    A

    REPORT

    ON

    BHARAT HEAVY

    ELECTRICALS LIMITED

    HARIDWAR

    Submitted to: Submitted by:

    Mangesh Jaiswal

    Anand Engineering

    College, Agra

    U.P.

  • 8/8/2019 Man Summer Trng

    2/29

    PREFACE

    In the present competitive world market when customer satisfaction is the

    prime objective. Quality, price and services are the major areas to conquer.

    Initiative, foresight, talent and competency are imperative to manage the

    business.

    The B.Tech. Course imparts the students the tinge of such virtues and

    prepares to take the technical world in their stride. In the midst of the course.

    Summer training in some technical organization is arranged for the students:that is vitally essential. Such training gives practical experience and helps the

    students to view the real technology closely, which in turn widely influences

    their conceptions and perceptions.

    The summer training assumed all the more significance when it is done

    in a reputed, last growing and professionally managed world level organization

    like BHARAT HAVEY ELECTRICALS LIMITED. I was really fortunate in

    getting an opportunity to work with them

    The project taken up was to study the Central foundry forge plant.

    I feel proud of getting a chance to study the technical system of a world

    level company and have learnt a lot about the complicity and legal aspects of

    the system.

  • 8/8/2019 Man Summer Trng

    3/29

    HEEP

    &

    CFFP

    BHEL, HARIDWAR

  • 8/8/2019 Man Summer Trng

    4/29

    ACKNOWLEDGEMENT

    The preparation of this project report would not have been

    possible without the guidance and blessings of several people.

    I owe my thanks to Mr. Kapil Dev (Principal of S&T

    Training Centre) for this encouragement, expert guidance in

    bringing out this project.

    Mangesh Jaiswal

  • 8/8/2019 Man Summer Trng

    5/29

    CONTENTS

    1. Prologe A. BHEL An Overview

    B. HEEP An Overview

    2. Study on Turbines & Auxiliary Block

    3. Study on Material Specification

    4. Study on Blade Shop

    5. Broad Specification of Major Machines Tools & Machines

    (CNC & Non CNC)

    6. Other Areas

    A. BHEL AN OVERVIEW

    BHEL is the largest engineering and manufacturing enterprise in India in the

  • 8/8/2019 Man Summer Trng

    6/29

    energy related infrastructure sector today. BHEL was established more than 40

    years ago when its first plant was setup in Bhopal ushering in the indigenous

    Heavy Electrical Equipment Industry in India a dream which has been more than

    realized with a well recognized track record of performance it has been earning

    profits continuously since 1971-72.

    BHEL caters to core sectors of the Indian Economy viz., Power Generation's &

    Transmission, Industry, Transportation, Telecommunication, Renewable Energy,

    Defense, etc. The wide network of BHEL's 14 manufacturing division, four power

    Sector regional centres, over150 project sites, eight service centres and 18 regional

    offices, enables the Company to promptly serve its customers and provide them

    with suitable products, systems and services efficiently and at competitive prices.

    BHEL has already attained ISO 9000 certification for quality management, and

    ISO 14001 certification for environment management.

    POWER GENERATION

    Power generation sector comprises thermal, gas, hydro and nuclear

    power plant business as of 31.03.2001, BHEL supplied sets account for nearly

    64737 MW or 65% of the total installed capacity of99,146 MW in the country, as

    against nil till 1969 -70.

    BHEL has proven turnkey capabilities for executing power projects

    from concept to commissioning, it possesses the technology and capability to

    produce thermal sets with super critical parameters up to 1000 MW unit rating and

    gas turbine generator sets of up to 240 MW unit rating. Co -generation and

    combined-cycle plants have been introduced to achi eve higher plant efficiencies. to

    make efficient use of the high-ash-content coal available in India, BHEL supplies

    circulating fluidized bed combustion boilers to both thermal and combined cycle

    power plants.

  • 8/8/2019 Man Summer Trng

    7/29

    The company manufactures 235 MW nuclear turbin e generator sets and has

    commenced production of 500 MW nuclear turbine generator sets.

    Custom made hydro sets of Francis, Pelton and Kapian types for different head

    discharge combination are also engineering and manufactured by BHEL.

    In all, orders for more than 700 utility sets of thermal, hydro, gas and nuclear have

    been placed on the Company as on date. The power plant equipment manufactured

    by BHEL is based on contemporary technology comparable to the best in the world

    and is also internationally competitive.

    The Company has proven expertise in Plant Performance Improvement through

    renovation modernization and up rating of a variety of power plant equipment

    besides specialized know how of residual life assessment, health diagnostics and

    life extension of plants.

    INDUSTRIES

    BHEL is a major contributor of equipment and systems to industries, cement,

    sugar, fertilizer, refinances, petrochemicals, paper, oil and gas, metallurgical and

    other process industries. The range of system & equipment supplied include s:

    captive power plants, co-generation plants DG power plants, industrial steam

    turbines, industrial boilers and auxiliaries. Waste heat recovery boilers, gas

    turbines, heat exchangers and pressure vessels, centrifugal compressors, electrical

    machines, pumps, valves, seamless steel tubes, electrostatic precipitators, fabric

    filters, reactors, fluidized bed combustion boilers, chemical recovery boilers and

    process controls.

    The Company is a major producer of large -size thruster devices. It also supplies

    digital distributed control systems for process industries, and control &

    instrumentation systems for power plant and industrial applications. BHEL is the

  • 8/8/2019 Man Summer Trng

    8/29

    only company in India with the capability to make simulators for power plants,

    defense and other applications.

    The Company has commenced manufacture of large desalination plants to help

    augment the supply of drinking water to people.

    TRANSPORTATION

    BHEL is involved in the development design, engineering, marke ting, production,

    installation, maintenance and after-sales service of Rolling Stock and traction

    propulsion systems. In the area of rolling stock, BHEL manufactures electric

    locomotives up to 5000 HP, diesel-electric locomotives from 350 HP to 3100 HP,

    both for mainline and shunting duly applications. BHEL is also producing rolling

    stock for special applications viz., overhead equipment cars, Special well wagons,

    Rail-cum-road vehicle etc., Besides traction propulsion systems for in -house use,

    BHEL manufactures traction propulsion systems for other rolling stock producers

    of electric locomotives, diesel -electric locomotives, electrical multiple units and

    metro cars. The electric and diesel traction equipment on India Railways are

    largely powered by electrical propulsion systems produced by BHEL. The

    company also undertakes retooling and overhauling of rolling stock in the area of

    urban transportation systems. BHEL is geared up to turnkey execution of electric

    trolley bus systems, light rail systems etc. BHEL is also diversifying in the area of

    port handing equipment and pipelines transportation system.

    TELECOMMUNICATION

    BHEL also caters to Telecommunication sector by way of small, medium and large

    switching systems.

    RENEWABLE ENERGY

  • 8/8/2019 Man Summer Trng

    9/29

    Technologies that can be offered by BHEL for exploiting non-conventional and

    renewable sources of energy include: wind electric generators, solar photovoltaic

    systems, solar lanterns and battery-powered road vehicles. The Company has taken

    up R&D efforts for development of multi- junction amorphous silicon solar cells

    and fuel based systems.

    HUMAN RESOURCE DEVELOPMENT INSTITUTE

    The most prized asset of BHEL is its employees. The Human Resource

    Development Institute and other HRD centers of the Company help in not only

    keeping their skills updated and finely honed but also in addi ng new skills,

    whenever required. Continuous training and retraining, positive, a positive work

    culture and participative style of management have engendered development of a

    committed and motivated work force leading to enhanced productivity and higher

    levels of quality.

    ACTIVITY PROFILE

    PRODUCTS - Industrial Fans

    Power Generation & Transmission - Seamless steel Tubes

    - Steam Turbine-Generator Sets &Auxiliaries

    - Fabric Filters

    - Boiler and Boiler Auxiliaries - AC DC Motors, Variable speed

    - Once-through Boilers - AC Drive

    - Nuclear Power Generation Equipment - Electronic Control Gear &

    Automation

  • 8/8/2019 Man Summer Trng

    10/29

    - Hydro Turbine-Generator Sets & Auxiliaries - Equipment

    - Mini/Micro Hydro Generator Sets - DDC for Process Industry

    - Gas Turbine-Generator Sets - Thruster Equipment

    - Waste Heat Recovery Boilers - Power Devices

    - Heat Exchangers - Energy Meters

    - Condensers - Transformer

    - Bowi Mills and Tube Mills - Switch gear

    - Gravimetric Feeders - Insulator

    - Regenerative Air Pre-Heaters - Capacitors

    - Electrostatic Precipitators - Broad Gauge AC, AC/DC Loco

    Motives

    - Bag Filters - Diesel-Electric Shunting

    Locomotives- Valves - Traction Motors & Control

    Equipment

    - Pumps - Electric Trolley Buses

    - Electrical Machines - AC/DC Electric Multiple Units

    - Piping Systems - Drives and Controls for Metro

    Systems

    - Power, Distribution & Instrument

    Transformers

    - Battery-Operated Passengers

    Vans- Reactors - X-Mas Trees and Well Heads

    - Synchronous Condensers - Cathodic Protection Equipment

    - Switchgear - Digital Switching Systems

    - Control gear - Rural Automatic Exchange

    - Distributed Digital Control for Power

    Stations

    - Simulators

    - Bus Ducts - Wind Electric Generators

    -Rectifiers

    -Solar Powered Water Pumps

    - Porcelain Insulators - Solar Water Heating Systems

    - Ceralin - Photo Votaic Systems

    - Defense Equipment

    INDUSTRIES/TRANSPORTATION/OIL

    & GAS/

    - Reverse Osmoses Desalination

    Plants

  • 8/8/2019 Man Summer Trng

    11/29

    TELECOMMUNICATION/RENEWABLE

    ENERGY

    SYSTEMS & SERVICES

    - Steam Turbine-Generator Sets - Turkey Utility Power Stations/

    EPC

    - Gas Turbine-Generator Sets - Contracts

    - Diesel Engine-Based Generators - Captive Power Plants

    - Industrial Steam Generators - Co-generation Systems

    - Heat Recovery Steam Generators - Combined Cycle Power Plants

    - Fluidised Bed Combustion Boilers - Modernization & Renovation of

    Power

    - Drive Turbine Stations and FLA Studies

    - Manne Turbines - Switch yards and Substations

    - Industrial Heat Exchangers - HVDC Transmission Systems- Centrifugal Compressor - Shorts sines condensation

    Systems

    - Industrial Valves - Power system analysis

    - Reactors - Electron comissionly and

    Operation

    - Columns - Consultancy services

    - Pressure Vessels - Consultancy Services

    - Pumps

    B. HEEP : AN OVER VIEW

    Over the years, Bharat Heavy Electricals Limited has emerged as world class

    Engineering and Industrial giant, the best of its kind in entire South East Asia. Its

    business profile cuts across various sectors of Engineering/Power utilities and

    Industry. The Company today enjoys national and international presence featuring

    in the "Fortune International-500" and is ranked among the top 12 companies in

    the world, manufacturing power generation equipment. BHEL has now 14

    Manufacturing Divisions, 8 Service Centres and 4 Power Sectors Regional Centres

  • 8/8/2019 Man Summer Trng

    12/29

    besides a large number of project sites spread over India and abroad.

    The Company is embarking upon an ambitious growth path through clear vision,

    mission and committed values to sustain and augment its image as a world class

    enterprise.

    VISION

    World-class, innovative, competitive and profitable engineering enterprise

    providing total business solutions.

    MISSION

    The leading Indian engineering enterprise providing quality products systems and

    services in the fields of energy, transportation, infrastructure and other potential

    areas.

    VALUES

    y Meeting commitments made to external and internal customers.y Foster learning creativity and speed of response.y Respect for dignity and potential of individuals.y Loyalty and pride in the company.y Team playing.y Zeal to excel.y Integrity and fairness in all matters.

    HEAVY ELECTRICAL EQUIPMENT PLANT (HEEP)

    At Hardwar, against the picturesque background of Shivalik Hills, 2 important

    manufacturing units of BHEL are located viz. Heavy Electrical Equipment Plant

    (HEEP) & Central Foundry Forge Plant (CFFP). The hum of the construction

    machinery woke up Shivalik Hills during early 60s and sowed the seeds of one of

  • 8/8/2019 Man Summer Trng

    13/29

    the greatest symbol of Indo Soviet Collaboration Heavy Electrical Equipment

    Plant of BHEL. Following is the brief profile of Heavy Electrical Equipment

    Plant:-

    1. ESTABLISHMENT AND DEVELOPMENT STAGES:

    * Established in 1960s under the Indo-Soviet Agreements of1959 and 1960 in

    the area of Scientific, Technical and Industrial Cooperation.

    * DPR prepared in 1963-64, construction started from October '63.

    * Initial production of Electric started from January, 1967.

    * Major construction / erection / commissioning completed by 1971 -72 as per

    original DPR scope.

    * Stamping Unit added later during 1968 to 1972.

    * Annual Manufacturing capacity for Thermal sets was expanded from 1500

    MW to 3500 MW under LSTG. Project during 1979 -85 (Sets up to 500

    MW, extensible to 1000/1300 MW unit sizes with marginal addition in

    facilities with the collaboration of M/s KWU -Siemens, Germany.

    * Motor manufacturing technology updated with Siemens collaboration during

    1984-87.

    * Facilities being modernized continually through Replacements /

    Reconditioning-Retrofitting, Technological / operational balancing.

    2. INVESTMENTS:

    * Gross Block as on 31.3.95 is Rs. 355.63 Crores (Plant and Machinery Rs.

    285.32 Crores).

    * Net Block as on 31.3.95 is Rs. 113.81 Crores (Plant & Machinery Rs.

  • 8/8/2019 Man Summer Trng

    14/29

    76.21 Crores).

    3. TOWNSHIP AND PERIPHERAL INFRASTRUCTURES:

    * A large modern township for employees and allied personnel with social andwelfare amenities.

    * Medical: - Main Hospital (200 beds) 1

    - Dispensaries in various 9

    Townships sectors

    - Occupational health center 1

    * Educational: No. of Schools (including 19

    Intermediate levels)

    Science Degree College 1

    * Residential: Around 6780 quarters.

    * Other amenities:

    - Good Road network- Shopping Centres- Central Stadium- Community Centres- A Club- Police Stations- CISF Complex for over 500 CISF personnel.- Convention Hall (a most modern Air Conditioned Auditorium with 1500

    seating capacity).

    - Parks.

  • 8/8/2019 Man Summer Trng

    15/29

    4. HEEP PRODUCT PROFILE:

    * THERMAL AND NUCLEAR SETS

    (Turbines, Generators, Condensers and Auxiliaries of unit capacity upto

    1000 MW)

    * HYDRO SETS INCLUDING SPHERICAL AND DISC VALVES

    (Kaplan, Francis, Pelton and reversible Turbines of all sizes and matching

    generators and auxiliaries maximum runner dia 6600 mm)

    * ELECTRICAL MACHINES:

    (For various industrial applications, pump drives & power station

    auxiliaries, Unit capacity up to 20000 KW AC / DC)

    * CONTROL PANELS

    (For Thermal / Hydro sets and Industrial Drives)

    * LARGE SIZE GAS TURBINES

    (Unit Rating: 60-200 MW)

    * LIGHT AIRCRAFT

  • 8/8/2019 Man Summer Trng

    16/29

    * DEFENSE PRODUCTS

    5. HEEP: FACILITIES AND INFRASTRUCTURE

    Modernization and regular up gradation / up gradation of facilities and other

    infrastructure is a continuous Endeavour at HEEP, BHEL. After initial setting up

    of the plant during the year 1964-72, in collaboration with the Soviet Union, the

    plant facilities and infrastructures have since been continuously upgraded under

    various investment projects viz, Stamping Unit Proje ct, LSTG Project, Motor

    Project, Governing Components Project, TG Facilities Modernization, TG

    Facilities Augmentation, Quality Facilities Augmentation, EDP projects, Gas

    Turbine Project, Facilities have also been added and establishments have been

    created for new projects in Defense and Aviation Project. Additionally, R &D

    facilities have also been created under Generators Research Institute, Pollution

    Control Research Institute, HTL modernization and other such schemes.

    Today the Plant has unique manufacturing and testing facilities,

    computerized numerically controlled machine -tools, Blade shop, heavy duty lathes,

    milling machines, boring machines, machining centers and many more. The Over

    Speed Vacuum Balancing Tunnel created for rotors up to 1300 MW (32T, 6.9 M

    dia bladed rotor, 6 rpm up to 4500 rpm) is one of the 8 of its kind in the entire

    world.

    The total spectrum of sophisticated, unique and other facilities at HEEP,

    Hardwar are the state-of-the-art in manufacturing processes and can be utilized for

    a variety of products' manufacture.

  • 8/8/2019 Man Summer Trng

    17/29

    TURBINE AND AUXILIARY BLOCK-III

    1.0 GENERAL

    1.1 Block-III manufactures Steam Turbines, Hydro Turbines, Gas Turbines and

    Turbines Blades. Special Toolings for all products are also manufactured in

    the Tool Room located in the same block. Equipment layout plan is a per

    Drawing appended in Section III. Details of facilities are given in Section II.

    1.2 The Block consists of four Bays, namely, Bay-I and II of size 36x378 metres

    and 36x400 metres respectively and Bay-III and IV of size 24x402 metres

    and 24x381 metres respectively. The Block is equipped with the facilities of

    EOT Cranes, compressed air, Steam, Over speed Balancing Tunnel,

    indicating stands for steam turbine, rotors, one Test stand for testing 210

    MW steam turbines Russian Design, one Test Stand for Hydro Turbine

    Guide Apparatus and two separate Test Stands for the testing of Governing

    Assemblies of Steam and Hydro Turbines.

    1.3 All the parts are conserved, painted and packed before dispatch.

  • 8/8/2019 Man Summer Trng

    18/29

    2.0 MANUFACTURING FACILITIES2.1 HYDRO TURBINES

    For manufacturing of Hydro Turbines, Bay-I has the following sections:

    (a) Circular Components Machining Section This section is equipped with

    a number of large/ heavy size Horizontal and Vertical Boring Machines,

    Drilling Machines, Centre Lathes, Marking Table and Assembly Bed. The

    major components machined in this section are Spiral Casing with Stay

    Ring, Spherical and Disc Valve bodies and Rotors.

    (b) Runner and Servo Motor Housing Machining Section This section is

    equipped with NC/CNC and conventional machines comprising Heavy and

    Medium size vertical and Horizontal Boring Machines, Centre Lathes,

    Grinding machines and Drilling Machines, Marking Table, Assembly Bed,

    Assembly Stands for Steam Turbine and Gas Turbine assemblies and

    Wooden Platform for overturning heavy components. Hydro Turbine

    Runners, Servomotors, cylinders, Labyrinth Ring, Regulating Ring, Stay

    Ring, Turbine Cover, Lower Ring, Kaplan Turbine Runner Body and Blades

    are machined here.

    (c) Guide Vanes and Shaft Machining Section This section is equipped

    with Heavy duty Lathe machines up to 16 metres bed, CNC turning

    machines, Horizontal Boring Machine, Heavy planer, Deep Drilling

    Machine, Boring Machines, marking Table, Marking Machines and

    Assembly Beds. Turbine shafts, Guide Vanes, Journals and Rotors of

    Spherical and Disc Valves are machined here. Rotors of Steam Turbines are

    also machined in this section.

    (d) Assembly Section In this section, assembly and testing of Guide

  • 8/8/2019 Man Summer Trng

    19/29

    Apparatus, Disc Valve, Spherical Valves, Servo motor shaft and combined

    Boring of coupling holes are done.

    (e) Preservation and Packing Section Final preservation and packing of all

    the Hydro Turbine components / assemblies is done here.

    (f) Small components Machining Section This is equipped with Planetary

    Grinding Machine, Cylindrical Grinding Machines, small size Lathes,

    Planers, Vertical and Horizontal Boring Machines. Small components like

    Bushes, Levers, Flanges etc. and Governing assemblies and machines here.

    (g) Governing Elements Assembly and Test Stand Section This section is

    equipped with facilities like oil Pumping Unit, Pressure Receiver,

    Servomotors etc. for assembly and Testing of Governing Elements.

    2.2 STEAM TURBINES

    The facilities and parts manufactured in the various sections of Steam

    Turbine manufacture are as follows:

    (a) Turbine casing Machining Section It is equipped with large size Planer,

    Drilling, Horizontal Boring, Vertical Boring, CNC Horizontal and Vertical

    Boring machines etc. Fabrication work like casings, Pedestals etc. are

    received from Fabrication Block-II.

    (b) Rotor Machining Section It is equipped with large size machining tools

    like Turning Lathe, CNC Lathes, Horizontal Boring Machines, special

    purpose Fir tree Groove Milling Machine etc. Some rotor forgings are

    imported from Russia and Germany and some are indigenously

    manufactured at CFFP, BHEL, Haridwar.

    (c) Rotor Assembly Section This is equipped with Indicating Stand; Small

    size Grinding, Milling, Drilling, machines, Press and other devices for

  • 8/8/2019 Man Summer Trng

    20/29

    fitting Rotors and Discs. Machined Rotor, Discs and Blades are assembled

    here. Balancing and over speeding of Rotor is done on the dynamic

    balancing machine.

    (d) Turbine casing Assembly Section Machined casings are assembled and

    hydraulically tested by Reciprocating Pumps at two times the operating

    pressure.

    (e) Test Station - Test station for testing of 210 MW USSR Steam Turbine at

    no load is equipped with condensers, Ejector, Oil Pumps, Oil containers

    Steam Connections etc, required for testing. Over speed testing is done for

    emergency Governor. Assembly Test Stands for different modules of

    Siemens design are equipped with accessory devices.

    (f) Painting Preservation and Packing Section All the parts are painted,

    preserved and packed here for final dispatch.

    (g) Bearings and Miscellaneous Parts Machining Section This section is

    equipped with small and medium size basic machine tools, e.g., lathes,

    Milling M/c, Horizontal Borer, Vertical Borer, drilling M/c etc. for

    manufacture of bearings and other miscellaneous parts of turbine.

    (h) Sealing and Diaphragm Machining Section It is equipped with medium

    size Vertical Boring, Horizontal Boring, Planning, Drilling Machines etc.

    wherein castings of sealing Housings, Liner housings, For gings of Rotor

    Discs, castings and fabricated Diaphragms and components are machined. It

    is also equipped with CNC machining center.

    Precision Horizontal Boring, Plano-Milling machines etc, are for

    manufacture of Governing Casting, Servo Casings and other medium parts

    of governing and Main Turbine assemblies.

  • 8/8/2019 Man Summer Trng

    21/29

    (i) Governing Machining Section This section is equipped with medium

    size and small size lathes, medium CNC lathe, Milling, Grinding, Drilling,

    Slotting and Honing Machines. Governing assembly parts are machined

    here.

    (j) Diaphragm and Governing Assembly Section It is equipped with

    deflection testing equipment for Diaphragms, Dynamic Balancing Machine

    for balancing Impeller of Centrifugal Oil Pumps and small fittings and

    assembly equipment. Governing test stand is equipped with the facilities like

    Oil Pumping Unit, Pressure Receiver, Servomotor, over speed testing of

    Emergency Governor etc.

    (k) Light machine shop In addition to normal conventional machine tools it

    is equipped with CNC Lathes, CNC Milling, CNC Vertical Boring,

    Precision Milling, planetary grinding machines etc. for manufacture of small

    and medium precision components of governing and other turbine parts.

    2.3 GAS TURBINE

    All the components of Gas Turbine are machined and assembled using the

    facilities available for manufacturing of steam and hydro turbines except the

    following facilities which are procured exclusively for the manufacturing of

    Gas Turbine and are installed in the areas specified for gas turbine

    manufacturing.

    a) Hydraulic Lifting Platform

    This facility is used for assembly and disassembly of G.T. Rotor. This is a

    hydraulically operated platform which travels up to 10 M height to facilitate

    access to different stages of Rotor. This is installed in Bay -I assembly area.

    b) CNC Creep Feed Grinding M/c.

  • 8/8/2019 Man Summer Trng

    22/29

    This is installed in Gas Turbine machining area Bay -II Extn. This M/c

    grinds the hearth serration on rotor disc faces. Hirth serrations are radial

    grooves teeth on both the faces of rotor discs. Torque is transmitted through

    these serrations, which are very accurately ground.

    c) External Broaching Machine

    This machine is installed in GT machining area and is used to make groove

    on the outer dia of rotor discs for the fitting of moving blades on the discs.

    d) CNC Facing Lathe

    This machine is installed in GT machining area and is used basically for

    facing rotor disc but can turn other components also.

    e) CNC Turning Lathe

    This machine is installed in Bay-I Heavy Machine Shop and is used to turn

    Tie Rods of Gas Turbine, which have very high length / diameter ratio. Tie -

    Rod is a very long bolt (length approx. 10 meter & dia 350 mm) which is

    used to assembly and hold the gas turbine rotor discs to form a composite

    turbine rotor.

    f) Wax Melting Equipment

    This is low temp. Electric furnace installed in Gas Turbine blading area in

    Bay-II. It is used to mix and melt Wax and Colaphonium, which is required

    to arrest the blade movement during the blade tip machining of stator blade

    rings.

    g) Gas Turbine Test Bed

    This test bed is installed near the Gas Turbine Machining area in Bay-II.

    This facility is used to finally assemble the gas turbine. Combustion

  • 8/8/2019 Man Summer Trng

    23/29

    chambers are not assembled here, which are assembled with main assembly

    at the site.

    h) Combustion Chamber Assembly Platform

    This facility is a 3 Tier Platform installed in Bay-I assembly area and is used

    for assembly of Combustion Chambers of Gas Turbine.

    3.0 MANUFACTURING PROCESS3.1 HYDRO TURBINES

    The major processes involved in various Hydro Turbine Sections are as

    follows:

    - Marking and checking of blanks manual as well as with specialmarking M/c.

    - Machining on Horizontal Boring, Vertical Boring, Lathes etc. as the casemay be on CNC /Conventional Machines.

    - Intermediate assembly operation is carried out on the respectiveassembly beds provided.

    - Then the assembly is machined as per requirement.- The sub-assemblies are further assembled for hydraulic/functional

    testing. Hydraulic testing is done using a power driven triple piston

    horizontal hydraulic pump which can generate a pressure of 200

    Kg/Cm2. It can also be carried out using a power pack.

    - On Governing elements / assembly and test stand, the components / sub -assemblies / assemblies are tested up to a hydraulic pressure of 200 Kg /

  • 8/8/2019 Man Summer Trng

    24/29

    c m2 using the piston pump. Oil testing up to 40 Kg / c m2 is carried out

    with oil pumping unit, which is permanently installed on this bed.

    3.2 STEAM TURBINEProcesses carried out in various sections of steam turbine manufacture are

    based on the following main phases.

    (a) Machine section Castings, Forgings, welded structures and other blanks

    are delivered to this section. The manufacturing process is based on the use

    of high efficiency carbide tipped tools, high speed and high feed machining

    techniques with maximum utilization of machine tool capacity and quick

    acting jigs and fixtures.

    (b) Assembly Section Casings and Governing assemblies are hydraulically

    tested for leakage on special test Bed. Assembled unit of governing and

    steam distribution systems are tested on Governing Test Bed. General

    Assembly and testing of Steam Turbine is carried out on the main Test Bed

    in Bay-II.

    (c) Painting, Preservation and Packing After testing the turbine, it is

    disassembled and inspected. Then the parts are painted, conserved and

    packed for final dispatch.

    3.3 GAS TURBINE

    The major processes involved in manufacturing Gas Turbine in various

    sections of Bk-III are as follows:

    a) Machining

    Castings, Forgings, welded structures and other blanks are received from

  • 8/8/2019 Man Summer Trng

    25/29

    concerned agencies in the respective sections. These are machined keeping

    in view optimum utilization of machine tools and toolings. Special jigs and

    fixtures are made available to facilitate accurate and faster machining.

    Proper regime and tool grades have been established to machine the

    materials like inconel, which have poor machinablity.

    b) Main Assembly

    Final assembly is done on test bed. Parts are assembled to make sub -

    assemblies. These sub-assemblies are again machined as per technological

    and design requirements and are made ready for final assembly. After

    assembly and insulation assembled Gas Turbine is sent to site.

    c) Rotor Assembly

    The rotor is assembled on Hydraulic Lifting Platform and sent to main

    assembly, where after checking clearances, it is sent for machining. After

    balancing, turbine side of rotor is disassembled, inner casing is fitted and

    rotor reassembled. This work is also carried out on Hydraulic Lifting

    Platform. Finally rotor is sent for assembly on test bed.

    d) Combustion Chamber Assembly

    This assembly is carried out on 3 tier platform installed for this purpose in

    Bay-I assembly. After machining of all components, ceramic tiles are fitted

    in flame tube. Burner and piping etc. is fitted in dome and combustion

    chamber is finally assembled. It is directly sent to site aft er insulation.

    3.2 BRAZED TYPE BLADES

  • 8/8/2019 Man Summer Trng

    26/29

    3.3 GAS TURBINE BLADES

    A.

    HYDRO TURBINE LABORATORY

    1. INTRODUCTION

    Hydro Turbine Laboratory at HEEP, Hardwar was set up in late '60s. It

    comprises of three Test Beds with electronic Instrumentation Laboratory for

    test bed operation/maintenance and for carrying out Site Investigations. It

    has a modest Workshop to manufacture hydro turbine models. Till

    December '95 about 160 numbers of tests have successfully been performed

    in the Laboratory which includes Contractual as well as Developmental tests

    on Hydro Turbine Models, Calibration of Hydraulic Valves, Nozzles and

    Flow Measuring Devices for 210 MW Thermal Sets. Besides performing the

  • 8/8/2019 Man Summer Trng

    27/29

    main function of design/ development of hydraulic passages of hydro

    turbines, design of models, their manufacture and testing, the Laboratory has

    also been engaged in Field Test Studies at various Hydro Power Sites for

    conducting Index Tests, Head Loss Measurement, Up rating Studies and

    attending to various Site Problems.

    2. DESIGN:

    3. MANUFACTURING:

    4. TESTING:

    5. TESTING CAPABILITIES:

    - Runaway speed tests of reaction and impulse turbine.- Determination of MW output of prototype turbine under specified

    operating conditions.

    6. INSTRUMENTATION LABORATORY

    The Instrumentation Laboratory is equipped with the most modern

    instrumentation for carrying out accurate measurements during testing in the

    Laboratory as well as during field testing. The major facilities are:

    - Ultrasonic Flowmeter for field tests.

    - Magnetic Tape Recorder with Waveform Analyzer.

    - Microprocessor based Pressure Pulsation Measuring System.

    - Microprocessor based Wicket Gate Torque Measuring System.

    - Microprocessor based Hydraulic Thrust Measuring system.

    7. CALIBRATION

  • 8/8/2019 Man Summer Trng

    28/29

    The Laboratory is equipped with the required facilities for calibration of

    load cells, pressure pulsation transducers, weights, volumetric tanks and

    torque wrenches. Calibration of these terms is performed with respect to

    standards with history trace.

    .

    BOARD OF DIRECTORS

    K.G. Ramachandran Chairman & Managing Director

    Bharat Heavy Electricals Limited

    BHEL House, Siri Fort, New Delhi 110 049

    A.V. Singh Additional Secretary & Financial Advisor

    Ministry of Industry. Deptt. of Heavy IndustryUdyog Bhawan, New Delhi 110 011

    Pradeep Kumar Joint Secretary

    Ministry of Industry. Deptt of Heavy Industry

    Udyog Bhawan, New Delhi 110 011

    Dr. Jamshed J. Irani Managing Director

    Tata Iron & Steel Company Limited

    Jamshedpur 831 001

    Shekhar Datta Ex-Managing Director & PresidentGreaves Limited, E/8, Sea Face Park

    Bhulabhai Desai Road, Mumbai 400 001

    Ms. Tarjani Vakil Ex-CMD, EXIM Bank of India

    A-1, Ishwar Das Mansion, Nana Chowk

    Mumbai 400 007

    J. Jayaraman Ex-CMD, Cochin Refineries Limited

  • 8/8/2019 Man Summer Trng

    29/29

    39/4, Ashwin Apartment

    C.P. Ramaswamy Road, Chennai 600 018

    K.C. Lahiry Director (Power)

    Bharat Heavy Electricals Limited

    BHEL House, Siri Fort, New Delhi 110 049

    K.S. Rao Director (IS&P)

    Bharat Heavy Electricals Limited

    Integrated Office Complex

    Lodhi Road, New Delhi 110 003

    Ishan Shankar Director (Personnel)

    Bharat Heavy Electricals Limited

    BHEL House, Siri Fort, New Delhi 110 049

    M.K. Mittal Director (ER&D)

    Bharat Heavy Electricals LimitedBHEL House, Siri Fort, New Delhi 110 049