METHOD STATEMENT Description of Task / Activity: METHOD STATEMENT FOR PAINTING WORKS Project Name: Company: Document Reference: Associated JSA Reference Number Attached Yes No Prepared By: Position: Mechanical Engineer Date: 05 th July,2015 Discipline Engineer: Position: Mechanical Engineer Date: 05 th July, 2015 Contractor Project Manager Review: Position: MEP Manager Date: 05 th July, 2015 DL Discipline Engineer/Manager Review: Bassam Alameer Position: MEP Manager Date: 05 th July, 2015 DL HSE Manager Review: Position: Date: WPF Review: Position: Date: DL/HSE/MS/0001 Rev. 01

Upload: mohd-rashid

Post on 12-Jan-2016

10 views

Category:

Documents


1 download

DESCRIPTION

Painting works method of statetment

TRANSCRIPT

Page 1: Method of Statement for Paint

METHOD STATEMENT

Description ofTask / Activity:

METHOD STATEMENT FOR PAINTING WORKS

Project Name:

Company:

Associated JSA

Reference Number Attached

Yes No

Prepared By:

Position: Mechanical Engineer Date: 05th July,2015

Discipline Engineer:

Position: Mechanical Engineer Date: 05th July, 2015

Contractor Project Manager Review:

Position: MEP Manager Date: 05th July, 2015

DL Discipline Engineer/Manager Review:

Bassam Alameer

Position: MEP Manager Date: 05th July, 2015

DL HSE Manager Review:

Position: Date:

WPF Review:

Position: Date:

Key Plant and Tools Required:

Paint brush, roller, Scaffolding and Ladder

DL/HSE/MS/0001 Rev. 01

Document Reference:

Page 2: Method of Statement for Paint

METHOD STATEMENT

Key Materials Required:

Paint

Other Essential Equipment:

(ie: access platforms/winches/ladders etc)

Specific Identified Residual Hazards:(or refer to the task specific risk assessment(s))

Specific Staff Training Requirements:

WORKING AT HEIGHT

Temporary Supports and Props needed to facilitate the works:

NONE

Method of Access and Egress to the work area:

LADDERS

SCAFFOLDS

Fall Protection Measures:(Where work at height cannot be eliminated - consider both Personnel & Materials)

SAFETY HARNESS

Hazardous Substances:(Attach COSHH Assessments and MSDS)

Very Toxic Harmful/Irritant

Corrosive Dangerous for the

environment

Oxidising Highly flammable

Explosive

Applicable: No Yes No Yes Yes Yes No

SWL's:

(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure where the work is taking place.)

Required Personnel Protective Equip.:

OTHER:

1: Coveralls

DL/HSE/MS/0001 Rev. 01

Page 3: Method of Statement for Paint

METHOD STATEMENT2: Gas Detector

3: Gas Mask/Hood

:

Safety Boots

Hard Hats Safety Gloves

Hearing Protection

Respiratory Protection

Eye Protection

High Visibility

Welder Shield

Face Shield Fall Arrest Disposable Mask

Goggles

Emergency Procedures:

First Aid Facilities:

Name of On-Site First Aider: ABBAS

First Aid Box Location:

Location of Nearest Hospital:

Other Information & Comments:

RESPONSIBILITIES

1) All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full accordance with safety procedures specified.

2) It is the responsibility of the supervisor to ensure prior to giving any personnel the job of Painting that they are fully aware of the hazards involved and are competent to carry out the work safely.

3) The supervisor must ensure that this procedure is fully complied with.

DL/HSE/MS/0001 Rev. 01

Page 4: Method of Statement for Paint

METHOD STATEMENT

Sequence of Operations:(Specifying methods of working, tools, materials and equipment utilised)

1) Ensure the surface is free from any grease and dust prior to application of

painting.

2) Paint/ Primer to properly mixed in a steel pail separately.

3) Apply the primer by means of paint roller/ brush to as many as coat to

achieve the thickness.

4) Allow the painted surface to fully cue as per the painting procedure and

project specification.

5) Carry out the second coat and final coat painting as per approved project

specification.

6) After the completion of Final Inspection remove ladders and scaffolds for the

work area.

7) Remove all the debris and garnet spillage from the work spot

8) All the tools from the work area to be removed and area to be thoroughly

clean the area.

9) For Mixing ratio and dry time refer Data Sheet.

DL/HSE/MS/0001 Rev. 01

Page 5: Method of Statement for Paint

METHOD STATEMENTMETHOD STATEMENT ACCEPTANCE FORM

TITLE PAINTING WORKS ON PIPES IN POWER GENERATION BUILDING

DATE TRADENAME

PRINT SIGNATURE

RESPONSIBLE ENGINEER / SUPERVISOR

DL/HSE/MS/0001 Rev. 01

I HAVE READ AND UNDERSTOOD THE METHOD STATEMENT FOR THE WORK ACTIVITIES ABOVE