INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, REZONINGS, PRELIMINARY SITE PLANS, PRELIMINARY PLANS, NONRESIDENTIALSUBDIVISION, RESIDENTIAL SUBDIVISION INTO MORE THAN ONE DWELLING UNIT PER LOT, AND PUBLIC SCHOOL COMPREHENSIVE PLAN CONSISTENCY REVIEW To Be Completed By Department Responsiblefor Approval Sought; Completed Certificate Must Be Attached to the Agenda Item and Approval Document Completed Application Received On (Date): J une 10, 2009- Certificate Form Completed By : D.Huber Parcel I.D. Ws: -1 3-26-16-0000-00300-0000, 13-26-16-0000-00400-00000,0010~ (attach survey if project includes portion of parcel) project Name: -Grand Trinity Plaza Add Subdivision Name: r A Z No.: 96 TAZ Map Version: GIS kpplicant Name, Address, and Telephone Number: -Grand Trinity Plaza 2551 Drew St, Ste 301, Clearwater, FL 33765 sob Site Address: -Little RoadNilla Entrada Proiect has direct connection (See 402.5.C.5.A) to followina collectorslarterials: Mgregated with another project? (See 402.5.C.5.B) X Yes No (If yes, identify project name and I.D. No. -CRD85-146, CRD84-1202 Prior building(s) on or after January 1, 1985? X Yes - No (If yes, identify use and unitslsq. ft. 180,121 existg restaur, retail shopng &,bank) Approval Sought (Check all that apply): - DRI - Rezoning - Preliminary Plan ,x- Preliminary Site Plan - I-yr Extension Nonresidential Subdivision Residential Subdivision into More than One Dwelling Unit Per Lot Public School Comprehensive Plan Consistency Review TYPE OF DEVELOPMENT (Use TIS Exhibits for land use description and units of measurement, and if not on Exhibits, use ITE land use codes and description) If not restricted by applicant, use maximum allowed by requested (rezoning or DRI) or approved (other approvals) zoning or land use, whichever is less) !esidential Nonresidential Single Family Mobile Home Park Congregate Care Facility D.U. D.U. D.U. Apartments D.U. Low-Rise Condorrownhouse D.U. Hi-Rise Condominium (3 or more stories) D.U. Other Residential D.U. EXEMPTIONS AND LIMITED EXEMPTIONS (Rec EXEMPTIONS (See 402.6 and Concurrency Applicability): A. ALL FACILITIES Approved school consistency review or preliminarylconstruction plan prior to December 1,2006 Complete application prior to December I, 2006 (apply old 402 and TIS Guidelines) Unexpired Certificate of Level of Service Compliance Unexpired DRI approved prior to April 9, 1991 Unexpired Initial Certificate of Capacity 0. ROADS ONLY Unexpired DRI applied for or approved prior to December 1,2006 Unexpired Traffic Study completed after June 4, 1999 Unexpired approved Traffic Study Methodology prior to December I, 2006 (apply old TIS Guidelines) Unexpired approved Development Agreement exempt from transportation concurrency A N . . . 4 a. ~JS~JC.. Oxemption Expires On: 2 -5- hu (cY*~(. he . Exemption Revoked On: ment Signature (required for roads only) Specific Use New I sq. ft. retail 1 5,500- sq. ft. arocerv store 1 -1 5,849- (specify unit) Storage1Display Area - I sq. ft. uires Authorized Signature) *LIMITED EXEMPTIONS (See 402.7; requires signature from County Administrator or his designee): Public School or School Required for School Concurrency Governmental Building or Use Target Business (requires letter from PEDC) EC Preferred Industrial Uses and Corporate Business Park Affordable Housing (requires letter from Community Development) TND Development Exemptions (check all that apply): Impact Fees or Interlocal Agreement As Pro~ortionate Share (Roads Onlv) , r Traffic Study Waiver (Roads Only) 3 years committed capacity vs. 1 yr. (Roads Extension of Certificate wlo Additional Review Other (requires CAO approval) Authorized Signature ISSUANCE DATE: (Use date of final zoningldevelopment order approval) Authorized Signature BPlRATlON (See 402.3.A): All Facilities (other than roads): Certificate of Capacity f xpires (or subject to additional review) On: Revoked On: Relinquished On: (6 yrs. from issuance) Roads: Certificate of Capacity Expires (or subject to additional review) On: (GM to complete) Revoked On: Relinquished On: "Completed Certificate of Capacity with limited exemptions or with exemptions for which no prior certificate of capacity has been issued must be distributed to the following: 1) Growth Management Administrator; 2) Engineering Services Director; 3) Parks and Recreation Director; 4) Transportation Manager; 5) Development Director; 6) MPO Transportation Planning Coordinator; 7) Assistant County Administrator for Development Services; 8) Assistant County Administrator for Utilities Services; 9) OMB Director; and 10) BCC as a noted item on agenda, excluding 3) and 8) if exemption is for roads only.

Upload: lenhu

Post on 29-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, REZONINGS, PRELIMINARY SITE PLANS, PRELIMINARY PLANS,

NONRESIDENTIAL SUBDIVISION, RESIDENTIAL SUBDIVISION INTO MORE THAN ONE DWELLING UNIT PER LOT, AND PUBLIC SCHOOL COMPREHENSIVE PLAN CONSISTENCY REVIEW

To Be Completed By Department Responsible for Approval Sought; Completed Certificate Must Be Attached to the Agenda Item and Approval Document

Completed Application Received On (Date): J u n e 10, 2009- Certificate Form Completed By : D.Huber

Parcel I.D. Ws: -1 3-26-16-0000-00300-0000, 13-26-16-0000-00400-00000,0010~ (attach survey if project includes portion of parcel)

project Name: -Grand Trinity Plaza Add Subdivision Name:

r A Z No.: 96 TAZ Map Version: GIS

kpplicant Name, Address, and Telephone Number: -Grand Trinity Plaza 2551 Drew St, Ste 301, Clearwater, FL 33765

sob Site Address: -Little RoadNilla Entrada

Proiect has direct connection (See 402.5.C.5.A) to followina collectorslarterials:

Mgregated with another project? (See 402.5.C.5.B) X Yes No (If yes, identify project name and I.D. No. -CRD85-146, CRD84-1202

Prior building(s) on or after January 1, 1985? X Yes - No (If yes, identify use and unitslsq. ft. 180,121 existg restaur, retail shopng &,bank)

Approval Sought (Check all that apply): - DRI - Rezoning - Preliminary Plan ,x- Preliminary Site Plan - I-yr Extension

Nonresidential Subdivision Residential Subdivision into More than One Dwelling Unit Per Lot Public School Comprehensive Plan Consistency Review

TYPE OF DEVELOPMENT (Use TIS Exhibits for land use description and units of measurement, and if not on Exhibits, use ITE land use codes and description)

If not restricted by applicant, use maximum allowed by requested (rezoning or DRI) or approved (other approvals) zoning or land use, whichever is less) !esidential Nonresidential

Single Family Mobile Home Park Congregate Care Facility

D.U. D.U. D.U.

Apartments D.U. Low-Rise Condorrownhouse D.U. Hi-Rise Condominium (3 or more stories) D.U. Other Residential D.U.

EXEMPTIONS AND LIMITED EXEMPTIONS (Rec EXEMPTIONS (See 402.6 and Concurrency Applicability):

A. ALL FACILITIES

Approved school consistency review or preliminarylconstruction plan prior to December 1,2006

Complete application prior to December I, 2006 (apply old 402 and TIS Guidelines) Unexpired Certificate of Level of Service Compliance Unexpired DRI approved prior to April 9, 1991 Unexpired Initial Certificate of Capacity

0. ROADS ONLY

Unexpired DRI applied for or approved prior to December 1,2006 Unexpired Traffic Study completed after June 4, 1999 Unexpired approved Traffic Study Methodology prior to December I, 2006 (apply old TIS Guidelines) Unexpired approved Development Agreement exempt from transportation concurrency

A N... 4 a. ~ J S ~ J C . .

Oxemption Expires On: 2 -5- h u (cY*~(. h e . Exemption Revoked On:

ment Signature (required for roads only)

Specific Use New I sq. ft. retail 1 5 , 5 0 0 - sq. ft.

arocerv store 1 -1 5,849- (specify unit)

Storage1 Display Area - I sq. ft.

uires Authorized Signature) *LIMITED EXEMPTIONS (See 402.7; requires signature from County Administrator or his designee):

Public School or School Required for School Concurrency Governmental Building or Use Target Business (requires letter from PEDC) EC Preferred Industrial Uses and Corporate Business Park Affordable Housing (requires letter from Community Development) TND Development

Exemptions (check all that apply):

Impact Fees or Interlocal Agreement As Pro~ortionate Share (Roads Onlv) , r Traffic Study Waiver (Roads Only) 3 years committed capacity vs. 1 yr. (Roads

Extension of Certificate wlo Additional Review Other (requires CAO approval)

Authorized Signature

ISSUANCE DATE: (Use date of final zoningldevelopment order approval) Authorized Signature

BPlRATlON (See 402.3.A): All Facilities (other than roads): Certificate of Capacity f xpires (or subject to additional review) On: Revoked On: Relinquished On:

(6 yrs. from issuance) Roads: Certificate of Capacity Expires (or subject to additional review) On: (GM to complete) Revoked On: Relinquished On:

"Completed Certificate of Capacity with limited exemptions or with exemptions for which no prior certificate of capacity has been issued must be distributed to the following: 1) Growth Management Administrator; 2) Engineering Services Director; 3) Parks and Recreation Director; 4) Transportation Manager; 5) Development Director; 6) MPO Transportation Planning Coordinator; 7) Assistant County Administrator for Development Services; 8) Assistant County Administrator for Utilities Services; 9) OMB Director; and 10) BCC as a noted item on agenda, excluding 3) and 8) if exemption is for roads only.

Page 2: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

CONCURRENCY REVIEW (To Be Completed by Department Listed Below Only; Leave Blank if a 402.6 Exemption Applies)

:amp. Plan Elements Meets LOS Std. Review Standards Conditional

Approval (attach conditions of

Yes No approval)

Roads (Growth Management) IPc( 0 E l LDC 402.5, Transportation Element 2.4.1 and TIS Guidelines

water~later Supply (Utilities) El 0 El LDC 402.4.A and Public Facilities Element 1 .I and 1.3

Sewer (Utilities) 0 0 El LDC 402.4.A and Public Facilities Element 3.1

ParksRecreation (Parks) I n El LDC 402.4.B and Recreation and Open Space Element 1 . I

Solid Waste (Utilities) n o El LDC 402.4.A and Public Facilities Element 4.1

mass Transit (Public Transportation) 0 0 0 LDC 402.4.A and Transportation Element 5.1

Reviewed by: S L Authorized Signature:

r)Q-Kev 7~ Title Date

Page 2 of 2

Page 3: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

CONCURRENCY REVlEW (To Be Completed by Department Listed Below Only; Leave Blank if a 402.6 Exemption Applies)

Comp. Plan Elements Meets LOS Std. Review Standards Conditional Approval

Yes No (attach conditions of approval or list below)

Roads (Growth Management)

LDC 402.5, Transportation Element 2.4.1 and TIS Guidelines

Waterwater Supply (Utilities)

Aloha Utilities LDC 402.4.A. and Public Facilities Element 1.1 and 1.3

Sewer (Utilities) Aloha Utilities LDC 402.4.A. and Public Facilities Element 3.1

Parksmecreation (Parks)

LDC 402.4.8. and Recreation and Open Space Element 1.1

Solid Waste (Utilities)

LDC 402.4.A. and Public Facilities Element 4.1

Mass Transit (Public Transportation)

LDC 402.4.A. and Transportation Element 5.1

Authorized Signature: /,<a ! d L - Michael A. Kirkpatrick Lead Utilities Inspector

Reviewed by: Cindv A. Zatorski

Development Review Tech I Title June 30.2009

Date

GRAND TRINITY PLAZA ADDITION PARCEL ID #'S 13-26-16-0000-00300-0000; 13-26-16-0000-00400-0000,0010 PCU# 07-2 13.01

For Water 1 Wastewater:

Potable water and wastewater service for this project is not provided by the Pasco County Utilities Services Branch. The appropriate utility service provider, Aloha Utilities, must be contacted directly to provide capacity statements. The telephone number is (727) 372-01 15.

For Solid Waste:

The provision of solid waste service is contingent upon the County receiving all permits and approvals necessary to implement and construct the County's planned disposal system improvements and facility expansions needed to serve the development; and the Developer's, and its successors or assigns, compliance with the conditions of Pasco County Code Chapter 90 and other applicable regulatory requirements.

PASCO COUNTY W L O P M E N T REVISN'

SPECIAL EXCEPTION NO. SE-6691 PARCEL ID #05-26-20-0000-00300-0060

Page 4: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

June 19,2009

Bill Mazas President Grand Trinity Plaza LLC 2551 Drew Street Suite 301 Clearwater, FL 33765

YoRichard Marcel LEED AP NC Keith Zayac & associates, Inc 701 Enterprise Rd, Ste 404 Safety Harbor, FL 34695 Email: RichardQkeithzayac.com

RE: Water and Wastewater Availability

Pracel # 13-26-16-0000-00400-0010,0000 & 00300-0000

Property Address: 4010,4038,4134 Little Rd, New Port Richey FL 34665

I

GOVERNMENTAL

Dear Mr. Mazas:

Potable water lines and wastewater lines are in operation in the vicinity of the proposed project mentioned above. However, in order to provide service to the subject parcels, developer funded system enhancements such as line extensions may be required.

Your firm has indicated that this project will consist of a commercial project with an estimated flow demand of 5,337 GPD for water and wastewater. FGUA presently has sufficient capacity to provide potable water and sanitary sewer as estimated above.

Prior to beginning design work on this project, a meeting should be scheduled with Pradeep Sethi to determine the best point of connection and discuss requirements for construction. He can be reached at 407- 629-6900 ext. 122 or via e-mail at p ~ e t h i @ g ~ ~ m ~ e ~ . ~ ~ m .

Availability of potable water and sanitary sewer service is contingent upon final acceptance of the infrastructure to be constructed by the developer. The FGUA Utilities' Operations Manual requires the project engineer to perform hydraulic computations to determine what impact this project will have on our existing system. A site map showing the approximate location of the utilities is included for your reference as well as list of the next steps to be taken in order to you're your project forward.

LEA ANN THOMAS, CHAIR Polk County

JIM LAVENDER Lee County

ROBERT KNIGHT Citrus County

VACANT) Town of Dundee

SHANE PARKER Hendry County

MICHELE BAKER Pasco County

CHRIS M. ROGERS DeSoto County

FGUA OPERATIONS OFFICE

Government Services Group, Inc. 280 Wekiva Springs Rd.. Ste 2000 Longwood FL 32779

877/552-3482 Toll Free 407/629-6900 Tel 407/6296963 Fax

Page 5: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

This letter should not be construed as a commitment to serve, but only as a statement of the availability of service and is effective for twelve (12) months from the date hereof. Florida Governmental Utility Authority will commit to serve only upon receipt of all appropriate connection fees, a signed request for service and/or an executed service agreement, and the approval of all State and local regulatory agencies.

Further, this letter of availability of water and wastewater service is to be utilized for development review for this project only. Individual letters of availability will be required for the purpose of obtaining building permits.

When you are ready to move forward with your project, please submit a copy of this letter along with four (4) sets of plans for review, an engineer's opinion of probable construction cost (EOPCC) and a check to cover plan review fees in the amount of $300 for the first nine (9) sheets (or less) and an additional $25 for every sheet over 9 sheets.

If you should have any further questions please feel free to contact our development review team at 407- 629-6900.

Sincerely,,

L/ Director of Operations

Page 6: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

CONCURRENCY REVlEW (To Be Completed by Department Listed Below Only; Leave Blank if a 402.6 Exemptlon Applies)

C o m ~ . Plan Elements Meets LOS Std. Review Standards Conditional

Approval (attach conditions of

Yes No approval)

Roads (Growth Management) 0 0 0 LDC 402.5, Transportation Element 2.4.1 and TIS Guidelines

Waterwater Supply (Utilities) 0 0 0 LDC 402.4.A and Public Facilities Element 1 . I and 1.3

Sewer (Utilities) 0 0 0 LDC 402.4.A and Public Facilities Element 3.1

ParksIRecreation (Parks) 0 I3 0 LDC 402.4.8 and Recreation and Open Space Element 1 .I

Solid Waste (Utilitles) nEl 0 LDC 402.4.A and Publlc Facilities Element 4.1

Mass Translt (Public Transportation) 0 0 a LDC 402.4.A and Transportation Element 5.1

Reviewed by:

I n *- Title W-qF 7 -a/c79

Date

Page 2 of 2

Page 7: INITIAL CERTIFICATE OF CAPACITY - Pasco …egov.pascocountyfl.net/Content/ECM/ConsolidatedAgendas/DRC_07-30... · INITIAL CERTIFICATE OF CAPACITY REQUIRED FOR DRls, ... Proiect has

PUBLIC TRANSPORTATION PLAN REVIEW COMMENTS

PROJECT: Grand Trinity Plaza Add Memo # DR09-781

BY: M. Carroll & T. Williams ENGINEER:

COMMENTS

All changes to plan are to be "bubbled" or "clouded" for easy Identification. A cover letter itemizing all comments along wlth response must also be submltted.

As originally requested in March 2008, PCPT request that the following transit amenities be placed along the ROW on Little Road.

Transit amenities shall include: A concrete pad, a shelter, bench, trash receptacle, bicycle rack, sign for bus route information, lighting with a minimum 3.5 foot candle powered by an off-grid power renewable energy power source, landscaping, adequate road configuration for at least one bus at a time to be able to pick up, drop off, and transfer passengers, adequate clear line of sight from the front and back of the bus for the driver's awareness and traffic and pedestrian safety, and pedestrian walkways to allow access to the bus stop and edge of roadway on a clearly defined path from all establishments within the ,parcel. All transit amenities must be in compliance with the Americans with Disabilities Act. The final approval of the design, architecture and placement of the transit amenities shall be by Pasco County in accordance with the Transit Infrastructure Guidelines Manual (www.ride~c~t.com). Responsible to obtain and comply with applicable Right-of-way Use Permit.

If possible, the bus shelter should be placed on the ROW between the Amscot Out Parcel and the Commercial Building South of it (Parcel 1).

NUMBER

1.

2.

REFERENCE

General