mine-to-plant optimization in concentrators and hydro …€¦ · mine-to-plant optimization in...

29
MINE - TO - PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS J.M. Menacho, L.A. Verdugo and G.E. Vega, De Re Metallica Ingeniería SpA, DRM-Tech I Congreso Internacional de Conminución de Minerales (Intermet) , Mayo 11 – 13, 2017, Lima, Perú.

Upload: dinhque

Post on 18-Apr-2018

230 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

MINE-TO-PLANT OPTIMIZATIONIN CONCENTRATORS AND HYDRO

PLANTS

J.M. Menacho, L.A. Verdugo and G.E. Vega, De Re Metallica Ingeniería SpA, DRM-TechI Congreso Internacional de Conminución de Minerales (Intermet) , Mayo 11 – 13, 2017, Lima, Perú.

Page 2: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Contents

• Framework

• Fragmentation Models and Blast Simulators

• Mill Models and Milling Simulators

• Mine-to-Plant at Concentrator and Hydro Sites

• Final Remarks

Page 3: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The Virtuous Mine-to-Plant Cycle…

Mine Plan

ConcentrationPlant

Production, Sales, Profit

Drillingand

Blasting

ComminutionPlant

MORE…Robust monitoringdevices and analytica are

needed to verify whether thereality fit the expected resultsand how can we permanently

improve them

THIS PAPER…Topics in ComminutionAnalytica for Mine-to-

Plant Applications

• Geology• Geotechnics• Geometallurgy• Hydrogeology• Mining Operation

Page 4: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Fragmentation Models• Kuz-Ram model

• SveDeFo´s fragmentation equation

• Kou-Rustan´s fragmentation equation

• NBC approach

• Chung and Katsabanis model

• Bergmann, Riggle and Wu model

• JKMRC models: “The Crushed Zone Model” and “The Two Component Model”

• DRM PBM-model

• Others

https://www.diva-portal.org/smash/get/diva2:995258/FULLTEXT01.pdf

• Most are empirical equations

• The Kuz-Ram equation is the most used with poorprediction of the fines content

• The JKRMC models employ a bimodal Kuz-Ramequation to improve the estimate of fines

• DRM model is phemenological in nature

Page 5: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The DRM PhenomenologicalFragmentation Model

i - 1_ _

i E Ei i i j j j_

j = 1i > 1

dw t= -S w E + b S w (E)

dE

_

Ej

i_-S E

i i jj = 1

w (E) = a e

k

i

i - 1

i ikk = 1i > 1

i - 1E

ik k jE Ek = jj

0

w 0 - a

1S b a

S - S

ija =, withThe integrated Reid´s solution is:

Classical PBM approach; batch process;breakage habit and specific rate ofbreakage parameters are recognized. B.C. isw(0) = f(0) for = 0.

_

E

The SiE and Bij parameters are sensitive to

blasting design and operational parametersand also to attributes of the rock mass.

DRM has a commercial software version especiallydesigned for Mine-Planning applications

Constitutiveequations

Page 6: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

DRM Model Performance

Imageanalysis

Crushed Product Predictedfrom the Fragmentation Model

Size distribution of the ROM productand the the crushed product are well-predicted from the DRM.Blast andDRM.Crush fragmentation models

ROM GranulometryComputed In The Muck Pile

Page 7: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Blast Simulators• I Blast, TBC Co., Nice, France, Physics based simulator• Blo Up, Itasca, Illinois, USA, Physics based simulator• JK Sim Blast, JKRMC, Australia• Others

http://www.dna-blast.com/Blasting-Design-Simulation-Optimization/Blasting-Optimization.html

Sellers, E. et al., (2012) “Improved Understanding of Explosive – Rock Interactions Using the Hybrid Stress Blasting Model,” in SHIRMS 2012 (Proc. of the 2nd Southern Hemisphere Int. Rock Mechanics Symp., South Africa, May, 2012).

http://www.soft-blast.com/JKSimBlast/JKSimBlast.htm

• Oriented toward design of drill and blast operations: Fragmentation Image Analysis; Muck-Pile shapeprediction; Free face and Cratering visualization, PPV, Frequencies and Waveform prediction, Air Blast model

• The Kuz-Ram model is the preferred tool to estimateROM ore granulometry

Page 8: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Milling Models

POWER MODELSBond, Austin, Morrell, Hogg & Fuerstenau,

others

POPULATION BALANCE MODELS

(PBM)Austin, Herbst, Lynch,

Morrell, others

DEM MODELSDesign of liner, chute,

SAG mill discharge, other similar

Classes of grinding models

Construction based on A. Doll, Technical Memo to UBC Mine331 Class, Nov. 11, 2015.

Page 9: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

PBM SAG Mill Modelling

PRODUCTFEED

LOAD

PARTICLE BREAKAGE• Rate of Breakage• Breakage Habit

POWER CONSUMPTION• Charge Dynamics

MASS TRANSPORT• Fluid Dynamics

DISCHARGE SYSTEM• Classifier

Arrangement

The best known

Modest fundamental support

The poorestdescribed

The mostprofitable

Mixture of Geomet

Units

Page 10: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The DRM SAG Mill Model

Grinding/TransportChamber

wi, WCO

Initial values ofW, JC, rC, PM

ci

Updated values ofW, JC, rC, PM

PP´

p´i

P´i

F

fi

TrunnionDischarge

Pulp LiftersGrate

pi

L.G. Austin, J.M. Menacho and F. Pearcy, “A General Model for Semi-autogenous and AutogenousMilling”, - APCOM 87. Proc. 20th Int. Symp. Appl. of Computers and Mathematics in the MineralIndustries. Vol. 2: Metallurgy. Johannesburg, SAIMM, 1987. pp. 107 - 126.

• Particle Breakage : Austin approach, with energy-based equations

• Power Consumption : Hogg/Fuerstenau

• Mass Transport : Flow through Porous Media, Menacho

• Discharge System : Classifying/Splitting devices, open knowledge

Page 11: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The DRM Mass Transport Model

2P μ- = q + βρq

z k

2 23C P C i i

0.5+δC Ci

P C i ii

42.86 A μ 1-ε ( w x )A ε

P´= + Wρ 1.75 1-ε L w x

The turbulent slurry flow through theSAG mill is represented by the Ergunequation. In one dimension it is given by:

Making use of the Forchheimer-Dupuit’s approach, a closed relation between thecirculating flowrate P´and the slurry hold up W is deduced. Note that W α P´1/0.5+d.

The slurry in the SAG mill behaves close to a Bingham fluid, then the apparentviscosity μP is a function of the yield stress and the Bingham viscosity of the slurry,

-1

P S Bingham0μ = du dy τ +μ

S. Ergun and A.A. Orning, "Fluid Flow Through Packed Columns", Chem. Engng. Progr. 48 89-94 (1952).

J.M. Menacho and P.A. Chávez, “Mass Transfer in SAG Milling”, PROCEMIN 2012, Santiago, Chile (2012).

Page 12: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

DRM Mass Transport Model

10

12

14

16

18

20

22

24

26

28

30

800 900 1000 1100 1200 1300 1400 1500

Fresh Flowrate, m3/h

Mill

Fra

ctio

nal H

old

-Up J

, %

JKMRC DRM

DRM approach is more sensitive to over filling

J.M. Menacho and P.A. Chávez, “Mass Transfer in SAG Milling”, PROCEMIN 2012, Santiago, Chile (2012).

Page 13: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Comminution Simulators

• JKSimMet software, Nappier Munn et al., JKRMC

• ModSim simulator, R.P. King, MTI

• MolyCop Tools, J.E. Sepúlveda, MolyCop

• Usim Pac, Caspeo

• MinProSim, J. Delgadillo, MinProSim Consultants

• MetSmart, Minerality, Toronto, Canada

• MetSim, J. Bartlett, Proware (specific applications)

• Others

http://www.dna-blast.com/Blasting-Design-Simulation-Optimization/Blasting-Optimization.html

Page 14: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Mine-to-Plant Challenges at Concentrator Sites

• Process-oriented blasting strategies taking into consideration metallurgicalattribute distribution in the orebody

• Improved measurement/estimate of bench structure (joints and fractures)

• Better measurement/estimate of the fines content in the muck-piles

• Better geometallurgical modelling of the orebody

• Effective blastability lab test (rock strength and crack formation)

• More representative crushability lab test

• Improved monitoring devices for on-line control of the inner SAG millgeometry and rheology and its relationship to power draw and capacity

• Reliable models of mass transport through SAG mills, useful for more realisticoptimization and control issues

Page 15: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°1:Mine-to-Plant at a Concentrator Site

BlastingPrimaryCrusher

PebbleCrusher

Ball Mills

SAG Mill

HydrocycloneBatteries

Stock Pile

Open Pit Mining

Primary Crusher• Capacity, t/h• Power, kW

• 4,000• 600

Pebble Crusher• Capacity, t/h• Power, kW

• 1,000• 325

Throughput (Base Case), t/h 1,630

ROM P80 (Base Case), mm 108

Powder Factor, g/t 300

Burden/Spacing, m/m 8/9

Drill Diameter, inch 10.625

SAG Mill Diameter, m 9.75

SAG Mill Lenght, m 4.57

SAG Mill Power, kW 13,263

SAG Mill Speed, rpm 9.48

J Balls, % Volume 22

Apparent Density, t/m3 4.00

BM Diameter, m 6.71

BM Lenght, m 10.98

BM Power, kW 27,748

BM Speed, rpm 12.25

J Balls, % Volume 32

Apparent Density, t/m3 4.76

Page 16: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°1:Mine-to-Plant at a Concentrator Site• ROM granulometry profiles for different powder factors in the blasting step

Page 17: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°1:Mine-to-Plant at a Concentrator Site• SAG mill reduced selection function and throughput/power draw relationship

2,050 - 1,630=25.8%

1,630

1,630 t/h 2,050 t/h

SAG

Mill

Mo

tor

Pow

er D

raw

, kW

Page 18: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°1:Mine-to-Plant at a Concentrator Site• Mill power draw/powder factor and pebble size and tonnage vs. powder factor:

SAG

Mill

Mo

tor

Pow

er D

raw

, kW

Page 19: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Mine-to-Plant Challenges atHydro Process Sites

• Improved technical and economical Mine-to-Plant strategies aimed tomaximize plant capacity/recovery at minimum cost, constrained by theeconomical heap permeability

• Process-oriented blasting strategies taking into consideration metallurgicalattribute distribution in the orebody

• Improved measurement/estimate of bench structure (joints and fractures)

• Better measurement/estimate of fines in the muck-piles

• Better geometallurgical modelling of the orebody

• Effective blastability lab test (rock strength and crack formation)

• More representative crushability lab test

• Reliable dynamic heap leaching models aimed to evaluate the impact of the overall comminution step into hydrodynamic and metallurgical responses of the heap

Page 20: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The DRM Hydrodynamic andMetallurgical Heap Leach Model

Variable-saturation liquid infiltration through porous beds is described by theRichards´ equation. In one dimension it is,

θ h= k h + 1

t z z

Where θ is the saturation, k is the hydraulic conductivity, h is the matric potential,z is the height coordinate and t is the time. Boundary conditions are as follows:

0 0

z=0

hθ z,0 = θ and k h + 1 = q 0,t

z

The dynamic liquid inventory inside the heap and the effluent flowrate are themain responses of the model.

L.A. Richards (1931), "Capillary Conduction of Liquids through Porous Mediums“, Physics, 1(5): 318- 333.

J.M. Menacho and F.J. Troncoso (2013), “Scale Up of Heap and Dump Leaching Results”, COPPER 2013.

Page 21: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

The DRM Hydrodynamic andMetallurgical Heap Leach Model

An advection-dispersion model is used to describe the reactive transport ofCopper

Sθc c c= θD - qc + ρ

t z z t

Where c is the mean copper concentration in the internal leach solution, D is thedispersion coefficient, q is the application rate, ρ is the apparent density of theheap and cS is the Copper grade in the ore. Leach kinetics is given by:

S

0 S SM

c q= -(λ + λ )(c - c )

t ρz

Where λ0 and λ are specific rate parameters and cSM is the lowest Copper grade inthe leached ore (residual grade).

Page 22: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Performance of the DRMHeap Leach Model

PLS Flowrate

Cu Concentration in PLS

Cu Production

Mine Plan Production P1:Tonnage x Cu Grade x Recovery

Hydro Plant Production P2:PLS Flow x Cu Concentration x SX Efficiency

Page 23: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

HS

HT

CHS

CHT

F1 ROM

F2

F3F4

F5

F7

F6

F8F11

F9

F10

Producto Final

PF

HS

HT

CHS

CHT

F1 ROM

F2

F3F4

F5

F7

F6

F8

F11

F9

F10

Producto Final

PF

Heap Leaching SX-EW EW-CathodesAgglomeration

Drum

Blasting

Crushing Plant

Options

Case Study N°2:Mine-to-Plant in a Leach Site

Reference Case 1 Case 2

Page 24: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°2:Mine-to-Plant in a Leach Site

1 Increase in Powder Factor2 Id 1 + 3ry Screen from 12.7 mm to 15 mm

3 Id 2 + 3ry Circuit Open4 Id 1 + 2ry Screen U/F to Final Product

Hard 1 Hard 2 Hard 3 Hard 4Soft 1 Soft 2 Soft 3 Soft 4

Page 25: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Case Study N°2:Mine-to-Plant in a Leach Site

1 Increase in Powder Factor2 Id 1 + 3ry Screen from 12.7 mm to 15 mm

3 Id 2 + 3ry Circuit Open4 Id 1 + 2ry Screen U/F to Final Product

Hard 1 Hard 2 Hard 3 Hard 4Soft 1 Soft 2 Soft 3 Soft 4

+8,000 Cu t/y

Page 26: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Final Remarks• Most of the existing fragmentation models are empirically-based. The Kuz-

Ram model is the most used by the blasting operators

• Even the modern JKMRC fragmentation models are improved variation of thesame Kuz-Ram model

• Conversely, the DRM fragmentation model is phenomenological in natureproviding a fundamental frame to understand the nature of the process andoptimizing parameters. Intensive testing at industrial operations validates itspredictive capacity and practical utility as a Planning Tool

• Blast simulators existing in the market are mostly oriented toward design ofdrill and blast operation rather than process optimization objectives

• Three kind of milling models can be found in the current market: (i) DEMmodels mainly oriented to design of pieces and machines; (ii) Power models,mainly oriented to equipment dimensioning and (iii) PBM models orientedtoward industrial optimization issues like the Mine-to-Plant applications

Page 27: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Final Remarks• There exist at least 20 different experimental tests to estimate specific energy

consumption linked to power draw models for machine dimensioning. None isfully satisfactory

• Mass transport through the SAG mill chamber is a pending task. The Austinempirical power-equation is the most used with relative success

• DRM mass transfer model is based on fluid transport through porous media.Explicit dependency on the slurry rheology, load apparent density and internalgranulometry naturally appear in this fundamental model. Initial evaluation isquite encouraging

• The bottle neck to maximize capacity at Concentrator Sites is often in thegrinding step. Early fines production at the mine may increase capacity from5% to 30% depending on compatibility with the existing facilities

Page 28: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Final Remarks• Mass transfer becomes “throughput controlling” when the SAG mill feed gets

finer as result of more intensive blasting practices. Reliable tools to deal withthis situation grow into a first need

• In Hydro Sites comminution end at the crushing plant. Moderate increase incapacity compared to Concentrator are here expected. An excess of fines maydrastically reduce heap permeability and hence reduce efficiency in theleaching step.

• The blasting practice in Hydro Sites may be foccused to maximize productionbelow 2” subjected to produce less than 15% below 100# in the final crushedproduct

• Relevant current technological challenges in Mine-to-Plant issues are:

Process-oriented blasting strategies taking into consideration metallurgicalattribute distribution in the orebody

Improved measurement/estimate of bench structure (joints and fractures)

Page 29: MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO …€¦ · MINE-TO-PLANT OPTIMIZATION IN CONCENTRATORS AND HYDRO PLANTS ... • MetSim, J. Bartlett, ... The dynamic liquid

Final Remarks Better measurement/estimate of the fines content in the muck-piles.

Current methods are “blind“ below 2 inches

Better geometallurgical modelling of the orebody

Effective blastability lab test (rock strength and crack formation)

More representative crushability lab test

Improved monitoring devices for on-line control of the inner SAG millgeometry and rheology and its relationship to power draw and capacity

Better models for mass transport through SAG mills, useful for morerealistic optimization and control issues

Better dynamic heap leaching models aimed to evaluate the impact of theoverall comminution step into hydrodynamic and metallurgical responsesof the heap