integrated facilities solution - naseo...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets...

25
Integrated Facilities Solution R. Michael Burke National Solutions Director Johnson Controls

Upload: others

Post on 25-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Integrated Facilities Solution

R. Michael BurkeNational Solutions DirectorJohnson Controls

Page 2: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Agenda

•Industry Trends

•Convergence of Energy, Building Automation Systems and Technology

C St d hi hli hti f l j t ith tifi bl ROI•Case Study highlighting successful projects with quantifiable ROI

•Energy Retrofits

•Performance Contracting

Page 3: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Having problems getting to your data?

Dashboard Strategy3

Page 4: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

“Perfect St ”

Commodity Prices

Water Contaminants

Challenging Global GHG

EmissionsWater

ScarcityClimate ChangeStorm” Prices Contaminants Economy Emissions Scarcity Change

Energy Prices IncreasingNo real Energy Technology or“ET” In Place

Demand for “Green” IncreasingConcerns

Demand for Green IncreasingLimited Visibility

Goals Energy Efficiency

Water Efficiency

Renewable Energy

Asset Renewal

SAVE MoneySAVE Reso rcesYour

4

SAVE Resources

Sustainable, Green Environment

Your Benefits

Page 5: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Convergence of Intelligent and Green Buildings

Proprietary & Confidential55

Mid 90’s Early 2000Today

Page 6: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Industry Trends

Communications Infrastructure

Page 7: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Convergence: E.T. vs ERP

Executive Director

Facility Manager

Energy Manager Utility Bill

Administrator

Facility Technician

Operator

Emissions

Dashboard(KPI Views)

Work Order Mngtand Alerts

Event Management

Utility BillsMeters

Role-based, Enterprise Security

Web LinksThi d P t A

BAS

CMMS

Real Estate & Programs

Third Party Apps

JCI InterfaceSteam

Energy BillsOnly

JCI InterfaceJCI Interface

Integration Layer

Open Systems •------ ---•----- ---•----- ----• ------ --

Water•------ ---•----- ---•----- ----• ------ --

Gas•------ ---•----- ---•----- ----• ------ --

Electric•------ ---•----- ---•----- ----

OnlyMeters Only ERP/ Financial Data

• ----- --

Page 8: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Facilities, Energy, and All Costs

Page 9: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

CMMS Integration

With technologies like Blackberryinterfaces, touch style kiosks, & ‘one touch’ supplier (Grainger) integrationpp ( g ) gthe maintenance staff and supervisors have the tools necessary to effectively manage:

• Work Orders

• Purchase Orders

• Preventative Maint. Schedules

Inventory• Inventory

• Resource Loads

Page 10: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Energy Retrofits

Energy retrofit examples funded by Performance Contractsgy y

Johnson Controls10

Page 11: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

VA DOC Major Institutions Completed

Sussex I State Prison

Buckingham Correctional Center Sussex II State Prison

N tt C ti l C tGreensville Correctional Center

Nottoway Correctional Center

Page 12: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Water System Upgrades

Water and energy cost savings

Significant reductions in maintenance costs

Vandal resistant/enhanced security

Contraband-automated shutdown procedure

Page 13: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Completed Water Project

3,392 flush valves 3.5 to 1.6 gpf

424 shower valves 3 to 2 gpm

132 toilets 3.5 to1.6 gpf low flow toilets

162 faucets 3 to .5 gpm low flow faucets

24 urinals 1.5 to 1.0 gpf low flow urinals

41 shower heads 3.5 to 2.0 gpm shower heads

Page 14: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Facility Automation and Control System

Energy savings

Improved environmental conditions

Reliability and lower operational costs

Feed back, troubleshooting, facility management tool

Integration with old or new systems

Page 15: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Completed Facility Automation/Control System

5,675 Temperature, Humidity, Refrigeration, Freezer and Indoor Air Quality SensorsSensors

2,000 Heating/Cooling Valves and Outside Air Damper Control Points

1,980 Fan, Pump, Compressor, Variable Speed Drive and Filter Status PointsPoints

1,150 Fan, Pump, Chiller and Compressor Control Points1,150 Fan, Pump, Chiller and Compressor Control Points

Page 16: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

VA DoC Summary

Total project savings are $3.1 mil each year, Guaranteed!

VA Department of Corrections received over $33 mil worth of improvements to their facilities paid for by savings.

Johnson Controls16

Page 17: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

1212.5C

lark

• FY06 12.1 KWhs/SF

99.510

10.511

11.512

KWhs/SF/Yr

• Occupied in FY05, 122,000 sqft, 400 Employees, Cost $17 5 M

Lew

is a

nd

• FY08 11.6 KWhs/SF

• FY10 10.1 KWhs/SF9

FY06FY07FY08FY09FY10

2530

$17.5 M• Green Design Elements – Daylighting, HE-HVAC, Recycling, Water Conservation, Native Materials• Moving from Excellent to Outstanding Performance FY07 ESP Deployed

man

• 16.5 % Reduction

• FY06 26.7 KWhs/SF

05

10152025

FY06FY07FY08FY09FY10

KWhs/SF/Yr

•Sq Ft 753 138arry

S. T

rum

• FY08 21.7 KWhs/SF

• FY10 19.8 KWhs/SF FY06FY07FY08FY09FY10

30

•Sq. Ft. – 753,138•2800 FTE•Built in 1983PC 2005

Ha • 25.8 % Reduction

• FY06 25.2 KWhs/SF

05

1015202530

KWhs/SF/Yr

Wai

nwrig

ht • FY08 24.0 KWhs/SF

• FY10 18.9 KWhs/SF 0

FY06FY07FY08FY09FY10Size: 234,599 sq. ft.Building Population: 693Year Built: 1891Year Commissioned: 1981

W • 25.0 % Reduction

Page 18: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Empire State Building

Tenant Energy Management Program at ESB

Track energy use for each participating sub-t d t tmetered tenant

Provide tenants with energy use and benchmarking information via an online dashboard as ell as s stainabilit tips anddashboard, as well as sustainability tips and updates

3% energy savings are expected from changes in tenant operations as a result ofchanges in tenant operations as a result of providing them with rich information feedback

More importantly, the technology enables ESB to align incentives so for the 1st time tenantsto align incentives so, for the 1st time, tenants can reap $ savings by investing in efficiency

Page 19: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Empire State BuildingKey element of $20M whole-building retrofit program

OUTCOMES• 38% overall energy use reduction38% overall energy use reduction• $4M annual energy spend savings• 33% cooling load reduction• 33% cooling load reduction• Capital budget optimization resulting in

$17M savings and 3.1 year payback$ g y p y• 105,000 metric tons greenhouse gas

emission reduction over 15 years• Energy Star 90 rating (90% percentile)• LEED “Gold” certification targetg

Page 20: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Other examples

• Alabama DoC

• South Carolina

• City of Baltimore, DGS and Large Data Center

Johnson Controls20

Page 21: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Funding for Energy Conservation Projects and Technology

•Performance Contracting

•ARRA FundingARRA Funding

•Other Stimulus vehicles and incentives.

Johnson Controls21

Page 22: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Energy Performance Contracting?

How it works:• You enter into an agreement with a private energy service company (ESCO).

• The ESCO will identify and evaluate energy saving opportunities and then recommend• The ESCO will identify and evaluate energy-saving opportunities and then recommend a package of improvements to be paid for through savings.

• The ESCO will guarantee that savings meet or exceed annual payments to cover all project costs—usually over a contract term of 7 to 10 or 10-15 yearsproject costs usually over a contract term of 7 to 10 or 10 15 years.

• If savings don't materialize, the ESCO pays the difference, not you. To ensure savings, the ESCO offers staff training and long-term maintenance services.

Many types of building improvements can be funded through your existing budgets• Many types of building improvements can be funded through your existing budgets—new lighting technologies, boilers and chillers, energy management controls and swimming pool covers, to name a few.

Johnson Controls22

Page 23: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Energy Performance Contracting (cont)

A qualified ESCO can help you put the pieces together:

• Identify and evaluate energy-saving opportunities; y gy g pp ;

• Develop engineering designs and specifications;

• Manage the project from design to installation to monitoring;

• Arrange for financing;

• Train your staff and provide ongoing maintenance services; and

• Guarantee that savings will cover all project costs.

Johnson Controls23

Page 24: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

SummaryEnergy Convergence + Re-commissioning + The funding to procure this.

While reducing Energy and Water, the Technology will help monitor, measure and report on Key Performance Indicators.

Bill Admin

Page 25: Integrated Facilities Solution - NASEO...2010/10/27  · 132 toilets 3.5 to1.6 gpf low flow toilets 162 faucets 3 to .5 gpm low flow faucets 24 urinals 1.5 to 1.0 gpf low flow urinals

Questions & Answers