may 27th · bid date changed to: may 27th, 2015 at 1:00 pm. addendum #3 narrative: 1. updated sheet...

7
BID DATE CHANGED TO: May 27 th , 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See clouded sidewalk. (page 2) 2. Updated Sheet C4.0 – Bid Pack #2B - See the new utility alignment. The sanitary sewer has moved. (page 3) 3. Clarification: Sheet A5.1 – Door suppliers to provide a complete door system for doors 105A, 102, 112A, and 113A to include the door, jamb, lite frames, with stops, and all necessary trim. Glass will be provided in bid package #8B. 4. Clarification: Sheet A5.1 – Note 5. Disregard this note. No electronic closers are required 5. Material Change: See the Collaborative Design RFI 003 response that outlines the flooring selections and adjusts the tile to match standard sizes produced by the manufacturer. (page 4) 6. Clarification: In bid package #9B – Painting. All wood doors, jambs, and casing to be stained. Include this scope in bid package #9B. 7. Donated Plumbing Fixtures. The following fixtures will be donated by the Clapper Co. (cut sheets available by request from Langlas & Associates) a. Floor mounted toilets with flush valves. The mechanical contractor will provide bolts, wax rings, and the seats. b. Urinals with flush valves and the in wall carriers (Wade: 400 AM11). c. Baby bow flush valves in the day care bathroom d. China wall hung lavatory with a 4” center faucet and grid drain. (mechanical contractor to include wall carrier and p-traps). 8. Mechanical and Electrical clarifications, changes, and alternates will be addressed in the attached Collaborative Design Architects Addendum Pages. Many alternate manufactures are provided, and a number of questions are addressed within this document. (pages 5-7) 9. This is not a prevailing wage project. 10. Owner will require background checks of every employee that will be on site. This will be organized and paid for by the owner. Addendum 3 contains (7) pages including this narrative.

Upload: others

Post on 09-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative:

1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See clouded sidewalk. (page 2)

2. Updated Sheet C4.0 – Bid Pack #2B - See the new utility alignment. The sanitary sewer has moved. (page 3)

3. Clarification: Sheet A5.1 – Door suppliers to provide a complete door system for doors 105A, 102, 112A, and 113A to include the door, jamb, lite frames, with stops, and all necessary trim. Glass will be provided in bid package #8B.

4. Clarification: Sheet A5.1 – Note 5. Disregard this note. No electronic closers are required

5. Material Change: See the Collaborative Design RFI 003 response that outlines the flooring selections and adjusts the tile to match standard sizes produced by the manufacturer. (page 4)

6. Clarification: In bid package #9B – Painting. All wood doors, jambs, and casing to be stained. Include this scope in bid package #9B.

7. Donated Plumbing Fixtures. The following fixtures will be donated by the Clapper Co. (cut sheets available by request from Langlas & Associates)

a. Floor mounted toilets with flush valves. The mechanical contractor will provide bolts, wax rings, and the seats.

b. Urinals with flush valves and the in wall carriers (Wade: 400 AM11). c. Baby bow flush valves in the day care bathroom d. China wall hung lavatory with a 4” center faucet and grid drain. (mechanical

contractor to include wall carrier and p-traps). 8. Mechanical and Electrical clarifications, changes, and alternates will be addressed in

the attached Collaborative Design Architects Addendum Pages. Many alternate manufactures are provided, and a number of questions are addressed within this document. (pages 5-7)

9. This is not a prevailing wage project. 10. Owner will require background checks of every employee that will be on site. This will

be organized and paid for by the owner. Addendum 3 contains (7) pages including this narrative.

Page 2: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See
Jason Arrowsmith
Cloud
Page 3: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

45 ° ELBOW

IN-LINE TEE FITTING FOR NEW

INSTALLATIONS. SADDLE AS

APPROVED BY ENGINEER FOR

EXISTING INSTALLATIONS.

SEWER MAIN

COMPACTED BACKFILL

(SEE SPECS)

PLUG

VARIES

STEEL POST PAINTED

GREEN AT END OF MARKER

PROPERTY LINE

6" MIN. SERVICE LINE

SLOPE

1

4

" PER FOOT MINIMUM

2" x 4" WOOD MARKER

10.10'

45°'

EXISTING MH, APPROX.

INVERT DEPTH = 9'

PROPOSED SCHOOL

EXPANSION

12.05'

3.80'

24.22'

PROPERTY

BOUNDARY

13.22'

STEEL POST MARKER

PAINTED BLUE

PROPERTY LINE

EXCAVATION LINE

CONCRETE THRUST BLOCK

PLUG OR CAP

24"MAX.

18" MIN.

AWWA TEE OR TAPPING

SLEEVE ON WATER MAIN

CONCRETE THRUST

BLOCK

STREET SURFACE

FINISHED GRADE

MIN

. C

OV

ER

AS

S

PE

CIF

IE

D

ALTERNATIVE

CURB STOP LOCATIONS

C4.0

PROPOSED

WATER AND SEWER

CO

LLA

BO

RA

TIV

E D

ES

IG

N

2280 G

RA

NT

R

OA

D - S

UIT

E C

B

ILLIN

GS

, M

T 59102

T. 406.248.3443 F

. 406.248.3765 w

ww

.collaborativedesignarchitects.com

TR

IN

IT

Y LU

TH

ER

AN

S

CH

OO

L

AD

DIT

IO

N A

ND

R

EM

OD

EL

2802 B

ELV

ED

ER

E

CIT

Y R

EV

IE

W S

ET

MAY 5, 2015

TRINITY LUTHERAN SCHOOL

1331

NSP

RFI_001

BIL

LIN

GS

MO

NT

AN

A

CO

LLA

BO

RA

TIV

E D

ES

IG

N

2280 G

RA

NT

R

OA

D - S

UIT

E C

B

ILLIN

GS

, M

T 59102

T. 406.248.3443 F

. 406.248.3765 w

ww

.collaborativedesignarchitects.com

NOTES:

1. THRUST BLOCKING TO BE IN CONFORMANCE WITH

STANDARD DRAWING 2660-1.

2. FOR BOLTED FITTINGS, BLOCKING SHALL NOT

OBSTRUCT BOLTS.

3. MECHANICAL RESTRAINT MAY BE REQUIRED.

SCALE: N/A

SANITARY SEWER SERVICE LINE

C4.0

2

SCALE: N/A

WATER SERVICE LINE

C4.0

1

NOTE: END OF SANITARY SEWER

SERVICE STUB IS TO EXTEND TO

PROPERTY LINE OR THROUGH

EXISTING UTILITY EASEMENT.

Page 4: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

COLLABORATIVE DESIGN A R C H I T E C T S

2280 Grant Road Suite C Billings, MT T. 406.248.3443 F. 406.248.3765 collaborativedesignarchitects.com

RFI_003

Project: Trinity Lutheran School Date: 05-19-15

2802 Belvedere Drive

Billings, MT 59102

Project# 1331

The following items were listed as questions from the General Contractor on May 19, 2015. Please notify me if there are any questions or concerns. This list is to accompany the bidding documents.

1. Tile Finishes: - T1 is now an 8" x 8" white gloss tile (PL02) - T2 is now a 4" x 4" red tile (D017) - T3 is a 1" x 1" white coved tile (color to match flooring) - Flooring to be 12" x 12" white tile with the proper slip resistant coefficient (color to match white coved tile). - Tile in all bathrooms will reach a height of 7'-4". - Please see Figure A for clarification and details.

2. Carpet Tiles:

- CP2: Patcraft Planks; Mixed Materials; Color Choice #10374; Clear Red #00855

- CP3: Patcraft Planks; Mixed Materials; Color Choice #10374; Brite Blue #00407

- CP4: Patcraft Planks; Mixed Materials; Color Choice #10374; Green Apple #00350

Figure A:

Page 5: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

COLLABORATIVE DESIGN

A R C H I T E C T S

2280 Grant Road Suite C Billings, MT T. 406.248.3443 F. 406.248.3765 collaborativedesignarchitects.com

ADDENDUM

Attn: Project: Addendum # Project # Date: Address: These Addendum items are to be red-lined on the drawings, distributed to all subcontractors, and are to be considered part of the Construction Documents. All bids on the due date are to include these modifications. The plans and specifications for this project are hereby modified and/or superseded by this Addendum: MECHANICAL Drawings Sheet M3.1 Plumbing Schedules

1. Clarification: A church member has agreed to donate all P1, P1A, P1B, P2 and P3A fixtures for the project. This donation will include battery powered flush valves and wall hangers where applicable. The donation water closet does not include jonnie bolts, bowl wax and the seats. The donation lavatory includes 4 “ center set faucet & grid drain but the contractor will need to provide wall carrier, stops, supplies and trap.

Mechanical Prior Approvals Products of the following manufacturers have been reviewed for bidding. All equipment will be reviewed for complete compliance with Specification and Drawings during Shop Drawing Review. Exhaust Fans Greenheck, ACME Grilles, Registers, Diffusers Price Louvers Greenheck Intake & Relief Ventilators Greenheck Volume Dampers Greenheck, Nailor Air Filters Flanders Fintube Radiation Sigma Air Handling Units JCI Round Ducts Lewis and Lambert Flue and Breeching Schebler ELECTRICAL

Trinity Lutheran School

All Plan Holders

1331

2802 Belvedere Billings, MT 59102

1

5-18-15

Jason Arrowsmith
Line
Jason Arrowsmith
Text Box
3
Page 6: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

2280 Grant Road Suite C Billings, Montana 59102 T. 406.248.3443 F.406.248.3765 collaborativedesignarchitects.com

Drawings Sheet E1.1 1. Delete: Hex Note 2 and circuit N-35 indicated for plumbing fixture connection. Donated fixtures to be provided with battery powered flush valves. Sheet E2.1 1. Clarification: The light fixture in Computer Lab Stor. 108 shall be a type F4 light fixture. Sheet E3.1

1. Clarification: The base bid Light fixture Schedule shall indicate the type F6 light fixture to have two F17T8 lamps. 2. Clarification: The base bid and alternate Light Fixture Schedules shall indicate the model number for the type X2 light fixture to be EVE-U-R-W-E.

Electrical Prior Approvals Products of the following manufacturers have been reviewed for bidding. All equipment will be reviewed for complete compliance with Specification and Drawings during Shop Drawing Review. Base Bid Light Fixture Manufacturer F1/F1E Columbia Lighting, Deco Lighting, HE Williams F2/F2E Columbia Lighting, Deco Lighting, HE Williams F3/F3E Columbia Lighting, Deco Lighting F4 Columbia Lighting, Deco Lighting, HE Williams F5 Columbia Lighting, Deco Lighting, HE Williams F6 Columbia Lighting, Deco Lighting, HE Williams F7 Columbia Lighting, Crystal Lighting, Juno, Mule RE Emergi-Lite, Exitronix , Mule, Philips X1 Exitronix, Mule, Philips X2 Emergi-Lite, Exitronix, Mule, Philips

Jason Arrowsmith
Text Box
End of Addendum #3
Page 7: May 27th · BID DATE CHANGED TO: May 27th, 2015 at 1:00 PM. Addendum #3 Narrative: 1. Updated Sheet AS1.1 – Bid Pack #2A – Include removal and replacement of north sidewalk. See

2280 Grant Road Suite C Billings, Montana 59102 T. 406.248.3443 F.406.248.3765 collaborativedesignarchitects.com

Alternate Bid Light Fixture Manufacturer F1/F1E Columbia Lighting, Deco Lighting, HE Williams F2/F2E Columbia Lighting, Deco Lighting, HE Williams F3/F3E Columbia Lighting, Deco Lighting, HE Williams F4 Columbia Lighting F5 Columbia Lighting, Deco Lighting, HE Williams, LSI F6 Columbia Lighting, Deco Lighting, HE Williams F7 Columbia Lighting, Crystal Lighting, Juno, Lumux RE Emergi-Lite, Exitronix, Mule, Philips X1 Exitronix, Mule, Philips X2 Exitronix, Philips, Mule, Emergi-Lite Lighting Control Single Circuit Wall OC Hubbell Two Circuit Wall OC Hubbell Ceiling OC Hubbell Power Pack Hubbell End of addendum items from Con’eer Engineering, Inc. as of May 18, 2015