CDR Mike
DanishO f f i c e o f I n t e r n a l
C o n t r o l
CDR David
Hatchett A v i a t i o n
L o g i s t i c s C e n t e r
Linking Internal
Control with Lean
Six Sigma and ISO
9000 Quality
Management
2017ASMC PDI
U n i t e d S t a t e C o a s t G u a r d
Working
Together OMB A123/Green Book
ISO 9001
SIX SIGMA
Overview
• Internal Control• Green Book• What is it?
• OMB Circular A123• What is it?
• How does it fit in with the Green Book?
• Process Standardization• ISO9001• What is it?
• How does it fit in with the Green Book?
• Process Improvement• DMAIC• What is it?
• How does it fit in with the Green Book?
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
GAO Green Book
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
Executive commitment to risk management, documented
procedure, and performance measuring.
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
Basis of a business case analysis; identify, assess, and respond to risks. (ERM, GAR)
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
Document procedures and activities to ensure objectives
are met (TTP, SOPs, Desk Guides, Checklists)
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
Assure others you are achieving objectives, retain
support documentation; highlight gaps so others can
take action as required. (SOA, Personnel Records, ERM)
Entity Level Control
Control environment
Risk assessment
Control activities
Information and
communications
Monitoring activities
Evaluate processes to continuously improve, drive key performance indicators. (Dashboards, AIA, ICOFR)
Working
Together OMB A123/Green Book
ISO 9001
SIX SIGMA
Working
Together Control Environment
Risk Assessment
Monitoring
Information and Communication
Control Activities
OMB A123/Green Book
ISO 9001
SIX SIGMA
Process Measurement &
Control
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
OMB Cir A123 - Appendix A
An Undelivered Orders (UDOs)
Example
• Is monitoring and control valuable to the organization?• Money tied up in
obligations that are no longer needed?
• Reliability of financial statements?
• Focus Areas• Travel?
• Contracts?
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
Plan
An Undelivered Orders (UDOs)
Example
• Design a process to ensure obligations are valid• Establish Thresholds
• Define reviews
• Evaluate if the design is working• Statistically sample
• Extrapolate
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
Evaluate
Design &
Effectiveness
An Undelivered Orders (UDOs)
Example
• Is your sample extrapolation greater than your threshold?
• Do we get the same results across at focus areas (contracts, travel, etc)
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
Conclude
An Undelivered Orders (UDOs)
Example
• Re-design a process to ensure results remain under established threshold.• Don’t just fix the issues
found
• Consider the root cause
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
Correct
An Undelivered Orders (UDOs)
Example
• Statement of Assurance
Plan
Evaluate Design
Test Effectiveness
Conclude
Correct
Report
Report
Working
Together Control Environment
Risk Assessment(Plan/Evaluate)
Monitoring
Information and Communication
(Report)
Control Activities(Evaluate/Conclude)
OMB A123/Green Book
ISO 9001
SIX SIGMA
Depot Maintenance Results
FY16 Production
21 – MH-6510 – MH-60
4 – HC-1304 – HC-144
ISO 9001:14001
AS 9110
• Customer Focus • ALC values its customers
• Leadership • ALC's leaders establish unity of purpose and
direction for the organization.
• Involvement of People• Employees are the organization's most valued
assets.
• Process Approach • Processes are defined, designed, and managed to
achieve desired results.
• System Approach• Interrelated processes are managed as a system.
ISO 9001:14001 continued
• Continual Improvement • Continual improvement of processes,
products, and services.
• Factual Approach to Decision Making • Decisions are based on process
measurement data and information is captured and analyzed
• Mutually Beneficial Supplier Relationships• ALC has created clear and open
communication with its suppliers.
Working
Together Control Environment
Risk Assessment(Plan/Evaluate)
Monitoring
Information and Communication
(Report)
Control Activities(Evaluate/Conclude)
Leadership
Customer
Engage people
System
Improve
Decision making
Relationship
Process
OMB A123/Green Book
ISO 9001
SIX SIGMA
Process Improvement:
Six Sigma DMAIC Model
Define
Measure
Analyze
Improve
Control
Process Improvement:
Six Sigma DMAIC Model
•Set project scope including potential opportunities for improvement
• Identify process to be improved & stakeholdersDefine
Measure
Analyze
Improve
Control
Process Improvement:
Six Sigma DMAIC Model
•Set project scope including potential opportunities for improvement
• Identify process to be improved & stakeholdersDefine
• Identify key aspects of the process (critical to quality)
•Define measurements, and collect current dataMeasure
Analyze
Improve
Control
Process Improvement:
Six Sigma DMAIC Model
•Set project scope including potential opportunities for improvement
• Identify process to be improved & stakeholdersDefine
• Identify key aspects of the process (critical to quality)
•Define measurements, and collect current dataMeasure
•Explain variables likely to drive variation
• Identify possible improvementsAnalyze
Improve
Control
Process Improvement:
Six Sigma DMAIC Model
•Set project scope including potential opportunities for improvement
• Identify process to be improved & stakeholdersDefine
• Identify key aspects of the process (critical to quality)
•Define measurements, and collect current dataMeasure
•Explain variables likely to drive variation
• Identify possible improvementsAnalyze
• Implement the improvement and measure the outcomeImprove
Control
Process Improvement:
Six Sigma DMAIC Model
•Set project scope including potential opportunities for improvement
• Identify process to be improved & stakeholdersDefine
• Identify key aspects of the process (critical to quality)
•Define measurements, and collect current dataMeasure
•Explain variables likely to drive variation
• Identify possible improvementsAnalyze
• Implement the improvement and measure the outcomeImprove
•Sustained measurement dashboards
•Management reviewControl
Process Improvement
• Define – ALC paint facility was a bottle neck slowing depot level maintenance and the return of aircraft to the operational commander.
Process Improvement
• Measure – It took 3 people 36 hours to cycle an aircraft through a full paint job.
Process Improvement
Analyze - The priority was to shorten this length to 24 hours to meet overall production goals.
- The problem was having only one paint facility. This caused the aircraft to back up in the queue, adding hours and days to the production schedule.
Strategic Intent – Enterprise Production System
Aircraft WIP Status Board
UNCLAS/FOUO
Incoming
Disassy/Blast Interim Assembly Assembly Final Ground Chks Test PDM
Rmv Panels/Strip Hull Paint One DITMCO Two Paint Grd Turns Flights Certification
(15d) (50d) (5d) (17d) (10d) (17d) (9d) (13d) (6d) (3d)
MRR
1 2 1 1 1 1 1 1 1 1
1076 [12]
6019 1078 [15] +12TB 1075 [8] 1074 [13] 1073 [8]
06SEP+12TB 1077 [38] +11TB +8TB +7TB
+12TB
Incoming
Blast Interim Assembly Final Ground Test
Disassy. Strip Composite Hull Paint DITMCO Post Assembly/QA Paint Runs Flights
(5d) (4d) (5d) (21d) (4d) (4d) (36d) (7d) (5d) (5d)
SRR
1 1 1 2 1 1 4 1 1 1
1189 [36] 1185 [4]
1190 [5] +9TB +5TB
+13TB 1193 [5] 1186 [14]
6512 1192 [5] +14TB +5TB 1184 [5]
18AUG+16TB 1191 [13] 1187 [20] +6TB
+18TB +5TB
1188 [28]
+9TB
Incoming
De-Paint Disassembly OP Ground FCF Final Paint
DROP IN/ MOD(Off-Site) Induction Inspections Repairs Assembly Checks Runs Test Flights Delivery
(11d) (32d) (113d) (20d) (10d) (5d) (14d) (14d)
LRS
1 1 3 3 3 1 1 1
1502/Dmil
1312/PEI 1311 1308 2007/TCTO
1310 2003/Mod
Incoming
Strip Repairs Hangar Op Ground Flights Final Paint
(Off-Site) Induction Disassembly Inspections Modify Assembly Checks Ops QA Ops
(10d) (15d) (28d) (45d) (52d) (34d) (12d) (5d) (7d)
MRS
1 1 1 2 2 1 1 1 1
4419 4418
Buffer Minimal Buffer Buffer (#)= Planned Phase [#]= Remaining Phase Modifications & TB = Total BufferQuarantine
Available (<4wd) Exceeded Duration Duration Drop-ins Available
Process Improvement
• Improve – reduce the paint team from 3 people to 2 and work a day and a night shift.
- Paint facility was now able to paint a full air craft in 24 hours.
- The bottleneck was relieved and production schedule returned.
Strategic Intent – Enterprise Production System
Aircraft WIP Status Board
UNCLAS/FOUO
Incoming
Disassy/Blast Interim Assembly Assembly Final Ground Chks Test PDM
Rmv Panels/Strip Hull Paint One DITMCO Two Paint Grd Turns Flights Certification
(14d) (49d) (5d) (16d) (10d) (16d) (9d) (12d) (6d) (3d)
MRR
1 2 1 1 1 1 1 1 1 1
1083 [9]
+13TB
6015 1085 [9] 1084 [30] 1082 [7] 1081 [5] 1080 [1]30MAY
+7TB +16TB +12TB +13TB +2TB
NC 2305 NC 2309
[73] [1]
Incoming
Blast Interim Assembly Final Ground Test
Ind/Dissy. Strip Composite Hull Paint DITMCO Post Assembly/QA Paint Runs Flights
(6d) (5d) (5d) (21d) (4d) (4d)(36d)
(7d) (5d) (5d)
SRR
1 1 1 2 1 1 4 1 1 1
1103 [17]
6559 1108 [5] 1107 [13] 1106 [4] 1105 [36] +12TB 1101 [3] 1100 [1]30APR
+19TB +22TB +22TB +17TB +9TB +9TB
Incoming
De-PaintDisassembly
OP Ground FCF Final Paint
Drop In(Off-Site)Induction Inspections Repairs
Assembly Checks Runs Test Flights Delivery
(11d)(32d)
(113d) (20d) (10d) (5d) (14d) (14d)
LRS
1 1 3 3 3 1 1 1
2001
08MAY1315 1314/PEI 1313
Incoming
StripRepairs
Hangar Op Ground Flights Final Paint
(Off-Site)Induction
Disassembly InspectionsModify
Assembly Checks Ops QA Ops
(10d) (15d) (28d) (45d) (52d) (34d) (12d) (5d) (7d)
MRS
1 1 1 2 2 1 1 1 1
2700
2316 2701 4422 4421
13-Jun
Buffer Minimal Buffer Buffer (#)= Planned Phase [#]= Remaining Phase Modifications & TB = Total Buffer
QuarantineAvailable (<4wd) Exceeded Duration Duration Drop-ins Available
Process Improvement
• Control – a more detailed analysis was done to determine when, based on number of aircraft in production, the paint booth could return to just working day shifts.
Which is most important?
• ALL of the ABOVE• Green Book sets the principles
• OMB A-123 tells us what to do
• ISO and BPI tells us how for operations
• Federal Accounting Standards Advisory Board tells us how to account for operations in the Financial Statements
• GAO Yellow Book (Generally Accepted Governmental Auditing Standards) outlines the audit
Working
Together Control Environment
Risk Assessment(Plan/Evaluate)
Monitoring
Information and Communication
(Report)
Control Activities(Evaluate/Conclude)
Measure
Analyze
Control
Leadership
Customer
Engage people
System
Improve
Decision making
Relationship Correct
Analyze
Improve
Process
Define
OMB A123/Green Book
ISO 9001
SIX SIGMA