july, 2018 t&vs odc capabilities · lower development costs and faster time-to-market •...
TRANSCRIPT
![Page 1: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/1.jpg)
July, 2018
Test and Verification Solutions
T&VS ODC Capabilities
![Page 2: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/2.jpg)
Copyright T&VS Limited | Private & Confidential | Page 2
Our Services and Products
Services
Hardware Verification DfT Software Testing Consultancy Training
Engagement options
Resource Augmentation
Managed Service
Offshore Development Centre (ODC)
Location
Onsite Blended Offshore
Products
asureSignTM asureVIPTM
![Page 3: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/3.jpg)
Copyright T&VS Limited | Private & Confidential | Page 3
India
UK
Germany
Singapore
South Korea
USA
Japan
Sweden
Italy
Malaysia
APAC
EuropeAmericas
Growth Story
Global presence in all high-end technology locations
01.9
3.1 3.7 4.4
6.5 78
11
02468
1012
FY 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19(Est.)
MIL
LIO
N IN
US
D
FINANCIAL YEAR
Revenue Growth
![Page 4: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/4.jpg)
Copyright T&VS Limited | Private & Confidential | Page 4
Delivered values
▪ Lower development costs and faster time-to-market• “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by
20%”
Steve Neill, Managing Director of Infineon UK
▪ Improved product features• “T&VS had the knowledge, skills and experience to ramp up quickly and help perform an
independent verification of the Gnodal design.”
Fred Homewood, CEO Gnodal
▪ Improved quality• "T&VS staff introduced independence into our signoff procedure. This has had a big impact
on the quality of ClearSpeed products.”
Russell David, VP Engineering at ClearSpeed
▪ Faster time-to-market• “T&VS didn’t let us down. They quickly grasped the software design and provided us with
an effective and efficient way forward for software unit testing.”
Craig Gulliford, CEO Creo Medical
![Page 5: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/5.jpg)
Copyright T&VS Limited | Private & Confidential | Page 5
Silicon to Software Support
Firmware
DFT
ATE
Security Testing
Pre - Silicon Post - Silicon Software
Architectural Modeling
IP/Subsystem/SoC
Verification
Emulation &
Prototyping
Post-Silicon Validation
Embedded SW Testing
Application/Network Testing
Conformance Testing
Carrier Acceptance Testing
![Page 6: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/6.jpg)
Copyright T&VS Limited | Private & Confidential | Page 6
ODC Capabilities Snapshot
Technical Capabilities ODC Client
Simulation Based Verification
Project and Relationship Management
Verification Flow
▪ Feature Extraction
▪ Verification Plan
o Checkers
o Functional Coverage
▪ Test Bench Implementation
▪ Verification Execution
o Coverage Reports
o Failing Test Count
o Bug Tracking
▪ Signoff
SoC
Block n
Block n
Block Level
Verification
Valued Added Services Productivity Tools
▪ asureSIGN
▪ VIP
▪ Register Modelling
▪ Run Manager
Industry Verticals
▪ Retail
▪ IoT
▪ Networking
▪ Automotive
▪ Consumer
▪ Industrial
▪ Medical
▪ 5G and comms
Per Project Roles
Project Manager
Team Lead 1 Team Lead 2 Team Lead n
Engineers
...
...
...
Engineers
...
...
...
Engineers
...
...
...
Senior Management
Program Manager
Senior Management
Escalation Planning
Facilities
▪ Security
Checks
▪ T&VS Servers
▪ Secure Access
Geographies
▪ APAC
▪ Europe
▪ North America
Project Manager
Technical Lead
T&VS
Onsite Staff
Program Manager
Senior Management
Programs
Forecasting
Reporting
Technical
Communication
Escalation Planning
Per Project Roles
Technical Lead
▪ System C Modelling
▪ Analog Modelling
▪ Emulation
▪ Prototyping
▪ Formal Methods
▪ DFT
▪ Gate Level
▪ Safety Verification
▪ Security Verification
▪ Portable Stimulus
▪ Post Si- Validation
▪ Software testing
![Page 7: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/7.jpg)
Copyright T&VS Limited | Private & Confidential | Page 7
Benefits of a T&VS ODC
▪ Save costs
▪ Reduce timescales
▪ Reduce risks
▪ Provide access to skilled test and verification resources
▪ Leverage experienced project management talent
▪ Enable the use of the latest tools, processes and methodologies
▪ Operate in a secure state-of-the-art IT and office environment
▪ Gain new insights based on independent expertise
▪ Provide high-quality, pro-active and professional project control
▪ Enable quick access to local contacts in the USA, Europe, India and APAC
▪ Remove the barriers you face in successfully completing your projects on time, on budget and right first time.
![Page 8: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/8.jpg)
Copyright T&VS Limited | Private & Confidential | Page 8
ODC DfT capabilities & setup
Experience Levels of Resources
• Headed by 20 yrs of Industry experienced professional
• Average level of experience 3-4 yrs
• Every ODC program is lead by 6-8 years experienced Lead and 2-4 yrs of experienced professionals.
• Periodic reviews and Checklist based sign-offs
Expertise Levels of Resources
• The expertise on DfTvaries from Multi millongates to few thousand gates of devices.
• Leads are with a skill of architecting DfT for SoC
• The senior resources have seen few tape outs.
• The junior resources are trained with T&VS DfTflows with commercial EDA Tools.
• Resources are responsible and independent to handle front end and DfT tasks.
EDA Capabilities
• Mentor Graphics DfTsolutions
• Tessent MBIST
• Tessent TestKompress
• Questa
• Synopsys DfT Solutions
• SMS
• DFTMAX
• DC
• DFT Compiler
• Cadence DfT Solutions
• Genus
• Modus
![Page 9: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/9.jpg)
Copyright T&VS Limited | Private & Confidential | Page 9
ODC Security and Infrastructure
▪ Using T&VS Servers
▪ Physical Isolation▪ Biometric or RF card access
▪ Surveillance Camera
▪ No Printers
▪ Dedicated Phone Lines
▪ Dedicated Admin
▪ Server Isolation
▪ Network Isolation▪ Dedicated Line
▪ LAN Separation
▪ Sonic Firewall
▪ Secure VPN
▪ Document Sharing
▪ Bug Filing
▪ Using Customers Servers
▪ Connection▪ Secure VPN
▪ VNC Client or NXClient
▪ Physical Isolation▪ Dedicated Conference Bridge Line
▪ Dedicated Admin
▪ Dedicated Server
▪ Network Isolation▪ Document Sharing
▪ Bug Filing
![Page 10: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/10.jpg)
Copyright T&VS Limited | Private & Confidential | Page 10
ODC Facility Infrastructure & Network Infra Setup
Dell Server
• Intel Xeon E5-2420 @ 1.90 GHZ
• 8*8 GB RAM with 24 Processor
• Redhat 5 (64 bit)
• Supports asureSign, Cadence, Questa, Xilinx, Quartus,
• Imperas, DVM, Synplify-Pro, Altera
• 10 to 12 users able to run Blocklevel Testcases at same time
• 5 to 7 users able to run chip verification at same time
License Server
• Intel Dual-core E5700 @ 3.00.GHZ.
• 4 GB RAM.
• Installed Fedora 15 (64 bit).
• Configured all license file in same location.
• License fetched through environmental variable and Router IP Nat.
CVS Server
• AMD Phenom II 810
• 4 GB Ram with 4 Processor
• Redhat 5 (64 Bit)
• CVS repository: I2C, I2S, UVM, UVM_I2C, UVM_SPDIF. SPI, TDM_EVC
• Fetch CVS via Router IP Nat.
Internet
License ServerReserved for user by name
Local User Machines
![Page 11: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/11.jpg)
Copyright T&VS Limited | Private & Confidential | Page 11
Experienced Project Management
Finding project managers and team leaders with the right experience
to work on complex designs with fast changing requirements and tight
development schedules can be a challenge. Our talented pool of
project management professionals provide each ODC with the vital
element that will reduce risk and ensure the success of your project.
“
”
Mike BartleyT&VS Founder and CEO
![Page 12: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/12.jpg)
Copyright T&VS Limited | Private & Confidential | Page 12
T&VS ODC – Key Business Drivers
▪ Cost Savings▪ “TVS engineers saved 2 months on our 12
month schedule, and reduced our costs by 20%”. Steve Neill, Managing Director of Infineon UK
▪ Resource flexibility▪ “TVS provided the OVM-compliant
verification IP on schedule and to budget, and were flexible enough to incorporate change requests.” Simon Knowles, VP for Strategy & DXP Technology, ICERA
▪ Increased quality of deliverables▪ “TVS helped us incorporate the VIP into
our test environment in good time for our tape-out and left us with complete documentation to allow us to repeat the work should we ever need to on a future generation of our technology.” Fred Homewood, CEO of Gnodal
Faster time-to-market
Improved quality/reduced product risk
Lower development
costs
Improved product features
Trusted partner
![Page 13: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/13.jpg)
Copyright T&VS Limited | Private & Confidential | Page 13
List of ODCs
ODC Name Scope of Work Duration
Rotork IoT Security Testing for Manufacturer in the Oil & Gas Industry 30 days
Bluwireless Improving IP quality using SystemC-based UVM 3 years
Ericsson CPU Verification 1 year
Ultra Controls Analyzed software requirements for DO-178B standards compliance 4 months
Graphix Asset Security Improvements for a Complex Health Care Application 6 months
Creo Medical T&VS helps Creo Medical Prepare for Medical Device Certification 3 months
IMG Sub block verification of Power VR GPU Processor 1 year
Infineon Requirements Management and Traceability 4 years
Saadhvi Automate testing of location aware workforce management mobile app
3 months
Mir Limited Mobile app, Web application testing & Web services testing 7 months
![Page 14: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/14.jpg)
Copyright T&VS Limited | Private & Confidential | Page 14
List of ODCs (continued)
ODC Name Scope of Work Duration
Helitune DO254 compliant verification plan, test bench and coverage closure 6 months
IGCAR RTL and VIP development for PCI 32 6 months
Calsoft Verification of DDR/LPPDR Memory 9 months
ST Micro Analog Modelling 15 months
ST Micro SoC Verification 12 months
ST Micro IP Verification 9 months
ST Micro Design Front End & DfT (ECO in RTL, Synthesis, Formal Verification, Scan Insertion – compression/regular, ATPG, pattern simulation (also with sdf), MBIST insertion and simulations, Functional Fault Grading)
6 months
DO-254 HUD Verification for LIEOE 2 years
Pactron SV based BFM developed to generate DDR4 transactions and to verify MEI block.
6 months
Telechips SoC Subsystem level Verification 1 year
LG LPDDR4 PHY Verification 1 year
![Page 15: July, 2018 T&VS ODC Capabilities · Lower development costs and faster time-to-market • “T&VS engineers saved 2 months on our 12 month schedule, and reduced our costs by 20%”](https://reader034.vdocuments.mx/reader034/viewer/2022042404/5f18814db0ef81475572257a/html5/thumbnails/15.jpg)
July, 2018
Test and Verification Solutions
THANK YOU