ridgeway community center renovations

33
SHEET NAME SHEET NO. DATE COPYRIGHT STRANG, INC. DRAWING SET 2021 ARCHITECTURAL MECHANICAL STRUCTURAL ELECTRICAL ARCHITECTURAL DESIGN, MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING STRANG, INC. STRUCTURAL ENGINEERING ONEIDA TOTAL INTEGRATED ENTERPRISES REVISIONS No. DESCRIPTION DATE DESIGN TEAM PROJECT IMAGE SHEET INDEX STAMPS SITE LOCATION MAP TITLE SHEET T001 09/20/2021 CD 208 JARVIS ST RIDGEWAY, WI 53582 PROJECT NO. : 2021046 RIDGEWAY COMMUNITY CENTER RENOVATIONS ELECTRICAL E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES E100A LOWER LEVEL DEMOLITION PLAN - AREA A E100B LOWER LEVEL DEMOLITION PLAN - AREA B E101A FIRST FLOOR DEMOLITION PLAN - AREA A E201A FIRST FLOOR LIGHTING PLAN - AREA A E300A LOWER LEVEL POWER PLAN - AREA A E301A FIRST FLOOR POWER PLAN - AREA A E301B FIRST FLOOR POWER PLAN - AREA B E302A ROOF POWER PLAN - AREA A E302B ROOF POWER PLAN - AREA B E401 FIRST FLOOR SYSTEMS PLAN - AREA B E701 ELECTRICAL ONE LINE DIAGRAM E901 ELECTRICAL SCHEDULES TITLE T001 TITLE SHEET GENERAL G002 GENERAL INFORMATION G003 LIFE SAFETY PLAN & CODE INFORMATION STRUCTURAL S203 ROOF FRAMING PLAN ARCHITECTURAL A001 SCHEDULES AND DETAILS A101A DEMOLITION PLANS - AREA A A101B DEMOLITION PLAN - AREA B A150 DEMOLITION PLAN - ROOF A200 ARCHITECTURAL SITE PLAN A201A FLOOR PLANS - AREA A A250A ROOF PLAN A250B ROOF PLAN - AREA B A301A REFLECTED CEILING PLAN - AREA A A301B REFLECTED CEILING PLAN - AREA B MECHANICAL M001 HVAC SCHEDULES M101A MECHANICAL DEMOLITION PLAN - AREA A M101B MECHANICAL DEMOLITION PLAN - AREA B M201A MECHANICAL PLAN - AREA A M201B MECHANICAL PLAN - AREA B M202 ROOF MECHANICAL PLAN M801 MECHANICAL DETAILS PROJECT LOCATION N RIDGEWAY

Upload: others

Post on 29-May-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RIDGEWAY COMMUNITY CENTER RENOVATIONS

SHEET NAME

SHEET NO.

DATE

COPYRIGHT STRANG, INC.

DRAWING SET

2021

ARCHITECTURAL MECHANICAL

STRUCTURAL ELECTRICAL

ARCHITECTURAL DESIGN, MECHANICAL,

ELECTRICAL, AND PLUMBING ENGINEERING

STRANG, INC.

STRUCTURAL ENGINEERING

ONEIDA TOTAL INTEGRATED ENTERPRISES

REVISIONS

No. DESCRIPTION DATE

DESIGN TEAM PROJECT IMAGE

SHEET INDEXSTAMPS

SITE LOCATION MAP

TITLE SHEET

T001

09/20/2021

CD

208 JARVIS ST

RIDGEWAY, WI 53582 PROJECT NO. : 2021046

RIDGEWAY COMMUNITY CENTER RENOVATIONS

ELECTRICAL

E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

E100A LOWER LEVEL DEMOLITION PLAN - AREA A

E100B LOWER LEVEL DEMOLITION PLAN - AREA B

E101A FIRST FLOOR DEMOLITION PLAN - AREA A

E201A FIRST FLOOR LIGHTING PLAN - AREA A

E300A LOWER LEVEL POWER PLAN - AREA A

E301A FIRST FLOOR POWER PLAN - AREA A

E301B FIRST FLOOR POWER PLAN - AREA B

E302A ROOF POWER PLAN - AREA A

E302B ROOF POWER PLAN - AREA B

E401 FIRST FLOOR SYSTEMS PLAN - AREA B

E701 ELECTRICAL ONE LINE DIAGRAM

E901 ELECTRICAL SCHEDULES

TITLE

T001 TITLE SHEET

GENERAL

G002 GENERAL INFORMATION

G003 LIFE SAFETY PLAN & CODE INFORMATION

STRUCTURAL

S203 ROOF FRAMING PLAN

ARCHITECTURAL

A001 SCHEDULES AND DETAILS

A101A DEMOLITION PLANS - AREA A

A101B DEMOLITION PLAN - AREA B

A150 DEMOLITION PLAN - ROOF

A200 ARCHITECTURAL SITE PLAN

A201A FLOOR PLANS - AREA A

A250A ROOF PLAN

A250B ROOF PLAN - AREA B

A301A REFLECTED CEILING PLAN - AREA A

A301B REFLECTED CEILING PLAN - AREA B

MECHANICAL

M001 HVAC SCHEDULES

M101A MECHANICAL DEMOLITION PLAN - AREA A

M101B MECHANICAL DEMOLITION PLAN - AREA B

M201A MECHANICAL PLAN - AREA A

M201B MECHANICAL PLAN - AREA B

M202 ROOF MECHANICAL PLAN

M801 MECHANICAL DETAILS

PROJECT LOCATION

N

RIDGEWAY

Page 2: RIDGEWAY COMMUNITY CENTER RENOVATIONS

DETAIL REFERENCE

Detail Number

Sheet Number

SECTION REFERENCE

Section Number

Sheet Number

BUILDING SECTION REFERENCE

Building Section Number

Sheet Number

INTERIOR ELEVATION

Interior Elevation Number

Sheet Number

EXTERIOR ELEVATION

Exterior Elevation Number

Sheet Number

ROOM NAME/ROOM NUMBER

PARTITION TYPE

SPECIFIC ELEVATION NOTE

SPECIFIC PLAN NOTE

CEILING HEIGHT

WINDOW/BORROWED LIGHT TYPE

VERTICAL ELEVATION

COLUMN GRID NUMBER

NEW DOOR

DEMO DOOR

REVISION

(Cloud Around Revision)

#

##

###

##

###

##

###

##

###

##

###

#

NAME

ELEVATION

ROOM NAME

RM ##

#

#

#

#'-##"

BL-#

EXISTING DOOR

SPECIFIC DEMOLITION NOTE#

PRECAST CONCRETE

CONCRETE MASONRY UNIT (SECTION)

BRICK (SECTION)

STEEL (SECTION)

RIGID INSULATION (SECTION)

EXTERIOR INSULATION AND FINISH SYSTEM (SECTION)

EXTERIOR INSULATION AND FINISH SYSTEM (ELEVATION)

PLYWOOD (SECTION)

GRANULAR FILL

STONE VENEER (ELEVATION)

SOIL, INFILL

SOIL, UNDISTURBED

6" MAX

3' - 0" MIN 3' - 6" MIN

12" MAXT

.O. S

EA

T

1' -

6" 3'

- 0

"

AT

AC

CE

SS

IBLE

UN

IT

1' -

5"

NOTE:

- ALL FIXTURE MOUNTING INSTALLATION & CLEARANCE DIMENSIONS SHALL MEET ALL ADA ACCESSIBILITY STANDARDS AND NO ACCESSORY SHALL PROJECT MORE THAN 4" FROM WALL.- PROVIDE BLOCKING IN WALLS FOR ALL WALL MOUNTED EQUIPMENT, ACCESSORIES, AND CABINETRY AS REQUIRED; INCLUDING OWNER ITEMS.- ALL ITEMS SHOWN ARE NOT NECESSARILY IN THIS PROJECT.

ELONGATED RIM

GRAB BAR (GB)

1' - 6 1/2"

18" GRAB BAR (GB)

WATER CLOSET URINAL

2' -

6"

3' - 5 1/2"

TOILET PAPER DISPENSER (TPD)

GRAB BAR (GB)

3' -

3"

3' - 3 1/2"

TO

RE

FLE

CT

IVE

SU

RF

AC

E

3' -

4"

2' -

10"

2' -

3"

MIN

MIRROR (MIR)

BOTTOM OF APRON

INSULATE PIPE DRAIN & HOT WATER SUPPLY @ALL SINKS WHERE P.LAM PANEL IS NOT SHOWN

3' -

4"

SOAP DISPENSER (SD)

TO

OP

ER

AB

LE C

ON

TR

OLS

3' -

4"

MA

X

TO

OP

ER

AB

LE C

ON

TR

OLS

3' -

4"

MA

X

2' -

6"

PAPER TOWEL DISPENSER / RECEPTACLE (PTD/R)

SANITARY NAPKIN DISPENSER (SND)

SANITARY NAPKIN RECEPTACLE (SNR)

TO

SP

OU

T O

UT

LET

3' -

0"

MA

X

2' -

3"

MIN

ELECTRIC WATER COOLER (EWC)

ACCESSORIES

B.O

. CA

BIN

ET

2' -

6"

FIRE EXTINGUISHERCABINET (FEC)

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

33 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

GENERALINFORMATION

G002

UH UNIT HEATER

UNF UNFINISHED

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT, VOLT, VALVE

VAC VACUUM

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VSF VINYL SHEET FLOORING

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST, WIDTH, WIDE, WATT, WASTE, WATER

W/ WITH

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD WOOD

WF WIDE FLANGE

WM WIRE MESH

WP WATERPROOF, WEATHERPROOF

WR WATER RESISTANT, WATER RECEPTACLE

WT WEIGHT

WWF WELDED WIRE FABRIC

YD YARD

MTL METAL

MUL MULLION

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NON POTABLE WATER

NTS NOT TO SCALE

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFF OFFICE

OFOI OWNER FURNISHED OWNER INSTALLED

OH OVERHEAD

OHCD OVERHEAD COILING DOOR

OHSD OVERHEAD SECTIONAL DOOR

OP OPERABLE PARTITION

OPG OPENING

OPNG OPENING

OPP OPPOSITE

OPP-H OPPOSITE HAND

PA PUBLIC ADDRESS

PC PLUMBING CONTRACTOR

PDO POWER DOOR OPERATOR

PERP PERPENDICULAR

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLYWD PLYWOOD

PR PAIR

PT PAINT

PTD PAPER TOWEL DISPENSER

PTD/R PAPER TOWEL DISPENSER / RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PVT PAVER TILE

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RB RESILIENT BASE

RBC RESILIENT BASE COVED

RBS RESILIENT BASE STRAIGHT

RD ROOF DRAIN

REF REFERENCE, REFRIGERATOR

REFR REFRIGERATOR

REINF REINFORCED

REM REMOVE

REQ REQUIRED

REQD REQUIRED

RF RESINOUS FLOORING

RM ROOM, RATED METAL

RO ROUGH OPENING

RT RUBBER TILE

RUB RUBBER

RWD REDWOOD

S SOUTH, SINK, SUPPLY

S&V STAIN & VARNISH

SAB SOUND ATTENUATION BLANKET

SAN SANITARY

SB SOIL BORING

SC SOLID CORE

SCD SEAT COVER DISPENSER

SCHED SCHEDULE

SCON SEALED CONCRETE

SD SOAP DISPENSER

SECT SECTION

SF SQUARE FOOT

SH SHELF

SHR SHOWER

SHT SHEET

SIM SIMILAR

SNR SANITARY NAPKIN RECEPTACLE

SNV SANITARY NAPKIN VENDOR

SOG SLAB ON GRADE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

ST STONE

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

T TREAD, THRESHOLD

T&B TOP & BOTTOM

T&G TONGUE & GROOVE

TEL TELEPHONE

TEMP TEMPORARY, TEMPERATURE

TER TERRAZZO

THK THICK

TKBD TACK BOARD

TOB TOP OF BEAM

TOF TOP OF FOOTING

TOS TOP OF STEEL

TPD TOILET PAPER DISPENSER

TRANS TRANSPARENT

TV TELEVISION

TW TOP OF WALL

TYP TYPICAL

EMER EMERGENCY

ENCL ENCLOSURE

EP ELECTRIC PANEL, EPOXY

EQ EQUAL

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXH EXHAUST

EXP EXPANSION

EXPO EXPOSED

EXST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK, FLOOR BOX

FCTY FACTORY

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTIINGUISHER CABINET

FF FINISH FLOOR

FFLR FITNESS FLOOR

FH FUME HOOD, FIRE HOSE

FHC FIRE HOSE CABINET

FIN FINISH

FIX FIXTURE

FL FLOOR

FLUOR FLUORESCENT

FO FINISHED OPENING

FOC FACE OF CONCRETE

FOS FACE OF STUD

FPRF FIREPROOFING

FRP FIBERGLASS REINFORCED PLASTIC

FRT FIRE RETARDANT

FRZ FREEZER

FT FOOT, FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

FV FIELD VERIFY

G GAS

GA GAUGE

GALV GALANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GL GLASS

GMGS GLASS MAT GYPSUM SHEATING

GND GROUND

GWB GYPSUM WALL BOARD

GYP GYPSUM

H HIGH

HB HOSE BIBB

HBD HARDBOARD

HC HOLLOW CORE

HDWD HARDWOOD

HDWE HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSEPOWER

HR HOUR

HSS HOLLOW STRUCTURAL STEEL

HT HEIGHT

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HWD HARDWOOD

ID INSIDE DIAMETER

IE INVERT ELEVATION

IF INSIDE FACE

IMP INSULATED METAL PANEL

INSUL INSULATION

INT INTERIOR

ITD IMPACT TRAFFIC DOOR

JAN JANITOR

JBE JOIST BEARING ELEVATION

JT JOINT

KIT KITCHEN

KO KNOCKOUT

KP KICK PLATE

KS KNEE SPACE

L LENGTH, ANGLE

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LT LIGHT

LWC LIGHT WEIGHT CONCRETE

MATL MATERIAL

MAX MAXIMUM

MB MOP BASIN

MC MECHANICAL CONTRACTOR

MECH MECHANICAL

MEMB MEMBRANE

MEP MECHANICAL, ELECTRICAL, PLUMBING

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE, MOP HOLDER

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

ML&P METAL LATH & PLASTER

MO MASONRY OPENING

MTD MOUNTED

# POUND, NUMBER

& AND

< ANGLE

@ AT

A-100 A LABEL - 100 MINUTE FIRE RATING

B-90 B LABEL - 90 MINUTE FIRE RATING

C-45 C LABEL - 45 MINUTE FIRE RATING

D-20 D LABEL - 20 MINUTE FIRE RATING

Ø DIAMETER, ROUND, PHASE

AB ANCHOR BOLT

ABBR ABBREVIATION

ACOUS ACOUSTICAL

ACP ACOUSTICAL CEILING PANEL

ACR ACRYLIC, ACRYLIC MARKER BOARD

ADJ ADJUSTABLE, ADJACENT

AFF ABOVE FINISH FLOOR

AFS AIR FLOW STATION

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL, ARCHITECT

ASPH ASPHALT

AV AIR VALVE

BAF BAFFLES

BD BOARD

BHD BULKHEAD

BITUM BITUMINOUS

BL BORROWED LITE

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BN BULLNOSE

BO BOTTOM OF

BOT BOTTOM

BP BASE PLATE

BRG BEARING

BSC BIO-SAFETY CABINET

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

BTW BETWEEN

BUR BUILT-UP ROOF

C CONVECTOR, CHANNEL

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CH COAT HOOK

CHBD CHALKBOARD

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLOS CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONJ CONSTRUCTION JOINT

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTROL

CONTR CONTRACTOR

CORR CORRIDOR

CPT CARPET

CR CARD READER

CS CAST STONE

CT CERAMIC TILE

CTR CENTER

CTSK COUNTERSINK

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CYL CYLINDER

D DEPTH

DBA DECK BEARING ANGLE

DBL DOUBLE

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DO OVER, DITTO

DP DAMPPROOFING

DR DOOR

DS DOWNSPOUT

DSD DUCT SMOKE DETECTOR

DT DRAIN TILE

DTL DETAIL

DWG DRAWING

DWL DOWEL

E EAST

EA EACH, EXHAUST AIR

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EHD ELECTRIC HAND DRYER

EIFS EXTERIOR INSULATION FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ABBREVIATIONS MATERIAL LEGEND

SYMBOL LEGEND

SCALE: 3/8" = 1'-0"

STANDARD MOUNTING HEIGHTS

Page 3: RIDGEWAY COMMUNITY CENTER RENOVATIONS

FACP

UP

UP

UP

DN

DN

UP

UP

UP

UP

UP

UP

CLASSIFICATION OF WORK: (IEBC 2015 Sections 503, 504, 505)Level 1 & 2 AlterationProject Area (Level 2 Alteration) 54 sq. ft.

BUILDING AREA:Work Area 54 gross sq. ft. First Floor 15,336 gross sq. ft. Building Total 26,050 gross sq. ft.

PRIMARY BUILDING USES: (IBC 2015 Chapter 3)

Location Occupancy group Floor areaBusiness Group B, Business 5,062 gsfAssembly Group A-3, Assembly 8,984 nsfStorage Group S-2, Low Hazard Storage 4,041 gsf

TYPE OF CONSTRUCTION: 2B (IBC 2015 Chapter 6)

FIRE RESISTANCE RATINGS:Fire Resistance Hourly Ratings for Structural Components: (IBC 2015 Table 601)Primary Structural Frame 0 HourBearing Walls, Exterior 0 HourBearing Walls, Interior 0 HourFloor Construction 0 HourRoof Construction 0 Hour

ALLOWABLE AREA CALCULATIONS:9,500 sq.ft. Basic Allowable Area per A-3 Occupancy (most restrictive) (IBC 2015 Table 506.2) 6,555 sq.ft. Frontage Increase (IBC 2015 Section 506.3) 16,055 sq. ft. Total Allowable Area per Floor

ALLOWABLE HEIGHT CALCULATIONS: (IBC 2015 Tables 504.3 and 504.4)3 stories 55 feet Basic Allowable Height per B OccupancyNA NA Sprinkler Increase 3 stories 55 feet Total Allowable Height

OCCUPANT LOAD CALCULATIONS: (IBC 2015 Table 1004.1.2)Assembly (Exercise Room) 2,962 gsf / 50 = 60 persons Assembly (Unconcentrated) 3,758 nsf / 15 = 250 persons Business 5,062 gsf / 100 = 51 personsKitchen 591 gsf / 120 = 5 personsLibrary (Reading) 633 nsf / 50 = 13 persons Library (Stack) 1,040 gsf / 100 = 11 persons Storage 4,041 gsf / 300 = 14 persons

Total occupancy 404 persons

TOILET FIXTURE CALCULATIONS: (IBC 2015 Table 2902.1)

Type of Use Occupant load Water closets Lavatories Drinking Servicefountains sink

Men Women Men Women Men Women

Assembly (Exerc.) 30 30 0.24 0.46 0.15 0.15 0.06Assembly (Unconc.) 125 125 1 2.49 0.62 0.62 0.25 Business 26 26 1.04 1.04 0.65 0.65 0.26Kitchen 3 3 0.04 0.04 0.01 0.01Library 7 7 0.05 0.1 0.02 0.02Library 6 6 0.05 0.1 0.02 0.02Storage 7 7 0.07 0.07 0.07 0.07

Total required for 202 202 3 5 2 2 1 entire building

Total providedfor entire building 10* 7 6 6 2

Notes * Provided fixtures are 4 WC and 6 Urinals

CODE INFORMATION

EXIT WIDTH CALCULATIONS: (IBC 2015 Section 1005.3.1 & 1005.3.2)

Non-Sprinkled:

Stairs, Required Stairs, Provided Other Egress, Required Other Egress, Provided

404 persons x 108 inches 404 persons x 72 inches0.3 / 2 stairs = 60.6 inches 0.2 / 2 exits = 40.4 inches

FIRE EXTINGUISHER CABINET

EGRESS DIRECTION

60" Ø WHEELCHAIR TURNING SPACE

1 HOUR RATED FIRE PARTITION

2 HOUR RATED FIRE PARTITION

3 HOUR RATED FIRE PARTITION

FECNOT TO SCALE

LIFE SAFETY PLAN LEGEND

OR

OR

OR

830 SF

STORAGE

845 SF

MARSHAL'S OFFICE

EXIT 76"

781 SF

STORAGE (EXISTINGBOILER)

1,020 SF

STORAGE (EXISTINGAIR HANDLER)

USE OCCUPANCY

BUSINESS

STORAGE

UNEXCAVATED

STAIRS LEADING UP TO GRADE

EX

IT

76"

EX

IT

76"

EXIT 76"

EXIT 33" EXIT33"

1,671 SF

COMMUNITY ROOM

829 SF

SENIOR'S ROOM

1,040 SF

LIBRARY (STACK)

440 SF

KITCHEN

359 SF

OFFICE1,258 SF

CONFERENCE

2,962 SF

GYMNASIUM

494 SF

CONFERENCE

160 SF

MENS 151 SF

WOMENS

2,182 SF

CORRIDOR

TEMP. OFFICE SPACE TO BE DEMOLISHED(FUTURE DEMOLITON - NOT IN SCOPE OF WORK)

RAMP

RAMP

EX

IT

33"

ROUTE TO ACCESSIBLE PARKING

LEVEL 2 ALTERATION WORK AREA: 54 SF

64 SF

STORAGE

273 SF

STORAGE

151 SF

DISHES

USE OCCUPANCY

ASSEMBLY (EXERCISE ROOM)

ASSEMBLY(UNCONCENTRATED)

BUSINESS

KITCHEN

LIBRARY (READING)

LIBRARY (STACK)

STORAGE

633 SF

LIBRARY (READING)

173 SF

CLOSETS

179 SF

CLOSETS

223 SF

STORAGE

54 SF

ELECTRICALCLOSET

121 SF

OFFICE

830 SF

OFFICE

649 SF

OFFICE1,143 SF

OFFICE

612 SF

OFFICE

OPEN TO BELOW

USE OCCUPANCY

BUSINESS

STORAGE

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

37 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

LIFE SAFETY PLAN &CODE INFORMATION

G003

GENERAL LIFE SAFETY PLAN NOTES

1 ALL DOOR LEAVES ARE 36" WIDE WITH 33" CLEAR EGRESS WIDTH, UNLESS NOTEDOTHERWISE.

2 WIDTHS NOTED ON LIFE SAFETY PLANS ARE CLEAR EGRESS WIDTHS

3 SEE SITE PLAN FOR ACCESSIBLE ROUTE TO ACCESSIBLE PARKING STALLS.

PN

TNSCALE: 1/16" = 1'-0"G003

1 BASEMENT LIFE SAFETY PLAN

PN

TNSCALE: 1/16" = 1'-0"G003

2 FIRST FLOOR LIFE SAFETY PLAN

SCALE: NTS

PN

TN

G003

3 SECOND FLOOR LIFE SAFETY PLAN

Page 4: RIDGEWAY COMMUNITY CENTER RENOVATIONS

6"

4 1/4"

3 5/8" LIGHT GAUGE METAL FRAMING AT 16" O.C.

ONE LAYER 5/8" TYPE X GWB

CEILING AS SCHED

PROVIDE ACOUSTIC SEALANT AT PERIMETER

B01

RESILIENT FLOORING

RESILIENT REDUCER, SEE SCHEDULE OF INTERIOR FINISHES FOR ADDITIONAL INFORMATION

EXISTING CONCRETE FLOOR OR OTHER EXISTING MATERIAL

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

REVISIONS

PROJECT NO.

SHEET NO.

2021

No. DESCRIPTION DATE

#

9/23

/202

1 12

:34:

18 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

SCHEDULES ANDDETAILS

A001

SCALE: 1" = 1'-0"A001

1 PARTITION TYPES

ROOM FINISH SCHEDULE

NO. NAME

FINISHES CEILING

REMARKSFLOOR BASE TYPE

001 MARSHAL'S OFFICE

002 STORAGE LVT-1 WB-1

003 STORAGE (EXISTING BOILER)

004 STORAGE (EXISTING AIR HANDLER)

101 OFFICE

101A OFFICE

102A LIBRARY (READING)

102B LIBRARY (STACK)

103 SENIOR'S ROOM

103A CLOSETS

103B TOILET

104 COMMUNITY ROOM LVT-1 WB-1 ACP-2

104A CLOSETS LVT-1 WB-1

104B ELECTRICAL CLOSET LVT-1 WB-1

105 KITCHEN EPOX-1 WB-1

105A DISHES

111 STORAGE

111A MENS

111B OFFICE

111C STORAGE

111D SHOWER

112 GYMNASIUM

113 STORAGE

113A JANITOR

113B WOMENS

113C STORAGE

114 ENTRY

115 CONFERENCE

116 CONFERENCE

118 STORAGE SHED

190 CORRIDOR

201 OFFICE

202 OFFICE

203 STORAGE

204 OFFICE

205 OFFICE

206 WOMENS

207 JAN.

208 MENS

209 CLOSET

290 CORRIDOR

ROOM FINISH SCHEDULE GENERAL NOTES

1 REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS

2 ALL BLANK CELLS ARE "EXISTING TO REMAIN"

3

ROOM FINISH SCHEDULE LEGEND

ACP ACOUSTICAL CEILING PANEL

CG CORNER GUARD

CPT BROADLOOM CARPET

CPTL CARPET TILE

CT CERAMIC TILE

EC EXPOSED CONCRETE

ES EXPOSED STRUCTURE

ETR EXISTING TO REMAIN

FRP FIBERGLASS REINFORCED PANELS

G GROUT

GWB GYPSUM WALL BOARD

LVT LUXURY VINYL TILE

PLAM PLASTIC LAMINATE

PT PAINT

RB RESILIENT BASE

SSM SOLID SURFACE MATERIAL

ST INTERIOR STONE

SV SHEET VINYL

WD WOOD

INTERIOR FINISHES SCHEDULE

IFS Category ABBR DESCRIPTION MANUFACTURER PATTERN COLOR NUMBER SIZE REMARKS

06 61 16 SOLID SURFACING FABRICATIONS

06 61 16 SOLID SURFACING FABRICATIONS SSM-1 SOLID SURFACE CORIAN NEUTRALCONCRETE

09 30 00 TILING

09 30 00 TILING LVT-1 VINYL TILE INTERFACE A00406 ANTIQUELIGHT OAK

A004 5"x36"

09 51 00 ACOUSTICAL CEILINGS

09 51 00 ACOUSTICAL CEILINGS ACP-1 ACOUSTIC CEILINGPANEL

ARMSTRONG OPTIMA WHITE 2X4

09 51 00 ACOUSTICAL CEILINGS ACP-2 ACOUSTIC CEILINGPANEL

ARMSTRONG OPTIMA WHITE 2X2

09 65 00 RESILIENT FLOORING

09 65 00 RESILIENT FLOORING RB-1 RESILIENT FLOOR BASE TARKETT BLACK MAGIC TG4 4"

09 67 23 RESINOUS FLOORING

09 67 23 RESINOUS FLOORING EPOX-1 EPOXY TSR SLATESTONE

09 91 00 PAINTING

09 91 00 PAINTING PT-2 MATCH EXISTING MATCH EXIST.

GENERAL FINISH NOTES

1 REFER TO SHEET A001 FOR STANDARD FLOOR TRANSITION DETAILS.

2 REFER ALSO TO INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION.

3 INSTALL FLOORING UNDER EQUIPMENT AND MILLWORK.

4 FOR FLOORING TRANSITIONS OCCURRING AT A DOORWAY, CENTER TRANSITION ONDOOR UNLESS NOTED OTHERWISE.

5 ALL TOUCH UP AND REPAIR PAINT TO BE PT-2 (MATCH EXISTING).

SCALE: 6" = 1'-0"A001

2 TRANSITION, LVT-CONCRETE

Page 5: RIDGEWAY COMMUNITY CENTER RENOVATIONS

FACP

UP

UP

UP

UP

STORAGE

MARSHAL'S OFFICE

STORAGE (EXISTINGBOILER)

DEMOLISH AIR HANDLING UNITS. REMOVE PIPING AS REQUIRED TO CAP AND ENCLOSE WITHIN THE WALL AND ABANDON IN PLACE.

REMOVE WALL BASE IN AREA

COMMUNITY ROOM

KITCHEN

DISHES

CLOSETS

TOILET

CLOSETS SENIOR'S ROOM LIBRARY (STACK)

CORRIDOR

DEMOLISH AIR HANDLING UNITS. REMOVE PIPING AS REQUIRED TO CAP AND ENCLOSE WITHIN THE WALL AND ABANDON IN PLACE.

DEMOLISH ACOUSTIC CEILING PANELS AND GRID IN AREA. SALVAGE ACP FOR RE-USE.

DEMOLISH SILLS AT WINDOWS IN THE COMMUNITY ROOM

DEMOLISH CERAMIC TILE WALL BASE IN ROOM.

KEY PLAN

A

N

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

19 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

DEMOLITION PLANS -AREA A

A101A

GENERAL DEMOLITION PLAN NOTES

1 MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING.COORDINATE DISRUPTIONS IN SERVICE WITH OWNER.

2 PROTECT IN PLACE DURING ENTIRE CONSTRUCTION PROCESS: ALL FLOORING,SURFACES AND ITEMS TO REMAIN.

3 COORDINATE THE AVAILABILITY OF AREAS REQUIRING DEMOLITION WITH OWNER.SEQUENCE WORK ACCORDINGLY AND COORDINATE W/ ALL TRADES.

4 EXISTING CONSTRUCTION TO REMAIN IS SHOWN SCREENED. CONSTRUCTION ANDEQUIPMENT TO BE REMOVED IS SHOWN WITH DASHED LINES.

5 PATCH, PREPARE, REPAIR AND / OR RESTORE SURFACES SCHEDULED TO REMAININTACT THAT ARE DAMAGED AS A RESULT OF DEMOLITION WORK.

6 VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTINGCONDITIONS.

7 DEMOLITION PLANS ARE NOT NECESSARILY INCLUSIVE OF ALL ITEMS NEEDINGREMOVAL. COORDINATE WITH ALL OTHER DRAWINGS AND FIELD VERIFY EXISTINGCONDITIONS.

8 COORDINATE DEMOLITION DIMENSIONS ON THIS PLAN WITH OTHER DRAWINGS ANDEXISTING CONDITIONS.

9 REFER TO HVAC, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FORADDITIONAL DEMOLITION AND MODIFICATIONS REQUIRED FOR HVAC, ELECTRICAL,PLUMBING, AND FIRE PROTECTION SYSTEMS.

10 REMOVE EXISTING ACOUSTIC CEILING PANELS AS REQUIRED FOR CONSTRUCTIONOF ABOVE-CEILING ELECTRICAL AND MECHANICAL WORK. RETURN CEILING PANELSTO GRID AFTER COMPLETION OF ABOVE-CEILING WORK.

PN

TNSCALE: 1/8" = 1'-0"A101A

1 BASEMENT FLOOR PLAN

PN

TNSCALE: 1/8" = 1'-0"A101A

2 FIRST FLOOR DEMOLITION PLAN

Page 6: RIDGEWAY COMMUNITY CENTER RENOVATIONS

UP

UP

UP

UP

DN

DN

2,962 SF

GYMNASIUM

151 SF

WOMENS

64 SF

STORAGE

175 SF

ENTRY

494 SF

CONFERENCE

1,258 SF

CONFERENCE359 SF

OFFICE

273 SF

STORAGE

160 SF

MENS

146 SF

STORAGE

2,182 SF

CORRIDOR

830 SF

OFFICE

649 SF

OFFICE

1,143 SF

OFFICE

612 SF

OFFICE

731 SF

CORRIDOR

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

21 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

DEMOLITION PLAN -AREA B

A101B

PN

TNSCALE: 1/8" = 1'-0"A101B

1 FIRST FLOOR DEMOLITION PLAN

PN

TNSCALE: 1/8" = 1'-0"A101B

2 SECOND FLOOR DEMOLITION PLAN

GENERAL DEMOLITION PLAN NOTES

1 MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING.COORDINATE DISRUPTIONS IN SERVICE WITH OWNER.

2 PROTECT IN PLACE DURING ENTIRE CONSTRUCTION PROCESS: ALL FLOORING,SURFACES AND ITEMS TO REMAIN.

3 COORDINATE THE AVAILABILITY OF AREAS REQUIRING DEMOLITION WITH OWNER.SEQUENCE WORK ACCORDINGLY AND COORDINATE W/ ALL TRADES.

4 EXISTING CONSTRUCTION TO REMAIN IS SHOWN SCREENED. CONSTRUCTION ANDEQUIPMENT TO BE REMOVED IS SHOWN WITH DASHED LINES.

5 PATCH, PREPARE, REPAIR AND / OR RESTORE SURFACES SCHEDULED TO REMAININTACT THAT ARE DAMAGED AS A RESULT OF DEMOLITION WORK.

6 VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTINGCONDITIONS.

7 DEMOLITION PLANS ARE NOT NECESSARILY INCLUSIVE OF ALL ITEMS NEEDINGREMOVAL. COORDINATE WITH ALL OTHER DRAWINGS AND FIELD VERIFY EXISTINGCONDITIONS.

8 COORDINATE DEMOLITION DIMENSIONS ON THIS PLAN WITH OTHER DRAWINGS ANDEXISTING CONDITIONS.

9 REFER TO HVAC, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FORADDITIONAL DEMOLITION AND MODIFICATIONS REQUIRED FOR HVAC, ELECTRICAL,PLUMBING, AND FIRE PROTECTION SYSTEMS.

10 REMOVE EXISTING ACOUSTIC CEILING PANELS AS REQUIRED FOR CONSTRUCTIONOF ABOVE-CEILING ELECTRICAL AND MECHANICAL WORK. RETURN CEILING PANELSTO GRID AFTER COMPLETION OF ABOVE-CEILING WORK.

Page 7: RIDGEWAY COMMUNITY CENTER RENOVATIONS

FACP

41' -

9"

21' -

4"

33' -

4"

8' -

5"

19' - 5" 44' - 10" 28' - 1"

1' - 11"

DEMOLISH ROOFING MEMBRANE AND INSULATION AS REQUIRED FOR INSTALLATION OF STEEL AND CURBING FOR RTU'S

DEMOLISH ROOFING MEMBRANE AND INSULATION AS REQUIRED FOR INSTALLATION OF STEEL AND CURBING FOR RTU'S

DEMOLISH ROOFING MEMBRANE AS REQUIRED FOR THE REPAIR OF LEAKING ROOF IN HATCHED AREA.

DEMOLISH ROOFING MEMBRANE AND INSULATION AS REQUIRED FOR INSTALLATION OF STEEL AND CURBING FOR FCU'S

KEY PLAN

A B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

22 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

DEMOLITION PLAN -ROOF

A150

PN

TNSCALE: 1/8" = 1'-0"A150

1 DEMOLITION PLAN - ROOF

GENERAL DEMOLITION PLAN NOTES

1 MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING.COORDINATE DISRUPTIONS IN SERVICE WITH OWNER.

2 PROTECT IN PLACE DURING ENTIRE CONSTRUCTION PROCESS: ALL FLOORING,SURFACES AND ITEMS TO REMAIN.

3 COORDINATE THE AVAILABILITY OF AREAS REQUIRING DEMOLITION WITH OWNER.SEQUENCE WORK ACCORDINGLY AND COORDINATE W/ ALL TRADES.

4 EXISTING CONSTRUCTION TO REMAIN IS SHOWN SCREENED. CONSTRUCTION ANDEQUIPMENT TO BE REMOVED IS SHOWN WITH DASHED LINES.

5 PATCH, PREPARE, REPAIR AND / OR RESTORE SURFACES SCHEDULED TO REMAININTACT THAT ARE DAMAGED AS A RESULT OF DEMOLITION WORK.

6 VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTINGCONDITIONS.

7 DEMOLITION PLANS ARE NOT NECESSARILY INCLUSIVE OF ALL ITEMS NEEDINGREMOVAL. COORDINATE WITH ALL OTHER DRAWINGS AND FIELD VERIFY EXISTINGCONDITIONS.

8 COORDINATE DEMOLITION DIMENSIONS ON THIS PLAN WITH OTHER DRAWINGS ANDEXISTING CONDITIONS.

9 REFER TO HVAC, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FORADDITIONAL DEMOLITION AND MODIFICATIONS REQUIRED FOR HVAC, ELECTRICAL,PLUMBING, AND FIRE PROTECTION SYSTEMS.

10 REMOVE EXISTING ACOUSTIC CEILING PANELS AS REQUIRED FOR CONSTRUCTIONOF ABOVE-CEILING ELECTRICAL AND MECHANICAL WORK. RETURN CEILING PANELSTO GRID AFTER COMPLETION OF ABOVE-CEILING WORK.

Page 8: RIDGEWAY COMMUNITY CENTER RENOVATIONS

UP

UP

UP

UP

UP

UP

UP

1,671 SF

COMMUNITY ROOM

440 SF

KITCHEN

1,040 SF

LIBRARY (STACK)829 SF

SENIOR'S ROOM

2,182 SF

CORRIDOR

151 SF

DISHES2,962 SF

GYMNASIUM

1,258 SF

CONFERENCE494 SF

CONFERENCE

359 SF

OFFICE

151 SF

WOMENS

160 SF

MENS

PROVIDE CONCRETE TRANSFORMER PAD

PROVIDE RAISED CONCRETE PAD FOR MECHANICAL EQUIPMENT

PROVIDE BOLLARD

STORAGE SHED

PROVIDE RAISED CONCRETE PAD FOR MECHANICAL EQUIPMENT

ACCESSIBLE ENTRY

AREA OF SITE WORK

AREA OF SITE WORK

AREA OF SITE WORK

PATCH PAVEMENT OVER NEW ELECTRICAL SERVICE

ACCESSIBLE PARKING

TEMP. OFFICE SPACE

NOTE: TEMP. OFFICE SPACE WILL BE AVAILABLE FOR USE AS JOBSITE TRAILER.

PROVIDE CONCRETE CURB

16' -

0"

18' - 0"

6"

6"

CONCRETE FILLED POST HOLE

6"

6"

AS

PH

ALT

4'-0

" B

EL

OW

SUBSOIL

ASPHALT

TROWEL FINISH TOP OF CONCRETE BASE

COMPACTED DRAINAGE FILL @ CONCRETE SLAB LOCATION

4" DIA. PIPE FILLED W/ CONCRETE PAINTED

DOMED CONCRETE FILL AT POST TOP

AS

PH

ALT

3'-0

" B

EL

OW

1"

R2 1/2"

R3"

7"

6" COMPACTED SUBBASE

ASPHALT PAVEMENT

SIDEWALK WHERE OCCURS SEE PLAN

6"

1' -

1"

1' - 0"5 255/256"

KEY PLAN

A B

N

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

REVISIONS

PROJECT NO.

SHEET NO.

2021

No. DESCRIPTION DATE

#

9/23

/202

1 12

:34:

24 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ARCHITECTURAL SITEPLAN

A200

PN

TNSCALE: 1" = 10'-0"A200

1 ARCHITECTURAL SITE PLAN

SCALE: 3/4" = 1'-0"A200

2 BOLLARD DETAILSCALE: 1 1/2" = 1'-0"A200

3 CURB W/O GUTTER

Page 9: RIDGEWAY COMMUNITY CENTER RENOVATIONS

UP

UP

UP

UP

UP

UP

UP

A

1

C

B

2

830 SF

002

STORAGE

845 SF

001

MARSHAL'S OFFICE

781 SF

STORAGE (EXISTINGBOILER)

INFILL WITH LAYER OF RIGID INSULATION SEALED TO PERIMETER OF OPENING WITH PARTITION TYPE B-01 AS REQUIRED TO PATCH AND INFILL WALL WHERE UNIT VENTILATORS WERE REMOVED.

A

1

C

B

2 3

/- ---

/- ---

100' - 0" 9' - 0"

1671.22 SF

104

COMMUNITY ROOM 440 SF

KITCHEN

1039.82 SF

102B

LIBRARY (STACK)

828.57 SF

103

SENIOR'S ROOM

2,182 SF

CORRIDOR

151 SF

DISHESINFILL WITH LAYER OF RIGID INSULATION SEALED TO PERIMETER OF OPENING WITH PARTITION TYPE B-01 AS REQUIRED TO PATCH AND INFILL WALL WHERE UNIT VENTILATORS WERE REMOVED.

LVT-1

632.94 SF

102A

LIBRARY (READING)

54 SF

ELECTRICALCLOSET

SSM-1 TYP. FOR ALL WINDOW SILLS IN COMMUNITY ROOM. FIELD VERIFY DIMENSION

2' - 4" VIF

VIF

11 1

/2"

PROVIDE EXPANSION JOINT COVER AT BUILDING EXPANSION JOINT TO TRANSITION LVT FLOORING

EPOX-1

PATCH CONCRETE WHERE OUTLET REMOVED

KEY PLAN

A

N

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

25 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FLOOR PLANS - AREAA

A201A

GENERAL FLOOR PLAN NOTES

1 ALL DRAWINGS ARE OF EQUAL IMPORTANCE IN DEFINING THE WORK OF THECONTRACT DOCUMENTS. CAREFULLY STUDY AND COMPARE ALL DRAWINGSDURING THE BIDDING PERIOD AND BEFORE INSTALLATION OF WORK. PROMPTLYREPORT INCONSISTENCIES IN THE DRAWINGS TO THE ARCHITECT FORCLARIFICATION.

2 DO NOT SCALE DRAWINGS. THE DRAWINGS ARE NOT NECESSARILY TO SCALE - USEGIVEN DIMENSIONS. VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECTSITE PRIOR TO THE START OF CONSTRUCTION. ANY INCONSISTENCIESDISCOVERED BY THE CONTRACTOR SHALL BE REPORTED PROMPTLY TO THEARCHITECT FOR CLARIFICATION BEFORE COMMENCING THE WORK. DIMENSIONSARE GIVEN FROM FACE TO FACE OF WALLS. SEE WALL SECTIONS AND PARTITIONTYPES FOR EXACT CONSTRUCTION DETAILS.

3 WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BEDETERMINED FROM DOCUMENTS CONSULT THE ARCHITECT BEFORE PROCEEDINGWITH WORK.

4 PATCH, PREPARE AND / OR RESTORE WORK SCHEDULED TO REMAIN THAT ISDAMAGED AS A RESULT OF DEMOLITION WORK. RESTORATION AND PATCHINGWORK SHALL BE DONE IN A MANNER THAT MAINTAINS FIRE RATING OF RATEDBUILDING COMPONENTS.

5 PROTECT WORK IN PLACE DURING CONSTRUCTION

6 COORDINATE THE AVAILABILITY OF AREAS REQUIRING WORK WITH THE OWNER.

7 REFER TO HVAC, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FORADDITIONAL WORK AND MODIFICATIONS REQUIRED FOR HVAC, ELECTRICAL,PLUMBING AND FIRE PROTECTION SYSTEMS.

PN

TNSCALE: 1/8" = 1'-0"A201A

1 BASEMENT FLOOR PLAN

PN

TNSCALE: 1/8" = 1'-0"A201A

3 FIRST FLOOR PLAN

Page 10: RIDGEWAY COMMUNITY CENTER RENOVATIONS

UP

UP

A

1

C

B

2 3 4 5 6

D

PATCH AND REPAIR EXISTING BUILT-UP ROOFING AS REQUIRED FOR RTU, CURB AND SUPPORT INSTALLATION. SEE MECHANICAL, STRUCTURAL DRAWINGS FOR MORE INFO.

PATCH AND REPAIR EXISTING BUILT-UP ROOFING AS REQUIRED FOR RTU, CURB AND SUPPORT INSTALLATION. SEE MECHANICAL, STRUCTURAL DRAWINGS FOR MORE INFO.

PATCH, REPAIR AND RE-GRADE EXISTING BUILT-UP ROOFING IN HATCHED AREA

PATCH AND REPAIR EXISTING BUILT-UP ROOFING AS REQUIRED FOR FCU, CURB AND SUPPORT INSTALLATION. SEE MECHANICAL, STRUCTURAL DRAWINGS FOR MORE INFO.

KEY PLAN

A B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

REVISIONS

PROJECT NO.

SHEET NO.

2021

No. DESCRIPTION DATE

#

9/23

/202

1 12

:34:

27 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ROOF PLAN

A250A

GENERAL ROOF PLAN NOTES

1 REFER TO OTHER DRAWINGS IN PLAN SET FOR ADDITIONAL INFORMATION ANDCOORDINATION.

2 VERIFY EXISTING CONDITIONS AT THE START OF ROOFING WORK TO CONFIRMDESIGN INTENT SHOWN ON PLANS.

3 NOTIFY ARCHITECT OF ANY FIELD DISCREPANCIES PRIOR TO THE START OFCONSTRUCTION SHOWN ON PLAN.

4 PROVIDE TAPERED INSULATION CRICKETS AT EQUIPMENT CURBS FOR POSITIVEDRAINAGE TO ROOF DRAINS AND SCUPPERS.

5 REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR LOCATIONSOF PLUMBING VENTS, STACKS, AND OTHER ROOF PENETRATIONS.

6 COMPLETE ROOFING WORK PER ROOFING MANUFACTURER'S STANDARD DETAILSTO MAINTAIN ROOFING MANUFACTURER'S WARRANTY.

8 ARROWS INDICATE DIRECTION OF DOWNWARD SLOPE, U.N.O.

PN

TNSCALE: 1/8" = 1'-0"A250A

1 ROOF PLAN

Page 11: RIDGEWAY COMMUNITY CENTER RENOVATIONS

DH

DH DH

L1L1

L1L1L1

L1

L1

L1

L1L1L1

CEILING PLAN MATERIAL LEGEND

GYPSUM BOARD CEILING

2' X 2' ACOUSTICAL CEILING PANELS

2' X 4' ACOUSTICAL CEILING PANELS

A

1

C

B

2 3

PATCH AND REPAIR CEILING AS REQUIRED FOR RTU AND DUCTWORK WORK

9' - 9"

A

1

C

B

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

29 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

REFLECTED CEILINGPLAN - AREA A

A301A

GENERAL CEILING PLAN NOTES

1 REFER TO ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

2 MECHANICAL, ELECTRICAL, AND PLUMBING FIXTURES SHOWN FOR COORDINATIONONLY. REFER TO M.E.P. DRAWINGS FOR ADDITIONAL INFORMATION.

3 ALL NEW AND EXISTING GWB CEILINGS AND SOFFITS TO BE PT-1 UNLESS NOTEOTHERWISE.

4 ALL CEILINGS ARE EXISTING TO REMAIN UNLESS NOTED WITH CEILING HEIGHT.

5 REMOVE AND STORE ALL ACOUSTIC CEILING PANEL AND REPLACE AT END OFCONSTRUCTION. REPLACE DAMAGED ACP WITH ACP SALVAGED FROM ROOMS TORECIEVE NEW CEILING.

PN

TNSCALE: 1/8" = 1'-0"A301A

2 FIRST FLOOR REFLECTED CEILING PLAN - AREA A

PN

TNSCALE: 1/8" = 1'-0"A301A

1 BASEMENT REFLECTED CEILING PLAN

Page 12: RIDGEWAY COMMUNITY CENTER RENOVATIONS

L1

L1

CEILING PLAN MATERIAL LEGEND

GYPSUM BOARD CEILING

2' X 2' ACOUSTICAL CEILING PANELS

2' X 4' ACOUSTICAL CEILING PANELS

A

C

B

2 3 4 5 6

D

PATCH AND REPAIR CEILING AS REQUIRED FOR RTU AND DUCTWORK WORK

C

B

2 3 4 5 6

D

PATCH AND REPAIR EXISTING WOOD DECKING AS REQUIRED FOR RTU AND DUCTWORK WORK

PATCH AND REPAIR CEILING AS REQUIRED FOR RTU AND DUCTWORK INSTALL

PATCH AND REPAIR CEILING AS REQUIRED FOR RTU AND DUCTWORK INSTALL

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/23

/202

1 12

:34:

31 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

REFLECTED CEILINGPLAN - AREA B

A301B

GENERAL CEILING PLAN NOTES

1 REFER TO ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

2 MECHANICAL, ELECTRICAL, AND PLUMBING FIXTURES SHOWN FOR COORDINATIONONLY. REFER TO M.E.P. DRAWINGS FOR ADDITIONAL INFORMATION.

3 ALL NEW AND EXISTING GWB CEILINGS AND SOFFITS TO BE PT-1 UNLESS NOTEOTHERWISE.

4 ALL CEILINGS ARE EXISTING TO REMAIN UNLESS NOTED WITH CEILING HEIGHT.

5 REMOVE AND STORE ALL ACOUSTIC CEILING PANEL AND REPLACE AT END OFCONSTRUCTION. REPLACE DAMAGED ACP WITH ACP SALVAGED FROM ROOMS TORECIEVE NEW CEILING.

PN

TNSCALE: 1/8" = 1'-0"A301B

2 FIRST FLOOR REFLECTED CEILING PLAN

PN

TNSCALE: 1/8" = 1'-0"A301B

3 SECOND FLOOR REFLECTED CEILING PLAN

Page 13: RIDGEWAY COMMUNITY CENTER RENOVATIONS

SA OR OA DUCT RISER

MD MOTORIZED CONTROL DAMPER

BD BALANCE DAMPER

FD FIRE DAMPER

HVAC SYMBOL LEGEND

AIR DEVICE LEGEND & TAGS

SD SUPPLY DIFFUSERSDG SPIRAL DUCT SUPPLY GRILLEEG EXHAUST GRILLERG RETURN GRILLE

ABBREVIATIONS

AD ACCESS DOORALUM ALUMINUMDN DOWNEC ELECTRICAL CONTRACTOREXH EXHAUSTFD FIRE DAMPERG GASGC GENERAL CONTRACTORMC MECHANICAL CONTRACTOROA OUTSIDE AIROED OPEN END DUCTPC PLUMBING CONTRACTORRA RETURN AIRSA SUPPLY AIRTYP TYPICAL

SUPPLY AIR DEVICE

RETURN AIR DEVICE

EXHAUST AIR DEVICE

AIR DEVICE TAGTAGCFM

CONNECT TO EXISTING

TEMPERATURE SENSORT

FD

MD

AIR DEVICE TAG ABBREVIATIONS

MISC SYMBOL LEGEND

1" LINED DUCT

2" LINED DUCT

SA OR OA DUCT DROP

RA DUCT RISER

RA DUCT DROP

EA DUCT RISER

EA DUCT DROP

TURNING VANES

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

12:0

2 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

HVAC SCHEDULES

M001

GENERAL HVAC NOTES

1 PROVIDE MANUAL BALANCING DAMPERS AT EACH DIFFUSER, GRILLE AND BRANCHTAKE-OFF IN ALL SUPPLY, RETURN AND EXHAUST DUCTWORK. LOCATE BALANCINGDAMPERS AS CLOSE TO THE BRANCH TAKE-OFF AS POSSIBLE.

2 DUCT SIZE TO DIFFUSERS, REGISTERS AND GRILLES SHALL BE SAME SIZE AS NECKSIZE UNLESS NOTED OR DETAILED OTHERWISE.

3 INLET DUCT SIZE TO SUPPLY AIR TERMINAL SHALL BE SAME AS INLET UNLESSOTHERWISE NOTED.

4 OUTLET DUCT SIZE TO EXHAUST AIR TERMINALS SHALL BE THE SAME AS OUTLETUNLESS OTHERWISE NOTED.

5 COORDINATE DIFFUSER, REGISTER, GRILLE AND ACCESS PANEL LOCATIONS WITHREFLECTED CEILING PLAN.

6 PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO DIFFUSERS,REGISTERS AND GRILLES UNLESS NOTED OTHERWISE IN SPECIFICATIONS.FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER, REGISTER ORGRILLE. REFER TO SPECIFICATIONS FOR FLEXIBLE DUCT REQUIREMENTS.FLEXIBLE DUCTS ARE NOT ALLOWED ABOVE NON-ACCESSIBLE CEILINGS.

8 CONTRACTOR TO VERIFY LOCATIONS AND FIELD CONDITIONS PRIOR TO START OFWORK.

9 NO SERVICE SHALL BE INTERRUPTED OR CHANGED WITHOUT WRITTEN PERMISSIONFROM OWNER.

10 WHERE WORK INTERFERES WITH OWNER’S USE OF PREMISES, SCHEDULE WORKTHROUGH OWNER TO MINIMIZE INCONVENIENCE TO OWNER. OWNER MUSTAPPROVE SCHEDULE IN WRITING BEFORE CONTRACTOR BEGINS ANY SUCH WORK.

11 PROVIDE ROOM THERMOSTAT FOR EACH ROOM UNLESS INDICATED OTHERWISE.

12 PROVIDE BALANCING DAMPERS FOR ALL BRANCH MAIN TAKE-OFFS SERVING TWOOR MORE AIR TERMINAL BOXES, DIFFUSERS, ETC.

13 CONTRACTOR SHALL FIELD VERIFY LAYOUT AND MANUFACTURE’S INSTALLATIONREQUIREMENTS FOR ACTUAL EQUIPMENT PROVIDED.

14 MISCELLANEOUS STEEL FOR EQUIPMENT AND PIPE SUPPORTS SHALL BE PROVIDED.REFER TO ARCHITECTURAL SPECIFICATIONS FOR FINISHING OF MISCELLANEOUSSTEEL. ALL STEEL SHALL BE PAINTED.

15 CONTRACTOR SHALL COORDINATE LOCATIONS OF HVAC MAINS, BRANCHES, PIPING,ETC WITH ALL OTHER TRADES PRIOR TO INSTALLATION.

16 ALL ELEVATIONS NOTED ARE RELATIVE TO FINISHED FLOOR ELEVATION.

17 NO PIPING OR DUCTS SHALL BE INSTALLED ABOVE ELECTRICAL EQUIPMENT,UNLESS OTHERWISE NOTED. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICALEQUIPMENT LOCATIONS. COORDINATE WITH EC FOR EXACT LOCATIONS.

18 COORDINATE THE LOCATIONS OF DIFFUSERS, REGISTERS AND GRILLES WITHELECTRICAL LIGHT FIXTURES, LIGHT FIXTURE SUPPORT RODS AND FIRE SPRINKLERHEADS FOR FREE INTERFERENCE.

19 ALL WALL-MOUNTED GRILLES SHALL BE ALIGNED VERTICALLY AND HORIZONTALLYWHENEVER POSSIBLE. FOR DISCREPANCIES, CONTACT THE ARCHITECT.

20 INSTALL ALL PIPING WITH PITCHES NOTED IN SPECIFICATIONS UNLESS NOTED ORSHOWN OTHERWISE.

21 ECCENTRIC REDUCERS SHALL BE USED UNLESS NOTED OTHERWISE.

22 UNLESS OTHERWISE NOTED, CENTER THERMOSTAT DEVICES ABOVE OUTLETS ANDSWITCHES IF WITHIN CLOSE PROXIMITY AND APPLICABLE. COORDINATE EXACTLOCATIONS WITH ARCHITECT.

23 REFER TO DIVISION 1 DOCUMENT FOR ALTERNATES.

24 PROVIDE FLEXIBLE DUCT CONNECTIONS AT ALL DUCTWORK CONNECTIONS TO AIRHANDLING UNITS, RETURN FANS AND EXHAUST FANS.

25 REFER TO ARCHITECTURAL ROOF PLANS FOR LOCATIONS OF PENETRATIONSTHROUGH ROOF.

GENERAL HVAC NOTES

PACKAGED ROOFTOP UNITS (OWNER PRE-PURCHASED)

RTU SERVES

UNIT HEATING SECTION COOLING SECTION DESIGN DIMENSIONS UNIT ELECTRICAL

MANUF. MODEL REMARKS

SUPPLY FAN EXT. S.P.IN IN.

WATER

SUPPLY FAN

FILTER TYPEENT. AIR

TEMP.LV. AIRTEMP.

INPUTBTU

OUTPUTBTU

BURNERTYPE GAS TYPE

GASPRESS.

INCH W.C.NOM.TONS REF. TYPE

ENT. AIRTEMP.

ENT. AIR TEMP.

COIL LV.AIR TEMP. WIDTH LENGTH HEIGHT

WEIGHTLBS. VOLT PH MCA MOCP

CFM OFSTD. AIR

MIN. CFMOF O.A.

MOTORHP FAN WHEEL TYPE DB (°F) WB (°F)

1 COMMUNITY ROOM 1 1,400 295 0.80 1 CENTRIFUGAL 2" PLEATED 52 °F 95 °F 120000 96000 1 STAGE NG 7 4.0 R-410 81 °F 77 61 52 °F 4' - 5" 7' - 5" 3' - 5" 980 208 3 30 40 TRANE YHC047E3RHA 1,2,3

2 COMMUNITY ROOM 1 1,400 295 0.80 1 CENTRIFUGAL 2" PLEATED 52 °F 95 °F 120000 96000 1 STAGE NG 7 4.0 R-410 81 °F 77 61 52 °F 4' - 5" 7' - 5" 3' - 5" 980 208 3 30 40 TRANE YHC047E3RHA 1,2,3

3 SENIOR'S ROOM 8 1,500 330 0.80 1 CENTRIFUGAL 2" PLEATED 52 °F 95 °F 120000 96000 1 STAGE NG 7 4.0 R-410 86 °F 77 61 53 °F 4' - 5" 7' - 5" 3' - 5" 980 208 3 30 40 TRANE YHC047E3RHA 1,2,3

4 LIBRARY 9 1,400 365 0.80 1 CENTRIFUGAL 2" PLEATED 52 °F 95 °F 120000 96000 1 STAGE NG 7 4.0 R-410 89 °F 77 61 52 °F 4' - 5" 7' - 5" 3' - 5" 980 208 3 30 40 TRANE YHC047E3RHA 1,2,3

5 HALLWAY 1,050 290 0.80 3/4 CENTRIFUGAL 2" PLEATED 52 °F 95 °F 100000 80000 1 STAGE NG 7 3.0 R-410 80 °F 77 61 53 °F 3' - 8" 5' - 10" 3' - 5" 770 208 3 24 30 TRANE YHC037E3RHA 1,2,3

6 GYMNASIUM 17 3,700 890 0.80 2 3/4 PLENUM 2" PLEATED 52 °F 95 °F 200000 160000 2 STAGE NG 7 10.0 R-410 85 °F 77 61 53 °F 5' - 3" 8' - 4" 4' - 3" 1610 208 3 48 60 TRANE YHC120F3MA 1,2,3

DIFFUSER, REGISTER, GRILLEMIN AIRFLOW

(CFM)MAX AIRFLOW

(CFM) SERVICE FACE SIZE NECK SIZE MOUNTING MANUF. MODEL REMARKS

RG-1

120 210 RETURN 24"x24" 8" LAY-IN PRICE 80

450 700 RETURN 24"x24" 16" LAY-IN PRICE 80

700 1600 RETURN 24"x24" LAY-IN

RG-2

0 700 RETURN 24"x12" SIDEWALL PRICE 530

SD-1

0 120 SUPPLY 24"x24" 6" LAY-IN PRICE SPD

121 210 SUPPLY 24"x24" 8" LAY-IN PRICE SPD

SDG-1

0 100 SUPPLY 10"x4" DUCT MOUNT PRICE SDG

101 150 SUPPLY 10"x4" DUCT MOUNT PRICE SDG

151 500 SUPPLY 22"x8" DUCT MOUNT PRICE SDG

ELECTRIC WALL HEATERS (OWNER PRE-PURCHASED)

EWH SERVES

CABINET

CAP. WATTS CAP BTU RECESSINTEGRAL

STAT

ELECTRICAL

MANUF. MODEL REMARKSW H D VOLT PH FLA

1 ENTRY 111 1' - 2" 1' - 6" 0' - 4" 3000 10240 NO YES 208 1 14.4 QMARK AWH4404F

2 ENTRY 111 1' - 2" 1' - 6" 0' - 4" 3000 10240 NO YES 208 1 14.4 QMARK AWH4404F

3 MENS 111A 1' - 2" 1' - 6" 0' - 4" 3500 11950 NO YES 208 1 19.2 QMARK AWH4408F

4 WOMENS 113B 1' - 2" 1' - 6" 0' - 4" 3500 11950 NO YES 208 1 19.2 QMARK AWH4408F

5 MENS 208 1' - 2" 1' - 6" 0' - 4" 2500 8530 NO YES 208 1 14.4 QMARK AWH4404F

6 WOMENS 206 1' - 2" 1' - 6" 0' - 4" 2500 8530 NO YES 208 1 14.4 QMARK AWH4404F

1. PROVIDE WITH SINGLE ZONE VAV CONROLS.2. PROVIDE WITH VARIABLE SPEED, DIRECT DRIVE FAN.3. BASED ON 87° DB/75°WB SUMMER AND -15° DB WINTER DESIGN CONDITIONS

ELECTRIC BASEBOARD RADIATION

EBB LOCATION SERVICECAP.

WATTS LENGTH VOLT PH FLA MANUF. MODEL REMARKS

1 001 MARSHAL'S OFFICE 001 MARSHAL'S OFFICE 2500 8' - 0" 208 1 12 QMARK QMKC25008W 1

1. PROVIDE INTEGRAL THERMOSTAT.

HEAT PUMP UNIT (OWNER PRE-PURCHASED)

ACCU

COMPRESSOR ELECTRICAL

MANUF. MODEL REMARKSSERVICE LOCATION NOM. CAP. TONS SEER VOLT PH MCA MOCP

1 FCU-1 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

2 FCU-2 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

3 FCU-3 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

4 FCU-4 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

5 FCU-5 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

6 FCU-6 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

7 FCU-7 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

8 FCU-8 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

9 FCU-9 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

10 FCU-10 ROOF 2.0 15 208 1 17 27 TRANE/MITSUBISHI NTXSKH24A112AA

FAN COIL UNIT (OWNER PRE-PURCHASED)

FCU LOCATION SERVES TYPE CFM OF STD. AIR MIN. CFM OF O.A.COOLING CAP.

(BTU)HEATING CAP. @

-13°F (BTU)

ELECTRICAL

MANUF, MODEL REMARKSVOLT PH

1 CEILING 002 STORAGE HORIZ. DUCTED 600 100 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

2 CEILING 001 MARSHAL'S OFFICE HORIZ. DUCTED 600 90 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

3 CEILING 101 OFFICE HORIZ. DUCTED 600 90 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

4 CEILING 116 CONFERENCE HORIZ. DUCTED 600 115 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

5 CEILING 116 CONFERENCE HORIZ. DUCTED 600 115 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

6 CEILING 115 CONFERENCE HORIZ. DUCTED 600 150 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

7 CEILING 205 OFFICE HORIZ. DUCTED 600 60 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

8 CEILING 204 OFFICE HORIZ. DUCTED 600 55 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

9 CEILING 204 OFFICE HORIZ. DUCTED 600 55 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

10 CEILING 202 OFFICE HORIZ. DUCTED 600 55 CFM 24000 20000 208 1 TRANE/MITSUBISHI TPEADA0241AA70A POWERED BY OUTDOOR UNIT

Page 14: RIDGEWAY COMMUNITY CENTER RENOVATIONS

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR.

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR.

104A

CLOSETS

104

COMMUNITY ROOM

105A

DISHES

105

KITCHEN

190

CORRIDOR

102B

LIBRARY (STACK)103

SENIOR'S ROOM

103A

CLOSETS

?

?

103B

TOILET

111C

STORAGE

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR.

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR. 001

MARSHAL'S OFFICE

002

STORAGE

003

STORAGE (EXISTING BOILER)

KEY PLAN

A

N

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

11:3

6 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

MECHANICALDEMOLITION PLANAREA A

M101A

SCALE: 1/8" = 1'-0"M101A

1 FIRST FLOOR MECHANICAL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"M101A

2 BASEMENT MECHANICAL DEMOLITION PLAN

0" 4' 8' 16'

0" 4' 8' 16'

Page 15: RIDGEWAY COMMUNITY CENTER RENOVATIONS

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR.

REMOVE EXISTING UNIT VENTILATOR, ASSOCIATED PIPING AND CONTROL. CAP PIPING BELOW FLOOR.

111

STORAGE

111B

OFFICE

111C

STORAGE

111D

SHOWER

111A

MENS

190

CORRIDOR

101

OFFICE

116

CONFERENCE 115

CONFERENCE

190

CORRIDOR

114

ENTRY

113

STORAGE

113C

STORAGE

113B

WOMENS

112

GYMNASIUM

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

12:0

5 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

MECHANICALDEMOLITION PLANAREA B

M101B

SCALE: 1/8" = 1'-0"M101B

1 FIRST FLOOR MECHANICAL DEMOLITION PLAN

0" 4' 8' 16'

Page 16: RIDGEWAY COMMUNITY CENTER RENOVATIONS

30"x

8" S

A

30"x

8" R

A

20"x

8" S

A

30"x

8" S

A

30"x

8" R

A

30"x

8" S

A

30"x

8" R

A

20"x

8" S

A

30"x8" SA

30"x8" RA

20"x

8" S

A

200

SD-1

200

SD-1 200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

8"ø SA (TYP) 8"ø SA (TYP)

700

RG-1

750

RG-1

700

RG-1

16"ø SA DN FROM RTU-516"ø RA UP TO RTU-5 500

RG-2

12"ø SA UP12"ø RA DN

10"ø SA

8"ø SA

50

SDG-1

50

SDG-1

50

SDG-1 6"ø SA

50

SDG-1

190

CORRIDOR

111C

STORAGE

FD

FD

105

KITCHEN

105A

DISHES

104

COMMUNITY ROOM104A

CLOSETS

103B

TOILET

103A

CLOSETS

103

SENIOR'S ROOM

102B

LIBRARY (STACK)

190

CORRIDOR30"x32" SA DN FROM RTU-1

30"x32" RA UP TO RTU-1

30"x32" SA DN FROM RTU-2

30"x32" RA UP TO RTU-2

20"x

8" S

A8"ø SA (TYP)

100

SD-1

100

SD-18"ø SA

30"x32" SA DN FROM RTU-3

30"x32" RA UP TO RTU-3

30"x32" SA DN FROM RTU-4

30"x32" RA UP TO RTU-4

750

RG-1 700

RG-1

700

RG-1

700

RG-1

700

RG-1

TRTU-2

TRTU-1

TRTU-3

TRTU-4

TRTU-5

ACCU-1

ACCU-2

200

SD-1

200

SD-1

200

SD-1

510

RG-1

200

SD-1

200

SD-1

200

SD-1

EWH-1

002

STORAGE

003

STORAGE (EXISTING BOILER)

001

MARSHAL'S OFFICE

EBB-1

EBB-1

4"ø

OA

500

RG-1

4"ø OA

MOTORIZED DAMPER

3/4" COND. DOWN ALONG WALL. SPILL ON GRADE.

3/4" COND. DOWN ALONG WALL. SPILL ON GRADE.

WALL CAP

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING DOWN ALONG WALL.

REF. PIPING INSTALL PER MANUF. RECOMM.

TFCU-1

TFCU-2

16"x

8" S

A

FCU-1

FCU-2

WALL CAP

3/4" C

16"x8" SA

16"x8" RA

16"x8" RA

3/4"

C

SLO

PE

SLOPE

REF. PIPING DOWN ALONG WALL.

MOTORIZED DAMPER

KEY PLAN

A

N

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

11:4

0 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

MECHANICAL PLANAREA A

M201A

SCALE: 1/8" = 1'-0"M201A

1 FIRST FLOOR MECHANICAL PLAN AREA A

SCALE: 1/8" = 1'-0"M201A

2 BASEMENT MECHANICAL PLAN AREA A

0" 4' 8' 16'

0" 4' 8' 16'

Page 17: RIDGEWAY COMMUNITY CENTER RENOVATIONS

EWH-2

12"ø SA UP12"ø RA DN

10"ø SA

50

SDG-150

SDG-1

50

SDG-1

50

SDG-150

SDG-1

50

SDG-1

450

RG-1

485

RG-1

485

RG-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

200

SD-1

510

RG-1

10"ø SA

10"ø SA 10"ø SA200

SD-1

200

SD-1

200

SD-1

22"ø SA

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

500

SDG-1

34"x18" RA TURNED UP

101

OFFICE

190

CORRIDOR

111

STORAGE

111C

STORAGE

111B

OFFICE

111A

MENS111D

SHOWER

112

GYMNASIUM

116

CONFERENCE

115

CONFERENCE

113C

STORAGE113B

WOMENS

113A

JANITOR

114

ENTRY

1 1/4" COND. DOWN ALONG WALL. SPILL ON GRADE.

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING UPREF. PIPING UP

TRTU-6

TFCU-3

FCU-3

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING INSTALL PER MANUF. RECOMM.

8"ø OA

6"ø 6"

ø

6"ø8"ø OA

REF. PIPING INSTALL PER MANUF. RECOMM.

TFCU-4

TFCU-5

TFCU-6

REF. PIPING INSTALL PER MANUF. RECOMM.

16"x

8"

FCU-4

16"x8" SA16"x8" SA

16"x

8" S

A

FCU-5 FCU-6

200

RG-1

200

RG-1

FD

FD

190

CORRIDOR

3/4" C1 1/4" C1 1/4" C1" C3/4" C

3/4" C

16"x8" RA

16"x8" RA 16"x8" RA 16"x8" RA

EWH-3EWH-4

3/4" COND. DOWN ALONG WALL. SPILL ON GRADE.

18"x34" SA FROM RTU-6 ABOVE

18"x34" RA UP TO RTU-6 ABOVE

1" COND. DOWN FROM ABOVE

SLOPE SLOPE SLOPE

REF. PIPING UP

MOTORIZED DAMPER

MOTORIZED DAMPER

8"ø SA 6"ø SA

12"ø RA DN

12"ø SA UP

700

RG-2

12"ø SA150

SDG-110"ø SA

100

SDG-1

100

SDG-1100

SDG-1

8"ø SA

6"ø SA

540

RG-1

545

RG-1

545

RG-1

120

SD-1

120

SD-1

120

SD-1120

SD-1

120

SD-1

120

SD-1

120

SD-1

120

SD-1

120

SD-1

545

RG-1200

SD-1

200

SD-1

200

SD-1

208

MENS

206

WOMENS

205

OFFICE

204

OFFICE

290

CORRIDOR

112

GYMNASIUM

202

OFFICE

203

STORAGE

201

OFFICE

829.63 SF

8"ø OA

6"ø 6"ø

6"ø

16"x

8" S

A

FCU-9

16"x

8" S

A

FCU-8FCU-7

16"x

8" S

A

REF. PIPING UP WITHIN PIPE CURB ASSEMBLY

REF. PIPING UP WITHIN PIPE CURB ASSEMBLY

REF. PIPING INSTALL PER MANUF. RECOMM.

6"ø

OA

FCU-10

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING INSTALL PER MANUF. RECOMM.

120

SD-1

120

SD-1

120

SD-1

120

SD-1

120

SD-1

120

SD-1

FD

FD

8"Ø OED. BALANCE TO 300 CFM

12"ø RA

REF. PIPING UP WITHIN PIPE CURB ASSEMBLY

REMOVE BACKDRAFT DAMPER IN EXISTING BUILDING RELEIF. CONNECT NEW OA DUCT TO EXISTING DUCT ABOVE CEILING.

3/4" COND. DOWN TO LEVEL 1

REMOVE BACKDRAFT DAMPER IN EXISTING BUILDING RELEIF. CONNECT NEW OA DUCT TO EXISTING DUCT ABOVE CEILING.

SLOPE SLOPE SLOPE

1" COND DOWN TO LEVEL 1

EWH-5 EWH-6

REF. PIPING UP WITHIN PIPE CURB ASSEMBLY

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

11:4

9 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

MECHANICAL PLANAREA B

M201BSCALE: 1/8" = 1'-0"M201B

1 FIRST FLOOR MECHANICAL PLAN AREA B

SCALE: 1/8" = 1'-0"M201B

2 SECOND FLOOR MECHANICAL PLAN AREA B

0" 4' 8' 16'

0" 4' 8' 16'

Page 18: RIDGEWAY COMMUNITY CENTER RENOVATIONS

RTU-3

RTU-2

RTU-5

RTU-4

DROP

1" NG

3/4" NG

3/4"

NG

3/4"

NG

3/4" NG

LOOP SEAL

LOOP SEAL

LOOP SEAL

LOOP SEAL

LOOP SEAL

INSTALL GAS PIPING ON PIPE SUPPORT BLOCKS 8'-0" O.C. (MAX)

3/4"

NG

RTU-1

RTU-6

3/4" NG

1 1/4" NG UP FROM EXISTING GAS METER (1000 CFH @ 2 PSIG). VERIFY LOCATION AND PRESSURE WITH LOCAL UTILITY.

1 1/4" NG

1" NG

1" TEE, CAP FOR FUTURE (300 CFH)

1" NGDROP

1" NG

ACCU-3 ACCU-4 ACCU-5 ACCU-6ACCU-7 ACCU-8 ACCU-9

ACCU-10

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING INSTALL PER MANUF. RECOMM.

REF. PIPING INSTALL PER MANUF. RECOMM.

EXISTING ROOF CAP

EXISTING ROOF CAP

INSTALL GAS PIPING ON PIPE SUPPORT BLOCKS 8'-0" O.C. (MAX)

INSTALL REF. PIPE SUPPORT BLOCKS 8'-0" O.C. (MAX.) TYP

REF PIPING FROM BELOW (TYP)

LOOP SEAL

KEY PLAN

A B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

11:5

5 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ROOF MECHANICALPLAN

M202SCALE: 1/8" = 1'-0"M202

1 ROOF MECHANICAL PLAN AREA A

SCALE: 1/8" = 1'-0"M202

2 ROOF MECHANICAL PLAN AREA B

0" 4' 8' 16'

0" 4' 8' 16'

Page 19: RIDGEWAY COMMUNITY CENTER RENOVATIONS

DESCRIPTION DOUBLE LINE SINGLE LINE

BRANCH TAKE-OFF SUPPLY, RETURN OR

EXHAUST

CONVERGING

TEE

ELBOW

TRANSITION FITTINGS

OR

6"

MIN

1/4

W

45.0

W

R

W

DIVERGING

FLOW

FLOW

20° MAX

30° MAX

R / W = 1.5

45° TYP

L

W

MIN DIM = 2W

OPPOSED BLADE DAMPER AS PER SPECIFICATIONS

NOTE:

L = 1/4W (4" MIN)

AIRFLOW 45° BOOT TAP

AIRFLOW

AIRFLOW

SELF-SEALING GASKET DUCT CONNECTION (LINLAB SPIROSAFE OR EQUAL)

SPIRAL DUCTBALANCE DAMPER

45° TAKE-OFF, RECT TO ROUND AS REQUIRED

FLEX DUCT, 48" MAX LENGTH

FLEX ELBOW, SUPPORT TO MAINTAIN RADIUS

SUPPLY DIFFUSER

CONDENSING UNIT, MOUNT WITH VIBRATION ISOLATORS

PENETRATE UP

RUN IN CEILING SPACE

COIL CONNECTION

DRAIN TO OUTSIDE

EXPANSION VALVE

AIR CONDSIGHT GLASS

FILTER DRYER AIRFLOWL S

L

S

SLOPE PIPE DOWN

CLAMPS

STAINLESS STEEL WASHER EMBEDDED IN CONST. SEALANT.

LAG SCREW

ROOF CURB BY MECH. CONTR.

RUBBER FLASHING BY GEN. CONTR.

INSULATION

ROOF DECK

ROOFING

WOOD NAILER BY MECH.

CONTR.

COVER

BOOT

GAS PIPE

GALVANIZED STEEL STRAP

"DURA-BLOK" ROOF SUPPORT BY MECHANICAL CONTACTOR

INSULATION

ROOF DECK

ROOFING

SRCURE DUCT TO UNIT IN ACCORDANCE WITH MANUF. INSTRUCTIONS

GASKET ALL AROUND BY MECH. CONTR.

WOOD NAILER BY MECH. CONTR.

ROOF CURB BY MECH. CONTR.

RUBBER FLASHING BY

ROOFING CONTR.

ROOFING

INSULATION

ROOF DECK

"D.O."

CAULK AROUND CLOSURE PLATE

SHEET METAL DUCT

FLEXIBLE CONNECTION

ACOUSTIC SEALANT AT ALL EDGES

2 LAYERS OF 5/8" MOLD RESISTANT PAPERLESS GYP. BD. BY MECH CONTR.

6" ROCKWOOL INSULATION BY MECH. CONTR.

SHEET METAL CLOSURE PLATE BY MECH. CONTR.

ROOF OPENING TO ACCOMMODATE DUCT-WORK ONLY

ACOUSTIC INSULATION

GALV. STEEL CHANNEL

GALV. METAL ANGLE1

2"

MIN

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 3:

11:5

9 P

M

09/20/2021

208 JARVIS STRIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

MECHANICAL DETAILS

M801

SCALE: NTSM801

1 DUCT FITTINGSSCALE: NTSM801

2 BRANCH DUCT TAKE-OFF AND DAMPERSCALE: NTSM801

3 SPIRAL DUCT TEE TAP DETAILSCALE: NTSM801

4 CEILING DIFFUSER CONNECTION

SCALE: NTSM801

5 SPLIT SYSTEM AIR CONDITIONERSCALE: NTSM801

6 PIPE CURB ASSEMBLYSCALE: NTSM801

7 GAS PIPING RUN ABOVE ROOFSCALE: NTSM801

8 ROOFTOP UNIT CURB DUCT CONN.

Page 20: RIDGEWAY COMMUNITY CENTER RENOVATIONS

J

LINE VOLTAGE DIGITAL COUNTDOWN TIMER SWITCH

JUNCTION BOX

ELECTRICAL ABBREVIATIONS

OS

LV#WALL OCCUPANCY SENSOR, DUAL TECHNOLOGY. REFER TO SPECIFICATIONS FOR REQUIREMENTS.

DAYLIGHT HARVESTING SENSOR.

ACT ACOUSTICAL CEILING TILEAFF ABOVE FINISH FLOORAFG ABOVE FINAL GRADEAIC AMPERE INTERRUPTING CAPACITYALT ALTERNATEAPPROX APPROXIMATELYAMP AMPEREARCH ARCHITECT, ARCHITECTURALATS AUTOMATIC TRANSFER SWITCHAUX AUXILIARYAV AUDIO VISUALAWG AMERICAN WIRE GAUGE

BFG BELOW FINAL GRADEBLDG BUILDINGBSC BIOSAFETY CABINET

C CONDUITCB CIRCUIT BREAKERCCTV CLOSED CIRCUIT TELEVISIONCFCI CONTR FURNISHED, CONTR

INSTALLEDCKT CIRCUITCLG CEILINGCONT CONTINUOUS, CONTINUATIONCONTR CONTRACTORCT CABLE TRAYCTP CLEAN TECHNICAL POWERCTR CENTERCU COPPER

DAS DISTRIBUTED ANTENNA SYSTEMDED DEDICATEDDISC DISCONNECTDIST DISTRIBUTIONDIV DIVISIONDWG DRAWING

EBU EMERGENCY BATTERY UNITEC ELECTRICAL CONTRACTOREGB EQUIPMENT GROUND BUSELCU EMERGENCY LIGHTING CONTROL

UNITELEC ELECTRICALELEV ELEVATOREM EMERGENCYEMT ELECTRICAL METAL TUBINGEQUIP EQUIPMENTER ELEVATOR RECALLETR EXISTING TO REMAINEWC ELECTRIC WATER COOLER

F FUSEFA FIRE ALARMFB FLOOR BOXFL FLOORFPC FIRE PROTECTION CONTRACTOR

GC GENERAL CONTRACTORGD GARBAGE DISPOSALGFCI GROUND FAULT CKT INTERRUPTERGND GROUNDGYP GYPSUM

HOA HAND-OFF-AUTOMATIC SWITCHHORIZ HORIZONTALHP HORSEPOWERHT HEIGHT

IG ISOLATED GROUNDIT INFORMATION TECHNOLOGY

JB JUNCTION BOX

KV KILOVOLTKVA KILOVOLT-AMPEREKW KILOWATTKWH KILOWATT HOUR

LTS LIGHTSLV LOW VOLTAGE

BASIC LIGHTING CONTROL DEVICE SYMBOLS

MISCELLANEOUS SYMBOLS

MC MECHANICAL/HVAC CONTRACTORMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMEGB MAIN EQUIPMENT GROUNDING BUSMIN MINIMUMMISC MISCELLANEOUSMLO MAIN LUG ONLYMMS MANUAL MOTOR STARTERMFR MANUFACTURERMTR MOTORMTS MANUAL TRANSFER SWITCHMW MICROWAVE

N.C. NORMALLY CLOSEDNEC NATIONAL ELECTRICAL CODENEMA NATIONAL ELECTRICAL MFR ASSOC.NFSS NON-FUSED SAFETY SWITCHNIC NOT IN CONTRACTNL NIGHTLIGHTN.O. NORMALLY OPENNTS NOT TO SCALENU NEAR UNIT

OFCI OWNER FURNISHED, CONTR INSTALLED

OFOI OWNER FURNISHED, OWNER INSTALLED

OU ON UNIT

P POLEPBC PLUMBING CONTRACTORPDO POWER DOOR OPERATORPH PHASEPNL PANELPP POWER POLEPRI PRIMARYPRV POWER ROOF VENTILATORPVC POLYVINYL CHLORIDE

SHT SHEETSPEC SPECIFICATIONSPKR SPEAKERSP SPARESPD SURGE PROTECTIVE DEVICESTD STANDARDSUSP SUSPENDEDSW SWITCHSWBD SWITCHBOARDSWGR SWITCHGEARSYM SYMMETRICALSYS SYSTEM

TR TAMPER RESISTANTTCP TEMPERATURE CONTROL PANELTEL TELEPHONEXFMR TRANSFORMERTV TELEVISIONTYP TYPICAL

UG UNDERGROUNDUH UNIT HEATERUNO UNLESS NOTED OTHERWISE

V VOLTVA VOLT AMPEREVDP VIDEO DISPLAY PANELVERT VERTICALVFD VARIABLE FREQUENCY DRIVEVSD VARIABLE SPEED DRIVE

W WATTW/ WITHWC WATER CLOSETW/O WITHOUTWP WET LOCATION/WEATHERPROOF

XP EXPLOSION PROOF

LINETYPE EXPLANATION

SOLID DEVICES, LUMINAIRES, AND EQUIPMENT SHOWN WITH A HALF-TONE LINETYPE ARE EXISTING AND SHALL REMAIN IN PLACE.

DASHED DEVICES, LUMINAIRES, AND EQUIPMENT ARE TO BE DEMOLISHED AS PART OF THIS WORK.

SOLID DEVICES, LUMINAIRES, AND EQUIPMENT SHOWN WITH A DARK LINETYPE ARE NEW AND ARE BEING INSTALLED AS PART OF THIS WORK.

MOTOR OR ELECTRICAL CONNECTION TO EQUIPMENT.SEE ELECTRICAL CONNECTION SCHEDULE (UNO)

PANELBOARD

WHERE RECEPTACLES OR DATA DEVICES ARE NOTED AS "ABOVE COUNTER" THEY SHALL BE MOUNTED 6" ABOVE COUNTER OR 46" AFF WHERE NOT LOCATED ABOVE A COUNTER, UNLESS OTHERWISE NOTED ON PLANS, DETAILS, OR AS SHOWN ON ARCHITECTURAL ELEVATIONS.

DUPLEX RECEPTACLEABOVE COUNTER

DOUBLE DUPLEX RECEPTACLEABOVE COUNTER

PNL XXX

RECEPTACLE DEVICE SYMBOLS

SIMPLEX RECEPTACLENEMA DESIGNATION AS NOTED ON PLANSABOVE COUNTER

POWER DISTRIBUTION SYMBOLS

ELECTRICAL CONNECTION - SEE SCHEDULE (UNO)

NON-FUSED SAFETY DISCONNECT SWITCH

FUSED SAFETY DISCONNECT SWITCH

COMBINATION STARTER/DISCONNECT SWITCH

T TRANSFORMER

LINE VOLTAGE TOGGLE SWITCH WITH PILOT LIGHTP

LIGHTING CONTROL BUTTON STATION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.

LV#

LIGHTING IS REPRESENTED BY SHAPES WHICH REPRESENT THE APPROXIMATE SIZEAND SHAPE OF THE LUMINIARES SPECIFIED. THE ACTUAL FIXTURE SPECIFICATION ANDLOCATION (WALL, CEILING, FLOOR, ETC.) IS BASED ON THE DATA IN THE LUMINAIRESCHEDULE FOR THE LISTED FIXTURE TYPE AND OTHER DOCUMENTATION.

F1X-##,a

FIXTURE ID(SEE LUMINAIRE SCHEDULE)

CIRCUIT DESIGNATION, CONTROL ZONE DESIGNATION

SWITCH ZONE DESIGNATIONS ON FIXTURES CORRESPOND WITH CONTROL DEVICES(I.E. SWITCHES, SENSORS, ETC) WITH THE SAME DESIGNATION

LIGHTING SYMBOLS

ROUND RECESSED DOWNLIGHT, ROUND PENDANT LUMINAIRE,ROUND GROUND MOUNTED UPLIGHT.

SQUARE RECESSED DOWNLIGHT, SQUARE WALL MOUNTED LUMINAIRE, SQUARE GROUND MOUNTED UPLIGHT.

2'x2' RECESSED, SURFACE, PENDANT LUMINAIRE.

1'x4' CEILING MOUNTED, LINEAR DIRECT/INDIRECT, LINEAR WALL WASH, WALL MOUNTED LUMINAIRE

2'x4' RECESSED, SURFACE, PENDANT LUMINAIRE.

WALL MOUNTED LUMINAIRE

POLE MOUNTED LUMINAIRE

POLE MOUNTED POST-TOP LUMINAIRE, BOLLARD LUMINAIRE

CEILING MOUNTED SPOT-TYPE EMERGENCY BATTERY UNIT

WALL MOUNTED SPOT-TYPE EMERGENCY BATTERY UNIT

CEILING MOUNTED EXIT OR AREA OF RESCUE ASSISTANCE SIGN.

WALL MOUNTED EXIT OR AREA OF RESCUE ASSISTANCE SIGN.

T

BASIC SLIDE DIMMER WITH POSITIVE OFF SWITCH. MATCH DIMMING TECHNOLOGY TO LOAD CONTROLLED

D

LOW VOLTAGE LIGHTING CONTROL DEVICE SYMBOLS

DEVICE CONFIGURATION NOTATION (TYP). REFER TO SPECIFICATIONS FOR ALL SEQUENCES OF OPERATIONS AND ADDITIONAL REQUIREMENTS.

4' INDUSTRIAL LUMINAIRE

L1

LINE VOLTAGE TOGGLE SWITCH

DH

LINE VOLTAGE WALL OCCUPANCY SENSOR.INDICATES SWITCHING DESIGNATION

#

MEDIAL LINES DENOTE TROFFER ORIENTATION

FEEDER AND BRANCH CIRCUIT DESIGNATIONS

SYSTEM DESCRIPTION(2G) 1ø, 2W + GND(3G) 3ø, 3W + GND(4G) 3ø, 4W + GND(5G) 3ø, 3W + 200%N + GND(5G+IG) 3ø, 3W + 200%N + GND + ISOLATED GND

CONDUCTOR AMPACITY(SEE FEEDER SCHEDULE)

200-4G

NOTE:2G DESIGNATION SHALL HAVE AN EQUAL PHASE, NEUTRAL, AND GROUND CONDUCTOR SIZE AS 3G DESIGNATION. CONDUIT SIZE PER SPECIFICATION AND CODE.

ONE-LINE DIAGRAM SYMBOLS

M

GROUND ELECTRODE

NON-FUSED SWITCHAMPERAGE/PHASE

FUSED SWITCH

METER ENCLOSURE WITH SOCKET

400/3

SWITCH AMPERE/POLE

FUSE AMPERE

400/3300

AMPERE, POLE, SETTINGS, VOLTAGES, IDENTIFICATION, AND SIZES BELOW ARE EXAMPLES AND ARE NOT REPRESENTATIVE OF ACTUAL VALUES, REFER TO ONE-LINE DIAGRAM, RISER DIAGRAM, PANEL SCHEDULES, MOTOR SCHEDULES, EQUIPMENT SCHEDULES, AND DETAILS FOR ACTUAL VALUES.

MDPPANEL

ELECTRICAL PANELBOARD (REFER TO PANELBOARD SCHEDULE) IDENTIFICATION TAG

FACP

FIRE ALARM PULL STATION

WALL AUDIBLE/VISUAL NOTIFICATION APPLIANCE

SMOKE DETECTOR

FIRE ALARM REMOTE ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

A CEILING MOUNTED AUDIBLE-ONLY NOTIFICATION APPLIANCE

WALL MOUNTED VISUAL-ONLY NOTIFICATION APPLIANCE

CM FIRE ALARM ADDRESSABLE CONTROL MODULE

MM FIRE ALARM ADDRESSABLE MONITOR MODULE

DUCT SMOKE DETECTORSD

AV

V CEILING MOUNTED VISUAL-ONLY NOTIFICATION APPLIANCE

HEAT DETECTORH

WALL AUDIBLE-ONLY NOTIFICATION APPLIANCE

CEILING MOUNTED AUDIBLE/VISUAL NOTIFICATION APPLIANCE

AUDIBLE NOTIFICATION APPLIANCES SHALL BE TEMPORAL TYPE, UNLESS OTHERWISE NOTED.

PROVIDE POLYCARBONATE TAMPER COVER (WITH LOCAL ALARM)TR

INDICATES MINIMUM VISUAL APPLIANCE CANDELA RATING (TYP.)#

FIRE ALARM DEVICE SYMBOLS

RI REMOTE TEST AND INDICATOR STATION

#

#

#

NAC FIRE ALARM NAC PANEL

FAAP

MINOR MOTION COVERAGE CEILING OCCUPANCY SENSOR, DUAL TECHNOLOGY. REFER TO SPECIFICATIONS FOR REQUIREMENTS.

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

3 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ELECTRICALSYMBOLS,ABBREVIATIONS ANDGENERAL NOTES

E001

1 MOUNT EQUIPMENT AT NOMINAL MOUNTING HEIGHT INDICATED ON THE DRAWINGS OR DETAILEDON ARCHITECTURAL ELEVATIONS.

2 INSTALL INSULATED GREEN GROUND CONDUCTOR WITH ALL BRANCH CIRCUIT AND FEEDERCONDUCTORS, SIZE PER NEC TABLE 250.122.

3 ELECTRICAL CONTRACTOR SHALL PROVIDE SLEEVED OPENING WHERE REQUIRED TO RUNCONDUITS AND CABLE SYSTEMS THROUGH SLABS, WALLS, CEILINGS, AND BRIDGING, EXCEPTWHERE OTHERWISE NOTED. SEE ARCHITECTURAL DRAWINGS FOR WALL TYPE AND SPEC SECTION07 84 13 FOR SPECIFIC FIRE STOP METHODS.

4 CONTRACTOR SHALL REFER TO ELECTRICAL SPECIFICATIONS FOR MATERIAL AND EXECUTION OFWORK.

5 CONTRACTOR SHALL VERIFY ALL SIZES AND LOCATIONS OF ALL EXISTING SERVICES AFFECTED BYTHIS PROJECT.

6 ALL HOME RUNS SHALL BE MINIMUM 3/4" EMT.

7 THE CONTRACTOR SHALL REFER TO DRAWINGS AND SPECIFICATIONS OF OTHER SECTIONS FORADDITIONAL/RELATED ELECTRICAL REQUIREMENTS AS LISTED IN THE RESPECTIVE DIVISIONS.

8 ALL WORK SHOWN IS DIAGRAMMATIC IN NATURE AND INTENDED TO ILLUSTRATE GENERAL INTENTONLY. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL ADDITIONAL LABOR, MATERIALS,ACCESSORIES, EQUIPMENT, ETC. REQUIRED TO CREATE A FULLY FUNCTIONAL SYSTEM INACCORDANCE WITH THESE DRAWINGS, APPLICABLE CODES, AND INDUSTRY STANDARDS.

9 ELECTRICAL CONTRACTOR SHALL FULLY COORDINATE WITH ALL OTHER CONTRACTORS TO ENSURECONFLICTS DO NOT ARISE. ALL COORDINATION CONFLICTS BETWEEN CONTRACTORS SHALL BERESOLVED IN A MANNER THAT IS ACCEPTABLE TO OWNER, ARCHITECT, AND ENGINEER, AT NOCOST TO THE PROJECT.

10 ALL ELECTRICAL CONNECTIONS TO OTHER CONTRACTORS' EQUIPMENT SHALL BE FULLYCOORDINATED WITH THE PROVIDING CONTRACTOR PRIOR TO ROUGH-IN. ELECTRICALCONTRACTOR SHALL PROVIDE ALL ADJUSTMENTS NEEDED TO PROVIDE POWER TO EQUIPMENT.ANY ADJUSTMENTS REQUIRED SHALL BE AT NO COST TO THE PROJECT.

GENERAL ELECTRICAL NOTES

Page 21: RIDGEWAY COMMUNITY CENTER RENOVATIONS

FACP

AA

BB

CC

1

1

2

2

3

3

E

1

001

MARSHAL'S OFFICE

002

STORAGE

003

STORAGE (EXISTINGBOILER)

UNEXCAVATED

2

3

4

4

E100BE100A

E100BE100A

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

3 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

LOWER LEVELDEMOLITION PLAN -AREA A

E100A

GENERAL DEMOLITION NOTES

# SPECIFIC DEMOLITION NOTES

1 EXISTING TO REMAIN 400AMP MAIN DISCONNECT CURRENTLY POWERED FROMAERIAL 120/240V SINGLE PHASE SERVICE. REMOVE VERTICAL CONDUIT ANDSERVICE CONDUCTORS FROM PANEL TO WEATHERHEAD.

2 REMOVE POWER TO THE BOILER.

3 REMOVE POWER FROM THE AIR COMPRESSOR.

4 REMOVE POWER TO THE UNIT VENTILATOR.

5 REMOVE POWER TO AIR HANDLER AND ASSOCIATED GAS BURNER.

1 NOT ALL EXISTING DEVICES ARE SHOWN.

2 REMOVE ALL DEMOLISHED CONDUIT, DEVICES, LUMINAIRES, ETC. INDICATED.EXISTING TO REMAIN SYSTEMS SHALL BE MAINTAINED IN SERVICE. REMOVE ALLABANDONED HANGERS.

3 WHERE EQUIPMENT, LUMINAIRES, DEVICES, ETC. ARE INDICATED TO BE REMOVED,DISCONNECT AND REMOVE THE BRANCH CIRCUIT BACK TO THE NEXT JUNCTIONPOINT. ALL ABANDONED BRANCH CIRCUITS WILL BE REMOVED BACK TO THE SOURCE.

4 EXISTING CONDUIT, BOXES, LUMINAIRES, CEILING SUPPORT SYSTEMS, ETC. THATMUST BE MODIFIED OR RELOCATED FOR INSTALLATION OF NEW WORK, SYSTEMS,ETC. SHALL BE INCLUDED WITHIN THE SCOPE OF WORK OF THIS PROJECT.

PN

TNSCALE: 1/8" = 1'-0"E100A

1 LOWER LEVEL DEMOLITION PLAN - AREA A

Page 22: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

2

2

3

3

4

4

5

5

6

6

004

STORAGE (EXISTINGAIR HANDLER)

UNEXCAVATED

5

E100BE100A

E100BE100A

003

STORAGE (EXISTINGBOILER)

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

3 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

LOWER LEVELDEMOLITION PLAN -AREA B

E100B

GENERAL DEMOLITION NOTES

# SPECIFIC DEMOLITION NOTES

1 EXISTING TO REMAIN 400AMP MAIN DISCONNECT CURRENTLY POWERED FROMAERIAL 120/240V SINGLE PHASE SERVICE. REMOVE VERTICAL CONDUIT ANDSERVICE CONDUCTORS FROM PANEL TO WEATHERHEAD.

2 REMOVE POWER TO THE BOILER.

3 REMOVE POWER FROM THE AIR COMPRESSOR.

4 REMOVE POWER TO THE UNIT VENTILATOR.

5 REMOVE POWER TO AIR HANDLER AND ASSOCIATED GAS BURNER.

1 NOT ALL EXISTING DEVICES ARE SHOWN.

2 REMOVE ALL DEMOLISHED CONDUIT, DEVICES, LUMINAIRES, ETC. INDICATED.EXISTING TO REMAIN SYSTEMS SHALL BE MAINTAINED IN SERVICE. REMOVE ALLABANDONED HANGERS.

3 WHERE EQUIPMENT, LUMINAIRES, DEVICES, ETC. ARE INDICATED TO BE REMOVED,DISCONNECT AND REMOVE THE BRANCH CIRCUIT BACK TO THE NEXT JUNCTIONPOINT. ALL ABANDONED BRANCH CIRCUITS WILL BE REMOVED BACK TO THE SOURCE.

4 EXISTING CONDUIT, BOXES, LUMINAIRES, CEILING SUPPORT SYSTEMS, ETC. THATMUST BE MODIFIED OR RELOCATED FOR INSTALLATION OF NEW WORK, SYSTEMS,ETC. SHALL BE INCLUDED WITHIN THE SCOPE OF WORK OF THIS PROJECT.

PN

TNSCALE: 1/8" = 1'-0"E100B

1 LOWER LEVEL DEMOLITION PLAN - AREA B

Page 23: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

1

1

2

2

3

3

44

4 4 4

105

KITCHEN

105A

DISHES

190

CORRIDOR

104

COMMUNITY ROOM

103

SENIOR'S ROOM

102B

LIBRARY (STACK)

6

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/22

/202

1 11

:45:

19 A

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FIRST FLOORDEMOLITION PLAN -AREA A

E101A

GENERAL DEMOLITION NOTES

# SPECIFIC DEMOLITION NOTES

1 EXISTING TO REMAIN 400AMP MAIN DISCONNECT CURRENTLY POWERED FROMAERIAL 120/240V SINGLE PHASE SERVICE. REMOVE VERTICAL CONDUIT ANDSERVICE CONDUCTORS FROM PANEL TO WEATHERHEAD.

2 REMOVE POWER TO THE BOILER.

3 REMOVE POWER FROM THE AIR COMPRESSOR.

4 REMOVE POWER TO THE UNIT VENTILATOR.

5 REMOVE POWER TO AIR HANDLER AND ASSOCIATED GAS BURNER.

6 REMOVE FLOOR MOUNTED RECEPTACLE. CUT CONDUIT FLUSH WITH FLOOR,REMOVE CONDUCTORS AND MARK CIRCUIT BREAKER AS SPARE.

1 NOT ALL EXISTING DEVICES ARE SHOWN.

2 REMOVE ALL DEMOLISHED CONDUIT, DEVICES, LUMINAIRES, ETC. INDICATED.EXISTING TO REMAIN SYSTEMS SHALL BE MAINTAINED IN SERVICE. REMOVE ALLABANDONED HANGERS.

3 WHERE EQUIPMENT, LUMINAIRES, DEVICES, ETC. ARE INDICATED TO BE REMOVED,DISCONNECT AND REMOVE THE BRANCH CIRCUIT BACK TO THE NEXT JUNCTIONPOINT. ALL ABANDONED BRANCH CIRCUITS WILL BE REMOVED BACK TO THE SOURCE.

4 EXISTING CONDUIT, BOXES, LUMINAIRES, CEILING SUPPORT SYSTEMS, ETC. THATMUST BE MODIFIED OR RELOCATED FOR INSTALLATION OF NEW WORK, SYSTEMS,ETC. SHALL BE INCLUDED WITHIN THE SCOPE OF WORK OF THIS PROJECT.

PN

TNSCALE: 1/8" = 1'-0"E101A

1 FIRST FLOOR DEMOLITION PLAN - AREA A

Page 24: RIDGEWAY COMMUNITY CENTER RENOVATIONS

LVDLV

2

DH

DH DH

LV2

LVDLV

2LV

D

LV2 LV

D

LV2

L1L1

L1L1L1

L1

L1

L1

L1L1L1

AA

BB

CC

1

1

2

2

3

3

103

SENIOR'S ROOM102B

LIBRARY (STACK)

104

COMMUNITY ROOM

105

KITCHEN

105A

DISHES

190

CORRIDOR

A, b

A, b

A, c

A, a A, a A, b

A, b

A, c

A, b

A, b

A, c

A, b

A, b

A, c

A, b

A, b

A, c

A, a

A, a

A, c

A, a

A, a

A, c

A, a

A, a

A, c

A, a

A, a

A, c

A, a

A, a A, a A, a

A, a

A, a

A, bA, b A, b A, b

A, b

A, b

A, c

A, a

A, a

A, c

A, a

A, a

A, c

A, a

A, a

A, c

A, a

A, a

A, c

c

b c

111C

STORAGE

?

?

103A

CLOSETS

103B

TOILET

104A

CLOSETS

a,b,c

a,b,c

a,b,c

a,b a,b

a,b,c a,b,c a,b,c

a,b,ca,b,ca,b,c

ab,cab,c

a,b ab,c ab,c

ON/OFF

ON/OFF

ON/OFF

LV2 LVD

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

6 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FIRST FLOORLIGHTING PLAN -AREA A

E201A

1 SEE SPECIFICATIONS FOR ALL LIGHTING CONTROL SEQUENCES OF OPERATIONS.

2 COORDINATE FINAL LOCATIONS OF DEVICES, LUMINAIRES, ETC WITHARCHITECTURAL CEILING PLANS.

3 CONNECT NORMAL BRANCH LIGHTING CIRCUITS TO EXISTING LIGHTING BRANCHCIRCUITS.

4 ROOMS AND COMMON CORRIDORS WITH MULTIPLE OCCUPANCY SENSORS SHALLBE INTERCONNECTED TO ENERGIZE ALL LUMINAIRES SERVING AREA TOGETHER.

5 LUMINAIRE SCHEDULE LOCATED ON SHEET E901.

GENERAL LIGHTING NOTES

PN

TNSCALE: 1/8" = 1'-0"E201A

1 FIRST FLOOR LIGHTING PLAN - AREA A

SCALE: NTSE201A

2 LIGHTING CONTROL SYSTEM BUTTON LAYOUTS

Page 25: RIDGEWAY COMMUNITY CENTER RENOVATIONS

FACP

AA

BB

CC

1

1

2

2

3

3

2

E300A

003

STORAGE (EXISTINGBOILER)

002

STORAGE

001

MARSHAL'S OFFICE

UNEXCAVATED

E

2.2

2.2

ACCU-1A-12,14

FCU-1

FCU-2

ACCU-2A-7,9

EWH-1A-8,10

2.6

WP,GFI2.3

WP,GFI

2.3

2.1 2.92.7

2.4

T

2.10

2.11

EBB-1AMDP-8

EBB-1BMDP-9

2.12

BASEMENT89' - 3"

FIRST FLOOR100' - 0"

SECOND FLOOR112' - 6"

1

2.7 2.9 2.1 2.11

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

7 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

LOWER LEVEL POWERPLAN - AREA A

E300A

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E300A

1 LOWER LEVEL POWER PLAN - AREA ASCALE: 1/8" = 1'-0"E300A

2 EXTERIOR ELEVATION

Page 26: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

1

1

2

2

3

3

103

SENIOR'S ROOM

102B

LIBRARY (STACK)

190

CORRIDOR

104

COMMUNITY ROOM

105

KITCHEN

105A

DISHES

190

CORRIDOR

MDP

104A

CLOSETS

103A

CLOSETS

103B

TOILET

111C

STORAGE

111B

OFFICE

102A

LIBRARY (READING)

E301BE301A

E301BE301A

SPDMDP-7

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

8 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FIRST FLOOR POWERPLAN - AREA A

E301A

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E301A

1 FIRST FLOOR POWER PLAN - AREA A

E301BE301A

Page 27: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

DD

2

2

3

3

4

4

5

5

6

6

190

CORRIDOR

111C

STORAGE

111D

SHOWER

111A

MENS

111

STORAGE

111B

OFFICE

101

OFFICE

116

CONFERENCE

115

CONFERENCE

112

GYMNASIUM

113B

WOMENS

113A

JANITOR

113C

STORAGE

114

ENTRY

FCU-3

2.2

FCU-4

2.2

FCU-5

2.2

FCU-6

2.2

EWH-2A-32,34

113

STORAGE

EWH-3A-27,29

EWH-4A-31,33

E301BE301A

E301BE301A

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:2

9 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FIRST FLOOR POWERPLAN - AREA B

E301B

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E301B

1 FIRST FLOOR POWER PLAN - AREA B

Page 28: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

1

1

2

2

RTU-1MDP-5

RTU-3MDP-4

RTU-2MDP-6

RTU-5A-1,3,5

RTU-4A-2,4,6

2.5

2.8

2.8 2.8

2.8

2.8

A

209

CLOSET

WP,GFIWP,GFI

WP,GFIWP,GFI

E302BE302A

E302BE302A

WP,GFI

KEY PLAN

A

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

0 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ROOF POWER PLAN -AREA A

E302A

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E302A

1 ROOF POWER PLAN - AREA A

Page 29: RIDGEWAY COMMUNITY CENTER RENOVATIONS

AA

BB

CC

DD

2

2

3

3

4

4

5

5

6

6

2.5

209

CLOSET

201

OFFICE

208

MENS

202

OFFICE

112

GYMNASIUM

201

OFFICE

206

WOMENS

207

JAN.

205

OFFICE

204

OFFICE

290

CORRIDOR

203

STORAGE

A

FCU-7

2.2

FCU-8

2.2

FCU-9

2.2

FCU-10

2.2

E302BE302A

E302BE302A

EWH-5A-35,37

EWH-6A-39,41

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

0 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

SECOND FLOORPOWER PLAN - AREA B

E302B

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E302B

1 SECOND FLOOR POWER PLAN - AREA B

Page 30: RIDGEWAY COMMUNITY CENTER RENOVATIONS

BB

CC

DD

2

2

3

3

4

4

5

5

6

6

RTU-6MDP-3

WP,GFI

ACCU-3A-16,18

ACCU-7A-11,13

ACCU-4A-20,22

ACCU-5A-15,17

ACCU-8A-24,26

ACCU-6A-19,21

ACCU-9A-28,30

ACCU-10A-23,25

2.8

WP,GFI WP,GFI2.3 2.3

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

1 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ROOF POWER PLAN -AREA B

E303B

GENERAL POWER NOTES

# SPECIFIC POWER NOTES

1 BRANCH CIRCUIT NUMBER SEQUENTIAL ORDER IS FOR BOOKKEEPING PURPOSESONLY AND MAY NOT REFLECT ACTUAL CIRCUIT BREAKER NUMBER SEQUENCE IN THEPANELBOARD. NUMBERS INDICATE WHICH DEVICES ARE CONNECTED TO A COMMONBRANCH CIRCUIT.

2 SEE MECHANICAL SHEETS FOR ADDITIONAL INFORMATION RELATED TO ELECTRICAL.

3 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

2.1 CT METER CABINET. ROUTE CONDUITS TO MDP INSIDE BUILDING,

2.2 INDOOR FAN COIL UNIT POWERED BY ASSOCIATED OUTDOOR UNIT. REFER TOMECHANICAL PLANS FOR ADDITIONAL INFORMATION.

2.3 CONNECT RECEPTACLE TO NEAREST CONVENIENCE RECEPTACLE CIRCUIT WITHCAPACITY.

2.4 UTILITY PAD MOUNTED SERVICE TRANSFORMER. ENSURE THAT THETRANSFORMER IS AT LEAST 5 FEET FROM THE ORIGINAL WINDOW SILL ON THESECOND FLOOR (AS MEASURED DIAGONALLY) PER PSC 114 REQUIREMENTS.

2.5 APPROXIMATE LOCATION OF EXISTING AERIAL SERVICE DROP ON ROOF. REFER TODEMO PLANS FOR ADDITIONAL REQUIREMENTS.

2.6 REPOWER EXISTING 400A SINGLE PHASE DISCONNECT FROM PANEL MDP.

2.7 FUTURE TENANT MULTIPLE METER CENTER.

2.8 PRE-WIRED INTEGRAL RECEPTACLE INSIDE RTU.

2.9 ELECTRICAL SERVICE TERMINATION CABINET.

2.10 ELECTRICAL CONTRACTOR TO PROVIDE TRENCH, CONDUIT FROM TRANSFORMERTO TERMINATION CABINET, AND SITE RESTORATION.

2.11 PROVIDE METER SOCKET AND 1" CONDUIT TO METER CABINET IN ACCORDANCEWITH ALLIANT ENERGY SERVICE RULES.

2.12 CONDUITS TO PANEL MDP IN INTERIOR OF BUILDING. MAXIMUM LENGTH OFCONDUCTORS INSIDE BUILDING 8 FEET PER WISCONSIN ELECTRICAL CODE.

PN

TNSCALE: 1/8" = 1'-0"E303B

1 ROOF POWER PLAN - AREA B

Page 31: RIDGEWAY COMMUNITY CENTER RENOVATIONS

SD

CM

RI

AA

BB

CC

DD

2

2

3

3

4

4

5

5

6

6

RTU-6

112

GYMNASIUM

RTU-6

3.1

3.1

102A

LIBRARY (READING)

190

CORRIDOR

111C

STORAGE

111B

OFFICE

111

STORAGE

111D

SHOWER

111A

MENS

101

OFFICE

116

CONFERENCE

115

CONFERENCE

113B

WOMENS

113A

JANITOR

113C

STORAGE

114

ENTRY

KEY PLAN

B

N

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

2 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

FIRST FLOORSYSTEMS PLAN -AREA B

E401

GENERAL SYSTEMS NOTES

# SPECIFIC SYSTEMS NOTES

1 ALL FIRE ALARM NOTIFICATION, DETECTION AND SIGNALING DEVICES SHALL MEETALL APPLICABLE CODES AND MANUFACTURER'S LISTING RECOMMENDATIONS.

2 DEVICE LOCATIONS ARE SHOWN TO INDICATE DESIGN INTENT ONLY.

3 INSTALL ALL FIRE ALARM CABLE IN CONDUIT.

4 REFER TO SPECIFICATION SECTION 07 84 00 PENETRATION FIRE STOPPING FOR ALLFLOOR AND WALL PENETRATIONS THROUGH RATED WALLS. REFER TO THEARCHITECTURAL LIFE SAFETY PLAN SHEETS FOR FLOOR AND WALL RATINGS.

5 EXISTING FIRE ALARM DEVICES NOT SHOWN.

3.1 CONNECT NEW FIRE ALARM DEVICES TO EXISTING FIRE ALARM PANEL LOCATED INAREA A LOWER LEVEL.

PN

TNSCALE: 1/8" = 1'-0"E401

1 FIRST FLOOR SYSTEMS PLAN - AREA B

Page 32: RIDGEWAY COMMUNITY CENTER RENOVATIONS

2030405060708090100110125150175200225250300350400450500600700800

100012001600200025003000

FEEDER AMPACITY

*

Ø

CONDUCTOR SIZE (kcmil)

N GND

PARALLEL SETS

CONDUIT SIZE

111111111111111111222223345678

3G,4G

3#123#103#83#63#43#43#33#23#13#13#1

3#1/03#2/03#3/03#4/03#2503#3503#5003#3/03#4/03#2503#3503#5003#3003#4003#3503#4003#4003#5003#500

3G,4G

1#121#101#81#61#41#41#31#21#11#11#1

1#1/01#2/01#3/01#4/01#2501#3501#/5001#3/01#4/01#2501#3501#5001#3001#4001#3501#4001#4001#5001#500

4G

1#121#101#101#101#101#81#81#81#81#61#61#61#61#61#41#41#41#31#31#21#21#1

1#1/01#1/01#2/01#3/01#4/01#2501#3501#400

3G,4G 3G 4G3/4"3/4"3/4"1"1"

1 1/4"1 1/4"1 1/4"1 1/2"1 1/2"1 1/2"1 1/2"

2"2"2"

2 1/2"2 1/2"

3"2"2"

2 1/2"3"3"

2 1/2"3"3"3"3"

3 1/2"3 1/2"

3/4"3/4"1"1"

1 1/4"1 1/4"1 1/4"1 1/2"1 1/2"1 1/2"1 1/2"

2"2"

2 1/2"2 1/2"2 1/2"

3"3 1/2"2 1/2" 2 1/2"

3"3"

3 1/2"3"3"3"

3 1/2"3 1/2"3 1/2"3 1/2"

FEEDER SCHEDULE

********

1. NOT ALL FEEDER AMPACITY OR WIRING CONFIGURATION MAY BE UTILIZED.2. CONDUCTOR AMPACITIES PER NEC TABLE 310-15(B)(16), CU, XHHW-2. FEEDER AMPACITY NOTED WITH (*) ARE BASED ON 60ºC PER NEC 110.14(C).3. CONDUIT SIZES ARE PER NEC CHAPTER 9 TABLES, 40% FILL OF SCHEDULE 80 PVC.4. CONDUCTOR AND CONDUIT SIZES SHOWN ARE MINIMUM SIZES. FEEDERS ARE NOT DERATED PER NEC ART.310, AND MAY NOT CORRESPOND TO OCPD AMPACITIES SHOWN ON THE ONE-LINE OR RISER DIAGRAM.5. CONTRACTOR SHALL DERATE EACH FEEDER'S AMPACITY FOR VOLTAGE DROP AND AMBIENT TEMPERATURE. INCREASE THE CONDUCTOR AND RACEWAY SIZES PER THE NEC AND SPECIFICATIONS. SUBMIT CALCULATIONS AND REVISED SIZES TO THE ARCHITECT/ENGINEER.6. PARALLEL SETS: EACH CONDUIT SHALL HAVE CONDUCTOR GROUPINGS OF A-B-C PHASE CONDUCTORS, GROUNDING CONDUCTOR(S), AND OR NEUTRAL CONDUCTOR(S).

PANEL

MDP

208Y/120V

800A

208Y/120V, 3-PHASEPAD MOUNTEDUTILITY TRANSFORMER

800-

4G

T

SPD

EXTERIOR NEMA 3R METER CABINET

30-4G

M

2[(2

#3/

0, 1

#3/

0N, 1

#3G

) 2"

C]

PANEL A

208Y/120V

225A

225-

4G

1

NOTE:PROVIDE ALL EQUIPMENT IN ACCORDANCE WITH UTILITY REQUIREMENTS.

PANEL E

208/120V

1 PHASE

400A

208/120V400A-2P

400A

4

EXTERIOR NEMA 3R TERMINATION CABINET SIZED

TO ACCOMODATE NEW SERVICE AND FUTURE TAPS

TO POWER A TENANTMULTI-METER CENTER

5

5

6

7

240/120V, 1-PHASE POLE MOUNTEDUTILITY TRANSFORMER

T

PANEL E

240/120V

1 PHASE

400A

2

3

240/120V400A

M

ARCHITECTURE

ENGINEERING

INTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

3 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ELECTRICAL ONE-LINEDIAGRAMS

E701

1 COMPLY WITH ALL ALLIANT ENERGY SERVICE RULES.

2 REFER TO EQUIPMENT SCHEDULES FOR SPECIFIC ELECTRICAL EQUIPMENTREQUIREMENTS.

3 SIZE OF GROUNDING ELECTRODE CONDUCTOR PER N.E.C. TABLE 250.86.

4 THE GROUNDING ELECTRODE CONDUCTOR SHALL BE UNSPLICED AND INSTALLEDIN NON-METALLIC (PVC SCHEDULE 40) CONDUIT TO PROTECT IT FROM DAMAGE.

1 PROVIDE METER BASE IN ACCORDANCE WITH ALLIANT ENERGY RULES.

2 REMOVE MAIN BONDING JUMPER.

3 REMOVE GROUNDING ELECTRODE CONDUCTOR.

4 PROVIDE NEW NAME PLATE FOR PANEL E INDICATING NEW VOLTAGE 208/120V.

5 SUBMIT PROPOSED EQUIPMENT TO ALLIANT ENERGY FOR APPROVAL PRIOR TOORDERING.

6 PROVIDE THREE 4" CONDUITS WITH PULL CORD. ALLIANT ENERGY WILL PROVIDETHE SERVICE CONDUCTORS.

7 PROVIDE PAD FOR SERVICE TRANSFORMER IN ACCORDANCE WITH ALLIANTENERGY RULES.

GENERAL ONE-LINE NOTES

# SPECIFIC ONE-LINE NOTES

SCALE: NONEE701

1 PARTIAL ONE-LINE DIAGRAMSCALE: NONEE701

2 PARTIAL DEMOLITION ONE-LINE DIAGRAM

Page 33: RIDGEWAY COMMUNITY CENTER RENOVATIONS

ARCHITECTUREENGINEERINGINTERIOR DESIGN

MADISON, WI | WAUKESHA, WI

SHEET NAME

PROJECT TITLE

COPYRIGHT STRANG, INC.

DRAWING SET

DATE

PROJECT NO.

SHEET NO.

2021

9/20

/202

1 1:

49:3

5 P

M

09/20/2021

208 JARVIS ST.RIDGEWAY, WI 53582

RIDGEWAYCOMMUNITY CENTERRENOVATIONS

2021046

CD

ELECTRICALSCHEDULES

E901

SERVICE ENTRANCE RATED

Notes:

Total Adj. Demand Current: 533 A

Total Conn. Current: 521 A

HVAC Heating 23000 VA 100.00% 23000 VA Total Adj. Demand: 191918 VA

Other 70000 VA 100.00% 70000 VA Total Conn. Load: 187865 VA

Motor 94865 VA 104.27% 98918 VA

Load Classification Connected Load Demand Factor Adjusted Demand Switchboard Totals

GFI - GFCI BREAKER AFCI - AFCI BREAKER SD - SWITCHING DUTY F - FUSED ST - SHUNT TRIP MCS - MOLDEDCASE SWITCH ET - ELECTRONIC TRIP METER - ELECTRONIC METERING

Legend:

521 A

187865 VA

16 SPACE -- -- 0 VA --

15 SPACE -- -- 0 VA --

14 SPACE -- -- 0 VA --

13 SPARE BREAKER 3 200 A 0 VA

12 SPARE BREAKER 3 200 A 0 VA

11 SPARE BREAKER 2 20 A 0 VA

10 SPARE BREAKER 2 20 A 0 VA

9 EBB-1B 2 20 A 2500 VA

8 EBB-1A 2 20 A 2500 VA

7 SPD 3 30 A 0 VA

6 RTU-2 3 40 A 9727 VA

5 RTU-1 3 40 A 9727 VA

4 RTU-3 3 40 A 9727 VA

3 RTU-6 3 60 A 16212 VA

2 PANEL A 3 225 A 67472 VA

1 EXISTING 400AMP SINGLE PHASE DISCONNECT 2 400 A 70000 VA

CKT Circuit Description # of Poles Trip Rating Load Remarks

Enclosure: Type 1 Neutral Bus: 100%

Mounting: Surface Wires: 4 Mains Rating: 800

Supply From: Phases: 3 Mains Type: MCB

Location: ELECTRICAL CLOSET 104B Volts: 120/208 Wye A.I.C. Rating: 35,000 A

Main Panel: MDP

Notes:

GFI - GFCI BREAKER AFCI - AFCI BREAKER SD - SWITCHING DUTY F - FUSED ST - SHUNT TRIP MCS - MOLDED CASE SWITCH HT - HANDLE TIE

Options:

Total Adj. Demand Current: 194 A

Total Conn. Current: 187 A

Total Adj. Demand: 69903.8 VA

HVAC Heating 18000 VA 100.00% 18000 VA Total Conn. Load: 67472 VA

Motor 49472 VA 104.92% 51903.8 VA

Load Classification Connected Load Demand Factor Adjusted Demand Panel Totals

Total Amps: 194 A 195 A 177 A

Total Load: 23021 VA 23180 VA 21271 VA

55 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 5653 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 5451 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 5249 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 5047 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 4845 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 4643 SPARE BREAKER 20 A 1 0 VA 0 VA 1 20 A SPARE BREAKER 44

-- -- -- -- 1250 VA 0 VA 1 20 A SPARE BREAKER 4239,41 EWH-6 20 A 2 1250 VA 0 VA 1 20 A SPARE BREAKER 40

-- -- -- -- 1250 VA 0 VA 1 20 A SPARE BREAKER 3835,37 EWH-5 20 A 2 1250 VA 0 VA 1 20 A SPARE BREAKER 36

-- -- -- -- 1750 VA 1500 VA -- -- -- --31,33 EWH-4 25 A 2 1750 VA 1500 VA 2 20 A EWH-2 32,34

-- -- -- -- 1750 VA 1591 VA -- -- -- --27,29 EHW-3 25 A 2 1750 VA 1591 VA 2 30 A ACCU-9 28,30

-- -- -- -- 1591 VA 1591 VA -- -- -- --23,25 ACCU-10 30 A 2 1591 VA 1591 VA 2 30 A ACCU-8 24,26

-- -- -- -- 1591 VA 1591 VA -- -- -- --19,21 ACCU-6 30 A 2 1591 VA 1591 VA 2 30 A ACCU-4 20,22

-- -- -- -- 1591 VA 1591 VA -- -- -- --15,17 ACCU-5 30 A 2 1591 VA 1591 VA 2 30 A ACCU-3 16,18

-- -- -- -- 1591 VA 1591 VA -- -- -- --11,13 ACCU-7 30 A 2 1591 VA 1591 VA 2 30 A ACCU-1 12,14

-- -- -- -- 1591 VA 1500 VA -- -- -- --7,9 ACCU-2 30 A 2 1591 VA 1500 VA 2 20 A EWH-1 8,10

-- -- -- -- 2641.7 VA 3242.3 VA -- -- -- ---- -- -- -- 2641.7 VA 3242.3 VA -- -- -- --

1,3,5 RTU-5 30 A 3 2641.7 VA 3242.3 VA 3 40 A RTU-4 2,4,6

CKT Options Circuit Description Trip Poles A B C Poles Trip Circuit Description Options CKT

Enclosure: Type 1 Neutral Bus: 100.00%

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: MDP Phases: 3 Mains Type: MLO

Location: CLOSET 209 Volts: 120/208 Wye A.I.C. Rating: 10,000 A

Branch Panel: A

LUMINAIRE SCHEDULE NOTES

1 LUMINAIRE MOUNTING TO BE COORDINATED WITH CEILING OR WALL TYPE. ALL TRIM AND MOUNTING ACCESSORIES SHALL BE PROVIDED AND VERIFIED COMPATIBLE WITH MOUNTING SURFACE TYPE.

2 FINAL MOUNTING HEIGHTS FOR SUSPENDED AND WALL LUMINAIRES SHALL BE AS NOTED AND CONFIRMED WITH ARCHITECTURAL ELEVATIONS AND DETAILS, IF APPLICABLE. IF THIS INFORMATION IS NOT SHOWN, HEIGHTS SHALL BE CONFIRMED PRIOR TO SUSPENSION ORDERING AND ROUGH-IN.

3 FIXTURE MANUFACTURER AND MODEL LISTED IS THE BASIS FOR DESIGN. ANY REQUEST FOR SUBSTITUTIONS SHALL BE PROVIDED WITH DOCUMENTATION OF EQUIVALENCE, INCLUDING (BUT NOT LIMITED TO) PHOTOMETRIC COMPARISON.

4 PART NUMBERS/SERIES LISTED ARE TO ESTABLISH A MINIMUM QUALITY LEVEL ONLY. SUPPLIERS SHALL VERIFY THE LISTED LUMINAIRE MEETS ALL REQUIREMENTS LISTED IN THIS SCHEDULE AND SPECIFICATIONS. WHERE THE PART NUMBER LISTED DOES NOT MEET ALL THE REQUIREMENTS. LISTED SUPPLIER SHALL PROVIDE LUMINAIRE WITH EQUAL OR BETTER QUALITY THAT MEETS ALL THE REQUIREMENTS.

5 MAXIMUM LUMINAIRE POWER IS LISTED TO ENSURE COMPLIANCE WITH ENERGY CODE CALCULATIONS. EQUALS SHALL NOT USE MORE VA THAN LISTED.

6 FOR CONTINUOUS DIMMING LUMINAIRES BALLAST FACTOR COLUMN LISTS THE DIMMING RANGE DESIRED IN PERCENTAGE. I.E. 10%-100% INDICATES A LUMINAIRE DIMMABLE FROM FULL(100%) DOWN TO 10%

LUMINAIRE SCHEDULE

LUMINAIRE ID DESCRIPTION MANUFACTURER/SERIES LAMP QTY, TYPE, SIZE COLOR TEMP DRIVER TYPE DIMMING %INPUT

VOLT-AMPS VOLTAGE MOUNTING NOTES

A 2x4 FLAT PANEL SYLVANIA PANELF2B 026 UNVD840 24G WH LED, 4160LM 4000 K LED, 0-10V 10-100% 32 VA 120 V RECESSED

MECHANICAL EQUIPMENT CONNECTION SCHEDULE NOTES

MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EQUIPMENT ID DESCRIPTIONLOCATION

MCALOAD VOLTAGE PHASE FEEDER

STARTER DISCONNECT

COMMENTSROOM NUMBER TYPE FURN / INST TYPE FURN / INST

ACCU-1 AIR COOLED CONDENSING UNIT EXTERIOR 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED DIV 26 / DIV 26 NEMA 3R FUSED DISCONNECT

ACCU-2 AIR COOLED CONDENSING UNIT EXTERIOR 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED DIV 26 / DIV 26 NEMA 3R FUSED DISCONNECT

ACCU-3 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-4 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-5 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-6 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-7 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-8 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-9 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

ACCU-10 AIR COOLED CONDENSING UNIT ROOF 17 A 3182 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER FUSED MANUFACTURER NEMA 3R FUSED DISCONNECT

EBB-1A ELECTRIC BASEBOARD MARSHAL'S OFFICE 001 14 A 2500 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EBB-1B ELECTRIC BASEBOARD MARSHAL'S OFFICE 001 14 A 2500 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-1 ELECTRIC WALL HEATER WEST STAIR 14 A 3000 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-2 ELECTRIC WALL HEATER ENTRY 114 14 A 3000 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-3 ELECTRIC WALL HEATER MENS 111A 14 A 3500 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-4 ELECTRIC WALL HEATER WOMENS 113B 14 A 3500 VA 208 V 1 (2#10, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-5 ELECTRIC WALL HEATER MENS 208 14 A 2500 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

EWH-6 ELECTRIC WALL HEATER WOMENS 206 14 A 2500 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

FCU-1 FAN COIL UNIT STORAGE 002 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-2 FAN COIL UNIT MARSHAL'S OFFICE 001 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-3 FAN COIL UNIT OFFICE 101 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-4 FAN COIL UNIT CONFERENCE 116 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-5 FAN COIL UNIT CONFERENCE 116 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-6 FAN COIL UNIT CONFERENCE 115 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-7 FAN COIL UNIT OFFICE 205 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-8 FAN COIL UNIT OFFICE 204 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-9 FAN COIL UNIT OFFICE 204 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

FCU-10 FAN COIL UNIT OFFICE 202 2 A 400 VA 208 V 1 (2#12, 1#12G) 1/2"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER POWER FROM RESPECTIVE OUTDOOR UNIT.

RTU-1 PACKAGED ROOFTOP UNIT ROOF 30 A 9727 VA 208 V 3 (3#8, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

RTU-2 PACKAGED ROOFTOP UNIT ROOF 30 A 9727 VA 208 V 3 (3#8, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

RTU-3 PACKAGED ROOFTOP UNIT ROOF 30 A 9727 VA 208 V 3 (3#8, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

RTU-4 PACKAGED ROOFTOP UNIT ROOF 30 A 9727 VA 208 V 3 (3#8, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

RTU-5 PACKAGED ROOFTOP UNIT ROOF 24 A 7925 VA 208 V 3 (3#10, 1#10G), 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

RTU-6 PACKAGED ROOFTOP UNIT ROOF 48 A 16212 VA 208 V 3 (3#6, 1#10G) 3/4"C INTEGRAL MANUFACTURER INTEGRAL MANUFACTURER

1 CONDUIT AND WIRE SIZE SHOWN ARE BASED ON NEC TABLE 310.15 (B)(16). EC TO ADJUST CONDUIT AND WIRE SIZE FOR VOLTAGE DROP, TEMPERATURE, ETC.

2 EC TO CONFIRM MECHANICAL EQUIPMENT CONNECTION REQUIREMENTS WITH MC PRIOR TO START OF WORK.

333

100 A100 A100 A