ISE – Systems Design Review. 12402 ISE – Thomas Mittner 12401 ISE – Erik Hilley MSD I - Fall Quarter, 2011. Norms & Values. 12401 & 12402 share the same set of written values as shown on EDGE. For interfacing and budget sharing purposes, this will be mutually beneficial. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ISE – Systems Design Review

ISE – Systems Design Review

12402 ISE – Thomas Mittner12401 ISE – Erik Hilley

MSD I - Fall Quarter, 2011

Page 2: ISE – Systems Design Review

Norms & Values

12401 & 12402 share the same set of written values as shown on EDGE.

For interfacing and budget sharing purposes, this will be mutually beneficial.

When there is communication from both teams, it is important to be thorough, accurate, professional and committed.

12401 & 02 will elaborate later on.

Page 3: ISE – Systems Design Review

Mission Profile 12401 is responsible for building a wind turbine that will

harvest wind energy which in turn will generate electric energy.

This energy will be stored within a controlled storage device.

12402 must be able to accept the energy, regulate and convert it into useable power for charging batteries.

12402 must be able to accept up to ten, 7.2V batteries and charge anywhere from one to all ten batteries within four hours.

The dock is theoretically capable of charging one of these empty batteries in 1.5 hours, and the full set will be dependent upon the power being generated from 12401 and how the power is transmitted from generation phase to individually battery charging phase.

Page 4: ISE – Systems Design Review

Mission Profile cont. The battery charging unit should take users no longer

than minutes to understand what it is, how its used, and how to tell the status of the batteries.

The dock must be operable in certain weather requirements, as batteries will often be charged outdoors, subjected to the elements of Rochester.

The dock should be robust as to work for as long as the LVE program needs to run for.

Page 5: ISE – Systems Design Review

System Plan Overview

HAWT Stepper Motor ControlsControls CableLead Acid

BatteryRegulator Regulator

P12401 P12402

Page 6: ISE – Systems Design Review

Efficiency Spreadsheet

E ffi c ie n c ie s S p re a d s h e e t Manual Input F ields

WE C E B (P roj e c t 1 2 4 0 1 ) D e s c ripti ve S ta ti s ti c s 1 2 4 0 1 1 2 4 0 2S te p P ow e r E ffi c ie n c y C os t V o lta g e 12 Volts T e c hnol og y 1 E ffi c ie n c y C os t T e c hnol og y 1 E ffi c ie n c y C os t

Windmill 887.3 35 $400.00 A m p e re s 3 Amps HAWT Windmill 35 $400.00 Micro C ontrollers 90 $40.00 G enerator 537.8 35 $- Wa tt a g e 36 Watts S tepper G enerator 35 $- S witcher R egulator 95 $9.00

R egulator 384.1 60 $9.00 B a tt e r y C o unt 5 C ount S witcher R egulator 60 $9.00 S torage 334.0 85 $250.00 T ota l P ow e r 180 Watts L ead Acid S torage 85 $250.00 1 2 4 0 2C ontrols 318.1 95 $8.00 C ha rg in g T im e 1.5 Hours Micro C ontroller 95 $8.00 T e c hnol og y 2 E ffi c ie n c y C os t

Wa tt -ho urs 270 Wh Discrete C ontrols 60 $18.00 C D P C (P r o je c t 1 2 4 0 2 ) 1 2 4 0 1 L inear R egulator 62.5 $3.00

S te p P ow e r E ffi c ie n c y C os t S e l e c t 1 2 4 0 1 T e c h nolo g y B e low T e c hnol og y 2 E ffi c ie n c y C os tL ine los s 315.0 99 S elect Tech. (1,2): 1 10 $100.00 C ontrols 311.9 90 $40.00 Alternator 30 $25.00

R egulator 283.5 95 $9.00 L inear R egulator 60 $3.00 Watt-hours 270.0 100 S e l e c t 1 2 4 0 2 T e c h nolo g y B e low L ithium Ion 80 $300.00

S elect Tech. (1,2): 1 Discrete C ontrols 60 $3.00

T ota l P ow e r R e qu ire d : 8 8 7 .3 wattsT ota l C os t: $ 7 1 6 .0 0

S avonious Mill

Page 7: ISE – Systems Design Review

Preliminary Budgeting

Page 8: ISE – Systems Design Review

12402: Thomas Mittner

As the systems engineer, I will be in charge on ordering the parts for the CDPC 12402 group. We will use some teamwork to determine the vendors to quote and then make a decision on where the parts will be ordered from. I will also deal directly with the personnel responsible for writing up the reqs to ensure that our ordering process goes smoothly.

I will also maintain the budget and keep track of the cost/log book. We currently have $500 dedicated to group 12402, however I will converse with Erik (12401 ISE) if either his or my group have trouble with funds, or to see if funds need to be reallocated in some fashion.

In addition to costs, quotes, and budgeting, I will be in charge of maintaining an interfacing notebook to ensure that our product will conform to specs and that all components and areas of our project will fit together seamlessly. This will take efforts from both the EE and ME interfacing managers within my group (Ryan and Matt O. respectively), as well as communications with the 12401 interfacing manager, Erik. There should be no surprises in the next phase of the project (detailed design or looking past that, creating and assembling), and maintaining the log as previously stated will prove critical to that.

Page 9: ISE – Systems Design Review

12401: Erik Hilley

Page 10: ISE – Systems Design Review

Interfacing

Electrical interfacing in 12041 Mechanical interfacing in 12401 Electrical interfacing in 12402 Mechanical interfacing in 12402 Electrical interfacing between 12401/02 Mechanical interfacing between 12401/02

Page 11: ISE – Systems Design Review

Looking Towards Detailed Design

As we plan to move forward into the detailed design phase, we plan on implementing a variety of strategies to ensure our products are meeting the needs of our customers and are conforming to our engineering metrics.

Items we will be working on include, but are not limited to...

Flow charts, feasibility analysis, failure modes and effects analysis (FMEA), and quality function deployment (QFD).