infrastructure industry day
TRANSCRIPT
![Page 1: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/1.jpg)
Infrastructure Industry DayAugust 5, 2021
![Page 2: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/2.jpg)
Opening & Welcoming Remarks Upcoming Business Opportunities:
1. Skyway Replacement RFQ/RFP (DBOM)2. On-Call Planning Services3. On-Call Asset Management Services4. MEP Contract Services5. Roadway Repair Contract Services6. Conveyances O&M Services
Networking Break – 15 minutes
2
Infrastructure Industry Day Agenda
![Page 3: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/3.jpg)
Upcoming Business Opportunities (continued): 1. Taxiway L (Design Build)2. T/A Arrival Doors 3. T/A Departure Doors4. T/B & T/C Skyways Station Flooring5. Passenger Loading Bridges 6. Terminal A Modernization Update
• Question and Answer Opportunity • Industry Day Concludes
3
Industry Day Agenda
![Page 4: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/4.jpg)
IntroductionsJustina Mann, Director of Project Delivery
Eduardo Mejia, Office of Business Opportunity
![Page 5: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/5.jpg)
Skyway APM Replacement RFQ/RFPScott Hill, Director of Maintenance
![Page 6: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/6.jpg)
6
Skyway APM Replacement RFQ/RFP IntroductionScott Hill, Director of Maintenance
Team Introduction HAS Infrastructure Division
Project DeliveryMaintenance
Planning TeamRicondo & AssociatesLea + ElliottVestaReaNewhouse & Associates
![Page 7: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/7.jpg)
7
IAH Skyway Automated People Mover (APM)Scott Hill, Director of Maintenance
BackgroundFormerly known as the TerminaLinkProvides Secure Side ConveyanceInservice
Phase 1 – 1999Phase 2 – 2005Phase 3 – 2010
Periodic AssessmentsOriginal Equipment
Reaching End Of Service LifeSystem Modernization
![Page 8: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/8.jpg)
8
Skyway APM Replacement Approach Scott Hill, Director of Maintenance
OverviewDesign Build Operate And Maintain (DBOM)
Full Fleet ReplacementAutomatic Train Control (ATC)Retrofit/Refurbish Of Facility AssetsOperations And Maintenance (O&M)
25-30 Years
![Page 9: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/9.jpg)
9
Skyway APM Replacement DBOM Procurement Scott Hill, Director of Maintenance
DBOM Procurement One Procurement And One Contract*Request For Qualifications (RFQ)
(Target September/October 2021)Request For Proposals (RFP)
(Target January/February 2022)Desired Notice To Proceed (NTP)
(Target November/December 2022)*Minority And Women Business Enterprises*
*Projected MWBE Goal 36%**9% Design, 17% Construction, 10% O&M* *Tentative – To Be Finalized
![Page 10: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/10.jpg)
10
SKYWAY REPLACEMENT PROJECT
![Page 11: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/11.jpg)
SKYWAY SYSTEM
![Page 12: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/12.jpg)
SKYWAY SYSTEM STATISTICS
System Name: Skyway (formerly TerminaLink)
Role: Airside conveyance (secure)
In Service Year(s): Phase 1 - 1999, Phase 2 - 2005, Phase 3 - 2010
System Operating Configuration: Pinched loop, elevated
Guideway Length: 1.0 miles (1.6 km) dual-lane guideway
Vehicle/Train Configuration: 2-car trains
Fleet Size: 16 vehicles (8, 2-car trains)
Propulsion: 600 Vac traction motors, guideway-mounted insulated power rail
Control System: Fixed block, fully automated
Peak Hour Capacity: 5,000 pphpd
Headway: 1.85 mins
![Page 13: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/13.jpg)
Terminal A InteriorsTerminal A Station
![Page 14: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/14.jpg)
![Page 15: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/15.jpg)
Terminal B Station
TER
MIN
AL S
TATI
ON
B
![Page 16: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/16.jpg)
![Page 17: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/17.jpg)
OFF
-LIN
E M
AIN
TEN
ANC
E AN
DST
OR
AGE
FAC
ILIT
Y
![Page 18: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/18.jpg)
OFF
-LIN
E M
AIN
TEN
ANC
E AN
DST
OR
AGE
FAC
ILIT
Y
![Page 19: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/19.jpg)
OFF
-LIN
E M
AIN
TEN
ANC
E AN
DST
OR
AGE
FAC
ILIT
Y
![Page 20: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/20.jpg)
26
![Page 21: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/21.jpg)
TERMINAL C STATION
![Page 22: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/22.jpg)
30
![Page 23: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/23.jpg)
Terminal D Station
TERMINAL D AND E STATION
![Page 24: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/24.jpg)
SYSTEM/STATION INTERFACES
![Page 25: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/25.jpg)
![Page 26: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/26.jpg)
SCOPE OF WORK
Full Turnkey System Replacement Including:Full Fleet ReplacementAutomatic Train Control(ATC) ReplacementRetrofit and Refurbish all existing
APM facilities Stations Guideway MSF Central Control Facility (CCF) Power Distribution Subsystem
![Page 27: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/27.jpg)
SCOPE OF WORK
Communication System ReplacementTelephoneEmergency TelephoneDynamic DisplaysPublic AddressCCTV
Remove and Replace Guideway Running Surface, Guidance Equipment and Power RailRemove and Replace Existing Power Distribution Equipment including new wiring and cablingRemove the Existing Central Control located in Terminal BExpand the Existing MSF Support Level to allow new Central Control and Support RoomsSystem Operation and Maintenance Contract
1 x Ten (10) Year Initial Term1 x Ten (10) Year 1st Renewal Option1 x Five (5) Year 2nd Renewal Option
![Page 28: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/28.jpg)
PERFORMANCE REQUIREMENTS
Fit within the Existing Fixed Facilities ConstraintsFully Automated Trains, without need of Drivers/Attendants
Operate Primarily as a Pinched LoopBi-directional Operations on Single Guideway sections for Maintenance/Failure ManagementVehicle CapacitySeating Capacity: Minimum 10% - Maximum 15 % of Normal Vehicle CapacityStanding Design Capacity: One passenger for each 2.7 ft2 of standee floor areaStanding Normal Capacity: One passenger for each 3.5 ft2 of standee floor area
Passenger Service CharacteristicsMinimum Capacity: 4800 pphpdMaximum Headway: 180 secondsMaximum Station Dwell:60 Seconds
![Page 29: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/29.jpg)
DESIGN LIFE
50 Years - Fixed Facility StructuresGuideways, Stations, MSF, and All Other Fixed Facility System Related Structures
30 Years – Guideway EquipmentRunning SurfacesGuidance Equipment, including Guideway Switches
30 Years - Power Distribution System Substations and All Wiring and Cabling 15 Years - ATC , Communication Equipment and All Other Major System Equipment Vehicle Design Life
At Least 30 years or 3,000,000 milesFull Rehabilitation of the Vehicle will be permitted at 15 years or 1,500,000 miles
![Page 30: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/30.jpg)
PROCUREMENT AND IMPLEMENTATION SCHEDULE
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Procurement Documents RFQ and RFP System Implementation
2025 2026 2027 2028
Design and Engineering ManufacturingConstructionInstallation and Integration Testing and Acceptance
2021 2022 2023 2024
*Preliminary
![Page 31: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/31.jpg)
GUIDEWAY SECTION
![Page 32: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/32.jpg)
GUIDEWAY SECTION
![Page 33: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/33.jpg)
GUIDEWAY SECTION
![Page 34: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/34.jpg)
POWER DISTRIBUTION SYSTEM (PDS)
![Page 35: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/35.jpg)
PDS SUBSTATION 1
![Page 36: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/36.jpg)
PDS SUBSTATION 2
![Page 37: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/37.jpg)
PDS SUBSTATION 3
![Page 38: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/38.jpg)
On-Call Planning Professional ServicesKaren Korir, Chief Aviation Planner
![Page 39: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/39.jpg)
On-Call Planning Professional Services
![Page 40: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/40.jpg)
49
Infrastructure Division, Planning & Capital DevelopmentKaren Korir, Chief Aviation Planner
Project ObjectivesOn-Call Planning Professional ServicesThree (3) Year Term with Two, One (1) Year Optional Extensions*Select 3 Teams*Airports – George Bush Intercontinental Airport, William P. Hobby Airport, Ellington Airport, Administration – Houston Airport System wide
*Tentative/Projected – To Be Finalized
![Page 41: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/41.jpg)
50
On-Call Planning Professional Services
Procurement:Request For Qualifications (RFQ) Advertise Fall 2021Minority And Women Business Enterprises
Projected DBE Goal 25%*
![Page 42: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/42.jpg)
On-Call Planning Professional Services
Technical Planning – Airfield, Terminal, Landside, Support Facilities Airport master plan implementation supportSupport to the capital improvement program and Airport Improvement Program (AIP) for grantsSupport to the Individual aviation planning project studiesSupport to Airport Spatial Information Services (ASIS/GIS) Environmental activities related to development, demographics, economic impacts, management of aviation planning dataAviation planning support to airport management
51
![Page 43: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/43.jpg)
Examples of Tasks
Developing Project Definition Manuals (PDM)/Project Definition Documents (PDD)Aviation activity forecastingModeling airfield and airspace movements, runway, taxiway, taxilane reconfigurations, greenfield site development, extensionsStudies for terminal expansions, renovations, as well support facilities.Modeling terminal passenger movementsModeling vehicle and roadway activities and preparing access studiesDeveloping Airport Layout Plan updates, Safety Risk Assessments, support in processing approval of plans by FAAPart 150 study tasks including mapping. Environmental issues relating to specific construction projects encompassing issues relating to air quality, wetlands, historic preservation, noise, water quality, or other categories covered under the National Environmental Protection Act or other applicable state and federal regulations.
52
![Page 44: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/44.jpg)
Examples of Tasks
Assisting in the preparation of requests and/or responses for qualifications/proposals on other aviation planning projects as neededProviding technical support to Airside Operations interpreting FAA requirements, including coordination of Modification of Standard waivers. Supporting HAS Infrastructure and other Divisions in its interaction with federal, state, local, public, and private agencies and groups Conducting plan reviews including construction drawings/reports as neededPreparing conceptual construction phasing plans, and project schedules for airfield, terminal, landside, and support facilities Cost estimating, feasibility analysis and various economic analysesConducting peak week surveys. Researching trends in the aviation industry Providing CAD, 3D Modeling, Rendering, presentation graphics support as needed Facilitating technical public review sessions
53
![Page 45: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/45.jpg)
On-Call Asset ManagementScott Hill, Director of Maintenance
![Page 46: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/46.jpg)
55
On-Call Asset Management Scott Hill, Director of Maintenance
OverviewThree (3) Year Term
One (1) Two (2) Year OptionMultiple Professional Services FirmsAsset Management Deliverable:
Condition AssessmentCommissioningRetro-CommissioningAsset InventoryEnterprise Asset Management System (EAMS)
![Page 47: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/47.jpg)
56
On-Call Asset ManagementScott Hill, Director of Maintenance
Standard Assessment Deliverables
![Page 48: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/48.jpg)
57
On-Call Asset ManagementScott Hill, Director of Maintenance
Procurement:Request For Qualifications (RFQ)*Advertise October 2021**Minority And Women Business Enterprises*
*Projected MWBE Goal 25%*
*Tentative/Projected – To Be Finalized
![Page 49: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/49.jpg)
MEP Contract ServicesScott Hill, Director of Maintenance
Angel Santos, Deputy Assistant Director
![Page 50: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/50.jpg)
59
MEP Contract Services Angel Santos, Deputy Assistant Director
Overview:Three (3) Year TermMultiple FirmsMinor Repair, Rehabilitation, Construction And Alteration OfHAS Facilities And Infrastructure Related To:
Mechanical And PlumbingAnd Associated Electrical
Work Orders Issued On-Call/As-Needed Includes:Storm Water Lift Stations, Sanitary Lift Stations, Ditch Gates, Grease Traps, Triturators,Dewatering Pumps, Various Plumbing Lines and other Mechanical/Plumbing Systems
![Page 51: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/51.jpg)
60
MEP Contract Services Angel Santos, Deputy Assistant Director
Procurement:Invitations To Bid (ITB)*Advertise September 2021*Minority And Women Business Enterprises*
*Projected MWBE Goal 11%*
*Tentative/Projected – To Be Finalized
![Page 52: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/52.jpg)
Roadway Repair ServicesScott Hill, Director of Maintenance
Angel Santos, Deputy Assistant Director
![Page 53: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/53.jpg)
62
Roadway Repair Contract Services Angel Santos, Deputy Assistant Director
Overview:Three (3) Year Term
One (1) Two (2) Year OptionMultiple FirmsMinor Repair, Rehabilitation, Construction And Alteration OfHAS Facilities And Infrastructure Related To:
Landside Roadway PavementWork Orders Issued On-Call/As-Needed
Includes:Street/Roadway Pavement, Driveways, Wheelchair Ramps, Sidewalks, Parking Lots and other Non-Airfield Pavement
![Page 54: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/54.jpg)
63
Roadway Repair Contract Services Angel Santos, Deputy Assistant Director
Procurement:Invitations To Bid (ITB)*Five (5) Year TermAdvertise September 2021*Minority And Women Business Enterprises*
*Projected MWBE Goal 0%*
*Tentative/Projected – To Be Finalized
![Page 55: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/55.jpg)
Conveyances O&M ServicesScott Hill, Director of Maintenance
Angel Santos, Deputy Assistant Director
![Page 56: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/56.jpg)
65
Conveyances O&M And Service Life Renewal Service Angel Santos, Deputy Assistant Director
Scope And Objectives:Invitation To Bid (ITB)Five (5) Year ContractConveyance System Operations And Maintenance (O&M) Services
Three Levels Of Service Best ManagementIndustry StandardReactive
HAS Operated Conveyance Systems
Type IAH HOU EFDHydraulic Elevator 41 14 1Roped-Hydraulic Elevator 3 0 0Traction Elevator 29 0 0MRL Traction Elevator 1 12 1Escalator 46 12 0Moving Sidewalk 9 4 0Wheelchair Lift 1 0 0Total 131 42 2
![Page 57: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/57.jpg)
66
Conveyance O&M Services Angel Santos, Deputy Assistant Director
Procurement:Invitations To Bid (ITB)*Five (5) Year TermAdvertise September 2021Minority And Women Business Enterprises
Projected MWBE Goal 15%*
*Tentative/Projected – To Be Finalized
![Page 58: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/58.jpg)
15 Minute Break
![Page 59: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/59.jpg)
Taxiway L Devon Tiner, Assistant Director of Aviation
![Page 60: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/60.jpg)
69
Ellington Airport Taxiway L Design/Build OpportunityDevon Tiner, HAS City Engineer
OverviewFull length concrete taxiwaySupports Runway 4/22 access for Houston Spaceport tenants.Design / Build Contracting OpportunityRFQ Advertisement in December 2021
![Page 61: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/61.jpg)
70
Ellington Airport Taxiway L Design/Build OpportunityDevon Tiner, HAS City Engineer
Ellington Airport Taxiway L Concept Design
![Page 62: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/62.jpg)
71
Ellington Airport Taxiway L Design/Build OpportunityDevon Tiner, HAS City Engineer
Ellington Airport Taxiway L Design/Build
![Page 63: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/63.jpg)
T/A Arrival Doors T/A Departure Doors
T/B & T/C Skyway Station FlooringJustina Mann, Director of Project Delivery
![Page 64: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/64.jpg)
73
Project 257A – IAH Terminal A. Arrivals Level Door ReplacementProject Manager – Michael Slade
• Project Objectives
• Removal and replacement of the automatic doors at Terminal A. Arrivals Level. Phased demolition of the existing entrance doors as well as required architectural demolition and repairs associated with installation of new doors
• Invitation To Bid (ITB)
• Project will be advertised September 2021
![Page 65: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/65.jpg)
74
Project 257B – IAH Terminal A. Departure Level Door ReplacementProject Manager – Michael Slade
• Project Objectives
• Removal and Replacement of the automatic doors at Terminal A. Departures Level. Phased demolition of the existing departures doors as well as required architectural demolition and repairs associated with installation of new doors.
• Invitation To Bid (ITB)
• Project will be advertised September 2021
![Page 66: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/66.jpg)
75
IAH 255 TB & TC – SKYWAY STATIONS CARPET REPLACEMENTProject Manager – Michael Slade
• Project Objectives
• Replace the existing floor finish at the Skyway Stations located in Terminal B and Terminal C. The carpet will be replaced with quartz Tile Terminals B & C Station Is Approximately 15,000 SF.
• Invitation To Bid
• Project will be advertised September 2021
![Page 67: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/67.jpg)
![Page 68: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/68.jpg)
![Page 69: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/69.jpg)
![Page 70: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/70.jpg)
Passenger Loading Bridge Dave Brandenburg, Executive Advisor
![Page 71: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/71.jpg)
80
Passenger Loading Bridge (PLB) ProcurementScope Description
PLB procurement for IAH and HOUProvide a single manufacture for approximately 40 PLB’s, PCA’s and GPU’s across both IAH and HOU to support standardized maintenance, operation, training, spare parts and consistent reliability.Includes the installation at Hobby of 5 PLB’s, PCA’s and GPU’sProvide 5 year turn-key maintenance for each PLB, PCA and GPU.
Design – Large On Call (Jacobs)Project Status
Design Complete Fall 2021Anticipate Contractor Procurement Winter 2021Anticipated Completion Winter 2025
![Page 72: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/72.jpg)
Domestic Redevelopment ProgramTerminal A Modernization Project
Dave Brandenburg, Executive Advisor
![Page 73: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/73.jpg)
82
IAH Domestic Redevelopment Program (DRP)Overview
Terminal A ProjectsBaggage Handling System Optimization
Design CompleteConstruction Contract Awarded
Early And Enabling Works (Curbside)ModernizationExpansion
![Page 74: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/74.jpg)
83
Early And Enabling Works (Curbside)Scope Description
Improvements To Exterior Terminal FunctionsCurbside Capacity Improvements
Demolish existing helicesConstruct new bridges connecting garagesExpanded Arrivals/Departures/Commercial curbs
South Terminal Roadway ImprovementsDesign-CMARProject Status
Advanced Design Document underwayAnticipate Architect/Engineer Services and CMAR RFQ Fall 2021
![Page 75: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/75.jpg)
84
Terminal A Modernization ProjectScope Description
Scope ElementsCore Building Systems Service ExtensionInbound Baggage Handling Service ExtensionGate Support Equipment ReplacementAddition/Renovation of Existing, RestroomsRefreshed Finishes, Furniture, Fixtures & Equipment
Project Status30% Design CompleteAnticipate Soliciting Architect/Engineer Services Fall 2021*Anticipate Soliciting EPM/PM Services Fall 2021*
* - Pending Council/Airline discussions
![Page 76: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/76.jpg)
85
Terminal A Expansion ProjectScope Description
PurposeIncrease Gate Capacity To Meet DomesticAirline Requirements
Project StatusAnticipate Soliciting Architect Engineer Services Fall 2021*Anticipate Soliciting EPM/PM Services Fall 2021*
* - Pending Council/Airline discussions
![Page 77: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/77.jpg)
86
IAH Domestic Redevelopment ProgramMilestones - 1
Program Scoping And ReviewIndustry Day Outreach Event (today) August 2021Domestic Airline Reviews/Briefs OngoingEconomic Development Committee Fall 2021Airport Airline Affairs Committee Fall 2021
![Page 78: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/78.jpg)
87
IAH Domestic Redevelopment ProgramMilestones - 2
Design And Construction SupportOn-Call Planning Services On Going
Expansion Project PDMOn-Call Design Services On Going
Curbside To 15% Design (ADD)Solicit Curbside A/E and CMAR Services Fall 2021Solicit Modernization/Expansion EPM/PM: Fall 2021Solicit Modernization/Expansion Design Services Fall 2021
![Page 79: Infrastructure Industry Day](https://reader031.vdocuments.mx/reader031/viewer/2022012504/617eaf23a9819f295258a863/html5/thumbnails/79.jpg)
Infrastructure Industry DayQuestion And Answer Opportunity