in situ road recycling the ridgeway enfield
TRANSCRIPT
![Page 1: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/1.jpg)
In situ road recycling The Ridgeway Enfield
Bob NoakesRoad Surface Treatment Association
![Page 2: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/2.jpg)
In situ road recycling The Ridgeway Enfield
A Case Study Presented by Bob Noakes
![Page 3: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/3.jpg)
• The Problem for the Highway Authority London Borough of Enfield
• Investigation into the causes and design of remedial solution
• Undertaking the construction process
• Conclusions
![Page 4: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/4.jpg)
![Page 5: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/5.jpg)
![Page 6: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/6.jpg)
![Page 7: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/7.jpg)
![Page 8: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/8.jpg)
![Page 9: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/9.jpg)
![Page 10: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/10.jpg)
![Page 11: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/11.jpg)
![Page 12: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/12.jpg)
Investigation Proposal from Norfolk Partnership Laboratory
• Core every 200m using 350mm dia cores
• On removal of the core, carry out stiffness testing of the layer directly below
• DCP from the bottom of the core, for 1m
• Remove sub-base material for trial mix testing
• Carry out stiffness testing below the sub-base material
• Hand auger for plastic and liquid limits samples from the London clay
• At trial pits in failed areas ensure the full suite of in situ testing is carried out, plus hand auger
![Page 13: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/13.jpg)
![Page 14: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/14.jpg)
![Page 15: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/15.jpg)
![Page 16: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/16.jpg)
Norfolk Partnership LaboratoryCounty Hall, Martineau Lane
NORWICH, Norfolk NR1 2SGTel: 01603 222416Fax: 01603 222457
Email: [email protected]
Stabilised Pavements Ltd Our Project No SPAV0004FAO G Howe Our Report and sample No NPL25533-604
Your Sample Ref D001Your Project or Order No
P&T Project No.
Date Report Issued 10-Jan-12
Email: Page 1 of 1
Scheme EnfieldLocation TP3 Depth 0.5 - 1mDate sampled 23-Nov-11 Date received 23-Dec-11Date tested 10-Jan-12Sample type Small disturbed sample Sample MassIf a sample certificate was provided it is available for inspection.The accuracy of information provided by third parties cannot be guaranteed.
MaterialDescription
Supplier Ex site Source UnknownConveyance note No. Not applicable
TEST SPECIMENLocation Not applicableOrientation Vertical
PREPARATION DETAILSMethod of Division WholePreparation Method Wet Sieving Oven dried @ 40°CPassing 425µm (%) 83
Natural MC (%) 12
Liquid Limit (%) 34Plastic Limit (%) 17Plasticity Index (%) 18Modified PI *(%) 15 *BRE Digest 240:1993.
This calculation is outside the scope of UKAS accreditation.Soil Classification CL
Remarks
Version 78
Test Code = 604 David Houseago (Lead Technician)
SoilLight greyish-brown slightly gravelly SILT. Gravel is fine to medium subangular flint.
PO Box 6909 Lutterworth Leicestershire LE17 4WW
Determination of Liquid Limit to BS1377-2:1990 Clause 4.3 Cone Penetrometer Method (definitive method)and Determination Plastic Limit and Plasticity Index to BS1377-2:1990 Clause 5
0920
www.norfolk.gov.ukwww.maygurney.co.uk
![Page 17: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/17.jpg)
Table 3.1 Construction Thickness and Mechanical Properties. Summary of Results
Core Ch’nage Remarks Asphalt thickness (mm)
Sub Base Sub Grade
Thicknes s (mm)
Stiffness Modulus (MPa)
Stiffness Modulus (MPa)
Minimum Calculated CBR (%)
1 50 350 350 255 2
2 250 400 225 38 2.5
3 355 Area of settlement 415 85 170 40 4.5
4 450 430 420 170 5
5 650 480 200 38 4.5
6 850 340 310 95 >10
7 1050 445 85 380 90 4.5
8 1080 Area of settlement 375 190 38 4.5
9 1250 350 270 34 3.5
Note 1: The cores were all 350mm diameter. Note 2: Stiffness Modulus (Sm) was determined with a Light Weight Dynamic Plate (LWD) test. With the exception of cores 3 and 7 it was not possible to measure Sm of the sub- grade because it was too deep to allow operation of the LWD. Note 3: The results of Dynamic Cone Penetrometer (DCP) tests were used to calculate values of California Bearing Ratio (CBR).Note 4: Silt and clay are water sensitive and the long term values of Sm and CBR may be lower than the quoted values.
![Page 18: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/18.jpg)
Atterberg Limits etc.
Atterberg limits
Core No. Basic Description
Natural moisture content (%)
Plastic Limit (PL)
Liquid Limit (LL)
Plasticit y Index (PI)
Dessicated
1 Clay 36 25 83 58 No 2 Clay 42.9 24 67 43 No 3 Silt 12.1 17 34 18 Yes
4 Sand N/A N/A N/A N/A
5 Clay 24.4 20 50 30 No
6 Sand N/A N/A N/A N/A
7 Clay 38.2 24 67 43 No 8 Clay 31.3 29 72 44 Marginal
9 Sand N/A N/A N/A N/A
![Page 19: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/19.jpg)
Pavement Design to TRL 386Asphalt 135 mm Re-Cycled, Cement Bound, Structural Layer 240 mm
Foundation Platform (mm) 85mm of bound constructionOr300mm of un bound construction.
Sub grade improvement • The thickness of the unbound platform is increased by replacement of a suitable
depth of sub grade with unbound material. Consideration could be given to placing the unbound material on a geo grid.
• Treat the cohesive sub grade with lime or lime and cement to increase its surface modulus to a minimum of 100MPa. This would be subject to testing for the presence of sulphates.
![Page 20: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/20.jpg)
![Page 21: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/21.jpg)
The Proposed Construction Solution
![Page 22: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/22.jpg)
Lime is White
![Page 23: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/23.jpg)
Cement mixing
![Page 24: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/24.jpg)
Checking spread rate
![Page 25: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/25.jpg)
Compacting stabilised layer
![Page 26: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/26.jpg)
Testing
![Page 27: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/27.jpg)
Sulphate tests
![Page 28: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/28.jpg)
![Page 29: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/29.jpg)
The Recycled Road
![Page 30: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/30.jpg)
Reduced local disruption and CO2
![Page 31: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/31.jpg)
Quicker build times
Rural project example: Outputs 2,000m2 per day
Further cost savings: Preliminaries Supervision Traffic Management
Less disruption
Days to Complete
![Page 32: In situ road recycling The Ridgeway Enfield](https://reader036.vdocuments.mx/reader036/viewer/2022071616/62d181b0ed1bce261a2e69d4/html5/thumbnails/32.jpg)
Thanks now off to the Sunset