• Brief introduction to the Smart Charge project• Lapland UAS participation
– What has been done– Currently under work– Lehtojärvi measurement, data gathering and visualisation system– V2G charger acquisitions– Measurement data sharing
www.lapinamk.fi
Project coordination members
www.lapinamk.fi
Smart Charge project
• Vehicle to Grid (V2G)– Technology for the idea of how electric vehicles can be used as a buffer for
electricity on the power grid• Project objective:
– The objective is to produce new insight on economic and technical vehicle-to-grid/building (V2G) opportunities and challenges through the pilot cases
– The main goal is to determine how V2G could be implemented for electric vehicles under arctic conditions
• To increase the utilization of distributed, renewable energy resources and to enable increased energy flexibility.
• The impact on the design of vehicles and the services they support will be investigated.
www.lapinamk.fi
Currently under construction
• V2G Pilot in Lehtojärvi– Real-time electricity measurement and visualisation system
• Will gather electricity usage and generation data from buildings, solar panels, EVsand chargers.
• Done:– Measurement system design– Acquisitions for most of the data gathering equipment
• To be done:– Choosing the energy meters– Installing the instrumentation– Programming– User interface
www.lapinamk.fi
V2G MEASUREMENTS
mm
BUILDING MEASUREMENTS
SOLAR PANEL MEASUREMENTS
DATA VISUALISATION FOR END USERS
Lehtojärvi pilot brief overview
www.lapinamk.fi
RS-485V2GV2
GLoRaWAN Ethernet
EV & EVSE ENERGY METER DATA TRANSCEIVER
POWER GRID
LORAWAN GATEWAY
CLOUD
Lehtojärvi pilot hardware overview
www.lapinamk.fi
www.lapinamk.fi
What has been done
• Charger acquisitions– Venematech V2G Charger
• Based on ISO15118-20 (to be released 2021 Q3-Q4)• Purchased
– Will arrive around the start of December
– EVSE (Electric Vehicle Supply Equipment) with LIN-CP• Type 2 AC charger prototype• To be ordered
– Chargers will be tested using Aurora Powertrain’s eSled
www.lapinamk.fi
What has been done
• Data sharing between UiT Narvik– Charging data gathered from eSleds on Lehtojärvi and Svalbard Safari
sites– Data delivered to UiT Narvik for analysis
www.lapinamk.fi
Additional information
• Project implementation 1.2.2019 - 31.07.2022• Interreg Nord 2014 – 2020 program• Project implementers: Lapland University of Applied Sciences
and UiT, (Universitet i Tromsø) The Artic University of Norway, Narvik
• Founder: Interreg Nord 2014-2020, Administrative Board of Norrbotten, Regional Council of Lapland
• Total budget 513 144€, – Lapland UAS 278 754 €, UiT - Arctic University of Norway 234 390 €