instrument engineering design

Upload: pi-mos

Post on 10-Apr-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Instrument Engineering Design

    1/25

    Annex- AI n s t r u m e n t D e s i o n

    . ..J o b C l a s s i f i c a t i o n TTCL 'THC Remarks*

    .

    1. BASIC ENGINZERING

    (1) L i c e n s o r D a t a( 2 ) L i c e n s o r S p e c i f i c a t i o n( 3 ) O;mer's S p e c i f i c a t i o n

    - A p p l i c a b l e c od e a nd s t a n d a r d s- o w n er ' s t e c h n i c a l r eq u ir em e nt

    -- 2. FRONT-END ENGTNZZRING'.) P r e l i m i n a r y . I nf o rm a t io n f o r P l o t P l an'. -%- L a y o ut a n d a r e a o f c o n t r o l r o o m ..

    - L a yo u t a n d a r e a o f l o c a l . p a n e l , . a n a l y z e r-s h e d, ' e t c .R o u t i n g o f m a i n c a b l e w z y ( c a b l e - d u c t , - . p i t , - -

  • 8/8/2019 Instrument Engineering Design

    2/25

    Instrument Desian

    - Job Classification - - - TTCL ,TZC Renarks-% ., - -- ~ e c i d i n g he logic based on th e operation(nor, start u?, stud own, etc.)

    - Kind of signals and decision of connectingpoints (NO, NC, live or not live, lock,non-lock, etc. \- Consultation and confirmation with otherdepartments f or the interlock logic ofrotating machinery, uni t facility, etc.

    3. DETAIL ENG I IN ZZR ING(1) study of Control Roo m, Local Psnel, and

    Analyzer Shed Layout in Planning Stage

    - Specify number of DCS equipmeht- Specify number of paneis and r a c k- Layout of instrument panels t o be locatedin the roan, and loca l panels

    Layout of analyzers in analyzer shed

  • 8/8/2019 Instrument Engineering Design

    3/25

    I n s t r u m e n t D es i qn

    Job c l a s s i f i c a t i o n - - TTCL . - TE:C Renarks

    - D e ci di ng s p e c i f i c a t i o n o f e l e c t r i c s o ur ce :. Requi red power (consu mpt ion ). v o l t a g e and f r e q u e n c y a nd t h e i r. N e c e s s i t y and s p e c i f i c a t i o n of em erg en cy

    o r n o n - f a i l u r e p ow er g e n e r a t o r- sg e c i f i c a t i o n a n d sum ming u p of n e c e s sa r yq u a n t i t y of s te a m , w a t e r , a i r , N2 g a s, e t c .t o b e u sed f o r j a c k e t , t r a c e , c o ol ln g ,

    p u rg i ng , s e a l i n g , e t c .( 4 ) D e t a i l d e s i g n o f I n s t r u m e n t Loop Diag ra m- - D e ci di ng t h e l o o p f u n c t i o n a nd t h e l o c a t i o n

    o f i n s t r u m e n t s, -.- D e c i s i o n of s i g n a l t r a n s m i s s i o n , s y s t e m an ds i g n a l l e v e l

    - De c i s i o n o f s i z e a nd n um ber of c o r e s o fw i r e and tu b in g f o r a i r

    - L o ca ti n g t r a n s i t i o n o r c o nn ec ti on p o i n t s- Study of d e t a i l w i r i n g mann er, v o l t a g e d r o p

  • 8/8/2019 Instrument Engineering Design

    4/25

    I n s t r u m e n t D e s i q n

    . - - .J o b C l a s s i f i c a t i o n TTCL ' TEC Remarks1 - -

    - D e c i d i n g m a j o r di m e n s i on s a n d l o c a t i o n o fa nc ho r b o l t s f o r p a n e l s

    - A l l o c a t i o n o f p r i n c i p a l e qu ip me nt t o b ep l a c e d a t t h e b a ck o f p a n e l a n d d i r e c p i o nof c a b l e s o r w i r e s t o b e c o n n e ct e d

    - ~ e c i d i n g h e name p l a t e l e t t e r i n g- D e c i d i n g t h e c o l o r o f s y m bo l s f o r

    s e m i - g ra p h i c d i s p l a y- D e c i d i n g d e t a i l s p e c i f i c a t i o n

    (6) C he ck f o r V e s s e l s N o z z l e a n d P i p i n g D ra wi ng- c h ec k in g t h e v e s s e l e n g i n ee r in g - dr a w in g s :

    \.. C o n f i r m a t io n o f s i z e a nd l o c a t i o n o f

    n o z z l e f o r i n s t r u m en t- N e c e s s i t y o f a t t a c h i n g i n s t r u m e n t s u p po r t

    a nd n e c e s s i t y , l o c a t i o n , v i e w a n g l e a nds u p p o r t i n g m an ne r o f t h e n n o w e l l , a ndc h a m be r f o r l e v e l i n d i c a t o r

  • 8/8/2019 Instrument Engineering Design

    5/25

    I n s t r u m en t D es i q n

    ~ o bl a s s i f i c a t i o n . - . TTCL . . EC Remarks..- D e c i d i ng s p e c i f i c a t i o n o f w a te r a nd

    d u s t- p ro o f c o n s t r u c t i o n o f p a n e l s- D e c i d i n g a s s o r t m e n t w i t h t h e m ain p a ne lk

    a nd s e q u e n t i a l p r i o r i t y on o p e r a t io n a lv i e w p o i n t

    - D e c i d i n g t h e s y s t e m & s o u r c e o f -p o w e rs u p p l y & a i r s u p p l y

    - O t h e r s a r e same a s t h e m ain p a n el( 9 ) C h e c ki n g o f V e nd or P r i n t *

    - C h ec k in g V e n d or ' s d e s c r i p t i o n s - . . t om ee t w i t h: t h e p ro cu re me nt s p e c i f i c a t i o n -- P r e p a r a t i o n o f a p p ro v e d d ra win gs ' t o b e\r e t u r n e d t o v e nd o rs( 1 0 ) L ay o u t o f C o n t r o l Room an d A n a l y ze r S h ed t- L o c a t i o n o f i n s t r u m e n t p a n e l s and d e sk , e t c .' i n c o n t r o l room ( i - e . , d im e ns io ns from t h e:, c e r t a i n b a s i c p o i n t )

  • 8/8/2019 Instrument Engineering Design

    6/25

    I n s t r u m e n t Desion. .

    - -J o b c l a s s i f i c a t i o n TTCL , T EC Remarks.

    ( 1 2 ) S p a r e P a r t s an d C o ns u ma b le s L i s t *- ~ u m ~ i n g - u ph e n e c e s s a r y q u a n t i t y o f

    c o m p l e t e e q u i - w en t o r e a ch a c c e s s o r yi n c l u d i n g c h a r t , i n k , l u b r i c a n t , e t c .

    - summing-up the n e c e s s a r y q u a n t i t y o fc o n s t r u c t i o n ma t e r i a l s

    ( 1 3 ) I n s t ru m e n t P r e s s u r e P i p i n g , A na l yz er P i p i n ga nd S t e am T r a c i n g H ook Up- B a s ic p i p i n g p a t t e r n f o r t y p i c a l ' s e r v i c e- D e c is i o ? o f p a t t e r n o f i i is tr um e nt p i p i n g

    f o r e ac h i t e m1 -.

    - D e c is i on o f m a t e r i a l s p e c i f i c a t i o n ' ( s i z e ,m a t e r i a l s t a n d a r d , a n d q u a n t i t y )

    - D e ci s i on o f s p e c i f i c a t i o n o f a s s o r t i n g p a r t- c o n f i r m a t i o n o f m o d e l o f i n s t r u m e n t a n d

    o r i e n t a t i o n

  • 8/8/2019 Instrument Engineering Design

    7/25

    I n s t r u m e n t D e s i a n

    Job c l a s s i f i c a t i o n TTCL - , ITEC Remarks.- D e c i s i on o f e l e v a t i o n o f l o c a l i n s t r u m en t

    a l l o c a t i o n b a s e d on t h e p l o t p l a n a nd p ip i n gd r a w i n g

    - D e c i s i on o f r o u t i n g o f s i g n a l w i r i n g . a ndp i p i n g

    - D e c i s i on o f s i z e a nd l o c a t i o n of l o c a lj u n c t i o n b ox

    - D e ci s i on o f m a t e r i a l s a nd f i t t i n g s f o rw i r i n g a nd p i p i n g

    - D e c i s i on o f r o u t i n g , o f g r o u n d , w i re a nd; c o n ne c t in g p o i n t s . .- D e c i s i o n o f r o u t i n g a n d t y p e o f s p a r e c a b l e s. 1.

    \- D e c i s i o n o f w o r ki n g p r o c e d u re o f c a b l ep e n e t r a t i o n t o a n d f ro m t h e c o n t r o l room o rd u c t a n d s e a l i n g m ann er t h e r e o f '

    - . Co n f ir m a ti o n o f a s s o r t i n g p o i n t s o f p i p i n gf o r i n s t r u m e n t u t i l i t y

  • 8/8/2019 Instrument Engineering Design

    8/25

    I n s t r u m e n t D e s i q n

    Job c l a s s i f i c a t i o n TTCL . . TEC - Remarks

    - C a l c u l a t i n g n e c e s s a r y s p a r e m a t e r i a l s f o rwork

    - D e c is i on a nd c o n f i r m a t i o n o f d e t a i ls p e c i f i c a t i o n o f ma t e r i a l s

    I

    ( 1 9 ) T y p ic a l Dug. a n d I n s t r u c t i o n f o r I n s t a l l a t i o n tand F a b r i c a t i o n( 2 0 ) . P r e p a r a t i o n of s p a r e parts l i s t *

    - f o r c o n s t r u c t i o n- f o r o p e r a t i o n. - 4. DCS ENGINEERING WOXK . .

    (1) B a s i c R e q u i r e m e n t f o r DCS . -. %S o f t w a r e- D at a s h e e t p r e p a r a t i o n a nd f i l l - c u t- D ata ' b a s e g e n e r a t i o n

    : - D o c u m e n t a t i o n

  • 8/8/2019 Instrument Engineering Design

    9/25

    Part if 1Instrument Engineering Design

    Training1. Overail (Standard ISA, API etc.)2. IS0 Company quality management policy

    Company quality objective3. TWC (Engineering work cheek sheet). In st me nt data sheet4. Hazardous area5. Delivery of goods condition6. Piping size standard / schedule7. Engineering design criteria / I h ~ I t u r n 1 De5i9n8. Engineering installation work9. Engineering testing

  • 8/8/2019 Instrument Engineering Design

    10/25

    Part # 2Instrument Con struction DesignTraining

    Description Reference- Typical installation- TTCL Drafting Manual- TTCL Standard Drawing

    2. - Material of instrumentation- Classification of Major and Auxiliary forinstrument work

    - Instrument material take off sheet- Bill of material sheet

  • 8/8/2019 Instrument Engineering Design

    11/25

    "Dl" and "D3" inan d Procurement"

    "Wl", "W2" and

    SPLIT OF WORK

    BETWEENAND PIPING/MECHANICAL INSTALLATION

    the column "Section Responsible for Materials Take-Offmeans:Piping Design Section, andInstrumentation Design Section.

    "W3" in the column "split of Site work " means:Piping groupMechanical Installation groupInstrumentation group

  • 8/8/2019 Instrument Engineering Design

    12/25

    ILLUSTRATION IN P&lFLOW DIA. (EXAMPLE) ARRANGEMENT DRAWING HOOK-UP DWG(DETAIL) - REMARI

  • 8/8/2019 Instrument Engineering Design

    13/25

    ILLUSTRATION IN P&lFLOW DIA.(EXAMPLE)

    I PRESSURE GAGE;q -8'1IA

    DIAPHRAGM-SEALED TYPEPRESSURE GAGE

    8AIK

    ILLUSTRATION IN PIPINGARRANGEMENT DRAWING

    PLAN DWG(NOTE: SHOW INCLUDINGVALVES HERE.NOT TO BEDESCRIBED IN NOZZLE CHART.)

    PLAN DWG(NOTE: FAN ITEMS ON THEPG SIDE,GIVE INDICATIONOF THEIR TYPE.)

    PLAN DWG

    DETAIL DWG

    PLAN DWG(NOTE: NOT TO BE DESCRIBEDIN NOZZLE CHART.)

    1 SECTION RESPO1 FORMATERIALS TAKE-OFF At . ROCUREMENT / SPLIT OF SITE WORK 1 REMARKS IIOOK-UP DWG(DETAIL)1 BOLT/NUT 0 02 GASKET 0 03 VALVE 0 04 BOLT/NUT 0 0

    W3(1 ) TAKE-OFF VALVES FORPRESSURE GAGES TO BEMOUNTED DIRECTLY ON AVESSEL SHALL BE OFFLANGED TYPE.IN PRINCIPLEVESSEL(2) D l IS RESPONSIBLEFOR TAKE-OFF ANDPROCUREMENT.

    (O F SW TYPE,IN PRINCIPLE)

    1 TEEI

    I ANUFACTURE123 FLANGE 4 PIPE5 UNION 6 PRESSURE GAGE

    00

    BOLT/NUTGASKET - 00

  • 8/8/2019 Instrument Engineering Design

    14/25

    DIAPHRAGM-SEALED TYPEPRESSURE GAGE

    ILLUSTRATION IN P&lFLOW DIA.(EXAMPLE)

    PLAN DWG I

    ILLUSTRATION IN PIPINGARRANGEMENT DRAWING

    TYPE-D2%DETAIL DWG

    DETAIL DWG

    PLAN DWG

    SECTION RESP OI .E FORMATERIALS TAKE-OFF A133 '70CUREMENT I SPLIT OF SITE WORK

    4 1 GASKET II 5 (VALVE

    NO.1

    6 BOLT/NUT 07 GASKET 0

    W 10

    8 FLANGE I.

    MATERIALSTEE

    1 9 1 PIPE I l 6

    W2

    1 101 UNION I

    D

    0W33

    1 1

    5

    67

    1 9 1 PRESSURE GAGE / 1 . 1 I 1 . 1

    PRESSURE GAGE

    8

    REMARKS

    a

    GASKETFLANGEPIPE

    , MANUFACTURE0

    aUNION

    (NOTE: SHOW INCLUDING VALVE.N O T T O H E D E S C R I B E DIN NOZZLE CHART.)

    a a

  • 8/8/2019 Instrument Engineering Design

    15/25

    ILLUSTRATION IN P&lFLOW DIA.(EXAMPLE)

    THERMOMETER

    SECTION RESPONSlBl IR

  • 8/8/2019 Instrument Engineering Design

    16/25

    SAFETY VALVE AND VACUUMBREAKER

    ILLUSTRATION IN P&lFLOW DIA.(EXAMPLE)

    .l\ LlNE DESIGNATION

    ILLUSTRATION IN PIPINGARRANGEMENT DRAWING

    LlNE DESIGNATIONq L 7

    rE DESIGNATION

    L I ~ E E SI GN AT IO N

    '1 WHEN A SPOOL P lPE ISINSERTED (IF DIRECTLY 1

    PLAN DWG- --

    DETAIL DWG DDETAIL DWG

    DETAIL DWG

    PLAN DWG

    JSTRATION INHOOK-UP DWG(DETAIL)

    C O N N E C ~ E DO THENOZZLE. ) DESCRIBE THESIZE AND SPEC.

    I MATERIALS TAKE-OFF AND . UREMENT I OF 'ITE 1

    DETAIL DWG(NOTE. SHALL BE DESCRIBED

    IN NOZZLE CHART.)

    REMARKS

    1 12 1 PIPE

    VESSEL

    BOLTS/NUTS (7 ) TO BEPROCURED BY D 3

    6 P I P E 0 0 ( 0 )7 SAFETY VALVE 0 0

    '1 BOLTS/NUTS (1 ) TO BEPROCURED BY D3

    I F (5) AND (6) ARE TOBE PREFABRICATED.THEWORK SHALL BE INCLUDEDIN INSTALLATION GROUP.

    NOTE : MARK" #O " MEANS TIiE RELATED NOZZLE NO.

  • 8/8/2019 Instrument Engineering Design

    17/25

    ILLUSTRATION IN P&l ILLUSTRATION IN PIPING JSTRATION INFLOW DIA (EXAMPLE) ARRANGEMENT DRAWING HOO K-UP DWG(DETAIL)

    LINE DESIGNATIONIF (8) AND (9 ) ARE TOBE PREFABRICATED.THEWORK SHALL BE INCLUDEDIN INSTALLATIOtl GROUP

    NOTE . MARI

  • 8/8/2019 Instrument Engineering Design

    18/25

  • 8/8/2019 Instrument Engineering Design

    19/25

  • 8/8/2019 Instrument Engineering Design

    20/25

    AIA

  • 8/8/2019 Instrument Engineering Design

    21/25

    REMARKS

    ILLUSTRATION IN P&l ILLUSTRATION IN PIPING

  • 8/8/2019 Instrument Engineering Design

    22/25

    FLOW DIA.(EXAMPLE) ARRANGEMENT DRAWING

    /PLAN DWG.r\

    DETAIL DWG(NOTE: SHOW INCLUDING VALVE.NOT TO BE DESCRIBEDIN NOZZLE CHART.)

    PLAN DWG.DETAIL DWG

    (NOTE: SHOW INCLUDING VALVE.NOT TO BE DESCRIBEDIN NOZZLE CHART.)

    PLAN DWG.

    $*

    PPLAN DWG.

    SECTION RESPON! - FOR OF 'ITE 'ORK I

  • 8/8/2019 Instrument Engineering Design

    23/25

    ILLUSTRATION IN P&lFLOW DIA.(EXAMPLE)

    LINE DESIGNATION--,---, 7

    2- ....w-AIA

    ILLUSTRATION IN PIPINGARRANGEMENT DRAWING

    -\ SIZE CLASS

    ILLUSTRATION INHOOK-UP DWG(DETAIL) I MATERIALS TAKE-OF F AI 'ROCUREM ENT I

    ' 1 WHEN ELEMENTS SUCH ASFLANGE. PIPE AND CAPARE TO BE PROCURED BYD l . A ND T H E COLUMN ISTO BE FABRICATED ATSITE. IT SHALL BE FAB-RICATED BY "PIPING"GROUP AND INSTALLED BYINSTALLATION GROUP.

    ILLUSTRATION IN P& l ILLUSTRATION IN PIPING SECTION RESPON. 1 FORILLUSTRATION IN I MATERIALS TAKE-OFF A "ROCUREMENT I SPL IT OF 'ITE 'ORK 1

  • 8/8/2019 Instrument Engineering Design

    24/25

    FLOW DIA.(EXAMP LE) ARRANGEMENT DRAWING

    DRAIN AND PURGE PIPING FORINSTRUMENTATION- LINE DESIGNATION

    ACTUAL FORM SHALL BEI ILLUSTRATED.WHEN TO BE EQUIP PED WlTHPURGE METER

    ,LNE DESIGNATION PLAN DWG

    HOOK-UP DWG(DETAIL)NO. MATERIALS D 1

    REMAKKS

    DRAIN

    13 FLANGE 0

    VALVE (8) IS INTEGRALWlTH THE LW EL GAGESUCH VALVES ARE NOT TOBE DESCRIBED IN P&l

    2 GASKET 03 VALVE 0 04 BOLT/NUT 0 0 1

  • 8/8/2019 Instrument Engineering Design

    25/25