Logistics Solutions for the Warfighter
Name of Presenter: Sean NolanCode:922
Date Presented: 6 JAN 2014
Blount Island CommandJacksonville, Florida
EQUIPMENT ADMINISTRATION
African Lion 15
Presented byBLOUNT ISLAND COMMANDExercise African Lion 15
Logistics Solutions for the Warfighter!
2Logistics Solutions for the Warfighter
AGENDA
• References• GCSS-MC (BIC)• GCSS-MC, GPN 2-11 (Temp Loan)• GCSS-MC, GPN 4-12 (Ground Equipment Records and Forms Preparation,
Composition, Disposition, and Filing Instructions)• GCSS-MC, GPN 1-13 (Total Asset Visibility)• Record Management • End-of-Ship Reports• Issues• Prepositioning Policy • Questions• Point of Contacts
3Logistics Solutions for the Warfighter
MPS (GCSS-MC)
• Cut-Over 19 Jul 2012
– Equipment Install Base Completeness (GPN-4-12)• Parent-Child Relationship– Calibration–Modification– SIM Policy » CCI/EKMS» SL-3 (TAMCN “SSRI) components
• Equipment IB Module (Record Jacket) and Notes
6Logistics Solutions for the Warfighter
GCSS-MC (TEMP LOAN GPN 2-11)
• Pre-Exercise – Unit providing Temp-Loan will retain ownership w/in the GCSS-MC Install Base along with CMR, RO’s and AO’s
information.
– In the Install Base, the issuing unit will add sub-custody party information of RO taking possession of equipment. A ‘start-date’ relationship of the sub-custody will be added and equipment will be re-assigned to loaner.
MAGTF RO’s need to be identified for all gear (45 Days prior to download).
– BIC will open a SR to capture the JLTI process and the ‘problem summary’ should read ‘ JLTI for Temp Loan’. The DODAAC of the receiving unit will be identified to include RO’s contact information.
– Once JLTI is completed, the SR will be closed.
• Post-Exercise– UNITS RECEIVING TEMP-LOANED EQUIPMENT ARE RESPONSIBLE FOR RETURNING EQUIPMENT IN A SERVICEABLE
CONDITION, TO INCLUDE ANY MAINTENANCE, REPAIR AND/OR REPLACEMENT OF SL-3 COMPONENTS.
– The using unit will open a SR to capture the JLTI process and the ‘problem summary’ should read JLTI RETURN FROM TEMP LOAN' TO MXXXXX. Once JLTI is completed, the SR will be closed by the using unit.
– BIC will execute and END DATE SUB-CUSTODY PARTY RELATIONSHIP in the GCSS-MC Install Base and update the item status.
8Logistics Solutions for the Warfighter
GCSS-MC (RECORDS MANAGEMENT)
• GPN 4-12– GCSS-MC retains all historical data, meaning that equipment record jackets (i.e. 696d’s) are no longer required.
– Gun Books will be issued and maintained ISO applicable Ordnance assets.
– MAGTF required to captured equipment maintenance and supply requisitioning information in GCSS-MC.
• Equipment records and forms issued ISO exercise assets.
– Local record folder
– SL-3 Extract Records
– LTI form
– Gun Books
– Keys (when applicable)
• End-Of-Ship Reports (USNS ??????)– SL-3 Deficiency Report
9Logistics Solutions for the Warfighter
PREPOSITIONING POLICY
• Publications– Equipment operators and maintenance manuals
are not embarked aboard ship.
• Shelf-Life– Material must have at least 24 months remaining
at time of sail.
10Logistics Solutions for the Warfighter
AL-15 (EQUIPMENT ADMIN ISSUES)
• Post-Exercise Deficiency Reporting
– Locally produce form (provided by TAAT)
• Possible Challenges (contingency) Issues:
– Network Capability and Challenges
– Reach-back Capability
– Scanning Capability (example: Accident Form SF-91)
– Repair parts requisitioning (During & Regeneration)
– Post exercise deficiencies identification and tracking
12Logistics Solutions for the Warfighter
BLOUNT ISLAND POCs
• TAAT OIC- LtCol Richard Righter– E-mail: [email protected] – Off Phone: 904-696-5445 – Blackberry: 904-525-3578
• Logistics Lead– Mr. Richard Buhr – E-mail: [email protected]– Off Phone: 904-696-5026– Blackberry: 904-254-2559
• SBCOTR (DAHL) - Mr. Sean Nolan– E-mail: [email protected] – Off Phone: 904-714-6296 – Blackberry: 904-625-2621