open – 120)
Total Power requirement : 3031.25 KVA, CESC
Backup Power : DG Sets (1X750 KVA & 2x1200 KVA)
Rainwater Harvesting : Surface Storage Capacity 220 KL, 218 KL storage for use &
Sub-Surface Recharge capacity 2939 KL, 6 nos. pits 3m dia, 2 m effective
depth. Depth of aquifer 60-100 mt.
Corporate Social Responsibility : Rs. 71 lacs
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 12 of 26
Chronology:
The unit presented their proposal before SEAC on 76th
SEAC meeting held on 19.02.2013. The State Level
Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations in the 76th
SEAC
meeting and subsequent response submitted on 09.04.2013 from the unit is given below :–
Directions of the Committee dated 28.02.2013 Response of the Proponent 09.04.2013
1. Modified plantation plan with the list of
plantation species should be submitted.
1. The pp has submitted the revised tree plantation
proposal. They also mentioned that total 441 nos. of
trees to be planted at the project site. (list submitted)
The number of trees existing at project site is 5.
2. Corporate Social Responsibility (CSR) Plan
with specific programmes based on need
assessment of local people and financial
commitment to be submitted.
2. The pp submitted revised CSR proposal with
financial commitment of Rs. 71 lacs for 4 years.
Detailed break of activities submitted.
3. Traffic Management Plan as discussed during
the presentation should be submitted.
3. The pp has submitted the traffic management plan.
4. The characteristics of the influent to the STP
to be specified and the method of effluent
treatment to be adopted in the STP should be
modified accordingly.
4. The pp submitted characteristics of the influent to the
STP and the method of effluent treatment to be
adopted in the STP is fluidized aerobic bio reactor
technology followed by tertiary treatment.
The letter dated 09.04.2013 has been considered in the 78th
SEAC meeting held on 08.05.2013. SEAC
recommended that
Directions of the Committee dated 21.05.2013 Response of the Proponent 09.01.2014
1. Information about specific Corporate Social
Responsibility (CSR) Plan.
1. The pp submitted revised CSR proposal with
financial commitment of Rs. 72 lacs for 4 years.
Detailed break of activities submitted.
2. Revised plantation list to be submitted. 2. The pp has submitted the revised plantation list of
441 nos. of trees and details of the proposed
plantation. Existing trees at project site 5 nos. to be
retained.
The case was put up for reconsideration. After careful consideration the SEAC recommended stipulated conditions
for environmental clearance for the project.
C. Note on Technical presentations
Industry Sector:-
1. ToR presentation for the proposed proposal for setting up a chemical/bulk drug manufacturing unit by
M/s. West Bengal Chemical Industries Ltd. on lease hold area land at SI area in Durgapur, Burdwan,
West Bengal.
Activity:
This is a proposal for chemical/bulk drug manufacturing unit on lease hold area in Durgapur, Burdwan.
Chronology:
Salient features of the proposed project are:
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 13 of 26
i) Location of the Site – Durgapur (near PCBL), Mouza – Gopinathpur, JL no. 85, PS – Faridpur, Dist -
Burdwan
ii) Land Area - 8 acres Lease hold area.
iii) Raw Materials – Different organic acids and inorganic salts
iv) Production Capacity – 4800 TPA (proposed)
v) Emission Sources – process and DG sets.
vi) Air Pollution Control System – Wet scrubber.
vii) Water Requirement – 15m3/day (Durgapur Projects Limited Supply from Damodar river after treatment)
viii) Wastewater – Process - 5m3/day (to be treated in ETP), Domestic - 3m
3/day ( to be treated in septic tank and
disposed to soak pit
ix) Power Source – 200 KW( from DPL)
x) Back up Power – DG Set, 2X125 KVA
The case was put up for consideration. After presentation, SEAC recommended ToR (Annexure -II) for conducting
draft EIA/EMP reports and the project proponent should submit the final EIA/EMP before SEAC after conducting
public hearing as per EIA notifications and its amendment thereafter.
2. Proposed Stone quarry by M/s. Kadampur Stone Mine at Mouza – Kadampur, JL no. 175, Plot No. CS
324, RS 1030, PS – Barabazar, Dist – Purulia, West Bengal.
Activity:
This is a proposal for stone quarry / mining of capacity 3000 ton/year of lease area 1.39 acres in Mouza –
Kadampur, JL no. 175, Plot No. CS 324, RS 1030, PS – Barabazar, Dist – Purulia, West Bengal. The mining will
be executed in a small hillock. After excavation the hillock will be levelled. Drilling is required to loosen the rock
exposed. The rock will be excavated by open cast method of mining by manually and excavated will be crushed
into different size as per requirement. No effluent will be generated as excavation will be restricted above water
table. There will not be any solid waste generation as whatever material will be produced will be consumed in
construction of road.
Name of the Environmental Consultant M/s. Centre Institute of Mining and Fuel Research. The case is put up
for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.
3. Proposed Stone quarry by M/s. Kadampur Stone Mine at Kadampur, Plot No. JL No. CS 526 & 527, RS
1003 & 1004, Mouza – Kadampur, Thana Barabazar, Dist - Purulia, West Bengal.
Activity:
This is a proposal for stone quarry / mining of capacity 1926 m3/year of lease area 3.50 acres in Kadampur, Plot
No. JL No. CS 526 & 527, RS 1003 & 1004, Mouza – Kadampur, Thana Barabazar, Dist - Purulia, West Bengal.
The rock will be excavated by open cast method of mining by manually and excavated will be crushed into
different size as per requirement. No effluent will be generated as excavation will be restricted above water table.
There will not be any solid waste generation as whatever material will be produced will be consumed in
construction of road.
Name of the Environmental Consultant M/s. Centre Institute of Mining and Fuel Research. The case is put up
for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 14 of 26
4. Proposed Stone quary by M/s. R S Mineral Pvt. Ltd. at Baradihi, Plot JL No. 308, Mouza – Baradihi, PS –
Manbazar II, Dist – Purulia, West Bengal.
Activity:
This is a proposal for quarz mining of capacity 50000 Ton/year of lease area 7.90 acres in Baradihi, Plot No. 1(P)
JL No. 308, Mouza – Baradihi, Thana Manbazar II, Dist - Purulia, West Bengal. The mine will be excavated by
open cast method of mining by semi-mechanized method. Drilling will be done by jack hammer drill and blasting
by explosives will be done. OB will be utilized in repairing of road, landfilling and suitable OB dump site is to be
arranged.
Name of the Environmental Consultant is M/s. Centre Institute of Mining and Fuel Research. The case is put up
for consideration. During the presentation committee recommended to submit detail Project Feasibility Report.
5. Proposed standalone cement grinding unit of capacity-1.60 MTPA and CPP 10 MW by M/s. Cement
Manufacturing Company Ltd. at Mohit Nagar railway crossing, Mouza – Kharia & Patkala, Dist-
Jalpaiguri, West Bengal.
Activity:
This is a proposal for installation of a standalone Cement Grinding unit (1.6 MTPA) with Coal fired TPP -10
MW. It is noted that clinker will not be manufactured at the site. The manufacturing process will involve grinding
of Cement Clinker with fly ash/slag and Gypsum.
Chronology:
This has reference to the application for environmental clearance dated 27.04.2009 along with FORM I, Project
Report and other documents to the MoEF. This also refers to the ToR issued by MoEF vide F.no J-
11011/292/2009-IA II(I) dated 09.10.2009 to the project proponent and dated 31.05.2012 to the Chief
Environment Officer, GoWB for consideration of the project from SEIAA/SEAC of West Bengal. This also has
reference to the letter dated 07.01.2014 for submission of additional clarification.
Salient features of the proposed project are :
i) Location of the Site – Mohit Nagar Railway Crossing, Mouza – Kharia & Patkala, Dist-Jalpaiguri, West
Bengal.
ii) Land Area – 50 acre.
iii) Green area - 33% of land area
iv) Raw Materials – PPC: Clinker (63%), Fly ash (35%), Gypsum (2%), PSC: Clinker (38%), slag(60%),
Gypsum (2%); OPC-Clinker (98%), Gypsum-(2%) .
v) Total : Clinker-2603 TPD, Fly ash-792 TPD, Gypsum-96 TPD, Slag-1357 TPD, Coal-180 TPD
vi) Production Capacity – PPC-0.746 MTPA, PSC-0.746 MTPA, OPC-0.106 MTPA & CPP-10 MW.
vii) No. of working days per annum – 300 days.
viii) Emission Sources -
ix) Cement Vertical Roller mill, Cement mill stack, Coal mill, Packing section,Transfer points, Fly ash storage
silo ,Cement silo, hot air generator .
x) CPP-AFBC boiler of capacity-50 TPH
xi) Air Pollution Control System – Individual pulse jet bag filter & ESP for AFBC boiler.
xii) Water Requirement – Cement Plant-250 KLD, CPP- 1650 KLD, Source – Groundwater.
xiii) Wastewater – Domestic wastewater will be treated through STP, Process waste water- to be treated in ETP.
xiv) Power Source – 8.8 MW (source WBSEB)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 15 of 26
The case was put up for consideration. During the presentation the committee recommended that the project
proponent should submit the following:-
1) Permission for holding the entire land required for the proposed project from the concerned authority along
with the summary details of said land schedule.
2) Results of fresh ground water sampling with details of number and location of sampling points.
3) Copy of permission for abstraction of ground water from the appropriate authority.
4) Information on the source and coal quality parameters in terms of MoEF OM vide no. J-11013/41/2006-
IA.II(I) dated 19.04.2012 & 05.02.2013.
5) Necessary certification from the proponent as well as the EIA Consultant as per relevant OM of MoEF.
The committee shall consider this application only after submission of the above mentioned clarifications.
Construction Sector:-
6. Proposed construction of a state of the art office building namely „Ecospace Tower‟ consisting of IT and
ITES offices by M/s Bengal Ambuja Housing Development Ltd. at Mouza – Chakpachuria, JL no. 33, Plot
no. II/F/13, Action area – II, New Town, Rajarhat, North 24 Pgns, West Bengal.
Activity:
This is a revised proposal for construction of a IT & ITES building (B+G+12) having Green Building
certification. Earlier SEAC has issued SCEC for an Office Building during 66th
SEAC meeting held on
25.04.2012. Now the unit has modified the proposal and submitted fresh FORM-I, FORM – IA and other
relevant documents.
Chronology:
Salient features of the proposed project are –
As per SCEC issued on 23.05.2012
for “Sri Viswakarma”
Revised proposal for “Ecospace
Tower”
Land Area : 20234 sqm. : 20234.738 sq. m.
Expected Population : 4043 (floating) : Total 4676 persons
Total Water requirement : 374 KLD (Operation stage) : 493 KLD (Operation Stage)
Fresh water requirement : 251 KLD (WBHIDCO supply) : 313 KLD (municipality supply)
Domestic Water requirement : 177 KLD (WBHIDCO supply) : 237 KLD
Wastewater generated : 129 KLD (to be treated in STP) : 190 KLD (to be treated in STP)
Wastewater recycled : 123 KLD (to be reused after
treatment in STP)
: 180 KLD (no break up)
Wastewater discharged Nil : Nil
Solid waste disposal : 1010.75 kg per day (4043X0.25
kg/day)
: 1.169 TPD, to be disposed by
WBHIDCO
Total Built-up Area : 60418.757 sqm. (as per MoEF
guidelines)
: 73455.50 sq.m
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 16 of 26
As per SCEC issued on 23.05.2012
for “Sri Viswakarma”
Revised proposal for “Ecospace
Tower”
Ground Coverage : 8072 sqm. (39.89% of land area) : 8073.31 sq.m (39.898% of land
area)
Total Paved Area : 4131 sqm. (20.42% of land area) : 4705.42 sqm. (23.25% of land
area)
Created Water body : 134 sqm (0.66% of land area) : Nil
Plantation area : 4097 sqm. (20.25% of land area) : 4046.95 sq.m (20% of land area)
Services and utilities : 333 sqm. (1.65% of land area) : 419.26 sq.m (2.072% of land
area)
No. of plantation proposed : 1040 : 1030
Generation of non-conventional
energy
: 4-7 KW : 4-7 KW
No. of Parking spaces proposed : 772 nos.
[cars – 618, LCV- 116 and Bus -
38 (621 – covered & 151 – open)]
: 765 nos.
Car – 612, LCV – 112, Bus - 38
Total Power requirement : 6100 KVA : 5672 KVA, New Town Electric
Supply Corporation Ltd.
Backup Power : DG Sets (2X2000 KVA and
2X1250 KVA)
: DG Sets ( 3x2000 KVA &
1X1800 KVA)
Usage of the project : Ambuja Corporate Office & Multi
user business park
: IT & ITES office
The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for
environmental clearance for the project with suggestion of incorporating proposal for roof top garden for reducing
heat load and CSR with financial commitment.
7. Proposed expansion of IT & ITES Office “ECOCENTRE” by M/s. Ambuja Realty Development Limited
at Plot No. 4, Block-EM, Sector-V, Kolkata – 700091, Dist. – 24 Parganas (North).
Activity:
This is a proposal for vertical expansion of an IT & ITES office “ECOCENTRE” having 1 block of B+G+19
storied to B+G+21 storied and having Green building rating.
Chronology:
Salient features of the proposed project are –
Existing Project
(Phase I)
Expansion Project
(Phase II)
Proposal after expansion
(Phase I +Phase II)
Total Land Area 7599.975 sq.m 7599.975 sq.m
Building profile 1 block of B+G+19
storied
Vertical expansion 1 block of B+G+21 storied
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 17 of 26
Existing Project
(Phase I)
Expansion Project
(Phase II)
Proposal after expansion
(Phase I +Phase II)
Total Land Area 7599.975 sq.m 7599.975 sq.m
Expected Population 8665 persons 6381 persons
Total Water requirement 619 KLD 478 KLD
Fresh Water requirement 377 KLD 279 KLD (NDITA supply)
Domestic water requirement 366 KLD 270 KLD
Wastewater generated 293 KLD 216 KLD
Wastewater treated 194 KLD
Wastewater recycled 194 KLD
Wastewater discharged Zero Nil
Solid waste disposal 2.83 TPD 3.14 TPD
Total Built-up Area 59452.26 sq.m 3480.921 sq.m 62933.181 sq.m
Ground Coverage 2940.36 sq.m (38.69%) 2982.69 sq.m (39.24%)
Exclusive tree plantation Area 1605.98sq.m (21.13%) 1617.09 sq.m(21.29%)
Other green area 1408.51sq.m (18.6%) 964.54 sq.m (12.69%)
Paved Area 1645.12 sq.m (21.65%) 1784.41 sq.m (23.47%)
Semi paved area 0 231.52 sq.m (3.04%)
No. of Parking Spaces
proposed
514 464 (covered-447, open-17)
Nos. of trees to be planted Existing-20, Retained-5,
Cut-15, Proposed--175
Power requirement 7 MVA 5.8 MVA
Backup Power DG sets-4x2000 KVA DG sets-3x1800 KVA
No. of solar street light 10 nos.
The case was put up for consideration. After careful consideration the SEAC recommended stipulated conditions for
environmental clearance.
8. Proposed construction of Logistic Centre by M/s. N. K. Plaza Pvt. Ltd. & Ors. at Mouza – Ankurhati &
Bipannapara, JL No. 30 & 27, Mohiary No. 1 Gram Panchayat, PS – Domjur, Dist – Howrah, West
Bengal.
Activity:
This is a proposal for construction of logistic centre having 4 nos. G+3 storied logistic blocks and 1 no. G+1
storied facility block.
Chronology:
Salient features of the proposed project are –
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 18 of 26
Land Area : 60670.81 sq.m
Expected Population : 1353 persons (during operation)
Total Water requirement : 125 KLD (operational stage)
Fresh water requirement : 73 KLD. (Source- ground water supply)
Wastewater generated : 52KLD (to be treated in STP)
Wastewater treated : 52 KLD.
Wastewater recycled : 52 KLD
Wastewater discharged : Nil
Rain water harvesting : Storage tank- 100 KL. recharge- 04 nos. recharge pit of capacity-28.35
KL/day each
Solid waste disposal : 250 kg/day
Total Built-up Area : 120940.92 sq.m (including parking)
Ground Coverage : 30335.23 sq.m (49.99 % of land area)
Exclusive tree plantation area : 13094.88 sq.m (21.59 % of land area)
Total green area :15314.50 sq.m (25.25% of land area)
Total Paved area : 13989.83 sq.m (23.06 % of land area)
Water body area : 161.88 sq.m(0.27% of land area)
Service area : 869.37 sq.m(1.43% of land area)
No. of plantation proposed : Proposed- 850 nos.
No. of Solar Street lights proposed : 55 nos.
No. of Parking spaces proposed : 50 nos. truck
Total Power requirement : 2500 KVA(WBSEDCL)
Backup Power : DG Sets ( 1x 1000 KVA & 1x1500 KVA)
The case was put up for consideration. During the presentation the committee recommended that the project
proponent should submit the following:-
1. Legal status of the entire land on which the project is proposed.
2. Details of storm water drainage system and concurrence from the concerned authority for discharge.
3. Detailed plan of solid waste management
4. Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said
meeting.
The committee shall consider this application only after submission of the above mentioned clarifications.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 19 of 26
9. Proposed Integrated Industrial Township by M/s. Kanchan Janga Integrated Infrastructure Development
Pvt. Ltd. (A Joint Venture Company of M/s. Shristi Infrastructure Development Corporation Ltd. & M/s.
West Bengal Industrial Infrastructure Development Corporation Ltd.) at Fatapukur, Jl. No. – 9, Mouza –
Chhat Gujrimari, Jl. No. – 10, Mouza – Kismat Sukani, PS - Rajganj, Dist. – Jalpaiguri, West Bengal.
Activity:
This is a proposal for development of an Integrated Industrial Township. The proposed Township shall include
small scale & green category industries; Retail, Hotel and Social Infrastructure like School, Educational
Institutes, Nursing Home, Health Care Centre etc. Further, Residential apartments along with individual plots are
also proposed.
Chronology:
ToR for conducting EIA studies has been accorded by SEAC during 63rd
SEAC meeting held on 31.01.2012
Salient features of the proposed project as per EIA/EMP submitted –
Total Land Area : 124.5 acres / 50.38 ha. Industrial Area – 63.95 acres (51.4%), Residential / Institutional
/ Commercial – 29.41 acres (23.6%), Infrastructure (Roads / STP) – 31.14 acres (25%)
Expected Population : Total- 25035, Industrial Zone – 14940 , Retail – 1335, Hotel – 500, Institutional &
Others – 800, Residential– 7460
Total Water requirement : 2481 KLD (Operation stage)[Residential-1119 KLD, Industrial-591 KLD,
Commercial-146 KLD, Landscaping-625 KLD]
Fresh Water requirement : 1483 KLD (Ground water: Permission obtained from SWID )
Wastewater generated : 1139 KLD (to be treated in modular STP in two locations)
Wastewater recycled : 998 KLD (to be reused after treatment in STP) (for flushing, green belt development)
Wastewater discharged : 94 KLD (to be discharged to natural drain / sewer after treatment in STP)
Solid waste disposal : 8930 kg per day (to be disposed off through panchayat) (biodegradable waste to be
processed in mechanized composting system)
[Industrial-4482 kg/day, retail-267 Kg/day, hotel-250 kg/day,residential-3730 kg/day,
institution and other -200 kg/day]
Total Built-up Area : Commercial, retail & social Complex – Total- 46450 sqm. including hotel – 9290
sqm., Social Infrastructure – 18580 sqm. (school, nursing house, health care)
&retail/shopping complex-18580 sq.m
Residential Complex (1846 flats) – 141515.6 sqm.
Individual Plots – 119110.5 sqm.
Building blocks Residential complex
Type Type of flat No. of block Total no. of flats TBUA
G+2 2 BHK 57 342 24465.09 sq.m
3 BHK 68 408 34265.60 sq.m
G+4 2 BHK 15 240 17018 sq.m
3 BHK 15 120 13879.7 sq.m
G+8 2 BHK 10 320 22690.6 sq.m
3 BHK 10 160 18506.20 sq.m
1 BHK 16 256 10690.54 sq.m
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 20 of 26
Individual Plot
Type of
plot
Plot area No. of plots Total area TBUA
A 267.5 sq.m 90 24075 sq.m 66222 sq.m
B 167.2 sq.m 115 19228 sq.m 52888.5 sq.m
Total Ground Coverage : 37.64 acres (30.23% of land area)
[Industrial-19.33 acres, Residential-8.89 acres]
Landscaped green area : 61.58 acres (49.45% of land area)
[Industrial-31.62 acres, Residential-14.5 acres]
Total Paved Area : 25.28 acres (20.31% of land area)
[industrial-12.98 acres, Residential-5.97 acres]
Total No. of plantation : 17451 approx.
No. of Parking spaces
proposed
: Total-3090, Commercial – 465,Industrial – 1209, Residential – 1416
Total Power requirement : Commercial – 2817 KW, Industrial – 6840 KW, Residential – 4229 KW, WBSEDCL
Backup Power : 2 DG Sets for every alternate street lighting (1x320 KVA, 1x600 KVA)
Commercial Area – 3x500 KVA
Industrial Area – 1x400 KVA and 17x175 KVA)
The case was put up for consideration. During the presentation the committee recommended that the project
proponent should submit the following:-
1. Details of industrial activities mentioning nos. of units, CETP etc. to be undertaken within the project.
2. Provision of waste water treatment facility and recycle of treated waste water to minimise fresh water
consumption.
3. Details of sewage and storm water drainage system.
4. Long term solid waste management plan including disposal of industrial waste.
5. Details of proper sludge disposal facility.
6. Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said
meeting.
The committee shall consider this application only after submission of the above mentioned clarifications.
10. Proposed Residential Complex by M/s. Muktamani Vanijya Pvt. Ltd. at 34B, B. T. Road, KMC Ward
No.1, Borough No. 1 Kolkata – 700 034, West Bengal.
Activity:
This is a proposal for construction of a Residential Complex having 3 nos. of B+18 storied Residential Blocks, 1
no. of B+G Podium, 1 no. of G+3 storied Assembly Block.
Chronology:
Salient features of the proposed project are -
Land Area : 9342.44 sqm.
Expected Population : Total – 1353 persons (Residents- 990, Club - 64, service -200, Floating –
99)
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 21 of 26
Total Water requirement : 205 KLD (Operation stage)
Fresh Water requirement : 179 KLD (KMC supply)
Domestic Water requirement : 170 KLD
Wastewater generated : 145 KLD (to be treated in STP)
Wastewater recycled : 26 KLD (Landscaping and car washing)
Wastewater discharged : 119 KLD (to be discharged to KMC sewer after treatment in STP)
Solid waste disposal : 710 kg per day (to be disposed off through KMC)
Total Built-up Area : 35344.88 qm.
Ground Coverage : 3531.37 sqm. (37.8% of land area)
Road / Paved Area : 1727.34 sqm. (18.49% of land area)
Other Green Area : 682.71 sqm. (7.31 % of land area)
Exclusive Tree Plantation
Area
: 1934.2 sqm. (20.7% of land area)
Semi paved area : 365.95 sq.m (3.92 % of land area)
Service area : 478.68 sq.m (5.12 % of land area)
Open parking area : 622.19 sq.m (6.66 % of land area)
Solar lights : 22 nos. (50%)
Total No. of plantation
proposed
: 135 nos.
No. of Parking spaces
proposed
: 231 nos. (Covered -172, Open -62)
Total Power requirement : 1500 KVA, CESC
Backup Power : DG Sets (4 nos. x 325 KVA)
RWH proposal : Surface storage : 1 storage tank 40 cum
Subsurface recharge : 1623 cum
Depth of recharge well : 1 recharge well 8m x 2.5 m x 2m, 115-127 m deep
CSR : Rs. 22 lakhs in 3 years
The case is put up for consideration. During the presentation the committee recommended that the project proponent
should submit the following:-
1) Provision for dual flushing etc. to increase recycle of treated waste water.
2) Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said
meeting.
The committee shall consider this application only after submission of the above mentioned clarifications.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 22 of 26
11. Proposed residential complex „Eternia‟ by M/s. Concast Infrastructure Pvt. Ltd. at JL No. 07, Ward no.
58 under KMC, Borough – VII, P.S-Tiljala, Kolkata-700046.
Activity:
This is a proposal for construction of a Residential Complex having 110 flats (1 block of B+G+31 storied).
Chronology:
Salient features of the proposed project are -
Land Area : 8105.85 sq.m (2.003 acre)
Expected Population : 1005 (Permanent- 660, temporary-345)
Total Water requirement : 156 KLD (KMC supply)
Fresh Water requirement : 156 KLD (KMC supply)
Wastewater generated : 106 KLD
Treated Wastewater : Nil
Wastewater recycled : Nil
Wastewater discharged : 106 KLD
Solid waste disposal : 0.52 TPD
Total Built-up Area : 29829.22 sq.m
Ground Coverage (basement area) : 2886.155 sq.m (35.61% of land area)
Total Paved Area (beyond basement) : 2013.462 sq.m (24.83% of land area)
Exclusive Tree Plantation Area : 1686.058 sq.m (20.8% of land area)
Total Green area : 2840.863 sq.m (35.05% of land area)
Service area : 365.37 sq.m (4.51% of land area)
Open parking area (beyond basement) : 969.35 sq.m (11.96% of land area)
Semi paved area : 1340.260 sq.m (16.54% of land area)
No. of solar street lights proposed : 31 nos.
Total No. of plantation proposed : 114 nos.
No. of Parking spaces proposed : 220 nos.(Open-93, Covered at ground floor-27, Basement-100)
Total Power requirement : 1099 KVA
Backup Power : 2x500 KVA
The case was put up for consideration.. After carefully considering the proposal the committee recommended that the
project proponent should submit the following:-
1) Provision of waste water treatment facility and recycle of treated waste water to minimise fresh water
consumption.
2) Details of Corporate Social Responsibility (CSR) with financial commitment as discussed during the said
meeting.
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 23 of 26
The committee shall consider this application only after submission of the above mentioned clarifications.
Summaries of above decisions are also provided in Table-1.
Table-1 : List of the projects which were placed before the SEAC in the eightieth meeting held on
18.01.2014 at 11:30 hrs. and the Summary Decisions thereof:
A Miscellaneous cases
Sl.
No.
Name of the unit & Project address Summary Decision
1. M/s. Bengal Shristi Infrastructure Development Ltd.
Proposed Residential project “Town House” at Mouza –
Ganrui, Gobindapur, Kumarpur, Gopalpur, PS –
Kanyapur, Asansol Municipal Corporation Ward No. 2,
30 & 31, Dist – Burdwan.
Referred to SEIAA for necessary action
2. M/s. Bengal Shristi Infrastructure Development Ltd.
Proposed Residential project “Tarang” at Mouza –
Ganrui, Gobindapur, Kumarpur, Gopalpur, PS –
Kanyapur, Asansol Municipal Corporation Ward No. 2,
30 & 31, Dist – Burdwan.
Referred to SEIAA for necessary action
3. M/s. India Power Corporation (Haldia) Ltd.
Application for amendment of Environmental Clearance
from 3x135 MW TPP to 3x150 MW TPP at Jl. No. – 94,
Mouza – Kismatshibrampur, Jl. No. – 170, Mouza –
Tentulberia, Jl. No. – 147, Mouza – Sovarampur, Jl. No.
– 146, Mouza – Kashbere, PS – Bhabanipur, Haldia, Dist.
– Purba Medinipur, West Bengal.
Referred to SEIAA for necessary action
4. M/s. Gagan Ferro Tech Ltd.
Proposed expansion project for 3x20 MT Induction
Furnace with caster and 2000 TPM Wire Drawing unit at
Jamuria Industrial Estate, Vill & PO – Ikra, Dist –
Burdwan.
Referred to SEIAA for necessary action
5. M/s. Shakambhari Ispat & Power Ltd.
Proposed expansion project for 0.9 MTPA Coal Washery
at Vill – Madandih, PO – Bartoria, Dist – Purulia, PIN –
723 121.
Referred to SEIAA for necessary action
B Cases placed for consideration of Environment
Clearance
Sl.
No.
Name of the unit & Project address Summary Decision
1. M/s. Burdwan Super Cement Pvt. Ltd.
Proposed expansion of the Cement Grinding Unit at JL
No. 36, Plot No. 72, 73, 141, Vill & Mouza – Sarpi, GP
– Ichapur, PS – Faridpur, Dist – Burdwan, West Bengal.
Recommended ToR as per MoEF OM No.
J-13012/12/2013-IA-II(I) dated 24.12.2013
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 24 of 26
B Cases placed for consideration of Environment
Clearance
Sl.
No.
Name of the unit & Project address Summary Decision
2. M/s. Soonerio Hotels Pvt. Ltd. & Beekay Plaza Pvt. Ltd.
Proposed Commercial Complex Cum Hotel at Plot No.
378,111,420 and 421/931 Mouza – Dabgram, J.L No –
2, P.S – Bhaktinagar,P.O – Sevoke Road, Ward No. 44
under Siliguri Municipal Corporation, Dist – Jalpaiguri,
Pin – 734 001.
Recommended to SEIAA for
Environmental Clearance
3. M/s. Cognizant Technology Solutions India Pvt. Ltd.
Proposed expansion of Office Building (Phase – II) at JL
No. 35, Mouza – Gangapur, PS – Kolkata Leather
Complex, Dist – 24 Parganas (South), West Bengal.
Recommended to SEIAA for
Environmental Clearance
4. M/s. Ajna Commercial Pvt. Ltd. & Others
Proposed Residential Complex at Jl. No. - 12, Mouza –
Raigachi, Rajarhat Bishnupur Gram Panchayat 1, PS –
Rajarhat, Dist. – 24 Parganas (North), West Bengal.
Recommended to SEIAA for
Environmental Clearance
5. M/s. Display Vinimay Pvt. Ltd. & 72 Ors.
Proposed Residential Complex at Mouza – Atghara, JL
No. 10, R.S. No. 133, Touzi No. 172, PS – Rajarhat,
Rajarhat-Gopalpur Municipality Ward No. 9, Dist – 24
Parganas (North), West Bengal.
Recommended for Stipulated Conditions
for Environmental Clearance
6. M/s. BKS Infraprojects LLP & 15 Ors.
Proposed Residential Complex at 130, Rishi Bankim
Chandra Road, Holding No. 184, South Dumdum
Municipality Ward No. 7, PS – Dumdum, Dist – 24
Parganas (North), West Bengal.
Recommended for Stipulated Conditions
for Environmental Clearance
7. M/s. South City Projects (Kolkata) Limited
Proposed Residential Complex at 88, B. L. Saha Road,
JL No. 10, Khatian Nos. 36, 38, 81 & 90, Borough No.
XIII, PO & PS – Behala, KMC Ward No. 116, Kolkata –
700 053, West Bengal.
Recommended for Stipulated Conditions
for Environmental Clearance with 2% of
the project cost for CSR
C Cases placed for presentation
Sl.
No.
Name of the unit & Project address Summary Decision
1. M/s. West Bengal Chemical Industries Ltd.
Proposed proposal for setting up a chemical/bulk drug
manufacturing unit on lease hold area land at SI area in
Durgapur, Burdwan, West Bengal.
Recommended modified ToR
2. M/s. Kadampur Stone Mine
Proposed Stone quarry at Mouza – Kadampur, JL no.
175, Plot No. CS 324, RS 1030, PS – Barabazar, Dist –
Purulia, West Bengal.
Asked for Additional Submission
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 25 of 26
C Cases placed for presentation
Sl.
No.
Name of the unit & Project address Summary Decision
3. M/s. Kadampur Stone Mine
Proposed Stone quarry at Kadampur, Plot No. JL No. CS
526 & 527, RS 1003 & 1004, Mouza - Kadampur,
Thana Barabazar, Dist Purulia, West Bengal.
Asked for Additional Submission
4. M/s. R. S. Minerals Pvt. Ltd.
Proposed Stone quarry at Baradihi, Plot JL No. 308,
Mouza – Baradihi, PS – Manbazar II, Dist – Purulia,
West Bengal.
Asked for Additional Submission
5. M/s. Cement Manufacturing Company Ltd.
Proposed stand alone cement grinding unit of capacity-
1.60 MTPA and CPP 10 MW at Mohit nagar railway
crossing, Mouza – Kharia & Patkala, Dist – Jalpaiguri,
West Bengal.
Asked for Additional Submission
6. M/s Bengal Ambuja Housing Development Ltd.
Proposed construction of a state of the art office building
namely „Ecospace Tower‟ consisting of IT and ITES
offices at Mouza – Chakpachuria, JL no. 33, Plot no.
II/F/13, Action area – II, New Town, Rajarhat, North 24
Pgns, West Bengal.
Recommended Stipulated Condition for
Environmental Clearance
7. M/s. Ambuja Realty Development Ltd.
Proposed expansion of IT & ITES Office
“ECOCENTRE” at Plot No. 4, Block-EM, Sector-V,
Kolkata – 700091, Dist. – 24 Parganas (North), West
Bengal.
Recommended Stipulated Condition for
Environmental Clearance
8. M/s. N. K. Plaza Pvt. Ltd. & Ors.
Proposed construction of Logistic Centre at Mouza –
Ankurhati & Bipannapara, JL No. 30 & 27, PS –
Domjur, Dist – Howrah, West Bengal.
Asked for Additional Submission
9. M/s. Kanchan Janga Integrated Infrastructure
Development Pvt. Ltd. (A Joint Venture Company of
M/s. Shristi Infrastructure Development Corporation
Ltd. & M/s. West Bengal Industrial Infrastructure
Development Corporation Ltd.)
Proposed Integrated Industrial Township at Fatapukur,
Jl. No. – 9, Mouza – Chhat Gujrimari, Jl. No. – 10,
Mouza – Kismat Sukani, PS - Rajganj, Dist. –
Jalpaiguri, West Bengal.
Asked for Additional Submission
10. M/s. Muktamani Vanijya Pvt. Ltd.
Proposed Residential Complex at 34B, B. T. Road,
KMC Ward No.1, Borough No. 1 Kolkata – 700 034,
West Bengal.
Asked for Additional Submission
Minutes of the 80th
meeting of the State Level Expert Appraisal Committee, West Bengal held on
18.01.2014 at 11:30 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake.
Page 26 of 26
C Cases placed for presentation
Sl.
No.
Name of the unit & Project address Summary Decision
11. M/s. Concast Infrastructure Pvt. Ltd.
Proposed residential complex „Eternia‟ at JL No. 07,
Ward no. 58 under KMC, Borough – VII, P.S-Tiljala,
Kolkata – 700 046.
Asked for Additional Submission
The meeting ended with a note of thanks to the Chair.
(Prof. (Dr.) Sudarshan Neogi)
Chairman
State Expert Appraisal Committee, West Bengal
(Shri Jayanta Bhattacharya)
Member
State Expert Appraisal Committee, West Bengal
(Dr. Kalyan Rudra)
Member
State Expert Appraisal Committee, West Bengal
(Dr. Satya Kinkar Pal)
Member
State Expert Appraisal Committee, West Bengal
(Prof. Bhabatosh Biswas)
Member
State Expert Appraisal Committee, West Bengal
(Prof. (Dr.) Swadesh Ranjan Raychaudhuri)
Member
State Expert Appraisal Committee, West Bengal
(Dr. Amitava Roy)
Member
State Expert Appraisal Committee, West Bengal
(Dr. Arunkanti Biswas)
Member
State Expert Appraisal Committee, West Bengal
_________________________________
(Shri P. K. Sarkar)
Secretary
State Expert Appraisal Committee, West Bengal