City of Los Angeles Department of City Planning x Environmental Analysis Section City Hall x 200 N. Spring Street, Room 750 x Los Angeles, CA 90012 OCTOBER 2012 Appendices To DRAFT ENVIRONMENTAL IMPACT REPORT HOLLYWOOD COMMUNITY PLAN AREA Appendices Volume 4 of 5 Millennium Hollywood Project Case Number: ENV-2011-675-EIR State Clearinghouse Number: 2011041094 Project Location: 1720, 1722, 1724, 1730, 1740, 1745, 1749, 1750, 1751, 1753, 1760, 1762, 1764, 1766, 1768, 1770 N. Vine Street; 6236, 6270, 6334 W. Yucca Street; 1733, 1741 N. Argyle Avenue; 1746, 1748, 1754, 1760, 1764 N. Ivar Avenue, Los Angeles, California, 90028 Council District: 13 Project Description: The proposed project includes the construction of approximately 1,052,667 net square feet of new developed floor area. The historic Capitol Records Building and the Gogerty Building are within the Project Site. These historic structures would be preserved and maintained and are operating as office and music recording facilities under long term lease. Including the existing approximately 114,303 square-foot Capitol Records Complex, the Project would include a maximum of approximately 1,166,970 net square feet of floor area resulting in a 6:1 Floor Area Ratio averaged across the Project Site. The Project would also demolish and/or remove the existing approximately 1,800 square foot rental car facility. The Project would develop a mix of land uses, including some combination of residential dwelling units, luxury hotel rooms, office and associated uses, restaurant space, health and fitness club uses, and retail uses. APPLICANT: Millennium Hollywood LLC PREPARED BY: CAJA Environmental Services ON BEHALF OF: The City of Los Angeles Department of City Planning Environmental Analysis Section

Upload: ngodiep

Post on 04-Jan-2017

230 views

Category:

Documents


0 download

TRANSCRIPT

  • City of Los Angeles

    Department of City Planning Environmental Analysis Section City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012

    OCTOBER 2012

    Appendices To

    DRAFT ENVIRONMENTAL IMPACT REPORT

    HOLLYWOOD COMMUNITY PLAN AREA

    Appendices Volume 4 of 5

    Millennium Hollywood Project

    Case Number: ENV-2011-675-EIR State Clearinghouse Number: 2011041094

    Project Location: 1720, 1722, 1724, 1730, 1740, 1745, 1749, 1750, 1751, 1753, 1760, 1762, 1764, 1766, 1768, 1770 N. Vine Street; 6236, 6270, 6334 W. Yucca Street; 1733, 1741 N. Argyle Avenue; 1746, 1748, 1754, 1760, 1764 N. Ivar Avenue, Los Angeles, California, 90028 Council District: 13 Project Description: The proposed project includes the construction of approximately 1,052,667 net square feet of new developed floor area. The historic Capitol Records Building and the Gogerty Building are within the Project Site. These historic structures would be preserved and maintained and are operating as office and music recording facilities under long term lease. Including the existing approximately 114,303 square-foot Capitol Records Complex, the Project would include a maximum of approximately 1,166,970 net square feet of floor area resulting in a 6:1 Floor Area Ratio averaged across the Project Site. The Project would also demolish and/or remove the existing approximately 1,800 square foot rental car facility. The Project would develop a mix of land uses, including some combination of residential dwelling units, luxury hotel rooms, office and associated uses, restaurant space, health and fitness club uses, and retail uses.

    APPLICANT: Millennium Hollywood LLC

    PREPARED BY: CAJA Environmental Services

    ON BEHALF OF: The City of Los Angeles

    Department of City Planning Environmental Analysis Section

  • Appendix IV.I

    Population and Employment Projections

    Millennium Hollywood

    RCLCO (June 8, 2012)

  • Appendix IV.J.1

    Fire Department Responses

    (October 24, 2011 and December 14, 2011)

  • From: Terrance W O'Connell Date: October 24, 2011 8:58:30 AM PDT To: Ryan Luckert Cc: "Downs, Michael" Subject: Per your request; Millennium Hollywood Project

    The required Fire Flow for the proposed project is 6000-9000 GPM from 4 to 6 Hydrants flowing at the same time. For the locations and capacities of the existing surrounding Fire Hydrants, please contact Mike Downs of the Dept of Water and Power. He may be reached at (213) 367-1218. Respectfully, Insp. O'Connell, Hydrants and Access Unit

    mailto:[email protected]:[email protected]:[email protected]

  • December 14, 2011 TO: Seth Wulkan, Assistant Environmental Planner

    CAJA Environmental Services, LLC FROM: Mark R. Woolf, Captain I-Paramedic Planning Section Los Angeles Fire Department 200 N. Main Street, Suite 1800 Los Angeles, CA 90012 SUBJECT: REQUEST FOR FIRE SERVICE INFORMATION FOR THE

    Millennium Hollywood Project The following are the answers to your questions in your letter dated September 8, 2011 1. Fire Stations 27, 82 and 41 are the closest fire stations to this project. Fire Station 27 is located at 1327 N. Cole Avenue in Hollywood. Fire Station 82 is located at 1800 N. Bronson Avenue in Hollywood. Fire Station 41 is located at 1439 N. Gardner Street in West Hollywood. 1a. Fire Station 27 is staffed with 16 members at all times. Six members are assigned to the Light Force (Truck and Engine company), four members are assigned to a Fire Engine, two members are assigned to the Paramedic Rescue Ambulance, and two members are assigned to the Basic Life Support (BLS) Rescue Ambulance, and two members are assigned to the Battalion Command Team. Battalion Chief -1 Captain II 1 Captain I 1 Apparatus Operator 1 Engineer 2 Firefighter/Paramedic 2 Firefighter - 8 Fire Station 82 is staffed with 6 members at all times. Four members are assigned to the Fire Engine, and two members are assigned to the Paramedic Rescue Ambulance. Captain I 1 Engineer 1 Firefighter/Paramedic 2 Firefighter - 2

  • Fire Station 41 is staffed with 6 members at all times. Four members are assigned to the Fire Engine, two members are assigned to the Paramedic Rescue Ambulance.. Captain I 1 Engineer 1 Firefighter/Paramedic 2 Firefighter - 2 1b. Fire Station 27: Battalion Command Team - 1 Truck 1 Engine 2 Paramedic Ambulance 1 Basic Life Support Ambulance 1 Fire Station 82: Engine 1 Paramedic Ambulance 1 Fire Station 41: Engine 1 Paramedic Ambulance 1 1c. Using 1750 N. Vine Street, as the incident address: Fire Station 27 is 0.7 miles from the proposed site. Fire Station 82 is 0.8 miles and Fire Station 41 is 1.7 miles away. The response times to the proposed site would be within 5 minutes from Fire Station 27. These response times meet the desired response distance standards of the LAFD. 1d. 2010 Daily Incident Data

    Fire Station Advanced Life Support

    Basic Life Support

    Fire & Other Daily Total

    27 9.8 6.4 3.3 19.5 82 5.8 3.3 1.8 10.9 41 5.8 3.9 3.0 12.8

    1e. Fire Station 27 is trained as a Urban Search and Rescue Task Force. 2. Average Response Times to Incidents Within the following Fire Station Districts, July 5, 2011 to Present

    Fire Station District Average Response Time to Structure Fires

    Target Time

    27 4:43

  • 3. 2010 Daily Incident Data with City Average

    Fire Station Advanced Life Support

    Basic Life Support

    Fire & Other Daily Total

    City Average 5.2 3.0 1.7 9.8 27 9.8 6.4 3.3 19.5 82 5.8 3.3 1.8 10.9 41 5.8 3.9 3.0 12.8

    Captain Mark R. Woolf

  • Appendix IV.J.2

    Police Department Response

    (August 16, 2012)

  • Appendix IV.J.3

    LAUSD Response (March 30, 2012)

  • LAUSD SCHOOLS ENROLLMENTS AND CAPACITIES

    SCHOOL YEAR: 2011-2012(Current and projected enrollments/capacities reflect data from School Year (SY) 2011-2012. SEE DISCLAIMER BELOW.)

    1 2 3 4 5 6 7 8 9 10 11 12Lo

    catio

    n C

    ode

    Scho

    ol N

    ame

    Cur

    rent

    Cal

    enda

    r

    Cur

    rent

    Cap

    acity

    Res

    iden

    t Enr

    ollm

    ent

    Actu

    al E

    nrol

    lmen

    t

    Cur

    rent

    sea

    ting

    over

    age/

    (sho

    rtag

    e)

    Ove

    rcro

    wde

    d N

    ow?

    Proj

    ecte

    d C

    apac

    ity

    Proj

    ecte

    d En

    rollm

    ent

    Proj

    ecte

    d se

    atin

    g ov

    erag

    e/(s

    hort

    age)

    Ove

    rcro

    wdi

    ng P

    roje

    cted

    in

    Fut

    ure ?

    3041 CHEREMOYA EL 1 TRK 397 176 286 221 No 375 167 208 No8226 LE CONTE MS** 1 TRK 1042 1157 949 (115) Yes 1674 1036 638 No8693 HOLLYWOOD SH** 1 TRK 1847 1280 1716 567 No 2445 1045 1400 No

    Schools Planned to Relieve Known OvercrowdingNONE

    NOTES:1 School's ID code.2 School's name 3 The current calendar the school is operating on. Schools operate on a 'multi-track' calendar (listed as 3-TRK or 4-TRK), because of overcrowded conditions.4

    5 The total number of students living in the school's attendance area and who are eligible to attend the school. Includes magnet students. -Multi-track calendars are utilized as one method of providing relief to overcrowded schools by increasing enrollment capacities. -A key goal of the Superintendent and Board of Education is to return all schools to a traditional 2-semester calendar (1-TRK).

    6 The number of students actually attending the school now, including magnet students.7 Current seating overage or (shortage): equal to (current capacity) - (resident enrollment).8 Current overcrowding status of school. The school is currently overcrowded if any of these conditions exist:

    -School is currently on a multi-track calendar. -There is currently a seating shortage. -There is currently a seating overage of LESS THAN or EQUAL TO a 'safety margin' of 30 seats.

    9

    10 Projected 4-year total number of students living in the school's attendance area and who are eligible to attend the school. Includes magnet students.11 Projected seating overage or (shortage): equal to (projected capacity) - (projected enrollment).12 Projected overcrowding status of school. The school will be considered overcrowded in the future if any of these conditions exist:

    -School remains on a multi-track calendar. -There is a seating shortage in the future. -There is a seating overage of LESS THAN or EQUAL TO a 'safety margin' of 30 seats in the future.

    * Independent Charter: Capacity and enrollment information is not reported for some independent charters.**

    DISCLAIMER: CURRENT AND PROJECTED DATA ARE UPDATED ANNUALLY AND BECOME AVAILABLE AFTER DECEMBER 1ST OF EACH CALENDAR YEAR.

    Current capacity shown for QEIA (Quality Education Investment Act) schools includes class-size reduction due to QEIA. Does not include capacity used bycharter co-locations. Projected capacity does not include class-size reduction due to QEIA

    School's current operating capacity, or the maximum number of students the school can serve while operating on its current calendar. Does not include capacity used by charter co-locations. Includes magnet students.

    The capacity the school will have after implementing LAUSD operational goals and shifting to a 2-semester (1 TRK) calendar without QEIA class-size reduction.Includes capacity currently used by charter co-locations. Includes magnet students.

    PROJECT SERVED: Millennium Hollywood Project, located at; 1720,1722,1724.1730,1740,1745,1749,1750,1751,1753,1760,1762,1764,1766,1768 & 1770 N. Vine St., 6236 & 6334 W. Yucca St., 1733 & 1741 N. Argyle Ave., 1746,1748,1754,1760, & 1764 N. Ivar St., Los Angeles, CA 90027

    Page 1 of 1 Millennium Hollywood Proj EnrCap #716.pdf 4/2/2012

  • LOS ANGELES UNIFIED SCHOOL DISTRICT Facilities Services Division LOC. CODE: 3041 SUBJECT: NEW SERVICE BOUNDARY DESCRIPTION FOR CHEREMOYA AVENUE SCHOOL

    EFFECTIVE JULY 1, 2005.

    The area described below has been approved by the superintendent as the attendance area served by the above-mentioned school. The description starts at the most northwesterly corner and follows the streets in clockwise order. Boundaries are on the center of the street unless otherwise noted. This boundary supersedes boundary effective July 1, 1984 (clarified 9-20-1995; updated 7-1-2003). This is an official copy for your file. (GRADES K 6) LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY * RIVERSIDE DRIVE TO ZOO DRIVE * A LINE SOUTHERLY FROM RIVERSIDE DRIVE AT ZOO DRIVE TO VERMONT AVENUE AT THE SOUTH BOUNDARY OF GRIFFITH PARK * GRIFFITH PARK BOUNDARY * FERN DELL DRIVE (BOTH SIDES) * LOS FELIZ BOULEVARD TO LAUGHLIN PARK DRIVE * LOS FELIZ BOULEVARD (BOTH SIDES EXCLUDED) * DE MILLE DRIVE (BOTH SIDES EXCLUDED) * KINGSLEY DRIVE EXTENDED * FRANKLIN AVENUE * VAN NESS AVENUE (BOTH SIDES EXCLUDED) * HOLLYWOOD BOULEVARD * CAHUENGA BOULEVARD * HOLLYWOOD FREEWAY TO VINE STREET * A LINE NORTHERLY FROM THE LAST SAID INTERSECTION THROUGH THE HOLLYWOOD RESERVOIR TO THE LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY AT THE EXTENSION OF CALIFORNIA STREET.

    For assistance, please call Master Planning and Demographics, Facilities Services Division, at (213) 633-7606. APPROVED: JAMES A. McCONNELL, JR., Chief Facilities Executive, Facilities Services Division DISTRIBUTION: School Master Planning and Demographics Pupil Statistics School Traffic and Safety Education Section Transportation Branch Department of Transportation, City of L. A.

  • LOS ANGELES UNIFIED SCHOOL DISTRICT Facilities Services Division LOC. CODE: 8226 SUBJECT: UPDATE BOUNDARY DESCRIPTION FOR JOSEPH LE CONTE MIDDLE SCHOOL

    EFFECTIVE JULY 1, 2008 (UPDATED 7-1-2010). Reconfiguration has changed the grade levels serviced by this school and the boundary description has been updated to reflect this change. This updating does not change the intent of the boundary as it was approved on July 1, 20089. The description starts at the most northwesterly corner and follows the streets in clockwise order. Boundaries are on the center of the street unless otherwise noted. This is an official copy for your file. (GRADES 6 - 8) SANTA MONICA BOULEVARD * BRONSON AVENUE (BOTH SIDES EXCLUDED) * FOUNTAIN AVENUE * WESTERN AVENUE * SUNSET BOULEVARD * KINGSLEY DRIVE (BOTH SIDES) * FOUNTAIN AVENUE * KINGSLEY DRIVE (BOTH SIDES) * SANTA MONICA BOULEVARD * KINGSLEY DRIVE (BOTH SIDES) * HOLLYWOOD FREEWAY * NORMANDIE AVENUE * MELROSE AVENUE * WESTERN AVENUE * BEVERLY BOULEVARD * BEACHWOOD DRIVE * MELROSE AVENUE * GOWER STREET. (GRADES 7 8) LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY * RIVERSIDE DRIVE TO ZOO DRIVE * LINE SOUTHERLY FROM RIVERSIDE DRIVE AT ZOO DRIVE TO VERMONT AVENUE AT THE SOUTH BOUNDARY OF GRIFFITH PARK * GRIFFITH PARK BOUNDARY * FERN DELL DRIVE (BOTH SIDES) * LOS FELIZ BOULEVARD TO LAUGHLIN PARK DRIVE * LOS FELIZ BOULEVARD (BOTH SIDES EXCLUDED) * DE MILLE DRIVE (BOTH SIDES EXCLUDED) * KINGSLEY DRIVE AND EXTENSION * HOLLYWOOD BOULEVARD * NORMANDIE AVENUE * SUNSET BOULEVARD * EDGEMONT STREET * MONROE STREET * ALEXANDRIA AVENUE * MONROE STREET AND EXTENSION EXCLUDING 773 NORTH ALEXANDRIA AVENUE AND 826 NORTH MARIPOSA AVENUE * NORMANDIE AVENUE * HOLLYWOOD FREEWAY * KINGSLEY DRIVE (BOTH SIDES EXCLUDED) * SANTA MONICA BOULEVARD * KINGSLEY DRIVE (BOTH SIDES EXCLUDED) * FOUNTAIN AVENUE * KINGSLEY DRIVE (BOTH SIDES EXCLUDED) * SUNSET BOULEVARD * WESTERN AVENUE * FOUNTAIN AVENUE * BRONSON AVENUE (BOTH SIDES) * SANTA MONICA BOULEVARD * VINE STREET * HOLLYWOOD BOULEVARD * CAHUENGA BOULEVARD * HOLLYWOOD FREEWAY TO THE PILGRIMAGE BRIDGE * A LINE NORTHERLY THROUGH THE HOLLYWOOD RESERVOIR TO THE LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY AT THE TERMINUS OF CALIFORNIA STREET.

    For assistance, please call Master Planning & Demographics, Facilities Services Division, at (213) 241-8044. APPROVED: JAMES SOHN, Chief Facilities Executive, Facilities Services Division DISTRIBUTION: School Office of Environmental Health and Safety Transportation Branch Department of Transportation, City of L. A. Master Planning and Demographics

  • LOS ANGELES UNIFIED SCHOOL DISTRICT Facilities Services Division LOC. CODE: 8693 SUBJECT: NEW SERVICE BOUNDARY DESCRIPTION FOR HOLLYWOOD HIGH SCHOOL

    EFFECTIVE JULY 1, 2008.

    The area described below has been approved by the superintendent as the attendance area served by the above-mentioned school. The description starts at the most northwesterly corner and follows the streets in clockwise order. Boundaries are on the center of the street unless otherwise noted. This boundary supersedes boundary effective September 1, 1982 (clarified 10-7-1996, 6-27-2005). This is an official copy for your file. (GRADES 9 12) A LINE FROM MULHOLLAND DRIVE AND FLOYE DRIVE WEST OF MULTIVIEW DRIVE THROUGH THE INTERSECTION OF FREDONIA DRIVE AND CAHUENGA BOULEVARD TO THE LOS ANGELES RIVER AT FORMAN AVENUE * LOS ANGELES RIVER * LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY * RIVERSIDE DRIVE TO ZOO DRIVE * LINE SOUTHERLY FROM RIVERSIDE DRIVE AT ZOO DRIVE TO VERMONT AVENUE AT THE SOUTH BOUNDARY OF GRIFFITH PARK * GRIFFITH PARK BOUNDARY * FERN DELL DRIVE (BOTH SIDES) * LOS FELIZ BOULEVARD TO LAUGHLIN PARK DRIVE * LOS FELIZ BOULEVARD (BOTH SIDES EXCLUDED) * DE MILLE DRIVE (BOTH SIDES EXCLUDED) * KINGSLEY DRIVE AND EXTENSION * HOLLYWOOD BOULEVARD * SERRANO AVENUE * CARLTON WAY AND EXTENSION * GORDON STREET * SUNSET BOULEVARD * GORDON STREET * SANTA MONICA BOULEVARD * GREENACRE AVENUE * FOUNTAIN AVENUE * FULLER AVENUE * SUNSET BOULEVARD * VISTA STREET * HAWTHORN AVENUE * VISTA STREET * RUNYON CANYON ROAD * MULHOLLAND DRIVE. (GRADE 12) CARLTON WAY AND EXTENSION * SERRANO AVENUE * HOLLYWOOD BOULEVARD * NORMANDIE AVENUE * SUNSET BOULEVARD * EDGEMONT STREET * MONROE STREET * ALEXANDRIA AVENUE * MONROE STREET AND EXTENSION EXCLUDING 773 NORTH ALEXANDRIA AVENUE AND 826 NORTH MARIPOSA AVENUE * NORMANDIE AVENUE * MELROSE AVENUE * VAN NESS AVENUE * SANTA MONICA BOULEVARD * GORDON STREET * SUNSET BOULEVARD * GORDON STREET.

    (OVER)

  • OPTIONAL: HOLLYWOOD AND FAIRFAX HIGH SCHOOLS (GRADES 9 12) MULHOLLAND DRIVE * LAUREL CANYON BOULEVARD (BOTH SIDES EXCLUDED, INCLUDING LAUREL CANYON PLACE, AMOR ROAD, CORNETT DRIVE, AND ELRITA DRIVE) TO THE INTERSECTION OF ELRITA DRIVE AND LAUREL CANYON BOULEVARD * LAUREL CANYON BOULEVARD TO WILLOW GLEN ROAD * A LINE EASTERLY AND NORTHERLY FROM LAUREL CANYON BOULEVARD AT WILLOW GLEN ROAD (EXCLUDING WILLOW GLEN ROAD, THAMES STREET, AND LEICESTER DRIVE) TO THE INTERSECTION OF WOODSTOCK ROAD AND MOUNT OLYMPUS DRIVE * WOODSTOCK ROAD (BOTH SIDES EXCLUDED) TO THE INTERSECTION OF WOODSTOCK ROAD AND WILLOW GLEN ROAD * A LINE NORTHERLY, EXCLUDING BOTH SIDES OF WOODSTOCK ROAD, ADA STREET, AND CARDWELL PLACE, TO AND EXCLUDING 7800 AND 7801 WOODROW WILSON DRIVE * A LINE EASTERLY INCLUDING BOTH SIDES OF WOODROW WILSON DRIVE AND ITS CONTRIBUTING STREETS * NICHOLS CANYON ROAD (BOTH SIDES) * A LINE WESTERLY THROUGH AND INCLUDING 3050 AND 3051 CHANDELLE ROAD AND NORTH OF BRIAR SUMMIT DRIVE TO AND INCLUDING 7950 MULHOLLAND DRIVE * MULHOLLAND DRIVE * RUNYON CANYON ROAD * VISTA STREET * HAWTHORN AVENUE * VISTA STREET * SUNSET BOULEVARD * LOS ANGELES UNIFIED SCHOOL DISTRICT BOUNDARY * A LINE NORTHERLY EAST OF MEREDITH PLACE, ALTO CEDRO DRIVE, BRIARCREST ROAD AND BRIARCREST LANE TO AND EXCLUDING 8600 MULHOLLAND DRIVE.

    For assistance, please call Master Planning & Demographics, Facilities Services Division, at (213) 893-6850. APPROVED: JOSEPH A. MEHULA, Chief Facilities Executive, Facilities Services Division DISTRIBUTION: School Office of Environmental Health and Safety Transportation Branch Department of Transportation, City of L. A. Master Planning and Demographics

  • Appendix IV.J.4

    Recreation and Parks Department Response

    (September 27, 2011)

  • Appendix IV.J.5

    Library Response

    (November 16, 2011)

  • -----Original Message----- From: Molles, Joseph [mailto:[email protected]] Sent: Wednesday, November 16, 2011 2:15 PM To: Seth Wulkan Subject: Re: Millennium Hollywood Project - Request for Library Information Hi Seth, Attached are our responses to your questions. Re: Millennium Hollywood Project The following is our response to your questions: 1a. Libraries that would serve the proposed project: Goldwyn Hollywood Regional Branch Library .24 miles from project 1623 N. Ivar Ave. Hollywood, CA 90028 b. Size (Square Feet):

    19,000 sq. ft. facility.

    c. Collection size/Circulation: 87,259 Volumes/Circulation 123,539 d. Staffing Levels:

    10 Full-time Employees e. Current/Future Service Population:

    83,173 (2000 census)/Per Planning Departments estimation, the population will reach 91,980 by 2010 and 94,494 by 2020.

    f. There are no planned improvements to add capacity through expansion. 2. On February 8, 2007, The Board of Library Commissioners approved a new Branch

    Facilities Plan. This Plan includes Criteria for new Libraries, which recommends new size standards for the provision of LAPL facilities 12,500 s.f. for community with less than 45,000 population and 14,500 s.f. for community with more than 45,000 population and up to 20,000 s.f. for a Regional branch. It also recommends that when a community reaches a population of 90,000, an additional branch library should be considered for the area.

    3. There are no plans for the development of any other new libraries to serve this

    community. The Los Angeles Public Library recommends a mitigation fee of $200 per capita based upon the projected population of the development. The funds will be used for staff,

  • books, computers and other library materials. It is recommended that mitigation fees be paid by the developer. Any increase in the residential population that is in close proximity to this branch has a direct impact on library services with increased demands for library materials, computers and information services.

  • Appendix IV.K.1

    Traffic Impact Study Report

    Proposed Millennium Hollywood Development, Hollywood California

    Crain & Associates (June 2012)

  • TRAFFIC IMPACT STUDY REPORT FOR PROPOSED

    MILLENNIUM HOLLYWOOD DEVELOPMENT

    HOLLYWOOD, CALIFORNIA

    Prepared for:

    MILLENNIUM HOLLYWOOD LLC

    Prepared by:

    Crain & Associates 300 Corporate Pointe, Suite 470

    Culver City, California 90230 (310) 473-6508

    June 2012

  • i

    EXECUTIVE SUMMARY

    The proposed Millennium Hollywood Development project (the Project) is to be

    constructed as a mixed use development in the Hollywood area of the City of Los

    Angeles (the City). The Project will include residential, office, retail, quality restaurant,

    sports/ fitness club and luxury hotel uses on two sites located in the Hollywood

    Community Plan area and the Community Redevelopment Agencys (CRA) Hollywood

    Redevelopment Plan area in the City. The Project entitlements will allow a variety of

    development scenarios that have different mixes of uses. The development scenario

    analyzed in this study (the Development Scenario) was selected as the one having the

    greatest traffic impacts of the various development scenarios that may be entitled.

    The Project will be developed on two sites that are located on the opposite sides of Vine

    Street. The east site (the East Site) is located on the southeast corner of Yucca Street

    and Vine Street. The west site (the West Site) is located across Vine Street,

    southwest of the corner of Yucca Street and Vine Street.

    For purposes of this traffic study, a project completion year of 2020 has been estimated.

    Upon completion, it is calculated that the Project, utilizing the Development Scenario,

    will generate approximately 9,922 net daily trips, including 574 trips during the AM peak

    hour (321 inbound, 253 outbound) and 924 trips during the PM peak hour (486 inbound,

    438 outbound).

    The Project would provide on-site parking in accordance with the parking requirements

    of the Los Angeles Municipal Code (LAMC), and as otherwise permitted through a

    variance for the sports club parking and the Development Agreement with the use of a

    shared parking program. The actual number of parking spaces required for the Project

    will be dependent upon the land uses developed in accordance with the Land Use

  • ii

    Equivalency Program included in the Development Agreement. That program would

    limit the Project trip generation levels to those analyzed in this study.

    Vehicular access to the West Site will be provided via two full-service driveways along

    Ivar Avenue and Vine Street. Access to the East Site will be through three driveways

    on Vine Street, Yucca Street and Argyle Avenue.

    This traffic study analyzed existing (2011) and future (2020) AM and PM peak-hour

    traffic conditions at 37 critical intersections in the vicinity of the Project site. The study

    locations were determined in consultation with the City of Los Angeles Department of

    Transportation (LADOT). Project impacts on the existing (2011) conditions were

    identified. Also, the project impacts considering the cumulative traffic impacts

    attributable to 58 identified potential related projects in the surrounding area plus

    ambient growth (2020 conditions) were identified. It is expected that the Project will

    have significant traffic impacts at the following 5 study intersections under the existing

    (2011) conditions and 13 study intersections under the future (2020) conditions, prior to

    mitigation. Those intersections are:

    2. Highland Avenue/Franklin Avenue (North) under future (2020) conditions only

    4. Cahuenga Boulevard/Franklin Avenue under existing (2011) and future (2020) conditions

    6. Argyle Avenue/Franklin Avenue US 101 Freeway Northbound On-Ramp under existing (2011) and future (2020) conditions

    14. La Brea Avenue/Hollywood Boulevard under future (2020) conditions only

    15. Highland Avenue/Hollywood Boulevard under future (2020) conditions only

    16. Cahuenga Boulevard/Hollywood Boulevard under existing (2011) and future (2020) conditions

    18. Vine Street/Hollywood Boulevard under existing (2011) and future (2020) conditions

    19. Argyle Avenue/Hollywood Boulevard under future (2020) conditions only

  • iii

    20. Gower Street/Hollywood Boulevard under future (2020) conditions only

    29. Cahuenga Boulevard/Sunset Boulevard under future (2020) conditions only

    31. Vine Street/Sunset Boulevard under existing (2011) and future (2020) conditions

    35. Vine Street/Fountain Avenue under future (2020) conditions only

    36. Vine Street/Santa Monica Boulevard under future (2020) conditions only

    In order to address these significant impacts, potential mitigation measures have been

    identified and are discussed in the Mitigation Measures section. Implementation of the

    identified mitigation measures would reduce the Project traffic impacts at 3 of the above

    5 intersections under the existing (2011) conditions and 8 of the 13 intersections under

    the future (2020) conditions to a less than significant level during AM and PM peak

    hours.

    Project traffic impacts were also analyzed for freeway segments and other Congestion

    Management Program (CMP) locations and project transit impacts were analyzed

    considering the transit service available in the Project site area. The increase in

    regional traffic on freeway and the CMP Arterial Network due to the Project was

    determined not to be significant. The increases in transit ridership due to the Project

    both with and without mitigation measures were also determined not be significant

    impacts.

  • iv

    TABLE OF CONTENTS Page Introduction ........................................................................................................... 1

    Project Description ................................................................................................ 6

    Environmental Setting ........................................................................................... 9 Freeways....................................................................................................... 10 Streets and Highways ................................................................................... 11 Existing (2011) Traffic Volumes .................................................................... 15 Public Transit ................................................................................................ 16 Analysis of Existing (2011) Traffic Conditions ............................................... 22

    Project Traffic ........................................................................................................ 27 Project Trip Generation ................................................................................. 27 Project Trip Distribution ................................................................................. 31 Project Trip Assignment ................................................................................ 32 Project Parking and Access .......................................................................... 38

    With Project Traffic Conditions .............................................................................. 40 Significant Traffic Impact Criteria .................................................................. 40 Existing (2011) With Project Conditions ........................................................ 41 Future (2020) Without and With Project Conditions ...................................... 46 Traffic Growth...................................................................................... 46 Related Projects .................................................................................. 47 Highway System Improvements.......................................................... 56 Analysis of Future (2020) Traffic Conditions ....................................... 56 CMP Freeway and Arterial Impact Analysis ........................................ 64 Transit Impacts.............................................................................................. 66 Existing Transit Service and Ridership................................................ 67 Project Transit Impact ......................................................................... 68

    Mitigation............................................................................................................... 71 Mitigation Measures ...................................................................................... 71 Traffic Impacts With Mitigation ...................................................................... 75

    Transit Impacts With Mitigation ..................................................................... 78

  • v

    APPENDICES

    Appendix A Signed Memorandum of Understanding (MOU) Appendix B Traffic Counts Appendix C Study Intersection Geometrics and Traffic Control Operations Appendix D Project Trip Generation Rates and Equations Appendix E Shared Parking Analysis Appendix F Related Projects Trip Generation Rates and Equations Appendix G Transit Service and Ridership Appendix H Conceptual Intersection Mitigation PlanAppendix I Critical Movement Analysis (CMA) WorksheetsAppendix J Horizon Year ImpactsAppendix K No Vine Street Access ImpactsAppendix L Project Component Location Shifting ImpactsAppendix M Trip Cap and Mitigation Triggers

  • vi

    LIST OF FIGURES Figure No. Page

    1 Project Site Vicinity Map....................................................................... 2

    2 Study Intersections Map....................................................................... 5

    3 Conceptual Project Site Plan................................................................ 7

    4 Existing (2011) Traffic Volumes ........................................................... 17

    5 Project Trip Distribution Percentages................................................... 33

    6 Project Traffic Volumes ........................................................................ 36

    7 Existing (2011) With Traffic Volumes With Project ............................ 42

    8 Related Projects Locations................................................................... 48

    9 Related Projects Traffic Volumes ......................................................... 54

    10 Future (2020) Traffic Volumes Without Project ................................. 58

    11 Future (2020) Traffic Volumes With Project ...................................... 60

    LIST OF TABLES

    Table No. Page

    1 Critical Movement Volume Ranges Levels of Service....................... 24

    2 Level of Service as a Function of CMA Values .................................... 25

    3 CMA Summary Existing (2011) Conditions ....................................... 26

    4 Project Trip Adjustment Factors ........................................................... 29

    5 Project Trip Generation ........................................................................ 30

    6 Project Directional Trip Distribution ...................................................... 32

    7 LADOT Criteria for Significant Traffic Impact ....................................... 40

    8 CMA Summary Existing (2011) With Project..................................... 44

    9 Related Projects Location, Description, and Trip Generation............... 49

    10 CMA Summary Future (2020) Without and With Project ................... 62

    11 Project Transit Trip Summary............................................................... 69

    12 Project Transit Impact ......................................................................... 70

    13 CMA Summary Existing (2011) With Project Plus Mitigation............. 77

    14 CMA Summary Future (2020) With Project Plus Mitigation............... 77

    15 Project Transit Trip Summary With Mitigation ................................... 78

    16 Project Plus Mitigation Transit Impacts ................................................ 79

  • 1

    INTRODUCTION

    Crain & Associates has been retained to prepare this traffic analysis that assesses the

    potential impacts of the Millennium Hollywood Project on the surrounding roadway

    system. The analysis that follows was prepared in accordance with the assumptions,

    methodology and procedures approved by LADOT. (See Appendix A for the

    Memorandum of Understanding (MOU) outlining the study parameters agreed to with

    LADOT.)

    The Project will be developed on two sites that are located on the opposite sides of Vine

    Street. The East Site is located on the southeast corner of Yucca Street and Vine

    Street. The West Site is located across Vine Street, southwest of the corner of Yucca

    Street and Vine Street (the East Site and West Site are referred to collectively as the

    Site). The Site is located within the Hollywood Community of the City of Los Angeles

    and, as shown in Figure 1, Project Site Vicinity Map, is within the Hollywood

    Redevelopment Project area.

    The Project would be a mixed use development, including residential, office, retail,

    quality restaurant, sports/ fitness club and luxury hotel uses on two sites. As part of the

    Project, the existing rental car facility area on the West Site will be demolished, but the

    existing Capitol Records Complex on the East Site will be preserved. The Capitol

    Records Complex includes the 13-story Capitol Records Building, along with its ancillary

    studio recording uses, and the existing two-story Gogerty Building.

    This report presents the results of the analysis of existing (2011) and future (2020)

    traffic conditions before and after Project completion at the following 37 study

    intersections.

    1. 101 Freeway NB Off-Ramp/Cahuenga Boulevard

    2. Franklin Avenue/Highland Avenue (North)

  • 3

    3. Franklin Avenue/Highland Avenue (South) 4. Franklin Avenue/Cahuenga Boulevard 5. Franklin Avenue - 101 Freeway SB Off-Ramp/Vine Street 6. Franklin Avenue - 101 Freeway NB On-Ramp/Argyle Avenue 7. Franklin Avenue/Gower Street 8. Franklin Avenue/Beachwood Drive 9. Yucca Street/Cahuenga Boulevard

    10. Yucca Street/Ivar Avenue 11. Yucca Street/Vine Street 12. Yucca Street/Argyle Avenue 13. Hollywood Boulevard/Fuller Avenue 14. Hollywood Boulevard/La Brea Avenue 15. Hollywood Boulevard/Highland Avenue 16. Hollywood Boulevard/Cahuenga Boulevard 17. Hollywood Boulevard/Ivar Avenue 18. Hollywood Boulevard/Vine Street 19. Hollywood Boulevard/Argyle Avenue 20. Hollywood Boulevard/Gower Street 21. Hollywood Boulevard/Bronson Avenue 22. Hollywood Boulevard/101 Freeway SB Ramps 23. Hollywood Boulevard/101 Freeway NB Ramps 24. Selma Avenue/Cahuenga Boulevard 25. Selma Avenue/Ivar Avenue 26. Selma Avenue/Vine Street 27. Selma Avenue/Argyle Avenue 28. Sunset Boulevard/Highland Avenue 29. Sunset Boulevard/Cahuenga Boulevard 30. Sunset Boulevard/Ivar Avenue 31. Sunset Boulevard/Vine Street 32. Sunset Boulevard/Argyle Avenue 33. De Longpre Avenue/Cahuenga Boulevard 34. De Longpre Avenue/Vine Street 35. Fountain Avenue/Vine Street 36. Santa Monica Boulevard/Vine Street 37. Melrose Avenue/Vine Street

  • 4

    These study intersections were selected because they were identified as having

    potentially significant traffic impacts and therefore require a detailed analysis. The

    selection was made in consultation with LADOT.

    The locations of these study intersections relative to the Site are shown in Figure 2,

    Study Intersection Map. These intersections are the critical intersections along the

    primary access routes to and from the Site, and are the intersections expected to be

    most affected by Project traffic. As agreed to with LADOT, since the Site is along a

    major highway, in a commercial area, and not adjacent to any areas zoned for single

    family homes, no residential street segments were expected to have traffic conditions

    impacted by the Project traffic. (For analysis purposes, segments of local streets in an

    area designated for single-family homes are considered as residential street

    segments.) Therefore, residential street segments would not be potentially significantly

    impacted by the Project and therefore residential segments were not required to be

    analyzed in this traffic report.

    It should be noted that this report was prepared using the standard LADOT analysis

    format and procedures. The individual intersection traffic impacts for each project are

    determined to either be significant or not significant. The LADOT determination is

    based upon the magnitude of the project impact considering the project impact and also

    considering the cumulative traffic volumes (including existing traffic, ambient growth and

    related projects growth) anticipated to occur. By following the MOU and the other

    applicable LADOT Traffic Study guidelines, this report conforms to standard City

    procedures for determining both project and cumulative traffic impacts. Further, the

    Project land-uses and densities are consistent with the Citys General Plan, including

    the existing and currently under consideration update of the Hollywood Community

    Plan. The Project also utilizes the land-uses incorporated into the Hollywood

    Community Plan update currently being considered by the City. Therefore the Project

    land-uses and design address the area transportation needs.

  • 6

    PROJECT DESCRIPTION

    The proposed Project is a mixed use development including some combination of

    residential, luxury hotel, sports/fitness club, office, retail and quality restaurant uses.

    The Project is to be located on two sites within the Hollywood Community Plan and

    CRAs Hollywood Redevelopment Plan area in the City.

    The Project entitlements will allow a variety of development scenarios that have

    different mixes of uses. The development scenario analyzed in this study (the

    Development Scenario also referred to as the Commercial Scenario) was selected as

    the one having the greatest traffic impacts of the various development scenarios that

    may be entitled.

    The West Site is approximately 78,629 square feet (1.81 acres) and the East Site is

    approximately 115,866 square feet (2.66 acres), for a combined lot area of

    approximately 194,495 square feet (4.47 acres).

    The West Site is generally bound by Ivar Avenue on the west, Yucca Street and two

    commercial buildings to the north, Vine Street to the east, and two commercial buildings

    to the south. The East Site is generally bound by Vine Street to the west, Yucca Street

    and the former KFWB radio station property to the north, Argyle Avenue to the east, and

    two commercial buildings to the south.

    The Development Scenario analyzed in this report includes 461 residential units, 254

    luxury hotel rooms, an 80,000 square-foot sports/fitness club, 264,303 square feet of

    office space, 100,000 square feet of retail uses and 25,000 square feet of quality

    restaurant uses. The development of the Project requires the demolition of the existing

    rental car facility, but will maintain and preserve the historic Capitol Records Complex.

    The conceptual site plan for the Project is shown in Figure 3.

  • 8

    The Project would provide on-site parking in accordance with the parking requirements

    of the LAMC, and as otherwise permitted through a variance for the sports club parking

    and the Development Agreement with the use of a shared parking program. The actual

    number of parking spaces required for the Project will be dependent upon the land uses

    developed in accordance with the Land Use Equivalency Program included in the

    Development Agreement. (That program would limit the Project trip generation levels to

    those analyzed in this study.) The existing parking requirements and agreements that

    apply to the Capitol Records Complex would remain in place.

    Based on the City ordinance required parking standards, maintaining the Capitol

    Records Complex parking and the implementation of a shared parking program, it is

    envisioned that the Project would include above-grade parking within the podium

    structures and approximately six levels of below grade parking.

    Vehicular access to the West Site will be provided via two full-service driveways along

    Ivar Avenue and Vine Street. Access to the East Site will be through three driveways

    on Vine Street, Yucca Street and Argyle Avenue.

  • 9

    ENVIRONMENTAL SETTING

    The Site is generally bounded by Yucca Street to the north, Ivar Avenue to the west,

    Argyle Avenue to the east, development fronting Hollywood Boulevard to the south, and

    bisected by Vine Street. The East Site is currently occupied by the Capitol Records

    Complex, and surface parking facilities. The West Site contains a car rental facility and

    surface parking facilities. Both portions of the Site are within the Hollywood Community

    Plan area and the CRAs Hollywood Redevelopment Project area of the City.

    The West Site is generally bound by Ivar Avenue on the west, Yucca Street and two

    commercial buildings to the north, Vine Street to the east, and two commercial buildings

    to the south. The two commercial buildings bordering the West Site to the north include a

    2-story art-deco building with retail, office and residential uses and the 5-story Marsha

    Toy building at the southwest corner of Yucca Street and Vine Street. The Marsha Toy

    building is currently occupied by the American Musical and Dramatic Academy

    (AMDA). The commercial buildings bordering the West Site to the south include the 2-

    story Hollywood Playhouse (Avalon) building fronting Vine Street, and a one-story

    commercial office building fronting Ivar Avenue.

    The East Site is generally bound by Vine Street to the west, Yucca Street and the former

    KFWB radio station property to the north, Argyle Avenue to the east, and two commercial

    buildings to the south. The two commercial buildings to the south include the Pantages

    Theater building at the northwest corner of Hollywood Boulevard and Argyle Avenue, and

    a one-story restaurant building known as the Lexington Social House fronting Vine

    Street.

  • 10

    West of the Site are the famous tourist attractions concentrated along Hollywood

    Boulevard, including Graumans Chinese Theater and the Hollywood and Highland

    mixed-use development.

    The residential development in the Project area is primarily multi-family in nature, with

    medium- to high-density residential developments concentrated next to the areas

    commercial corridors and along portions of Franklin Avenue and Gower Street. Some

    single- and multi-family residences are located east of the Site along local streets, such

    as Carlos Avenue and Vista Del Mar Avenue. Although single-family residences are

    interspersed throughout the study area, single-family residential development is primarily

    concentrated north of Franklin Avenue in the Hollywood Hills.

    Minimal light industrial uses, such as movie, radio and television studios, and auxiliary

    facilities for the entertainment industry, are located within the study area along portions

    of Sunset Boulevard.

    Overall the Site and its surrounding uses are well-served by Major and Secondary

    Highways, including Franklin Avenue, Yucca Street, Hollywood Boulevard, Sunset

    Boulevard, Highland Avenue, Cahuenga Boulevard, Vine Street, and Gower Street.

    Additionally, surface street access to and from the Hollywood Freeway (US-101) is

    provided within one-quarter mile of the Site. The Site is also well served by the transit

    system, with the Hollywood and Vine Redline Subway Station as well as numerous bus

    stops located within a quarter mile of the Site. These transportation facilities and other

    local roadways are described in more detail below.

    Freeways

    The Hollywood Freeway (US-101) extends in a northwesterly/southeasterly direction

    through the project area. Northwest of the Site, the Hollywood Freeway provides a direct

  • 11

    route through the Cahuenga Pass to the San Fernando Valley. Near Downtown Los

    Angeles, the Hollywood Freeway interchanges with the Harbor/Pasadena Freeways (I-

    110/SR-110). The Hollywood Freeway extends southeast of Downtown where it merges

    with the Golden State Freeway (I-5). In the vicinity of the Site, the Hollywood Freeway

    has four travel lanes per direction. Full surface street access is provided on Hollywood

    Boulevard, approximately one-half mile southeast of the Site. Less than one-quarter mile

    to the north, a southbound off-ramp is provided to Vine Street. Northbound and

    southbound on-ramps are available from Argyle Avenue, and northbound and

    southbound off-ramps are provided for Gower Street.

    According to the most current (2010) data available through the Caltrans Website, traffic

    volumes on the Hollywood Freeway between Sunset Boulevard and Argyle Avenue are

    approximately 196,000 vehicles per day (VPD), with peak-hour volumes of approximately

    11,700 vehicles per hour (VPH). Traffic volumes on the Hollywood Freeway between

    Argyle Avenue and Cahuenga Boulevard are approximately 211,000 VPD, with peak-

    hour volumes of approximately 12,800 VPH.

    Streets and Highways

    Franklin Avenue is an east-west street north of the Site. Designated a Secondary

    Highway, it extends through the Hollywood community from Sierra Bonita Avenue to the

    west to Saint George Street to the east. There is a southbound Hollywood Freeway off-

    ramp extending to the intersection of Franklin Avenue/Vine Street and a northbound on-

    ramp from the intersection of Franklin Avenue/Argyle Avenue. Franklin Avenue generally

    has two travel lanes per direction within an approximate 55- to 70-foot roadway width.

    Left-turn channelization is provided at major intersections.

    Yucca Street, the northern boundary of the Site, is a designated Secondary Highway

    between Cahuenga Boulevard and Vine Street. West of Cahuenga Boulevard and east

  • 12

    of Vine Street, Yucca Street becomes a local street. An on-ramp beginning north of the

    intersection of Yucca Street/Argyle Avenue accesses the southbound Hollywood

    Freeway. At its intersection with Vine Street, Yucca Street has one travel lane per

    direction, plus left- and right-turn channelization within an approximate 73-foot roadway

    width.

    Hollywood Boulevard is an east-west Major Class II Highway south of the Site. This

    street has full ramp access with the Hollywood Freeway less than one mile to the east.

    Hollywood Boulevard is approximately 70 feet wide, with two travel lanes per direction,

    along with left-turn channelization at major intersections. The Hollywood Walk of Fame,

    a popular tourist attraction, is part of the sidewalk on both sides of Hollywood Boulevard

    between Gower Street and La Brea Avenue.

    Argyle Avenue extends from north of Franklin Avenue to its southern terminus at Sunset

    Boulevard. Argyle Avenue, a local street throughout its length, runs along the eastern

    boundary of the Site. A southbound Hollywood Freeway on-ramp is provided from

    Argyle Avenue between Franklin Avenue and Yucca Street. In the project vicinity, Argyle

    Avenue provides one to two travel lanes per direction within an approximate 45- to 50-

    foot roadway width. Left-turn channelization is provided on Argyle Avenue at major

    intersections, including at Hollywood Boulevard.

    Selma Avenue, a local street, provides east-west access between Highland Avenue and

    Gower Street. In the project vicinity, this street has one travel lane in each direction

    within an approximate 40-foot roadway width.

    Sunset Boulevard is a Major Highway Class II, which provides continuous access

    between downtown Los Angeles and the Cities of West Hollywood, Beverly Hills, and

    Santa Monica. Sunset Boulevard is the northernmost east-west thoroughfare extending

    from downtown to the Pacific Ocean south of the Santa Monica Mountains and is heavily

    used by both local and commuter traffic. A northbound Hollywood Freeway off-ramp and

  • 13

    southbound freeway on-ramp are located on Sunset Boulevard, approximately three-

    quarters of a mile southeast of the Site. In the project vicinity, Sunset Boulevard

    provides three travel lanes in each direction, plus left-turn channelization within an

    approximate 70- to 80-foot roadway width.

    De Longpre Avenue is a Local Street that extends easterly from Formosa Avenue to its

    eastern terminus near its intersection with Gower Street. At its intersections with

    Cahuenga Boulevard and Vine Street, De Longpre Avenue provides one travel lane per

    direction within an approximately 60-foot roadway width.

    Fountain Avenue, a Secondary Highway, extends easterly from La Cienega Boulevard to

    its eastern terminus near its intersection with Bronson Avenue in the study area. At Vine

    Street, this east-west roadway provides one travel lane per direction plus left turn

    channelization at major intersections within an approximately 60- to 75-foot roadway

    width.

    Santa Monica Boulevard is designated as a Major Highway Class II. This east-west

    oriented roadway extends from Downtown Los Angeles through the Cities of

    West Hollywood and Beverly Hills to the City of Santa Monica. Approximately one and a

    half miles southeast of the Project, Santa Monica Boulevard has a partial interchange

    with the Hollywood Freeway including a northbound off-ramp and a southbound on-ramp.

    In the vicinity of the Site, Santa Monica Boulevard provides two travel lanes per direction

    plus left-turn channelization within an approximately 80 to 100-foot roadway width.

    Melrose Avenue, an east-west oriented roadway, is designated as a Secondary

    Highway. This roadway extends easterly from La Cienega Boulevard through the

    Hollywood area to east of Virgil Avenue. In the vicinity of the Site, Melrose Avenue

    provides two travel lanes per direction plus left-turn channelization within an

    approximately 60 to 90-foot roadway width.

  • 14

    Cahuenga Boulevard, a north-south roadway, is designated as a Secondary Highway

    south of Franklin Avenue and a Major Highway Class II to the north. North of Franklin

    Avenue, Cahuenga Boulevard accesses the Hollywood Freeway. West of the Site,

    Cahuenga Boulevard provides two through lanes per direction within an approximate 56-

    foot wide roadway near its intersection with Hollywood Boulevard. There are left-turn

    channelization at most major intersections; however, left turns are prohibited during the

    weekday PM peak period (4:00 PM to 7:00 PM) at its intersections with Hollywood

    Boulevard and Selma Avenue.

    Highland Avenue, a north-south roadway, is designated as a Major Highway Class II

    north of Melrose Avenue and a Divided Secondary Street south of Melrose Avenue. In

    the vicinity of the Site, this roadway provides three through travel lanes per direction, with

    left and/or right-turn channelization provided at the intersection with Hollywood

    Boulevard. Parking is prohibited on Highland Avenue at all times in the vicinity of the

    Site. Highland Avenue connects to the Hollywood Freeway with full northbound and

    southbound ramp connections approximately one and a half mile northwest of the Site.

    Vine Street is a north-south Major Highway Class II between Franklin Avenue and

    Melrose Avenue, south of which, it transitions to Rossmore Avenue which is designated

    as a collector street. North of Franklin Avenue, Vine Street is designated as a Collector

    Street. Immediately south of Franklin Avenue, a southbound Hollywood Freeway off-

    ramp extends to Vine Street. Vine Street bisects the Site and provides two travel lanes

    per direction and left-turn channelization within an approximate 65- to 75-foot roadway

    width. The Hollywood Walk of Fame branches down both sides of Vine Street between

    Yucca Street and Sunset Boulevard.

    Ivar Avenue, west of the Site, is a north-south local street with a roadway width of

    approximately 46 feet. It has one travel lane in each direction. Left turns are prohibited

    from 6:00 AM to 3:00 PM at its intersection with Hollywood Boulevard.

  • 15

    Gower Street, located east of the Site, is a north-south Secondary Highway between

    Franklin Avenue and Melrose Avenue. North of Franklin Avenue and south of Melrose

    Avenue, Gower Street is a local street. Gower Street terminates to the south at 1st

    Street in the Hancock Park community. Approximately half a mile northeast of the Site,

    the Hollywood Freeway interchanges with the surface street network through northbound

    and southbound off-ramps provided for Gower Street between Franklin Avenue and

    Yucca Street. Gower Street provides one travel lane per direction, plus left-turn

    channelization within an approximate 50-foot roadway width.

    Beachwood Drive is a Collector Street north of Franklin Avenue and a discontinuous

    Local Street south of Franklin Avenue. In the vicinity of the Site, Beachwood Drive has

    one lane per direction along with parking on both sides of the street.

    Bronson Avenue is designated as a Secondary Highway between Franklin Avenue and

    Santa Monica Boulevard. North of Franklin Avenue, Bronson Avenue is designated as a

    Collector Street and south of Melrose Avenue, Bronson Avenue is designated as a Local

    Street. Bronson Avenue provides north-south access from north of Franklin Avenue to

    Santa Monica Boulevard. This roadway resumes service south of Melrose Avenue and

    extends to its terminus at Beverly Boulevard. Near its intersection with Hollywood

    Boulevard, Bronson Avenue provides one travel lane per direction within an

    approximately 60-foot roadway width.

    Existing (2011) Traffic Volumes

    Traffic volumes for existing conditions at the 37 study intersections were obtained from

    manual traffic counts conducted in March, April, May, September and October 2011. In

    accordance with current LADOT Traffic Study Policies and Procedures, the traffic counts

    cover the weekday morning and afternoon peak hours of 7:00-10:00 AM and 3:00-

    6:00PM, and include separate counts of automobiles, pedestrians, bicycles, trucks and

    buses.

  • 16

    Peak-hour volumes were determined individually for each intersection based on the

    combined four highest consecutive 15-minute volumes for all vehicular movements at the

    intersection. Weekday peak-hour volumes at the study intersections are detailed on the

    pages that follow and illustrated in Figures 4(a) and 4(b). The intersection traffic count

    data sheets are provided in Appendix B.

    Information pertaining to intersection widths and geometrics, bus stop locations,

    on-street parking restrictions, and traffic signal operations were obtained from City

    engineering plans and subsequent field checks. The existing lane configuration and

    traffic control conditions for the 37 study intersections are illustrated in Appendix C.

    Public Transit

    The Site is located within a designated Transit Oriented District (TOD) and is

    accessible via multiple modes of public transportation. The Los Angeles County

    Metropolitan Transportation Authority (Metro) and LADOT provide an extensive system

    of rapid, local and shuttle bus lines in the Hollywood community. The Hollywood/Vine

    Metro Red Line Transit Station is within the quarter mile radius and allows immediate

    access to the Metro Red Line rail system. Additionally, a number of Metro and LADOT

    bus routes are within reasonable walking distance (less than one-quarter mile) from the

    Site, providing access for project employees, visitors, residents and guests.

    The public transit routes serving the immediate vicinity of the Site are described in detail

    below.

    Metro Bus Service

    Lines 180 and 181 are local lines that run between Altadena, Pasadena, Eagle Rock,

    Glendale and Hollywood. Near the Site, Lines 180 and 181 travel along Hollywood

    Boulevard, with a stop at the Hollywood/Vine Metro Red Line Transit Station. These

  • 19

    lines operate weekdays on headways of approximately 15 minutes. Headways are

    approximately 10 minutes on Saturday, Sunday and holidays.

    Line 210 is a local line that serves Redondo Beach, Torrance, Hawthorne, Inglewood,

    Crenshaw District, Mid-City, Hancock Park and Hollywood. Near the Site, Line 210

    operates on Vine Street, with stops at Sunset Boulevard and at the Hollywood/Vine

    Metro Red Line Transit Station. Line 210 operates daily on headways of

    approximately 15 minutes.

    Lines 212 and 312 are local lines that provide service between Hawthorne,

    Inglewood, Baldwin Hills, Mid-City, Miracle Mile and Hollywood via La Brea Avenue.

    Line 312 has limited stops throughout the route and does not operate on Saturday,

    Sunday, or holidays. Weekday headways are approximately 15 minutes. In addition

    to weekday service, Saturday, Sunday and holiday service is provided on Line 212

    with headways of approximately 15 to 20 minutes. Lines 212 and 312 stop at the

    Hollywood/Vine Metro Red Line Transit Station.

    Line 217 a local line, has north-south service from north of the Santa Monica

    Freeway (I-10) through the City of West Hollywood and the Hollywood community via

    Fairfax Avenue. Near the Site, Line 217 operates on Hollywood Boulevard with stops

    at Cahuenga Boulevard, at the Hollywood/Vine Metro Red Line Transit Station, and

    at Gower Street. Line 217 operates Monday through Saturday on headways of

    approximately 15 minutes. Sunday and holiday service operates on headways of

    approximately 15 to 20 minutes.

    Line 222 is also a local line. This line has north-south service beginning at

    Hollywood and Highland through Universal City, Burbank, and Sun Valley and

    terminates at the Sun Valley Station of the Antelope Valley Metrolink Line. Near the

  • 20

    Site, Line 222 operates on Argyle Avenue with a stop at Hollywood Boulevard and

    on Yucca Street with a stop at Vine Street. Line 222 runs Monday through Friday

    on headways of approximately 30 minutes. Saturday service operates on

    headways of approximately one hour. Sunday and holiday service operates on

    headways of approximately 40 minutes.

    Line 780 is part of the Metro Rapid Program, and serves Pasadena, Eagle Rock,

    Hollywood and West Hollywood. In the vicinity of the Site, Line 780 runs along

    Hollywood Boulevard with a stop at Argyle Avenue for the Hollywood/Vine Metro

    Red Line Transit Station. Service is available on weekdays only, and headways are

    approximately 10 to 15 minutes.

    Metro Rail Service

    Metro Red Line provides rail transportation between downtown Los Angeles, the

    Wilshire-Hollywood area and North Hollywood. In the vicinity of the Site, the Red

    Line operates north-south service underneath Vermont Avenue and east-west service

    underneath Hollywood Boulevard. The Metro Red Line Hollywood/Vine Transit

    Station is located one block south of the project site. Approximately three-quarters of

    a mile to the southwest, there is another Metro Red Line stop at the

    Hollywood/Highland Transit Station, as well as a stop approximately one mile to the

    southeast at the Hollywood/Western Transit Station. These Metro Red Line stops

    provide bicycle storage and park-and-ride lots to encourage multi-modal

    transportation. With a stop also available at Union Station in downtown Los Angeles,

    the Red Line links with the other three existing rail lines, providing access to Long

    Beach, Redondo Beach, Norwalk, Pasadena, and East Los Angeles. The Red Line

    operates between 4:30 AM and 1:00 AM, with headways in the project area ranging

    from approximately 10 to 20 minutes throughout the day.

  • 21

    LADOT Bus Service

    DASH Hollywood is a shuttle service that provides local access including

    throughout the Hollywood community. Near the Site, DASH Hollywood operates

    along Franklin Avenue, Argyle Avenue, Selma Avenue and Hollywood Boulevard.

    Stops within walking distance of the Site are provided on Hollywood Boulevard at

    Argyle Avenue, at Cahuenga Boulevard, and at the Hollywood/Vine Metro Red Line

    Transit Station. DASH Hollywood operates every day, including holidays, on

    approximately 30 minute headways.

    DASH Beachwood Canyon operates on a shuttle route between Beachwood

    Canyon and Sunset Boulevard. Near the Site, DASH Beachwood Canyon runs

    along Argyle Avenue, Yucca Street, Sunset Boulevard and Vine Street. It has stops

    on Argyle Avenue at Yucca Street, at the Hollywood/Vine Metro Red Line Transit

    Station, and on Vine Street at Hollywood Boulevard. DASH Beachwood Canyon

    operates Monday through Saturday on headways of approximately 25 minutes.

    DASH Hollywood/Wilshire has north-south shuttle service between Hollywood

    Boulevard and Wilshire Boulevard. In the vicinity of the Site, this route operates on

    Hollywood Boulevard, Vine Street, Argyle Avenue and Sunset Boulevard, with stops

    on Argyle Avenue at Hollywood Boulevard and on Vine Street at Sunset Boulevard.

    DASH Hollywood/Wilshire only operates during weekdays on headways of

    approximately 25 minutes.

    When transfer opportunities are considered, the Project is well served by public transit.

    Thus, it is expected that some of the person trips generated by the Project will utilize

    public transportation as their primary travel mode in lieu of being made by private

    vehicle trips.

  • 22

    Analysis of Existing (2011) Traffic Conditions

    An analysis of existing weekday AM and PM peak-hour traffic conditions was performed

    at the 37 study intersections listed below.

    1. 101 Freeway NB Off-Ramp/Cahuenga Boulevard

    2. Franklin Avenue/Highland Avenue (North)

    3. Franklin Avenue/Highland Avenue (South)

    4. Franklin Avenue/Cahuenga Boulevard

    5. Franklin Avenue - 101 Freeway SB Off-Ramp/Vine Street

    6. Franklin Avenue - 101 Freeway NB On-Ramp/Argyle Avenue

    7. Franklin Avenue/Gower Street

    8. Franklin Avenue/Beachwood Drive

    9. Yucca Street/Cahuenga Boulevard

    10. Yucca Street/Ivar Avenue

    11. Yucca Street/Vine Street

    12. Yucca Street/Argyle Avenue

    13. Hollywood Boulevard/Fuller Avenue

    14. Hollywood Boulevard/La Brea Avenue

    15. Hollywood Boulevard/Highland Avenue

    16. Hollywood Boulevard/Cahuenga Boulevard

    17. Hollywood Boulevard/Ivar Avenue

    18. Hollywood Boulevard/Vine Street

    19. Hollywood Boulevard/Argyle Avenue

    20. Hollywood Boulevard/Gower Street

    21. Hollywood Boulevard/Bronson Avenue

    22. Hollywood Boulevard/101 Freeway SB Ramps

    23. Hollywood Boulevard/101 Freeway NB Ramps

    24. Selma Avenue/Cahuenga Boulevard

  • 23

    25. Selma Avenue/Ivar Avenue

    26. Selma Avenue/Vine Street

    27. Selma Avenue/Argyle Avenue

    28. Sunset Boulevard/Highland Avenue

    29. Sunset Boulevard/Cahuenga Boulevard

    30. Sunset Boulevard/Ivar Avenue

    31. Sunset Boulevard/Vine Street

    32. Sunset Boulevard/Argyle Avenue

    33. De Longpre Avenue/Cahuenga Boulevard

    34. De Longpre Avenue/Vine Street

    35. Fountain Avenue/Vine Street

    36. Santa Monica Boulevard/Vine Street

    37. Melrose Avenue/Vine Street

    The traffic analysis was performed through the use of established traffic engineering

    techniques. The methodology used in this study for the analysis and evaluation of

    traffic operations at each study intersection is based on procedures outlined in Circular

    Number 212 of the Transportation Research Board1 for transportation planning

    analyses, such as this study. In the discussion of Critical Movement Analysis (CMA)

    for signalized intersections, procedures have been developed for determining operating

    characteristics of an intersection in terms of the Level of Service (LOS) provided for

    different levels of traffic volume, number of lanes provided, and other variables, such as

    the number of signal phases. The term "Level of Service" describes the quality of traffic

    flow. Levels of Service A to C operate quite well. Level D typically is the level for which

    a metropolitan area street system is designed. Level E represents volumes at or near

    the capacity of the highway which might result in stoppages of momentary duration and

    1 Interim Materials on Highway Capacity, Circular Number 212, Transportation Research Board,

    Washington, D.C., 1980.

  • 24

    fairly unstable flow. Level F occurs when a roadway is overloaded and is characterized

    by stop-and- go traffic with stoppages of long duration.

    A determination of the LOS at an intersection, where traffic volumes are known or have

    been projected, can be obtained through a summation of the critical movement volumes

    at that intersection. Once the sum of critical movement volumes has been obtained, the

    values indicated in Table 1 can be used to determine the applicable LOS.

    Table 1 Critical Movement Volume Ranges* For Determining Levels of Service

    Maximum Sum of Critical Volumes (VPH)

    Level of Two Three Four or Service Phase Phase More Phases A 900 855 825

    B 1,050 1,000 965

    C 1,200 1,140 1,100

    D 1,350 1,275 1,225

    E 1,500 1,425 1,375

    F --------------Not Applicable--------------- Note: * For planning applications only, i.e., not appropriate for operations

    and design applications.

    "Capacity" represents the maximum total hourly movement volume of vehicles in the

    critical lanes that have a reasonable expectation of passing through an intersection

    under prevailing roadway and traffic conditions. For planning purposes (such as for this

    traffic impact analysis), capacity equates to the maximum value of LOS E, as indicated

    in Table 1. The CMA values used in this study were calculated by dividing the sum of

    critical movement volumes by the appropriate capacity value for the type of signal

  • 25

    control present at the study intersections. Thus, the LOS corresponding to a range of

    CMA values is shown in Table 2.

    Table 2 Level of Service

    As a Function of CMA Values

    Level of Range of Service Description of Operating Characteristics CMA Values A Uncongested conditions; vehicles clear in a < 0.60 single cycle.

    B Similar to above. >0.60 < 0.70

    C Light congestion; occasional backups on >0.70 < 0.80 critical approaches.

    D Congestion on critical approaches, but >0.80 < 0.90 intersection functional. Vehicles required to wait through more than one cycle during short peaks. No long-standing lines formed.

    E Severe congestion with some long-standing >0.90 < 1.00 lines on critical approaches. Blockage of intersection may occur if traffic signal does not provide for protected turning movements.

    F Forced flow with stoppages of long duration. > 1.00

    By applying the above described process to the 37 study intersections, CMA values and

    corresponding LOS for existing (2011) traffic conditions were calculated. The results

    are shown in Table 3. The CMA calculation worksheets for existing conditions are

    included in Appendix I.

    As shown in Table 3, all of the study intersections are currently operating at LOS D or

    better during both AM and PM peak hours, except for the intersection of Franklin

    Avenue/Cahuenga Boulevard which is currently operating at LOS E during the PM peak

    hour.

  • 26

    Table 3 Critical Movement Analysis (CMA) Summary

    Existing (2011) Traffic Conditions

    No. Intersection CMA LOS CMA LOS1. 101 Fwy NB Off-Ramp/ Cahuenga Blvd. 0.353 A 0.648 B2. Franklin Ave./ Highland Ave. (North) 0.734 C 0.833 D3. Franklin Ave./ Highland Ave. (South) 0.763 C 0.744 C4. Franklin Ave./ Cahuenga Blvd. 0.833 D 0.955 E5. Franklin Ave.-101 Fwy SB Off-Ramp/Vine St. 0.377 A 0.628 B6. Franklin Ave.-101 Fwy NB On-Ramp/Argyle Ave. 0.669 B 0.789 C7. Franklin Ave./ Gower St. 0.591 A 0.752 C8. Franklin Ave./ Beachwood Dr. 0.663 B 0.664 B9. Yucca St./ Cahuenga Blvd. 0.447 A 0.617 B

    10. Yucca St./ Ivar Ave. 0.095 A 0.169 A11. Yucca St./ Vine St. 0.429 A 0.378 A12. Yucca St./ Argyle Ave. 0.111 A 0.300 A13. Hollywood Blvd./ Fuller Ave. 0.507 A 0.425 A14. Hollywood Blvd./ La Brea Ave. 0.898 D 0.737 C15. Hollywood Blvd./ Highland Ave. 0.708 C 0.741 C16. Hollywood Blvd./ Cahuenga Blvd. 0.741 C 0.701 C17. Hollywood Blvd./ Ivar Ave. 0.366 A 0.416 A18. Hollywood Blvd./ Vine St. 0.734 C 0.703 C19. Hollywood Blvd./ Argyle Ave. 0.445 A 0.617 B20. Hollywood Blvd./ Gower St. 0.693 B 0.637 B21. Hollywood Blvd./ Bronson Ave. 0.527 A 0.479 A22. Hollywood Blvd./ 101 Fwy SB Off-Ramps 0.471 A 0.357 A23. Hollywood Blvd./ 101 Fwy NB Off-Ramps 0.340 A 0.311 A24. Selma Ave./ Cahuenga Blvd. 0.468 A 0.561 A25. Selma Ave./ Ivar Ave. 0.121 A 0.294 A26. Selma Ave./ Vine St. 0.467 A 0.512 A27. Selma Ave./ Argyle Ave. 0.256 A 0.338 A28. Sunset Blvd./ Highland Ave. 0.886 D 0.831 D29. Sunset Blvd./ Cahuenga Blvd. 0.673 B 0.703 C30. Sunset Blvd./ Ivar Ave. 0.355 A 0.513 A31. Sunset Blvd./ Vine St. 0.806 D 0.737 C32. Sunset Blvd./ Argyle Ave. 0.439 A 0.443 A33. De Longpre Ave./ Cahuenga Blvd. 0.341 A 0.389 A34. De Longpre Ave./ Vine St. 0.468 A 0.585 A35. Fountain Ave./ Vine St. 0.684 B 0.765 C36. Santa Monica Blvd./ Vine St. 0.754 C 0.797 C37. Melrose Ave./ Vine St. 0.747 C 0.821 D

    PM Peak HourAM Peak Hour

  • 27

    PROJECT TRAFFIC

    The following section describes the methodology used to determine the trip generation,

    distribution and assignment of the Project. Driveway access and parking are also

    described in this section.

    Project Trip Generation

    Traffic-generating characteristics of many land uses, including the proposed uses and

    existing uses for the Project, have been surveyed and documented in studies conducted

    under the Institute of Transportation Engineers (ITE), Trip Generation, 8th Edition, 2008

    manual, with the exception of the existing Car Rental Facility. The rates used for the Car

    Rental Facility were derived from Appendix A10 of the Coastal Transportation Corridor

    Specific Plan. The trip generation rates in the ITE manual are nationally recognized,

    and are used as the basis for most traffic studies conducted in the City and the

    surrounding region. The rates for the Car Rental Facility were determined in

    consultation with LADOT as the most appropriate available rates.

    Accordingly, for this analysis, the trip generation rates and equations provided in

    Appendix D were used to estimate the daily, AM and PM peak-hour trips generated by

    the proposed and existing site uses. The ITE rates used to calculate the project trip

    generation provides an overly-conservative estimate, as these rates do not account for

    several significant factors which vary from project to project. These factors play a

    significant role in determining the actual traffic generating characteristics for a project,

    and therefore, adjustments to the project traffic generation estimates were deemed

    appropriate. The factors were developed in consultation with LADOT staff and in

    conformance with the LADOT guidelines. These factors are detailed below:

    The use of public transportation is an important consideration in the evaluation of a

    projects private automobile trip making potential. As noted previously in the Public

  • 28

    Transit section, transit service within the study area is extensive, especially with the

    Metro Red Line station one block south of the Site. Significant transit use as is

    anticipated for the Project is not accounted for in the ITE trip generation rates.

    Therefore, as indicated by the Memorandum of Understanding (MOU) contained in

    Appendix A, appropriate adjustments were discussed with LADOT and, found to be

    consistent with the LADOT Traffic Study Policies and Procedures. Those adjustments

    were made to the project trip generation to account for transit usage.

    Trip reductions related to the Project are also expected to occur as the result of multi-

    purpose or internal trips within the Site. This type of trip generally occurs at

    integrated developments containing a variety of uses. An example in this case would

    be that the residents, hotel guests and/or office workers are expected to use on-site

    retail, sports/fitness club and restaurant uses, thereby reducing some of the trips to and

    from the project site that these uses would have otherwise generated. Accordingly, the

    advantages of a mixed-use project have been considered in the evaluation of the trip-

    making potential of the Project and accounted for in the trip generation estimate in the

    MOU agreed to by LADOT.

    Trips generated by the Project were also reduced to account for the presence of pass-

    by trips. These are trips due to an intermediate stop at the Site during an existing or

    previously planned trip to another site. These intermediate stops may be for a planned

    purpose (such as stopping at a restaurant on the way from work), or they may be spur-

    of-the-moment impulse trips.

    Accounting for these adjustments more realistically reflects that some Project trips are

    already on the street system for another purpose and, therefore, are not contributing

    additional traffic to the surrounding roadway network.

  • 29

    Unlike transit trips, which result in a reduction in vehicle trips throughout the Project

    area, pass-by trips cannot be discounted at the Project driveway(s) or intersections

    immediately adjacent to the Site. Although pass-by trips represent motorists who would

    be on the nearby roadways anyway, the actual turning movements into and out of the

    Site must be explicitly accounted for.

    A summary of the baseline trip generation adjustment factors are presented in Table

    4. These project trip adjustment factors were developed and applied to the Project in

    consultation to LADOT.

    Table 4 Project Trip Adjustment Factors

    Proposed UsesResidential [1] 15% 0%Hotel 5% 10% 0%Fitness/Sports Club 15% 15% 20%Office [1] 15% 0%Retail 15% 15% 30%Quality Restaurant 15% 15% 10%

    [1] Internal trips based on support uses.

    Internal Capture

    Transit Usage

    Pass-By Trips

    Based on the trip generation rates and trip adjustment factors, the amount of new traffic

    expected to be generated by the Project was calculated. Table 5 summarizes the trip

    generation for the Project. As shown in Table 5, the Project is expected to generate

    approximately 9,922 net daily trips, including 574 trips during the AM peak hour (321

    inbound, 253 outbound) and 924 trips during the PM peak hour (486 inbound, 438

    outbound).

  • 30

    Table 5 Project Trip Generation

    AM Peak Hour PM Peak Hour

    LU Use/Description Size Units Daily I/B O/B Total I/B O/B Total

    Proposed Uses220 Residential 461 du 2,917 46 184 230 176 95 271310 Hotel 254 rooms 2,075 87 55 142 80 70 150492 Sports/Fitness Club 80,000 bldg sf 2,634 50 60 110 153 116 269710 General Office 264,303 bldg sf 2,820 359 49 408 64 311 375820 Retail 100,000 bldg sf 6,791 94 60 154 312 324 636931 Quality Restaurant 25,000 bldg sf 2,249 16 4 20 125 62 187

    Subtotal [A] 19,486 652 412 1,064 910 978 1,888

    Internal Trip CaptureCommute

    Residential 5% (146) (2) (10) (12) (9) (5) (14)Office (Based on Res.) 3% - 5% (146) (10) (2) (12) (5) (9) (14)

    SupportRes. (Based on support) 10% - 32% (943) (2) (22) (24) (57) (22) (79)Hotel 5% (104) (4) (3) (7) (4) (4) (8)Sports/Fitness Club 15% (395) (8) (9) (17) (23) (17) (40)Office (Based on support) 6% - 32% (912) (20) (6) (26) (21) (71) (92)Retail 15% (1,019) (14) (9) (23) (47) (48) (95)Quality Restaurant 15% (337) (2) (1) (3) (19) (9) (28)

    Subtotal [B] (4,002) (62) (62) (124) (185) (185) (370)

    Transit/Walk-in External TripsResidential 15% (274) (6) (23) (29) (17) (10) (27)Hotel 10% (197) (8) (6) (14) (8) (6) (14)Sports/Fitness Club 15% (336) (6) (8) (14) (20) (14) (34)General Office 15% (264) (49) (7) (56) (6) (34) (40)Retail 15% (866) (12) (8) (20) (40) (41) (81)Quality Restaurant 15% (287) (2) (1) (3) (16) (8) (24)

    Subtotal [C] (2,224) (83) (53) (136) (107) (113) (220)

    [D] Driveway ([A]+[B]+[C]) 13,260 507 297 804 618 680 1,298

    Pass-by Trips (% of External Auto)Sports/Fitness Club 20% (381) (7) (9) (16) (22) (17) (39)Retail 30% (1,472) (20) (13) (33) (68) (71) (139)Quality Restaurant 10% (163) (1) 0 (1) (9) (5) (14)

    Subtotal [E] (2,016) (28) (22) (50) (99) (93) (192)

    [F] Area Intersection Trips (Proposed Uses) 11,244 479 275 754 519 587 1,106([D]+[E])

  • 31

    Table 5 Project Trip Generation (Continued)

    AM Peak Hour PM Peak Hour

    LU Use/Description Size Units Daily I/B O/B Total I/B O/B Total

    Existing Uses710 General Office 114,303 bldg sf 1,479 184 25 209 35 172 207N/A Car Rental Facility 8,037 lot sf 102 2 2 4 4 4 8

    Subtotal [G] 1,581 186 27 213 39 176 215

    Existing Internal Trip CaptureOffice (Based on support) 0% - 1% (15) (1) 0 (1) 0 (1) (1)Car Rental Facility 15% (15) 0 (1) (1) (1) 0 (1)

    Subtotal [H] (30) (1) (1) (2) (1) (1) (2)

    Existing Transit/Walk-in TripsOffice 15% (220) (27) (4) (31) (5) (26) (31)Car Rental Facility 10% (9) 0 0 0 0 0 0

    Subtotal [I] (229) (27) (4) (31) (5) (26) (31)

    [J] Adjacent Intersection Trips ([G]+[H]+[I]) 1,322 158 22 180 33 149 182

    Pass-by Trips (None)

    [L] Area Intersection Trips (Existing Uses) 1,322 158 22 180 33 149 182([J]+[K])

    Net Site Adjacent Trips ([D]-[J])Residential 1,554 36 129 165 93 58 151Office 254 124 13 137 2 52 54Non-Office Commercial 10,130 189 133 322 490 421 911

    Total 11,938 349 275 624 585 531 1,116

    Net Area Trip Generation ([F]-[L])Residential 1,554 36 129 165 93 58 151Office 254 124 13 137 2 52 54Non-Office Commercial 8,114 161 111 272 391 328 719

    Total 9,922 321 253 574 486 438 924

    Project Trip Distribution

    The directional distribution of Project trips was estimated by taking into account existing

    traffic patterns, characteristics of the surrounding roadway system, and the geographic

    location and proximity of the Site to freeways and major travel routes. Based on these

  • 32

    factors, the overall project distribution percentages were determined and agreed to by

    LADOT, as summarized in Table 6.

    Table 6 Project Directional Trip Distribution

    Residential Office Non-Office CommercialNorth 10% 25% 25%South 30% 25% 25%East 35% 30% 25%West 25% 20% 25%

    100% 100% 100%

    Project Trip Assignment

    The directional distribution percentages for different land uses in Table 6 were then

    disaggregated and assigned to specific routes and intersections within the study area

    that are expected to be used to access the Project. Within the Project, the trips were

    connected to the locations where the parking for that Project use will be provided on the

    Site utilizing the routes considered most efficient and likely to be used by drivers.

    These Project trip assignment percentages for residential, office and non-office

    commercial are presented in Figure 5(a), 5(b) and 5(c) respectively. These

    percentages were reviewed and approved by LADOT.

    Applying the inbound and outbound percentages to the Project trip generation

    previously calculated in Table 6, the net traffic volumes for the Project at the 37 study

    intersections were determined for the AM and PM peak hours, as shown in Figures 6(a)

    and 6(b). The results of this traffic assignment provide the necessary level of detail to

    conduct the traffic impact analysis.

  • 38

    Project Parking and Access

    The Project would provide on-site parking in accordance with the parking requirements

    of the LAMC, and as otherwise permitted through a variance for the sports club parking

    and the Development Agreement with the use of a shared parking program. The actual

    number of parking spaces required for the Project will be dependent upon the land uses

    developed in accordance with the Land Use Equivalency Program included in the

    Development Agreement. (That program would limit the Project trip generation levels to

    those analyzed in this study.) The existing parking requirements and agreements that

    apply to the Capitol Records Complex would remain in place.

    Based on the code required parking standards and the implementation of a shared

    parking program (see Appendix E for the detailed parking analysis), it is envisioned that

    the Project would include above-grade parking within the podium structures and

    approximately six levels of below grade parking. The existing parking requirements and

    agreements that apply to the Capitol Records Complex would remain in place.

    Vehicular access to the West Site will be provided via two full-service driveways along

    Ivar Avenue and Vine Street respectively. The driveway on Ivar Avenue will be located

    approximately 250 feet south of Yucca Street and the driveway on Vine Street will be

    located approximately 270 feet south of Yucca Street. Both driveways will serve the

    parking structure on the West Site and thereby all uses of the project including the

    residential, commercial and non-commercial components situated on the West Site.

    To access the East Site, three full-service driveways will be provided on Vine Street,

    Yucca Street and Argyle Avenue. The driveway on Vine Street will be located about

    460 feet south of Yucca Street and will serve both the parking for both the residential

    and the office uses. The second East Site driveway, located on Argyle Avenue

    approximately 360 feet south of Yucca Street, will serve exclusively for the residential

  • 39

    use portion of the parking, while the third East Site driveway about 200 feet west of

    Argyle Avenue on Yucca Street will serve the office use portion of the parking

    exclusively.

    Ingress/egress driveways to/from the Site will be designed and constructed in

    accordance with the City design standards. A preliminary analysis concludes that the

    driveways as shown on the conceptual plans (Figure 3) will not introduce any unusual

    adverse hazards. The Citys permit process will ensure that no hazards are introduced

    into the final design and that the driveways will comply with the Citys applicable

    emergency and other access requirements. The final construction Site plan will be

    assessed in detail by LADOT as part of the building permit plan set approval process to

    ensure that 1) adequate emergency circulation is still being provided prior to a building

    permit being issued, 2) width and gate set back requirements are all met, and 3)

    adequate driveway sight distance continues to be provided for vehicles maneuvering

    into or out of the Project driveways.

  • 40

    WITH PROJECT TRAFFIC CONDITIONS

    This traffic report studies Existing and Existing Plus Project scenarios in addition to

    cumulative growth scenarios. This section analyzes the Project traffic impacts under

    both the existing and future conditions.

    Significant Traffic Impact Criteria

    LADOT defines a significant traffic impact attributable to a project based on a stepped

    scale with intersections experiencing high volume-to-capacity ratios being more

    sensitive to additional traffic than those operating with more available capacity.

    According to LADOT policy, a significant impact is identified as an increase in the CMA

    value due to project-related traffic of 0.010 or more when the final (with project) Level of

    Service is LOS E or F, a CMA increase of 0.020 or more when the final Level of Service

    is LOS D, or a CMA increase of 0.040 or more at LOS C. No significant impacts are

    deemed to occur at LOS A or B, as these operating conditions exhibit sufficient surplus

    capacities to accommodate large traffic increases with little effect on traffic delays.

    These criteria are summarized in Table 7.

    Table 7 LADOT Criteria for Significant Traffic Impact

    LOS Final CMA Value Project-Related Increase in CMA Value

    C 0.700 - 0.800 equal to or greater than 0.040 D > 0.800 - 0.900 equal to or greater than 0.020

    E, F > 0.900 equal to or greater than 0.010

  • 41

    Existing (2011) With Project Conditions

    The analysis of existing traffic conditions at the study intersections for existing year

    (2011) was performed as described previously. The Existing intersection volumes for

    the AM, and PM peak hours were shown previously on Figures 4(a) and 4(b)

    respectively. These estimates are the "benchmark" volumes used in determining

    project traffic impacts on the existing street system. Traffic volumes generated by the

    Project were then added to the Existing (2011) volumes to form th