Information Technology DivisionFabiola Rubio, CIO / Vice President
Overall Accomplishments
Continued development of the Orion Project partnerships
Appointment of the CIO/VP for coordination of IT Division
Switched Internet services from SBC to Time Warner Cable, providing a substantial cost savings and higher speed
Completed the 1900 PC Project to replace instructional computers District-wide
Overall Accomplishments Continued
Deployed the Microsoft Windows 2003 Project Upgrade (from Novel Groupwise to Microsoft Active Directory/Exchange)
Deployed the District-wide Wireless Project
Implemented an IT Plan and Centralized Training Repository through the Technology Resource Center
Realigned the IT Division for better customer support and expanded hours of operation
Overall Accomplishments Continued
Established the Equipment Replacement Committee to replace equipment in non-instructional areas
Established the Information Security Department
Established the Records Management Department
Overall Accomplishments Continued
Publish a quarterly IT Newsletter designed to keep the District informed of important updates and developments
Conducting the 3rd Annual IT Planning Session this Fall to bring the Division together for a day of dialogue and planning for the future
Administrative Applications(Programming/Database Administration)
Implemented SS number conversion simultaneously with UTEPImplemented the UTEP number conversion (80 and 88 prefix)Implemented Banner student online registration and web paymentCampus Pipeline/LuminisupgradeDeveloped ATD student tracking system
Technology Support Operations(Technicians)
Completed fiber and SONET network equipment/connection to MdP Campus
Established web-based email for faculty and staff allowing email access from home
Established on-site PC technical support at each campus
Technology Support Services(Customer Service)
Implemented the STS Program, which has grown from 13 to 35 students; currently partnering with EPISDImplemented Content Management and provided training for web page developmentUpdated all IT ProceduresExpanded help desk and campus operator hours of operation
Academic Computing Services
Hired ACS Lab Manager in April 2005
ACS Labs now serving as information centers for students, faculty and staff
Instructional Media Services
IT Committee funded the purchase of 160 LCD projectors for District-wide use
Developed schedule to increase IMS evening coverage
IMS reorganized to report directly to AVP, Instructional Resources and Technology
Technology Resource Center
Procured additional space, purchased equipment for new TRC at the Rio Grande Campus
Established mentoring program for faculty teaching distance education
Providing new WebCTtraining for faculty teaching online courses
3D Holographic Projection Lab
IT Committee supported the purchase of the instructional equipment for a total of $68,700
Lab has been set-up at the ATC
Providing on-going demonstrations for students, faculty and staff
Center for Instructional Telecommunications
Installed a Leitch Broadcast Server for more efficient programming on weekends
Produced approx. 67 video productions
Currently producing an instructional DVD for the Occupational Education Discipline
Established more efficient set-up processes for the recording of monthly board meetings
Distance Education
Showcased video conferencing capabilities by hosting 3 major conferencesOrion Project videoconferencing demo between EPCC, UTEP and EPISDDeveloped the THECB Distance Education Instructional PlanEPCC continues as a Host College and this summer as a Provide College for the Virtual College of Texas
Distance Education 2003-2004 Student Enrollment
273 2530
1,4901,703
866
389 409
0
2,1522,365
866
Virtual C olle ge O n-Line InstructionalT V
T otals
Fa ll S pr ing S um m e r
Distance Education 2004-2005 Student Enrollment
183 171 59
2,042 2,149
1,147
509 471
113
2,734 2,791
1,319
Virtual C olle ge O n-Line InstructionalT V
T otals
Fa ll S pr ing S um m e r
Distance Education 2003-2004 Sections Offered
2429
0
7583
44
8 80
107120
44
Virtual C olle ge O n-Line Instructional T V T otals
Fa ll S pring S um m e r
Distance Education 2004-2005 Sections Offered
15 158
90
107
55
10 104
115132
67
Virtual C olle ge O n-Line Instructional T V T otals
Fa ll S pr ing S um m e r
Distance Education Dual Credit Enrollment Growth
1,253
1,067
169
15
2001-2002 2002-2003 2003-2004 2004-2005
Jefferson High School