Instrument Gas to Air Conversion: A Solar Driven Demonstration

Kelly Parker, Sustainability Performance November 28, 2018

Page 2: Instrument Gas to Air Conversion

Husky Energy Inc. 2

How to Launch a Successful Demonstration Project

Challenge Identification Finance It! Internal

Process Time to Install Operation

From Concept to Operation

Page 3: Instrument Gas to Air Conversion

Husky Energy Inc. 3

Creating ‘Safe Spaces’

Reduce overall site emissions by providing instrument air for controllers within the wellsite separator package

The Driver

Sufficiently Low Production

Remote Access

100% Husky Owned and Operated

Regulatory Direction

Monetary Incentive Knowledge

EARLY ACTION

Page 4: Instrument Gas to Air Conversion

Husky Energy Inc. 4

• $1.4M PTAC Portfolio of Advanced Methane Detection, Analytics and Mitigation Project

• Project budget estimated at $56,000 allocated in 2017 – 2018

• In-kind contribution by Husky estimated at $9,000

Finance It!

Page 5: Instrument Gas to Air Conversion

Husky Energy Inc. 5

LCO Technologies Crossfire Air Compressor Piloting a Solution

Page 6: Instrument Gas to Air Conversion

Husky Energy Inc. 6

Renewable Power Source

• 4x Matrix 265W Mono Solar Panels

• Kinetic Top of pole mount 4 pane

• Midnite Solar Charge Controller, the KID

• 8 x Matrix L16 460 Ahr 6V AGM lead acid batteries

• 2 insulated battery boxes

Page 7: Instrument Gas to Air Conversion

Husky Energy Inc. 7

In Operation

Page 8: Instrument Gas to Air Conversion

Husky Energy Inc. 8

Historical Data Tracker

Page 9: Instrument Gas to Air Conversion

Husky Energy Inc. 9

Cost savings

maintenance

reliability

Revenue generation

Autonomy

Scalability

Key Performance Measures

Page 10: Instrument Gas to Air Conversion

Project Development Efforts

Page 11: Instrument Gas to Air Conversion

Husky Energy Inc. 11

Operations Engineer Engineering Manager Operations Supervisor Spartan Controls Tarpon Energy

Services Project Support

Operations Technical Specialist

SCADA Technologies PTAC Sustainability

Performance Husky Innovate

The Project Team

Page 12: Instrument Gas to Air Conversion

Husky Energy Inc. 12

DBM & Construction Package

Environmental Review

Hazard Analysis Method Hazard Review Job Book Documents

Pressure Piping Repair – Alteration

Procedure Instrument Air Tubing

Pressure Piping Repair – Alteration

Procedure Methanol Tubing

PSSR RAS RedLine

Standard Scope of Work

Technical Review Checklist

Husky Innovate Pilot Project Results Form

Documentation Snapshot

Page 13: Instrument Gas to Air Conversion

Lessons Learned To Date

Page 14: Instrument Gas to Air Conversion

Husky Energy Inc. 14

• Electrical engineering was the biggest challenge − Inaccurate and erroneous drawings − Insufficient solar capacity of the existing system

• Simple installation yet extensive with additional battery and solar capacity

• Going forward: optimize system efficiency based upon availability of the pilot − Increased assurance of wellsite ability to manage power demand from the

air compressor − With an optimized system design, explore cost benefit of including the

ESDs into the instrument air system

Lessons Learned

Page 15: Instrument Gas to Air Conversion

Solar Instrument Air Compressor: A Demonstration Project Kelly Parker, Sustainability Performance November 28, 2018