lied library - leisure reading 5230... · sprklr sq ssk sst st overhead opening opposite owner...
TRANSCRIPT
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
COVER PAGE
G1.01
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
01/C
OV
ER
PA
GE
/Tue
sday
, Mar
ch 2
9, 2
016/
12:3
0 P
M/
3/22/16
Interfaith Student Center
John S. Wright Hall
Richard Tam
Alumni Center
Archie C. GrantHall
57
Harmon Avenue
Maryland Parkway
Joe
Del
aney
Lan
eFlamingo Road
Uni
vers
ity
Roa
d
Brussels Street
Naples DriveSwenson Street
Trop
icana
Ave
nue
Harmon Avenue
Flamingo Access Road
Cottage Grove Avenue
Paradise Road
To Las VegasBoulevard
To Las VegasAirport
http://maps.unlv.edu
Main/Paradise Campus3D Building Map
Emergency Phones
1
2
3 5
6
7
8
9
10
1112
13
1415
1617
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
373839
40
41
42
4344 45
46
47
48
49 5051
52
53 54
55 56
57
585960
6162
63
64
65
66
6768
69
70
7172
73
7475
76
7778
79 80
81 82
83
84
85
86
87
88
Peter Johann Soccer Field
Myron PatridgeTrack Stadium
Flashlight
PidaPlaza
AlumniAmphitheatre
AlumniWalk
IntramuralFields
Bill “Wildcat” MorrisRebel Park
4
BUILDING NAMEABBREV. BUILDING NUMBER BUILDING NAMEABBREV. BUILDING NUMBER
BUILDING NAMEABBREV. BUILDING NUMBER
ARC Paul B. Sogg Architecture Building 11ASC Academic Success Center - Claude I. Howard Building 23BDC Bennett Professional Development Center 53BEH Frank and Estella Beam Hall 33BGC John D. "Jackie" Gaughan Boys and Girls Club 59BHS Rod Lee Bigelow Health Sciences 52BKS UNLV Bookstore 30BMC Lee and Thomas Beam Music Center 87BPB Robert L. Bigelow Physics 68BSL William S. Boyd School of Law 75BXG Boxing Gymnasium 50CBC Carol C. Harter Classroom Building Complex 28CDC Central Desert Complex 29CEB William D. Carlson Education 79CEB-HEA Holbert H. Hendrix Education Auditorium 80CET Carlson Education Trailer 77CHE Chemistry 66CNC Catholic Newman Center 19COX Cox Pavilion 25CSB Campus Services Building 27CWH Claudine Williams Residence Hall 6DAY Dayton Complex 3DIN Hazel M. Wilson Dining Commons 22EMS Eller Media Softball Stadium 46EPA Environmental Protection Agency 69FDH Flora Dungan Humanities 34FMA Facilities Management Administration 42
FND Foundations Building (D2) 89FTC Frank and Vicki Fertitta Tennis Complex 47GHT Greenhouse Trailer 2 63GRA Archie C. Grant Hall 82GUA Greenspun Hall 31HCH Artemus W. Ham Concert Hall 84HFA Alta Ham Fine Arts 83HOU Houssels House 13HUH Mitzi & Johnny Hughes Hall - Building A 18HWB Herman Westfall Building 43IGI Stan Fulton Building - International Gaming Institute 56JBT Judy Bayley Theatre 86KRH Kitty Rodman Residence Hall 9LAC Lied Athletic Complex 49LBC Lynn Bennett Early Childhood Education Center 64LDS LDS Institute of Religion Student Center 20LFG Lilly Fong Geoscience 73LLB Lied Library 37MFH Margie and Robert Faiman Residence Hall - Building D 14MPE Paul McDermott Physical Education 48MSB Robert Miller Soccer Building 55MSM/HRC Marjorie Barrick Museum and Harry Reid Center 36NTS North Trailer Site 60O&M Operations and Maintenance 40PAR Paradise Campus 1PCT Paradise Campus Trailers 2PES Paradise Elementary School 54
PKG1 Cottage Grove Parking Garage 85PKG2 Tropicana Parking Garage 4 PRO Publications/Reprographics/Copy Center 38PSB Claude I. Howard Public Safety 44RAB Research Administration Building 41RAJ James E. Rogers Center for Administration & Justice 74RHB Gym Road Residence Hall - Building B 17RHC Gym Road Residence Hall - Building C 15RHW Gym Road South Resident Services Building 10RPL Radiation Protection Laboratory 71RRC Rebel Recycling Center 58RWC Student Recreation and Wellness Center 5SAM Student Affairs Maintenance 8SCS System Computing Services 70SEB Science and Engineering Building 62SSC Student Services Complex 24STS South Trailer Site 12SU Student Union 32SWC SideWalk Café 78TAC Richard Tam Alumni Center 81TAY William D. Taylor Hall 57TBE Thomas T. Beam Engineering Complex 61TEC Technology Building 72TMA Thomas & Mack Moot Court 76TMC Thomas & Mack Center 26TON Tonopah Residence Complex 21TTL Temporary Teaching Labs 67UNH University Hall 45USB University Systems Building 39WBH William S. Boyd Residence Hall 7WBS Earl E. Wilson Baseball Stadium 51WHI Juanita Greer White Life Sciences 65WRI John S. Wright Hall 35WRL Eugene R. Warner Residential Life Building 16
UNIVERSITY OF NEVADALAS VEGAS
LIED LIBRARY - LEISUREREADING
03/22/16
ISSUED FOR PLAN REVIEW
4505 S. MARYLAND PARKWAYLAS VEGAS, NEVADA 89119
UNLV
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
SHEET INDEX, BASIS OFDESIGN / CODE,
ABBREVIATIONS,PROJECT TEAM
G1.02
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
02/S
HE
ET
IND
EX
, BA
SIS
OF
DE
SIG
N /
CO
DE
, AB
BR
EV
IATI
ON
S, P
RO
JEC
T TE
AM
/Tue
sday
, Mar
ch 2
9, 2
016/
12:3
1 P
M/
3/22/16
&L
@
˚ø#
(E)
#+-
ACOUSACI
ADADJAFF
AGGRAL
ALTANSI
APAPPROX
ARCHASB
ASHRAE
ASPHASTM
BCBOD
BDBITUMBLDG
BLKBLKG
BMBMBN
BOCA
BOTBRGBTU
BTUH
CABCBCB
CEMCERCFM
CGCI
CIPCJ
CLGCLKG
CLOCLRCO
COLCONCCONN
CONSTRCONT
ABBREVIATION LEGENDOH
OPNGOPP
OFOI
OFCI
PCPJPL
PLAMPLASPLBG
PLYWDPNLPOS
PPPR
PRCSTPSFPSIPT
P.T.PTD
PTD/R
PTNPTR
QT
RR orRAD
RDREF
REFRREINF
REQRESIL
REVRGTR
RMRORSRW
RWDRWL
S.SAN
SCSCD
SCHEDSD
SECTSH
SHRSHTSIM
SJSND
SNR
SPECSPRKLR
SQSSKSST
ST
OVERHEADOPENINGOPPOSITEOWNER FURNISHED, OWNERINSTALLEDOWNER FURNISHED,CONTRACTOR INSTALLED
POINT OF CURVATUREPANEL JOINTPLATEPLASTIC LAMINATEPLASTERPLUMBINGPLYWOODPANELPOSITIVEPOWER POLEPAIRPRECASTPOUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPOINTPOINT OF TANGENCYPAPER TOWEL DISPENSERCOMBINATION PAPER TOWELDISPENSER ANDRECEPTACLEPARTITIONPAPER TOWEL RECEPTACLE
QUARRY TILE
RISERRADIUS
ROOF DRAINREFERENCEREFRIGERATORREINFORCEDREQUIREDRESILIENTREVISIONREGISTERROOMROUGH OPENINGROD AND SHELFRIGHT OF WAYREDWOODRAINWATER LEADER
SOUTHSANITARYSOLID CORESEAT COVER DISPENSERSCHEDULESOAP DISPENSERSECTIONSHELLSHOWERSHEETSIMILARSAWN JOINTSANITARY NAPKINDISPENSERSANITARY NAPKINRECEPTACLESPECIFICATIONSSPRINKLERSQUARESERVICE SINKSTAINLESS STEELSTORM
ANDANGLEATCENTERLINEDEGREEDIAMETER OR ROUNDSQUAREEXISTINGPERPENDICULARPLATEPOUND OR NUMBERPLUS OR MINUSACOUSTICALAMERICAN CONCRETEINSTITUTEAREA DRAINADJUSTABLEABOVE FINISHED FLOORAGGREGATEALUMINUMALTERNATEAMERICAN NATIONALSTANDARDS INSTITUTEACCESS PANELAPPROXIMATEARCHITECTURALASBESTOSAMERICAN SOCIETY OFHEATING, REFRIGERATING,AND AIR CONDITIONINGENGINEERSASPHALTAMERICAN SOCIETY FORTESTING AND MATERIALS
BOTTOM OF CURBBOTTOM OF DECKBOARDBITUMINOUSBUILDINGBLOCKBLOCKINGBENCHMARKBEAMBULL NOSEBUILDING OFFICIALS ANDCODE ADMINISTRATORSBOTTOMBEARINGBRITISH THERMAL UNITBRITISH THERMAL UNITSPER HOUR
CABINETCHALKBOARDCATCH BASINCEMENTCERAMICCUBIC FEET PER MINUTECORNER GUARDCAST IRONCAST IN PLACECONTROL JOINTCEILINGCAULKINGCLOSETCLEARCLEANOUTCOLUMNCONCRETECONNECTIONCONSTRUCTIONCONTINUOUS
CORRCNTR
CTCTR
CTSK
DBLDEPT
DETDF
DIADIAG
DIMDISP
DLDNDODR
DRWDS
DSPDWG
DW
E.EAEJEL
ELECELEV
EMERENCLENGR
EPEQ
EQPTEWCEXP
EXPOEXST
EXT
FAFBFD
FDNFEFE
FFE ORFF&EFHCFIN
FIXTFL orFLR
FLASHFLUOR
FOCFOFFOS
FPRFFRFS
F.S.FT
FTGFURR
FUT
GAGALVor GI
CORRIDORCOUNTERCERAMIC TILECONTRACTORCOUNTERSUNK
DOUBLEDEPARTMENTDETAILDRINKING FOUNTAINDIAMETERDIAGONALDIMENSIONDISPENSERDEAD LOADDOWNDOOR OPENINGDOORDRAWERDOWNSPOUTDRY STANDPIPEDRAWINGDISHWASHER
EASTEACHEXPANSION JOINTELEVATIONELECTRICALELEVATOREMERGENCYENCLOSUREENGINEERELECTRICAL PANELEQUALEQUIPMENTELECTRIC WATER COOLEREXPANSIONEXPOSEDEXISTINGEXTERIOR
FIRE ALARMFLAT BARFLOOR DRAINFOUNDATIONFIRE EXTINGUISHERFIRE EXTINGUISHERCABINETFIXTURES, FURNISHINGS,AND EQUIPMENTFIRE HOSE CABINETFINISHFIXTUREFLOOR
FLASHINGFLUORESCENTFACE OF CONCRETEFACE OF FINISHFACE OF STUDSFIREPROOFFRAMEFINISH SURFACEFLOOR SINKFOOT OR FEETFOOTINGFURRINGFUTURE
GAUGEGALVANIZED IRON
GBGCGL
GNDGR
GYP
HBHC
HDWDHDWE
HGTHM
HORIZHPHRHR
HVAC
IDIN
INSULINTINV
JANJT
KIT
LABLAMLAVLKR
LLLPLT
MAXMBMC
MECHMEMB
MTLMEZZMFR
MHMINMIR
MISCMO
MTDMUL
N.NEC
NEMA
NICNO or #
NOMNPCNTS
O/OA
OBSOC or
O/COD
OFF
GRAB BARGENERAL CONTRACTORGLASSGROUNDGRADEGYPSUM
HOSE BIBHOLLOW COREHARDWOODHARDWAREHEIGHTHOLLOW METALHORIZONTALHIGH POINTHOURHAND RAILHEATING, VENTILATION,AND AIR CONDITIONING
INSIDE DIMENSIONINCHINSULATIONINTERIORINVERT
JANITORJOINT
KITCHEN
LABORATORYLAMINATELAVATORYLOCKERLIVE LOADLOW POINTLIGHT
MAXIMUMMARKER BOARDMEDICINE CABINETMECHANICALMEMBRANEMETALMEZZANINEMANUFACTURERMANHOLEMINIMUMMIRRORMISCELLANEOUSMASONRY OPENINGMOUNTEDMULLION
NORTHNATIONAL ELECTRIC CODENATIONAL ELECTRICMANUFACTURERSASSOCIATIONNOT IN CONTRACTNUMBERNOMINALNATIONAL PLUMBING CODENOT TO SCALE
OVEROVERALLOBSCUREON CENTER
OUTSIDE DIAMETEROFFICE
CLA
A6.01
2
3
4
1 A2.20
Storage105
Storage329 SF
3002
W2
1A5.01
1A5.01
1A5.01
AA6.01
SHEET INDEXIDG1.01
G1.02
G1.03
G1.04
G1.05
G1.06
A1.01
A2.01
A2.02
A3.01
A4.01
EG1.01
EG1.02
ED1.01
E1.01
E2.01
E3.01
E4.01
E5.01
EL2.1
NAMECOVER PAGE
GENERAL
SHEET INDEX, BASIS OF DESIGN / CODE,ABBREVIATIONS, PROJECT TEAM
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
ARCHITECTURAL
1ST FLOOR CONSTRUCTION ACCESS ONLY
2ND FLOOR PLAN
2ND FLOOR ENLARGED PLAN AND INTERIOR ELEVATIONS
2ND FLOOR REFLECTED CEILING PLANS
WALL SECTION AND DETAILS
ELECTRICAL
ELECTRICAL LEGEND, ABBREVIATIONS SHEET INDEX
ELECTRICAL SPECIFICATIONS
DEMOLITION PLAN SECOND FLOOR
LIGHTING PLAN SECOND FLOOR
POWER PLAN SECOND FLOOR
COMMUNICATIONS PLAN SECOND FLOOR
ELECTRICAL DETAILS
ONE LINE DIAGRAM & SCHEDULES
ELECTRIC LIGHTING
2ND FLOOR PARTIAL LIGHTING PLAN
1
MAT-2
6
N
±0"
C1 12'-0" AFF
F1
PROJECT LOCATION
PROJECT TEAM
CLIENT:UNLV4505 S. Maryland ParkwayLas Vegas, Nevada 89154p: (702) 895-5218
Project Manager: Patrick CastellanoUNLV Planning and Construction
ARCHITECT:LGA241 W. Charleston Blvd, Suite 107Las Vegas, Nevada 89101p: (702) 263-7111www.lgainc.com
Project Manager: John Lansdell
ELECTRICAL / LOW VOLTAGE:TJK Consulting Engineers , Inc5459 South Durango Drive, Suite #100Las Vegas, NV 89113p: (702) 871-3621f: (702) 871-8353
Project Manager: John Agostino
PL
WORKING SYMBOLS LEGEND
(SECTION NUMBER)(SHEET NUMBER)
(CEILINGTYPE)
(CEILINGHEIGHT)
INDICATESCEILING TYPEAND HEIGHT
ABOVEFINISHEDFLOOR.
REFLECTEDCEILING PLANS
INDICATESBUILDINGSECTION
PLANS
(ELEVATION NUMBER)(SHEET NUMBER) PLANS
INDICATESEXTERIORBUILDING
ELEVATION
(ROOM NAME)(ROOM NUMBER)
INDICATESROOM NAMEAND NUMBER
PLANS(EXCEPTEXITING)
(ROOM SQUAREFOOTAGE)
(LOAD FACTOR)(PERMITTEDOCCUPANTS)
(ROOM NAME)
EXITING PLANS
DISPLAYSINFORMATION
USED FOREGRESS
CALCULATIONS
PLANSINDICATES
ENLARGED PLANOR DETAIL
(PLAN OR DETAILNUMBER)
(SHEET NUMBER)
INDICATESBUILDING
SYSTEM TYPE.SEE BUILDING
SYSTEM SHEET(S).
PLANS ANDSECTIONS
(ELEVATION NUMBERALONG OUTSIDE)(SHEET NUMBER
INSIDE) INDICATESINTERIOR
ELEVATION
FLOOR PLANSAND ENLARGED
PLANS
INDICATESVERTICALHEIGHT
PLANS,ELEVATIONS
AND SECTIONS(ELEVATION TARGET)
(ELEVATION NUMBER)(SHEET NUMBER)
INDICATESREVISION
PLANS,ELEVATIONS
AND SECTIONS(REVISION INDICATOR)
INDICATESFINISH
MATERIAL
PLANS,ELEVATIONS
AND SECTIONS(FINISH MATERIAL)
INDICATESKEYNOTENUMBER
PLANS,ELEVATIONS
AND SECTIONS(KEYNOTE NUMBER)
(BUILDING SYSTEMTYPE)
WORKING DRAWING SYMBOL USELOCATION
(DRAWING NUMBER)(SHEET NUMBER)
STASTDSTL
STORSTRLSUSP
SVSYM
TT&G
TBT.B.TC
TELTERTHKTODTOMTOCTOPTOSTOW
TPTPD
TRANSTRTD
TSTV
TYP
UL
UNFUNO
UR
VCTVERTVEST
WW.W/
WCW.C.WD
W/OWP
WWMWSCT
WT
STATIONSTANDARDSTEELSTORAGESTRUCTURALSUSPENDEDSAFETY VESTIBULESYMMETRICAL
TREADTONGUE AND GROOVETACK BOARDTOWEL BARTOP OF CURBTELEPHONETERRAZZOTHICKTOP OF DECKTOP OF MASONRYTOP OF CONCRETETOP OF PARAPETTOP OF STEEL/STUDTOP OF WALLTOP OF PAVEMENTTOILET PAPERDISPENSERTRANSFORMERTREATEDTUBE STEELTELEVISIONTYPICAL
UNDERWRITERSLABORATORIESUNFINISHEDUNLESS NOTEDOTHERWISEURINAL
VINYL COMPOSITION TILEVERTICALVESTIBULE
WATERWESTWITHWALL COVERINGWATER CLOSETWOODWITHOUTWATERPROOFWELDED WIRE MESHWAINSCOTWEIGHT
(FFE ID) PLANSINDICATES FFE
SCHEDULEDITEM
RAM
PAR
T
MO
JAV
E
EA
STE
RN
FT A
PAC
HE
HU
ALA
PAI
U.P.
R.R.
LAS VEGAS BLVD
CIV
ICLOSE
E
VGT
CHEYENNE
SIM
MO
NS
CAREY
OWENS
BR
UC
E
SAHARA
MAI
N
LAS
VEG
AS B
LVD
FREMONT
J S
T
TON
OPA
HM
LK
LAKE MEAD PE
CO
S
STEWART
BONANZA
ALEXANDER
SA
ND
HIL
L
FLAMINGO
TROPICANA
TWAIN
RUSSELL
SUNSET
KO
VAL
LAS
I-15
PE
CO
S
MA
RY
LAN
D
PAR
ADIS
E
VALL
EY
VIE
W
DE
CAT
UR
DESERT INNA
RV
ILLE
RANCHO
BU
FFA
LO
RA
INB
OW
US 95
TEN
AYA
JON
ES
LAKE
CHEYENNE
DEL WEBB
DU
RA
NG
O
SMOKE RANCH
ALEXANDER
US 95TE
NAY
A
SUMMERLIN PKWY
FT A
PAC
HE
CHARLESTON
VEGAS
TOR
RE
Y P
INE
SJO
NE
S
ANAS
AZI
TOW
N C
EN
TER
TROPICANA
FLAMINGO
SPRING MTN
DU
RA
NG
O BU
FFA
LO
DESERT INN
RA
INB
OW
JON
ES
OAKEY
WASHINGTON
RUSSELL
CRAIG
ANN
HU
ALA
PAI
CENTENNIAL215
US 95
ELKHORNSKY POINTE
OSO BLANCA
GRAND TETON
DE
CAT
UR
215
CIM
AR
RO
N
GOWAN
215CE
NTER
MEAD
CLI
FF S
HA
DO
W
215
ANN
CENTENNIAL
GOWAN
FARM
KYLECANYON
VICINITY MAP
BASIS OF DESIGN & CODE INFORMATION1. CODES: 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL PLUMBING AND MECHANICAL CODE 2011 NATIONAL ELECTRICAL CODE 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE 2012 INTERNATIONAL EXISTING BUILDING CODE 2010 AMERICANS WITH DISABILITIES ACT STANDARDS
2. CONSTRUCTION: TYPE B II
3. SCOPE OF WORK: DEMOLITION AND TENANT IMPROVEMENT WITHIN EXISTING BUILDING
BASIS OF DESIGN & CODE INFORMATION
UNIVERSITY OF NEVADA LAS VEGASLIED LIBRARY - LEISURE READING2ND FLOOR4505 S. MARYLAND PARKWAYLAS VEGAS, NEVADA 89119
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
SPECIFICATIONS
G1.03
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
03/S
PE
CIF
ICAT
ION
S/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. ProjectIdentification:UniversityofNevadaLasVegas,MarjorieBarrick LiedLibrary,LeisureReading.
1. ProjectLocation:UniversityofNevadaLasVegas,LiedLibrary,4505S.MarylandParkway,LasVegas,NV.
B. Owner: UniversityofNevadaLasVegas,4505S.MarylandParkway,LasVegas,NV89154.1. Owner'sRepresentative:PatrickCastellano,ProjectArchitect;phone,
702-895-1591.C. Architect:LGA,241W.CharlestonBlvd,Suite107,LasVegas,NV89102;
phone,702-263-7111andfax,702-263-8111.1.2 WORKCOVEREDBYCONTRACTDOCUMENTS
A. TheWorkofProjectisdefinedbytheContractDocumentsandconsistsofthefollowing:1. ThisprojectincludesdemolitionwithintheLeisureReadingwall,and
theconstructionofsoundonthewestwall,newhardlidceiling,lighting,electrical,andlowvoltageworkandfiresprinklermodificationsathardlidceiling.
B. TypeofContract. 1. Projectwillbeconstructedunderasingleprimecontract.1.3 ACCESSTOSITE
A. General: Contractor shall have limiteduseofProject site for constructionoperationsasindicatedbyrequirementsofthisSection.
B. UseofSite:LimituseofProjectsitetoareaprovidedbyUNLVforstorageofmaterials.Donotdisturbportionsofsitebeyondareasinwhichthestorageisallowed.
C. ConditionofExistingBuilding:Maintainportionsofexistingbuildingaffectedbyconstructionoperations inadust tightconditionthroughoutconstructionperiod.Repairdamagecausedbyconstructionoperations.Existingflooringmustbeprotected.
1.4 COORDINATIONWITHOCCUPANTSA. Full Owner Occupancy: Owner will occupy site and existing building(s)
duringentireconstructionperiod.CooperatewithOwnerduringconstructionoperations tominimize conflicts and facilitateOwner usage. Perform theWork soasnot to interferewithOwner's day-to-dayoperations. Maintainexistingexitsunlessotherwiseindicated.1. Maintainaccess toexistingwalkways,corridors,andotheradjacent
occupied or used facilities. Do not close or obstruct walkways,corridors,orotheroccupiedorusedfacilitieswithoutwrittenpermissionfromOwnerandapprovalofauthoritieshavingjurisdiction.
2. NotifyOwnernotlessthan72hoursinadvanceofactivitiesthatwillaffect Owner's operations. Noisy or disruptive work may requirecoordinationwithbuildingoccupants.
1.5 WORKRESTRICTIONSA. Work Restrictions, General: Comply with restrictions on construction
operations.B. On-SiteWorkHours:Limitworkintheexistingbuildingtobusinessworking
hours of 7:00am to 7:00pm, Monday through Friday, unless otherwiseindicated.Offhoursworkmaybeapprovedbyownerwithadvancednotice,atnoadditionalcost.
C. ExistingUtilityInterruptions:DonotinterruptutilitiesservingfacilitiesoccupiedbyOwnerorothersunlesspermittedunderthefollowingconditionsandthenonly after providing temporary utility services according to requirementsindicated:1. NotifyOwnernot less than twodays inadvanceofproposedutility
interruptions.2. Obtain Owner’s written permission before proceeding with utility
interruptions.D. Noise,Vibration,andOdors:Coordinateoperationsthatmayresultinhigh
levelsofnoiseandvibration,odors,orotherdisruptiontoOwneroccupancywithOwner.1. NotifyOwnernotlessthantwodaysinadvanceofproposeddisruptive
operations.2. ObtainOwner’swrittenpermissionbeforeproceedingwithdisruptive
operations.E. NonsmokingBuilding:Smokingisnotpermittedwithinthebuildingorwithin
25feetofentrances,operablewindows,oroutdoor-airintakes.F. Controlled Substances: Use of tobacco products and other controlled
substancesisnotpermitted.1.6 SPECIFICATIONANDDRAWINGCONVENTIONS
A. SpecificationContent:TheSpecificationsusecertainconventionsforthestyleoflanguageandtheintendedmeaningofcertainterms,words,andphraseswhenusedinparticularsituations.Theseconventionsareasfollows:1. Imperativemoodandstreamlinedlanguagearegenerallyusedinthe
Specifications. Thewords"shall,""shallbe,"or"shallcomplywith,"dependingonthecontext,areimpliedwhereacolon(:)isusedwithinasentenceorphrase.
2. SpecificationrequirementsaretobeperformedbyContractorunlessspecificallystatedotherwise.
B. Division01GeneralRequirements:RequirementsofSectionsinDivision01applytotheWorkofallSectionsintheSpecifications.
C. DrawingCoordination: Requirements formaterialsandproducts identifiedonDrawingsaredescribedindetailintheSpecifications.OneormoreofthefollowingareusedonDrawingstoidentifymaterialsandproducts:1. Terminology: Materials and products are identified by the typical
generictermsusedintheindividualSpecificationsSections.2. Keynoting:Materialsandproductsareidentifiedbyreferencekeynotes
referencing Specification Section numbers found in this ProjectManual.
ENDOFSECTION011000
SECTION012500-SUBSTITUTIONPROCEDURESPART 1 - GENERAL
1.7 SUMMARY
A. Section includes administrative and procedural requirements forsubstitutions.
B. RelatedRequirements:1. Division 01 Section "Product Requirements" for requirements for
submitting comparable product submittals for products by listedmanufacturers.
1.8 DEFINITIONSA. Substitutions:Changesinproducts,materials,equipment,andmethodsof
constructionfromthoserequiredbytheContractDocumentsandproposedbyContractor.
1.9 ACTIONSUBMITTALSA. SubstitutionRequests:Submitthreecopiesofeachrequestforconsideration.
Identifyproductorfabricationorinstallationmethodtobereplaced.IncludeSpecificationSectionnumberandtitleandDrawingnumbersandtitles.
1. SubstitutionRequestForm:UseCSIForm13.1A.2. Documentation:Showcompliancewithrequirementsforsubstitutions
andthefollowing,asapplicable:a. Statement indicating why specified product or fabrication or
installationcouldn’tbeprovided,ifapplicable.b. Coordinationinformation,includingalistofchangesorrevisions
needed to other parts of theWork that will be necessary toaccommodateproposedsubstitution.
c. ProductData,includingdrawingsanddescriptionsofproductsandfabricationandinstallationprocedures.
d. Samples,whereapplicableorrequested.e. Certificates and qualification data, where applicable or
requested.f. Materialtestreportsfromaqualifiedtestingagencyindicating
and interpretingtestresults forcompliancewithrequirementsindicated.
g. Detailed comparison of Contractor's construction scheduleusing proposed substitution with products specified for theWork,includingeffectontheoverallContractTime.Ifspecifiedproduct ormethod of construction cannot be providedwithinthe Contract Time, include letter from manufacturer, onmanufacturer's letterhead,statingdateof receiptofpurchaseorder,lackofavailability,ordelaysindelivery.
h. Costinformation,includingaproposalofchange,ifany,intheContractSum.
i. Contractor's certification that proposed substitution complieswithrequirementsintheContractDocumentsexceptasindicatedin substitution request, is compatible with related materials,and is appropriate for applications indicated. Substitutionsrequiredmustbeissuedduringbiddingifduetoschedulingorprocurementconflict.
j. Contractor'swaiverofrightstoadditionalpaymentortimethatmay subsequently become necessary because of failure ofproposedsubstitutiontoproduceindicatedresults.
3. Architect's Action: If necessary, Architect will request additionalinformation or documentation for evaluation within seven days ofreceiptofa request for substitution. Architectwill notifyContractorofacceptanceorrejectionofproposedsubstitutionwithin15daysofreceiptofrequest,orsevendaysofreceiptofadditionalinformationordocumentation,whicheverislater.a. Forms ofAcceptance: ChangeOrder, Construction Change
Directive, or Architect's Supplemental Instructions for minorchangesintheWork.
b. UseproductspecifiedifArchitectdoesnotissueadecisiononuseofaproposedsubstitutionwithintimeallocated.
1.10 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibilityof proposed substitution with related products and materials. Engage aqualified testing agency to perform compatibility tests recommended bymanufacturers.
PART2- PRODUCTS2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately ondiscoveryofneedforchange,butnotlaterthan15dayspriortotimerequiredforpreparationandreviewofrelatedsubmittals.1. Conditions:ArchitectwillconsiderContractor'srequestforsubstitution
whenthefollowingconditionsaresatisfied:a. Requested substitution is consistent with the Contract
Documentsandwillproduceindicatedresults.b. Requested substitution will not adversely affect Contractor's
constructionschedule.c. Requested substitution has received necessary approvals of
authoritieshavingjurisdiction.d. Requestedsubstitutioniscompatiblewithotherportionsofthe
Work.e. Requestedsubstitutionhasbeencoordinatedwithotherportions
oftheWork.f. Requestedsubstitutionprovidesspecifiedwarranty.g. If requested substitution involves more than one contractor,
requestedsubstitutionhasbeencoordinatedwithotherportionsoftheWork,isuniformandconsistent,iscompatiblewithotherproducts,andisacceptabletoallcontractorsinvolved.
B. SubstitutionforConvenience:Notallowed.ENDOFSECTION012500
SECTION012600-CONTRACTMODIFICATIONPROCEDURESPART 1 - GENERAL
1.1 SUMMARY
A. SectionincludesadministrativeandproceduralrequirementsforhandlingandprocessingContractmodifications.
1.2 MINORCHANGESINTHEWORKA. Architectwill issuesupplemental instructionsauthorizingminorchanges in
theWork,notinvolvingadjustmenttotheContractSumortheContractTime,onAIADocumentG710,"Architect'sSupplementalInstructions."
1.3 PROPOSALREQUESTSA. Owner-InitiatedProposalRequests:Architectwillissueadetaileddescription
of proposed changes in the Work that may require adjustment to theContractSumortheContractTime.Ifnecessary,thedescriptionwillincludesupplementalorrevisedDrawingsandSpecifications.1. Work Change Proposal Requests issued by Architect are not
instructionseithertostopworkinprogressortoexecutetheproposedchange.
2. Within10daysafterreceiptofProposalRequest,submitaquotationestimating cost adjustments to theContract Sum and theContractTimenecessarytoexecutethechange.a. Includea list of quantities of products required or eliminated
andunitcosts,with totalamountofpurchasesandcredits tobe made. If requested, furnish survey data to substantiatequantities.
b. Indicateapplicable taxes,deliverycharges,equipment rental,andamountsoftradediscounts.
c. Includecostsoflaborandsupervisiondirectlyattributabletothechange.
d. Include an updated Contractor's construction schedule thatindicatestheeffectofthechange,including,butnotlimitedto,changesinactivityduration,startandfinishtimes,andactivityrelationship. Use available total float before requesting anextensionoftheContractTime.
e. QuotationForm:UseCSIForm13.6D,"ProposalWorksheetSummary,"andForm13.6C,"ProposalWorksheetDetail."
B. Contractor-InitiatedWorkChangeProposals:Iflatentorchangedconditionsrequire modifications to the Contract, Contractor may initiate a claim bysubmittingarequestforachangetoArchitect.1. Includeastatementoutliningreasons for thechangeand theeffect
of the changeon theWork. Providea completedescriptionof theproposedchange.IndicatetheeffectoftheproposedchangeontheContractSumandtheContractTime.
2. Include a list of quantities of products required or eliminated andunitcosts,withtotalamountofpurchasesandcreditstobemade.Ifrequested,furnishsurveydatatosubstantiatequantities.
3. Indicate applicable taxes, delivery charges, equipment rental, andamountsoftradediscounts.
4. Include costs of labor and supervision directly attributable to thechange.
5. IncludeanupdatedContractor'sconstructionschedulethatindicatestheeffectofthechange,including,butnotlimitedto,changesinactivityduration,startandfinishtimes,andactivityrelationship.UseavailabletotalfloatbeforerequestinganextensionoftheContractTime.
6. Comply with requirements in Division 01 Section "SubstitutionProcedures" if the proposed change requires substitution of oneproductorsystemforproductorsystemspecified.
7. WorkChangeProposalRequestForm:UseCSIForm13.6A,"ChangeOrder Request (Proposal)," with attachments CSI Form 13.6D,"Proposal Worksheet Summary," and Form 13.6C, "ProposalWorksheetDetail."
1.4 CHANGEORDERPROCEDURESA. OnOwner'sapprovalofaWorkChangesProposalRequest,ownerwillissue
aChangeOrderforsignaturesofArchitectandContractor.1.5 CONSTRUCTIONCHANGEDIRECTIVE
A. ConstructionChangeDirective:Ownerwitharchitect’sagreementmayissueaConstructionChangeDirective. ConstructionChangeDirective instructsContractortoproceedwithachangeintheWork,forsubsequentinclusioninaChangeOrder.1. Construction Change Directive contains a complete description of
change in theWork. It also designates method to be followed todeterminechangeintheContractSumortheContractTime.
B. Documentation: Maintaindetailedrecordsona timeandmaterialbasisofworkrequiredbytheConstructionChangeDirective.1. Aftercompletionofchange,submitanitemizedaccountandsupporting
data necessary to substantiate cost and time adjustments to theContract.
ENDOFSECTION012600
SECTION012900-PAYMENTPROCEDURESPART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements necessary toprepareandprocessApplicationsforPayment.
B. RelatedRequirements:Division01Section"ContractModificationProcedures"foradministrativeprocedures
forhandlingchangestotheContract.1.2 SCHEDULEOFVALUES
A. Coordination: Coordinate preparation of the schedule of values withpreparationofContractor'sconstructionschedule.1. Coordinate line items in the scheduleof valueswithother required
administrativeformsandschedules,includingthefollowing:a. ApplicationforPaymentformswithcontinuationsheets.b. Submittalschedule.c. Items required to be indicated as separate activities in
Contractor'sconstructionschedule.2. SubmitthescheduleofvaluestoArchitectatearliestpossibledatebut
no later thansevendaysbeforethedatescheduledforsubmittalofinitialApplicationsforPayment.
B. Format andContent: Provide at least one line item for eachSpecificationSection.
1. Identification: Include the following Project identification on thescheduleofvalues:a. Projectnameandlocation.b. NameofArchitect.c. Architect'sprojectnumber.d. Contractor'snameandaddress.e. Dateofsubmittal.f. UNLVPO#andproject#
2. Arrange schedule of values consistent with format ofAIADocumentG703.
3. ProvideabreakdownoftheContractSuminenoughdetailtofacilitatecontinuedevaluationofApplicationsforPaymentandprogressreports.ProvidemultiplelineitemsforprincipalsubcontractamountsinexcessoffivepercentoftheContractSum.
4. Roundamountstonearestwholedollar;totalshallequaltheContractSum.
5. EachiteminthescheduleofvaluesandApplicationsforPaymentshallbecomplete. Include totalcostandproportionateshareofgeneraloverheadandprofitforeachitem.
C. EachApplicationforPaymentshallbeconsistentwithpreviousapplicationsandpaymentsascertifiedbyArchitectandpaidforbyOwner.
D. PaymentApplicationTimes:SubmitApplicationforPaymenttoArchitectbythefirstofthemonth.TheperiodcoveredbyeachApplicationforPaymentisonemonth,endingonthelastdayofthemonth.
E. Application for Payment Forms: Use AIA Document G702 andAIADocumentG703asformforApplicationsforPayment.
F. ApplicationPreparation:Completeeveryentryonform.Notarizeandexecuteby a person authorized to sign legal documents on behalf of Contractor.Architectwillreturnincompleteapplicationswithoutaction.1. EntriesshallmatchdataonthescheduleofvaluesandContractor's
construction schedule. Use updated schedules if revisions weremade.
2. Include amounts of Change Orders and Construction ChangeDirectives issuedbefore last dayof constructionperiod coveredbyapplication.
G. Transmittal:SubmitonesignedandnotarizedoriginalcopyofeachApplicationforPaymenttoArchitectbyamethodensuringreceipt.Onecopyshallincludewaiversoflienandsimilarattachmentsifrequired.1. Transmit each copywith a transmittal form listing attachments and
recordingappropriateinformationaboutapplication.H. Waivers of Mechanic's Lien: With eachApplication for Payment, submit
waiversofmechanic'slienfromentitieslawfullyentitledtofileamechanic'slienarisingoutoftheContractandrelatedtotheWorkcoveredbythepayment.1. Submitpartialwaiversoneachitemforamountrequestedinprevious
application,afterdeductionforretainage,oneachitem.
2. Whenanapplicationshowscompletionofanitem,submitconditionalfinalorfullwaivers.
3. Ownerreservestheright todesignatewhichentities involved in theWorkmustsubmitwaivers.
4. WaiverForms:SubmitexecutedwaiversoflienonformsacceptabletoOwner.
I. InitialApplicationforPayment:AdministrativeactionsandsubmittalsthatmustprecedeorcoincidewithsubmittaloffirstApplicationforPaymentincludethefollowing:1. Listofsubcontractors.2. Scheduleofvalues.3. Contractor'sconstructionschedule(preliminaryifnotfinal).4. Submittalschedule(preliminaryifnotfinal).5. ListofContractor'sstaffassignments.6. Copiesofbuildingpermits.7. Copies of authorizations and licenses from authorities having
jurisdictionforperformanceoftheWork.8. Initialprogressreport.9. Certificatesofinsuranceandinsurancepolicies.
J. Application for Payment at Substantial Completion: AfterArchitect issuestheCertificateofSubstantialCompletion,submitanApplicationforPaymentshowing100percentcompletionforportionoftheWorkclaimedassubstantiallycomplete.1. IncludedocumentationsupportingclaimthattheWorkissubstantially
completeandastatementshowinganaccountingofchangestotheContractSum.
2. This application shall reflect Certificates of Partial SubstantialCompletion issued previously for Owner occupancy of designatedportionsoftheWork.
K. FinalPaymentApplication:AftercompletingProjectcloseoutrequirements,submit final Application for Payment with releases and supportingdocumentation not previously submitted and accepted, including, but notlimited,tothefollowing:1. EvidenceofcompletionofProjectcloseoutrequirements.2. Insurancecertificates forproductsandcompletedoperationswhere
requiredandproofthattaxes,fees,andsimilarobligationswerepaid.3. Updatedfinalstatement,accountingforfinalchangestotheContract
Sum.4. AIADocumentG706-1994,"Contractor'sAffidavitofPaymentofDebts
andClaims."5. AIA Document G706A-1994, "Contractor's Affidavit of Release of
Liens."6. AIADocumentG707-1994,"ConsentofSuretytoFinalPayment."7. Evidencethatclaimshavebeensettled.8. Finalmeterreadingsforutilities,ameasuredrecordofstoredfuel,and
similardataasofdateofSubstantialCompletionorwhenOwnertookpossessionofandassumedresponsibilityforcorrespondingelementsoftheWork.
9. Finalliquidateddamagessettlementstatement.ENDOFSECTION012900
SECTION013300-SUBMITTALPROCEDURESPART 1 - GENERAL
1.1 SUMMARY
A. Sectionincludesrequirementsforthesubmittalscheduleandadministrativeandprocedural requirements forsubmittingShopDrawings,ProductData,Samples,andothersubmittals.
B. RelatedRequirements:1. Division 01 Section "Construction Progress Documentation" for
submittingschedulesandreports,includingContractor'sconstructionschedule.
2. Division01Section"OperationandMaintenanceData"forsubmittingoperationandmaintenancemanuals.
3. Division01Section"ProjectRecordDocuments"forsubmittingrecordDrawings,recordSpecifications,andrecordProductData.
4. Division01Section"DemonstrationandTraining"forsubmittingvideorecordings of demonstration of equipment and training of Owner'spersonnel.
1.2 DEFINITIONSA. ActionSubmittals:Writtenandgraphicinformationandphysicalsamplesthat
requireArchitect'sresponsiveaction.B. Informational Submittals: Written and graphic information and physical
samplesthatdonotrequireArchitect'sresponsiveaction.Submittalsmayberejectedfornotcomplyingwithrequirements.
1.3 ACTIONSUBMITTALSA. SubmittalSchedule:Submitascheduleofsubmittals,arrangedinchronological
orderbydatesrequiredbyconstructionschedule.Includetimerequiredforreview,ordering,manufacturing,fabrication,anddeliverywhenestablishingdates.IncludeadditionaltimerequiredformakingcorrectionsorrevisionstosubmittalsnotedbyArchitectandadditionaltimeforhandlingandreviewingsubmittalsrequiredbythosecorrections.
1.4 SUBMITTALADMINISTRATIVEREQUIREMENTSA. Architect'sDigital Data Files: Electronic copies of digital data files of the
ContractDrawingswillnotbeprovidedbyArchitect forContractor'suse inpreparingsubmittals.
B. Coordination: Coordinate preparation and processing of submittals withperformanceofconstructionactivities.1. Coordinate each submittal with fabrication, purchasing, testing,
delivery,othersubmittals,andrelatedactivitiesthatrequiresequentialactivity.
2. Coordinatetransmittalofdifferenttypesofsubmittalsforrelatedpartsof theWork so processingwill not be delayed because of need toreviewsubmittalsconcurrentlyforcoordination.a. Architect reserves the right towithhold action on a submittal
requiring coordination with other submittals until relatedsubmittalsarereceived.
C. Processing Time: Allow time for submittal review, including time for re-submittals,asfollows.TimeforreviewshallcommenceonArchitect’sreceiptofsubmittal.NoextensionoftheContractTimewillbeauthorizedbecauseof failure to transmit submittals enough in advance of theWork to permitprocessing,includingre-submittals.1. InitialReview:Allow8daysforinitialreviewofeachsubmittal.Allow
additionaltimeifcoordinationwithsubsequentsubmittalsisrequired.Architect will advise Contractor when a submittal being processedmustbedelayedforcoordination.
2. IntermediateReview:Ifintermediatesubmittalisnecessary,processitinsamemannerasinitialsubmittal.
3. Re-submittalReview:Allow8daysforreviewofeachre-submittal.D. PaperSubmittals:Placeapermanentlabelortitleblockoneachsubmittal
itemforidentification.
SPECIFICATIONS
CONTINUED ON G1.04
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
SPECIFICATIONS
G1.04
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
04/S
PE
CIF
ICAT
ION
S/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
1. Indicatenameoffirmorentitythatpreparedeachsubmittalonlabelortitleblock.
2. Provideaspaceapproximately6by8inchesonlabelorbesidetitleblocktorecordContractor'sreviewandapprovalmarkingsandactiontakenbyArchitect.
3. Includethefollowinginformationforprocessingandrecordingactiontaken:a. Projectname.b. Date.c. NameofArchitect.d. NameofConstructionManager.e. NameofContractor.f. Nameofsubcontractor.g. Nameofsupplier.h. Nameofmanufacturer.i. Submittalnumberorotheruniqueidentifier, includingrevision
identifier.1) SubmittalnumbershalluseSpecificationSectionnumber
followed by a decimal point and then a sequentialnumber (e.g.,061000.01). Re-submittalsshall includean alphabetic suffix after another decimal point (e.g.,061000.01.A).
j. NumberandtitleofappropriateSpecificationSection.k. Drawingnumberanddetailreferences,asappropriate.l. Location(s)whereproductistobeinstalled,asappropriate.m. Othernecessaryidentification.
E. ElectronicSubmittals:Identifyandincorporateinformationineachelectronicsubmittalfileasfollows:1. Assemble complete submittal package into a single indexed file
incorporatingsubmittalrequirementsofasingleSpecificationSectionandtransmittalformwithlinksenablingnavigationtoeachitem.
2. Namefilewithsubmittalnumberorotherunique identifier, includingrevisionidentifier.a. FilenameshalluseprojectidentifierandSpecificationSection
number followed by a decimal point and then a sequentialnumber (e.g., LNHS-061000.01). Resubmittals shall includean alphabetic suffix after another decimal point (e.g., LNHS-061000.01.A).
3. ProvidemeansforinsertiontopermanentlyrecordContractor'sreviewandapprovalmarkingsandactiontakenbyArchitect.
4. Transmittal Form for Electronic Submittals: Use electronic formacceptabletoOwner,containingthefollowinginformation:a. Projectname.b. Date.c. NameandaddressofArchitect.d. NameofConstructionManager.e. NameofContractor.f. Nameoffirmorentitythatpreparedsubmittal.g. Namesofsubcontractor,manufacturer,andsupplier.h. Categoryandtypeofsubmittal.i. Submittalpurposeanddescription.j. SpecificationSectionnumberandtitle.k. Specification paragraph number or drawing designation and
genericnameforeachofmultipleitems.l. Drawingnumberanddetailreferences,asappropriate.m. Location(s)whereproductistobeinstalled,asappropriate.n. Relatedphysicalsamplessubmitteddirectly.o. Indicationoffullorpartialsubmittal.p. Transmittalnumber,numberedconsecutively.q. Submittalandtransmittaldistributionrecord.r. Othernecessaryidentification.s. Remarks.
F. Deviations:IdentifydeviationsfromtheContractDocumentsonsubmittals.G. Re-submittals: Makere-submittals insameformandnumberofcopiesas
initialsubmittal.1. Notedateandcontentofprevioussubmittal.2. Note date and content of revision in label or title block and clearly
indicateextentofrevision.3. Resubmitsubmittalsuntiltheyaremarkedwithapprovalnotationfrom
Architect's-actionstamp.H. Distribution:Furnishcopiesoffinalsubmittalstomanufacturers,subcontractors,
suppliers,fabricators,installers,authoritieshavingjurisdiction,andothersasnecessary forperformanceof constructionactivities. Showdistributionontransmittalforms.
I. UseforConstruction:RetaincompletecopiesofsubmittalsonProjectsite.UseonlyfinalactionsubmittalsthataremarkedwithapprovalnotationfromArchitect'sactionstamp.
PART2- PRODUCTS2.1 SUBMITTALPROCEDURES
A. GeneralSubmittalProcedureRequirements:1. SubmitelectronicsubmittalsviaemailasPDFelectronicfiles.
a. Architect will return annotated file. Annotate and retain onecopyoffileasanelectronicProjectrecorddocumentfile.
2. ActionSubmittals:Submitthreepapercopiesofeachsubmittalunlessotherwiseindicated.Architectwillreturntwocopies.
3. CertificatesandCertificationsSubmittals: Provideastatement thatincludes signature of entity responsible for preparing certification.Certificates and certifications shall be signedby anofficer or otherindividualauthorizedtosigndocumentsonbehalfofthatentity.a. Provideanotarizedstatementonoriginalpapercopycertificates
andcertificationswhereindicated.B. ProductData:Collectinformationintoasinglesubmittalforeachelementof
constructionandtypeofproductorequipment.1. If information must be specially prepared for submittal because
standard published data are not suitable for use, submit as ShopDrawings,notasProductData.
2. Markeachcopyofeachsubmittaltoshowwhichproductsandoptionsareapplicable.
3. Includethefollowinginformation,asapplicable:a. Manufacturer'scatalogcuts.b. Manufacturer'sproductspecifications.c. Standardcolorcharts.d. Statementofcompliancewithspecifiedreferencedstandards.e. Testingbyrecognizedtestingagency.f. Applicationoftestingagencylabelsandseals.g. Notationofcoordinationrequirements.h. Availabilityanddeliverytimeinformation.
4. For equipment, include the following in addition to the above, asapplicable:a. Wiringdiagramsshowingfactory-installedwiring.
b. Printedperformancecurves.c. Operationalrangediagrams.d. Clearancesrequiredtootherconstruction,ifnotindicatedon
accompanyingShopDrawings.5. SubmitProductDatabeforeorconcurrentwithSamples.6. SubmitProductDatainthefollowingformat:
a. PDFelectronicfile.b. ThreepapercopiesofProductDataunlessotherwiseindicated.
Architectwillreturntwocopies.C. Shop Drawings: Prepare Project-specific information, drawn accurately
to scale. Do not base Shop Drawings on reproductions of the ContractDocumentsorstandardprinteddata.1. Preparation:FullyillustraterequirementsintheContractDocuments.
Includethefollowinginformation,asapplicable:a. Identificationofproducts.b. Schedules.c. Compliancewithspecifiedstandards.d. Notationofcoordinationrequirements.e. Notationofdimensionsestablishedbyfieldmeasurement.f. Relationshipandattachment toadjoiningconstructionclearly
indicated.g. Sealandsignatureofprofessionalengineerifspecified.
2. Sheet Size: Except for templates, patterns, and similar full-sizedrawings,submitShopDrawingsonsheetsatleast8-1/2by11inches,butnolargerthan22by34inches.
3. SubmitShopDrawingsinthefollowingformat:a. PDFelectronicfile.b. Three opaquecopiesofeachsubmittal. Architectwill retain
onecopies;remainderwillbereturned.D. CoordinationDrawingsSubmittals: Complywith requirementsspecified in
Division01Section"ProjectManagementandCoordination."E. Contractor'sConstructionSchedule:Complywithrequirementsspecifiedin
Division01Section"ConstructionProgressDocumentation."F. ApplicationforPaymentandScheduleofValues:Complywithrequirements
specifiedinDivision01Section"PaymentProcedures."G. Closeout Submittals and Maintenance Material Submittals: Comply with
requirementsspecifiedinDivision01Section"CloseoutProcedures."H. MaintenanceData:ComplywithrequirementsspecifiedinDivision01Section
"OperationandMaintenanceData."I. QualificationData:Preparewritteninformationthatdemonstratescapabilities
andexperienceoffirmorperson. Include listsofcompletedprojectswithprojectnamesandaddresses,contactinformationofarchitectsandowners,andotherinformationspecified.
PART3- EXECUTION3.1 CONTRACTOR'SREVIEW
A. ActionandInformationalSubmittals: Revieweachsubmittalandcheckforcoordination with otherWork of theContract and for compliancewith theContract Documents. Note corrections and field dimensions. Mark withapprovalstampbeforesubmittingtoArchitect.
B. ProjectCloseoutandMaintenanceMaterialSubmittals:SeerequirementsinDivision01Section"CloseoutProcedures."
C. Approval Stamp: Stamp each submittal with a uniform, approval stamp.IncludeProjectnameandlocation,submittalnumber,SpecificationSectiontitle and number, name of reviewer, date of Contractor's approval, andstatementcertifyingthatsubmittalhasbeenreviewed,checked,andapprovedforcompliancewiththeContractDocuments.
3.2 ARCHITECT'SACTIONA. General: Architectwillnot reviewsubmittals thatdonotbearContractor's
approvalstampandwillreturnthemwithoutaction.B. Action Submittals: Architect will review each submittal, make marks to
indicatecorrectionsorrevisionsrequired,andreturnit.Architectwillstampeach submittalwith an action stampandwillmark stampappropriately toindicateaction.
C. Incompletesubmittalsareunacceptable,willbeconsiderednon-responsive,andwillbereturnedforre-submittalwithoutreview.
D. SubmittalsnotrequiredbytheContractDocumentsmaynotbereviewedandmaybediscarded.
ENDOFSECTION013300.
SECTION015000-TEMPORARYFACILITIESANDCONTROLSPART 1 - GENERAL
1.1 SUMMARY
A. Section includesrequirements for temporaryutilities,support facilities,andsecurityandprotectionfacilities.
B. RelatedRequirements:1. Division01Section"Summary"forworkrestrictionsandlimitationson
utilityinterruptions.1.2 USECHARGES
A. WaterandSewerServicefromExistingSystem:WaterfromOwner'sexistingwatersystemisavailable forusewithoutmeteringandwithoutpaymentofusecharges.Provideconnectionsandextensionsofservicesasrequiredforconstructionoperations.
B. ElectricPowerServicefromExistingSystem:ElectricpowerfromOwner'sexistingsystemisavailableforusewithoutmeteringandwithoutpaymentofusecharges.Provideconnectionsandextensionsofservicesasrequiredforconstructionoperations.
1.3 INFORMATIONALSUBMITTALSA. Fire-SafetyProgram:ShowcompliancewithrequirementsofNFPA241and
authoritieshavingjurisdiction.IndicateContractorpersonnelresponsibleformanagementoffirepreventionprogram.
1.4 QUALITYASSURANCEA. Accessible Temporary Egress: Comply with applicable provisions in the
U.S.Architectural&TransportationBarriersComplianceBoard'sADA-ABAAccessibilityGuidelinesandICC/ANSIA117.1.
PART2- PRODUCTS2.1 EQUIPMENT
A. FireExtinguishers:Portable,ULrated;withclassandextinguishingagentasrequiredbylocationsandclassesoffireexposures.
PART3- EXECUTION3.1 TEMPORARYUTILITYINSTALLATION
A. Lighting: Provide temporary lighting with local switching that providesadequateilluminationforconstructionoperations,observations,inspections,andtrafficconditions.1. Installandoperatetemporarylightingthatfulfillssecurityandprotection
requirementswithoutoperatingentiresystem.B. TelephoneService:
1. Provide superintendent with cellular telephone or portable two-wayradioforusewhenawayfromfieldoffice.
3.2 SECURITYANDPROTECTIONFACILITIESINSTALLATION
A. EnvironmentalProtection: Provideprotection,operate temporary facilities,andconductconstructionasrequiredtocomplywithenvironmentalregulationsand that minimize possible air, waterway, and subsoil contamination orpollutionorotherundesirableeffects.
B. TemporaryPartitions:Providefloor-to-ceilingdustproofpartitionstolimitdustanddirtmigrationandtoseparateareasoccupiedbyOwnerfromfumesandnoise.
1. Construct dustproof partitionswith two layers of 6-mil polyethylenesheetoneachside.Coverfloorwithtwolayersof6-milpolyethylenesheet,extendingsheets18inchesupthesidewalls.Overlapandtapefulllengthofjoints.Coverfloorwithfire-retardant-treatedplywood.
2. Insulatepartitionstocontrolnoisetransmissiontooccupiedareas.3. Seal jointsandperimeter. Equippartitionswithgasketeddustproof
doorsandsecuritylockswhereopeningsarerequired.4. Protectair-handlingequipment.5. Providewalk-offmatsateachentrancethroughtemporarypartition.
C. TemporaryFireProtection:Installandmaintaintemporaryfire-protectionfacilitiesof types needed to protect against reasonably predictable and controllable fire losses.ComplywithNFPA241;managefirepreventionprogram.
1. Prohibitsmokinginconstructionareas.2. Supervise welding operations, combustion-type temporary heating
units,andsimilarsourcesoffireignitionaccordingtorequirementsofauthoritieshavingjurisdiction.
3. Develop and supervise an overall fire-prevention and -protectionprogram forpersonnelatProjectsite. Reviewneedswith localfiredepartmentandestablishprocedurestobefollowed.Instructpersonnelinmethodsandprocedures.Postwarningsandinformation.
4. Provide temporary standpipes and hoses for fire protection. Hanghoseswith awarning sign stating that hoses are for fire-protectionpurposesonlyandarenottoberemoved.Matchhosesizewithoutletsizeandequipwithsuitablenozzles.
3.3 OPERATION,TERMINATION,ANDREMOVALA. Supervision: Enforce strict discipline in use of temporary facilities. To
minimizewasteandabuse,limitavailabilityoftemporaryfacilitiestoessentialandintendeduses.
B. Maintenance:Maintainfacilitiesingoodoperatingconditionuntilremoval.1. Maintainoperationof temporaryenclosures,heating,cooling,
humiditycontrol,ventilation,andsimilarfacilitiesona24-hourbasiswhererequiredtoachieveindicatedresultsandtoavoidpossibilityofdamage.
C. TerminationandRemoval: Removeeachtemporary facilitywhenneedforits service has ended,when it has been replaced by authorized use of apermanent facility, or no later than Substantial Completion. Complete or,if necessary, restore permanent construction thatmayhavebeendelayedbecauseofinterferencewithtemporaryfacility.RepairdamagedWork,cleanexposed surfaces, and replace construction that cannot be satisfactorilyrepaired.1. Materialsandfacilitiesthatconstitutetemporaryfacilitiesareproperty
ofContractor.2. At Substantial Completion, repair, renovate, and clean permanent
facilitiesusedduringconstructionperiod.ComplywithfinalcleaningrequirementsspecifiedinDivision01Section"CloseoutProcedures."
ENDOFSECTION015000
SECTION016000-PRODUCTREQUIREMENTSPART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for selectionof products for use in Project; product delivery, storage, and handling;manufacturers' standard warranties on products; special warranties; andcomparableproducts.
B. RelatedRequirements:1. Division 01 Section "Substitution Procedures" for requests for
substitutions.1.2 DEFINITIONS
A. Products:ItemsobtainedforincorporatingintotheWork,whetherpurchasedforProject or taken frompreviously purchased stock. The term "product"includes the terms "material," "equipment," "system," and terms of similarintent.
1. NamedProducts: Itemsidentifiedbymanufacturer'sproductname,includingmakeormodelnumberorotherdesignationshownorlistedinmanufacturer's published product literature, that is current as ofdateoftheContractDocuments.
2. NewProducts:Itemsthathavenotpreviouslybeenincorporatedintoanotherprojectorfacility.Productssalvagedorrecycledfromotherprojectsarenotconsiderednewproducts.
3. Comparable Product: Product that is demonstrated and approvedthrough submittal process to have the indicatedqualities related totype,function,dimension,in-serviceperformance,physicalproperties,appearance,andothercharacteristicsthatequalorexceedthoseofspecifiedproduct.
1.3 ACTIONSUBMITTALSA. ComparableProductRequests: Submit request for consideration of each
comparable product. Identify product or fabrication or installationmethodtobereplaced.IncludeSpecificationSectionnumberandtitleandDrawingnumbersandtitles.1. Architect's Action: If necessary, Architect will request additional
informationordocumentationforevaluationwithinoneweekofreceiptofacomparableproduct request. ArchitectwillnotifyContractorofapprovalorrejectionofproposedcomparableproductrequestwithin15daysofreceiptofrequest,orSEVENdaysofreceiptofadditionalinformationordocumentation,whicheverislater.a. FormofApproval:AsspecifiedinDivision01Section"Submittal
Procedures."b. UseproductspecifiedifArchitectdoesnotissueadecisionon
useofacomparableproductrequestwithintimeallocated.1.4 QUALITYASSURANCE
A. CompatibilityofOptions:IfContractorisgivenoptionofselectingbetweentwoormoreproductsforuseonProject,selectproductcompatiblewithproductspreviouslyselected,evenifpreviouslyselectedproductswerealsooptions.
1.5 PRODUCTDELIVERY,STORAGE,ANDHANDLINGA. Deliver,store,andhandleproductsusingmeansandmethodsthatwillprevent
damage,deterioration,andloss,includingtheftandvandalism.Complywithmanufacturer'swritteninstructions.
B. DeliveryandHandling:1. Scheduledeliverysothatthereisnostoragewithintheworkarea.All
shorttermstorageshallbeincontainersinalocationagreedtobytheOwner.
2. Deliver products to Project site in an undamaged condition inmanufacturer'soriginalsealedcontainerorotherpackagingsystem,
completewithlabelsandinstructionsforhandling,storing,unpacking,protecting,andinstalling.
3. Inspect products on delivery to determine compliance with theContractDocumentsandtodeterminethatproductsareundamagedandproperlyprotected.
C. Storage:1. Storeproductstoallowforinspectionandmeasurementofquantityor
countingofunits.2. StorematerialsinamannerthatwillnotendangerProjectstructure.3. Store products that are subject to damage by the elements, under
cover in a weathertight enclosure above ground, with ventilationadequatetopreventcondensation.
4. Complywithproductmanufacturer'swritteninstructionsfortemperature,humidity, ventilation, and weather-protection requirements forstorage.
1.6 PRODUCTWARRANTIESA. WarrantiesspecifiedinotherSectionsshallbeinadditionto,andrunconcurrent
with,otherwarrantiesrequiredbytheContractDocuments.Manufacturer'sdisclaimersandlimitationsonproductwarrantiesdonotrelieveContractorofobligationsunderrequirementsoftheContractDocuments.1. Manufacturer's Warranty: Written warranty furnished by individual
manufacturer for a particular product and specifically endorsed bymanufacturertoOwner.
2. SpecialWarranty:WrittenwarrantyrequiredbytheContractDocumentstoprovidespecificrightsforOwner.
B. SpecialWarranties: Prepareawrittendocument thatcontainsappropriatetermsandidentification,readyforexecution.1. Manufacturer'sStandardForm: Modified to includeProject-specific
informationandproperlyexecuted.2. Specified Form: When specified forms are included with the
Specifications, prepare a written document using indicated formproperlyexecuted.
3. Refer to Divisions 02 through 33. Sections for specific contentrequirements and particular requirements for submitting specialwarranties.
C. SubmittalTime:ComplywithrequirementsinDivision01Section"CloseoutProcedures."
PART2- PRODUCTS2.1 PRODUCTSELECTIONPROCEDURES
A. General Product Requirements: Provide products that comply with theContractDocuments,areundamagedand,unlessotherwise indicated,arenewattimeofinstallation.1. Provide products completewith accessories, trim, finish, fasteners,
andotheritemsneededforacompleteinstallationandindicateduseandeffect.
2. Standard Products: If available, and unless custom products ornonstandardoptionsarespecified,providestandardproductsoftypesthathavebeenproducedandusedsuccessfullyinsimilarsituationsonotherprojects.
3. OwnerreservestherighttolimitselectiontoproductswithwarrantiesnotinconflictwithrequirementsoftheContractDocuments.
4. Whereproductsareaccompaniedbytheterm"asselected,"Architectwillmakeselection.
5. Descriptive,performance,andreferencestandardrequirementsintheSpecificationsestablishsalientcharacteristicsofproducts.
ENDOFSECTION016000
SECTION017300-EXECUTIONPART 1 - GENERAL
1.1 SUMMARY
A. Section includes general administrative and procedural requirementsgoverningexecutionoftheWorkincluding,butnotlimitedto,thefollowing:1. Constructionlayout.2. Fieldengineeringandsurveying.3. InstallationoftheWork.4. Cuttingandpatching.5. CoordinationofOwner-installedproducts.6. Progresscleaning.7. Startingandadjusting.8. Protectionofinstalledconstruction.9. CorrectionoftheWork.
B. RelatedRequirements:1. Division01Section"Summary"forlimitsonuseofProjectsite.2. Division01Section"CloseoutProcedures"forsubmittingfinalproperty
surveywithProjectRecordDocuments,recordingofOwner-accepteddeviationsfromindicatedlinesandlevels,andfinalcleaning.
3. Division07Section"PenetrationFirestopping"forpatchingpenetrationsinfire-ratedconstruction.
1.2 QUALITY ASSURANCE
A. CuttingandPatching:Complywithrequirementsforandlimitationsoncuttingandpatchingofconstructionelements.1. OperationalElements:Donotcutandpatchoperatingelementsand
relatedcomponentsinamannerthatresultsinreducingtheircapacityto performas intendedor that results in increasedmaintenanceordecreasedoperationallifeorsafety.
2. OtherConstructionElements:Donotcutandpatchotherconstructionelementsorcomponents inamanner thatcouldchange their load-carrying capacity, that results in reducing their capacity to performas intended,or that results in increasedmaintenanceordecreasedoperationallifeorsafety.
3. VisualElements:Donotcutandpatchconstructioninamannerthatresults in visual evidence of cutting and patching. Do not cut andpatch exposed construction in a manner that would, in Architect'sopinion,reducethebuilding'saestheticqualities.Removeandreplaceconstructionthathasbeencutandpatchedinavisuallyunsatisfactorymanner.
PART2- PRODUCTS2.1 MATERIALS
A. General:ComplywithrequirementsspecifiedinotherSections.B. In-PlaceMaterials:Usematerialsforpatchingidenticaltoin-placematerials.
For exposed surfaces, usematerials that visuallymatch in-place adjacentsurfacestothefullestextentpossible.1. Ifidenticalmaterialsareunavailableorcannotbeused,usematerials
that,wheninstalled,willprovideamatchacceptabletoArchitect forthevisualandfunctionalperformanceofin-placematerials.
PART3- EXECUTION3.1 EXAMINATION
A. ExistingConditions:Theexistenceandlocationofutilitiesandconstructionindicatedasexistingarenotguaranteed.Beforebeginningwork,investigate
CONTINUED ON G1.05
SPECIFICATIONS
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
SPECIFICATIONS
G1.05
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
05/S
PE
CIF
ICAT
ION
S/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
and verify theexistenceand locationof utilities,mechanical andelectricalsystems,andotherconstructionaffectingtheWork.
B. ExaminationandAcceptanceofConditions: Beforeproceedingwith eachcomponent of the Work, examine substrates, areas, and conditions, withInstallerorApplicatorpresentwhereindicated,forcompliancewith
requirements for installation tolerances and other conditions affectingperformance.Recordobservations.1. Examine roughing-in for mechanical and electrical systems to
verify actual locations of connections before equipment and fixtureinstallation.
2. Examinewalls,floors,androofsforsuitableconditionswhereproductsandsystemsaretobeinstalled.
3. Verify compatibility with and suitability of substrates, includingcompatibilitywithexistingfinishesorprimers.
C. Proceed with installation only after unsatisfactory conditions have beencorrected.ProceedingwiththeWorkindicatesacceptanceofsurfacesandconditions.
3.2 PREPARATIONA. FieldMeasurements: Takefieldmeasurementsasrequiredtofit theWork
properly. Recheckmeasurements before installing each product. WhereportionsoftheWorkareindicatedtofittootherconstruction,verifydimensionsofotherconstructionbyfieldmeasurementsbeforefabrication.CoordinatefabricationschedulewithconstructionprogresstoavoiddelayingtheWork.
B. SpaceRequirements: Verifyspacerequirementsanddimensionsof itemsshowndiagrammaticallyonDrawings.
C. Review of Contract Documents and Field Conditions: Immediately ondiscoveryoftheneedforclarificationoftheContractDocumentscausedbydifferingfieldconditionsoutsidethecontrolofContractor,submitarequestforinformationtoArchitectaccordingtorequirementsinDivision01Section"ProjectManagementandCoordination."
3.3 CONSTRUCTIONLAYOUTA. Verification:BeforeproceedingtolayouttheWork,verifylayoutinformation
shownonDrawings,inrelationtothepropertysurveyandexistingbenchmarks.Ifdiscrepanciesarediscovered,notifyArchitectpromptly.
3.4 INSTALLATIONA. General:LocatetheWorkandcomponentsoftheWorkaccurately,incorrect
alignmentandelevation,asindicated.1. Makeverticalworkplumbandmakehorizontalworklevel.2. Wherespaceislimited,installcomponentstomaximizespaceavailable
formaintenanceandeaseofremovalforreplacement.3. Concealpipes,ducts,andwiring infinishedareasunlessotherwise
indicated.B. Comply with manufacturer's written instructions and recommendations for
installingproductsinapplicationsindicated.C. Install products at the time and under conditions thatwill ensure the best
possibleresults.MaintainconditionsrequiredforproductperformanceuntilSubstantialCompletion.
D. Conduct construction operations so no part of the Work is subjected todamaging operations or loading in excess of that expected during normalconditionsofoccupancy.
E. Sequence the Work and allow adequate clearances to accommodatemovement of construction items on site and placement in permanentlocations.
F. ToolsandEquipment:Donotusetoolsorequipmentthatproduceharmfulnoiselevels.
G. Templates:Obtainanddistributetothepartiesinvolvedtemplatesforworkspecifiedtobefactorypreparedandfield installed. CheckShopDrawingsofotherworktoconfirmthatadequateprovisionsaremadeforlocatingandinstallingproductstocomplywithindicatedrequirements.
H. Attachment: Provide blocking and attachment plates and anchors andfastenersofadequatesizeandnumbertosecurelyanchoreachcomponentinplace,accuratelylocatedandalignedwithotherportionsoftheWork.Wheresizeandtypeofattachmentsarenotindicated,verifysizeandtyperequiredforloadconditions.1. MountingHeights:Wheremountingheightsarenotindicated,mount
componentsatheightsdirectedbyArchitect.2. Allow for building movement, including thermal expansion and
contraction.3. Coordinate installation of anchorages. Furnish setting drawings,
templates,anddirectionsforinstallinganchorages,includingsleeves,concrete inserts,anchorbolts,and itemswith integralanchors, thataretobeembedded inconcreteormasonry. Deliversuch itemstoProjectsiteintimeforinstallation.
I. Joints: Make joints of uniform width. Where joint locations in exposedworkarenotindicated,arrangejointsforthebestvisualeffect.Fitexposedconnectionstogethertoformhairlinejoints.
J. HazardousMaterials:Useproducts,cleaners,andinstallationmaterialsthatarenotconsideredhazardous.
3.5 CUTTINGANDPATCHINGA. CuttingandPatching,General: Employskilledworkers toperformcutting
andpatching.Proceedwithcuttingandpatchingattheearliestfeasibletime,andcompletewithoutdelay.1. Cutin-placeconstructiontoprovideforinstallationofothercomponents
or performance of other construction, and subsequently patch asrequiredtorestoresurfacestotheiroriginalcondition.
B. Existing Warranties: Remove, replace, patch, and repair materials andsurfacescutordamagedduringinstallationorcuttingandpatchingoperations,bymethodsandwithmaterialssoasnottovoidexistingwarranties.
C. TemporarySupport:Providetemporarysupportofworktobecut.D. Protection:Protectin-placeconstructionduringcuttingandpatchingtoprevent
damage.ProvideprotectionfromadverseweatherconditionsforportionsofProjectthatmightbeexposedduringcuttingandpatchingoperations.
E. AdjacentOccupiedAreas:Avoidinterferencewithuseofadjoiningareasorinterruptionoffreepassagetoadjoiningareas.
F. ExistingUtilityServicesandMechanical/ElectricalSystems:Whereexistingservices/systems are required to be removed, relocated, or abandoned,bypass such services/systems before cutting to prevent interruption tooccupiedareas.
G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping,grinding,andsimilaroperations, includingexcavation,usingmethods leastlikely to damage elements retained or adjoining construction. If possible,review proposed procedures with original Installer; comply with originalInstaller'swrittenrecommendations.1. Ingeneral,usehandorsmallpower toolsdesigned forsawingand
grinding,nothammeringandchopping. Cutholesandslotsneatlytominimumsizerequired,andwithminimumdisturbanceofadjacentsurfaces.Temporarilycoveropeningswhennotinuse.
2. FinishedSurfaces:Cutordrillfromtheexposedorfinishedsideintoconcealedsurfaces.
3. MechanicalandElectricalServices:Cutoffpipeorconduit inwallsorpartitionstoberemoved.Cap,valve,orplugandsealremainingportion of pipe or conduit to prevent entrance ofmoisture or otherforeignmatteraftercutting.
4. Proceedwithpatchingafterconstructionoperationsrequiringcuttingarecomplete.
H. Patching:Patchconstructionbyfilling,repairing,refinishing,closingup,andsimilaroperationsfollowingperformanceofotherwork.Patchwithdurableseamsthatareasinvisibleaspracticable.ProvidematerialsandcomplywithinstallationrequirementsspecifiedinotherSections,whereapplicable.1. Inspection: Where feasible, test and inspect patched areas after
completiontodemonstratephysicalintegrityofinstallation.2. ExposedFinishes: Restoreexposedfinishesofpatchedareasand
extend finish restoration into retained adjoining construction in amannerthatwillminimizeevidenceofpatchingandrefinishing.
3. FloorsandWalls:Wherewallsorpartitionsthatareremovedextendonefinishedareaintoanother,patchandrepairfloorandwallsurfacesin thenewspace. Provideanevensurfaceofuniformfinish,color,texture,andappearance.Removein-placefloorandwallcoveringsandreplacewithnewmaterials,ifnecessary,toachieveuniformcolorandappearance.
4. Ceilings: Patch, repair,or rehang in-placeceilingsasnecessary toprovideaneven-planesurfaceofuniformappearance.
I. Cleaning:Cleanareasandspaceswherecuttingandpatchingareperformed.Removepaint,mortar,oils,putty,andsimilarmaterialsfromadjacentfinishedsurfaces.
3.6 PROGRESSCLEANINGA. General:CleanProjectsiteandworkareasdaily,includingcommonareas.
Enforcerequirementsstrictly.Disposeofmaterialslawfully.1. Complywith requirements inNFPA241 for removal of combustible
wastematerialsanddebris.2. Do not hold wastematerialsmore than seven days during normal
weatherorthreedaysifthetemperatureisexpectedtoriseabove80degF.
B. Site:MaintainProjectsitefreeofwastematerialsanddebris.C. WorkAreas:Cleanareaswhereworkisinprogresstothelevelofcleanliness
necessaryforproperexecutionoftheWork.1. Removeliquidspillspromptly.2. WheredustwouldimpairproperexecutionoftheWork,broom-clean
orvacuumtheentireworkarea,asappropriate.D. InstalledWork:Keepinstalledworkclean.Cleaninstalledsurfacesaccording
to written instructions of manufacturer or fabricator of product installed,usingonlycleaningmaterialsspecificallyrecommended.Ifspecificcleaningmaterialsarenotrecommended,usecleaningmaterialsthatarenothazardoustohealthorpropertyandthatwillnotdamageexposedsurfaces.
E. ConcealedSpaces:Removedebrisfromconcealedspacesbeforeenclosingthespace.
F. ExposedSurfacesinFinishedAreas:Cleanexposedsurfacesandprotectasnecessary toensure freedomfromdamageanddeteriorationat timeofSubstantialCompletion.
G. WasteDisposal:Donotburyorburnwastematerialson-site.Donotwashwastematerialsdownsewersorintowaterways.
H. Duringhandlingandinstallation,cleanandprotectconstructioninprogressandadjoiningmaterialsalready inplace. Applyprotectivecoveringwhererequired to ensure protection from damage or deterioration at SubstantialCompletion.
I. Clean and provide maintenance on completed construction as frequentlyas necessary through the remainder of the construction period. Adjustand lubricateoperablecomponentstoensureoperabilitywithoutdamagingeffects.
3.7 STARTINGANDADJUSTINGA. Start equipment and operating components to confirm proper operation.
Removemalfunctioningunits,replacewithnewunits,andretest.B. Adjust equipment for proper operation. Adjust operating components for
properoperationwithoutbinding.C. Test each piece of equipment to verify proper operation. Test and adjust
controls and safeties. Replacedamagedandmalfunctioning controls andequipment.
D. Manufacturer's Field Service: Comply with qualification requirements inDivision01Section"QualityRequirements."
3.8 PROTECTIONOFINSTALLEDCONSTRUCTIONA. ProvidefinalprotectionandmaintainconditionsthatensureinstalledWorkis
withoutdamageordeteriorationattimeofSubstantialCompletion.B. Complywithmanufacturer'swritteninstructionsfortemperatureandrelative
humidity.ENDOFSECTION017300
SECTION017700-CLOSEOUTPROCEDURESPART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for contractcloseout,including,butnotlimitedto,thefollowing:1. SubstantialCompletionprocedures.2. Finalcompletionprocedures.3. Warranties.4. Finalcleaning.5. RepairoftheWork.
B. RelatedRequirements:1. Division01Section"OperationandMaintenanceData"foroperation
andmaintenancemanualrequirements.2. Division01Section"ProjectRecordDocuments"forsubmittingrecord
Drawings,recordSpecifications,andrecordProductData.3. Division01Section"DemonstrationandTraining"forrequirementsfor
instructingOwner'spersonnel.1.2 ACTIONSUBMITTALS
A. ProductData:Forcleaningagents.B. Contractor's List of Incomplete Items: Initial submittal at Substantial
Completion.C. CertifiedListofIncompleteItems:FinalsubmittalatFinalCompletion.
1.3 CLOSEOUTSUBMITTALSA. CertificatesofRelease:Fromauthoritieshavingjurisdiction.B. CertificateofInsurance:Forcontinuingcoverage.
1.4 MAINTENANCEMATERIALSUBMITTALSA. ScheduleofMaintenanceMaterialItems:Formaintenancematerialsubmittal
itemsspecifiedinotherSections.1.5 SUBSTANTIALCOMPLETIONPROCEDURES
A. Contractor'sListofIncompleteItems:Prepareandsubmitalistofitemstobecompletedandcorrected(Contractor'spunchlist),indicatingthevalueofeachitemonthelistandreasonswhytheWorkisincomplete.
B. Submittals Prior to Substantial Completion: Complete the following aminimumof[10]tendayspriortorequestinginspectionfordeterminingdateofSubstantialCompletion.TechnicalsubmittalscanbesubmittedviaPDF.Finishesandothermaterialobjectssubmittedforapprovalrequire5copies(1forUNLV,2forcontractor,1forLGA).Listitemsbelowthatareincompleteattimeofrequest.1. CertificatesofRelease:Obtainandsubmitreleasesfromauthorities
havingjurisdictionpermittingOwnerunrestricteduseoftheWorkandaccesstoservicesandutilities.Includeoccupancypermits,operatingcertificates,andsimilarreleases.
2. Submit closeout submittals specified in other Division 01 Sections,including project record documents, operation and maintenancemanuals,finalcompletionconstructionphotographicdocumentation,damage or settlement surveys, property surveys, and similar finalrecordinformation.
3. Electronically submit maintenance material submittals specified inindividual Divisions 02 through 33 Sections, including tools, spareparts, extra materials, and similar items, and deliver to locationdesignatedbyArchitect.Labelwithmanufacturer'snameandmodelnumberwhereapplicable.a. Schedule of Maintenance Material Items: Prepare and
electronicallysubmitscheduleofmaintenancematerialsubmittalitems,includingnameandquantityofeachitemandnameandnumber of related Specification Section. Obtain Architect’ssignatureforreceiptofsubmittals.
4. Submittest/adjust/balancerecords.C. ProceduresPriortoSubstantialCompletion:Completethefollowingaminimum
of10dayspriortorequestinginspectionfordeterminingdateofSubstantialCompletion.Listitemsbelowthatareincompleteattimeofrequest.1. AdviseOwnerofpendinginsurancechangeoverrequirements.2. MakefinalchangeoverofpermanentlocksanddeliverkeystoOwner.
AdviseOwner'spersonnelofchangeoverinsecurityprovisions.3. Completestartupandtestingofsystemsandequipment.4. PerformpreventivemaintenanceonequipmentusedpriortoSubstantial
Completion.5. InstructOwner'spersonnelinoperation,adjustment,andmaintenanceof
products,equipment,andsystems.SubmitdemonstrationandtrainingvideorecordingsspecifiedinDivision01Section"DemonstrationandTraining."
6. AdviseOwnerofchangeoverinheatandotherutilities.7. ParticipatewithOwnerinconductinginspectionandwalkthroughwith
localemergencyresponders.8. TerminateandremovetemporaryfacilitiesfromProjectsite,alongwith
mockups,constructiontools,andsimilarelements.9. Completefinalcleaningrequirements,includingtouchuppainting.10. Touchupandotherwiserepairandrestoremarredexposedfinishesto
eliminatevisualdefects.D. Inspection:SubmitawrittenrequestforinspectiontodetermineSubstantial
Completionaminimumof10dayspriortodatetheworkwillbecompletedandreadyforfinalinspectionandtests.Onreceiptofrequest,ArchitectwilleitherproceedwithinspectionornotifyContractorofunfulfilledrequirements.ArchitectwillpreparetheCertificateofSubstantialCompletionafterinspectionorwillnotifyContractorofitems,eitheronContractor'slistoradditionalitemsidentifiedbyArchitect,thatmustbecompletedorcorrectedbeforecertificatewillbeissued.1. Re-inspection: Request re-inspection when the Work identified in
previousinspectionsasincompleteiscompletedorcorrected.2. Resultsofcompletedinspectionwillformthebasisofrequirementsfor
finalcompletion.1.6 FINALCOMPLETIONPROCEDURES
A. PreliminaryProcedures: Beforerequestingfinal inspection fordeterminingfinalcompletion,completethefollowing:1. SubmitafinalApplicationforPaymentaccordingtoDivision01Section
"PaymentProcedures."2. CertifiedListofIncompleteItems:SubmitcertifiedcopyofArchitect's
Substantial Completion inspection list of items to be completed orcorrected(punchlist),endorsedanddatedbyArchitect.Certifiedcopyofthelistshallstatethateachitemhasbeencompletedorotherwiseresolvedforacceptance.
3. CertificateofInsurance:Submitevidenceoffinal,continuinginsurancecoveragecomplyingwithinsurancerequirements.
4. Submitpest-controlfinalinspectionreportandwarranty.5. InstructOwner'spersonnelinoperation,adjustment,andmaintenance
ofproducts,equipment,andsystems.B. Inspection: Submit a written request for final inspection to determine
acceptance.Onreceiptofrequest,ArchitectwilleitherproceedwithinspectionornotifyContractorofunfulfilledrequirements.ArchitectwillprepareafinalCertificateforPaymentafterinspectionorwillnotifyContractorofconstructionthatmustbecompletedorcorrectedbeforecertificatewillbeissued.1. Re-inspection: Request re-inspection when the Work identified in
previousinspectionsasincompleteiscompletedorcorrected.1.7 LISTOFINCOMPLETEITEMS(PUNCHLIST)
A. OrganizationofList:Includenameandidentificationofeachspaceandareaaffectedbyconstructionoperationsforincompleteitemsanditemsneedingcorrection including, if necessary, areas disturbed by Contractor that areoutsidethelimitsofconstruction.UseCSIForm14.1A.1. Organize itemsapplying toeachspacebymajorelement, including
categoriesforceiling,individualwalls,floors,equipment,andbuildingsystems.
1.8 SUBMITTALOFPROJECTWARRANTIESA. Time of Submittal: Submit written warranties on request of Architect for
designatedportionsoftheWorkwherecommencementofwarrantiesotherthandateofSubstantialCompletionisindicated,orwhendelayinsubmittalofwarrantiesmightlimitOwner'srightsunderwarranty.
B. OrganizewarrantydocumentsintoanorderlysequencebasedonthetableofcontentsoftheProjectManual.1. Electronicallysizedtoreceive8-1/2-by-11-inchpaper.2. Markeachfiletoidentifytheproductorinstallation.Provideatyped
description of the product or installation, including the nameof theproductandthename,address,andtelephonenumberofInstaller.
3. Provideacoversheetwith the title "WARRANTIES,"Projectname,andnameofContractor.
PART2- PRODUCTS2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended bymanufacturerorfabricatorofthesurfacetobecleaned.Donotusecleaning
agents that are potentially hazardous to health or property or that mightdamagefinishedsurfaces.
PART3- EXECUTION3.1 FINALCLEANING
A. General: Perform final cleaning. Conduct cleaning and waste-removaloperationstocomplywithlocallawsandordinancesandFederalandlocalenvironmentalandantipollutionregulations.
B. Cleaning: Employ experienced workers or professional cleaners for finalcleaning. Cleaneachsurfaceorunit toconditionexpected inanaveragecommercial building cleaning and maintenance program. Comply withmanufacturer'swritteninstructions.1. Completethefollowingcleaningoperationsbeforerequesting
inspectionforcertificationofSubstantialCompletionforentireProjectorforadesignatedportionofProject:a. CleanProject site, yard, and grounds, in areas disturbed by
constructionactivities,includinglandscapedevelopmentareas,ofrubbish,wastematerial,litter,andotherforeignsubstances.
b. Sweep paved areas broom clean. Remove petrochemicalspills,stains,andotherforeigndeposits.
c. Rakegroundsthatareneitherplantednorpavedtoasmooth,even-texturedsurface.
d. Removetools,constructionequipment,machinery,andsurplusmaterialfromProjectsite.
e. Removesnowandicetoprovidesafeaccesstobuilding.f. Clean exposed exterior and interior hard-surfaced finishes
to a dirt-free condition, free of stains, films, and similarforeign substances. Avoid disturbing natural weathering ofexteriorsurfaces. Restorereflectivesurfacesto theiroriginalcondition.
g. Removedebrisandsurfacedustfromlimitedaccessspaces,including roofs, plenums, shafts, trenches, equipment vaults,manholes,attics,andsimilarspaces.
h. Sweepconcretefloorsbroomcleaninunoccupiedspaces.i. Vacuumcarpetandsimilarsoftsurfaces,removingdebrisand
excessnap;cleanaccordingtomanufacturer'srecommendationsifvisiblesoilorstainsremain.
j. Clean transparent materials, including mirrors and glass indoors andwindows. Removeglazing compounds and othernoticeable, vision-obscuring materials. Replace chipped orbrokenglassandotherdamagedtransparentmaterials.Polishmirrorsandglass,takingcarenottoscratchsurfaces.
k. Removelabelsthatarenotpermanent.l. Wipe surfaces of mechanical and electrical equipment and
similar equipment. Remove excess lubrication, paint andmortardroppings,andotherforeignsubstances.
m. Replacedisposableairfiltersandcleanpermanentairfilters.Cleanexposedsurfacesofdiffusers,registers,andgrills.
n. Clean light fixtures, lamps, globes, and reflectors to functionwithfullefficiency.
o. LeaveProjectcleanandreadyforoccupancy.3.2 REPAIROFTHEWORK
A. CompleterepairandrestorationoperationsbeforerequestinginspectionfordeterminationofSubstantialCompletion.
B. Repair or remove and replace defective construction. Repairing includesreplacing defective parts, refinishing damaged surfaces, touching up withmatching materials, and properly adjusting operating equipment. Wheredamagedorwornitemscannotberepairedorrestored,providereplacements.Removeandreplaceoperatingcomponentsthatcannotberepaired.Restoredamagedconstructionandpermanent facilitiesusedduringconstruction tospecifiedcondition.1. Removeandreplacechipped,scratched,andbrokenglass,reflective
surfaces,andotherdamagedtransparentmaterials.2. Touchupandotherwiserepairandrestoremarredorexposedfinishes
and surfaces. Replace finishes and surfaces that already showevidenceofrepairorrestoration.a. Donotpaintover"UL"andotherrequiredlabelsandidentification,
includingmechanicalandelectricalnameplates.Removepaintappliedtorequiredlabelsandidentification.
3. Replacepartssubjecttooperatingconditionsduringconstructionthatmayimpedeoperationorreducelongevity.
4. Replaceburned-outbulbs,bulbsnoticeablydimmedbyhoursofuse,and defective and noisy starters in fluorescent andmercury vaporfixturestocomplywithrequirementsfornewfixtures.
ENDOFSECTION017700
SECTION017823-OPERATIONANDMAINTENANCEDATAPART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for preparingoperationandmaintenancemanuals,includingthefollowing:1. Operationandmaintenancedocumentationdirectory.2. Emergencymanuals.3. Operationmanualsforsystems,subsystems,andequipment.4. Productmaintenancemanuals.5. Systemsandequipmentmaintenancemanuals.
1.2 CLOSEOUTSUBMITTALSA. ManualContent:Operationsandmaintenancemanualcontentisspecified
in individual Specification Sections to be reviewed at the time of Sectionsubmittals. Submit reviewedmanual content formatted and organized asrequiredbythisSection.1. Architect will comment on whether content of operations and
maintenancesubmittalsareacceptable.2. Where applicable, clarify and update reviewed manual content to
correspondtorevisionsandfieldconditions.B. Format: Submit operations and maintenance manuals in the following
format:1. Electronically
C. Manual Submittal: Submit each manual in final form prior to requestinginspectionforSubstantialCompletionandatleast15daysbeforecommencingdemonstrationandtraining.Architectwillreturncopywithcomments.1. CorrectorreviseeachmanualtocomplywithArchitect'scomments.
Submitcopiesofeachcorrectedmanualwithin15daysofreceiptofArchitect's comments and prior to commencing demonstration andtraining.
PART2- PRODUCTS2.1 REQUIREMENTSFOROPERATION,ANDMAINTENANCEMANUALS
A. Organization: Unless otherwise indicated, organize each manual into aseparatesectionforeachsystemandsubsystem,andaseparatesectionforeachpieceofequipmentnotpartofasystem.Eachmanualshallcontainthefollowingmaterials,intheorderlisted:
CONTINUED ON G1.06
SPECIFICATIONS
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
SPECIFICATIONS
G1.06
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/G1.
06/S
PE
CIF
ICAT
ION
S/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
1. Titlepage.2. Tableofcontents.3. Manualcontents.B. TitlePage:Includethefollowinginformation:1. Subjectmatterincludedinmanual.2. NameandaddressofProject.3. NameandaddressofOwner.4. Dateofsubmittal.5. NameandcontactinformationforContractor.6. NameandcontactinformationforConstructionManager.7. NameandcontactinformationforArchitect.8. NameandcontactinformationforCommissioningAuthority.9. NamesandcontactinformationformajorconsultantstotheArchitect
thatdesignedthesystemscontainedinthemanuals.
10. Cross-referencetorelatedsystemsinotheroperationandmaintenancemanuals.
C. Table of Contents: List each product included in manual, identified byproductname,indexedtothecontentofthevolume,andcross-referencedtoSpecificationSectionnumberinProjectManual.
D. Manuals, ElectronicCopy:Submitmanuals intheformofelectroniccopywithlabeledvolumes.
2.2 OPERATION MANUALS
A. Content:InadditiontorequirementsinthisSection,includeoperationdatarequiredinindividualSpecificationSectionsandthefollowinginformation:1. System,subsystem,andequipmentdescriptions. Usedesignations
forsystemsandequipmentindicatedonContractDocuments.2. Performance and design criteria if Contractor is delegated design
responsibility.3. Operatingstandards.4. Operatingprocedures.5. Operatinglogs.6. Wiringdiagrams.7. Controldiagrams.8. Pipedsystemdiagrams.9. Precautionsagainstimproperuse.10. Licenserequirementsincludinginspectionandrenewaldates.
B. Descriptions:Includethefollowing:1. Product name and model number. Use designations for products
indicatedonContractDocuments.2. Manufacturer'sname.3. Equipmentidentificationwithserialnumberofeachcomponent.4. Equipmentfunction.5. Operatingcharacteristics.6. Limitingconditions.7. Performancecurves.8. Engineeringdataandtests.9. Completenomenclatureandnumberofreplacementparts.
C. OperatingProcedures:Includethefollowing,asapplicable:1. Startupprocedures.2. Equipmentorsystembreak-inprocedures.3. Routineandnormaloperatinginstructions.4. Regulationandcontrolprocedures.5. Instructionsonstopping.6. Normalshutdowninstructions.7. Seasonalandweekendoperatinginstructions.8. Requiredsequencesforelectricorelectronicsystems.9. Specialoperatinginstructionsandprocedures.
D. SystemsandEquipmentControls:Describethesequenceofoperation,anddiagramcontrolsasinstalled.
E. PipedSystems:Diagrampipingasinstalled,andidentifycolor-codingwhererequiredforidentification.
2.3 PRODUCTMAINTENANCEMANUALSA. Content:Organizemanualintoaseparatesectionforeachproduct,material,
and finish. Include source information, product information, maintenanceprocedures, repair materials and sources, and warranties and bonds, asdescribedbelow.
B. Source Information: List each product included in manual, identified byproductnameandarrangedtomatchmanual'stableofcontents.Foreachproduct, list name,address, and telephonenumberof Installer or supplierandmaintenanceserviceagent,andcross-referenceSpecificationSectionnumberandtitleinProjectManual.
C. ProductInformation:Includethefollowing,asapplicable:1. Productnameandmodelnumber.2. Manufacturer'sname.3. Color,pattern,andtexture.4. Materialandchemicalcomposition.5. Reorderinginformationforspeciallymanufacturedproducts.
D. MaintenanceProcedures:Includemanufacturer'swrittenrecommendationsandthefollowing:1. Inspectionprocedures.2. Typesofcleaningagentstobeusedandmethodsofcleaning.3. List of cleaning agents and methods of cleaning detrimental to
product.4. Scheduleforroutinecleaningandmaintenance.5. Repairinstructions.
E. RepairMaterialsandSources:Includelistsofmaterialsandlocalsourcesofmaterialsandrelatedservices.
F. Warranties and Bonds: Include copies of warranties and bonds and listsof circumstances and conditions thatwould affect validity ofwarranties orbonds.
2.4 SYSTEMSANDEQUIPMENTMAINTENANCEMANUALSA. Content: For each system, subsystem, and piece of equipment not part
of a system, include source information, manufacturers' maintenancedocumentation,maintenanceprocedures,maintenanceandserviceschedules,sparepartslistandsourceinformation,maintenanceservicecontracts,andwarrantyandbondinformation,asdescribedbelow.
B. Manufacturers'MaintenanceDocumentation: Manufacturers'maintenancedocumentationincludingthefollowinginformationforeachcomponentpartorpieceofequipment:1. Standardmaintenanceinstructionsandbulletins.2. Drawings, diagrams, and instructions required for maintenance,
including disassembly and component removal, replacement, andassembly.
3. Identificationandnomenclatureofpartsandcomponents.4. Listofitemsrecommendedtobestockedasspareparts.
C. MaintenanceProcedures: Include the following informationand items thatdetailessentialmaintenanceprocedures:1. Testandinspectioninstructions.2. Troubleshootingguide.
3. Precautionsagainstimpropermaintenance.4. Disassembly; component removal, repair, and replacement; and
reassemblyinstructions.5. Aligning,adjusting,andcheckinginstructions.6. Demonstrationandtrainingvideorecording,ifavailable.
D. Maintenance and Service Schedules: Include service and lubricationrequirements, list of required lubricants for equipment, and separateschedulesforpreventiveandroutinemaintenanceandservicewithstandardtimeallotment.
E. SparePartsListandSourceInformation: Include listsofreplacementandrepair parts, with parts identified and cross-referenced to manufacturers'maintenancedocumentationandlocalsourcesofmaintenancematerialsandrelatedservices.
F. Warranties and Bonds: Include copies of warranties and bonds and listsof circumstances and conditions thatwould affect validity ofwarranties orbonds.
PART3- EXECUTION3.1 MANUALPREPARATION
A. Product Maintenance Manual: Assemble a complete set of maintenancedata indicatingcareandmaintenanceofeachproduct,material,andfinishincorporatedintotheWork.
B. OperationandMaintenanceManuals:Assembleacompletesetofoperationandmaintenancedataindicatingoperationandmaintenanceofeachsystem,subsystem,andpieceofequipmentnotpartofasystem.
C. Manufacturers' Data: Where manuals contain manufacturers' standardprinteddata,includeonlysheetspertinenttoproductorcomponentinstalled.MarkeachsheettoidentifyeachproductorcomponentincorporatedintotheWork.Ifdataincludemorethanoneiteminatabularformat,identifyeachitemusingappropriatereferencesfromtheContractDocuments.IdentifydataapplicabletotheWorkanddeletereferencestoinformationnotapplicable.
D. Drawings:Preparedrawingssupplementingmanufacturers'printeddatatoillustratetherelationshipofcomponentpartsofequipmentandsystemsandtoillustratecontrolsequenceandflowdiagrams.CoordinatethesedrawingswithinformationcontainedinrecordDrawingstoensurecorrectillustrationofcompletedinstallation.
E. Comply with Division 01 Section "Closeout Procedures" for schedule forsubmittingoperationandmaintenancedocumentation.
ENDOFSECTION017823
SECTION017839-PROJECTRECORDDOCUMENTSPART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for projectrecorddocuments,includingthefollowing:1. RecordDrawings.
1.2 CLOSEOUTSUBMITTALSA. RecordDrawings:Complywiththefollowing:
1. NumberofCopies:Submitonesetofmarked-uprecordprints.PART2- PRODUCTS2.1 RECORDDRAWINGS
A. RecordPrints:Maintainonesetofmarked-uppapercopiesoftheContractDrawingsandShopDrawings, incorporatingnewandrevisedDrawingsasmodificationsareissued.1. Preparation:Markrecordprintstoshowtheactualinstallationwhere
installation varies from that shown originally. Require individual orentitywhoobtainedrecorddata,whetherindividualorentityisInstaller,subcontractor,orsimilarentity,toprovideinformationforpreparationofcorrespondingmarked-uprecordprints.a. Giveparticularattentiontoinformationonconcealedelements
thatwouldbedifficulttoidentifyormeasureandrecordlater.b. Recorddataassoonaspossibleafterobtainingit.c. Record and check the markup before enclosing concealed
installations.2. Mark the Contract Drawings and Shop Drawings completely and
accurately.Usepersonnelproficientatrecordinggraphicinformationinproductionofmarked-uprecordprints.
3. Markrecordsetswitherasable,red-coloredpencil.UseothercolorstodistinguishbetweenchangesfordifferentcategoriesoftheWorkatsamelocation.
4. Note Construction Change Directive numbers, alternate numbers,ChangeOrdernumbers,andsimilaridentification,whereapplicable.
PART3- EXECUTION3.1 RECORDINGANDMAINTENANCE
A. Recording: Maintain one copy of each submittal during the constructionperiodforprojectrecorddocumentpurposes.Postchangesandrevisionstoprojectrecorddocumentsastheyoccur;donotwaituntilendofProject.
B. MaintenanceofRecordDocumentsandSamples:StorerecorddocumentsandSamplesinthefieldofficeapartfromtheContractDocumentsusedforconstruction.Donotuseprojectrecorddocumentsforconstructionpurposes.Maintainrecorddocumentsingoodorderandinaclean,dry,legiblecondition,protected from deterioration and loss. Provide access to project recorddocumentsforArchitect'sreferenceduringnormalworkinghours.
ENDOFSECTION017839
SECTION017900-DEMONSTRATIONANDTRAININGPART 1 - GENERAL
1.1 SUMMARY
A. Section includesadministrativeandprocedural requirements for instructingOwner'spersonnel,includingthefollowing:1. Demonstrationofoperationofsystems,subsystems,andequipment.2. Traininginoperationandmaintenanceofsystems,subsystems,and
equipment.1.2 QUALITY ASSURANCE
A. Instructor Qualifications: A factory-authorized service representative,complyingwithrequirementsinDivision01Section"QualityRequirements,"experiencedinoperationandmaintenanceproceduresandtraining.
1.3 COORDINATIONA. CoordinateinstructionschedulewithOwner'soperations.Adjustscheduleas
requiredtominimizedisruptingOwner'soperationsandtoensureavailabilityofOwner'spersonnel.
PART2- PRODUCTS2.1 INSTRUCTION PROGRAM
A. ProgramStructure:Developaninstructionprogramthatincludesindividualtrainingmodulesforeachsystemandforequipmentnotpartofasystem,asrequiredbyindividualSpecificationSections.
PART3- EXECUTION
3.1 PREPARATIONA. Assemble educational materials necessary for instruction, including
documentation and training module. Assemble training modules into atrainingmanualorganized incoordinationwith requirements inDivision01Section"OperationsandMaintenanceData."
3.2 INSTRUCTIONA. EngagequalifiedinstructorstoinstructOwner'spersonneltoadjust,operate,
andmaintainsystems,subsystems,andequipmentnotpartofasystem.B. Scheduling:Provideinstructionatmutuallyagreedontimes.Forequipment
thatrequiresseasonaloperation,providesimilarinstructionatstartofeachseason.
C. TrainingLocationandReferenceMaterial: Conduct trainingon-site in thecompletedandfullyoperationalfacilityusingtheactualequipmentin-place.Conducttrainingusingfinaloperationandmaintenancedatasubmittals.
ENDOFSECTION017900
SECTION024119-SELECTIVESTRUCTUREDEMOLITION1.1 PROJECTCONDITIONS
A. Owner will occupy portions of building immediately adjacent to selectivedemolitionarea.
B. HazardousMaterials:Notexpected.C. Protectionofhistoricfloormaterialinplaceisrequired.
1.2 EXECUTIONA. Professionalengineerengagedtosurveyconditionofbuilding.
1. Recordedbyuseofmeasureddrawings.B. UtilityServicesandMechanical/ElectricalSystems:Maintainedtooccupied
facilities.1. ShutOff:ByOwner.
C. Site Access and Temporary Controls: Minimum interference with roads,streets,walks,walkways,andotheradjacentoccupiedandusedfacilities
D. TemporaryFacilities:1. Temporarybarricadestopreventinjurytopeople.2. Protectionofexistingfinishworktoremain.3. Protectionoffurnishingsandequipment.
F. RemovedandSalvagedItems:Cleaned,crated,stored,andtransportedtoOwner'son-sitestoragearea.
E. Removed and Reinstalled Items: Cleaned, repaired, crated, stored, andreinstalled.
F. ExistingItemstoRemain:Existingconstructionprotectedagainstdamage.G. DisposalofDemolishedItems:
1. Burning:Notpermitted.2. Disposal:OffOwner'sproperty.
1.3 SELECTIVEDEMOLITIONSCHEDULEA. RaisedFloorSubstructureandFloorPanels.B. AcousticalCeilingGridandTiles.C. ToberevisedlaterD. FireExtinguisherWithRecessedCabinet.E. ExitSign.F. DoorSlab.
ENDOFSECTION024119
SPECIFICATIONS
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
1ST FLOORCONSTRUCTION ACCESS
ONLY
A1.01
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/A1.
01/1
ST
FLO
OR
CO
NS
TRU
CTI
ON
AC
CE
SS
ON
LY/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
USE FREIGHT ELEVATOR FORCONSTRUCTION ACCESS TOOTHER FLOORS
CONSTRUCTIONACCESS ENTRANCE
WOMEN1283
MEN1284
TELE.1262
RESERVE COUNTERCIRCULATION1111
CORRIDOR1110
STUDY RM1291
VEST.1287
OFFICE1293
STUDY RM1292OFFICE
1244OPEN OFFICE
SYSTEMS1243
WATER PUMPFIRE SUPPRESS.1251B
GENERATOREMERGENCY1251A
MECHANICAL1251
TELECOMM.1254
ROOMELECTRICAL
1252
CORR.1250B
SYSTEMSEMERGENCY
1253
VEST.1250A
CORRIDOR1250
AREAOPERATORE.O.A.
1255
L.A.S.R.1256
VEST.1260A
DATA.1261
CORRIDOR1260
ELEC.1263
CUST.1288
VEST.1213
CORR.1200
SERVICESLIBRARY GRAPHIC
NONBOOK WORKROOM/
1226B
CORR.1220
STACKS1226
STOR.CUST./1209
STUDYGROUP
1223
OFFICE AREA1226A
OFFICENONBOOK
1227
IDFCOMPUTER1241
STOREROOMWORK ROOM/OPERATIONS/
1242
STUDYGROUP
1224
PREVIEWNONBOOK
1225
SHOP1207A
OFFICE1207
SHIPPINGMAIL/1208
GROUP RMCOMMONS
INFO
1231
OFFICE1245
1232
CORRIDOR1230
STUDYGROUP
1221STUDYGROUP
1222
COUNTERSERVICE
1228
WOMEN1212
MEN1214
VEST.1215
CUST.1216
HOLDINGRECYCLE
1193
PKG AREAWORKROOM
I.L.L.
1204
OPEN OFFICEI.L.L.1201
ELEC.1195
RECEIVINGSUPPORT
1205HOLDING1205A
DATA.1194
OFFICE1203
TELE.1196
CORR.1190
STORAGE1202
VEST.1191
OPEN OFFICEWORK ROOM/
1189
REFERENCE1162
INFO. COMMONS1290
STORAGE1286
LOBBY1000
LOBBYELEV.1100
OFFICE1178
CORRIDOR1180
OFFICE1186
OFFICE1188
OFFICE1187
OFFICE1185
OFFICE1184
OFFICE1182
OFFICE1183 OFFICE
1177
SEATING AREAREFERENCE
1161
OFFICE1176 OFFICE
1174
OFFICE1175 OFFICE
1173
OFFICE1172
OFFICE1171
CORRIDOR1170
WOMEN1281
STUDYEXTENDED1280
ELEC.1117
MEN1282
VESTIBULE1000B
BOOK DISPLAYU.L.S. USED1000C
SECURITY1000A
BAR AREASNACK
1285
PIOCHEINSTRUCTION
ROOM1144
WOMEN1113
CUST.1114VEST.
1112
VEST.1116
WORK AREACIRCULATION
1121
MEN1115
CORR.1140
STORAGE1144A
CORR.1120
ROOMMACH.E1119A
SERVICE1125A
DATA1118
OFFICE1122
VEST.1119
STO.1125B
CORR.1140A
STORAGE1146A
CORRIDOR1130
OPEN OFFICECIRCULATION
1124
LOUNGESTAFF1125
OFFICE1145A
SECURITY1160A
VEST.1160
OFFICE1143 OFFICE
1145
LEARNINGINTERACTIVE
1147
OFFICE1143A WORK
1147A
EQUIPMENT1141
VEST.1127
WORK AREACIRCULATION
1126
CORR.1149ASTORAGE
1148CNTRL STA.CENTRAL
1150
CART STO.CIRCULATION
1128
CORR.1200A
CORRIDOR1300
HARMONENTRANCE
CAMPUS EASTENTRANCE
EMERGENCYEXIT ONLY
INFO. COMMONS1290
EUREKA INSTRUCTION
ROOM1146
AMARGOSA INSTRUCTION
ROOM1149
STUDY ROOMGROUP1231
1233
1234
1235
STUDY ROOMGROUP
STUDY ROOMGROUP
STUDY ROOMGROUP
STUDY ROOMGROUP
LIVING ROOMFURNITURE
INFORMATION DESK
1. FIRST FLOOR SHOWN FOR CONSTRUCTION ACCESS ONLY. NOWORK ON FIRST FLOOR.
2. KEEP ALL CONSTRUCTION PATHS OF TRAVEL CLEAN ANDDEBRIS FREE.
3. COORDINATE WITH UNLV STAFF ACCESS POINTS, MATERIALSTORAGE, ETC.
GENERAL NOTES - FLOOR PLAN
N
SCALE: 1" = 20'1 1ST FLOOR PLAN - CONSTRUCTION ACCESS ONLY
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
2ND FLOOR PLAN
A2.01
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/A2.
01/2
ND
FLO
OR
PLA
N/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
1A2.02
USE FREIGHT ELEVATOR FORCONSTRUCTION ACCESS TOOTHER FLOORS
CG
VEST.2211
TO BELOW
ESCALATOR
OFFICE2235 CATALOGING
TECH. SERVICES
2231A
OFFICE2236
VEST.2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252AVEST.2252B
STORAGECOMPACT
2231
OPEN
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
WOMEN2212
READING2180
SERV.2284RECEPTION
ADMIN.
2270 STO.2270A
DEANADMIN.
2278
OFFICE2275
STAIR#2
WOMEN2264A
MEN2264
ELEC.2263
TELE.2262
DONOR GALLERY2260
DATA.2261
VEST.2260A
OPEN OFFICEADMIN.
2271B
VISITORADMIN.
2271C
COUNT ROOMADMIN.
2272A
WORK AREAADMIN.
2277
FILE RMADMIN.
2273ASSIST.
ADMIN. DEV.
2271A
ASSIST.ADMIN. MGMT.
2271
ASSC. DEANADMIN.
2274
ACCT.ADMIN.
2272
VEST.2115
TO BELOWOPEN
CORRIDOR2300
TO BELOWOPEN
CONF.SMALL
2276
HALL.2290
CONFERENCEADMIN.
2281
ASST.MGMT.
2282
STAIR#3
CORRIDOR2100
MEN2114WORKSTATION
EXPRESS2110
PHONES2110A
WOMEN2112
VEST.2111 CUST.
2113
VESTIBULE2119
ELEC.2116
DATA2117 READING
2120
VEST.2121
STAIR#1
VEST.2125
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
STAIR# 5
PERIODICALSCURRENT
2170
HOLDINGRECYCLE
2193
MICROFORMS2160
PERIODICALSBOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,PERIODICALS,
2141
PUBLICATIONSGOVERNMENT
2130
ELEV#3
ELEV#1ELEV#2
ELEV#4
STAIR#6
1574sf
1107sf
92sf
124sf
148sf
1361sf
1435sf
140sf
140sf
155sf
173sf
163sf
331sf
174sf
364sf
647sf945sf
1602sf
54sf
50sf
40sf29sf
138sf
329sf
46sf
57sf
196sf
196sf
615sf
298sf
89sf 84sf
147sf 114sf
311sf
369sf
4897sf
4596sf
326sf 4448sf
4849sf
150sf
331sf
73sf
775sf
373sf
67sf67sf
475sf
1353sf
869sf
112sf
221sf
55sf 107sf243sf
187sf
219sf
138sf
82sf619sf
191sf
127sf
319sf
143sf
208sf
12sf
181sf
78sf
39sf 35sf
98sf
313sf
910sf
59sf
55sf
143sf
141sf
96sf
94sf
INFO.2181
HALL.2280A
CORR.2280
221sf
173sf
OFFICE2238
158sf
2118
GROUPSTUDY
2110B
GROUPSTUDY
LEISURE READING
N
SCALE: 1/16" = 1'-0"1 2ND FLOOR PLAN
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
2ND FLOOR ENLARGEDPLAN AND INTERIOR
ELEVATIONS
A2.02
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/A2.
02/2
ND
FLO
OR
EN
LAR
GE
D P
LAN
AN
D IN
TER
IOR
ELE
VATI
ON
S/T
uesd
ay, M
arch
29,
201
6/12
:31
PM
/
3/22/16
1. ALL DIMENSIONS ARE TAKEN FROM EXISTINGCONSTRUCTION AND FROM FACE OF CONCRETE, DRYWALLFINISH, OR CENTER OF COLUMN, UNO. ALL DIMENSIONSTAKEN FROM NEW CONSTRUCTION ARE FROM FACE OFSTUD FRAMING, UNLESS NOTED OTHERWISE. CONTRACTORIS TO VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TOCOMMENCING WORK. CONTRACTOR TO NOTIFY ARCHITECTIMMEDIATELY OF ANY DISCREPANCIES.
2. EXISTING SHELL CORE CONDITIONS MAY DIFFER FROMTENANT IMPROVEMENT CONSTRUCTION DOCUMENTS.CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY OF ANYDISCREPANCIES.
3. PROVIDE METAL BACKING IN WALL WHERE REQUIRED FOR,FIXTURES, CABINETS, WALL MOUNTED EQUIPMENT, ETC.PER MANUFACTURER REQUIREMENTS.
4. WALL TYPES ABOVE OPENINGS SHALL MATCH ADJACENTWALL CONSTRUCTION, UNO.
5. PROVIDE METAL CORNER BEAD AT ALL GYPSUM BOARDCORNERS, TO MATCH EXISTING.
6. PATCH, REPAIR AND PAINT ALL EXISTING WALLS. PAINT TOMATCH EXISTING TEXTURE AND COLOR.
GENERAL NOTES
FLOOR PLAN KEYNOTES
1
2
3
4
5
6
NEW WALL CONSTRUCTION. SEE DETAIL 3/A4.01. CUTCARPET BACK TO ACCOMMODATE NEW WALL.
EXISTING COLUMN FRAMING TO REMAIN. PROTECT INPLACE. REPLACE EXISTING WOOD BASE WITH NEWWOOD BASE. MATCH EXISTING WOOD BASE TYPE ANDFINISH/COLOR.
NEW FLAT SCREEN MONITOR, OFOI
EXISTING ELECTRICAL FLOOR BOX TO REMAIN ANDPROTECTED IN PLACE, TYP
NEW ELECTRICAL FLOOR BOX. SEE ELECTRICALDRAWINGS
PRESS READER, SEE DETAILS THIS SHEET
1
1
1
2
2
2
3
3
3
3
4
4
4
3
1
4
44
4
55
5
66
2
11'-0
"
14'-4"
12'-4"
EQ
EQ
3A2.02
2A2.02
6A4.01
5A4.01
3A4.01
READING2230
READING22405'
EQ EQ 3'-6"
FLAT SCREEN MONITOR,OFOI
RELOCATEDTHERMOSTAT
TYP
CL
CL
5'
6' 6' EQ EQ6'
FLAT SCREENMONITOR,OFOI
FLAT SCREEN MONITOR,OFOI
FLAT SCREENMONITOR, OFOI
NEW WOOD BASEFINISH TO MATCHEXISTING, TYP
PAINT AND FINISH TOMATCH EXISTING, TYP
EXISTING LIGHT FIXTURETO REMAIN. PROTECT INPLACE, TYP
RELOCATE EXISTINGCLOCK AND PLACE ON NEWWALL.
RELOCATE STROBELIGHT AND PLACE ONNEW WALL, TYP
RELOCATE STROBELIGHT AND PLACE ONNEW WALL, TYP
RELOCATE STROBELIGHT AND PLACE ONNEW WALL, TYP
NEW WOOD BASE AT ALLCOLUMNS. FINISH TO MATCHEXISTING, TYP
TYP
CL CL
CL
CL CLNOTE: ALL POWER/DATA TO BERELOCATED TO NEW WALL
SCALE: 1/8" = 1'-0"1 2ND FLOOR ENLARGED FLOOR PLANSCALE: 1/4" = 1'-0"2 LEISURE READING INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"3 LEISURE READING INTERIOR ELEVATION
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
2ND FLOOR REFLECTEDCEILING PLANS
A3.01
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/A3.
01/2
ND
FLO
OR
RE
FLE
CTE
D C
EIL
ING
PLA
NS
/Tue
sday
, Mar
ch 2
9, 2
016/
12:3
1 P
M/
3/22/16
B
B
C
C
CB
E
E
E
E
E
G
A
D
B
BREADING2230
READING2240
OF COLUMNCL
OF COLUMNCL
C
F
F
F
1'26
'1'
DE
MO
LITI
ON
RCP GENERAL NOTES1. VERIFY QUANTITIES AND SIZES OF ALL ELEC EQPT ON THE
RCP WITH THEIR RESPECTIVE DWGS AND SPECS. NOT ALLELEC EQUIPMENT SHOWN ON RCP.
2. REFER TO ELEC FOR LIGHT FIXTURE SPECIFICATIONS ANDEMERGENCY LIGHTING.
3. ALL MECH AND ELEC FIXTURES ARE TO BE LOCATED ASCLOSE AS POSSIBLE TO THE CONFIGURATIONS AND DIMSSHOWN.
4. ALL DIMENSIONS ARE TAKEN FROM THE FACE OF STUDFRAMING, OR CENTER OF COLUMN UNO. VERIFY ALL DIMS INTHE FIELD PRIOR TO COMMENCING WORK. NOTIFYARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
6. ALL EXPOSED SUSPENDED LIGHTING TO BE HUNG BYCABLES. DO NOT USE HANGERS FOR EXPOSED SUSPENDEDELEC.
1
1
1
1
1
1
2
2
2
3
4
5
6
7
77
7
5
8
9
2
A4.01
3A3.01
3A3.01
2
A4.01
9'-6"
9'-1
"
11'-6
"
28'
EQ EQ
9'-6"
OF
FIX
TUR
E
OF FIXTURE
OF FIXTURE
OF
FIX
TUR
E
OF COLUMNC
OF COLUMNC
L
L
C L
CL
CL
C L
CL
NE
W G
YP
BD
CE
ILIN
G
DEMOLITION RCP KEYNOTESA
B
C
D
E
F
G
REMOVE PORTION OF SUSPENDED ACOUSTIC TILECEILING
REMOVE AND SALVAGE EXISTING LIGHT FIXTURE.COORDINATE WITH OWNER.
EXISTING HVAC DIFFUSER TO REMAIN. PROTECT INPLACE
REMOVE EXISTING HVAC DIFFUSER.
EXISTING GYP BD SOFFIT TO REMAIN. PROTECT INPLACEEXISTING RECESSED DOWNLIGHT TO RECEIVERETROFIT LIGHT, SEE ELECTRICAL DRAWINGS, TYP
RELOCATE EXISTING SIGN, SEE 2/A3.01
RCP KEYNOTES1
2
3
4
5
6
7
8
9
LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING HVAC DIFFUSER
NEW HVAC DIFFUSER
PROVIDE ACCESS PANELS WHERE NECESSARY TOACCESS EXISTING EQIUPMENT ABOVE GYP BD SOFFIT
CONTROL JOINT CENTERED ON COLUMN, TYP
FRAMED GYP BD CEILING
EXISTING FRAMED GYP BD CEILING, PROTECT IN PLACE
EXTEND EXISTING SPRINKLER HEADS TO NEW GYP BDCEILING, TYP
RELOCATED SIGN
3 5/8" X 20 GA METALSTUDS CEILINGJOISTS AT 24" O.C.
CONTROL JOINT, SEEREFLECTED CEILINGPLAN FORLOCATIONS, TYP
5/8" GYP BD, TYP
EXISTING FRAMEDSOFFIT
SCALE: 1/8" = 1'-0"1 2ND FLOOR DEMO REFLECTED CEILING PLANSCALE: 1/8" = 1'-0"2 2ND FLOOR REFLECTED CEILING PLAN
SCALE: 3" = 1'-0"3 CONTROL JOINT DETAIL
CRAIG S. GALATI
REGISTERED
A R C H IT E C T
No: 1952
STATE O F N E VA DA
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/22/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
WALL SECTION ANDDETAILS
A4.01
JOHN LANSDELL
007115002 UNLV LEISURE READING [bimserver]
MICHELLE RIMLER
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a Nevada Corporation.Copyright © LG Architects, Inc. all rights reserved.Submission or distribution to meet official regulatoryrequirements or for other purposes in connection withthe project in not to be construed as publication inderogation of the Architects common law Copyrightsor other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/A4.
01/W
ALL
SE
CTI
ON
AN
D D
ETA
ILS
/Tue
sday
, Mar
ch 2
9, 2
016/
12:3
1 P
M/
3/22/166"
8'-6
"
1"
EXTEND EXISTING WALL OUTLETS, FIREALARM DEVICES AND ANY OTHER WALLMOUNTED DEVICES TO BE FLUSH WITH NEWWALL FINISHREMOVE EXISTING WOOD BASE WHEREOCCURS.
EXISTING 1-HOUR WALL CONSTRUCTION TOREMAIN IN PLACE
EXISTING SOFFITFRAMING TO REMAIN
TWO (2) LAYERS OF 5/8" GYP. BD. OVER 3 5/8"x 25 GA METAL STUDS @ 16" O.C. WITH 3 1/2"UNFACED FIBERGLASS ACOUSTICALINSULATION WITH 1" AIRSPACE BETWEENEXISTING WALL AND FRAMING. SYSTEM TO BEFROM FLOOR TO SOFFIT ABOVE
NEW WOOD BASE TO MATCH EXISTING TYPE ANDFINISH/PAINT, TYP
ACCESS CEILING TILES TOINSTALL 3 1/2" UNFACEDFIBERGLASS CONTINUOUSACOUSTICAL INSULATIONFROM FRAMING TO 1-HOURWALL
CONTINUOUS BEAD OF NON-HARDENING ACOUSTICALSEALANT ON ALL WALL/FLOOR EDGES
TOP AND BOTTOM STUD RUNNER INSTALLEDWITH RESILIENT MEMBRANE
EXISTING LIGHTFIXTURE TO BEREMOVED
FIELD VERIFY
1'
6"
8'-6" AFF (EXISTING)
9'-6" AFF (EXISTING)1'-0"
METAL STUD RUNNER TRACK
3 5/8" X 20 GA METAL STUDS AT 24" O.C.
3 5/8" KICKER STUD AT 4'-0" O.C. FROM 2'-0"ABOVE CEILING TO BENT PLATE AT DECK.BOLT THROUGH SLOTTED HOLE AT PLATE
1'-0" LONG 4"X4"X3/16" BENT PLATE W/SLOTTED BOLT HOLE WELDED TO STEELDECK
EXISTING CONCRETE FILL OVER METAL DECK
EXISTING SUSPENDED ACOUSTICAL TILECEILING
LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
3 5/8" X 20 GA METAL STUDS AT 24" O.C.
3 5/8" GYP BD
METAL STUD RUNNER TRACK
3'-8
"
5'-9 1/4"
6"3'
-8"
2'-10 3/4" 2'-10 3/4"
FRONT ELEVATIONBACK ELEVATION
MIR
TYP CHERRYWOOD STAINEDTO MATCH (OWNER TO
PROVIDE SAMPLE)
CUSTOM SIZE PLEXI-GLASS SIGN HOLDER
WITH STANDOFFS
TYP CHERRYWOOD VENEERSTAINED TO MATCH (OWNER
TO PROVIDE SAMPLE)
6"
4A4.01
4A4.01
MONITOR MOUNTEDTO WOOD LAMINATEON 55 DEGREE ANGLE
TYP CHERRYWOODVENEER, ALL SIDES,STAINED TO MATCH(OWNER TO PROVIDESAMPLE)
TYP CHERRYWOODBASE, STAINED TOMATCH (OWNER TOPROVIDE SAMPLE)
TYP CHERRYWOODVENEER, ALL SIDES,STAINED TO MATCH(OWNER TOPROVIDE SAMPLE)
TYP CHERRYWOODBASE, STAINED TOMATCH (OWNER TOPROVIDE SAMPLE)
5'- 9 1/4"
2' - 10 3/4" 2' - 10 3/4"
BACK ELEVATION FRONT ELEVATION
MIR
TYP CHERRYWOOD STAINEDTO MATCH (OWNER TO
PROVIDE SAMPLE)
CUSTOM SIZE PLEXI-GLASS STANDOFF
SIGN HOLDER
6"
4A4.01
4A4.01
MONITORMOUNTED TOWOOD ON 55DEGREE ANGLE
TYP CHERRYWOODVENEER, ALL SIDES,STAINED TO MATCH
(OWNER TO PROVIDESAMPLE)
2"
2"
1'-9"
7 3/4"
2'-1
"6"
4' -
2"
POWER/DATA CUTOUT, SIZE AND ALIGN
FOR POWER/DATAACCESS LOCATION
CONTINUOUSCHERRYWOODBASE TO MATCHEXISTINGBASEBOARD
MONITOR ANDBRACKET(SUPPLIED ANDINSTALLED BYOWNER)
SECTION
16"X19.5"X3/4" SHELFMOUNTED TO LEFT SIDE WALL
AWAY FROM ACCESS DOORFOR COMPUTER TOWER
(COMPUTER TOWER SUPPLIEDAND INSTALLED BY OWNER),BEYOND, ALLOW SPACE FOR
POWER/DATA TO ACCESSFLOOR OUTLETS
14" x14" ACCESSDOOR,CENTEREDBEYOND
CUSTOM SIZE PLEXI-GLASS SIGN HOLDER
WITH BRUSHEDNICKEL STANDOFFS
SECURELYATTACH KIOSK TOBLOCKING
8" x 12" CUTOUT FOR POWERAND DATA -CUT IN FIELD1'-9"
1"2"
2"2"
1'-2
"6"CHERRY WOOD BASE,
STAINED TO MATCHEXISTING BASEBOARD
14"W X 14"H CENTERACCESS PANEL ON
RIGHT SIDE OF FACE
McNICHOLS ROUNDEND SLOT 22 GAUGEPLAIN STEEL MOIRE,
ITEM #1688002238
PROVIDE CAMLOCKDOOR LOCK FOR
ACCESS PANEL
TYP CHERRYWOOD, ALLSIDES, STAINED TOMATCH (OWNER TOPROVIDE SAMPLE)
SCALE: 1" = 1'-0"1 WALL SECTIONSCALE: 1" = 1'-0"2 CEILING DETAIL
SCALE: 1 1/2"= 1'-0"5 PRESS READERSCALE: 1 1/2"= 1'-0"6 PRESS READER
SCALE: 1 1/2"= 1'-0"4 PRESS READERSCALE: 1 1/2"= 1'-0"3 PRESS READER
CONTROL DEVICE. LETTERS INDICATE TYPE:
FLS = FLOAT SWITCH, FS = FLOW SWITCH
FTS = FOOT SWITCH, LS = LIMIT SWITCH
PE = PNEUMATIC SWITCH, PS = PRESSURE SWITCH
JUNCTION BOX (USED FOR CLARITY ONLY)
RELAY OR CONTROL DEVICE. NUMBER REPRESENTS STANDARD
BRANCH CIRCUIT CONSISTING OF 2#12 IN MINIMUM SIZE CONDUIT
BRANCH CIRCUIT - SHORT SLASHES INDICATE NUMBER OF PHASE
HOME RUN TO PANELBOARD OR DEVICE - NUMBER OF ARROW
HEADS INDICATES NUMBER OF CIRCUITS
OR SWITCH LEGS, LONG SLASHES INDICATE NUMBER OF
NEUTRALS, LONG SLASH W/ A DOT INDICATES A SEPARATE
TC
PC
R
CONDUIT IN SLAB OR UNDERGROUND
ISOLATED GROUND WIRE.
PHOTOELECTRIC CELL
NOT INCLUDING GROUND WIRE
TIME CLOCK
RADIO OUTLET
C
BKR
CKT
CU
C.O.
ELEC
DWG
EXT
GND
GFI GROUND FAULT INTERRUPT
GROUND
EXISTING
ELECTRICAL
CONDUIT ONLY
COPPER
DRAWING
CONDUIT
BREAKER
CIRCUIT
FLOOR MOUNTED TELEPHONE OUTLET
COMPUTER OUTLET OR SPECIAL PURPOSE COMMUNICATIONS
ISOLATED GROUND TYPE (ORANGE) QUADRUPLEX RECEPTACLE
SWITCHED DUPLEX RECEPTACLE 18" AFF UNLESS NOTED OTHERWISE
PAY TELEPHONE OUTLET 48" AFF UNO
MULTIOUTLET ASSEMBLY - ARROW HEADS INDICATE EXTENT,
NUMBERS INDICATE SPACING IN INCHES
COUNTER HEIGHT RECEPTACLE (VERIFY HEIGHT)
MECHANICAL EQUIPMENT CROSS REFERENCE
SPECIAL PURPOSE RECEPTACLE - NUMBER REFERS TO
GFI DUPLEX RECEPTACLE 18" AFF UNLESS NOTED OTHERWISE
M
S
D
P
S
K
S
S
3
4
S
S
S
CONTROL STATION
MOTION SENSING SWITCH
TELEPHONE OUTLET 18" AFF UNO
KEY OPERATED SWITCH
DIMMER OPERATED SWITCH
SWITCH WITH PILOT LIGHT
SINGLE POLE SWITCH 48" AFF UNO
THREE WAY SWITCH 48" AFF UNO
FOUR WAY SWITCH 48" AFF UNO
24
C
2
2
AHU
C
RECEPTACLE SCHEDULE
CLOCK OUTLET
ELECTRIC SHEET NOTE DESIGNATION
AT 18" AFF UNO.
V
VOLTMETER
#
ABBREVIATIONS:
VS
AFF
AL
AFG
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ALUMINUM
VOLTMETER SWITCH
DEVICE FUNCTION
J
FS
A
T
F
SD
AS
THERMOSTAT
TS = TEMPERATURE SWITCH
AMMETER SWITCH
AMMETER
R RATE OF RISE
SMOKE /FIRE DAMPER
FIREMAN PHONE
F FIXED TEMPERATURE
VOLT AMPS
TRANSFORMER
WEATHER PROOF
XFMR
VOLTS
WP
V
VA
NOT TO SCALE
UNLESS NOTED OTHERWISE
POWER
TYPICAL
UNO
TYP
PWR
LIGHTING
PANELPNL
NTS
LTG
JUNCTION BOX
KILOWATT
KILOVOLT AMPS
KW
J-BOX
KVA
CONDUIT SEALING FITTING ( USED FOR CLARITY ONLY)
KILOWATT HOUR DEMAND METER
CCTV SURVEILLANCE CAMERA OUTLET
FIRE ALARM CONTROL PANEL
SMOKE DETECTOR LETTER (X) INDICATES TYPE.
HEAT DETECTOR LETTER (X) INDICATES TYPE.
TRANSFORMER
SINGLE RECEPTACLE 18" AFF UNLESS NOTED OTHERWISE
DUPLEX RECEPTACLE 18" AFF UNLESS NOTED OTHERWISE
FLOOR MOUNTED DUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE 18" AFF UNO
ISOLATED GROUND TYPE (ORANGE) DUPLEX RECEPTACLE
FLUORESCENT FIXTURE - LETTER DENOTES TYPE (LOWER CASE
EXIT FIXTURE - SHADED AREA DENOTES LIGHTED FACE, ARROWS
EMERGENCY OR NIGHT LIGHT CONNECTED FIXTURE (FLUORESCENT
EMERGENCY LIGHTING UNIT - LETTER DENOTES TYPE
DENOTE DIRECTION - LETTER DENOTES TYPE
POLE MOUNTED HID AREA LIGHT - LETTER DENOTES TYPE
WALL MOUNTED FIXTURE (FLUORESCENT SHOWN) - LETTER
HID OR INCANDESCENT FIXTURE - LETTER DENOTES TYPE
FLUORESCENT STRIP FIXTURE - LETTER DENOTES TYPE
TRACK LIGHTING - LETTER DENOTES TYPE
LETTER DENOTES SWITCHING), NUMBER DENOTES CIRCUIT
DISCONNECT SWITCH "F" INDICATES FUSIBLE
DISCONNECT SWITCH VENDOR FURNISHED
TELEPHONE TERMINAL BOARD 4 X 8 X 3/4" FIRE
A
A
A
A
A
SPORTS FIELD POLE ASSEMBLY
AT 18" AFF UNO.
SHOWN) - LETTER DENOTES TYPE
TTC
A
A
A
A
TTB
F
TELEPHONE TERMINAL CABINET
DENOTES TYPE
TREATED PLYWOOD
CONTACTOR VENDOR FURNISHED
CONTACTOR
TAMPER SWITCH
FAA
DH
FACP
DOOR HOLDER
I IONIZATION
D DUCT MOUNT
P PHOTOELECTRIC
H
X
X
S
HORN / STROBE
FIRE ALARM ANNUNCIATOR
STROBE
HORN
TV
SV
MOTION DETECTOR
PULL STATION
FLOW SWITCH
TELEVISION ANTENNA OUTLET
M
MOTOR OUTLET
SOLENOID VALVE
GROUND ROD
GENERATOR
SPEAKERS
G
COMBINATION MOTOR STARTER VENDOR FURNISHED
ELECTRICAL LEGEND:
T
P
TC TERMINAL CABINET
COMBINATION MOTOR STARTER
MOTOR STARTER
TRANSFORMER
PULLBOX
PANELBOARD FLUSH MOUNTED
PANELBOARD SURFACE MOUNTED
SWITCHBOARD
KWH
CIRCUIT BREAKER
DRAWOUT CIRCUIT BREAKER
MMETERING
D
INTERRUPTER SWITCH
FUSE
STSHUNT TRIP
GROUND FAULT INTERRUPTERGFI
TC
PC
R
M
S
D
P
S
K
S
S
3
4
S
S
S
24
C
2
2
AHU
C
VS
FS
F
SD
AS
A
A
A
A
A
TTC
A
A
A
A
TTB
F
FAA
DH
FACP
H
X
X
S
HORN
TV
SV
M
S
G
T
P
TC
KWH
M
D
ST
GFI
T
A
J
#
V
NEWEXISTINGNEWEXISTING DEFINITION DEFINITION
HORN
VS
FS
F
SD
AS
FAA
DH
FACP
H
X
X
S
TV
SV
M
S
G
KWH
M
D
ST
GFI
T
A
J
#
V
DEMOLITION
HORN
TC
PC
R
M
S
D
P
S
K
S
S
3
4
S
S
S
24
C
2
2
AHU
C
A
A
A
A
A
TTC
A
A
A
A
TTB
F
T
P
TC
DEMOLITION
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOOK THROUGH ALL DRAWINGS ASSOCIATED WITH THIS
PROJECT. WORK ASSOCIATED WITH THE ELECTRICAL CONTRACTOR'S TRADE MAY BE SHOWN ON OTHER
DRAWINGS. ANY ADDITIONAL COST RESULTING FROM THE FAILURE TO INCLUDE THESE ITEMS SHOWN ON THE
OTHER DRAWINGS WILL BE INCURRED BY CONTRACTOR.
2. IT IS THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS TO ESTABLISH A STANDARD OF QUALITY. THE
ENGINEER RESERVES THE RIGHT TO ALLOW OTHER METHODS AND MATERIALS NOT REFLECTED HEREIN. THE
CONTRACTOR SHALL BE RESPONSIBLE TO REQUEST THE ENGINEER WAIVE THE STANDARDS TO ALLOW
ALTERNATE MEANS AND METHODS PRIOR TO BEGINNING THE PROJECT. CONTRACT DOCUMENT REVISIONS
TO ACCOMMODATE INSTALLED CONDITIONS, WITHOUT PRIOR APPROVAL, WILL RESULT IN ADDITIONAL DESIGN
CHARGES TO THE CONTRACTOR.
3. ELECTRICAL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER IN ACCORDANCE WITH THE NECA
INSTALLATION STANDARDS TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER.
4. ALL WORK, MATERIALS AND EQUIPMENT SHALL CONFORM TO THE CURRENTLY ADOPTED EDITION OF ALL
APPLICABLE NATIONAL, STATE AND CITY CODES AND ORDINANCES.
5. ALL ELECTRICAL SYSTEM COMPONENTS SHALL BE LISTED OR LABELED BY UL OR OTHER RECOGNIZED
TESTING FACILITY AS ALLOWED BY AUTHORITY HAVING JURISDICTION.
6. WHERE AN APPARENT DISCREPANCY EXISTS BETWEEN THE REQUIREMENTS OF THE GENERAL NOTES AND
INFORMATION PORTRAYED IN THE ELECTRICAL DRAWINGS, THE CONTRACTOR SHALL INCLUDE IN THE BID
THE COST OF THE GREATER QUALITY OR QUANTITY.
7. CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID AND VERIFY EXISTING CONDITIONS.
8. CONTRACTOR SHALL INCLUDE IN BASE BID ALL COSTS REQUIRED FOR PERMITS AND INSPECTIONS.
9. CONTRACTOR SHALL VERIFY, WITH OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING BID, ALLOWABLE
WORKING HOURS, EMPLOYEE PARKING AREAS, MATERIAL DELIVERY, STORAGE REQUIREMENTS, DEMOLITION
AND REMOVAL OF CONSTRUCTION DEBRIS, AS WELL AS DAILY CLEAN UP REQUIREMENTS. INCLUDE ALL
COSTS IN BID FOR DUST BARRIERS, DUMPSTERS ETC. AS REQUIRED FOR THE DURATION OF THE PROJECT.
PERFORM ALL WORK AS DIRECTED BY OWNER'S REPRESENTATIVE AND ARCHITECT.
10. ALL ELECTRICAL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. IF TESTS SHOW THAT WORK IS
DEFECTIVE, CONTRACTOR SHALL MAKE ALL NECESSARY CORRECTIONS AT NO ADDITIONAL COST TO OWNER.
11. CONTRACTOR SHALL GUARANTEE ALL WORK AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP WHICH
MAY OCCUR UNDER NORMAL USE FOR A PERIOD OF ONE YEAR AFTER OWNER'S ACCEPTANCE. ALL DEFECTS
SHALL BE PROMPTLY CORRECTED BY CONTRACTOR WITHOUT ADDITIONAL COST TO OWNER.
12. PROVIDE AS-BUILT DRAWINGS TO ARCHITECT. DRAWINGS SHALL INCLUDE ACCURATE CONDUIT AND DEVICE
LOCATIONS DIMENSIONED FROM PERMANENT LANDMARKS SUCH AS BUILDING WALLS.
13. DO NOT SCALE ELECTRICAL DRAWINGS. VERIFY EXACT LOCATION OF ALL DEVICES, JUNCTION BOXES,
LIGHTING FIXTURES, ETC. WITH ARCHITECTURAL AND INTERIOR DESIGN DRAWINGS PRIOR TO INSTALLATION.
CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL MECHANICAL EQUIPMENT AND OTHER EQUIPMENT
REQUIRING ELECTRICAL CONNECTION PRIOR TO ROUGH-IN. EVERY OUTLET HEIGHT SHALL BE VERIFIED ON
EACH WALL WITH THE INTERIOR PLANNING AND DESIGN DRAWINGS. COORDINATE WITH CABINET SHOP
DRAWINGS TO ENSURE PROPER HEIGHT AND LOCATION WITH RESPECT TO MILLWORK, EQUIPMENT, ETC.
14. THESE DRAWINGS INDICATE THE FINISHED REQUIREMENTS FOR THE ELECTRICAL SYSTEMS, EQUIPMENT,
LIGHTING FIXTURES, OUTLETS AND DEVICES. DUE TO STRUCTURAL CONDITIONS, MECHANICAL DUCT, PIPING
CONFLICTS, OR OTHER LEGITIMATE REASONS, THE CONTRACTOR MAY DESIRE TO INSTALL THE WORK
INDICATED IN A MANNER DIFFERENT FROM THAT SHOWN. SUCH CHANGES SHALL BE PRESENTED TO THE
OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL PRIOR TO PROCEEDING. UPON APPROVAL, THE
WORK SHALL BE PERFORMED AND THE AS-BUILT DRAWINGS SHALL BE REVISED TO ACCURATELY REFLECT
THE WORK AS ACTUALLY INSTALLED.
15. ANY VARIANCE OR EXCEPTIONS THE THE DRAWINGS AND SPECIFICATIONS MUST BE REQUESTED AND
APPROVED IN WRITING BY THE ENGINEER. WHERE UNAUTHORIZED CHANGES ARE FOUND, THE CONTRACTOR
SHALL REMOVE THE INSTALLED WORK AND INSTALL IT AS SHOWN ON THE DRAWINGS AT NO ADDITIONAL
COST THE THE OWNER. COST SHALL INCLUDE ANY CUTTING , PATCHING, PAINTING AND REPAIR COST TO
INSTALLED CEILINGS, WALLS ETC. AS REQUIRED FOR CORRECTING THE DEFICIENCY.
16. RACEWAY SYSTEMS ARE SHOWN DIAGRAMMATICALLY. ACTUAL LOCATION AND ROUTING OF ALL, SHALL BE
DETERMINED BY CONTRACTOR TO SUIT FIELD CONDITIONS.
17. RACEWAYS SHALL BE INSTALLED CONCEALED WHENEVER POSSIBLE. RACEWAYS INSTALLED EXPOSED (AS
APPROVED BY ENGINEER IN WRITING PRIOR TO ROUGH-IN) SHALL BE ROUTED OUT OF PUBLIC VIEW AS MUCH
AS POSSIBLE. RACEWAYS SHALL BE RUN PARALLEL WITH, OR AT RIGHT ANGLE TO WALLS.
18. PROVIDE UL APPROVED EXPANSION FITTINGS WHERE RACEWAYS CROSS BUILDING EXPANSION JOINTS.
PROVIDE BONDING JUMPER(S) SIZED PER CODE WHERE REQUIRED. PROVIDE ALL FITTINGS REQUIRED FOR A
COMPLETE INSTALLATION. REFER TO ARCHITECTURAL DRAWINGS FOR EXPANSION JOINT LOCATION(S).
19. CONTRACTOR SHALL PROVIDE ALL RACEWAY SYSTEMS INDICATED ON THE DRAWING PER NEC
REQUIREMENTS AND GENERAL NOTES. ANY DEVIATION FROM THE WIRING METHODS INDICATED SHALL BE
ALLOWED ONLY BY SPECIFIC WRITTEN APPROVAL FROM EITHER THE ARCHITECT, ENGINEER OR OWNER.
CONTRACTOR'S BID SHALL INCLUDE ALL COSTS FOR RACEWAY SYSTEMS AS SPECIFIED UNLESS SPECIFIC
WRITTEN APPROVAL FOR AN ALTERNATIVE WIRING METHOD IS OBTAINED FROM EITHER THE ARCHITECT,
ENGINEER OR OWNER AND IS SUBMITTED AS PART OF CONTRACTOR'S FORMAL BID PROPOSAL.
20. PRIOR TO INSTALLATION, CONTRACTOR SHALL REVIEW THE COMPLETE SET OF CONSTRUCTION DOCUMENTS
FOR CONFLICTS WITH OTHER TRADES. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL WORK
WITH OTHER TRADES TO AVOID CONFLICT DURING INSTALLATION. CONTRACTOR SHALL MAKE MINOR
ADJUSTMENTS IN EQUIPMENT LOCATION AND ROUTING AS NECESSARY AT NO ADDITIONAL COST TO THE
OWNER.
21. CONTRACTOR SHALL BE RESPONSIBLE TO PROPERLY CUT AND PATCH EXISTING CONSTRUCTION AS
REQUIRED TO INSTALL NEW ELECTRICAL WORK. ALL PATCHING SHALL BE OF THE SAME MATERIALS,
WORKMANSHIP AND FINISH AS THE EXISTING WORK AND SHALL ACCURATELY MATCH ALL SURROUNDING
WORK TO THE SATISFACTION OF THE ARCHITECT.
22. ALL ELECTRICAL EQUIPMENT SHALL HAVE SUFFICIENT GUTTER SPACE AND LUGS TO ACCOMMODATE
QUANTITY AND SIZE OF CONDUCTORS REQUIRED. CONTRACTORS SHALL PROVIDE EQUIPMENT WITH
OVERSIZED ENCLOSURES WHERE REQUIRED.
23. COORDINATE ELECTRICAL REQUIREMENTS FOR ALL PLUMBING AND MECHANICAL EQUIPMENT WITH FINAL
CONTRACTOR SELECTION. THE CONTRACTOR SHALL SIZE DISCONNECTS BASED UPON CIRCUIT BREAKER
RATINGS AND PROVIDE FUSING AS REQUIRED PER EQUIPMENT MANUFACTURER RECOMMENDATIONS AND
U.L. LISTING REQUIREMENT
24. SIZING OF MOTOR-RELATED ELECTRICAL COMPONENTS, INCLUDING FEEDER AND/ OR BRANCH CIRCUITS
(WIRE AND CONDUIT) AND OVERCURRENT PROTECTION (BREAKER AND/ OR FUSES) IS BASED ON RATINGS
INDICATED IN THE CONTRACT DOCUMENTS AS WELL AS NEC APPROXIMATED LOADS FOR A GIVEN MOTOR
HORSEPOWER, VOLTAGE AND PHASE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL MOTOR
AND APPLIANCE RATING AND LOADS. CONTRACTOR TO PROVIDE CORRECTLY SIZED MOTOR OVERLOAD
ELECTRICAL COMPONENTS BASED ON NAMEPLATE RATING. REFLECT ALL CHANGES IN THE AS-BUILT
DRAWINGS.
25. THE ELECTRICAL CONTRACTOR PRIOR TO ROUGH-IN, SHALL VERIFY ALL HVAC AMPERAGES, PHASES AND
VOLTAGES AGAINST PLAN REQUIREMENTS AND NOTIFY ENGINEER/ARCHITECT OF ANY DISCREPANCIES.
FAILURE TO VERIFY AND NOTIFY ENGINNER/ARCHITECT PRIOR TO ROUGH-IN SHALL RESULT IN THE
ELECTRICAL CONTRACTOR ASSUMING RESPONSIBILITY FOR DESIGN AND INSTALLATION REQUIREMENTS.
26. THE ELECTRICAL CONTRACTOR SHALL INSURE FINAL COORDINATION OF THE MANUFACTURERS
RECOMMENDED FUSE SIZES FOR THE INSTALLED MECHANICAL EQUIPMENT WITH THE SIZE DISCONNECT
PRIOR TO OR DURING ROUGH-IN. ADVISE ENGINEER IF CHANGES IN THE FINAL SELECTION OF MECHANICAL
EQUIPMENT HAVE IMPACTED DISCONNECT SWITCH, BREAKER, OR CONDUCTOR SIZES.
27. CONTRACTOR SHALL ENGAGE THE SERVICES FOR A STATE LICENSED FIRE ALARM
MANUFACTURER/INSTALLER TO PREPARE ALL DESIGN DRAWINGS AND CALCULATIONS REQUIRED FOR
SYSTEM APPROVAL BY THE AUTHORITY HAVING JURISDICTION. SUBMIT ALL PLANS AND PROVIDE ALL
PERMITS REQUIRED FOR A COMPLETE AND OPERABLE APPROVED LIFE SAFETY SYSTEM.
28. ALL PENETRATIONS OF FIRE RESISTIVE FLOORS OR WALLS SHALL BE PROTECTED BY MATERIALS AND
INSTALLATION DIAGRAMS THAT CONFORM TO UL LISTING FOR "THROUGH-PENETRATION FIRE STOP
SYSTEMS".
29. WHERE MOTORS ARE INSTALLED IN SUSPENDED CEILINGS, CONTRACTOR SHALL PROVIDE DISCONNECT
SWITCH IN SUSPENDED CEILING WITHIN REACH FROM ACCESS POINT.
30. VERIFY DEVICE COLOR AND MOUNTING ORIENTATION (VERTICAL OR HORIZONTAL) WITH ARCHITECTURAL AND
INTERIOR DESIGN DRAWINGS PRIOR TO ORDERING ANY EQUIPMENT AND PROVIDE DEVICES AS REQUIRED.
UNLESS NOTED OTHERWISE, DEVICES AND DEVICE PLATES SHALL BE WHITE IN COLOR.
31. PROVIDE TYPED UPDATED PANEL DIRECTORY TO BE MOUNTED ON INSIDE OF ALL PANEL DOOR COVERS.
DIRECTORY SHALL REFLECT ALL ADDITIONS OR MODIFICATIONS TO EXISTING PANELS AND SHALL REFLECT
ACTUAL "AS-BUILT" CONDITIONS.
32. ALL NEW PANELBOARDS AND SWITCHBOARDS SHALL BE OF THE SAME MANUFACTURER AND HAVE LOCKING
DOORS AND BE KEYED THE SAME U.N.O.
33. UPON COMPLETION OF THE INSTALLATION OF LIFE SAFETY SYSTEM WIRING AND DEVICES, A PERFORMANCE
TEST OF THE ENTIRE LIFE SAFETY SHALL BE PERFORMED TO THE SATISFACTION OF THE AUTHORITY HAVING
JURISDICTION.
34. ALL EQUIPMENT ELECTRICAL TERMINATIONS TO UNDERGO A TORQUE TEST. ELECTRICAL CONTRACTOR IS
RESPONSIBLE FOR MANUFACTURER'S RECOMMENDED TORQUE DOCUMENTATION AND TOOLS TO PERFORM
TORQUE TEST.
35. FLOOR MOUNTED ELECTRICAL EQUIPMENT SHALL BE MOUNTED ON A 4" HIGH CONCRETE PAD.
36. INSTALL TRANSFORMER FOLLOWING MANUFACTURER'S RECOMMENDATIONS FOR VENTILATION CLEARANCES.
37. FURNISH AND INSTALL A COMPLETE AND OPERATIONAL ELECTRICAL SYSTEM IN ACCORDANCE WITH PLANS
AND SPECIFICATIONS.
38. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, ARCHITECT AND ENGINEER AS REQUIRED
SHUT-DOWNS OR TIE-INS RELATING TO THESE SYSTEMS. REQUESTS FOR SHUTDOWNS SHALL BE SUBMITTED
IN WRITING AT LEAST ONE WEEK IN ADVANCE FOR APPROVAL BY THE OWNER.
39. ALL EXPOSED RACEWAYS SHALL BE PAINTED TO MATCH ADJACENT SURFACES.
40. THE ELECTRICAL CONTRACTOR ASSUMES ALL RESPONSIBILITY AND LIABILITY FOR ANY "VALUE ENGINEERING"
OF THE MATERIALS, SPECIFICATIONS AND DESIGN OF THIS PROJECT, INCLUDING ANY AND ALL COST FOR ANY
REVISIONS TO THE CONTRACT DOCUMENTS REQUIRED AS A RESULT IF THE "VALUE ENGINEERING".
41. PROPOSED ALTERNATE LIGHT FIXTURES SHALL BE SUBMITTED WITH A PHOTOMETRIC STUDY SHOWING
COMPLIANCE WITH ALL APPLICABLE LIGHTING CODES AND ORDINANCES.
42. AFTER COMPLETION OF THE INSTALLATION, THE ENTIRE ELECTRICAL SYSTEM SHALL BE THOROUGHLY
CLEANED. REMOVE ALL FOREIGN MATERIAL, DUST, PAINT, OIL GREASE, UNNEEDED LABELS AND STICKERS
FROM EQUIPMENTS. REMOVE ALL DEBRIS ACCUMULATED DURING CONSTRUCTION.
43. ALL 120V AND 277V DEVICES SHALL HAVE A DEDICATED NEUTRAL.
2
S
S
H
TS
F
FS
V
T
S
S
H
TS
F
FS
V
T
2
S
S
H
TS
F
FS
V
T
2
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.
2211
TO BELOW
ESCALATOR
OFFICE
2235
CATALOGING
TECH. SERVICES
2231A
OFFICE
2236
VEST.
2250A
CORRIDOR
2250
ELEC.
2252
STAIR# 4
MECHANICAL
2251
COMM.
TELE-
2252A
VEST.
2252B
STORAGE
COMPACT
2231
OPEN
OFFICE
NEW
2229
OFFICE
2222
PROCESSING
SERIALS/
TECH. SERVICES
2226
OFFICE
2237
DATA
2233
OFFICE
2234
OFFICE
2232
2224
CORR.
2220A
AREA
OPEN OFFICE
TECH. SERVICES
2226A
OFFICE
NEW
2228
OFFICE
2227
READING
2230
CUST.
2213
RECEPTION
2220
CONFERENCE
2225
SERVICE
2223
BINDERY
TECH. SERV.
2221A
ACQUISITION
TECH. SERV.
2221
MEN
2214
VEST.
2215
WOMEN
2212
READING
2180
SERV.
2284
RECEPTION
ADMIN.
2270
STO.
2270A
DEAN
ADMIN.
2278
OFFICE
2275
STAIR#2
WOMEN
2264A
MEN
2264
ELEC.
2263
TELE.
2262
DONOR GALLERY
2260
DATA.
2261
VEST.
2260A
OPEN OFFICE
ADMIN.
2271B
VISITOR
ADMIN.
2271C
COUNT ROOM
ADMIN.
2272A
WORK AREA
ADMIN.
2277
FILE RM
ADMIN.
2273
ASSIST.
ADMIN. DEV.
2271A
ASSIST.
ADMIN. MGMT.
2271
ASSC. DEAN
ADMIN.
2274
ACCT.
ADMIN.
2272
VEST.
2115
TO BELOW
OPEN
CORRIDOR
2300
TO BELOW
OPEN
CONF.
SMALL
2276
HALL.
2290
CONFERENCE
ADMIN.
2281
ASST.
MGMT.
2282
STAIR#3
CORRIDOR
2100
MEN
2114
WORKSTATION
EXPRESS
2110
PHONES
2110A
WOMEN
2112
VEST.
2111 CUST.
2113
VESTIBULE
2119
ELEC.
2116
DATA
2117
READING
2120
VEST.
2121
STAIR#1
VEST.
2125
VESTIBULE
2191
CORRIDOR
2190
DATA
2194
MECHANICAL
2201
VEST
2200
HALL
2192
ELEC.
2195
TELE.
2196
STAIR# 5
PERIODICALS
CURRENT
2170
HOLDING
RECYCLE
2193
MICROFORMS
2160
PERIODICALS
BOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,
PERIODICALS,
2141
PUBLICATIONS
GOVERNMENT
2130
ELEV#3
ELEV#1
ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.
2181
HALL.
2280A
CORR.
2280
OFFICE
2238
2118
GROUP
STUDY
GROUP
STUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified by
the Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107
las vegas, nevada 89102
Tel: 702.263.7111
www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereof
furnished by the Architect are to be used only with
respect to this Project and are not to be used on any
other Project with the exception of one contract set
for each party to the building contract. Such
Documents are to be returned or suitably accounted
for to the Architect on request at the completion of
the Project. Any use or reproduction of this Drawing
in whole or in part by any means whatsoever is
strictly prohibited except with the specific written
consent of LG Architects, Inc., a Nevada
Corporation. Copyright © LG Architects, Inc. all
rights reserved. Submission or distribution to meet
official regulatory requirements or for other purposes
in connection with the project in not to be construed
as publication in derogation of the Architects
common law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLAND
PARKWAY
LAS VEGAS, NEVADA
89119
(consultant)
(stamp)
te
am
wo
rk://b
im
se
rve
r/0
07
11
50
02
U
NL
V L
EIS
UR
E R
EA
DIN
G/IS
SU
ED
F
OR
P
LA
N R
EV
IE
W/#
La
yID
/#
La
yo
ut N
am
e/F
rid
ay, F
eb
ru
ary 2
6, 2
01
6/2
:5
8 P
M/
ELECTRICAL LEGEND, ABBREVIATIONS SHEET INDEX
ELECTRICAL LEGEND,ABBREVIATIONS SHEET
INDEX
EG1.01
GENERAL NOTES:
SHEET INDEX
SHEET NUMBER SHEET TITLE
EG1.01 ELECTRICAL LEGEND, ABBREVIATIONS SHEET INDEX
EG1.02 ELECTRICAL SPECIFICATIONS
ED1.01 DEMOLITION PLAN SECOND FLOOR
E1.01 LIGHTING PLAN SECOND FLOOR
E2.01 POWER PLAN SECOND FLOOR
E3.01 COMMUNICATIONS PLAN SECOND FLOOR
E4.01 ELECTRICAL DETAILS
E5.01 ONE LINE DIAGRAM & SCHEDULES
ELECTRICAL SPECIFICATIONS
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.
2211
TO BELOW
ESCALATOR
OFFICE
2235
CATALOGING
TECH. SERVICES
2231A
OFFICE
2236
VEST.
2250A
CORRIDOR
2250
ELEC.
2252
STAIR# 4
MECHANICAL
2251
COMM.
TELE-
2252A
VEST.
2252B
STORAGE
COMPACT
2231
OPEN
OFFICE
NEW
2229
OFFICE
2222
PROCESSING
SERIALS/
TECH. SERVICES
2226
OFFICE
2237
DATA
2233
OFFICE
2234
OFFICE
2232
2224
CORR.
2220A
AREA
OPEN OFFICE
TECH. SERVICES
2226A
OFFICE
NEW
2228
OFFICE
2227
READING
2230
CUST.
2213
RECEPTION
2220
CONFERENCE
2225
SERVICE
2223
BINDERY
TECH. SERV.
2221A
ACQUISITION
TECH. SERV.
2221
MEN
2214
VEST.
2215
WOMEN
2212
READING
2180
SERV.
2284
RECEPTION
ADMIN.
2270
STO.
2270A
DEAN
ADMIN.
2278
OFFICE
2275
STAIR#2
WOMEN
2264A
MEN
2264
ELEC.
2263
TELE.
2262
DONOR GALLERY
2260
DATA.
2261
VEST.
2260A
OPEN OFFICE
ADMIN.
2271B
VISITOR
ADMIN.
2271C
COUNT ROOM
ADMIN.
2272A
WORK AREA
ADMIN.
2277
FILE RM
ADMIN.
2273
ASSIST.
ADMIN. DEV.
2271A
ASSIST.
ADMIN. MGMT.
2271
ASSC. DEAN
ADMIN.
2274
ACCT.
ADMIN.
2272
VEST.
2115
TO BELOW
OPEN
CORRIDOR
2300
TO BELOW
OPEN
CONF.
SMALL
2276
HALL.
2290
CONFERENCE
ADMIN.
2281
ASST.
MGMT.
2282
STAIR#3
CORRIDOR
2100
MEN
2114
WORKSTATION
EXPRESS
2110
PHONES
2110A
WOMEN
2112
VEST.
2111 CUST.
2113
VESTIBULE
2119
ELEC.
2116
DATA
2117
READING
2120
VEST.
2121
STAIR#1
VEST.
2125
VESTIBULE
2191
CORRIDOR
2190
DATA
2194
MECHANICAL
2201
VEST
2200
HALL
2192
ELEC.
2195
TELE.
2196
STAIR# 5
PERIODICALS
CURRENT
2170
HOLDING
RECYCLE
2193
MICROFORMS
2160
PERIODICALS
BOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,
PERIODICALS,
2141
PUBLICATIONS
GOVERNMENT
2130
ELEV#3
ELEV#1
ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.
2181
HALL.
2280A
CORR.
2280
OFFICE
2238
2118
GROUP
STUDY
GROUP
STUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified by
the Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107
las vegas, nevada 89102
Tel: 702.263.7111
www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereof
furnished by the Architect are to be used only with
respect to this Project and are not to be used on any
other Project with the exception of one contract set
for each party to the building contract. Such
Documents are to be returned or suitably accounted
for to the Architect on request at the completion of
the Project. Any use or reproduction of this Drawing
in whole or in part by any means whatsoever is
strictly prohibited except with the specific written
consent of LG Architects, Inc., a Nevada
Corporation. Copyright © LG Architects, Inc. all
rights reserved. Submission or distribution to meet
official regulatory requirements or for other purposes
in connection with the project in not to be construed
as publication in derogation of the Architects
common law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLAND
PARKWAY
LAS VEGAS, NEVADA
89119
(consultant)
(stamp)
te
am
wo
rk://b
im
se
rve
r/0
07
11
50
02
U
NL
V L
EIS
UR
E R
EA
DIN
G/IS
SU
ED
F
OR
P
LA
N R
EV
IE
W/#
La
yID
/#
La
yo
ut N
am
e/F
rid
ay, F
eb
ru
ary 2
6, 2
01
6/2
:5
8 P
M/
ELECTRICALSPECIFICATIONS
EG1.02
ELECTRICAL SPECIFICATIONS
SECTION 16000
PROJECT NUMBER 15096
PART 1 - GENERAL REQUIREMENTS:
1.1 DESCRIPTION
A SCOPE: THE ELECTRICAL WORK CONSISTS OF FURNISHING EVERYTHING NECESSARY FOR AND INCIDENTAL TO THE
EXECUTION AND COMPLETION OF ALL ELECTRICAL WORK INDICATED ON THE DRAWINGS AND SPECIFIED BELOW
INCLUDING BUT NOT LIMITED TO:
1. ELECTRICAL PANELS, CONTROLS SERVICE, DISCONNECTS, CONDUITS, WIRING, ETC. FOR ALL OUTLETS AND
EQUIPMENT.
2. TELEPHONE / DATA OUTLETS AND CONDUIT AS INDICATED.
3. CONTROL WIRING FOR ELECTRICAL AND HVAC SYSTEMS.
4. TRANSFORMER PAD AND PRIMARY CONDUIT SYSTEM TO POINT OF CONNECTION WITH POWER COMPANY.
B THE DRAWINGS ARE DIAGRAMMATIC UNLESS INDICATED OTHERWISE. THE DRAWINGS REFLECT CIRCUITING ONLY
AND ARE NOT DEPICTING EXACT CONDUIT ROUTING UNLESS SPECIFICALLY NOTED OTHER WISE.
1. DATA PRESENTED ON THESE DRAWINGS ARE AS ACCURATE AS PLANNING CAN DETERMINE, BUT FIELD
VERIFICATION OF ALL DIMENSIONS, LOCATIONS, LEVELS, ETC., TO SUIT FIELD CONDITIONS IS REQUIRED. REVIEW
ALL ARCHITECTURAL, AND LIGHTING DRAWINGS AND ADJUST ALL WORK TO MEET THE REQUIREMENTS OF
CONDITIONS SHOWN. DISCREPANCIES BETWEEN DIFFERENT PLANS, OR BETWEEN DRAWINGS AND
SPECIFICATIONS, OR REGULATIONS AND CODES GOVERNING THE INSTALLATION SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER IN WRITING BEFORE THE DATE OF BID OPENING. IF DISCREPANCIES ARE NOT
REPORTED, THE CONTRACTOR SHALL BID THE GREATER QUANTITY OR BETTER QUALITY, AND APPROPRIATE
ADJUSTMENTS WILL BE MADE AFTER CONTRACT AWARD. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD
MEASURE AND CONFIRM MOUNTING HEIGHTS AND LOCATION OF ELECTRICAL EQUIPMENT WITH RESPECT TO
COUNTERS, RADIATION, ETC. DO NOT SCALE DISTANCES OFF THE ELECTRICAL DRAWINGS. USE ACTUAL
BUILDING DIMENSIONS.
C EXAMINE ALL DRAWINGS FOR WORK REQUIRED BY THIS SUBCONTRACTOR.
1.2 CODES
A ALL WORK SHALL BE IN ACCORDANCE WITH THE NEC AND LOCAL GOVERNING CODES.
1. ALL UTILITY WORK SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE SERVING POWER AND TELEPHONE
COMPANIES.
2. ALL OFF SITE WORK SHALL BE IN ACCORDANCE WITH THE UNIFORM STANDARD DRAWINGS FOR CLARK COUNTY
AREA.
3. FOR THE REQUIREMENTS ON ROUTING AND SUPPORT OF ALL LOW VOLTAGE CABLE REFER TO THE
SPECIFICATION HERE (http://oit.unlv.edu/sites/default/files/campus_wiring_standards_8-26-15_1.pdf)
1.3 SUBSTITUTIONS
A CONTRACTOR'S BID PRICE SHALL REFLECT THE COSTS OF ALL MATERIALS AS SPECIFIED. NO PRIOR APPROVAL OF
MATERIALS WILL BE GIVEN PRIOR TO AWARD OF BID. ALL SWITCHGEAR AND PANELBOARDS SHALL BE FURNISHED BY
A SINGLE MANUFACTURER.
B SUBSTITUTIONS OF EQUAL QUALITY AND OF BENEFIT TO THE OWNER WILL BE EVALUATED AT THE
CONTRACTOR'S REQUEST. ANY ADDITIONAL COST TO THE OWNER FOR REVIEW OF SUBSTITUTIONS WILL BE AT THE
CONTRACTOR'S EXPENSE.
C AFTER REVIEW OF SUBSTITUTES, THE DECISION OF THE ENGINEER IN DETERMINING EQUAL MATERIALS WILL BE
FINAL.
1.4 SUBMITTALS
A PROVIDE SUBMITTALS FOR THE FOLLOWING EQUIPMENT:
1. WIRING DEVICES
2. CIRCUIT BREAKERS
B SHOP DRAWINGS AND APPROVALS
1. THE CONTRACTOR SHALL SUBMIT SIX (6) IDENTICALLY BOUND SETS OF SHOP DRAWINGS ON THE FOLLOWING
ITEMS:
a. OUTLINE DRAWINGS AND DATA SHEETS OF EACH CIRCUIT BREAKER, DISCONNECT, TRANSFER SWITCH,
GENERATOR, TRANSFORMER, PANEL BOARD, AND SWITCHBOARD.
1) HIGHLIGHT SERVICE CONDITIONS OF EQUIPMENT AND THE APPROPRIATE DERATING TO MEET 2.1.B.
b. DATA SHEETS OF ALL WIRING DEVICES, LIGHTING FIXTURES, AND FUSES.
1.5 QUALITY ASSURANCE
A ALL WORK SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER AND IN ACCORDANCE WITH NECA
STANDARDS.
B ALL WORK SHALL BE SUBJECT TO INSPECTION AND POSSIBLE REJECTION IF NOT IN ACCORDANCE WITH THESE
SPECIFICATIONS, THE DRAWINGS, AND INSTALLED IN NEAT AND WORKMANLIKE MANNER.
C ANY REJECTED WORK SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
PART 2 - PRODUCTS:
2.1 MATERIAL AND EQUIPMENT
A MATERIAL AND EQUIPMENT SHALL BE NEW AND OF CURRENT PRODUCTION BY MANUFACTURERS REGULARLY
ENGAGED IN THE MANUFACTURE OF SUCH ITEMS. ELECTRICAL SWITCHGEAR AND COMPONENTS SHALL BE THE
PRODUCT OF A SINGLE MANUFACTURER. ALL MATERIAL SHALL BE UL LISTED.
B SERVICE CONDITIONS
1. ALTITUDE- 2100 FEET
2. TEMPERATURE
a. INDOOR - 40 DEGREE C (100 DEGREE F)
b. OUTDOOR - 60 DEGREE C (140 DEGREE F)
C CONDUITS
1. INTERIOR CONDUIT SHALL BE EMT WITH COMPRESSION OR SET SCREW FITTINGS.
2. FMC SHALL BE USED FOR FINAL CONNECTION TO LIGHTING FIXTURES NOT TO EXCEED 72 INCHES.
a. FNC OR ALUMINUM FMC SHALL NOT BE USED.
b. FMC SHALL NOT BE USED EXCEPT AS NOTED ABOVE WITHOUT PRIOR APPROVAL OF THE ENGINEER.
5. MC CABLE MAY NOT BE USED.
6. CONDUIT FITTINGS SHALL BE STEEL OR MALLEABLE IRON TYPE.
D CABLE
1. CONDUCTORS SHALL BE TYPE THHN/THWN 75 DEGREE WIRE.
2. CONDUCTORS SHALL BE COPPER.
3. MINIMUM WIRE SIZE SHALL BE #12 AWG.
a. 120V BRANCH CIRCUITS OVER 65 FEET IN LENGTH FROM THE CENTER OF THE LOAD TO THE PANEL SHALL BE
#10 AWG AND BRANCH CIRCUITS OVER 130 FEET SHALL BE #8 AWG. INCREASE CONDUIT AND WIRE SIZES AS
REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
4. UNLESS OTHERWISE REQUIRED BY LOCAL ORDINANCES GROUND WIRES SHALL BE GREEN, NEUTRAL WIRES
SHALL BE WHITE (120V) OR GRAY (277V) AND PHASE WIRES SHALL BE BLACK (PHASE A), RED (PHASE B), AND
BLUE (PHASE C) FOR A 120/208 VOLT SYSTEM AND BROWN (PHASE A), ORANGE (PHASE B), AND YELLOW (PHASE
C) FOR A 277/480 VOLT SYSTEM.
E WIRING DEVICES
1. WIRING DEVICES SHALL BE AS FOLLOWS:
a. RECEPTACLES - 120V, 20A, NEMA 5-20R, SPECIFICATION GRADE, SIDE AND BACK WIRED WITH CLAMP TYPE
TERMINALS, NYLON, WHITE, 2 POLE, 3 WIRE GROUNDING.
1) PROVIDE GRAY COLOR FOR COMPUTER OUTLETS.
2. DEVICE PLATES SHALL BE NYLON, COLOR SHALL MATCH DEVICE WITH MATCHING SCREWS.
G SAFETY SWITCHES SHALL BE GENERAL DUTY TYPE, NEMA 1 INDOOR AND NEMA 3R OUTDOOR.
H OVERCURRENT PROTECTION DEVICES:
1. CIRCUIT BREAKERS SHALL BE OF THE SAME MANUFACTURES AS PANELBOARDS AND SWITCHBOARDS. PROVIDE
BREAKERS AS NOTED ON THE SCHEDULE.
2. FUSES USED TO PROTECT MOTORS SHALL BE BUSSMAN TYPE FRN-R. ALL FUSES INSTALLED IN FUSED
DISCONNECTS SHALL BE CLASS R UNLESS NOTED OTHERWISE.
3. PROVIDE HACR RATED BREAKERS FOR MECHANICAL EQUIPMENT.
I PROVIDE GROUNDING FOR ALL BRANCH CIRCUITS. CONDUIT, LISTED FOR USE, MAY BE USED FOR GROUNDING FOR
20A BRANCH CIRCUITS ONLY WHEN APPROVED FOR SUCH USE. ALL FMC AND NON-METALLIC CONDUIT SHALL HAVE
A SEPARATE GROUND WIRE.
J OUTLET, PULL AND JUNCTION BOXES
1. EACH SWITCH, LIGHT, RECEPTACLE OR OTHER OUTLET SHALL BE PROVIDED WITH A CODE GAUGE, GALVANIZED
STEEL OUTLET BOX. JUNCTION AND PULLBOXES SHALL BE CODE GAUGE, GALVANIZED STEEL. OUTLET BOXES
SHALL BE OF THE ONE PIECE, KNOCKOUT TYPE, IN GENERAL 4" SQUARE WITH PLASTER RING. PLASTER RINGS
SHALL BE SET TO PROVIDE NOT MORE THAN 1/8" FROM WALL SURFACE TO RING. IN NO CASE SHALL PLASTER
RING PROJECT BEYOND SURFACE OF WALL. SINGLE GANG RINGS SIMILAR TO STEEL CITY 52-C-50 SHALL BE
USED FOR 4” BOXES IN UNFINISHED BRICK. RACO 3180 BOXES MAY BE USED FOR UNFINISHED MASONRY FLUSH
WALL OUTLETS. CENTER ALL OUTLET BOXES IN BLOCK COURSE AND PROVIDE A SMOOTH FINISH BLOCK AT
OUTLET LOCATIONS.
2. BOXES INSTALLED FOR TELEPHONE, ALARM, COMPUTER AND SECURITY SYSTEMS SHALL BE PROVIDED WITH
APPROPRIATE COVERPLATES.
PART 3 - EXECUTION
3.1 INSTALLATION
A EQUIPMENT LOCATIONS SHALL BE AS CLOSE AS PRACTICAL TO LOCATIONS SHOWN ON THE PLAN DRAWINGS AND
SUBJECT TO SUCH APPROVED REVISIONS AT NO COST TO THE OWNER AS MAY BE FOUND NECESSARY OR
DESIRABLE AT THE TIME WORK IS INSTALLED.
B CLOSE ALL OPENINGS IN WALLS, FLOORS, AND ROOFS TO THE APPROVAL OF THE ARCHITECT.
C PAINT ALL CONDUITS AND BOXES THAT ARE REQUIRED TO BE EXPOSED TO MATCH BUILDING SURFACES. RUN ALL
EXPOSED CONDUIT PARALLEL AND PERPENDICULAR TO BUILDING LINES.
D PROVIDE ENGRAVED PHENOLIC NAMEPLATES ON ALL EQUIPMENT AND INSTALL TYPED DIRECTORY IN PANELBOARDS.
FASTEN NAMEPLATES WITH SCREWS OR RIVETS, DO NOT USE ADHESIVE.
E COORDINATE THE WORK WITH OTHER TRADES.
F MEGGER TEST ALL FEEDER CIRCUITS AFTER INSTALLATION.
G INSTALL 200 POUND TEST PULL NYLON PULL CORD IN ALL SIGNAL AND COMMUNICATION CONDUITS.
H INSTALL SWITCHES AT 48" AFF AND RECEPTACLES AT 18" AFF UNLESS NOTED OTHERWISE.
I PANELBOARDS SHALL BE INSTALLED WITH THE TOP OF THE CABINET 6'-0" AFF.
J CONDUITS AND OUTLETS SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE; EXCEPT THAT CERTAIN MOTOR
AND LIGHTING FEEDER CONDUITS MAY BE RUN EXPOSED IN CERTAIN AREAS AS INDICATED ON THE DRAWINGS.
CONDUIT AND OUTLETS SHOWN TO BE INSTALLED IN CABINETS, COUNTERS, AND CASEWORK SHALL BE RUN OR
INSTALLED AS DIRECTED BY THE ARCHITECT.
L PATCH AND REPAIR AREA WHERE ITEMS HAVE BEEN DEMOLISHED OR DAMAGED DURING CONSTRUCTION TO MATCH
ADJACENT SURFACES TO OWNER'S APPROVAL.
N CONDUITS PENETRATING FLOOR SLABS SHALL BE INSTALLED A MINIMUM OF 2” AFF.
O LABEL ALL SPARE CONDUITS/PULLSTRINGS AT BOTH ENDS WITH IDENTIFICATION OF LOCATION AT THE OPPOSITE
END.
P A COMPLETELY AND THOROUGHLY SWAB RACEWAY BEFORE INSTALLING WIRE.
Q REQUEST INSPECTIONS FROM LOCAL GOVERNING AUTHORITIES.
3.2 PROJECT COMPLETION
A REMOVE ALL DISCARDED MATERIALS FROM DEMOLITION AND INSTALLATION FROM THE JOB SITE.
B PROVIDE REPRODUCIBLE RECORD DRAWINGS OF ALL COMPLETED WORK.
C GUARANTEE ALL MATERIAL FURNISHED AND ALL WORKMANSHIP PERFORMED FOR A PERIOD OF ONE YEAR FROM
THE DATE OF FINAL ACCEPTANCE OF THE WORK. ANY DEFECTS DEVELOPING WITHIN THIS PERIOD, TRACEABLE TO
MATERIAL FURNISHED AS A PART OF THIS SECTION OR WORKMANSHIP PERFORMED HEREUNDER, SHALL BE MADE
GOOD AT NO ADDITIONAL EXPENSE TO THE OWNER.
"END OF SECTION"
18 J
CN
1
1
1 1
1
1
11
11
1
3
3
3
3
AREA BAREA C
AREA AAREA B
4
4
8
5
6
5
6
5
5
6
5
6
5
6
5
5
6
88
8
8
8
8
8
9
9
7 77
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10 10 10 10 10
101010
3
3
3
3
3
3
3
3
3
3
3
3
3
3
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
108
1010
101010
8
7
7
STAIR# 4
1107sf
MS
MS 3
2H4-
8
AX
AX
CN
+15'
-4"
AFF
CY
EXISTING PANEL 2L1EXISTING PANEL 2H4
EXISTING LIGHTINGCONTROL PANEL 2R4
EXISTING PANEL 2L2
M
M
2
AREA BAREA C
ELEV#4
326sf
3
3
6
EXISTING FIREALARM PANEL
EXISTING LIGHTINGCONTROL PANELS
EXISTING PANEL 2L4
EXISTING PANEL 2L3
EXISTING LIGHTINGCONTROL PANEL 2R1
EXISTING PANEL E2H1
EXISTING LIGHTING CONTROL PANEL
2
2
AREA AAREA B
TJK # 15096
MARCH 10, 2016
STAIR#1
ELEV#2
ELEV#4
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
1. ALL CONDUIT AND WIRING FROM REMOVED DEVICES SHALL BE REMOVEDBACK TO SOURCE.
2. PROVIDE POWER CONTINUATION TO DOWN STREAM DEVICES.
3. CONDUIT IN INACCESSIBLE LOCATIONS SHALL BE CAPPED OFF AND TOREMAIN IN PLACE.
4. WIRING SHALL NOT BE ABANDONED IN INACCESSIBLE CONDUITS.
5. PROVIDE UPDATED, TYPED PANEL DIRECTORIES FOR ALL PANEL BOARDSWITH CIRCUITS MODIFIED, ADDED OR REMOVED.
6. CONTRACTOR TO RELOCATE ALL EXTERIOR DEVICES ON REFURNISHEDWALL. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR ALLREFURNISHED WALLS.
DEMOLITION GENERAL NOTES:
1. LIGHT FIXTURES TO REMAIN. THOROUGHLY CLEAN LIGHT FIXTURE ANDLAMPS.
2. EXISTING CONTROLS TO REMAIN.
3. REMOVE LIGHT FIXTURES AND RETURN TO OWNER. COORDINATE WITHPROJECT MANAGER FOR RETURN REQUIREMENTS.
4. EXISTING EXIT SIGNS TO REMAIN.
5. EXISTING CONDUCTORS TO BE REMOVED BACK TO REQUEST ACTIVESOURCE. REFER TO E2.01 FOR RE-INSTALLATION INFORMATION.
6. EXISTING CABLES (QUANTITY OF 2) TO BE REMOVED BACK TO PATCHPANEL. REFER TO E3.01 FOR RE-INSTALLATION INFORMATION.
7. EXISTING TRACK LIGHTING TO BE DEMOLISHED.
8. EXISTING FIXTURES TO REMAIN. PROTECT IN PLACE DURINGCONSTRUCTION.
9. EXISTING FIXTURES TO BE DEMOLISHED.
10. EXISTING STRIP FIXTURES TO BE DEMOLISHED.
DEMOLITION KEY NOTES: #
SCALE:
DEMOLITION PLAN SECOND FLOOR - AREA C3 1/8" = 1'-0"
DEMOLITION PLANSECOND FLOOR
ED1.01SCALE:
DEMOLITION PLAN SECOND FLOOR - AREA B2 1/8" = 1'-0"
MATCHLINE SEE BELOW RIGHT FOR CONTINUATION
MATCHLINE SEE ABOVE RIGHT FOR CONTINUATION
SCALE:
DEMOLITION PLAN SECOND FLOOR - AREA A1 1/8" = 1'-0"
MATCHLINE SEE BELOW LEFT FOR CONTINUATION
MATCHLINE SEE ABOVE LEFT FOR CONTINUATION
S1
S1
S1
S1
R1
R1
R1
R1
R1
R1
R1 R1 R1 R1
R1 R1
R1
R1
P1
P1
R1 R1
R1
R1
S1
S1
P1
P1
T1
S2
S2
S2
S2
S2
S2S2
S2
a
a
b
S1
S1
S1
b
bb
b
b
b
b
b b
b
c
c c
d d
d
e
d
f
f
f
f
f
ff
f
d d
d
d
CS1
R1 R1c c
R1 R1c c
3
NUMBER INDICATES DEPTH OF DIFFUSER. (TYPICAL)
2
15
4
4
22
2 2
0
6
4
4
4
4
2 2
22
4
4
0
2
35
2 5
7 1
3
2 6
3 4
2
1 3
4
5 6
1
5
0 3 2
3
5
LOWER CASE LETTER INDICATESSWITCH LEG/LTG CONTROL ZONE (TYPICAL)
a
TA TA
TA
e e
T1
T1
T1
T1 T1 T1
SM
AREA AAREA B
NUMBER INDICATES DEPTH OF DIFFUSER. (TYPICAL)
AREA BAREA C
1
1
1
1
1
2H4-7
2H4-5
2H4-3
J
J
22
2
J
E1H1-33
4
S2f
S2f
STAIR# 4
1107sf
ESN
ESN
EXISTING PANEL 2L1EXISTING PANEL 2H4
EXISTING LIGHTINGCONTROL PANEL 2R4
EXISTING PANEL 2L2
1
AREA BAREA C
2L1-28
2L1-30
ELEV#4
326sf
EXISTING FIREALARM PANEL
EXISTING LIGHTINGCONTROL PANELS
EXISTING PANEL 2L4
EXISTING PANEL 2L3
EXISTING LIGHTINGCONTROL PANEL 2R1
EXISTING PANEL E2H1
EXISTING LIGHTING CONTROL PANEL
AREA AAREA B
2
2
TJK # 15096
MARCH 10, 2016
STAIR#1
ELEV#2
ELEV#4
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
LIGHTING PLAN SECONDFLOOR
E1.01
SCALE:
LIGHTING PLAN SECOND FLOOR - AREA A1 1/8" = 1'-0"
SCALE:
LIGHTING PLAN SECOND FLOOR - AREA B2 1/8" = 1'-0"
MATCHLINE SEE ABOVE LEFT FOR CONTINUATION
MATCHLINE SEE BELOW RIGHT FOR CONTINUATION
SCALE:
LIGHTING PLAN SECOND FLOOR - AREA C3 1/8" = 1'-0"
MATCHLINE SEE ABOVE RIGHT FOR CONTINUATION
MATCHLINE SEE BELOW LEFT FOR CONTINUATION
1. CONTRACTOR TO COORDINATE WITH LIGHTING DESIGNER EL2.1DRAWINGS AND THAT SHALL DICTATE ALL FIXTURE INFORMATION ANDCONTROLS.
2. CIRCUITING SHOWN IS FOR POWER ONLY TO THE FIXTURES. REFER TODRAWING EL2.1 FOR CONTROLS. ROUTE CIRCUITS THROUGH RELAYPANEL. PROVIDE CONDUCTORS AS NEEDED TO ALLOW FOR PROPERSWITCHING/CONTROLS.
3. REFER TO EL2.1 FOR LOCATION OF LIGHTING CONTROL PANELS (ESN).
4. LOW VOLTAGE LIGHTING CONTROL WIRING SHALL BE INSTALLED INCONDUIT 3/4" (MINIMUM) WHERE EXPOSED.
GENERAL NOTES:
1. REFERENCE EL2.1 FOR LIGHTING DESIGN, CONTROLS AND LIGHT FIXTURETYPES.
2. CONNECT LIGHTS TO EXISTING CIRCUITS IN THE AREA AS SHOWN.
3. CONNECT LIGHTS TO EXISTING EMERGENCY CIRCUIT IN THE AREA ASSHOWN.
4. ROUTE 3/4" CONDUIT WITHIN EXISTING WALL TO NEW SWITCH LOCATION.REFER TO EL2.1 FOR CABLING REQUIREMENTS.
KEY NOTES: #
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
READING2180
OFFICE2238
AREA AAREA B
+56"
+56"
+56"
+56"
2L1-22
2L1-24
2L1-26
AREA BAREA C
+56"
1
1
2
2
2
2
2
2
2
2
2
10'-10 1/2"
14'-4"
11'-0"
1
2'-10"
EQ.
EQ.
CG
OFFICE2235
CATALOGINGTECH. SERVICES
2231A
OFFICE2236
VEST.
2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252A
VEST.2252B
STORAGECOMPACT
2231
1107sf
EXISTING PANEL 2L1EXISTING PANEL 2H4
EXISTING LIGHTINGCONTROL PANEL 2R4
EXISTING PANEL 2L2
AREA BAREA C
VEST.2211
CUST.
WOMEN2212
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
PERIODICALS
HOLDINGRECYCLE
2193
ELEV#4
326sf
EXISTING FIREALARM PANEL
EXISTING LIGHTINGCONTROL PANELS
EXISTING PANEL 2L4
EXISTING PANEL 2L3
EXISTING LIGHTINGCONTROL PANEL 2R1
EXISTING PANEL E2H1
EXISTING LIGHTING CONTROL PANEL
AREA AAREA B
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.2211
TO BELOW
ESCALATOR
OFFICE2235
CATALOGINGTECH. SERVICES
2231A
OFFICE2236
VEST.
2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252A
VEST.2252B
STORAGECOMPACT
2231
OPEN
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
WOMEN2212
READING2180
SERV.2284RECEPTION
ADMIN.
2270 STO.2270A
DEANADMIN.
2278
OFFICE2275
STAIR#2
WOMEN2264A
MEN2264
ELEC.2263
TELE.2262
DONOR GALLERY2260
DATA.2261
VEST.2260A
OPEN OFFICEADMIN.
2271B
VISITORADMIN.
2271C
COUNT ROOMADMIN.
2272A
WORK AREAADMIN.
2277
FILE RMADMIN.
2273
ASSIST.ADMIN. DEV.
2271A
ASSIST.ADMIN. MGMT.
2271
ASSC. DEANADMIN.
2274
ACCT.ADMIN.
2272
VEST.2115
TO BELOWOPEN
CORRIDOR2300
TO BELOWOPEN
CONF.SMALL
2276
HALL.2290
CONFERENCEADMIN.
2281
ASST.MGMT.
2282
STAIR#3
CORRIDOR2100
MEN2114WORKSTATION
EXPRESS
2110
PHONES2110A
WOMEN2112
VEST.2111 CUST.
2113
VESTIBULE2119
ELEC.2116
DATA2117 READING
2120
VEST.2121
STAIR#1
VEST.2125
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
STAIR# 5
PERIODICALSCURRENT
2170
HOLDINGRECYCLE
2193
MICROFORMS2160
PERIODICALSBOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,PERIODICALS,
2141
PUBLICATIONSGOVERNMENT
2130
ELEV#3
ELEV#1ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.2181
HALL.2280A
CORR.2280
OFFICE2238
2118
GROUPSTUDY
GROUPSTUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
POWER PLAN SECONDFLOOR
E2.01
SCALE:
POWER PLAN SECOND FLOOR - AREA B2 1/8" = 1'-0"
SCALE:
POWER PLAN SECOND FLOOR - AREA A1 1/8" = 1'-0"
MATCHLINE SEE ABOVE LEFT FOR CONTINUATION
MATCHLINE SEE BELOW RIGHT FOR CONTINUATION
SCALE:
POWER PLAN SECOND FLOOR - AREA C3 1/8" = 1'-0"
MATCHLINE SEE ABOVE RIGHT FOR CONTINUATION
MATCHLINE SEE BELOW LEFT FOR CONTINUATION
GENERAL NOTES:
1. ALL CURRENT FLOOR BOXES ARE TO REMAIN. UNLESS OTHERWISE NOTED2. ALL CURRENT ELECTRICAL AND DATA LOCATIONS TO REMAIN AS IS UNLESS
OTHERWISE NOTED.3. FOR ALL POWER AND DATA TO BE INSTALLED WITHIN THE EXISTING TRENCH
DUCT AND CELLULAR FLOOR THE CONTRACTOR SHALL COORDINATE THEREMOVAL AND REINSTALLATION OF ALL FLOORING AS NEEDED TO ACCESSTHE DISTRIBUTION SYSTEM.
4. ALL FLOOR BOX INSTALLATION REQUIRE AN XRAY OF THE FLOOR PRIOR TOTHE START OF ANY WORK.
5. VERIFY EXACT LOCATION AND DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
POWER NOTES:1. REFER TO E4.01 FOR FLOOR BOX DETAIL FOR FLOOR BOXES CONNECTING
BACK TO THE EXISTING TRENCH SYSTEM OR PROVIDE A LEGRAND RC7FLOOR BOX FOR POKE THRU BOXES OPTION. REFERENCE E3.01 FOR MOREINFORMATION.
2. EXISTING BACK BOX TO BE EXTENDED TO NEW WALL SURFACE. INTERCEPTEXISTING CIRCUIT AT NEAREST ACTIVE SOURCE AND INSTALL NEWCONDUCTORS. THEN REINSTALL EXISTING DEVICES AND COVER PLATE.
#
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
READING2180
OFFICE2238
TT
CT
CT
CT
F
1
+56"2
2
+56"2
2
+56"2
2
+56"2
3
2
AREA AAREA B
AREA BAREA C
+56"2
3
2
EXISTING
1 1
1
42
2
2
2
2
2
2
4
4
4
4
4
4
SS
S
5
5
5
VEST.2211
CUST.
WOMEN2212
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
HOLDINGRECYCLE
2193
ELEV#4
326sf
T
CT
CT
AREA AAREA B
EXISTING
GENERAL NOTES: KEY NOTES: #
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.2211
TO BELOW
ESCALATOR
OFFICE2235
CATALOGINGTECH. SERVICES
2231A
OFFICE2236
VEST.
2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252A
VEST.2252B
STORAGECOMPACT
2231
OPEN
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
WOMEN2212
READING2180
SERV.2284RECEPTION
ADMIN.
2270 STO.2270A
DEANADMIN.
2278
OFFICE2275
STAIR#2
WOMEN2264A
MEN2264
ELEC.2263
TELE.2262
DONOR GALLERY2260
DATA.2261
VEST.2260A
OPEN OFFICEADMIN.
2271B
VISITORADMIN.
2271C
COUNT ROOMADMIN.
2272A
WORK AREAADMIN.
2277
FILE RMADMIN.
2273
ASSIST.ADMIN. DEV.
2271A
ASSIST.ADMIN. MGMT.
2271
ASSC. DEANADMIN.
2274
ACCT.ADMIN.
2272
VEST.2115
TO BELOWOPEN
CORRIDOR2300
TO BELOWOPEN
CONF.SMALL
2276
HALL.2290
CONFERENCEADMIN.
2281
ASST.MGMT.
2282
STAIR#3
CORRIDOR2100
MEN2114WORKSTATION
EXPRESS
2110
PHONES2110A
WOMEN2112
VEST.2111 CUST.
2113
VESTIBULE2119
ELEC.2116
DATA2117 READING
2120
VEST.2121
STAIR#1
VEST.2125
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
STAIR# 5
PERIODICALSCURRENT
2170
HOLDINGRECYCLE
2193
MICROFORMS2160
PERIODICALSBOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,PERIODICALS,
2141
PUBLICATIONSGOVERNMENT
2130
ELEV#3
ELEV#1ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.2181
HALL.2280A
CORR.2280
OFFICE2238
2118
GROUPSTUDY
GROUPSTUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
COMMUNICATIONS PLANSECOND FLOOR
E3.01
ALL CABLES SHALL BE BLUE TO INDICATE DATA. CONTRACTOR TOPROVIDE NEW TO MATCH EXISTING CABLE. ROUTE TO THE NEARESTDATA CLOSET IN ROOM 2233 OR 2196 AND PROVIDE NEW DATA JACKAND PATCH PANEL AS NEEDED
DATA JACKS LABELS USE THE FOLLOWING FORMAT:
IIII-DNNN
WHERE IIII IS THE FOUR DIGIT IDF ROOM NUMBER
D = DESIGNATES A DATA DROP
V = DESIGNATES A VOICE (TELEPHONE) LINE
NNN = DESIGNATES THE JACK NUMBER ON THE IDF
PATCH PANEL.
IN IDF 2233 THE NEXT PANEL WILL BEGIN WITH JACK DXXXIN IDF 2196 THE NEXT PANEL WILL BEGIN WITH JACK DXXX
1. ALL CURRENT FLOOR BOXES ARE TO REMAIN. UNLESS OTHERWISE NOTED2. ALL CURRENT ELECTRICAL AND DATA LOCATIONS TO REMAIN AS IS UNLESS
OTHERWISE NOTED.3. FOR ALL POWER AND DATA TO BE INSTALLED WITHIN THE EXISTING TRENCH
DUCT AND CELLULAR FLOOR THE CONTRACTOR SHALL COORDINATE THEREMOVAL AND REINSTALLATION OF ALL FLOORING AS NEEDED TO ACCESSTHE DISTRIBUTION SYSTEM.
4. ALL FLOOR BOX INSTALLATION REQUIRE AN XRAY OF THE FLOOR PRIOR TOTHE START OF ANY WORK.
5. FOR THE REQUIREMENTS ON ROUTING AND SUPPORT OF ALL LOW VOLTAGECABLE REFER TO THE SPECIFICATION HERE(http://oit.unlv.edu/sites/default/files/campus_wiring_standards_8-26-15_1.pdf)
1. EXISTING DATA OUTLETS TO REMAIN - THE CONTRACTOR SHALL REMOVETHE DEVICE AND PROTECT DURING THE REWORK OF THE WALL OR FLOORTHEN REINSTALL THE DEVICE AS REQUIRED FOR THE DEVICE ON THENEWLY FINISHED WALL OR FLOOR.
2. DATA OUTLETS - PROVIDE A 1" CONDUIT TO THE CEILING SPACE ABOVEWITH A 4 11/16 EXTRA DEEP J-BOX AND A SINGLE GANG MUD RINGPROVIDE CAT 6 DATA CABLES QTY AS INDICATED AND ROUTE THE CABLETO THE DATA ROOM #2233. TERMINATE ON NEW PATCH PANEL IN OWNERPROVIDED RACK
3. NEW FLOOR BOX PROVIDE ELECTRICAL AND DATA AS INDICATED. FOR THEDATA.THE CONTRACTOR MAY ROUTE BACK THRU THE EXIST TRENCH ORPROVIDE A NEW POKE THRU IN LOCATION INDICATED. ROUTE THRUCONDUIT BACK TO NEAREST TR ROOM LABEL AS REQUIRED DATA THISSHEET FOR ADDITIONAL INFORMATION.
4. EXISTING DATA LOCATION - EXISTING BACK BOX TO BE EXTENDED TO THENEW WALL SURFACE CONTRACTOR SHALL INSTALL NEW CAT 6 CABLE QTYAS INDICATED, NEW DATA JACK AND FACEPLATE. ROUTE THE CABLEUSING THE EXISTING PATHWAY AND REUSING THE EXISTING PATCHPANELS IN THE DATA CLOSET 2233.
5. EXISTING FIRE ALARM DEVICE - BACK BOX TO BE EXTENDED TO NEW WALLSURFACE. INTERCEPT EXISTING CIRCUIT AT NEAREST JUNCTION BOX ANDINSTALL NEW CONDUCTORS. THEN REINSTALL EXISTING DEVICES ANDCOVER PLATE.
SCALE:
COMMUNICATIONS PLAN SECOND FLOOR - AREA B2 1/8" = 1'-0"
MATCHLINE SEE BELOW LEFT FOR CONTINUATION
SCALE:
COMMUNICATIONS PLAN SECOND FLOOR - AREA A1 1/8" = 1'-0"
MATCHLINE SEE ABOVE RIGHT FOR CONTINUATION
SCALE:
RACK SPACE ROOM 22334 1/8" = 1'-0"
SCALE:
RACK SPACE ROOM 2194 3 1/8" = 1'-0"
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.2211
TO BELOW
ESCALATOR
OFFICE2235
CATALOGINGTECH. SERVICES
2231A
OFFICE2236
VEST.
2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252A
VEST.2252B
STORAGECOMPACT
2231
OPEN
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
WOMEN2212
READING2180
SERV.2284RECEPTION
ADMIN.
2270 STO.2270A
DEANADMIN.
2278
OFFICE2275
STAIR#2
WOMEN2264A
MEN2264
ELEC.2263
TELE.2262
DONOR GALLERY2260
DATA.2261
VEST.2260A
OPEN OFFICEADMIN.
2271B
VISITORADMIN.
2271C
COUNT ROOMADMIN.
2272A
WORK AREAADMIN.
2277
FILE RMADMIN.
2273
ASSIST.ADMIN. DEV.
2271A
ASSIST.ADMIN. MGMT.
2271
ASSC. DEANADMIN.
2274
ACCT.ADMIN.
2272
VEST.2115
TO BELOWOPEN
CORRIDOR2300
TO BELOWOPEN
CONF.SMALL
2276
HALL.2290
CONFERENCEADMIN.
2281
ASST.MGMT.
2282
STAIR#3
CORRIDOR2100
MEN2114WORKSTATION
EXPRESS
2110
PHONES2110A
WOMEN2112
VEST.2111 CUST.
2113
VESTIBULE2119
ELEC.2116
DATA2117 READING
2120
VEST.2121
STAIR#1
VEST.2125
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
STAIR# 5
PERIODICALSCURRENT
2170
HOLDINGRECYCLE
2193
MICROFORMS2160
PERIODICALSBOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,PERIODICALS,
2141
PUBLICATIONSGOVERNMENT
2130
ELEV#3
ELEV#1ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.2181
HALL.2280A
CORR.2280
OFFICE2238
2118
GROUPSTUDY
GROUPSTUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
ELECTRICAL DETAILS
E4.01
SECTION OF EXISTING FLOOR DUCT SYSTEM SCALE: NONE
TOP VIEW NEW FLOOR BOX SCALE: NONE
2
1
ONE LINE DIAGRAM & SCHEDULES
F: 702.871.8353www.tjkengineers.com
P: 702.871.3621Las Vegas, NV 891135459 S. Durango Dr., Suite100
tjk consulting engineers, inc.
TJK # 15096
E
N
LAO
N
THOMAS M.ANDERSON
EGIN -RE
NDA
VEO
ETA
FA
TS
EXP. 12-31-16
PRS
ISF O
E
1No. 93 64
ELECTRICAL
MARCH 10, 2016
CG
VEST.2211
TO BELOW
ESCALATOR
OFFICE2235
CATALOGINGTECH. SERVICES
2231A
OFFICE2236
VEST.
2250A
CORRIDOR2250
ELEC.2252
STAIR# 4
MECHANICAL2251
COMM.TELE-
2252A
VEST.2252B
STORAGECOMPACT
2231
OPEN
OFFICENEW
2229
OFFICE2222
PROCESSINGSERIALS/
TECH. SERVICES
2226
OFFICE2237
DATA2233
OFFICE2234
OFFICE2232
MAIL2224
CORR.2220A
AREAOPEN OFFICE
TECH. SERVICES
2226A
OFFICENEW
2228
OFFICE2227
READING2230
CUST.2213
RECEPTION2220
CONFERENCE2225
SERVICE2223
BINDERYTECH. SERV.
2221AACQUISITIONTECH. SERV.
2221
MEN2214 VEST.
2215
WOMEN2212
READING2180
SERV.2284RECEPTION
ADMIN.
2270 STO.2270A
DEANADMIN.
2278
OFFICE2275
STAIR#2
WOMEN2264A
MEN2264
ELEC.2263
TELE.2262
DONOR GALLERY2260
DATA.2261
VEST.2260A
OPEN OFFICEADMIN.
2271B
VISITORADMIN.
2271C
COUNT ROOMADMIN.
2272A
WORK AREAADMIN.
2277
FILE RMADMIN.
2273
ASSIST.ADMIN. DEV.
2271A
ASSIST.ADMIN. MGMT.
2271
ASSC. DEANADMIN.
2274
ACCT.ADMIN.
2272
VEST.2115
TO BELOWOPEN
CORRIDOR2300
TO BELOWOPEN
CONF.SMALL
2276
HALL.2290
CONFERENCEADMIN.
2281
ASST.MGMT.
2282
STAIR#3
CORRIDOR2100
MEN2114WORKSTATION
EXPRESS
2110
PHONES2110A
WOMEN2112
VEST.2111 CUST.
2113
VESTIBULE2119
ELEC.2116
DATA2117 READING
2120
VEST.2121
STAIR#1
VEST.2125
VESTIBULE2191
CORRIDOR2190
DATA2194
MECHANICAL2201
VEST2200
HALL2192
ELEC.2195
TELE.2196
STAIR# 5
PERIODICALSCURRENT
2170
HOLDINGRECYCLE
2193
MICROFORMS2160
PERIODICALSBOUND
2140
WORK ROOM, HOLDING
OPEN OFFICE,PERIODICALS,
2141
PUBLICATIONSGOVERNMENT
2130
ELEV#3
ELEV#1ELEV#2
ELEV#4
STAIR#6
1107sf
326sf
373sf
191sf
INFO.2181
HALL.2280A
CORR.2280
OFFICE2238
2118
GROUPSTUDY
GROUPSTUDY
AREA OF WORK
REVISIONS
ISSUED FOR PLAN REVIEW
All dimensions and on-site conditions are to be verified bythe Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/10/16
241 w charleston, suite 107las vegas, nevada 89102
Tel: 702.263.7111www.lgainc.com
TA
007115002 UNLV LEISURE READING
TJK
0071-15-002
File:
Drawn By:
Checked By:
Project No.:
All Drawings, Specifications and Copies thereoffurnished by the Architect are to be used only withrespect to this Project and are not to be used on anyother Project with the exception of one contract setfor each party to the building contract. SuchDocuments are to be returned or suitably accountedfor to the Architect on request at the completion ofthe Project. Any use or reproduction of this Drawingin whole or in part by any means whatsoever isstrictly prohibited except with the specific writtenconsent of LG Architects, Inc., a NevadaCorporation. Copyright © LG Architects, Inc. allrights reserved. Submission or distribution to meetofficial regulatory requirements or for other purposesin connection with the project in not to be construedas publication in derogation of the Architectscommon law Copyrights or other reserved rights.
Key Plan:
3D View:
UNIVERSITY OFNEVADA LAS VEGAS
LIED LIBRARY -LEISURE READING
4505 S. MARYLANDPARKWAY
LAS VEGAS, NEVADA89119
(consultant)
(stamp)
team
wor
k://b
imse
rver
/007
1150
02 U
NLV
LE
ISU
RE
RE
AD
ING
/ISS
UE
D F
OR
PLA
N R
EV
IEW
/#La
yID
/#La
yout
Nam
e/Fr
iday
, Feb
ruar
y 26
, 201
6/2:
58 P
M/
ONE LINE DIAGRAM &SCHEDULES
E5.01
4000A 480Y/277V 3PH, 4W NEMA 1 AIC=65,000 "MSG"GFI
ST
320040002500 KVA
M
CUSTOMERMETERING
TVSS
E1H1225AMLO
E1L1100AMLO
30KVAE3H1100AMLO
G
EDB
225A
1000 KW
2000A
1600A
100AE3L1
MLO600AE5H1
EDP
MLO
MCC
PANEL
225AMCB
ST600800
MCC
800400
1L1 1L2 1L3 2L1 3L1 3L22L2
800400
1H1
3H1
800400
2H1 4H1 5H1 5H24H22H2 3H2
1H2
400800 400
225
1H3
3H32H3
600800
300KVAK-RATED 13
WATERUFERGRID
PRIMARYMETERING
PANEL
PANEL
PANEL PANEL
PANEL
PANEL
A
E1L3
PANEL
PANEL PANEL PANEL PANEL PANEL PANEL PANEL
PANEL
PANEL
PANEL
PANEL PANEL PANEL PANEL PANEL PANEL PANEL
PANEL
PANEL PANEL
E
225AMLO MLO
225AMLO
225AMLO225A
MLO225A
MLO225A
MLO225A
225/3 225/3 225/3 225/3 225/3 225/3SPACE FOR
3-225/3 BREAKERS
1000/3
1000A 208Y/120 3PH, 4W "DB4" NEMA 1 AIC=22,000 NEMA 1 AIC=22,0001000A 208Y/120 3PH, 4W "DB1"
400800 800
400
1000A 208Y/120 3PH, 4W "DB2" NEMA 1 AIC=22,000
BLDGSTEEL
TVSS
200% N
ASC= 60,140
EXISTING ELECTRICAL ONE LINE DIAGRAMSCALE: NONE
1600AMLO
480V
120/208V
480V
120/208V
75KVA
PANELE2H1600AMLO
(BYUPS
OWNER)
TVSS
200% NK-RATED 13300KVA
1000/3 1000/3
300KVAK-RATED 13200% N
225/3
200% NK-RATED 13225KVA
800/3
NEMA 1 AIC=22,000800A 208Y/120 3PH, 4W "DB3"
300400
PANELPANEL
PANEL
3H42H4
1H4
225400
2000/3
PANELUPS
16001600
480T4
120/208
480
120/208T1
480
120/208T2
480
120/208T3
K4 K4 600AMLO
K1330KVA
120/208V
480V
100AMCB
PANELE1L460AMLO
5#4/O, 1#2, 2-1/2"C
7- 4"C EACH WITH4#750 KCMIL
(2) 2-1/2"C EACH W/4#3/0, 1#2
400AMLO
400AMLO
4#2,1#6,1-1/2"C
100AMLO
100AMLO
100AMLO
100AMLO MLO
125AMLO100A
MLO100A
MLO100A 100A
MLO100AMLO
100AMLO
100AMLO
4#2,1#6,1-1/2"C
225AMLO
225AMLO
4#4/0, 1#2, 2-1/2"C
2-4" SPARE CONDUIT
4 #4/0, 1#2, 2-1/2"C
5-4"C EACH \W4-750KCMIL1#250 KCMIL
4-4"C EACH \W4-750 KCMIL,1#250 KCMIL
2-3"C EACH W/3#350 KCMIL1#1
3#8,1#10,3/4"C
4#2,1#6,1-1/2"C
PANEL
MCB60AE3L2
15KVA
4#6,1#8,1"C
K4
120/208V
480V
4#10,1/2"C
4#2,1#6,1-1/2"C
PANEL
100AMLO
E1L2
4#2,1#61-1/2"C
3#2,1#3/0,1#6,2"C
4#8,3/4"C4#4/0,1#2,2-1/2"C
2-3"C EACHW/ 4#350KCMIL1#2
3#2,1#6,1-1/2"C
2-3"CEACH W/4#350KCMIL1#2
4#6,1#8,1"C
CB 45A
SPARE SPARE
2-3"C EACH W/3#250KCMIL,1#2
3-4"C EACH W/5#400KCMIL,1#2/0 1#2/0
5#400KCMIL,3-4"C EACH W/
3#250KCMIL,1#22-3"C EACH W/
3-4"C EACH W/5#400KCMIL,1#2/0
3#250KCMIL,1#22-3"C EACH W/ 3#350 KCMIL,1#2,3"C
3-3"C EACH W/ 5#300KCMIL,1#1/0
4#4, 1#6,1-1/2"C
4#1/0,1#4,2"C
1H6100AMLO
PANEL1H5
MLO100A
PANEL
225400
1/02/0
2/02/0
#8
#8 #2
#8
NOTES:
1. PROVIDE UPDATED TYPED WRITTEN PANEL DIRECTORY.