MINOS Near Detector Hall and Access Spaces. Presented by Rob Plunkett Fermi National Accelerator Laboratory. Introduction. Physical Layout of Minos Shaft and Hall Access to Hall Video of hall Infrastructure and Services Hall Environment Conclusions. - PowerPoint PPT PresentationTRANSCRIPT
xxgaooo
NUMI
MINOS Near Detector Halland Access Spaces
Presented by
Rob Plunkett
Fermi National Accelerator Laboratory
NNNB WorkshopMay 2-3, 2002
Page 2
NUMI
Introduction
• Physical Layout of Minos Shaft and Hall
• Access to Hall
• Video of hall
• Infrastructure and Services
• Hall Environment
• Conclusions
NNNB WorkshopMay 2-3, 2002
Page 3
NUMI
Hall Schematic showing Detector and Services
LCW Distribution
“House” Power
Magnet P.S.
Experiment Electronics
Experimental Power
NNNB WorkshopMay 2-3, 2002
Page 4
NUMI
Hall Schematic showing Beam Envelope
Notes: Beam descends at 3.3o angleArea in front of detector has been kept clear from muon rate considerations!
Beam envelope 12 ft. diameter
NNNB WorkshopMay 2-3, 2002
Page 5
NUMI
Elevation of MINOS Service Building
NNNB WorkshopMay 2-3, 2002
Page 6
NUMI
Details of Hall and Detector
NNNB WorkshopMay 2-3, 2002
Page 7
NUMI
Underground Schematic showing Detector Installation Path
340 ft.400 ft. shaft to end
NNNB WorkshopMay 2-3, 2002
Page 8
NUMI
Personnel Elevator
Elevator Characteristics~20 person capacity
4000 lb. load limit
Speed 200 ft/s
Size 5’4” x 7’10” (about like highrise)
Separate emergency elevator
Vertical Doors
NNNB WorkshopMay 2-3, 2002
Page 9
NUMI
Details of MINOS Shaft
Clear load space 22 ft. max.
8 ft. slot
5 ¾ ft
NNNB WorkshopMay 2-3, 2002
Page 10
NUMI
Access Tunnels showing Beam
Narrow Section
Wider Section (downstream)
NNNB WorkshopMay 2-3, 2002
Page 11
NUMI
Floor Area near Shaft
Sump trench
Elevator (separated by wall)To Minos (level)
To Absorber (9% grade)
NNNB WorkshopMay 2-3, 2002
Page 12
NUMI
View of Hall Outfitting
Escape Passageway
Drip Ceiling Crane Rails
Looking towards Soudan
NNNB WorkshopMay 2-3, 2002
Page 13
NUMI
Equipment Cranes
• There are cranes installed in both the MINOS service building and the MINOS hall.
• For use lowering equipment down shaft:– 15 ton capacity
– Speed 40 ft/min.
– Hook height 18’6”
– “Pitch and catch” control system
• For assembling MINOS detector in hall:– 15 ton capacity
– Hook height 22 ft.
NNNB WorkshopMay 2-3, 2002
Page 14
NUMI
Installed Electrical Power
• Power in Minos Hall comes in “house power” and experimental “quiet power” varieties. Will focus on quiet power for now.
• Sizing of capacity for quiet power in hall has been determined by the needs of the Minos Experiment.– Front-end electronics
– DAQ electronics
• Current experimental needs of the experiment are served by:– Two 75 KVA transformers ==> 150 KW.
• Upstream panel board is sized for 600 A @ 480 V or 300 KW.
• Upstairs transformer is 750 KVA.
NNNB WorkshopMay 2-3, 2002
Page 15
NUMI
Pumping and Water Control
• Tunnel system will generate between 320-400 gal/min. steadily.
• All water is pumped out of MINOS shaft sump.– Target and decay pipe system drain to this point.
• Before it is removed, water will serve as primary cooling for the underground equipment.
• Pumping system based around redundancy.– Two well pumps, each with adequate capacity to handle job separately.
– Third backup pump as well.
– Emergency generator.
NNNB WorkshopMay 2-3, 2002
Page 16
NUMI
Installed Water Cooling
• Cooling needs (LCW) of MINOS experiment include:– Direct Water cooling of front end ASIC electronics.– Cooling of MINOS magnet.– Cooling of magnet power supply
• Our primary cooling water supply is expected to be the tunnel inflow.– One large unit Fan Coil (25 KW) for general hall environmental control– 4 units for supplemental electronics cooling @ 7 KW each.
• Heat exchanger for LCW sized for 150 KW. This is adequate but not generous for experiment.
• Little or no spare capacity– May need to add dehumidifiers– Loads usually come in higher than design.
• Proposals would prudently plan for additional cooling. (My opinion).– Probably needs additional water supply
NNNB WorkshopMay 2-3, 2002
Page 17
NUMI
Expected Environmental Conditions
• Temperature in Hall will be held at 60-70 degrees F.
• Fan coil units with auxiliary heaters.
• Relative Humidity at 60%
• Egress corridor maintained at positive pressure w.r.t. hall.
• Basic air flow is from corridor into the hall, then exiting through vent to surface.
• Drip ceiling covers area over MINOS detector only.
• Remainder of hall will be quite dry anyway.
NNNB WorkshopMay 2-3, 2002
Page 18
NUMI
Conclusions
• Needs of MINOS experiment will be well-met by the MINOS service building, shaft, and experimental hall.
• Services have been sized to be appropriate. No extra cooling capacity.
• Beam itself enters at an angle. Upstream section of hall has beam center about 10 feet above floor.
• Experiment has specified a stay-clear drift space of 40 m upstream of detector, and this is reflected in the civil construction. Material in this area would require extensive simulation to understand its effects.