mehsana, gujarat · pradhan mantri krishi sinchayee yojana (pmksy) district irrigation plan...
TRANSCRIPT
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)MEHSANA, GUJARAT
MEHSANA
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)MEHSANA, GUJARAT
MEHSANA
1
Contents Executive Summary ................................................................................................................... 6
Introduction ......................................................................................................................... 10
i. Background ....................................................................................................................... 10
ii. Vision ............................................................................................................................... 15
iii. Objective.......................................................................................................................... 15
iv. Strategy/approach ........................................................................................................... 16
v. Programme Components.................................................................................................. 16
v. Rationale/ Justification .................................................................................................... 18
vi. Methodology .................................................................................................................... 18
1 General Information of the District ........................................................................ 20
1.1 District Profile ........................................................................................................... 20
1.2 Demography .............................................................................................................. 22
1.3 Biomass and Livestock .............................................................................................. 24
1.4 Agro-Ecology, Climate, Hydrology and Topography ................................................ 26
1.5 Soil Profile ................................................................................................................. 27
1.6 Land Use Pattern ....................................................................................................... 28
2 District Water Profile ....................................................................................................... 31
2.1 Area Wise, Crop Wise Irrigation Status .................................................................... 31
2.2 Production and Productivity of Major Crops ............................................................ 36
2.3 Irrigation Based Classification .................................................................................. 38
3 Water Availability ............................................................................................................. 39
3.1 Status of Water Availability ...................................................................................... 40
3.2 Status of Ground Water Availability ......................................................................... 41
3.2.1 Hydrogeology ..................................................................................................... 42
3.2.2 Geomorphology ................................................................................................. 42
3.3 Status of Command Area .......................................................................................... 43
3.4 Existing type of Irrigation ......................................................................................... 46
4 Water Requirement / Demand ......................................................................................... 47
4.1 Domestic Water Demand .......................................................................................... 47
4.2 Crop Water Requirement .......................................................................................... 48
4.3 Livestock Water Requirement .................................................................................. 50
4.4 Industrial Water Requirement .................................................................................. 51
4.5 Water Demand for Power Generation ...................................................................... 51
4.6 Total Water Demand of the district for various sectors ............................................ 51
4.7 Water Budget ............................................................................................................ 52
2
5 Strategic Action Plan for Irrigation in District under PMKSY ......................................... 53
5.1 Component wise Strategic Action Plan ..................................................................... 53
5.2 Department wise allocation of budget ...................................................................... 55
5.3 Year wise Strategic Action Plan ................................................................................. 56
5.4 Monitoring and Evaluation ....................................................................................... 56
5.5 Output & Outcome .................................................................................................... 57
5.5.1 Additional Area to be irrigated .......................................................................... 57
5.5.2 Employment Generation ................................................................................... 58
5.5.3 Increase in the income of farmers ..................................................................... 58
5.6 Suggestions................................................................................................................ 58
5.7 Summary Strategic Action Plan ............................................................................ 60
5.8 Annexure - Department wise strategic action plans ................................................. 65
5.8.1 Nodal Irrigation Department ............................................................................. 65
5.8.2 SSNNL ................................................................................................................ 69
5.8.3 GWRDC .............................................................................................................. 70
5.8.4 GLDC .................................................................................................................. 72
5.8.5 GGRC ................................................................................................................. 73
5.8.6 GSWMA ............................................................................................................. 75
5.8.7 ATMA ................................................................................................................. 95
3
LIST OF TABLES:
Table 1.1: District Profile .......................................................................................................... 20
Table 1.2: Gender wise classification of Population ................................................................ 22
Table 1.3: Category wise population ........................................................................................ 23
Table 1.4: Locality wise population.......................................................................................... 24
Table 1.5: Population of small animals .................................................................................... 25
Table 1.6: Population of Large Animals & Draft Animals........................................................ 25
Table 1.7: Agro-Ecology Data ................................................................................................... 26
Table 1.8: Agro-ecological situations of district ...................................................................... 26
Table 1.9: Soil Classification .................................................................................................... 28
Table 1.10: Land Use Pattern ................................................................................................... 28
Table 2.1: Area wise Irrigation Status of Agriculture Crops (2013-14) - District Summary.... 31
Table 2.2: Area wise Irrigation Status of Agriculture Crops (2013-14) - Taluka Summary .... 32
Table 2.3: Area under Horticulture Crops (2014-15) .............................................................. 35
Table 2.4: Area under Horticulture Crops (2014-15) - Taluka wise ........................................ 35
Table 2.5: Production and Productivity of Major Crops – Kharif Season .............................. 36
Table 2.6: Production & Productivity - Rabi season ................................................................ 37
Table 2.7: Production & Productivity of Crops - Summer Season ........................................... 37
Table 2.8: Irrigation based classification ................................................................................ 38
Table 3.1: Status of water availability ...................................................................................... 40
Table 3.2: Details of STP .......................................................................................................... 41
Table 3.3: Status of ground Water ........................................................................................... 42
Table 3.4: Status of Canal Command ...................................................................................... 43
Table 3.5: Status of other services command .......................................................................... 44
Table 3.6: Existing type of Irrigation ....................................................................................... 46
Table 4.1: Present Water Demand (2015) ................................................................................ 47
Table 4.2: Future Water demand (2020) ................................................................................ 47
Table 4.3: Crop water demand................................................................................................. 48
Table 4.4: Crop wise water requirement ................................................................................. 49
Table 4.5 Livestock water demand .......................................................................................... 50
Table 4.6: Animal wise water requirement .............................................................................. 51
Table 4.7: Industrial water requirement.................................................................................. 51
Table 4.8: Total water demand ................................................................................................ 51
Table 4.9: Water budget .......................................................................................................... 52
Table 5.1: Component wise Strategic Action Plan Budget ....................................................... 53
Table 5.2: Department wise allocation of budget .................................................................... 55
Table 5.3 GSWMA Plan Abstract ............................................................................................. 55
Table 5.4 Convergence with MNREGA .................................................................................... 56
Table 5.5 Additional Area to be irrigated .......................................................................... 57
Table 5.6 Employment Generation .......................................................................................... 58
Table 5.7: District level plan of Nodal Irrigation Department ................................................ 65
Table 5.8: Taluka summary of nodal irrigation department ................................................... 65
Table 5.9: Taluka plan of Nodal Irrigation Department .......................................................... 65
Table 5.10: District level plan of SSNNL ................................................................................. 69
Table 5.11: Taluka level plan of SSNNL - CE Ahmedabad ....................................................... 69
4
Table 5.12: Taluka level plan of SSNNL - CE Mehsana ........................................................... 70
Table 5.13: District level plan of GWRDC ................................................................................ 70
Table 5.14: Taluka level plan of GWRDC ................................................................................. 71
Table 5.15: District level plan of GLDC .................................................................................... 72
Table 5.16: Taluka level plan of GLDC ..................................................................................... 72
Table 5.17: District level plan of GGRC ................................................................................... 73
Table 5.18: Taluka level plan of GGRC .................................................................................... 74
Table 5.19 District plan of GSWMA ......................................................................................... 75
Table 5.20: Strategic Action Plan of ATMA ............................................................................. 95
5
LIST OF FIGURES:
Figure 1.1 Block wise Population Distribution ......................................................................... 23
Figure 1.2: Category wise population ...................................................................................... 24
Figure 1.3: Population of Large Animals ................................................................................. 25
Figure 2.1: Gross Irrigated and Rainfed area under Agriculture Crops .................................. 32
Figure 3.1: Water availability of district .................................................................................. 41
Figure 4.1: Block wise Domestic Water Requirement (MCM) ................................................ 48
Figure 4.2: Crop water demand & existing water potential ..................................................... 49
Figure 5.1: Component wise Fund Distribution under PMKSY .............................................. 54
Figure 5.2: Yearly budget requirement .................................................................................... 56
LIST OF MAPS:
Map 1-1 District Map ............................................................................................................... 21
Map 1-2 Map of Agro-ecological situations ............................................................................. 27
Map 1-3 District Soil Map ........................................................................................................ 29
Map 1-4 District Watershed Map............................................................................................. 30
Map 3-1 River & Waterbody Map ............................................................................................ 39
Map 3-2 Canal Map of district ................................................................................................. 45
6
Executive Summary In an agrarian economy like India, agriculture utilizes the major share of country‟s
exploitable water resources. Though the sector utilizes the maximum share of
exploitable water resources, availability of the same at different locations to different
extent makes it vital to adopt effective utilization of water through storage,
channelizing and judicial use. At some places like Punjab and Haryana, the
environmental and socio-economic rationale for this capture by the sector is now
being questioned. Accordingly, it is needed to challenge and change the
fundamentals of the prevailing view of water resources exploitation. A new and more
suitable approach to water resources allocation is necessary if the population is to be
adequately fed, without further degradation and destruction of the critical ecosystem
services. Water productivity needs to be enhanced considerably, and economic cost-
benefit analysis and pricing regimes can play a significant role in such a process.
However, these economic measures will not be sufficient on their own. They will
need to be buttressed by technological innovation and institutional changes in order
to encourage a more equitable distribution of resources and to mitigate potential
international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a
resource by agriculture. Agricultural use of water for irrigation is itself contingent on
land resources. In a situation of growing water scarcity and rising demands for non-
agricultural (household and industrial) use of water, reassessment of sectoral
allocations of water are inevitable. In developing countries, irrigated agriculture
plays a vital role in contributing towards domestic food security and poverty
alleviation. Therefore, achievement of these objectives is dependent on adequate
allocations of water to agriculture. Justification of such allocations requires that
irrigated agriculture be a cost-effective means of achieving stated political or social
objectives, such as food security or poverty alleviation, and that all externalities be
taken into account in the pricing mechanism. Improved allocation of irrigation water
is required within the agriculture sectors in order to achieve greater efficiency in the
use of irrigation water and existing irrigation infrastructure. Reallocation is also
required in order to reduce waterlogging and salinization of irrigated land, to
decrease the negative environmental impacts and other externalities of irrigation
(caused by over extraction of groundwater and depletion and pollution of surface
water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas.
Priorities of Government of India were reflected in the Hon‟ble President‟s address to
the joint Session of the Parliament of 16th Lok Sabha where it was emphasized that
“Each drop of water is precious. Government is committed to giving high priority to
water security. It will complete the long pending irrigation projects on priority and
7
launch the „Pradhan Mantri Krishi Sinchayee Yojana‟ with the motto of „Har Khet Ko
Pani‟. There is a need for seriously considering all options including linking of rivers,
where feasible; for ensuring optimal use of our water resources to prevent the
recurrence of floods and drought. By harnessing rain water through „Jal Sanchay‟ and
„Jal Sinchan‟, water conservation and ground water recharge will be nurtured. Micro
irrigation will be popularized to ensure „Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period
of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-
going schemes of Ministry of Water Resources, River Development and Ganga
Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural
Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed and
Convergence with MGNREGA were brought together under the umbrella program of
PMKSY. Further the scheme seeks convergence with other schemes like Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural
Electrification programmes (JLNNSM & REP), Rural Infrastructure Development
Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD),
Members of Legislative Assembly Local Area Development Fund (MLALAD), Local
Body Funds (LBF), Working Plan of State Forest Department (WPSFD), etc.
PMKSY will be implemented in an area development mode only by adopting a
decentralized state level planning and projectised execution structure that will allow
the state to draw up their own irrigation development plans based on DIPs and SIPs
with a horizon of 5-7 years. The program will be supervised and coordinated utilizing
the existing mechanism and structure available under Rashtriya Krishi Vikas Yojana
(RKVY) program with state agriculture department acting as the State Nodal Agency
for implementation of PMKSY. However, the implementing departments for the four
components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop)
and PMKSY (watershed development) will be decided by the respective program
ministry/department.
The 05 chapters along with introduction chapter, explains the profile of district, its
water requirement for agriculture and allied sector, water availability, assessment of
water requirement for various sectors and strategic action plan for augmentation and
effective management of available water resources.
District Profile: Mahesana district is an important district in North Gujarat region.
As per 2011 census, the district has a population of 20,35,064 persons with
population density of 462 per sq km. Population wise it ranks 15th in the State. The
male and female population in the district is 10,56,520 and 9,78,544 respectively
with a female/male sex ratio of 926/1000. The district has semi-arid climate with
three distinguished seasons i.e. Kharif (June to September), Rabi (October to
January) and Summer (February to May). According to climate, topography, soil
characteristics and cropping pattern, Mahesana district falls under North Gujarat
8
Agro-climatic Zone-IV, which is further sub-divided into 4 Agro-ecological
situations. The soil type of Mahesana district in general is sandy loam. It has low
water holding capacity. The soils of the district possess neutral (in reaction) soil pH
(6.5 to 7.5).
Agriculture in Mehsana: Castor, bajra, cotton, tomato, moong are the main
kharif crops and wheat, mustard and cumin are the main rabi crops grown in the
district. As per 2013-14 data, out of gross cropped area of 5,45,781 ha (exclusive of
horticulture crops) in the district, 3,73,985 ha (or 68.52%) is irrigated while 1,71,796
ha (31.48%) is rainfed. Kharif crops have a share of 3,04,946 ha (or 55.87%), Rabi
crops have a share of 1,87,480 ha (or 34.35%) and Summer crops have a share of
53,355 ha (or 9.78%). During the year 2013-14, total production of major agricultural
crops and the productivity were recorded as 23,69,299 quintals & 1351.84 kg/ ha
(Kharif season), 44,48,997 quintals & 3639 kg/ ha (Rabi season), and 3,50,750
quintals & 2361 kg/ ha (Summer season).
As per 2014-15 data, out of 58,661 ha area under horticulture crops in the district,
fruits, vegetables, spices and flowers have area share of 32.77 per cent, 45.81 per
cent, 21.17 per cent and 0.25 per cent respectively. 96.72% of the area under
horticulture crops was irrigated in the district.
District Water Profile: River system of Mahesana district includes Khari river and
Rupen river. Both these rivers are ephemeral in nature and flow only during good
monsoon years. The river Sabarmati forms the eastern boundary of the district with
very limited catchment area in the district. Major part of the area in the district is
devoid of any drainage network and does not fall in any catchment. Sources of water
supply include major & medium irrigation canals, minor irrigation tanks, diversion
channels, rain water harvesting structures and ground water extraction structures
such as bore wells. However, overexploitation of groundwater has been observed in
the district with the draft considerably exceeding the recharge. As per Central
Ground Water Board notification 2011, the status ground water in eight Talukas of
the district is over exploited, while in one block it is critical.
During the year 2014-15, total canal command of the district was 1,84,058 Ha, out of
which 1,11,919 Ha is developed and 71,020 Ha is undeveloped. Further, total other
services command of the district was 11,007 Ha, out of which all area was developed.
There were 21 nos. of government canals, 73 nos. of community ponds, 210 nos. of
private ponds, 355 nos. of water harvesting structures and 292 nos. of government
bore wells, in the district.
The total water annual water availability of the district is 1708.3027 MCM, out of
which share of surface water and ground water are nearly equal to 50%. Further,
there are 6 ongoing projects and 3 proposed projects of Sewage Treatment Plant
(STP) in the district. On completion of above STP projects, the treated water will be
9
mainly used for irrigation and industrial purposes. This will add annual water
availability of 36.368 MCM by the year 2020.
Demand for water sources and the gap: The present & projected water demand
from various sectors such as domestic, livestock, agriculture, industrial and power in
the district is assessed. The total present water demand from various sectors is
2113.1535 MCM, while future water demand (2020) is 2132.3975 MCM. To meet this
demand, total of 872.0627 MCM surface water and 836.24 MCM ground water is
available in the district. Further, water availability of 36.368 MCM will be added by
2020 through ongoing and proposed STP units. Therefore, the present water gap is
to the tune of 404.851 MCM, and the projected water gap (2020) shall be to the tune
of 387.727 MCM. To bridge this gap, strategic action plan has been prepared by
various departments.
Proposed plan: Total planned outlay for four years works out to be Rs.
1073.1098 Crores. Maximum share of Rs. 828.648 Crores (77.22%) is for Har Khet
Ko Pani Component, followed by Per Drop More Crop Component of Rs. 101.62
Crores (9.47%), followed by AIBP Component of Rs. 74.259 Crores (6.92%), followed
by PMKSY Watershed Component of Rs 67.219 Crs (6.26%), and very marginal share
of Extension Component of Rs 1.363 Crs (0.13%). Considering department wise fund
requirement, maximum share of Rs. 573.76 Crores (53.47%) is for Nodal Irrigation
Departments, followed by SSNNL of Rs. 284.8478 Crores (26.54%), followed by
marginal shares of GSWMA (6.26%), GGRC (6.47%), GWRDC (4.94%), GLDC
(2.19%), and ATMA (0.13%). The budget requirement of GSWMA includes
component of convergence with MNREGA of Rs 374.578 Lakhs.
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be
monitored by the District Level Irrigation Committee. During the upcoming four
financial years, an additional area of 80,555 ha area will be covered under PMKSY.
This will generate additional total number of man days of 1,27,97,381, and increase
in the income of agricultural labourers in the district by Rs. 228.77 Lakhs.
10
Introduction
i. Background
Preparation of decentralized area specific district planning process visualized in
various plans took concrete shape through the years and initiatives like specific
guidelines on methodologies and processes for preparation of district plans;
framework for preparation of perspective plan, medium term and annual plans by
then planning commission in 1969 and the 73rd and 74th constitutional amendments
conferring constitutional status to Panchayats at district and sub district level; local
self-government in urban areas; constitution of district planning committee to
consolidate the plans prepared at Panchayats and municipalities and prepare a draft
development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by
planning commission on preparation of district level plans and making it an integral
part of the process of preparation of the states 11th five year plan. The Planning
commission issued guidelines in August 2006 for preparation of the district plans.
The guidelines define the District Planning as „the process of preparing an integrated
plan for the local government sector in a district taking into account the resources
(natural, human and financial) available and covering the sectorial activities and
schemes assigned to the district level and below and those implemented through
local governments in a state. The document that embodies this statement of
resources and their allocation for various purposes is known as the District Plan”.
Government of India through a resolution in National Development Council on 29th
May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to
address the slow growth of agriculture and allied sectors by incentivizing states to
draw up plans for their agriculture sectors more comprehensively. The NDC
resolution states "GoI introduced a new Additional Central Assistance Scheme to
incentivize states to draw up plans for their agriculture sector more comprehensively,
taking agro-climatic conditions, natural resource issues and technology into account,
and integrating livestock, poultry and fisheries, etc. This involved a new scheme for
Additional Central Assistance (ACA) to State Plans, administered by the Union
Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to
supplement the State-specific strategies including special schemes for beneficiaries
of land reforms. The newly created National Rainfed Area Authority on request, was
to assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a comprehensive district
agriculture plans (C-DAP) that will fully utilize available resources and include allied
agriculture sectors. Further, GOI issued a manual on preparation of comprehensive
district agriculture plans to help the states prepare C-DAP. As per these guidelines,
the objective of district planning is „to design an integrated and participatory action
plan for the development of local area in general and agriculture and allied sectors in
particular‟. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:
11
To prepare a Comprehensive District Agriculture Plan (C-DAP) through
participatory process involving various organisations and stakeholders.
To enable optimum utilisation of scarce natural, physical & financial
resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like
credit, technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with
food security and cropping system that will improve farmers‟ income.
The guidelines required the state/district authorities to (i) ensure that the
agricultural plans are prepared for the district and then integrated into the
agricultural plans of the State based on the agro-climatic conditions, availability of
technology, trained manpower and natural resources; (ii) local needs / crops / feed
and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the
plan; (iii) productivity gaps for important crops and livestock and fisheries are
reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process
was the Government of India guidelines issued in 2015 in the form of a template for
the preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as
part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the
preparation of DIP and SIP mandatory for the states to receive funds from the
program. The present report is a product of these long drawn efforts of Government
of India to strengthen the decentralized planning process in the country focusing on
the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological
balance and promotion of developmental activities. Considering its vital importance
and ever increasing demand for water, in the face of population growth, urbanization
& industrialization and considerations of climatic change, making water, an
increasingly a scarce resource, available to multiple uses, planning and management
of this vital resources, utilization of water economically, optimally and equitably
assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry
of Water Resources suggests an availability of 1123 billion cubic meters (BCM)
against a current estimated demand of 710 BCM. The Standing Committee of the
Ministry of Water Resources estimates that this water demand will rise to 1093 BCM
by 2025. Though the existing water availability in the immediate future seems to be
adequate, with the near constant supply of water resources in the face of increasing
12
demand on account of population growth, urbanisation and industrialization will
strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was
reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800
cubic meters. The projected per capita availability of water is 1341 cubic meters in
2025 and 1140 cubic meters in 2050 suggesting shortage of water in the medium
term1. Further, the all India water balance estimates does not reflect the variations in
water balance across time and space- certain areas having a positive water balance
and the others facing acute shortage. The problem is further accentuated by water
quality related issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were
allocated for irrigation purposes and the rest meeting the domestic and industrial
demands. In a recent study2 on the demand for water from agriculture, domestic and
industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34
BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42
BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total
balance water available while agriculture demand for water will be (605 BCM in
2000, 675 BCM in 2025 and 637 BCM in 2050). This change is partly because of the
changing sectorial contributions of India‟s GDP and also partly because of dynamics
of irrigation development in the country where the initial expansion in area under
irrigation is propelled by the availability of abundant water resources and availability
of good quality land. This is no longer the case in many of the states where the
availability of land and water are serious constraints for further expansion of
irrigation. Further, as per the erstwhile planning commission up to March 2012 out
of 141 million hectares of net sown area in the country 114 (or 81%) million hectares
is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation
Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This
leaves 40 percent of the net sown area in the country dependent on rainfall which
makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns
were to be addressed through certain basic principles and commonality in
approaches in dealing with planning, development and management of water
resources3 under an Integrated Water Resource Management framework. The main
objectives of water resource management as delineated in National Water Policy
2012 are:
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India,
New Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water
Management Institute, Colombo. 3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
13
a) Planning, development and management of water resources need to be
governed by common integrated perspective considering local, regional, State
and national context, having an environmentally sound basis, keeping in view
the human, social and economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to
the objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making
and regulation of water resources.
d) Water needs to be managed as a common pool community resource held, by
the state, under public trust doctrine to achieve food security, support
livelihood, and ensure equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum
ecological needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive
needs, followed by high priority allocation for other basic domestic needs
(including needs of animals), achieving food security, supporting sustenance
agriculture and minimum eco-system needs. Available water, after meeting
the above needs, should be allocated in a manner to promote its conservation
and efficient use.
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation,
runoff, river, lakes, soil moisture, and ground water, sea, etc., are
interdependent and the basic hydrological unit is the river basin, which should
be considered as the basic hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future
needs will depend more on demand management, and hence, this needs to be
given priority, especially through (a) evolving an agricultural system which
economizes on water use and maximizes value from water, and (b) bringing in
maximum efficiency in use of water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an
integrated manner, consistent with broader environmental management
approaches inter-alia including the use of economic incentives and penalties
to reduce pollution and wastage.
j) The impact of climate change on water resources availability must be factored
into water management related decisions. Water using activities need to be
regulated keeping in mind the local geo climatic and hydrological situation.
The National Water Policy 2012 drives the water resource management program
planning and management in the country. Government of India launched
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the constraints in
providing assured irrigation as well as increasing efficiency and productivity of
current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon‟ble President‟s address to the joint
14
Session of the Parliament of 16th Lok Sabha where he indicated that “Each drop
of water is precious. Government is committed to giving high priority
to water security. It will complete the long pending irrigation projects
on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’
with the motto of ‘Har Khet Ko Pani’. There is a need for seriously
considering all options including linking of rivers, where feasible; for
ensuring optimal use of our water resources to prevent the
recurrence of floods and drought. By harnessing rain water through
‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation
and ground water recharge. Micro irrigation will be popularised to
ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 Crores over a
period of five years from 2015-16 to 2019-20. The programme is an amalgamation of
on-going schemes of Ministry of Water Resources, River Development and Ganga
Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural
Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed &
Convergence with MGNREGA were brought together under the umbrella program of
PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi
National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas
Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programmes (JLNNSM & REP), Rural Infrastructure Development Fund (RIDF),
Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds
(LBF), Working Plan of State Forest Department (WPSFD) etc.
The PMKSY will be implemented in an area development mode only by adopting a
decentralized state level planning and projectised execution structure that will allow
the state to draw up their own irrigation development plans based on DIPs and SIPs
with a horizon of 5-7 years. The program will be implemented as part of Rashtriya
Krishi Vikas Yojana (RKVY) with state agriculture department acting as the State
Nodal Agency. However, the implementing departments for the four components like
AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY
(watershed development) will be decided by the respective program
ministry/department.
The funds under this program would be provided to the states as per the pattern of
assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance
and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme
was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The
financial assistance provided to the state governments from this centrally sponsored
scheme is subject to fulfilment of certain conditions. Firstly, a state will become
eligible to access PMKSY fund only if it has prepared the District Irrigation Plans
(DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the
15
expenditure in water resource development for agriculture sector in the year under
consideration is not less than the baseline expenditure, which is defined as the
average of the expenditure in irrigation sector irrespective of the department in the
state plan in three years prior to the year under consideration. Secondly, States will
be given additional weightage for levying charges on water and electricity for
irrigation purposes, so as to ensure sustainability of the programme. Thirdly,
interstate allocation of PMKSY fund will be decided based on
Share of percentage of unirrigated area in the state vis-à-vis national average
including prominence of areas classified under Desert Development
Programme (DDP) and Drought Prone Area Development Programme
(DPAP)
Increase in percentage share of expenditure on water resource development
for agriculture sector in State Plan expenditure in the previous year over three
years prior to it and
Improvement in irrigation efficiency in the state.
ii. Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be
to ensure access to some means of protective irrigation to all agricultural farms in the
country, to produce „per drop more crop‟, thus bringing much desired rural
prosperity.
iii. Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation
of district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area
under assured irrigation (Har Khet Ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use
of water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase
availability both in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving
technologies (More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation
practices
g) Ensure the integrated development of rainfed areas using the watershed
approach towards soil and water conservation, regeneration of ground water,
arresting runoff, providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management
and crop alignment for farmers and grass root level field functionaries.
16
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
iv. Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct
water sources; construction of water harvesting structures, secondary & micro
storage, groundwater development, enhancing potentials of traditional water
bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo
(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and
M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both
assured and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to
access recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the
farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and
other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer
producers‟ organisations/NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on
more crop per drop of water through mass media campaign, exhibitions, field
days, and extension activities through short animation films etc.
v. Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP): To focus on faster
completion of ongoing Major and Medium Irrigation including National Projects
2. PMKSY (Har Khet Ko Pani):
a) Creation of new water sources through Minor Irrigation (both surface and ground
water)
b) Repair, restoration and renovation of water bodies; strengthening carrying
capacity of traditional water sources, construction rain water harvesting structures
(Jal Sanchay)
c) Command area development, strengthening and creation of distribution network
from source to the farm
d) Ground water development in the areas where it is abundant, so that sink is
created to store runoff/ flood water during peak rainy season
17
e) Improvement in water management and distribution system for water bodies to
take advantage of the available source which is not tapped to its fullest capacity
(deriving benefits from low hanging fruits). At least 10% of the command area to be
covered under micro/precision irrigation
f) Diversion of water from source of different location where it is plenty to nearby
water scarce areas, lift irrigation from water bodies/rivers at lower elevation to
supplement requirements beyond IWMP and MGNREGS irrespective of irrigation
command
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc.
at feasible locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan,
approval of annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices
like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan)
c) Topping up of input cost particularly under civil construction beyond
permissible limit (40%), under MGNREGS for activities like lining inlet,
outlet, silt traps, distribution system etc.
d) Construction of micro irrigation structures to supplement source creation
activities including tube wells and dug wells (in areas where ground water is
available and not under semi critical/ critical/ over exploited category of
development) which are not supported under AIBP, PMKSY (Har Khet Ko
Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation
plan.
e) Secondary storage structures at tail end of canal system to store water when
available in abundance (rainy season) or from perennial sources like streams
for use during dry periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pump-sets including water
carriage pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and
agronomic measures including cropping alignment to maximise use of
available water including rainfall and minimise irrigation requirement (Jal
Sanrakshan);
h) Capacity building, training and awareness campaign including low cost
publications, use of pico projectors and low cost films for encouraging
potential use water source through technological, agronomic and management
practices including community irrigation.
i) The extension workers will be empowered to disseminate relevant
technologies under PMKSY only after requisite training is provided to them
especially in the area of promotion of scientific moisture conservation and
agronomic measures, improved/ innovative distribution system like pipe and
box outlet system, etc. Appropriate Domain Experts will act as Master
Trainers.
18
j) Information Communication Technology (ICT) interventions through NeGP-A
to be made use in the field of water use efficiency, precision irrigation
technologies, on farm water management, crop alignment etc. and also to do
intensive monitoring of the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture
conservation activities such as ridge area treatment, drainage line treatment,
rain water harvesting, in-situ moisture conservation and other allied activities
on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed blocks including renovation of traditional water
bodies
v. Rationale/ Justification
In reference to the status and need of irrigation, the water resource management
including irrigation related priorities was identified for Mahesana district by the
peoples‟ representatives of district with support from administration and technical
experts. For instance the reports of Strategic Research and Extension Plan (SREP)
prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)
prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit
Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified
number of irrigation related issues for Mahesana district including (i) promoting
water use efficiency through sprinkler and drip irrigation; (iii) promoting protected
poly-house cultivation to minimize risk factors and enhance quality and productivity;
(iv) Improvement of on-farm water delivery and efficiency of existing irrigation
systems; (v) promotion of soil conservation of arable & non-arable land through
engineering measures; (vi) creation of new water harvesting structures, check dams,
ponds, tanks, etc. (vii) increase the forest cover in the district and (viii) land
improvement measures.
vi. Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited
Mahesana district to collect data and have interaction with all the stakeholders.
Methodology adopted to prepare DIP is outlined in brief as under:
Collection of primary and secondary data from multiple sources including
Season and Crop Reports, Statistical Handbook, District Census Handbook and
other published documents and websites of different departments.
Meetings with state government departments and related institutions were held
and meeting through VC was also held with state level authorities.
GIS maps of the area‟s/clusters were studied to understand the land
morphology, topography of the district.
Discussions and interviews were held with officers of agriculture department,
horticulture department, sub division soil conservation office, Agriculture
19
Technology Management Agency (ATMA), District Watershed Development
Agency (DWDA) of District Rural Development Authority (DRDA), Animal
Husbandry department, Water resource department and identified the key
issues and key focus areas of the region. Discussion with District Development
Manager of NABARD for Mahesana district was also held during the visit.
During the course of field visit, facilitation support was provided by GGRC field
executive.
Team members also participated in the State Level workshop and held active
discussions with GoI officers, State Level officers and scientists of various
institutions including Indian Meteorological Department (IMD) and Krishi
Vigyan Kendra (KVK) office etc.
On the basis of detailed discussion and analysis of data, the team arrived at the
projections of various components of PMKSY and Department wise plan for four
years from 2016-17 to 2019-20 was prepared which is given in Annexure.
20
Chapter –I
1 General Information of the District
1.1 District Profile
The Bombay State was bifurcated on 1st May 1960 and separate State of Gujarat and
Maharashtra were formed. Since that date the Mahesana district became a part of
Gujarat State. Mahesana district is an important district in North Gujarat region and
its head quarter, Mahesana is known as “Oil city of India”. The district has Asia‟s
biggest APMC for spices and oil-seed. Total geographical area of the district is 4393
km2. It covers 2.24% of total area of Gujarat State.
Latitude and longitude:
The district headquarter has latitude of 23.588 ˚N and longitude of 72.3693 ˚E. In
the north it is bounded by Banaskantha district, in the south by Ahmedabad district,
in the east by Sabarkantha district and in the west by the Patan district. Table 1.1: District Profile
Name of the District District Code Latitude Longitude
Mahesana 471 23.588 ˚N 72.3693 ˚E
Source: Census of India, 2011
Administrative Setup:
In the State of Gujarat, the community development blocks are coterminous with the
Talukas. The Talukas contain large number of villages and possibly several towns.
The villages have Village Panchayats to run the local administration. A Village
Panchayat may constitute for one revenue village, several revenue villages or a part of
a large village. Similarly, the towns have Municipality or Municipal Corporation as of
local self-government. The District Collector looks after the general administration,
maintenance of law and order, collection of land revenue and settlement of law
related disputes, civil supplies, district planning, mid-day meal scheme etc. at the
district level. At the Taluka level, Mamlatdar looks after the land development,
revenue collection, civil supplies and law and order. The functions of administration
of law and order, and control and investigation of crime are done by the
Superintendent of Police of the district with the help of Police Stations working
under him.
21
Map 1-1 District Map
The Panchayati Raj institutions are fairly strong and most of the development works
have been transferred to the District Panchayats and its subordinate bodies. The
District Panchayat has an elected President while District Development Officer
appointed by the Government works as its Secretary, who looks after day-to-day
work related to the development. Similarly, at the Taluka level, Taluka Panchayats
have been constituted which have an elected President. The Taluka Development
Officer, placed by the Government as Secretary of the Taluka Panchayats and he
conducts the regular administrative work. Similarly, an elected President heads the
Source: BISAG
22
Municipality and the Chief Officer works as the Secretary of the Municipality, who
looks after the day-to-day work.
In case of the large cities, the State Government has constituted Municipal
Corporation, which are headed by an elected Mayor and the Municipal
Commissioner, appointed by the Government, looks after the routine work. At the
Village level, the Sarpanch is the elected Chief and the Talati (Village Mantri) works
as the Secretary to the Village Panchayat and looks after the day-to-day work.
1.2 Demography
As per Census of India (2011), Mahesana district is the 15th most populated district in
the Gujarat State. Further, Mahesana is the 10th densest district in the State.
Population Density of Mahesana district is 462 per square km. In Mahesana district,
Mahesana taluka has the highest population (529816) whereas Satlasana taluka has
the lowest (89546). The decadal growth in population of Mahesana district has been
10.31%, in comparison to 2001 census.
Table 1.2: Gender wise classification of Population
S. No Name of Taluka Population
M F CH* Total 1 Satlasana 46036 43510 12174 89546 2 Kheralu 68968 64810 17769 133778 3 Unjha 91093 84446 18399 175539 4 Visnagar 136329 125917 27503 262246 5 Vadnagar 74437 71008 18566 145445 6 Vijapur 133713 123986 28425 257699 7 Mahesana 277094 252722 60643 529816 8 Becharaji 51152 48436 12421 99588 9 Kadi 177698 163709 42032 341407
Total 1056520 978544 237932 2035064
Source: Census of India, 2011 * < 6 years of age
23
Figure 1.1 Block wise Population Distribution
Table 1.3: Category wise population
S. No Name of the Taluka
Category-wise population Total SC ST General No. of
Households No. of members
1 Satlasana 8134 243 81169 17757 89546 2 Kheralu 11304 385 122089 26456 133778 3 Unjha 13948 708 160883 38151 175539 4 Visnagar 19109 1370 241767 55222 262246 5 Vadnagar 9384 106 135955 29054 145445 6 Vijapur 16662 1317 239720 54857 257699 7 Mahesana 46211 3964 479641 110653 529816 8 Becharaji 8015 181 91392 20728 99588 9 Kadi 29521 1118 310768 71601 341407 Total 162288 9392 1863384 424479 2035064 Source: Census of India, 2011
It can be observed that the majority of population in the district belong to general
category. The proportion of ST population is very marginal and less than 0.5% in all
9 Talukas of the district. The proportion of SC population is also marginal and less
than 10% in all 9 Talukas of the district, and highest (9%) in Satlasana Taluka.
Satlasana
89546
4%
Kheralu
133778
6% Unjha
175539
9%
Visnagar
262246
13%
Vadnagar
145445
7%
Vijapur
257699
13%
Mahesana
529816
26%
Becharaji
99588
5%
Kadi
341407
17%
24
Figure 1.2: Category wise population
Table 1.4: Locality wise population
S. No Name of the Taluka Locality wise population Rural Urban Total
1 Satlasana 89546 0 89546 2 Kheralu 111935 21843 133778 3 Unjha 118431 57108 175539 4 Visnagar 185493 76753 262246 5 Vadnagar 117655 27790 145445 6 Vijapur 222581 35118 257699 7 Mahesana 328076 201740 529816 8 Becharaji 87014 12574 99588 9 Kadi 260003 81404 341407 Total 1520734 514330 2035064 Source: Census of India, 2011
It can be observed that the district is predominantly rural, with their proportion
being 74.72% of the total population. Satlasana Taluka has 100% rural population,
while Mahesana Taluka has highest urban population of 2,01,740 in the district.
1.3 Biomass and Livestock
The livestock population in the district, as per Livestock census 2012, is 11,52,493 of
which 3,07,919 are small animals, 8,21,214 are large animals, while 23,360 are draft
animals. The district has seen an increase of approximately 31.2% in the total
livestock population in the year 2012, as compared to year 2007 which recorded the
livestock population as 8,96,064 as per Livestock census 2007. Therefore, the annual
growth in livestock population can be presumed to be 6.24%.
SC
162288
8%
ST
9392
0%
General &
OBC
1863384
92%
SC
ST
General & OBC
25
Table 1.5: Population of small animals
Name of Taluka
Small Animals (Nos.) Poultry Ducks Pigs Goats Sheep Total
Satlasana 4836 0 6 19038 6336 30216 Kheralu 7095 2 0 9477 687 17261 Unjha 978 0 0 7211 77 8266 Visnagar 885 0 0 12967 901 14753 Vadnagar 20349 0 0 5462 6 25817 Vijapur 649 0 0 10730 1222 12601 Mahesana 11608 821 0 13621 2052 28102 Becharaji 17 0 0 4350 294 4661 Kadi 144909 0 0 17009 887 162805 Jotana 509 10 0 2832 86 3437 Total 191835 833 6 102697 12548 307919 Source: Livestock Census, 2012 Table 1.6: Population of Large Animals & Draft Animals
Name of Taluka
Large animals (Nos.) Draft Animals (Nos.) Indigenous Hybrid Cow Buffalos Total
Satlasana 10249 30323 41713 82285 3661 Kheralu 11400 41216 55941 108557 1720 Unjha 7211 2736 25659 35606 1448 Visnagar 14686 24759 61272 100717 1979 Vadnagar 5321 14935 57656 77912 630 Vijapur 18679 30440 68558 117677 1706 Mahesana 20842 11606 92865 125313 7398 Becharaji 8127 1226 34520 43873 569 Kadi 19978 3315 75476 98769 4030 Jotana 5227 669 24609 30505 219 Total 121720 161225 538269 821214 23360 Source: Livestock Census, 2012
It can be observed that population of poultry is highest in the category of small
animals, followed by Goats and Sheep. The population of Ducks and Pigs is very
marginal.
Figure 1.3: Population of Large Animals
0
20000
40000
60000
80000
100000
Po
pu
latio
n
Population of Large Animals
Indegenous (No.) Hybrid Cow (Nos.) Buffalos
26
It can be observed that population of large animals is highest in Mahesana Taluka,
and lowest in Jotana Taluka. Further, the proportion of population of Buffaloes is
highest in the category of large animals, followed by Hybrid cows and Indigenous
cows in the district.
1.4 Agro-Ecology, Climate, Hydrology and Topography
The district has semi-arid climate with three distinguished seasons i.e. Kharif (June
to September), Rabi (October to January) and Summer (February to May). The
district receives the rainfall through south-west monsoon which normally starts from
middle of June. July and August are the richer months of rainfall. The average
rainfall is 585.1 mm with a 24 rainy days. However, scanty and uneven rainfall
pattern is not common. The temperature varies from 6.3 0C to 43.8 0C, depending
upon the season of the year. The December and January are the coldest months while
April and May are the hottest months of the year. Table 1.7: Agro-Ecology Data
Agro Ecological Zone Type
Type of Terrain
Normal Annual Rainfall (mm)
Average Monthly Rainfall (mm)
No. of Rainy Days (No.)
North Gujarat Agro-climatic Zone-IV
Majority of soil is sandy loam
585.1 140.65 24.1
Average Weekly Temperature (oC) Summer (April-May) Winter (Oct.-March) Rainy (June-Sept.)
Min. Max. Mean Min. Max. Mean Min. Max. Mean 17.6 43.8 31.4 6.3 39.4 22.8 21.8 38.8 30.8
Source: IMD, Ahmedabad
According to climate, topography, soil characteristics and cropping pattern,
Mahesana district falls under North Gujarat Agro-climatic Zone-IV. Further, the
entire district is divided into 4 Agro-ecological situations. Table 1.8: Agro-ecological situations of district
Sr. No.
Agro-Ecological situation
Soil texture
Rainfall Attitude (m)
Principal Crops
Source of Irrigation
Taluka Cover
1 I Sandy loam
500-750
150-300
Cotton, Wheat, Bajra, mustard
Tube well and Cenal
Visnagar
2 II Sandy loam
700-850
150-300
Cotton, Bajra, Sorghum, mustard
Tube well Vijapur, Kadi, Mahesana, Becharaji
3 III Sandy 700- 150- Groundnut, Tubewell Kheralu,
27
& Sandy loam
850 300 Cotton, Bajra, Sorghum
and Cenal Satlasana, Vadnagar
4 IV Sandy &
Sandy loam
500-700
150-300
Cotton, Wheat, Sorghum, Mustard
Tubewell Unjha
Source: CDAP, 2012
Map 1-2 Map of Agro-ecological situations
It can be observed that Visnagar Taluka falls under category of AES-I; Becharaji,
Mahesana, Kadi & Vijapur Talukas fall under the category of AES-II; Satlasana,
Kheralu and Vadnagar Talukas fall under the category of AES-III, and Unjha Taluka
falls under the category of AES-IV.
1.5 Soil Profile
The soil type of Mahesana district in general is sandy loam. It has low water holding
Source: CDAP, 2012
28
capacity. The soils of the district possess neutral (in reaction) soil pH (6.5 to 7.5). The
electrical conductivity of the soil is low. Organic carbon and nitrogen content of the
soil is low, phosphorus content of the soil is medium and high in potassium. So,
overall, the soil fertility indices are poor from the point of view of agriculture. Soils of
some part of Kadi and Bechraji taluka are saline. The major soil related problems are
susceptibility to soil erosion, improper use of chemical fertilizer without
incorporating desired organic fertilizers is another impediment in sustaining soil
health.
Table 1.9: Soil Classification
Name of Taluka
Sandy Soil Sandy Loam Saline Soil Other Area (ha)
% Area (ha)
% Area (ha)
% Area (ha)
%
Mahesana 4290 6 67210 94 - - - - Kadi 8391 12 49651 71 11888 17 - - Becharaji 5058 15 25293 75 3372 10 - - Unjha 7818 30 18242 70 - - - - Visnagar 2035 5 36637 90 - - 2035 5 Vadnagar 2499 10 22498 90 - - - - Vijapur 1620 4 36456 90 - - 2430 6 Kheralu 2687 10 24185 90 - - - - Satlasana 2128 15 12912 85 - - - - Source: CDAP, 2012
1.6 Land Use Pattern
As per Comprehensive District Agriculture Plan (CDAP, 2012), total geographical
area of the district is 4,39,153 ha. Net area under cultivation of different crops is
3,49,342 ha. The share of net area sown to total geographical area is 79.54 per cent.
The cropping intensity of Mehsana district is 101.75%. Table 1.10: Land Use Pattern
S. No. Name of Block/Taluka
Geographical Area (ha)
Cultivated Area (ha)
Cultivable, not under crop (ha)
Cultivable waste (ha)
Current Fallow (ha)
1 Mahesana 83265 71501 669 70 540 2 Kadi 83090 69931 1887 371 1076 3 Becharaji 41381 33725 1228 391 771 4 Unjha 31668 26060 656 505 356 5 Visnagar 47996 40708 579 209 346 6 Vadnagar 31132 24998 1636 430 1447 7 Vijapur 56334 40507 7645 1223 7251 8 Kheralu 33438 26872 816 308 402 9 Satlasana 30849 15040 3913 1736 1866 Total 439153 349342 19029 5243 14055
Source: CDAP, 2012
29
Map 1-3 District Soil Map
Source: BISAG
30
Map 1-4 District Watershed Map
Source: BISAG
31
CHAPTER II
2 District Water Profile Agriculture and Animal Husbandry is the main source of livelihood for the rural
people of district. The major farming systems of the distr ict are Agriculture +
Animal Husbandry followed by Agriculture + Animal Husbandry + Horticulture.
Castor, bajra, cotton, tomato, moong are the main kharif crops and wheat, mustard
and cumin are the main rabi crops grown in the district.
2.1 Area Wise, Crop Wise Irrigation Status
Out of gross cropped area of 5,45,781 ha (exclusive of horticulture crops) in the
district, 3,73,985 ha (or 68.52%) is irrigated while 1,71,796 ha (31.48%) is rainfed.
Kharif crops have a share of 3,04,946 ha (or 55.87%), Rabi crops have a share of
1,87,480 ha (or 34.35%) and Summer crops have a share of 53,355 ha (or 9.78%).
Castor and Cotton are the Major crops cultivated in kharif season with an area share
of 34.13 per cent and 31.87 per cent respectively. In rabi season, 60.39 per cent area,
i.e. 73,843 ha was covered under wheat and 23.74 per cent area (29,036 ha.) was
covered under Rapeseed & Mustard. Bajra is the major crop cultivated in summer
season with area share of 92 per cent respectively.
Table 2.1: Area wise Irrigation Status of Agriculture Crops (2013-14) - District Summary
Crop Type
kharif (Area in ha.) Rabi (Area in ha.) Summer (Area in ha.)
Total
Irr RF Tot Irr RF Tot Irr RF
Tot Irr RF Tot
Cereals 4970 18469 23439 81817 0 81817 19704
0 19704
106491
18469 124960
Coarse Cereals
0 589 589 15 0 15 0 0 0 15 589 604
Pulses 0 12759 12759 63 80 143 60 0 60 123 12839 12962 Oil Seeds
59414
10352 69766 25840 10 25850 597 0 597 85851 10362 96213
Fibre 50677
1297 51974 0 0 0 0 0 0 50677 1297 51974
Other 18389
128030
146419 79445 210 79655 32994
0 32994
130828
128240
259068
Total 133450
171496 304946
187180
300
187480
53355
0 53355
373985
171796 545781
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
32
Figure 2.1: Gross Irrigated and Rainfed area under Agriculture Crops
Out of total gross cropped area under Agriculture, Mahesana Taluka has a share of
21.66 per cent, followed by Kadi (13.85%) and Vijapur (12.81%). Mahesana Taluka
has the largest rainfed area of the district, i.e. 38,933 ha. Taluka wise area under
various crops in irrigated and rainfed situation is highlighted in Table 2.2.
Table 2.2: Area wise Irrigation Status of Agriculture Crops (2013-14) - Taluka Summary
1. Block: Becharaji Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 2800 2800 8670 0 8670 175 0 175 8845 2800 11645 Coarse Cereals
0 195 195 0 0 0 0 0 0 0 195 195
Pulses 0 4005 4005 0 75 75 0 0 0 0 4080 4080 Oil Seeds
5815
500 6315 3815 0 3815 0 0 0 9630 500 10130
Fibre 3640
275 3915 0 0 0 0 0 0 3640 275 3915
Others 330 18530
18860 6422 75 6497 1030 0 1030 7782 18605
26387
Total 9785
26305
36090 18907
150 19057
1205 0 1205 29897
26455
56352
2. Block: Kadi Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 4970
660 5630 1180 0 1180 1845 0 1845 7995 660 8655
Coarse Cereals
0 60 60 0 0 0 0 0 0 0 60 60
Pulses 0 525 525 0 5 5 0 0 0 0 530 530 Oil Seeds
14020
1085 15105 1010 10 1020 15 0 15 15045
1095 16140
Fibre 552 345 5865 0 0 0 0 0 0 5520 345 5865
68.52%
31.48%
Gross Irrigated Area Rainfed Area
33
0 Others 534
5 24975
30320 10735
135 10870
3170 0 3170 19250
25110
44360
Total 29855
27650
57505 12925
150 13075
5030 0 5030 47810
27800
75610
3. Block: Kheralu Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 2458 2458 7475 0 7475 2235 0 2235 9710 2458 12168 Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0
Pulses 0 171 171 0 0 0 15 0 15 15 171 186 Oil Seeds
2522
230 2752 3100 0 3100 22 0 22 5644 230 5874
Fibre 4337
25 4362 0 0 0 0 0 0 4337 25 4362
Others 1546
11340
12886 7731 0 7731 4451 0 4451 13728
11340
25068
Total 8405
14224
22629 18306
0 18306
6723 0 6723 33434
14224
47658
4. Block: Mahesana Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 4688 4688 20233
0 20233
3910 0 3910 24143
4688 28831
Coarse Cereals
0 0 0 15 0 15 0 0 0 15 0 15
Pulses 0 3370 3370 0 0 0 0 0 0 0 3370 3370 Oil Seeds
12162
1343 13505 6996 0 6996 0 0 0 19158 1343 20501
Fibre 9605
10 9615 0 0 0 0 0 0 9605 10 9615
Others 3380
29522
32902 17020
0 17020
6005 0 6005 26405
29522
55927
Total 25147
38933
64080 44264
0 44264
9915 0 9915 79326
38933
118259
5. Block: Satlasana Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 920 920 6900 0 6900 4900 0 4900
11800
920 12720
Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0
Pulses 0 483 483 21 0 21 45 0 45 66 483 549 Oil Seeds
3525
4885 8410 259 0 259 522 0 522 4306 4885 9191
Fibre 2335
0 2335 0 0 0 0 0 0 2335 0 2335
Others 1398
3988 5386 3742 0 3742 522 0 522 5662 3988 9650
Total 7258
10276
17534 10922
0 10922
5989 0 5989 24169
10276
34445
6. Block: Unjha Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 3035 3035 7280 0 7280 150 0 150 7430 3035 10465 Coarse Cereals
0 255 255 0 0 0 0 0 0 0 255 255
Pulses 0 1194 1194 0 0 0 0 0 0 0 1194 1194
34
Oil Seeds
3900
449 4349 4703 0 4703 0 0 0 8603 449 9052
Fibre 3890
107 3997 0 0 0 0 0 0 3890 107 3997
Others 695 8254 8949 5302 0 5302 5223 0 5223 11220 8254 19474 Total 84
85 13294
21779 17285 0 17285
5373 0 5373 31143 13294
44437
7. Block: Vadnagar Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 1800 1800 10360
0 10360
2670 0 2670 13030
1800 14830
Coarse Cereals
0 79 79 0 0 0 0 0 0 0 79 79
Pulses 0 1110 1110 40 0 40 0 0 0 40 1110 1150 Oil Seeds
6470
800 7270 1610 0 1610 0 0 0 8080 800 8880
Fibre 4500
20 4520 0 0 0 0 0 0 4500 20 4520
Others 967 9060 10027 4712 0 4712 4775 0 4775 10454
9060 19514
Total 11937
12869
24806 16722 0 16722
7445 0 7445 36104
12869
48973
8. Block: Vijapur Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 364 364 10508
0 10508
2716 0 2716 13224
364 13588
Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0
Pulses 0 738 738 0 0 0 0 0 0 0 738 738 Oil Seeds
6450
460 6910 149 0 149 38 0 38 6637 460 7097
Fibre 9900
460 10360 0 0 0 0 0 0 9900 460 10360
Others 2171
10463
12634 19357 0 19357
6155 0 6155 27683
10463
38146
Total 18521
12485
31006 30014
0 30014
8909 0 8909
57444
12485
69929
9. Block: Visnagar Crop Type
Kharif Rabi Summer Total Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot
Cereals 0 1744 1744 9211 0 9211 1103 0 1103 10314 1744 12058 Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0
Pulses 0 1163 1163 2 0 2 0 0 0 2 1163 1165 Oil Seeds
4550
600 5150 4198 0 4198 0 0 0 8748 600 9348
Fibre 6950
55 7005 0 0 0 0 0 0 6950 55 7005
Others 2557
11898
14455 4424 0 4424 1663 0 1663 8644 11898
20542
Total 14057
15460
29517 17835 0 17835
2766 0 2766 34658
15460
50118
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
The district was having a total area of 58,661 ha under horticulture crops during
2014-15. Out of the total area under horticulture crops fruits, vegetables, spices and
35
flowers have area share of 32.77 per cent, 45.81 per cent, 21.17 per cent and 0.25 per
cent respectively. 96.72% of the area under horticulture crops was irrigated in the
district.
Table 2.3: Area under Horticulture Crops (2014-15)
Crops Irr Area (ha)
RF Area (ha)
Total Area (ha)
Production (MT/ Yr)
Productivity (Kg/ Ha)
Fruits 17302.5 1922.5 19225 226730.26 11793.512
Vegetables 26876 0 26876 506757.76 18855.401
Spices 12419 0 12419 20746.76 1670.566
Flowers 141 0 141 1227.49 8705.603
Total Area 56738.5 1922.5 58661 755462.27 12878.442
Source: Department of Horticulture
Out of total gross cropped area under Horticulture, Mahesana Taluka has a share of
22 per cent, followed by Vijapur (20.43%) and Kadi (19.62%). Taluka wise area under
various crops in irrigated and rainfed situation is highlighted in tble.2.4.
Table 2.4: Area under Horticulture Crops (2014-15) - Taluka wise
Blocks Fruits Vegetables Spices Flowers Total Area (ha)
Prod (MT)
Area (ha)
Prod (MT)
Area (ha)
Prod (MT)
Area (ha)
Prod (MT)
Area (ha)
Prod (MT)
Mehsana 7479 81873.02
3770 63357.28
1638 2831.9236
38 331.88
12925 148394.1
Visnagar 1983 22806.89
2178 35073.19
1078 1774.1448
13 110.43
5252 59764.65
Vijapur 2129 29257.23
8799 186214.17
1041 1779.2168
21 181.26
11990 217431.9
Kadi 4200 47403.32
5257 108551.04
2037 3353.547
16 136.57
11510 159444.5
Unjha 768 9768.2
1020 14566.24
1766 2609.4608
12 105.15
3566 27049.05
Becharaji 281 3813.66
1048 14862.69
1654 2662.843
7 61.99 2990 21401.18
Kheralu 649 9244.93
1017 16139.43
1004 1715.5716
9 78.2 2679 27178.13
Satlasana 744 10082.29
1666 33040.2
1015 1918.8122
8 70.86 3433 45112.16
Jotana 481 5456.07
1124 20162.21
499 883.635 11 97.03 2115 26598.95
Vadnagar 511 7024.65
997 14791.31
687 1217.603
6 54.12 2201 23087.68
Total 19225
226730.26
26876
506757.76
12419 20746.7578
141 1227.49
58661
755462.3
Source: Department of Horticulture
36
2.2 Production and Productivity of Major Crops
It can be observed that Castor has highest area under cultivation (59,829 ha), highest
production (12,68,973 quintals/yr) and highest average yield (3299.3 Kg/ha) during
Kharif season. The details of the area, production and yield of various crops of
Mehsana district can be observed in Table 2.5.
Table 2.5: Production and Productivity of Major Crops – Kharif Season
Rainfed Irrigated Total
Crops Area (ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Area (ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Area(ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Paddy 0 0 0 4970 - - 4970 - -
Wheat 0 0 0 9082 277545.92
3056 9082 277545.92
3056
Bajra 19153 191338.47
999 0 0 0 19153 191338.47
999
Jowar 140 1484 1060 0 0 0 140 1484.00 1060
Mung 4308 19773.72
459 0 0 0 4308 19773.72 459
Math 976 549.9 56.34 0 0 0 976 549.90 56.34
Udid 6708 44071.56
657 0 0 0 6708 44071.56 657.00
Tobacco 0 0 0 50 331.25
662.5 50 331.25 662.50
Groundnut
160 - - 1425 26818.5
1882 1585 26818.50
1692.02
Castor 850 18028.5
2121 58979 1250945
2121 59829
1268973.09
2121.00
Sesamum
5027 17544.23
349 0 0 0 5027 17544.23 349.00
Cotton 580 1328.2
229 55292 409714
741 55872 411041.92
735.68
Tur 5 - - 0 0 0 5 - -
Gaur seed
0 0 0 591 2314.72
391.66 591 2314.72 391.66
Fennel 0 0 0 6969 107512.1
1542.72 6969 107512.14
1542.72
Total 37907
294118.58
775.9 137358
2075181.49
1510.78 175265
2369299.42
1351.84
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
It can be observed that Wheat has highest area under cultivation (73,843 ha), and
highest production (22,56,642 quintals/yr) during Rabi season. However, Tobacco
has highest average yield (13,251 Kg/ha) during Rabi season.
37
Table 2.6: Production & Productivity - Rabi season
Rainfed Irrigated Total
Crops Area (ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Area (ha)
Prod(Qtn/Yr)
Yield (kg/ha)
Area(ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Wheat 0 0 0 73843
2256642
3056 73843
2256642.08
3056.00
Gram 80 1066.4
1333 44 533.2 1211.82
124 1599.60
1290.00
Rapeseed & mustard
0 0 0 29036
445412.2
1534 29036
445412.24
1534.00
Isabgol 0 0 0 138 776.94
563 138 776.94 563.00
Fennel 0 0 0 5807 97034.97
1671 5807 97034.97
1671.00
Bajra 0 0 0 1103 28258.86
2562 1103 28258.86
2562.00
Tobacco 0 0 0 12220
1619272
13251 12220
1619272.20
13251.00
Total 80 1066 1333 122191
4447930
3640 122271
4448997
3639
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
It can be observed that Bajra has highest area under cultivation (13,679 ha), highest
production (3,50,455 quintals/yr) and highest average yield (2562 Kg/ha) during
Summer season. Table 2.7: Production & Productivity of Crops - Summer Season
Rainfed Irrigated Total
Crops Area (ha)
Prod(Qtn/Yr)
Yield (kg/ha)
Area (ha)
Prod(Qtn/Yr)
Yield (kg/ha)
Area(ha)
Prod (Qtn/Yr)
Yield (kg/ha)
Bajra 0 0 0 13679 350456
2562 13679 350455.98
2562.00
Sesamum
0 0 0 35 116.12
331.77 35 116.12
331.77
Groundnut
0 0 0 30 177.4 591.33 30 177.40
591.33
Paddy 0 0 0 1110 - - 1110 - -
Total 0 0 0 14854
350750
2361.3 14854
350750
2361.3
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
38
2.3 Irrigation Based Classification
Total gross cultivated area of the district (agriculture + horticulture) is 6,04,442 Ha,
out of which the gross irrigated area is 4,30,723.5 Ha and gross unirrigated area is
1,73,718.5 Ha.
Table 2.8: Irrigation based classification
Name of Taluka Gross Irrigated Area (Ha)
Gross Unirrigated Area (Ha)
Gross Cultivated Area (Ha)
Becharaji 32858.9 26483.1 59342
Kadi* 59933.45 28244.05 88177.5
Kheralu 36048.1 14288.9 50337
Mahesana* 92536.55 39704.95 132241.5
Satlasna 27527.6 10350.4 37878
Unja 34632.2 13370.8 48003
Vadnagar 38253.9 12920.1 51174
Vijapur 69221.1 12697.9 81919
Visanagar 39711.7 15658.3 55370
Total 430723.5 173718.5 604442
Source: Department of Agriculture, Agriculture Statistic of state, Agristat
* Area under cultivation of horticulture crops in Jotana Taluka is equally distributed to
Mehsana & Kadi Taluka, to maintain uniformity of data.
39
CHAPTER III:
3 Water Availability River system of Mahesana district include Khari river and Rupen river. The Khari
river flows in south side of Mahesana city and Rupen river flows in north. Both rivers
meet to the small desert of Kutch. Rivers Rupen and Khari drain part of the district.
Both these rivers are ephemeral in nature and flow only during good monsoon years.
The river Sabarmati forms the eastern boundary of the district with very limited
catchment area in the district. Major part of the area in the district is devoid of any
drainage network and does not fall in any catchment.
Map 3-1 River & Waterbody Map
Source: BISAG
40
Sources of water supply include: Major & medium irrigation canals, Minor irrigation
tanks, Diversion channels, Rain water harvesting structures and Ground water
extraction structures such as bore wells. There are five line irrigation departments
namely Dharoi Naher, Panchayat Irrigation department, Sujlam Suflam, SSNNL &
GWRDC which are engaged in supply & distribution of water mainly for irrigation,
domestic and also for industrial purposes. Nagar Palika, Gram Panchayats and
Drinking water department are responsible for supplying drinking water. However,
to some extent domestic and industrial water requirement is also met from the
private sources.
3.1 Status of Water Availability Table 3.1: Status of water availability
S. No. Sources Kharif Rabi Summer Total (MCM)
1 Surface Irrigation (i) Canal(Major &
Medium Irrigation) 224.774 581.5287 41 847.3027
(ii) Minor Irrigation tanks
0 3 0 3
(iii) Lift Irrigation/Diversion
0 10 0 10
(iv) Rain Water Harvesting
0 9 0 9
(v) Industrial 2.76 2 Ground Water 836.24 Total 224.774 603.5287 41 1708.3027 Source: SSNNL and WRD, Govt. of Gujarat
It can be observed that the major sources of water availability are major & medium
irrigation canals, and bore wells. The total water annual water availability of the
district is 1708.3027 MCM, out of which share of surface water and ground water are
nearly equal to 50%. The water availability in the district is assessed based on the
average annual discharge available in various surface and ground irrigation
structures of various line irrigation departments such as: Dharoi Naher, Panchayat
Irrigation Department, SSNNL, Sujlam Suflam and GWRDC.
The availability of water from treated effluents is also assessed. Presently, there are
no running sewage treatment plants (STP) in the district, and hence the water
availability from treated effluents is zero. There are 6 ongoing projects of Sewage
Treatment Plant (STP) in the district. Further, tenders have been floated for 3
projects of STP units. Details of ongoing and proposed STP projects are given in
Table 3.2.
41
Figure 3.1: Water availability of district
Table 3.2: Details of STP
Sr. No Name of project
District Name of Contracting Agency.
Capacity Status
1 Kadi Mahesana M/s. lon Exchange 16 MLD Work under progress
2 Vadnagar Mahesana M/s.Super Construction
5.94 MLD Work under progress
3 Visnagar Mahesana M/s. lon Exchange 22.42 MLD Work under progress
4 Mahesana II Mahesana M/s. lon Exchange 41.64 MLD Work under progress
5 Unjha phase Mahesana NA 13.64 MLD Tender floated
On completion of above STP projects, the treated water will be mainly used for
irrigation and industrial purposes. Thus, it can be presumed that annual water
availability of 36.368 MCM will be added by the year 2020.
3.2 Status of Ground Water Availability
As per Central Ground Water Board notification 2011, the status ground water in
eight talukas of the district is over exploited, while in one block it is critical. Taluka
wise status of ground water and total draft and recharge details are given in following
table.
847.3027
3 10 9 2.76
836.24
0
100
200
300
400
500
600
700
800
900
Canals Minor
Irrigation
tanks
Diversion RWH
Structures
Industrial
Sources
Ground
Water
MC
M
Source of water availability
Water Availability (MCM)
42
Table 3.3: Status of ground Water
# Taluka Status of block as per CGWB notification
Ground water (MCM)
OE Critical Semi-Critical
Safe Saline Draft Recharge Gap
1 Becharaji O.E. 42.49 31.17295 11.317 2 Kadi O.E. 189.21 131.1007 58.1093 3 Kheralu O.E. 93.886 79.13159 14.7544 4 Mahesana O.E. 226.21 158.5282 67.6818 5 Satlasana O.E. 58.5 53.89597 4.60403 6 Vadnagar Critical 62.75 66.31906 3.569064 7 Visnagar O.E. 130.92 104.2976 26.6224 8 Vijapur O.E. 180.46 125.8161 54.6439 9 Unjha O.E. 65.71 63.4637 2.2463
Source: Central Ground Water Board, 2011
It can be observed that the draft of ground water considerably exceeds its recharge in
8 Talukas and is nearly equal in 9th Taluka. This indicates alarming situation for
ground water resource. Thus, the reliance on groundwater needs to be minimized
and more focus should be emphasized on ground water recharge, water use efficiency
and sustainable use of water.
3.2.1 Hydrogeology
Precambrian hard rocks, semi-consolidated Mesozoic and tertiary formations and
unconsolidated quaternary alluvial deposits form multilayer aquifer system in the
district. Groundwater occurs both under phreatic and confined conditions, however
its development is restricted depending upon the aquifer geometry and yield
characteristic of individual aquifer and/or ground water quality of the formation
water. Occurrence of groundwater can be divided in two groups a) Ground water in
fissured formation (Hard rock); b) Groundwater in porous formations
(Sedimentary).
Number of ground water monitoring wells of CGWB (as on 31-03-2012) are 60,
including 16 no of dug wells and 44 no of piezometers. Groundwater occurs in
unconfined to confined condition in Quaternary alluvium and under unconfined
condition in granite gneiss in limited area.
3.2.2 Geomorphology
Major physiographic unit of the district is alluvial plain. Predominant geological
formations include alluvium in major parts, and granite & gneiss in eastern and
north eastern part of district.
a) Dissected hilly terrain: The north eastern part of Satlasana taluka which is made
up of Delhi metasediments and post Delhi intrusives is characterised by high hills
and linear ridges with narrow intermountain valleys.
b) Piedmont plain with inselbergs: A belt of about 20-30 km width fringing the hilly
terrain in the north eastern part of the district is characterised by moderate relief
43
(2m/km) and is comprised of shallow alluvium with boulder/gravel beds and
occasional inliers of older rocks.
c) Alluvial plain: It is a vast sandy tract characterised by gently sloping, slightly
rolling to undulatory topography owing to presence of sand dunes. the most
prominent unit and covers the most part of the district.
Soil types: In major part the soils are sandy in nature. In general the soils are poor to medium in
fertility and water retention capacity. Most soils have good aeration, porosity and
permeability. The hydraulic conductivity of the soils ranges from as low as 0 for
saline and alkali soils in the western part to more than 7cm/hr for calcareous sandy
soils in the north and west. Soils of the district fall in five broad categories as below.
I) Saline and alkali soils: These are typically deep, grey calcareous sandy clay loams
of low permeability.
II) Calcareous sandy loams: These are generally Deep, light grey or brown sandy
loams of moderate to good permeability and drainage.
III) Calcareous sandy soils: These are mostly pale yellow and brown sands & loamy
sands of good depth and high permeability.
IV) Non calcic brown soils: These are characterised by pale brown to brown deep
loamy sands and sandy loams of adequate to good permeability.
V) Non calcic red brown soils: These are of mixed colluvial and alluvial derivations
from rocks of the Aravali system. Mostly deep loamy sands to sandy loams with
adequate to good hydraulic conductivity.
3.3 Status of Command Area
The command area in the district can be categorized as Canal command and other
services command, which encompasses command created by ponds, tanks and tube
wells.
Table 3.4: Status of Canal Command
S. No. Name of the Taluka Information of Canal Command (Ha)
Total Area Developed Area Undeveloped Area 1 Satlasana 964 867 97 2 Kheralu 1639 1429 210 3 Vadnagar 15808 13033 2775 4 Visnagar 33898 15910 17988 5 Unjha 21190 10746 10444 6 Mehsana 12237 6170 6067 7 Vijapur 36261 13584 22677 8 Kadi 39235 28473 10762 9 Becharaji 21202 20649 553
10 Jotana 1624 1058 566
Total 184058 111919 72139
Source: SSNNL and WRD, Govt. of Gujarat
44
It can be observed that Kadi Taluka has highest canal command in the district
followed by Vijapur taluka and Visnagar taluka. Total canal command of the district
is 1,84,058 Ha, out of which 1,11,919 Ha is developed and 71,020 Ha is undeveloped.
Table 3.5: Status of other services command
# Name of the Taluka Information on the other Services Command
Total Area Developed Area Undeveloped Area
1 Satlasana 511.77 511.77 0
2 Kheralu 941.91 941.91 0
3 Vadnagar 2354.46 2354.46 0
4 Visnagar 504 504 0
5 Unjha 471.04 471.04 0
6 Mehsana 732.035 732.035 0
7 Vijapur 425.435 425.435 0
8 Kadi 2855.06 2855.06 0
9 Becharaji 2113.99 2113.99 0
10 Jotana 97.53 97.53 0
Total 11007.23 11007.23 0
Source: SSNNL and WRD, Govt. of Gujarat
Kadi Taluka has highest other services command in the district followed by Vadnagar
taluka and Becharaji taluka. Total other services command of the district is 11,007.23
Ha, out of which all area is developed.
45
Map 3-2 Canal Map of district
Source: BISAG
46
3.4 Existing type of Irrigation Table 3.6: Existing type of Irrigation
Name of Taluka
Source of Irrigation
Surface Irrigation Ground Water
Total
Govt. Canal
Community Ponds
Pvt. Ponds
WHS Govt. Tube Wells
Kheralu No 1 58 26 17 14 116 C.A (ha) 1429 723.1 0.91 0 228 2381.01
Visnagar No 2 1 0 0 31 34 C.A (ha) 15910 10 0 0 504 16424
Vadnagar No 1 1 13 0 2 17 C.A (ha) 15355 10 0.455 0 32 15397.46
Mahesana No 2 1 1 0 45 49 C.A (ha) 6580 10 0.035 0 732 7322.035
Unjha No 2 1 1 0 29 33 C.A (ha) 10746 10 0.035 0 471 11227.04
Satlasana No 1 9 122 167 1 300 C.A (ha) 927 70 4.27 371.5 16 1388.77
Vijapur No 1 1 41 0 16 59 C.A (ha) 13748 10 1.435 0 260 14019.44
Kadi No 5 0 0 27 144 176 C.A (ha) 39235 0 0 515.06 2340 42090.06
Jotana No 2 0 0 22 0 24 C.A (ha) 1624 0 0 97.53 0 1721.53
Becharaji No 4 1 6 122 10 143 C.A (ha) 21202 35 0.21 1915.78 163 23315.99
Source: SSNNL, WRD and Comprehensive Agriculture Plan, Govt. of Gujarat
It can be observed that there are 21 nos. of government canals, 73 nos. of community
ponds, 210 nos. of private ponds, 355 nos. of water harvesting structures and 292
nos. of government bore wells, in the Mahesana district.
47
CHAPTER IV:
4 Water Requirement / Demand The earlier Chapters deals with the general profile, water profile and water
availability in Mehsana district. The present chapter deals with the current (2015)
and projected (2020) demand for water from various sectors. The demand has been
worked out on the basis of data collected from different departments which has
already been presented in previous chapters. The unit for volume of water has been
chosen as million cubic meters (MCM) instead of Billion cubic meters as suggested in
the guidelines.
4.1 Domestic Water Demand
To assess present population (2015) and future population (2020), an annual growth
rate of 2% is assumed. To assess water demand, requirement of 100 lpcd for rural
and 140 lpcd for urban are assumed.
Table 4.1: Present Water Demand (2015)
Talukas Population in 2015 Present Gross Water Demand in (MCM)
Rural Urban Total Rural Urban Total Satlasana 96710 0 96710 3.53 0.00 3.53 Kheralu 120890 23590 144480 4.41 1.21 5.62 Unjha 127905 61677 189582 4.67 3.15 7.82 Visnagar 200332 82893 283225 7.31 4.24 11.55 Vadnagar 127067 30013 157080 4.64 1.53 6.17 Vijapur 240387 37927 278314 8.77 1.94 10.71 Mahesana 354322 217879 572201 12.93 11.13 24.07 Becharaji 93975 13580 107555 3.43 0.69 4.12 Kadi 280803 87916 368719 10.25 4.49 14.74 Total 1642392 555476 2197868 59.95 28.38 88.33
It can be observed that total present domestic water demand is 88.33 MCM. Sources
of supplying domestic water include: Dharoi dam & Local tube well for Satlasana,
Kheralu, Unjha, Visnagar and Vadnagar Talukas, and Narmada main canal & local
tube well for the remaining Talukas of Vijapur, Mahesana, Becharaji and Kadi. Table 4.2: Future Water demand (2020)
Talukas Projected Population 2020 Future Gross Water Demand (in MCM)
Rural Urban Total Rural Urban Total Satlasana 105664 0 105664 3.86 0.00 3.86 Kheralu 132083 25775 157858 4.82 1.32 6.14 Unjha 139749 67387 207136 5.10 3.44 8.54 Visnagar 218882 90569 309451 7.99 4.63 12.62 Vadnagar 138833 32792 171625 5.07 1.68 6.74 Vijapur 262646 41439 304085 9.59 2.12 11.70 Mahesana 387130 238053 625183 14.13 12.16 26.29
48
Becharaji 102677 14837 117514 3.75 0.76 4.51 Kadi 306804 96057 402861 11.20 4.91 16.11 Total 1794466 606909 2401375 65.50 31.01 96.51 It can be observed that projected future domestic water demand (2020) is 96.51
MCM, and will increase by 9.26%, as compared to present domestic water demand
(2015).
Figure 4.1: Block wise Domestic Water Requirement (MCM)
4.2 Crop Water Requirement
Water demand of different crops (agriculture + horticulture) has been worked out
based on the area under different crops as discussed in Chapter 2.
Table 4.3: Crop water demand
Taluka Area Sown (ha)
Irrigated Area (ha)
Crop water demand (MCM)
Existing water potential (MCM)
Water potential to be created (MCM)
Becharaji 59342 32859 150.07 126.91 23.15 Kadi 88177.5 59933 257.99 243.90 14.09 Kheralu 50337 36048 134.69 124.35 10.35 Mahesana 132242 92537 435.25 398.89 36.36 Satlasana 37878 27528 192.508 182.343 10.17 Unjha 48003 34632 144.633 129.324 15.31 Vadnagar 51174 38254 174.483 163.978 10.51 Vijapur 81919 69221 300.453 294.713 5.74 Visnagar 55370 39712 210.178 198.526 11.65 Total 604442 430724 2000 1863 137
3.5
3 5.6
2 7.8
2
11
.55
6.1
7
10
.71
24
.07
4.1
2
14
.74
3.8
6 6.1
4 8.5
4
12
.62
6.7
4
11
.7
26
.29
4.5
1
16
.11
0
5
10
15
20
25
30
Satlasana Kheralu Unjha Visnagar Vadnagar Vijapur Mahesana Becharaji Kadi
(MC
M)
Domestic Water Requirement
Present Gross Water Demand (2015) Future Gross Water Demand (2020)
49
It has been assumed that water potential required is equal to the total crop water
demand of cultivated area, while the existing water potential is equal to crop water
requirement of irrigated area. It can be observed that water potential to be created is
to the tune of 137 MCM for Mahesana district.
Figure 4.2: Crop water demand & existing water potential
The crop wise water requirement has been taken based upon discussion with
Agriculture Universities and department officials as per practice prevailing in the
State which is as under: Table 4.4: Crop wise water requirement
Season Crops MCM/Ha Crops MCM/Ha Kharif Paddy 0.005 Groundnut 0.003
Jowar 0.0035 Castor 0.005 Bajri 0.0035 Sesamum 0.002 Maize 0.0035 Cotton 0.005 Ragi 0.002 Tobacco 0.0042 Mung 0.0024 Guar seed 0.0035 Math 0.0024 Soyabean 0.0024 Udid 0.0024 Tur 0.0024
Rabi Wheat 0.0052 Sugarcane 0.018 Jowar 0.007 Isabgul 0.0032 Maize 0.007 Fennel 0.007 Gram 0.003 Tobacco 0.0063 Rapeseed & mustard
0.0035
Summer Groundnut 0.0075 Mung 0.007
15
0.0
7
25
7.9
9
13
4.6
9
43
5.2
5
19
2.5
08
14
4.6
33
17
4.4
83
30
0.4
53
21
0.1
78
12
6.9
1
24
3.9
0
12
4.3
5
39
8.8
9
18
2.3
43
12
9.3
24
16
3.9
78
29
4.7
13
19
8.5
26
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
450.00
500.00
(MC
M)
Crop Water Demand & Existing Potential
Water Potential required (MCM) Existing water potential (MCM)
50
Bajra 0.0065 Udid 0.007 Paddy 0.017 Sesamum 0.0035 Maize 0.0098
Horticulture Chillies 0.009 Banana 0.025 Fennel 0.007 Other fruits 0.012 Cumin 0.0032 Vegetables 0.006167 Fenugreek 0.0059 Flower 0.006 Other spices 0.0032
4.3 Livestock Water Requirement
As mentioned in section 1.3, the annual growth in livestock population can be
presumed to be 6.24%, based on livestock census 2007 & 2012. Accordingly, the
present livestock population (2015) and future livestock population (2020) is
assessed. The table below represents the animal wise water requirement as well as
total water requirement of the district for animals.
Table 4.5 Livestock water demand
Taluka Total Number of livestock
Present water Demand (MCM)
Water demand in 2020 (MCM)
Existing Water Potential (MCM)
Water potential to be created (MCM)
Satlasana 137907 2.46 3.11 2.46 0.65 Kheralu 151413 3.12 3.94 3.12 0.82 Unjha 53804 1.05 1.33 1.05 0.28 Visnagar 139435 2.91 3.68 2.91 0.77 Vadnagar 123895 2.22 2.81 2.22 0.59 Vijapur 156691 3.38 4.27 3.38 0.89 Mehsana 190917 3.7 4.68 3.7 0.98 Becharaji 58295 1.26 1.59 1.26 0.33 Kadi 315325 2.93 3.7 2.93 0.77 Jotana 40556 0.87 1.1 0.87 0.23 Total 1368238 23.90 30.21 23.9 6.31
It has been assumed that the existing water potential is equal to present water
demand of livestock. Thus, the water potential to be created implies the quantum of
water availability to be created to meet livestock water demand in 2020. It can be
observed that water potential to be created is to the tune of 6.31 MCM for Mahesana
district.
For calculating the livestock water demand, Water requirement for each of the
animal is estimated based on the following assumption as per the secondary data
received from Animal husbandry department.
51
Table 4.6: Animal wise water requirement
Animal Daily Water Demand (Liter)
Animal Daily Water Demand (Liter)
Milch Cow/ Buffalo 65 Pig 7 Dry Cow/ Buffalo 60 Sheep/ Goat 5 Calf 10 Camel 24 Heifer 20 Broiler Birds (Per 1000 birds) 459 Horse 40 Layer Birds (Per 100 birds) 18 Mare 50
4.4 Industrial Water Requirement
Presently, there are two water consuming industries operating in the district, while 4
more industries have been recently sanctioned. It can be observed from the following
table that total water potential to be created by 2020 is 4.754 MCM.
Table 4.7: Industrial water requirement
Taluka Name of Industry Water demand (MCM)
Water Demand in 2020 (MCM)
Existing Water potential (MCM))
Water potential to be created (MCM)
Jotana Phnidhar Mega Food Pvt Ltd
0.5475 0.5475 0.5475 0
Kadi Torrent Pharma 0.376 0.912 0.376 0.536 Recently sanctioned & Agreement to be done Kadi Rainbow Paper Ltd. - 0.547 0 0.547 Kadi GIDC- Mandal -
Hansalpur, Industries Estate
- 2.92 0 2.92
Kadi Fanidhar Mega Food Pvt Ltd.
- 0.547 0 0.547
Kadi Mescot Infrastructure
- 0.204 0 0.204
4.5 Water Demand for Power Generation
The district is not having any thermal or nuclear power plant where water may be
consumed. Therefore, demand of water for power generation has been taken as nil.
4.6 Total Water Demand of the district for various sectors
This section presents the total water demand of the district and has been calculated
by summing up all major sectors consuming water.
Table 4.8: Total water demand
Components Total MCM Domestic Crop Livestock Industrial Power
Present (2015) 88.33 2000 23.90 0.9235 0 2113.1535 Future (2020) 96.51 2000 30.21 5.6775 0 2132.3975
52
It can be observed that the total present water demand from various sectors is
2113.1535 MCM, while future water demand (2020) is 2132.3975 MCM.
4.7 Water Budget
A total of 872.0627 MCM surface water and 836.24 MCM ground water is available
in Mehsana district. It can be observed that based on present and projected water
demand (2020), and present water availability (surface & ground), the present water
gap is to the tune of 404.851 MCM, and projected water gap (2020) is to the tune of
424.095 MCM. However, water availability of 36.368 MCM will be added by 2020
through ongoing and proposed STP units. So, the projected water gap (2020) shall be
to the tune of 387.727 MCM.
Table 4.9: Water budget
Existing water availability (MCM)
Total (MCM)
Water demand (MCM)
Water gap (MCM)
Surface water
Ground water
Present Projected (2020)
Present Projected (2020)
872.0627 836.24 1708.3027 2113.1535 2132.3975 404.851 424.095
53
CHAPTER V
5 Strategic Action Plan for Irrigation in District under PMKSY
A strategic plan for four years has been prepared starting from 2016-17 to 2019-20.
The strategic action plan is broadly prepared under five heads namely: AIBP, Har
Khet ko Pani, PMKSY Watershed, Per drop more crop and Extension. Various
departments which have prepared the strategic action plan include:
i. Nodal irrigation departments including Dharoi Naher, Sardar Sarovar
Narmada Nigam Limited (SSNNL) and Gujarat Water Resource Development
Corporation ( GWRDC)
ii. Gujarat State Watershed Management Agency (GSWMA)
iii. Gujarat Land Development Corporation (GLDC)
iv. Gujarat Green Revolution Company Limited (GGRC)
v. Agriculture Technology Management Agency (ATMA)
5.1 Component wise Strategic Action Plan
Total planned outlay for four years works out to be Rs. 1073.1098 Crores.
Maximum share of Rs. 828.648 Crores (77.22%) is for Har Khet Ko Pani Component,
followed by Per Drop More Crop Component of Rs. 101.62 Crores (9.47%), followed
by AIBP Component of Rs. 74.259 Crores (6.92%), followed by PMKSY Watershed
Component of Rs 67.219 Crs (6.26%), and very marginal share of Extension
Component of Rs 1.363 Crs (0.13%). Detailed component wise break up of financial
outlay can be observed in the following table.
Table 5.1: Component wise Strategic Action Plan Budget (in Rupees Lakh)
Component Yr16-17 Yr17-18 Yr18-19 Yr19-20 Total Budget
% Share
AIBP 6131.1 1294.8 0 0 7425.9 6.92 Har Khet Ko Pani
14685 36301.84 26279.48 5598.48 82864.8 77.22
PMKSY Watershed*
3421.728 1850.956 835.9523 613.363 6721.9993 6.26
Per Drop More Crop
2941 2407 2407 2407 10162 9.47
Extension 30.15 32.77 35.38 37.99 136.29 0.13 Total 27208.978 41887.366 29557.812 8656.833 107310.9893
* PMKSY Watershed includes PMKSY watershed component and convergence with MGNREGA
AIBP component is to be executed mainly by Sardar Sarovar Narmada Nigam Ltd.
(SSNNL). Har Khet ko Pani component will be implemented by Nodal Irrigation
Department, SSNNL, GWRDC and GLDC. Per drop more crop component will be
executed by GWRDC and GGRC. Water shed component will be taken care of by the
Rural Development Department through GSWMA and extension & training
component will be executed by ATMA. However, all the stakeholders need to have
54
coordination among themselves to have the maximum irrigation efficiency and to
avoid duplicity.
Figure 5.1: Component wise Fund Distribution under PMKSY
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)-Watershed Component
PMKSY-Watershed Component (erstwhile named as Integrated Watershed
Management Programme) is one of the flagship program of Govt. of India. The main
objectives of this is to restore the ecological balance by harnessing, conserving and
developing degraded natural resources such as soil, vegetative cover and water.
Gujarat is one of the largest States in context of land area treatment under PMKSY-
Watershed project. The important activities carried out under this projects are Soil
moisture conservation, Water harvesting, Vegetative cover and Plantation,
Agricultural production and Productivity improvement, Dairy development, Agro
processing, Livelihood and Income Generating Activities etc. In Gujarat PMKSY-
Watershed component is implemented through a State Level Nodal Agency
constituted as Gujarat State Watershed Management Agency (GSWMA), an
autonomous society supported under the Rural Development Department (RDD) of
Government of Gujarat. GSWMA has vision of “Enhancing the quality of rural
population through Sustainable, Equitable and Participatory Natural resources
Management” and also has Mission of “Creating sustainable rural livelihoods
through scientific and Integrated Watershed Development Approach”. GSWMA
works in all the 33 districts of Gujarat. GSWMA planned to cover all the micro-
watersheds (at village level) of the state in the next 18 years.
Thus it will cover all the talukas of the state. Total 610 no. of PMKSY-Watershed
Component projects under six batches covering 31.04 lakh hectors of land are
currently under implementation. GSWMA has its own structural arrangements
(GSWMA, District Watershed Development Unit, PIA, and Watershed Committee)
6.92%
77.22%
6.26%9.47%
0.13%
AIBP Har Khet Ko Pani PMKSY Watershed
Per Drop More Crop Extension
55
from state to village level for implementation of program and has system of internal
monitoring of project activities through different means. GSWMA has its own web
based monitoring system as Soil Water Resource Management System (SWaRSys).
The said system is online and helps not only for the monitoring/documentation of all
the main project activities but also facilitates to collect and collate monthly and
quarterly data from District level offices. For preparation of DIP, the watershed
component information is collected from various levels and incorporated in this
document for the years 2016-20.
5.2 Department wise allocation of budget
Out of the total planned outlay of Rs. 1073.1098 Cr, maximum share of Rs. 573.76
Crores (53.47%) is for Nodal Irrigation Departments, followed by SSNNL of Rs.
284.8478 Crores (26.54%), followed by marginal shares of GSWMA (6.26%), GGRC
(6.47%), GWRDC (4.94%), GLDC (2.19%), and ATMA (0.13%).
Table 5.2: Department wise allocation of budget
Department
Yr16-17 Yr17-18 Yr18-19 Yr19-20 Total Budget (Rs Lakhs)
% Share
Nodal Dept.
2597 25116 25172 4491 57376.000 53.47
SSNNL 17111.62 11373.16 0 0 28484.78 26.54 GWRDC 1324 1324 1324 1324 5296 4.94 GSWMA* 3421.728 1850.956 835.9523 613.363 6721.9993 6.26 GLDC 587.48 587.48 587.48 587.48 2349.92 2.19 GGRC 2137 1603 1603 1603 6946 6.47 ATMA 30.15 32.77 35.38 37.99 136.29 0.13 Total 27208.97
8 41887.366
29557.812
8656.833
107310.9893
* The budget includes component of convergence with MNREGA of Rs 374.578 Lakhs.
Table 5.3 GSWMA Plan Abstract
Block Fund Requirement (Rs Lakhs) Yr 2016-17 Yr 2017-18 Yr 2018-19 Yr 2019-20 Total
Kadi 488.56989 210.5725 179.8411 173.047 1052.0306 Bechraji 1657.0022 341.833 252.0667 267.2689 2518.1708 Mehsana 702.55451 217.629 0 0 920.18353 Kheralu 34.741856 0 0 0 34.741856 Satlasana 538.85992 1080.921 404.0445 173.047 2196.8725 Total 3421.7284 1851 835.95 613.36 6721.9993
The expenditure towards other components of Rs 609 Lakhs during year 16-17,
536.37 Lakhs during year 17-18, 227.289 Lakhs during year 18-19 and Rs 110.973
Lakhs during year 2019-20 have been proportionately divided into 5 blocks.
However, the actual fund requirement in each block may vary.
56
Convergence with MNREGA
GSWMA has proposed to execute land development activities and desilting of ponds
& tanks under convergence with MNREGA. Budget of Rs 374.578 Lakhs will be
utilized under convergence with MNREGA, with break-up of Rs 221.159 Lakhs
during 1st Year, Rs 65.23 Lakhs during 2nd Year, Rs 19.35 Lakhs during 3rd Year and
Rs 68.839 Lakhs during 4th Year.
Table 5.4 Convergence with MNREGA
Block Convergence with MNREGA (Rs Lakhs) Yr 2016-17 Yr 2017-18 Yr 2018-19 Yr 2019-20 Total
Kadi 31.57809 7.42084 4.162829 19.42143 62.58318 Bechraji 107.0982 12.04662 5.83465 29.99614 154.9756 Mehsana 45.40871 7.66952 0 0 53.07823 Kheralu 2.245496 0 0 0 2.245496 Satlasana 34.82852 38.09302 9.352521 19.42143 101.6955 Total 221.159 65.23 19.35 68.839 374.578
5.3 Year wise Strategic Action Plan
Year wise financial outlay for the four years can be observed in Fig.5.2. In the first
year of implementation, i.e. in financial year 2016-17, a budget of Rs. 272.0897
Crores is proposed. In the subsequent three years, Rs.418.873 Crores, Rs. 295.578
Crores and Rs. 86.568 Crores budget is estimated for various departments.
Figure 5.2: Yearly budget requirement
5.4 Monitoring and Evaluation
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be
monitored by the District Level Irrigation Committee. Further, the activities, outputs
272.08978
418.87366
295.578123
86.56833
0
50
100
150
200
250
300
350
400
450
Year 2016-17 Year 2017-18 Year 2018-19 Year 2019-20
Budget Requirement in Rs Crores
57
and outcomes will be reported in web based MIS of PMKSY for review at state and
national level. Some of the key indicators that will be used to monitor and evaluate
the progress of PMKSY include:
Annual irrigation water supply per unit irrigated area measured as the ratio of
total volume of irrigation water supplied at intake divided by total area
irrigated in all seasons
Potential created and utilized measured as the ratio of total potential utilised
(measured crop area) to irrigation potential created
Output (agricultural production) per unit irrigated area measured as the ratio
of total value of agriculture production divided by the total irrigated area.
Output (agricultural production) per unit irrigation water supply measured as
the ratio of total value of agriculture production divided by the total volume of
irrigated water supplied
Total Operations & Maintenance (O&M) cost per unit irrigated area measured
as the total Management, Operation and Maintenance (MOM) costs for the
system divided by total area irrigated (potential utilised).
Total Operations & Maintenance (O&M) cost per unit volume of water
supplied measured as total Management, Operation and Maintenance (MOM)
costs for the system divided Total volume of water supplied (all uses)
Equity performance measured as actual area irrigated in head, middle and tail
divided by Command area in head, middle and tail.
5.5 Output & Outcome
5.5.1 Additional Area to be irrigated
During the upcoming four financial years, an additional area of 80,555 ha area will
be irrigated under Pradhan Mantri Krishi Sinachyi Yojna. Out of 80,555 ha, area of
55,722 hectares will be covered by the various Water Resource Departments (Dharoi
Naher, Panchayat Irrigation Department, GWRDC, SSNNL and Sujlam Suflam), area
of 15,503 ha by Gujarat Green Revolution Company Ltd. (GGRC), area of 3899 ha by
GLDC and area of 5430 ha by GSWMA.
Table 5.5 Additional Area to be irrigated
Name of Department Additional Area to be Irrigated under PMKSY (ha.) Yr 16-17
Yr 17-18
Yr 18-19
Yr 19-20
Total
Nodal Irrigation Department 994 1944 1810 1661 6409 Sardar Sarovar Narmada Nigam Ltd. (SSNNL)
22957 22957
0 0 45914
Gujarat Water Resource Development Corporation Ltd. (GWRDC)
849.658
849.658
849.658
849.658
3398.632
58
Gujarat Land Development Corporation (GLDC)
974.76 974.76
974.76
974.76
3899.04
Gujarat Green Revolution Company Ltd. (GGRC)
4770.3 3577.72
3577.72
3577.72
15503.46
Gujarat State Watershed Management Agency (GSWMA)
3156.98
1547 623 103.95
5430.93
Total 33702.698
31850.14
7835.138
7167.088
80555.06
5.5.2 Employment Generation
Table 5.6 indicates number of man days that will be generated by implementation of
proposed plans. The total number of man days generated will be 1,27,97,381. It is
based on the assumption that 40% cost of watershed department and 20% cost of all
other departments are labour charges. Daily labour wage of Rs. 178 is considered. Table 5.6 Employment Generation
Name of Department Total Budget (Rs Lakhs)
Labour Cost (Rs Lakhs)
No. of Man-days Generated
Nodal Irrigation Department 57376 11475.2 6446742 Sardar Sarovar Narmada Nigam Ltd. (SSNNL)
28484.78 5696.956 3200537
Gujarat Water Resouce Development Corporation Ltd. (GWRDC)
5296 1059.2 595056
Gujarat Land Development Corporation (GLDC)
2349.92 469.984 264036
Gujarat Green Revolution Company Ltd. (GGRC)
6946 1389.2 780449
Gujarat State Watershed Management Agency (GSWMA)
6721.999 2688.799 1510561
Total 12797381
5.5.3 Increase in the income of farmers
Increase in the income of farmers on account of proposed interventions is assessed
by multiplying additional income of farmer per hectare with the additional area to be
brought under irrigation (ha). It is assumed that income of agriculture labourer
increases by Rs 284 per hectare of additional area irrigated, on account of
employment generated. Therefore, increase in the income of agricultural labourers is
assessed to be Rs 228.77 Lakhs.
5.6 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of Panchayat Samities and then
finalise the village plan and prepare DPR.
There should not be any duplicity of project.
The Department should supplement each other so that the maximum irrigation
efficiency is achieved.
Agriculture and Horticulture Department should take micro irrigation projects
in the command of minor irrigation projects which are either completed or
likely to be completed in near future.
59
All the irrigation projects should have a component of water conveyance so that
the each drop of water is judiciously utilized.
Where ever feasible, Solar pump sets should be installed.
All the structures planned should be geo tagged and marked on map, so that
social monitoring of the projects can be conducted. This will also avoid the
duplicity.
Priority should be given to projects to minimize the gap in potential created and
potential utilized.
Execution of the scheme should be expeditiously completed.
There should be smooth fund flow for timely completion of the project and to
avoid cost escalation.
60
5.7 Summary Strategic Action Plan
Sr.
No
Concerned
Department
Component Activity Total
Number
Command
Area
Potential
(Ha)
Estimated cost (in Rs. Lakhs)
Yr 16-
17
Yr 17-
18
Yr 18-
19
Yr 19-
20
Total
1 SSNNL - CE
Ahmedabad
AIBP Major Irrigation 5 Nos.
16.497 km
2038 5097.6 261.3 0 0 5358.9
2 SSNNL - CE
mehsana
Major Irrigation 40 Nos
/49.2564
Km
9843 1033.5 1033.5 0 0 2067
3 Nodal
Irrigation
Dept.
Har khet ko
pani
Lined Field Channels 29 1965 1140 1600 1870 1608 6218
Water Harvesting
Structures
51 2045 760 22100 21920 1650 46430
Secondary Storage
Structures (Tank)
221 907 277 386 392 448 1503
Other works 88 1492 420 1030 990 785 3225
4 SSNNL - CE
Ahmedabad
Lined Channels
(UGPL)
230 Nos.
239.7 km
10414 2638.02 1735.86 0 0 4373.88
5 SSNNL - CE
mehsana
Lined Channels
(UGPL)
850
Nos/187.78
Km
35500 8342.5 8342.5 0 0 16685
6 GWRDC Recharge Structure 172 860 430 430 430 430 1720
Recharge Tubewell in
Sujalam Suflam Canal
36 180 90 90 90 90 360
7 GLDC Farm pond 816 1175 228.48 228.48 228.48 228.48 913.92
Sim pond 188 789 235 235 235 235 940
WHS 332 1934 124 124 124 124 496
8 GWRDC Per drop
more crop
(Micro
Irrigation)
DRIP on Exisitng
Tubewells
142 2198.62 704 704 704 704 2816
New Tubewell with
Drip
10
160 100 100 100 100 400
61
Sr.
No
Concerned
Department
Component Activity Total
Number
Command
Area
Potential
(Ha)
Estimated cost (in Rs. Lakhs)
9 GGRC Drip Irrigation System
(DIS)
- 9302.06 1923.38 1443 1443 1443 6252.38
Sprinkler Irrigation
System (SIS)
- 6201.38 213.71 160.28 160.28 160.28 694.55
10 GSWMA PMKSY
Watershed
Newly created WHS
Animal camp 76 0 22.99 10.02 0 0 33.01
Causeway on
connecting roads
7 0 13.44 0 0 0 13.44
Check / Protection
wall
3 0 7.57 0 0 0 7.57
Drainage line
correction (To prevent
flooding of Gamtal)
794 rmt 0 8.33 10.04 0 0 18.37
Drinking water facility 14 0 23.91 0 0 0 23.91
Rain water harvesting
system
6 0 8 0 0 0 8
Revival of natural
water bodies with
recharge activities
7 0 26.14 0 0 0 26.14
Sanitation
facilities/Sewerage
line
1 rmt 0 1.51 0 0 0 1.51
Pipe Culvert /
Khadiyavat
2 0 4.34 0 0 0 4.34
Drainage line
correction (To prevent
flooding of Gamtal)
6 0 12.91 0 0 0 12.91
Gypsum 360 0 2.1 0 0 0 2.1
GSWMA PMKSY Land Development 0
62
Sr.
No
Concerned
Department
Component Activity Total
Number
Command
Area
Potential
(Ha)
Estimated cost (in Rs. Lakhs)
Watershed Farm Bunding 1884 rmt 0 0.96 0 0 0 0.96
Afforestation 16 Ha 0 54.79 4.56 0 0 59.35
Agriculture Demo 5 0 0.01 0 0 0 0.01
Agro Forestry 2 Ha 0 0 4.56 0 0 4.56
Horticulture 740 Ha 0 0.37 0 0 0 0.37
Land leveling 774 Ha 0 64.84 41.03 11.4 12.22 129.49
Drip / Sprinkler 1 Ha 0 0.08 0 0 0 0.08
Bamboo Plantation 6 Ha 0 0 1.08 0 0 1.08
Farm Bunding 2169 0 158.64 72.98 12.72 7.85 252.19
Holticulture plant
distribution
1 0 0.68 0 0 0 0.68
Soil & Moisture
Conservation
0
Check wall 54 67 49.91 23.99 0 0 73.9
Earthen bund 190 819 176.12 98.66 89.63 86.46 450.87
Protection Wall 31 0 19.33 25.56 12 0 56.89
Waste weir 97 27 82.97 60.44 11.91 10.4 165.72
Bench Terracing 2 cum 0 6.06 0 0 0 6.06
Brushwood Checks 120 0 0 1.2 1.2 0 2.4
Countour Trenches 2376 rmt 0 0 5.4 5.4 5.02 15.82
Field Outlet 224 82 93.73 16.64 16.44 10.67 137.48
Gabion structure 1 0 0 2.11 0 0 2.11
Gully plug 106 0 3.69 5.61 0 11.22 20.52
Loose Boulder Checks 295 20 0 19.77 11.45 2.75 33.97
Nala Plug 9 0 10.67 0 0 0 10.67
Stone bunding 17 rmt 0 5.56 4.86 2.15 0 12.57
Linkage Channel /
Pond Inlet / Outlet
34 1 17.33 23.35 21.89 21.89 84.46
Waste weir 2 11 0 4.92 0 0 4.92
Water Harvesting
Structures
0
63
Sr.
No
Concerned
Department
Component Activity Total
Number
Command
Area
Potential
(Ha)
Estimated cost (in Rs. Lakhs)
Cause way cum Chek
dam
18 13 7.22 9.38 9.38 9.38 35.36
Check dam 183 1482 226.74 131.48 123.31 101.96 583.49
Village/Community
Pond
51 840 30 45.92 50.03 0 125.95
Farm Pond 2 7 3.95 0 0 0 3.95
Percolation Tank 0 0 5.22 0 0 0 5.22
Pond Inlet 20 14 48.62 4.86 0 0 53.48
Pond Outlet 10 7 20.84 2.68 0 0 23.52
Drainage line
correction (To prevent
flooding of Gamtal)
5 2 12.37 0 0 0 12.37
Under Ground
Linkage channel with
Pond
2 0 5.86 0 0 0 5.86
Stone bunding 3 6 6.47 0 0 0 6.47
Ground Water
Recharging Structures
0
Dugwell Recharge 30 12 9.82 2 0 0 11.82
Farm Recharge Filter 118 0 27.4 5.42 0 0 32.82
Holiya in farm/Field 91 4 31.2 0.93 0 0 32.13
Pond Recharge
structure
35 120 48.25 4.57 0 0 52.82
Miscell 0
AGRICULTURE
ACTIVITIES
24058 0 321.31 237.37 67.02 44.56 670.26
Agro Processing 445 0 91.76 39.31 14.05 14.55 159.67
Animal Husbandry 1773 0 231.89 180.56 68.93 51.51 532.89
Establishing linkages 16 0 1.64 0.12 0 0 1.76
Local handicraft 25 0 1.8 4.23 0 0 6.03
Minor Activities 228 0 14.15 13.71 2.75 2.29 32.9
64
Sr.
No
Concerned
Department
Component Activity Total
Number
Command
Area
Potential
(Ha)
Estimated cost (in Rs. Lakhs)
Non-conventional
Energy
1 0 0 0.23 0 0 0.23
Capacity Building,
M&E
312.8 186.73 77.88 29.432 606.842
Admin 206.48 174.54 95.41 39.493 515.923
Consolidation 90 175.1 54 42.048 361.148
Renovated WHS 0
Recharge / Repair of
open wells
27 0 24.73 0 0 0 24.73
Deepening/Desiltation
Of Pond
245 1753 535.77 104.11 52.36 40.82 733.06
Deepening Of
Percolation Tank
7 230 0 15.15 0 0 15.15
De-siltation of
Checkdam
15 46 7.34 9.5 5.29 0 22.13
Repairing of
Checkdam
1 0 0 1.04 0 0 1.04
11 GSWMA-
MoRD
Convergence
with
MGNREGA
Newly Created
Land leveling 774 Ha 0 10.26 6.84 6.84 6.84 30.78
Bamboo Plantation 6 Ha 0 0 30.84 8.42 0 39.26
Renovated 0
Deepening/Desiltation
of Pond
245 - 207.92 27.55 4.09 62 301.56
De-siltation of
Checkdam
15 - 2.98 0 0 0 2.98
12 ATMA Capacity
Building
Training programmes 1374 - 30.15 32.77 35.38 37.99 136.29
65
5.8 Annexure - Department wise strategic action plans
5.8.1 Nodal Irrigation Department
i. District Summary: Table 5.7: District level plan of Nodal Irrigation Department
Compo. Activity Total Nos
Total CA (ha.)
Additional irrigat. Area (ha.)
Fund Requirement (Rs Lakhs) Yr 16-17
Yr 17-18
Yr 18-19
Yr 19-20
Total
Har Khet ko pani
Lined Field Channels
29 64875 1965 1140 1600 1870 1608 6218
Har Khet ko pani
WHS 51 0 2045 760 22100 21920 1650 46430 Secondary Storage Structures (Tank)
221 0 907 277 386 392 448 1503
Other Works
88 0 1492 420 1030 990 785 3225
TOTAL 389 64875 6409 2597 25116 25172 4491 57376
ii. Taluka Summary: Table 5.8: Taluka summary of nodal irrigation department
Sr. No
TALUKA Fund Req. (Rs Lakhs) 2016-17 2017-18 2018-19 2019-20 Total
1 VISNAGAR 612 905 906 1001 3424 2 VADANAGAR 240 10360 10330 518 21448 3 MEHSANA 510 860 990 732 3092 4 VIJAPUR 278 10325 10430 448 21481 5 KHERALU 194 420 530 448 1592 6 UNJHA 222 905 910 623 2660 7 BECHARAJI 172 315 410 185 1082 8 JOTANA 114 280 150 60 604 9 KADI 121 335 185 85 726 10 SATALASANA 134 411 331 391 1267 Total 2597 25116 25172 4491 57376 Table 5.9: Taluka plan of Nodal Irrigation Department
VISNAGAR Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
6 15910 300 330 300 356
Water Harvesting Structures
8 0 180 400 420 450
66
Secondary Storage Structures (Tank)
37 0 42 55 56 60
Other Works 16 0 90 120 130 135 TOTAL 67 15910 612 905 906 1001 VADNAGAR Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
4 15535 130 250 210 268
Water Harvesting Structures
5 0 40 10000 10000 100
Secondary Storage Structures (Tank)
30 0 40 50 60 60
Other Works 8 0 30 60 60 90 TOTAL 47 15535 240 10360 10330 518 MEHSANA Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
5 6580 200 300 400 172
Water Harvesting Structures
8 0 200 400 400 400
Secondary Storage Structures (Tank)
20 0 20 40 40 40
Other Works 16 0 90 120 150 120 TOTAL 49 6580 510 860 990 732 VIJAPUR Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
4 13748 150 200 300 208
Dams/Water Harvesting Structures
4 0 40 10000 10000 100
Secondary Storage
22 0 28 35 40 50
67
Structures (Tank) Other Works 11 0 60 90 90 90
TOTAL 41 13748 278 10325 10430 448 KHERALU Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
4 1429 120 210 320 208
Water Harvesting Structures
3 0 0 100 100 150
Secondary Storage Structures (Tank)
12 0 14 20 20 30
Other Works 10 0 60 90 90 60 TOTAL 29 1429 194 420 530 448 UNJHA Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
3 10746 120 150 160 213
Dams/Water Harvesting Structures
4 0 0 400 400 200
Secondary Storage Structures (Tank)
30 0 42 55 50 60
Other Works 10 0 60 300 300 150 TOTAL 47 10746 222 905 910 623 BECHRAJI Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
0 0 0 0 0 0
Water Harvesting Structures
7 0 100 200 300 100
Secondary Storage Structures (Tank)
28 0 42 55 50 55
68
Other Works 6 0 30 60 60 30 TOTAL 41 0 172 315 410 185 JOTANA Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
0 0 0 0 0 0
Water Harvesting Structures
4 0 100 200 100 0
Secondary Storage Structures (Tank)
12 0 14 20 20 30
Other Works 4 0 0 60 30 30 TOTAL 20 0 114 280 150 60 KADI Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
0 0 0 0 0 0
Dams/Water Harvesting Structures
4 0 100 200 100 0
Secondary Storage Structures (Tank)
18 0 21 35 35 35
Other Works 4 0 0 100 50 50 TOTAL 26 0 121 335 185 85 SATLASNA Block Fund Req (Rs Lakhs) Component Activity Total
Nos Total CA (ha)
2016-17
2017-18
2018-19
2019-20
Hark Khet ko pani
Lined Field Channels
3 927 120 160 180 183
Dams/Water Harvesting Structures
4 0 0 200 100 150
Secondary Storage Structures (Tank)
12 0 14 21 21 28
Other Works 3 0 0 30 30 30 TOTAL 22 927 134 411 331 391
69
5.8.2 SSNNL
i. District Summary:
Table 5.10: District level plan of SSNNL
Component
Activities 2016-17 2017-18 Total Area (Ha)
Fund (Rs Lakhs)
Area (Ha)
Fund (Rs Lakhs)
Area (Ha)
Fund (Rs Lakhs)
CE ABAD AIBP Major
Irrigation 792 5097.6 1246 261.3 2038 5358.9
Har Khet Ko Pani
Lined Channels (UGPL)
6281 2638.02 4133 1735.86 10414 4373.88
CE Mehsana AIBP Major
Irrigation 4921.5
1033.5 4921.5
1033.5 9843 2067
Har Khet Ko Pani
Lined Channels (UGPL)
17750 8342.5 17750 8342.5 35500
16685
GRAND TOTAL 29744.5
17111.62 28050.5
11373.16 57795 28484.78
ii. Taluka Summary:
a) SSNNL - CE Ahmedabad Table 5.11: Taluka level plan of SSNNL - CE Ahmedabad
Taluka Component Activity Total Nos
CA (Ha)
Estimated cost (Rs Lacs)
Yr 2016-17 Yr 2017-18 Kadi AIBP Major
Irrigation 5 Nos. 16.497 km
2038 5097.60 261.30
Kadi Har Khet Ko Pani
Lined Field Channels
230 Nos. 239.7 km
10414 2638.02 1735.86
Total 12452 7735.62 1997.16
70
b) SSNNL - CE Mehsana Table 5.12: Taluka level plan of SSNNL - CE Mehsana
S No
Block Component
Activity Nos/ Cap(cum )
CA (Ha)
Fund Req. (Rs. Lakhs)
Yr 16-17
Yr 17-18
1 Kadi / Mehsana
AIBP
Major Irrigation
27/46.14 8724 916 916
2 Jotana / Mehsana
1/0.1964 566 59.5 59.5
3 Bechraji / Mehsana
AIBP
Major Irrigation
12/2.92 553 58 58
Sub Total
9843 1033.5
1033.5
Construction of Field Channels (UGPL) 1 Kadi /
Mehsana
Har khet ko pani (UGPL)
Lined Field Channels(UGPL)
374/82.15 15531 3649.8
3649.8
2 Jotana / Mehsana
36/6.22 1176 276.35 276.35
3 Bechraji / Mehsana
440/99.41 18793 4416.35
4416.35
Sub Total
35500 8342.5
8342.5
5.8.3 GWRDC
i. District Summary: Table 5.13: District level plan of GWRDC
Component Activity Total Nos
CA (Ha)
Fund Requirement (in Rs Lacs) Yr 16-17
Yr 17-18
Yr 18-19
Yr 19-20
Total
Har Khet ko Pani
Recharge Structure
172 860 430 430 430 430 1720
Recharge Tubewell in Sujalam Suflam Canal
36 180 90 90 90 90 360
Per Drop more crop
DRIP on Exisitng Tubewells
142 2198.62
704 704 704 704 2816
71
New Tubewell with Drip
10 160 100 100 100 100 400
Grand Total 360 3398.62
1324 1324 1324 1324 5296
ii. Taluka Summary: Table 5.14: Taluka level plan of GWRDC
Taluka
Component
Activity Total Nos
CA (Ha)
Fund Requirement (in Rs Lacs) Yr 16-17
Yr 17-18
Yr 18-19
Yr 19-20
Total
Becharaji
Har Khet ko Pani
Recharge Structure
8 40 20 20 20 20 80
Per Drop more crop
DRIP on Exisitng Tubewells
4 68.4 20 20 20 20 80
New Tubewell with Drip
1 16 10 10 10 10 40
Kadi Har Khet ko Pani
Recharge Structure
32 160 80 80 80 80 320
Per Drop more crop
DRIP on Exisitng Tubewells
41 730.74
204 204 204 204 816
New Tubewell with Drip
2 32 20 20 20 20 80
Kheralu
Har Khet ko Pani
Recharge Structure
24 120 60 60 60 60 240
Per Drop more crop
DRIP on Exisitng Tubewells
10 83.39
48 48 48 48 192
New Tubewell with Drip
1 16 10 10 10 10 40
Mahesana
Har Khet ko Pani
Recharge Structure
12 60 30 30 30 30 120
Recharge Tubewell in Sujalam Suflam Canal
22 112 56 56 56 56 224
Per Drop more crop
DRIP on Exisitng Tubewells
34 473.55
172 172 172 172 688
New Tubewell with Drip
2 32 20 20 20 20 80
Satlasana
Har Khet ko Pani
Recharge Structure
16 80 40 40 40 40 160
Unjha Har Khet ko Pani
Recharge Structure
12 60 30 30 30 30 120
Recharge Tubewell in Sujalam Suflam Canal
3 16 8 8 8 8 32
Per Drop more crop
DRIP on Exisitng Tubewells
20 421.7
100 100 100 100 400
New Tubewell with Drip
1 16 10 10 10 10 40
Vadna Har Khet ko Recharge 4 20 10 10 10 10 40
72
gar Pani Structure Per Drop more crop
DRIP on Exisitng Tubewells
2 22.56
8 8 8 8 32
New Tubewell with Drip
1 16 10 10 10 10 40
Vijapur
Har Khet ko Pani
Recharge Structure
40 200 100 100 100 100 400
Recharge Tubewell in Sujalam Suflam Canal
1 4 2 2 2 2 8
Per Drop more crop
DRIP on Exisitng Tubewells
10 92.46
48 48 48 48 192
New Tubewell with Drip
1 16 10 10 10 10 40
Visnagar
Har Khet ko Pani
Recharge Structure
24 120 60 60 60 60 240
Recharge Tubewell in Sujalam Suflam Canal
10 48 24 24 24 24 96
Per Drop more crop
DRIP on Exisitng Tubewells
21 305.82
104 104 104 104 416
New Tubewell with Drip
1 16 10 10 10 10 40
5.8.4 GLDC
i. District Summary: Table 5.15: District level plan of GLDC
Component
Activity
Total Numbers
Command area (Ha.)
Fund Requirement for 4 Years (Rs lakhs)
Yr 16-17 Yr 17-18 Yr 18-19 Yr 19-20
Har Khet ko Pani
Farm pond
816 1175 228.48 228.48 228.48 228.48
Sim pond
188 789 235 235 235 235
WHS 332 1934 124 124 124 124
Total 1336 3899 587.48 587.48 587.48 587.48
ii. Taluka Summary: Table 5.16: Taluka level plan of GLDC
Taluka Component Activity Total Nos
C.A (Ha.)
Fund Requirement (Rs lakhs)
Yr 16-17
Yr 17-18
Yr 18-19
Yr 19-20
Unja Har Khet ko Pani Farm pond 88 126.72 24.64 24.64 24.64 24.64 Sim pond 20 84 25 25 25 25 WHS 32 192 8.96 8.96 8.96 8.96
73
Kadi Har Khet ko Pani Farm pond 84 120.96 23.52 23.52 23.52 23.52 Sim pond 20 84 25 25 25 25 WHS 32 192 8.96 8.96 8.96 8.96
Kheralu Har Khet ko Pani Farm pond 80 115.2 22.4 22.4 22.4 22.4 Sim pond 20 84 25 25 25 25 WHS 32 192 8.96 8.96 8.96 8.96
Jotana Har Khet ko Pani Farm pond 72 103.68 20.16 20.16 20.16 20.16 Sim pond 16 67.2 20 20 20 20 WHS 32 192 8.96 8.96 8.96 8.96
Becharaji Har Khet ko Pani Farm pond 64 92.16 17.92 17.92 17.92 17.92 Sim 16 67.2 20 20 20 20 pond 0 0 WHS 32 192 8.96 8.96 8.96 8.96
Mahesana Har Khet ko Pani Farm pond 88 126.72 24.64 24.64 24.64 24.64 Sim pond 20 84 25 25 25 25 WHS 24 144 6.72 6.72 6.72 6.72
Vadnagar Har Khet ko Pani Farm pond 88 126.72 24.64 24.64 24.64 24.64 Sim pond 20 84 25 25 25 25 WHS 32 192 8.96 8.96 8.96 8.96
Vijapur Har Khet ko Pani Farm pond 84 120.96 23.52 23.52 23.52 23.52 Sim pond 20 84 25 25 25 25 WHS 24 144 6.72 6.72 6.72 6.72
Visanagar Har Khet ko Pani Farm pond 88 126.72 24.64 24.64 24.64 24.64 Sim pond 20 84 25 25 25 25 WHS 32 192 8.96 8.96 8.96 8.96
Satalasana Har Khet ko Pani Farm pond 80 115.2 22.4 22.4 22.4 22.4 Sim pond 16 67.2 20 20 20 20 WHS 28 168 7.84 7.84 7.84 7.84 WHS 32 134.4 40 40 40 40
Total 1336 3899 587.5 587.5 587.5 587.5
5.8.5 GGRC
i. District Summary:
Component: Per Drop More Crop Table 5.17: District level plan of GGRC
Yr 2016-17
Yr 2017-18
Yr 2018-19
Yr 2019-20
Total
Drip Irrigation System (DIS)
Total Number (Farmers)
1789 1342 1342 1342 5814
Area (Ha.) 2862.17 2146.63 2146.63 2146.63 9302.06 Estimated Assistance (Rs. in lakh)
1923.38 1443 1443 1443 6250.97
Sprinkler Irrigation System (SIS)
Total Number (Farmers)
1193 894 894 894 3876
Area (Ha.) 1908.11 1431.09 1431.09 1431.09 6201.38 Estimated 213.71 160.28 160.28 160.28 694.55
74
Assistance (Rs. in lakh)
TOTAL Total Number (Farmers)
2982 2236 2236 2236 9690
Area (Ha.) 4770 3578 3578 3578 15503 Estimated Assistance (Rs. in lakh)
2137 1603 1603 1603 6946
ii. Taluka Summary: Table 5.18: Taluka level plan of GGRC
Taluka Yr 2016-17 Yr 2017-18 Yr 2018-19 Yr 2019-20 Total Area (Ha.)
Fund Req. (Rs. lakhs)
Total Area (Ha.)
Fund Req. (Rs. lakhs)
Total Area (Ha.)
Fund Req. (Rs. lakhs)
Total Area (Ha.)
Fund Req. (Rs. lakhs)
Bechraji 222.96 99.89 167.22 74.92 167.22 74.92 167.22 74.92 Gojhariya
1.06 0.48 0.80 0.36 0.80 0.36 0.80 0.36
Jotana 32.17 14.41 24.13 10.81 24.13 10.81 24.13 10.81 Kadi 500.57 224.26 375.43 168.19 375.43 168.19 375.43 168.19 Kheralu 1130.27 506.36 847.70 379.77 847.70 379.77 847.70 379.77 Mehsana
423.67 189.80 317.75 142.35 317.75 142.35 317.75 142.35
Satlasna 1224.05 548.37 918.04 411.28 918.04 411.28 918.04 411.28 Unjha 191.59 85.83 143.70 64.38 143.70 64.38 143.70 64.38 Vadnagar
155.85 69.82 116.89 52.37 116.89 52.37 116.89 52.37
Vijapur 512.38 229.55 384.28 172.16 384.28 172.16 384.28 172.16 Visnagar
375.70 168.31 281.77 126.24 281.77 126.24 281.77 126.24
TOTAL 4770.29
2137.09
3577.72
1602.82
3577.72
1602.82
3577.72
1602.82
75
5.8.6 GSWMA
District Summary:
Table 5.19 District plan of GSWMA
All amounts are in Rs Lakhs
Activity
Unit
Physical Target for FY (2016-17)
Unit
Cost (In Lakhs)
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit Amount (In Lakhs)
Name of Schemes
Animal camp No. 48 22.99 23 0 1124 0 0.00 0
Animal water trough (Havada) No. 0 0.00 0 0 0 0 0.00 0
Causeway on connecting roads No. 7 13.44 0 0 3227 0 0.00 0
Check / Protection wall No. 3 7.57 0 0 4649 0 0.00 0
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
rmt 284 8.33 0 0 318 0 0.00 0
Drinking water facility No. 14 23.91 0 0 3267 0 0.00 0
Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
Grassland/Gauchar Development
Ha. 0 0.00 0 0 0 0 0.00 0
76
Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
Panchayat Well Repair & Pump Room
No. 0 0.00 0 0 0 0 0.00 0
Rain water harvesting system No. 6 8.00 0 0 1112 0 0.00 0
Recharge / Repair of open wells
No. 27 24.73 8 0 3820 0 0.00 0
Repair / development of artificial water bodies
No. 0 0.11 0 0 633 0 0.00 0
Revival of natural water bodies with recharge activities
No. 7 26.14 0 0 10694 0 0.00 0
Sanitation facilities/Sewerage line
rmt 1 1.51 0 0 240 0 0.00 0
Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
Wind energy development No. 0 0.00 0 0 0 0 0.00 0
Pipe Culvert / Khadiyavat No. 2 4.34 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 6 12.91 0 0 1914 0 0.00 0
Gypsum No. 360 2.10 0 0 0 0 0.00 0
CAUSEWAY TO RIVER /Bench/POND IN LATE
No. 0 0.15 0 0 0 0 0.00 0
Land Development 0 0.00 0 0 0 0 0.00 0
Farm Bunding rmt. 1884 0.96 0 0 0 0 0.00 0
Afforestation Ha. 14 54.79 0 0 5608 0 0.00 0
Agriculture Demo No. 5 0.01 0 0 0 0 0.00 0
Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0
77
Horticulture Ha. 740 0.37 0 0 494 0 0.00 0
Land leveling Ha. 437 64.84 0 0 23812 54 10.26 MGNREGA
Pasture Ha. 0 0.00 0 0 0 0 0.00 0
Drip / Sprinkler Ha. 1 0.08 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 12 2.16 Forest
Farm Bunding No. 1259 158.64 0 0 59476 0 0.00 0
Holticulture plant distribution No. 1 0.68 0 0 0 0 0.00 0
Protection Wall No. 0 0.00 0 0 0 0 0.00 0
Soil & Moisture Conservation 0 0.00 0 0 0 0 0.00 0
Check wall No. 43 49.91 43899 39 14805 0 0.00 0
Earthen bund No. 80 176.12 135118 331 32649 0 0.00 0
Protection Wall No. 7 19.33 0 0 4949 0 0.00 0
Waste weir No. 33 82.97 28 2 16135 0 0.00 0
Bench Terracing cumec 2 6.06 0 0 312 0 0.00 0
Bori bandh No. 0 0.00 0 0 0 0 0.00 0
Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0
Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Countour Trenches rmt. 0 0.00 0 0 0 0 0.00 0
Earthern Dam rmt. 0 0.00 0 0 0 0 0.00 0
Field Outlet No. 150 93.73 8 82 13698 0 0.00 0
Gabion structure No. 0 0.00 0 0 0 0 0.00 0
Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Gully plug No. 7 3.69 0 0 587 0 0.00 0
Loose Boulder Checks No. 0 0.00 0 0 0 0 0.00 0
Nala Plug No. 9 10.67 0 0 2495 0 0.00 0
Stone bunding rmt. 2 5.56 0 0 400 0 0.00 0
78
Straggred Contour trenching(Terrace Talavadi)
0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
Linkage Channel / Pond Inlet / Outlet
No. 3 17.33 0 0 2958 0 0.00 0
Waste weir No. 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Water Harvesting Structure 0 0.00 0 0 0 0 0.00 0
Cause way cum Chek dam No. 3 7.22 204 13 1148 0 0.00 0
Check dam No. 59 226.74 230655 949 35502 0 0.00 0
Village/Community Pond No. 10 30.00 2500000 280 3750 0 0.00 0
Farm Pond No. 2 3.95 38000 7 1500 0 0.00 0
Percolation Tank No. 0 5.22 0 0 0 0 0.00 0
Pond Inlet No. 18 48.62 0 0 2876 0 0.00 0
Pond Outlet No. 9 20.84 62500 7 1740 0 0.00 0
OTHERS (Specifiy activities ) No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 5 12.37 430 2 1968 0 0.00 0
Under Ground Linkage channel with Pond
No. 2 5.86 0 0 435 0 0.00 0
Stone bunding No. 3 6.47 64700 6 880 0 0.00 0
Ground Water recharge structure
No. 0 0.00 0 0 0 0 0.00 0
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
0 0.00 0 0 0 0 0.00 0
Deepening/Desiltation Of No. 171 535.77 380111 1322 300474 51 207.92 MGNREGA
79
Pond
Deepening Of Percolation Tank
No. 0 0.00 0 0 0 0 0.00 0
De-siltation of Checkdam No. 5 7.34 7964 12 644 2 2.98 MGNREGA
Repairing of Checkdam No. 0 0.00 0 0 0 0 0.00 0
Ground Water Recharging Structures
0 0.00 0 0 0 0 0.00 0
Dugwell Recharge No. 28 9.82 300 12 3167 0 0.00 0
Farm Recharge Filter No. 91 27.40 232 0 4175 0 0.00 0
Holiya in farm/Field No. 88 31.20 6 4 4013 0 0.00 0
Pond Recharge structure No. 31 48.25 0 0 12153 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Sub Activity Name 0 0.00 0 0 0 0 0.00 0
AGRICULTURE ACTIVITIES No. 22104 321.31 0 0 3168 221 146.86 GGRC
AGRO PROCESSING ACTIVITIES
No. 72 91.76 0 0 4953 0 0.00 0
Animal Husbandry No. 756 231.89 0 0 8014 0 0.00 0
Establishing linkages No. 15 1.64 0 0 0 0 0.00 0
Local traditional handicraft No. 9 1.80 0 0 0 0 0.00 0
Minor Activities No. 54 14.15 0 0 599 0 0.00 0
Non-conventional Energy Sources
No. 0 0.00 0 0 0 0 0.00 0
- 0 0.00 0 0 0 0 0.00 0
Total 0 2591.57 3464186 3068 600535 340 370.18 0
Capacity Building , M&E - 312.80
80
Admin 206.48
Consolidation 90.00
Grand Total 3200.85
Activity Unit Physical Target for FY (2017-18)
Unit Cost (In Lakhs)
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit Amount (In Lakhs)
Name of Schemes
Animal camp No. 28 10.02 0 0 0 0 0.00 0
Animal water trough (Havada) No. 0 0.00 0 0 0 0 0.00 0
Causeway on connecting roads No. 0 0.00 0 0 0 0 0.00 0
Check / Protection wall No. 0 0.00 0 0 0 0 0.00 0
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
rmt 510 10.04 0 0 1598 0 0.00 0
Drinking water facility No. 0 0.00 0 0 0 0 0.00 0
Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
Grassland/Gauchar Development Ha. 0 0.00 0 0 0 0 0.00 0
81
Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
Panchayat Well Repair & Pump Room No. 0 0.00 0 0 0 0 0.00 0
Rain water harvesting system No. 0 0.00 0 0 0 0 0.00 0
Recharge / Repair of open wells No. 0 0.00 0 0 0 0 0.00 0
Repair / development of artificial water bodies
No. 0 0.00 0 0 0 0 0.00 0
Revival of natural water bodies with recharge activities
No. 0 0.00 0 0 0 0 0.00 0
Sanitation facilities/Sewerage line rmt 0 0.00 0 0 0 0 0.00 0
Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
Wind energy development No. 0 0.00 0 0 0 0 0.00 0
Pipe Culvert / Khadiyavat No. 0 0.00 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Gypsum No. 0 0.00 0 0 0 0 0.00 0
CAUSEWAY TO RIVER /Bench/POND IN LATE
No. 0 0.00 0 0 0 0 0.00 0
Land Development 0 0.00 0 0 0 0 0.00 0
Farm Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Afforestation Ha. 2 4.56 0 0 1416 0 0.00 0
Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0
Agro Forestry Ha. 2 4.56 0 0 0 0 0.00 0
Horticulture Ha. 0 0.00 0 0 0 0 0.00 0
Land leveling Ha. 213 41.03 0 0 14591 36 6.84 MGNREGA
82
Pasture Ha. 0 0.00 0 0 0 0 0.00 0
Drip / Sprinkler Ha. 0 0.00 0 0 0 0 0.00 0
Bamboo Plantation Ha. 6 1.08 0 0 0 155 30.84 0
Farm Bunding No. 687 72.98 0 0 6815 0 0.00 0
Holticulture plant distribution No. 0 0.00 0 0 0 0 0.00 0
Protection Wall No. 0 0.00 0 0 0 0 0.00 0
Soil & Moisture Conservation 0 0.00 0 0 0 0 0.00 0
Check wall No. 11 23.99 8622 28 5948 0 0.00 0
Earthen bund No. 41 98.66 9137 186 32369 0 0.00 0
Protection Wall No. 16 25.56 0 0 1500 0 0.00 0
Waste weir No. 55 60.44 43370 23 8839 0 0.00 0
Bench Terracing cumec
0 0.00 0 0 0 0 0.00 0
Bori bandh No. 0 0.00 0 0 0 0 0.00 0
Brushwood Checks No. 60 1.20 0 0 416 0 0.00 0
Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Countour Trenches rmt. 800 5.40 0 0 860 0 0.00 0
Earthern Dam rmt. 0 0.00 0 0 0 0 0.00 0
Field Outlet No. 26 16.64 0 0 1886 0 0.00 0
Gabion structure No. 1 2.11 0 0 250 0 0.00 0
Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Gully plug No. 33 5.61 0 0 892 0 0.00 0
Loose Boulder Checks No. 110 19.77 45450 20 2548 0 0.00 0
Nala Plug No. 0 0.00 0 0 0 0 0.00 0
Stone bunding rmt. 9 4.86 0 0 400 0 0.00 0
Straggred Contour trenching(Terrace Talavadi)
0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
83
Linkage Channel / Pond Inlet / Outlet No. 11 23.35 14600 1 3715 0 0.00 0
Waste weir No. 2 4.92 65000 11 625 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Water Harvesting Structure 0 0.00 0 0 0 0 0.00 0
Cause way cum Chek dam No. 5 9.38 0 0 1492 0 0.00 0
Check dam No. 45 131.48 119894 276 24085 0 0.00 0
Village/Community Pond No. 21 45.92 1200000 280 8125 0 0.00 0
Farm Pond No. 0 0.00 0 0 0 0 0.00 0
Percolation Tank No. 0 0.00 0 0 0 0 0.00 0
Pond Inlet No. 2 4.86 10 14 772 0 0.00 0
Pond Outlet No. 1 2.68 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Under Ground Linkage channel with Pond
No. 0 0.00 0 0 0 0 0.00 0
Stone bunding No. 0 0.00 0 0 0 0 0.00 0
Ground Water recharge structure No. 0 0.00 0 0 0 0 0.00 0
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
0 0.00 0 0 0 0 0.00 0
Deepening/Desiltation Of Pond No. 38 104.11 2121613 414 20083 10 27.55 MGNREGA
Deepening Of Percolation Tank No. 7 15.15 248938 230 74628 0 0.00 0
De-siltation of Checkdam No. 6 9.50 56964 22 754 0 0.00 0
Repairing of Checkdam No. 1 1.04 0 0 0 0 0.00 0
84
Ground Water Recharging Structures 0 0.00 0 0 0 0 0.00 0
Dugwell Recharge No. 2 2.00 0 0 250 0 0.00 0
Farm Recharge Filter No. 27 5.42 0 0 376 0 0.00 0
Holiya in farm/Field No. 3 0.93 4 0 0 0 0.00 0
Pond Recharge structure No. 4 4.57 1790000 120 500 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Sub Activity Name 0 0.00 0 0 0 0 0.00 0
AGRICULTURE ACTIVITIES No. 1353 237.37 0 0 0 108 87.69 GGRC
AGRO PROCESSING ACTIVITIES No. 255 39.31 0 0 0 0 0.00 0
Animal Husbandry No. 562 180.56 0 0 0 0 0.00 0
Establishing linkages No. 1 0.12 0 0 0 0 0.00 0
Local traditional handicraft No. 16 4.23 0 0 0 0 0.00 0
Minor Activities No. 82 13.71 0 0 0 0 0.00 0
Non-conventional Energy Sources No. 1 0.23 0 0 0 0 0.00 0
- 0 0.00 0 0 0 0 0.00 0
Total 0 1249.36
5723601 1623 215734 309 152.92 0
Capacity Building , M&E - 186.73
Admin 174.54
Consolidation 175.10
Grand Total 1785.73
85
Activity Unit Physical Target for FY (2018-19)
Unit Cost (In Lakhs)
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit Amount (In Lakhs)
Name of Schemes
Animal camp No. 0 0.00 0 0 0 0 0.00 0
Animal water trough (Havada) No. 0 0.00 0 0 0 0 0.00 0
Causeway on connecting roads No. 0 0.00 0 0 0 0 0.00 0
Check / Protection wall No. 0 0.00 0 0 0 0 0.00 0
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
rmt 0 0.00 0 0 0 0 0.00 0
Drinking water facility No. 0 0.00 0 0 0 0 0.00 0
Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
Grassland/Gauchar Development
Ha. 0 0.00 0 0 0 0 0.00 0
Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
Panchayat Well Repair & Pump Room
No. 0 0.00 0 0 0 0 0.00 0
86
Rain water harvesting system No. 0 0.00 0 0 0 0 0.00 0
Recharge / Repair of open wells
No. 0 0.00 0 0 0 0 0.00 0
Repair / development of artificial water bodies
No. 0 0.00 0 0 0 0 0.00 0
Revival of natural water bodies with recharge activities
No. 0 0.00 0 0 0 0 0.00 0
Sanitation facilities/Sewerage line
rmt 0 0.00 0 0 0 0 0.00 0
Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
Wind energy development No. 0 0.00 0 0 0 0 0.00 0
Pipe Culvert / Khadiyavat No. 0 0.00 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Gypsum No. 0 0.00 0 0 0 0 0.00 0
CAUSEWAY TO RIVER /Bench/POND IN LATE
No. 0 0.00 0 0 0 0 0.00 0
Land Development 0 0.00 0 0 0 0 0.00 0
Farm Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Afforestation Ha. 0 0.00 0 0 0 0 0.00 0
Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0
Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0
Horticulture Ha. 0 0.00 0 0 0 0 0.00 0
Land leveling Ha. 60 11.40 0 0 4664 36 6.84 MGNREGA
Pasture Ha. 0 0.00 0 0 0 0 0.00 0
Drip / Sprinkler Ha. 0 0.00 0 0 0 0 0.00 0
87
Bamboo Plantation Ha. 0 0.00 0 0 0 37 8.42 0
Farm Bunding No. 133 12.72 0 0 1035 0 0.00 0
Holticulture plant distribution No. 0 0.00 0 0 0 0 0.00 0
Protection Wall No. 0 0.00 0 0 0 0 0.00 0
Soil & Moisture Conservation 0 0.00 0 0 0 0 0.00 0
Check wall No. 0 0.00 0 0 0 0 0.00 0
Earthen bund No. 36 89.63 138 156 29600 0 0.00 0
Protection Wall No. 8 12.00 0 0 1500 0 0.00 0
Waste weir No. 6 11.91 0 2 85 0 0.00 0
Bench Terracing cumec
0 0.00 0 0 0 0 0.00 0
Bori bandh No. 0 0.00 0 0 0 0 0.00 0
Brushwood Checks No. 60 1.20 0 0 416 0 0.00 0
Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Countour Trenches rmt. 800 5.40 0 0 860 0 0.00 0
Earthern Dam rmt. 0 0.00 0 0 0 0 0.00 0
Field Outlet No. 25 16.44 0 0 190 0 0.00 0
Gabion structure No. 0 0.00 0 0 0 0 0.00 0
Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Gully plug No. 0 0.00 0 0 0 0 0.00 0
Loose Boulder Checks No. 105 11.45 0 0 1548 0 0.00 0
Nala Plug No. 0 0.00 0 0 0 0 0.00 0
Stone bunding rmt. 6 2.15 0 0 400 0 0.00 0
Straggred Contour trenching(Terrace Talavadi)
0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
Linkage Channel / Pond Inlet / Outlet
No. 10 21.89 0 0 0 0 0.00 0
88
Waste weir No. 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Water Harvesting Structure 0 0.00 0 0 0 0 0.00 0
Cause way cum Chek dam No. 5 9.38 0 0 0 0 0.00 0
Check dam No. 41 123.31 94894 226 16721 0 0.00 0
Village/Community Pond No. 20 50.03 1200000
280 8125 0 0.00 0
Farm Pond No. 0 0.00 0 0 0 0 0.00 0
Percolation Tank No. 0 0.00 0 0 0 0 0.00 0
Pond Inlet No. 0 0.00 0 0 0 0 0.00 0
Pond Outlet No. 0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Under Ground Linkage channel with Pond
No. 0 0.00 0 0 0 0 0.00 0
Stone bunding No. 0 0.00 0 0 0 0 0.00 0
Ground Water recharge structure
No. 0 0.00 0 0 0 0 0.00 0
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
0 0.00 0 0 0 0 0.00 0
Deepening/Desiltation Of Pond No. 21 52.36 11300 17 3560 2 4.09 MGNREGA
Deepening Of Percolation Tank No. 0 0.00 0 0 0 0 0.00 0
De-siltation of Checkdam No. 4 5.29 7964 12 404 0 0.00 0
Repairing of Checkdam No. 0 0.00 0 0 0 0 0.00 0
89
Ground Water Recharging Structures
0 0.00 0 0 0 0 0.00 0
Dugwell Recharge No. 0 0.00 0 0 0 0 0.00 0
Farm Recharge Filter No. 0 0.00 0 0 0 0 0.00 0
Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0
Pond Recharge structure No. 0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Sub Activity Name 0 0.00 0 0 0 0 0.00 0
AGRICULTURE ACTIVITIES No. 354 67.02 0 0 0 131 88.68 GGRC
AGRO PROCESSING ACTIVITIES
No. 58 14.05 0 0 0 0 0.00 0
Animal Husbandry No. 257 68.93 0 0 0 0 0.00 0
Establishing linkages No. 0 0.00 0 0 0 0 0.00 0
Local traditional handicraft No. 0 0.00 0 0 0 0 0.00 0
Minor Activities No. 55 2.75 0 0 0 0 0.00 0
Non-conventional Energy Sources
No. 0 0.00 0 0 0 0 0.00 0
- 0 0.00 0 0 0 0 0.00 0
Total 0 589.31 1314296 692 69108 206 108.03 0
Capacity Building , M&E - 77.88
Admin 95.41
Consolidation 54.00
Grand Total 816.60
90
Activity Unit Physical Target for FY (2019-20)
Unit Cost (In Lakhs)
Storage Volumes (Cubic Meter)
Command Area/ Irrigation Potential (Ha.)
Person days/Mandays Planned
Convergence
Unit Amount (In Lakhs)
Name of Schemes
Animal camp No. 0 0.00 0 0 0 0 0.00 0
Animal water trough (Havada) No. 0 0.00 0 0 0 0 0.00 0
Causeway on connecting roads No. 0 0.00 0 0 0 0 0.00 0
Check / Protection wall No. 0 0.00 0 0 0 0 0.00 0
Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
rmt 0 0.00 0 0 0 0 0.00 0
Drinking water facility No. 0 0.00 0 0 0 0 0.00 0
Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
Grassland/Gauchar Development
Ha. 0 0.00 0 0 0 0 0.00 0
Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
Panchayat Well Repair & Pump Room
No. 0 0.00 0 0 0 0 0.00 0
Rain water harvesting system No. 0 0.00 0 0 0 0 0.00 0
91
Recharge / Repair of open wells No. 0 0.00 0 0 0 0 0.00 0
Repair / development of artificial water bodies
No. 0 0.00 0 0 0 0 0.00 0
Revival of natural water bodies with recharge activities
No. 0 0.00 0 0 0 0 0.00 0
Sanitation facilities/Sewerage line
rmt 0 0.00 0 0 0 0 0.00 0
Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
Wind energy development No. 0 0.00 0 0 0 0 0.00 0
Pipe Culvert / Khadiyavat No. 0 0.00 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Gypsum No. 0 0.00 0 0 0 0 0.00 0
CAUSEWAY TO RIVER /Bench/POND IN LATE
No. 0 0.00 0 0 0 0 0.00 0
Land Development 0 0.00 0 0 0 0 0.00 0
Farm Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Afforestation Ha. 0 0.00 0 0 0 0 0.00 0
Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0
Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0
Horticulture Ha. 0 0.00 0 0 0 0 0.00 0
Land leveling Ha. 64 12.22 0 0 4998 36 6.84 MGNREGA
Pasture Ha. 0 0.00 0 0 0 0 0.00 0
Drip / Sprinkler Ha. 0 0.00 0 0 0 0 0.00 0
Bamboo Plantation Ha. 0 0.00 0 0 0 0 0.00 0
Farm Bunding No. 90 7.85 0 0 0 0 0.00 0
92
Holticulture plant distribution No. 0 0.00 0 0 0 0 0.00 0
Protection Wall No. 0 0.00 0 0 0 0 0.00 0
Soil & Moisture Conservation 0 0.00 0 0 0 0 0.00 0
Check wall No. 0 0.00 0 0 0 0 0.00 0
Earthen bund No. 33 86.46 132 146 29458 0 0.00 0
Protection Wall No. 0 0.00 0 0 0 0 0.00 0
Waste weir No. 3 10.40 0 0 0 0 0.00 0
Bench Terracing cumec 0 0.00 0 0 0 0 0.00 0
Bori bandh No. 0 0.00 0 0 0 0 0.00 0
Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0
Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Countour Trenches rmt. 776 5.02 0 0 790 0 0.00 0
Earthern Dam rmt. 0 0.00 0 0 0 0 0.00 0
Field Outlet No. 23 10.67 0 0 0 0 0.00 0
Gabion structure No. 0 0.00 0 0 0 0 0.00 0
Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
Gully plug No. 66 11.22 0 0 0 0 0.00 0
Loose Boulder Checks No. 80 2.75 0 0 490 0 0.00 0
Nala Plug No. 0 0.00 0 0 0 0 0.00 0
Stone bunding rmt. 0 0.00 0 0 0 0 0.00 0
Straggred Contour trenching(Terrace Talavadi)
0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
Linkage Channel / Pond Inlet / Outlet
No. 10 21.89 0 0 0 0 0.00 0
Waste weir No. 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
93
0 0.00 0 0 0 0 0.00 0
Water Harvesting Structure 0 0.00 0 0 0 0 0.00 0
Cause way cum Chek dam No. 5 9.38 0 0 0 0 0.00 0
Check dam No. 38 101.96 46 31 16226 0 0.00 0
Village/Community Pond No. 0 0.00 0 0 0 0 0.00 0
Farm Pond No. 0 0.00 0 0 0 0 0.00 0
Percolation Tank No. 0 0.00 0 0 0 0 0.00 0
Pond Inlet No. 0 0.00 0 0 0 0 0.00 0
Pond Outlet No. 0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) No. 0 0.00 0 0 0 0 0.00 0
Drainage line correction (To prevent flooding of Gamtal)
No. 0 0.00 0 0 0 0 0.00 0
Under Ground Linkage channel with Pond
No. 0 0.00 0 0 0 0 0.00 0
Stone bunding No. 0 0.00 0 0 0 0 0.00 0
Ground Water recharge structure
No. 0 0.00 0 0 0 0 0.00 0
Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
0 0.00 0 0 0 0 0.00 0
Deepening/Desiltation Of Pond No. 15 40.82 0 0 0 11 62.00 MGNREGA
Deepening Of Percolation Tank No. 0 0.00 0 0 0 0 0.00 0
De-siltation of Checkdam No. 0 0.00 0 0 0 0 0.00 0
Repairing of Checkdam No. 0 0.00 0 0 0 0 0.00 0
Ground Water Recharging Structures
0 0.00 0 0 0 0 0.00 0
Dugwell Recharge No. 0 0.00 0 0 0 0 0.00 0
Farm Recharge Filter No. 0 0.00 0 0 0 0 0.00 0
94
Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0
Pond Recharge structure No. 0 0.00 0 0 0 0 0.00 0
OTHERS (Specifiy activities ) 0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
0 0.00 0 0 0 0 0.00 0
Sub Activity Name 0 0.00 0 0 0 0 0.00 0
AGRICULTURE ACTIVITIES No. 247 44.56 0 0 0 62 47.62 GGRC
AGRO PROCESSING ACTIVITIES
No. 60 14.55 0 0 0 0 0.00 0
Animal Husbandry No. 198 51.51 0 0 0 0 0.00 0
Establishing linkages No. 0 0.00 0 0 0 0 0.00 0
Local traditional handicraft No. 0 0.00 0 0 0 0 0.00 0
Minor Activities No. 37 2.29 0 0 0 0 0.00 0
Non-conventional Energy Sources
No. 0 0.00 0 0 0 0 0.00 0
- 0 0.00 0 0 0 0 0.00 0
Total 0 433.55 178 177 51962 109 116.46 0
Capacity Building , M&E - 29.432
Admin 39.493
Consolidation 42.048
Grand Total 544.53
95
5.8.7 ATMA Table 5.20: Strategic Action Plan of ATMA
Yr 2016-17 Yr 2017-18 Yr 2018-19 Yr 2019-20 Total
No of Training
251 331 381 411 1374
No of Trainees
4830 5180 5530 5880 21420
Estimated Cost (In Rs.)
3015140 3276640 3538140 3799640 13629560
CUMIN
ISABGOL