Page 1: MINOS Near Detector Hall and Access Spaces

xxgaooo

NUMI

MINOS Near Detector Halland Access Spaces

Presented by

Rob Plunkett

Fermi National Accelerator Laboratory

Page 2: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 2

NUMI

Introduction

• Physical Layout of Minos Shaft and Hall

• Access to Hall

• Video of hall

• Infrastructure and Services

• Hall Environment

• Conclusions

Page 3: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 3

NUMI

Hall Schematic showing Detector and Services

LCW Distribution

“House” Power

Magnet P.S.

Experiment Electronics

Experimental Power

Page 4: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 4

NUMI

Hall Schematic showing Beam Envelope

Notes: Beam descends at 3.3o angleArea in front of detector has been kept clear from muon rate considerations!

Beam envelope 12 ft. diameter

Page 5: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 5

NUMI

Elevation of MINOS Service Building

Page 6: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 6

NUMI

Details of Hall and Detector

Page 7: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 7

NUMI

Underground Schematic showing Detector Installation Path

340 ft.400 ft. shaft to end

Page 8: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 8

NUMI

Personnel Elevator

Elevator Characteristics~20 person capacity

4000 lb. load limit

Speed 200 ft/s

Size 5’4” x 7’10” (about like highrise)

Separate emergency elevator

Vertical Doors

Page 9: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 9

NUMI

Details of MINOS Shaft

Clear load space 22 ft. max.

8 ft. slot

5 ¾ ft

Page 10: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 10

NUMI

Access Tunnels showing Beam

Narrow Section

Wider Section (downstream)

Page 11: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 11

NUMI

Floor Area near Shaft

Sump trench

Elevator (separated by wall)To Minos (level)

To Absorber (9% grade)

Page 12: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 12

NUMI

View of Hall Outfitting

Escape Passageway

Drip Ceiling Crane Rails

Looking towards Soudan

Page 13: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 13

NUMI

Equipment Cranes

• There are cranes installed in both the MINOS service building and the MINOS hall.

• For use lowering equipment down shaft:– 15 ton capacity

– Speed 40 ft/min.

– Hook height 18’6”

– “Pitch and catch” control system

• For assembling MINOS detector in hall:– 15 ton capacity

– Hook height 22 ft.

Page 14: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 14

NUMI

Installed Electrical Power

• Power in Minos Hall comes in “house power” and experimental “quiet power” varieties. Will focus on quiet power for now.

• Sizing of capacity for quiet power in hall has been determined by the needs of the Minos Experiment.– Front-end electronics

– DAQ electronics

• Current experimental needs of the experiment are served by:– Two 75 KVA transformers ==> 150 KW.

• Upstream panel board is sized for 600 A @ 480 V or 300 KW.

• Upstairs transformer is 750 KVA.

Page 15: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 15

NUMI

Pumping and Water Control

• Tunnel system will generate between 320-400 gal/min. steadily.

• All water is pumped out of MINOS shaft sump.– Target and decay pipe system drain to this point.

• Before it is removed, water will serve as primary cooling for the underground equipment.

• Pumping system based around redundancy.– Two well pumps, each with adequate capacity to handle job separately.

– Third backup pump as well.

– Emergency generator.

Page 16: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 16

NUMI

Installed Water Cooling

• Cooling needs (LCW) of MINOS experiment include:– Direct Water cooling of front end ASIC electronics.– Cooling of MINOS magnet.– Cooling of magnet power supply

• Our primary cooling water supply is expected to be the tunnel inflow.– One large unit Fan Coil (25 KW) for general hall environmental control– 4 units for supplemental electronics cooling @ 7 KW each.

• Heat exchanger for LCW sized for 150 KW. This is adequate but not generous for experiment.

• Little or no spare capacity– May need to add dehumidifiers– Loads usually come in higher than design.

• Proposals would prudently plan for additional cooling. (My opinion).– Probably needs additional water supply

Page 17: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 17

NUMI

Expected Environmental Conditions

• Temperature in Hall will be held at 60-70 degrees F.

• Fan coil units with auxiliary heaters.

• Relative Humidity at 60%

• Egress corridor maintained at positive pressure w.r.t. hall.

• Basic air flow is from corridor into the hall, then exiting through vent to surface.

• Drip ceiling covers area over MINOS detector only.

• Remainder of hall will be quite dry anyway.

Page 18: MINOS Near Detector Hall and Access Spaces

NNNB WorkshopMay 2-3, 2002

Page 18

NUMI

Conclusions

• Needs of MINOS experiment will be well-met by the MINOS service building, shaft, and experimental hall.

• Services have been sized to be appropriate. No extra cooling capacity.

• Beam itself enters at an angle. Upstream section of hall has beam center about 10 feet above floor.