ikram hakimi bin mohd zaki - welcome to universiti...

24
TENDER MANAGEMENT SYSTEM FOR JKR BESUT IKRAM HAKIMI BIN MOHD ZAKI UNIVERSITI TEKNIKAL MALAYSIA MELAKA

Upload: phungkhanh

Post on 29-Mar-2018

233 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

TENDER MANAGEMENT SYSTEM FOR JKR BESUT

IKRAM HAKIMI BIN MOHD ZAKI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

Page 2: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

TENDER MANAGEMENT SYSTEM FOR JKR BESUT

IKRAM HAKIMI BIN MOHD ZAKI

This report is submitted in partial fulfillment of the requirements for the

Bachelor of Computer Science (Software Development)

FACULTY OF INFORMATION AND COMMUNICATION TECHNOLOGY

UNIVERSITI TEKNIKAL MALA YSIA MELAKA

2008

11

Page 3: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

DECLARATION

I hereby declare that this project report entitled

TENDER MANAGEMENT SYSTEM FOR JKR BESUT

is written by me and is my own effort and that no part has been plagiarized without

citations.

STUDENT Date: 21 Nov 2008

SUPERVISOR: tl# (INTAN E~HANI BINT! ABO. JALIL)

Date: 21 Nov 2008

iii

Page 4: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

DEDICATION

To my beloved parents, family, friends and well-wishers for all of your support and

inspiration ...

iv

Page 5: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

v

ACKNOWLEDGEMENTS

Alhamdulillah, praises to be the Lord, Allah S.W.T for His blessing and

mercy I am capable to complete this Projek Sarjana Muda (PSM) as it is. My great

appreciation goes to my parents, Mohd Zaki bin Mustapha and Che Norlida binti

Zakaria" who taught me the value of education and their never-ending love and support

in all my efforts.

In particular, I wish to express my heartfelt gratitude and sincere appreciation to

my PSM supervisor, Miss Intan Ermahani Binti Abd. Jalil, for encouragement, guidance,

critics and friendship. Without her continued support and interest, the project would not

have been the same as presented here.

Last but not least, my sincere appreciation also extends to all my friends -

formally and informally - the words of encouragement and the tremendous amount of

goodwill. My spirits were sustained by their sympathy in the most frustrating moments

and by their sharing of my joy whenever I completed a chapter.

Page 6: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

VI

ABSTRACT

The Tender Management System for JKR Besut is an application that provides the

tender advertising and infonnation, and bid submissions by the contractor especially in F

class group. The Jabatan Kerja Raya (JKR) Management is responsible to upload the

tender infonnation for contractor to view by browsing it. The engineer is able to review

the bid submission record and has a privilege to approve or reject the bid. From the

functions stated above, the application requires three access levels to manage the system

which are administrator, contractor, registrar and engineer. The web application is

developed by using PHP as a programming language. The database for this system is

built using MySQL. The system also contributes toward solving the tender process

become easier with those functions applied.

Page 7: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

VB

ABSTRAK

Tender Management System for JKR Besut adalah merupakan satu aplikasi yang

menyediakan informasi sebutharga dan tawam sebutharga daripada golongan kontraktor

kelas F. Jabatan KeIja Raya (JKR) Managements bertanggungjawab dalam menyediakan

informasi sebutharga untuk golongan kontraktor tersebut. Jurutera berpotensi untuk

memaparkan rekod penghantaran bid dan mempunyai keutamaan untuk menerima atau

menolak tawaran. Aplikasi ini memerlukan tiga aras pengguna iaitu administrator,

kontraktor dan jurutera. Sistem aplikasi ini juga dibangunkan dengan menggunakan PHP

sebagai bahasa aturcara. Pangkalan data yang digunakan pula ialah MySQL. Sistem ini

berpeluang untuk memudabkan pemprosesan sebutbarga tender dengan adanya fungsi

yang diguna pakai.

Page 8: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

viii

TABLE OF CONTENTS

CHAPTER SUBJECT PAGE

CHAPTER I INTRODUCTION

1.1 Project Background 1

1.2 Problem Statement 2

1.2.1 Lack of proper infonnation management 2

1.2.2 Traditional record keeping

and paper-based application 2

1.2.3 Tender bidding process 2

1.3 Goal Statement and Objective 3

1.3.1 Goal 3

1.3.2 Objective 3

1.3.2.1 To create a good infonnation system 3

1.3.2.2 Computerized record management 3

1.3.2.3 Decision Support System

for tender bidding process 4

1.4 Scope 5

1.4.1 Data 5

1.4.2 Functionality 5

1.4.2.1 User Friendly 5

1.4.2.2 Security 5

1.4.3 Target User 6

1.5 Project Significant 6

1.6 Expected Output 7

1.7 Conclusion 7

Page 9: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

ix

CHAPTER II LITERATURE REVIEW AND PROJECT METHODOLOGY

2.1 Introduction 8

2.2 Facts and Findings 9

2.2.1 Domain 11

2.2.2 Existing System 12

2.2.2.1 Case Study 1 12

2.2.2.2 Case Study 2 13

2.2.3 Project Methodology 14

2.3 Project Methodology 15

2.4 Project Requirement 17

2.4.1 Software Requirements 17

2.4.2 Hardware requirements 17

2.4.3 Other Requirements 18

2.5 Project Schedule and Milestones 18

2.6 Conclusion 20

CHAPTER 111 ANALYSIS

3.1 Introduction 21

3.2 Problem Analysis 22

3.2.1 Current System Analysis 22

3.2.1.1 Manual and paper-based system 22

3.2.1.2 Infonnation management 23

3.2.1.3 Bidding Process 23

3.2.2 Detailed Problem Statement 23

3.2.2.1 Data Insecurity 23

3.2.2.2 Data Inconsistency 24

3.2.2.3 Convoluted in Searching 24

3.2.2.4 Excessive Manual Records 25

3.2.2.5 Inefficient Data Updates 25

3.2.3 To-Be System Analysis 25

3.2.3.1 Use case View 26

Page 10: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

3.2.3.2 Business Flow

3.2.3.3 Requirement Analysis

3.2.4 Data Requirement

3.2.5 Functional Requirement

3.2.6 Non-Functional Requirement

3.2.7 Others Requirement

3.2.7.1 Software Requirement

3.2.7.2 Hardware Requirement

3.2.7.3 Network Requirement

3.3 Conclusion

CHAPTER IV DESIGN

4.1 Introduction

4.2 High-Level Design

4.2.1 System Architecture

4.2.2 User Interface Design

4.2.2.1 Navigation Design

4.2.2.2 Input Design

4.2.2.3 Output Design

4.2.3 Database Design

4.2.3.1 Conceptual and Logical Database Design

4.2.3.2 Logical Database Design

4.2.3.3 Database Selection

4.3 Detailed Design

4.3.1 Software Design

4.4 Conclusion

CHAPTER V IMPLEMENTATION

5.1 Introduction

5.2 Software Development Environment setup

28

38

38

39

40

41

41

42

42

43

44

45

45

47

48

48

50

51

52

55

57

59

59

62

63

64

x

Page 11: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

Xl

5.2.1 Software, Hardware,

and Network Environment Setup 65

5.3 Software Configuration Management 65

5.3.1 Configuration Environment Setup 65

5.3 .1.1 AppServ Configuration 66

5.3.1.2 MySQL server Configuration 67

5.3.2 Version Control Procedure 67

5.4 Implementation Status 69

5.5 Conclusion 70

CHAPTER VI TESTING

6.1 Introduction 71

6.2 Test Plan 71

6.2.1 Test Organization 71

6.2.2 Test Environment 73

6.2.3 Test Schedule 74

6.2.3.1 Black-Box Testing 74

6.2.3.2 Usability Testing 74

6.3 Test Strategy 75

6.4 Black-Box Test Design 76

6.4.1 Test description and Test Data 76

6.4.2 Test Result and Analysis 83

6.5 Web Usability Testing 87

6.5.1 Test Description and Test Data 87

6.5.2 Test Results and Analysis 88

6.6 Conclusion 89

Page 12: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

CHAPTER VII CONCLUSION

7.1

REFERENCES

APPENDICES

7.2

7.3

7.4

7.5

Observation Weakness and Strengths

Strength

Weakness

Propositions for Improvement

Conclusion

90

91

91

91

91

92

93

xii

Page 13: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

Xlll

LIST OF FIGURES

FIGURES TITLE PAGE

2.1 www.lelong.com.my 12

2.2 www.lelong.com.my 13

3.1 Use Case Diagram 27

3.4 Sequence Diagram for Requester (Engineer) Operation 30

3.5 Sequence Diagram for Requester (Administrator) Operation 31

3.6 Sequence Diagram for Requester (Contractor) Operation 32

3.7 Sequence Diagram for Requester (Tender Registrar) Operation 33

3.8 Flowchart for Tender Bidding Process 3S

3.9 Flowchart for Tender Evaluation Process 36

4.1 TMS System Architecture 46

4.2 Navigation design for TMS 49

4.3 ERDforTMS 53

5.1 Software Development Environment for TMS 64

5.2 Apache Web Server configure screen 6

5.3 MySQL Database configure screen 67

6.1 Rating for TMS interface Design 88

Page 14: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

XIV

LIST OF TABLES

TABLES TITLE PAGE

2.1 Phase and activities of OOAD 16

2.2 Milestone for Projek Sarjana Muda 18

3.1 Actors of the TMS 26

3.2 Functional requirement 39

3.3 Non-functional requirement 40

3.4 Other Requirement 41

3.5 Hardware Requirement 42

3.6 Network Requirement 42

4.1 Output design system 50

5.1 Server, client and hardware requirement 65

5.2 Version control Procedure 68

S.3 TMS Implementation Status 69

6.1 System testing of TMS 74

6.2 Test Description and Test data of Login Module 76

6.3 Test Description and Test data of Staff Registration Module 77

6.4 Test Description and Test data of Database Backup Module 77

6.5 Test Description and Test data of Tender Registrar Module 78

6.6 Test Description and Test data of Tender Registration Module 79

6.7 Test Description and Test data of Tender Approval Module 80

6.8 Test Description and Test data of Tender Bidding Module 80

6.9 Test Description and Test data of Tender Bidder Selection Module 81

6.10 Test Description and Test data of Login Module 83

6.11 Test Description and Test data of Staff Registration Module 83

6.12 Test Description and Test data of Database Backup Module 83

6.13 Test Description and Test data of Database Backup Module 84

6.14 Test Description and Test data of Profile Update Module 84

Page 15: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

xv

h.1 ~ Test I>escription and Test data of Tender Registration Module 85

6.16 Test Description and Test data of Tender Approval Module 85

h.17 Test Description and Test data of Tender Bidding Module 85

6.18 Test Description and Test data of Tender Bidder Selection Module 86

Page 16: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted
Page 17: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

2

CHAPTER I

INTRODUCTION

1.1 Project Background

Tender bidding is a process by which one can seek prices and terms for a particular

project such as a construction job, to be carried out under a contract. The sealed offers

themselves, including company information, a project outline, and a price quote, are

known as tenders or bids.

Jabatan Kerja Raya Besut (after this known as JKR Besut) is responsible to be as

a medium to produce project tender inside the Besut district level. Not only they produce

tender but they also maintain and monitor the tender progress.

In this project, the tender online management system, using web-based application, is

used to help JKR Besut organization to be a medium of interaction between contractors

and JKR Besut, related to the tender issue. This is a very good communication method as

internet and web application has become a familiar tool for professional work in

management. Therefore. the tender bidding process can be managed more efficient using

this technology to replace the traditional process in term of management.

Page 18: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

3

1.2 Problem Statement

·I 'hcrc are a few problems identified in the current traditional tender management system

IIpplied by JKR Besut organization. The problems are listed as follows:

1.2.1 Lack of proper information management

Contractors have to come to JKR department to seek the information of the tender

available as the tenders information is put on the notice board. The information also can

he sought online, but for tender for the Class F, where project are available to work on

inside Besut district level is hard to find via online. There is also information such as

news related to the contractors in Class F group from top government which is hard to

seek.

1.2.2 Traditional record keeping and paper-based application

Most of documentation related about tenders and contractors are being made and

applied using paper based (including printing version) and archived using files and

folders for record keeping. This traditional method are very much looks as want-to-be

replaced for a long term management goal as JKR Besut want to apply information

system technology to record the tenders and contractors information for future references

and used Furthermore, paper-based application methods disallow the information from

being updated and managed easily.

1.2.3 Tender bidding process

Tender bidding process require a lot of process and decision which require a

professional logical judgment and management. The process require a lot of processing

time and· a lot of protocol, such as form filling process, contractor information and

experience and technical review before the bidding process is going to be finalized.

Page 19: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

4

1 .. 1 Goal Statement and Objective

t.3.1 Goal

The goal of study is to develop an online web-based application system called

Tender Management System (TMS for JKR Besut to help them to enhance their

Ilumagement productivity for tender and contractor via website browser.

1.3.2 Objective

The objective of the Tender Management System is listed as below.

1.3.2.1 To create a good infonnation system

The usage of this system will be ensuring that every user levels provided with

comprehensive information, depending on the user access level. Every user level will

support the system by giving related information and responsive. The information also

can be accessed via online using on any web browser platform.

) .3.2.2 Computerized record management

With the usage of this system, unnecessary usage of paper resource can be

reduced. All the information can be stored on centralized database. Every user level can

gain and access the information through the system. By computerizing record

management, JKR Besut organization can also enhance their management in record

keeping, where data can be reused for the future review.

Page 20: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

5

1.3.2.3 Decision Support System for tender bidding process

With the help of this system, JKR Besut management will be able to decide the

hest bidder for the related tender. The system makes a rational decision by gathering

related information, such as contractor experience, number of project handled, to be

review before making a decision to decide the best bidder.

Page 21: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

6

1.4 Scope

Scope describes the limitation or boundaries for Tender Management System. The

scope of the study for Tender Management System consists of data, functionality and

turget users.

1.4.1 Data

There are various types of data in this system which can be separate by user level.

Contractors will provide their information data related to their business. JKR Besut

management will provide information related to tenders for contractors. They also will

support information to update contractors profile in the contractor's testimonial of their

recent project works on the tender. There are some data are visible and some are not for

secure and privacy purpose.

1.4.2 Functionality

1.4.2.1 User friendly

The website content will be build with simply-looks but in corporate manner.

Bahasa Malaysia will be mainly use as it will help user from any level to understand the

system concept. By building this system using website application, it also will help user

to access the website anywhere via Internet connection.

1.4.2.2 Security

The website will be built with security with access level to hide private data and

to make the system being confidential and secure to use.

Page 22: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

7

1.43 Target User

The target user for this system can be divided on three categories. The first group

is JKR Besut organization, consisting administrator, engineers, and related staff. They

muinly provide information to the contractor and support the system with logical use.

The second group would be contractors as they will provide their information to

the system and also retrieve information related to the tender from the system.

The third group is tender submitter, from government or non government sectors

inside Besut district region where they will submit their tender request to the system.

1.S Project Significance

'lbe main reason of developing this Tender Management system is to provide

enhancement in tender management with association of JKR Besut and Class F

contractors group.

Tender Management System is designed to be able to record tenders and contractors

related information. This system also is able to process tender flow, starting from tender

request, tender bidding, selecting best bidder, and record the progress of the tender.

Convenient of using and access is also require as it will help user to works

remotely as long as they connected to Internet environment. The design also must be easy

to understand as it will help the users to quickly adapt to the system for the future use.

Page 23: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

1.6 Expected Output

The expected output is the Tender Management System will be able to use and work

according as what as it requested to. The system also will be able to work on any web

hrowsers platfonn and can be accessed anywhere via Internet. The system also will be

secured as it will protect the confidential and privacy of data effectively.

t.7 Conclusion

8

As a conclusion, Tender Management System will be provide a new perspective

on tender management inside JKR Besut management and also for the contractors. The

incorporation of web based application will makes it much more convenient and easy to

use almost everywhere via Internet connection. Therefore, Tender Management System

will enhance of JKR Besut management working and improves their communication to

contractors.

Page 24: IKRAM HAKIMI BIN MOHD ZAKI - Welcome to Universiti ...eprints.utem.edu.my/2765/1/...Besut_Ikram_Hakimi_Bin_Mohd_Zaki...p… · IKRAM HAKIMI BIN MOHD ZAKI This report is submitted

9

CHAPTER 2

LITERATURE REVIEW AND PROJECT METHODOLOGY

2.1 Introduction

This chapter discusses on the literature review conducted and the methodology

used to develop Tender Management System. It discusses on what is literature review and

their importance in creating Tender Management System. It also includes relevant facts

and findings, project requirements and also the project schedule and milestones. Apart

from that, a review is also conducted on existing tender management systems in the

market.

A literature review is a body of text that aims to review the critical points of

current knowledge on a particular topic. It is important process in the system

development which encompasses research and analysis on previous system, techniques

used and study on the project domain. The purpose of literature review is to fmd, read

and analyze the body of literature published on tendering and bidding system or any

works or studies related to Tender Management System. Besides that, it also discusses on

the PHP and DSS which is a vital part in constructing Tender Management System.