may 27th · bid date changed to: may 27th, 2015 at 1:00 pm. addendum #3 narrative: 1. updated sheet...
TRANSCRIPT
BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative:
1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See clouded sidewalk. (page 2)
2. Updated Sheet C4.0 – Bid Pack #2B - See the new utility alignment. The sanitary sewer has moved. (page 3)
3. Clarification: Sheet A5.1 – Door suppliers to provide a complete door system for doors 105A, 102, 112A, and 113A to include the door, jamb, lite frames, with stops, and all necessary trim. Glass will be provided in bid package #8B.
4. Clarification: Sheet A5.1 – Note 5. Disregard this note. No electronic closers are required
5. Material Change: See the Collaborative Design RFI 003 response that outlines the flooring selections and adjusts the tile to match standard sizes produced by the manufacturer. (page 4)
6. Clarification: In bid package #9B – Painting. All wood doors, jambs, and casing to be stained. Include this scope in bid package #9B.
7. Donated Plumbing Fixtures. The following fixtures will be donated by the Clapper Co. (cut sheets available by request from Langlas & Associates)
a. Floor mounted toilets with flush valves. The mechanical contractor will provide bolts, wax rings, and the seats.
b. Urinals with flush valves and the in wall carriers (Wade: 400 AM11). c. Baby bow flush valves in the day care bathroom d. China wall hung lavatory with a 4” center faucet and grid drain. (mechanical
contractor to include wall carrier and p-traps). 8. Mechanical and Electrical clarifications, changes, and alternates will be addressed in
the attached Collaborative Design Architects Addendum Pages. Many alternate manufactures are provided, and a number of questions are addressed within this document. (pages 5-7)
9. This is not a prevailing wage project. 10. Owner will require background checks of every employee that will be on site. This will
be organized and paid for by the owner. Addendum 3 contains (7) pages including this narrative.
45 ° ELBOW
IN-LINE TEE FITTING FOR NEW
INSTALLATIONS. SADDLE AS
APPROVED BY ENGINEER FOR
EXISTING INSTALLATIONS.
SEWER MAIN
COMPACTED BACKFILL
(SEE SPECS)
PLUG
VARIES
STEEL POST PAINTED
GREEN AT END OF MARKER
PROPERTY LINE
6" MIN. SERVICE LINE
SLOPE
1
4
" PER FOOT MINIMUM
2" x 4" WOOD MARKER
10.10'
45°'
EXISTING MH, APPROX.
INVERT DEPTH = 9'
PROPOSED SCHOOL
EXPANSION
12.05'
3.80'
24.22'
PROPERTY
BOUNDARY
13.22'
STEEL POST MARKER
PAINTED BLUE
PROPERTY LINE
EXCAVATION LINE
CONCRETE THRUST BLOCK
PLUG OR CAP
24"MAX.
18" MIN.
AWWA TEE OR TAPPING
SLEEVE ON WATER MAIN
CONCRETE THRUST
BLOCK
STREET SURFACE
FINISHED GRADE
MIN
. C
OV
ER
AS
S
PE
CIF
IE
D
ALTERNATIVE
CURB STOP LOCATIONS
C4.0
PROPOSED
WATER AND SEWER
CO
LLA
BO
RA
TIV
E D
ES
IG
N
2280 G
RA
NT
R
OA
D - S
UIT
E C
B
ILLIN
GS
, M
T 59102
T. 406.248.3443 F
. 406.248.3765 w
ww
.collaborativedesignarchitects.com
TR
IN
IT
Y LU
TH
ER
AN
S
CH
OO
L
AD
DIT
IO
N A
ND
R
EM
OD
EL
2802 B
ELV
ED
ER
E
CIT
Y R
EV
IE
W S
ET
MAY 5, 2015
TRINITY LUTHERAN SCHOOL
1331
NSP
RFI_001
BIL
LIN
GS
MO
NT
AN
A
CO
LLA
BO
RA
TIV
E D
ES
IG
N
2280 G
RA
NT
R
OA
D - S
UIT
E C
B
ILLIN
GS
, M
T 59102
T. 406.248.3443 F
. 406.248.3765 w
ww
.collaborativedesignarchitects.com
NOTES:
1. THRUST BLOCKING TO BE IN CONFORMANCE WITH
STANDARD DRAWING 2660-1.
2. FOR BOLTED FITTINGS, BLOCKING SHALL NOT
OBSTRUCT BOLTS.
3. MECHANICAL RESTRAINT MAY BE REQUIRED.
SCALE: N/A
SANITARY SEWER SERVICE LINE
C4.0
2
SCALE: N/A
WATER SERVICE LINE
C4.0
1
NOTE: END OF SANITARY SEWER
SERVICE STUB IS TO EXTEND TO
PROPERTY LINE OR THROUGH
EXISTING UTILITY EASEMENT.
COLLABORATIVE DESIGN A R C H I T E C T S
2280 Grant Road Suite C Billings, MT T. 406.248.3443 F. 406.248.3765 collaborativedesignarchitects.com
RFI_003
Project: Trinity Lutheran School Date: 05-19-15
2802 Belvedere Drive
Billings, MT 59102
Project# 1331
The following items were listed as questions from the General Contractor on May 19, 2015. Please notify me if there are any questions or concerns. This list is to accompany the bidding documents.
1. Tile Finishes: - T1 is now an 8" x 8" white gloss tile (PL02) - T2 is now a 4" x 4" red tile (D017) - T3 is a 1" x 1" white coved tile (color to match flooring) - Flooring to be 12" x 12" white tile with the proper slip resistant coefficient (color to match white coved tile). - Tile in all bathrooms will reach a height of 7'-4". - Please see Figure A for clarification and details.
2. Carpet Tiles:
- CP2: Patcraft Planks; Mixed Materials; Color Choice #10374; Clear Red #00855
- CP3: Patcraft Planks; Mixed Materials; Color Choice #10374; Brite Blue #00407
- CP4: Patcraft Planks; Mixed Materials; Color Choice #10374; Green Apple #00350
Figure A:
COLLABORATIVE DESIGN
A R C H I T E C T S
2280 Grant Road Suite C Billings, MT T. 406.248.3443 F. 406.248.3765 collaborativedesignarchitects.com
ADDENDUM
Attn: Project: Addendum # Project # Date: Address: These Addendum items are to be red-lined on the drawings, distributed to all subcontractors, and are to be considered part of the Construction Documents. All bids on the due date are to include these modifications. The plans and specifications for this project are hereby modified and/or superseded by this Addendum: MECHANICAL Drawings Sheet M3.1 Plumbing Schedules
1. Clarification: A church member has agreed to donate all P1, P1A, P1B, P2 and P3A fixtures for the project. This donation will include battery powered flush valves and wall hangers where applicable. The donation water closet does not include jonnie bolts, bowl wax and the seats. The donation lavatory includes 4 “ center set faucet & grid drain but the contractor will need to provide wall carrier, stops, supplies and trap.
Mechanical Prior Approvals Products of the following manufacturers have been reviewed for bidding. All equipment will be reviewed for complete compliance with Specification and Drawings during Shop Drawing Review. Exhaust Fans Greenheck, ACME Grilles, Registers, Diffusers Price Louvers Greenheck Intake & Relief Ventilators Greenheck Volume Dampers Greenheck, Nailor Air Filters Flanders Fintube Radiation Sigma Air Handling Units JCI Round Ducts Lewis and Lambert Flue and Breeching Schebler ELECTRICAL
Trinity Lutheran School
All Plan Holders
1331
2802 Belvedere Billings, MT 59102
1
5-18-15
2280 Grant Road Suite C Billings, Montana 59102 T. 406.248.3443 F.406.248.3765 collaborativedesignarchitects.com
Drawings Sheet E1.1 1. Delete: Hex Note 2 and circuit N-35 indicated for plumbing fixture connection. Donated fixtures to be provided with battery powered flush valves. Sheet E2.1 1. Clarification: The light fixture in Computer Lab Stor. 108 shall be a type F4 light fixture. Sheet E3.1
1. Clarification: The base bid Light fixture Schedule shall indicate the type F6 light fixture to have two F17T8 lamps. 2. Clarification: The base bid and alternate Light Fixture Schedules shall indicate the model number for the type X2 light fixture to be EVE-U-R-W-E.
Electrical Prior Approvals Products of the following manufacturers have been reviewed for bidding. All equipment will be reviewed for complete compliance with Specification and Drawings during Shop Drawing Review. Base Bid Light Fixture Manufacturer F1/F1E Columbia Lighting, Deco Lighting, HE Williams F2/F2E Columbia Lighting, Deco Lighting, HE Williams F3/F3E Columbia Lighting, Deco Lighting F4 Columbia Lighting, Deco Lighting, HE Williams F5 Columbia Lighting, Deco Lighting, HE Williams F6 Columbia Lighting, Deco Lighting, HE Williams F7 Columbia Lighting, Crystal Lighting, Juno, Mule RE Emergi-Lite, Exitronix , Mule, Philips X1 Exitronix, Mule, Philips X2 Emergi-Lite, Exitronix, Mule, Philips
2280 Grant Road Suite C Billings, Montana 59102 T. 406.248.3443 F.406.248.3765 collaborativedesignarchitects.com
Alternate Bid Light Fixture Manufacturer F1/F1E Columbia Lighting, Deco Lighting, HE Williams F2/F2E Columbia Lighting, Deco Lighting, HE Williams F3/F3E Columbia Lighting, Deco Lighting, HE Williams F4 Columbia Lighting F5 Columbia Lighting, Deco Lighting, HE Williams, LSI F6 Columbia Lighting, Deco Lighting, HE Williams F7 Columbia Lighting, Crystal Lighting, Juno, Lumux RE Emergi-Lite, Exitronix, Mule, Philips X1 Exitronix, Mule, Philips X2 Exitronix, Philips, Mule, Emergi-Lite Lighting Control Single Circuit Wall OC Hubbell Two Circuit Wall OC Hubbell Ceiling OC Hubbell Power Pack Hubbell End of addendum items from Con’eer Engineering, Inc. as of May 18, 2015