igg agenda 31st october 2012

47
31 st October 2012 R etailM arketD esign Service Page 1 IGG Agenda 31st October 2012 Minutes from Previous IGG Meeting 14:00 – 14:10 Review of Action Items 14:10 – 14:15 CER Update 14:15 – 14:25 Gemserv Update 14:25 – 14:35 MRSO Update 14:35 – 14:45 HSP Project Update 14:45 – 15:00 ESB Networks Update 15:00 – 15:30 AOB 15:30 – 15:45 Next Steps 15:45 – 16:00

Upload: arama

Post on 17-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

IGG Agenda 31st October 2012. Minutes. Minutes from IGG meeting 19 th September 2012 Version 1.0 For approval today. IGG Action Items. Updated IGG Action List issued in advance of meeting Actions closed since last IGG meeting: 6 IGG Actions carried forward: 3. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 1

IGG Agenda 31st October 2012

Minutes from Previous IGG Meeting 14:00 – 14:10

Review of Action Items 14:10 – 14:15

CER Update 14:15 – 14:25

Gemserv Update 14:25 – 14:35

MRSO Update 14:35 – 14:45

HSP Project Update 14:45 – 15:00

ESB Networks Update 15:00 – 15:30

AOB 15:30 – 15:45

Next Steps 15:45 – 16:00

Page 2: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 2

Minutes

Minutes from IGG meeting

19th September 2012

Version 1.0

For approval today.

Page 3: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 3

IGG Action Items

Updated IGG Action List issued in advance of meeting

Actions closed since last IGG meeting: 6

IGG Actions carried forward: 3

Page 4: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 4

IGG Actions Carried ForwardAP No Title Org

Assigned To

Due Date

809 LTNA: Suppliers to provide details on connections that qualify (include MPRNs, DUoS Group, current MIC) in order to quantify cost impact of the proposals

Suppliers 30/08/2012

814 ESBN to provide stats on Keypad installations at future IGGs

ESBN 31/10/2012

820 SMS: ESBN to investigate Data Protection Implications

ESBN 31/10/2012

Page 5: IGG Agenda 31st October 2012

CER Update

Industry Governance Group

31st October 2012

Page 6: IGG Agenda 31st October 2012

6

Retail Market Assurance Services for the Irish Electricity Market

Niemesh AminIGG 31st October 2012

[email protected]

Page 7: IGG Agenda 31st October 2012

21 September 2011 7

Assurance Activity UpdateBusiness As Usual (RMDS)

• Supplier Assurance

– Planning and scoping meetings have taken place for:

• a small supplier becoming a large supplier; and

• a new large supplier.

Page 8: IGG Agenda 31st October 2012

21 September 2011 8

Assurance Activity UpdateHarmonisation (HRDS)

Activities leading to the cut-over 28/29th October

• Performance testing review – evidence provided by HRDS

• Assurance Outcome report:

– Addendum made to the original report outlining the additional performance testing review and recommendations

– Report approved by CER on the 22nd October

Page 9: IGG Agenda 31st October 2012

9

Questions & Discussion

Page 10: IGG Agenda 31st October 2012

21 September 2011 10

MRSO Update

Gerry Halligan

31 October 2012

Page 11: IGG Agenda 31st October 2012

21 September 2011 11

Market Message 105L

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

2010 2011 2012

2010 29,969 42,601 44,792 40,470 37,163 37,689 40,398 37,114 42,961 43,152 43,611 35,899

2011 28,369 35,542 37,871 31,035 28,918 30,432 36,029 33,333 21,325 19,461 19,815 22,113

2012 16,990 22,820 25,349 20,213 24,860 21,984 21,921 21,084 21,607

January February March April May June July August September October November December

Page 12: IGG Agenda 31st October 2012

21 September 2011 12

Market Message 010

0

10,000

20,000

30,000

40,000

50,000

60,000

2010 2011 2012

2010 35,195 45,059 49,370 41,699 38,873 41,806 40,567 41,710 46,762 45,035 49,176 31,265

2011 35,629 37,899 40,477 28,747 32,688 34,577 36,818 33,783 22,052 20,093 24,687 20,960

2012 20,296 26,421 27,875 24,292 27,055 22,551 24,545 24,415 22,406

January February March April May June July August September October November December

Page 13: IGG Agenda 31st October 2012

21 September 2011 13

COS In Progress 25/10/2012 – 6,675

• Reviewed Monthly• Suppliers notified of individual

switches outstanding and reason• Switch outstanding for

Energisation or Token Meter Removal will not time-out

• Contact Customer or submit cancellation

• 12 Switches held due to an existing Open Service Order

Apr 12 4

May 12 1

Jun 12 1

Jul 12 2

Page 14: IGG Agenda 31st October 2012

21 September 2011 14

COS and CoLE

MonthExplicit

CoLEInferred

CoLETotal

CoLE Total 010% Explicit

CoLE% Total

CoLE

Jul-12 4,280 3,924 8,204 24,545 17% 33%

Aug 12 4,622 3,885 8,507 24,415 19% 35%

Sep 12 3,783 4,119 7,902 22,406 17% 35%

Page 15: IGG Agenda 31st October 2012

21 September 2011 15

Registration Rejections %

0.0%

0.5%

1.0%

1.5%

2.0%

2.5%

3.0%

3.5%

4.0%

4.5%

5.0%

2010 2011 2012

2010 2% 2% 2% 2% 3% 4% 4% 2% 2% 2% 3% 2%

2011 2.09% 2.36% 3.03% 2.68% 2.46% 2.52% 2.42% 2.55% 3.32% 3.32% 2.57% 2.43%

2012 3.45% 1.60% 2.50% 2.43% 3.72% 2.96% 1.71% 1.63% 2.51%

January February March April May June July August September October November December

Page 16: IGG Agenda 31st October 2012

21 September 2011 16

Debt Flagging

  Jul-12 Aug-12 Sep-12

Total MPRNs Received 921 665 662

Total Inferred CoLEs Returned to Outgoing Supplier 268 226 233

Returned for other reason to Outgoing supplier (Invalid MPRN, Switch Completed, Explicit CoLE) 57 22 49

Valid Debt Flags issued to Gaining supplier 596 417 380

Total Cancelled 223 207 160

Valid Debt Flags as % of total COS 2.7% 2.0% 1.8%

Page 17: IGG Agenda 31st October 2012

21 September 2011 17

Disputed Reads

259

214

164

392

260

302

137

207

185

201 197

164

120128

97

135149 149 144

172166 168

123

214

0

50

100

150

200

250

300

350

400

450

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Page 18: IGG Agenda 31st October 2012

21 September 2011 18

Total Withdrawal of 310 reads for all Suppliers

1,6621,677

924

1,354

1,764

1,587

1,283

1,390

1,292

1,512

1,793

1,181

768 749

520

943

1,163

819780

947

846

1,1491,078

1,002

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

Withdrawal of 310 Reads Withdrawals as % of Completions

Page 19: IGG Agenda 31st October 2012

21 September 2011 19

Objections - Erroneous Transfers

259

232

120

153

111

134

96 94104

78

114

79

5767 64

88

109

53

25

43 46

2635 32

0

50

100

150

200

250

300

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

No

. o

f O

bje

cti

on

s

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

No

. o

f C

oS

Co

mp

leti

on

s

No. of Objections CoS Completions

Page 20: IGG Agenda 31st October 2012

21 September 2011 20

Objections

  Jul-12 Aug-12 Sep-12

No. of Objections 26 35 32

Cancellations from Objections 21 26 28

 

Objection Emails to MRSO 16 6 9

Reasons:

Uncontactable by phone 2 1 -

Written communication 5 - 4

COS Confirmed 9 5 5

Other  - - -

Escalation Emails 9 1 2

Page 21: IGG Agenda 31st October 2012

21 September 2011 21

Email Encryption • Clear text email not secure

– subject to malicious interference

• Best practise is encrypt for sensitive or personal data

• Alternative option is use a type of Gateway to Gateway email encryption such as Transport Layer Security (TLS)

• ESB have the facility to set up TLS links between ESB and specific external email Domains

• In order for this to work effectively these Domains must also have a TLS enabled email gateway

Page 22: IGG Agenda 31st October 2012

21 September 2011 22

Benefits of TLS• Stronger Security - Encrypts every part of all messages

When using TLS the text of the email and the attachment are encrypted this offers stronger security than simply using a product like Axcrypt or Winzip which will encrypt the email attachment but not the email text.

 • Automated Encryption

TLS offers Gateway to Gateway email encryption which means that all emails sent from the ESB Domain to nominated external Domain(s) will automatically be encrypted, this removes the manual encryption step necessary when encrypting email attachments. 

 • Cost

There should not be any additional costs where the mail Gateway already uses TLS technology.

Page 23: IGG Agenda 31st October 2012

21 September 2011 23

ROI HSP Project Update

Page 24: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 24

RMDS Update

Retail Market Design Update

Aileen O Connor, RMDS

31st October 2012

Page 25: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 25

WP001 Message Resend Working Practice

Basis for amendment:The new Tibco based EMMA has the additional

functionality of an Archive folder

Therefore messages received on the EMMA will be stored there unless they have been deleted

Instances of message resends should therefore be the exception

At Today’s IGG Meeting:Approval for WP001 V1.4 Requested

WP01 V1.4

Page 26: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 26

Messages which have been received to the EMMA but subsequently deleted from both the inbound and archive folders will be treated on a case by case basis.

In some instances the message can be re created and resent

For situations where the MP has lost previously received messages, there are a number of methods which may be used depending on the scenario; NMS can resend the XML via an email The EMMA database can be updated to allow a the message

with the same transaction reference number to be resent.

Basis of amendment to Message Resend Working Practice WP001

Page 27: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 27

Screen shot of archive folder structure

As this is a windows based application, normal windows searching will work.

Page 28: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 28

How to search using the Webform

The Webform User Guide also references the search functionality

Page 29: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 29

MCR 1130 V1.0 – Introduction of Essential Plant into the Market Design

Market Change Request DR raised to present Working Practice 0022,which

details the procedure for the De-Energisation of Essential Plant Sites.

DR Approved at IGG meeting of 19th September 2012.

At Today’s IGG Meeting:

Approval for MCR 1130 RequestedMCR 1130

Page 30: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 30

DR 1124 V1.0 - Sending of MM116N only where Customer Name is Different on MM010 and MM016

Discussion Request

Classified as Jurisdictional Specific at HWG meeting on 19th September & discussed at IGG meeting on same date

Consensus not reached DR put on hold & Suppliers requested to forward feedback confirming

their support or otherwise for DR Feedback received from three MPs to date indicates no support for DR

Options to consider:

A. Refer to CER for decision on whether to progress DR

B. Withdraw DR

DR 1124

Page 31: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 31

Harmonised Market Release 2013

Revised date for June 2013 to be agreed with all parties i.e. NIE, ESBN, and Market Participants

Influencing factors in relation to the June 2013 date: Requirement for delivery of Automated Debt Flagging Solution for RoI Delay to Go-Live date for H&SP Potentially one Release only feasible in 2013 Cognisant of MPs preference for not at month end however Consideration needs to be given to fact that this is the lst Harmonised

Release Date for availability of schema changes to be agreed

Revised date for Approval by Regulators at HSG 14/11/2012

HWG MPs requested to forward feedback on proposed new date to HRDS by 6/11/2012

Page 32: IGG Agenda 31st October 2012

31st October 2012 Page 32Retail Market Design Service

Harmonised Market Release 2013

Prioritisation of approved MCRs Contact names to be forwarded to HRDS not later than 1st November List of MCRs to issue from HRDS by 2nd November Lists will contain schema and non-schema RoI MCRs CDA will manage the non schema NI changes

Ranking of MCRs Rank in order of preference i.e. 1 – 8 [7 schema and 1 non schema change] Items for which MPs have no preference should be scored as 0 Points will be assigned based on MP rankings – 8 points for 1st ranked, 7 points

for 2nd ranked etc Analysis will be performed once results are returned to HRDS

N.B Highly ranked MCR in no way assumes automatic implementation

Lists of prioritised MCRs to be returned to HRDS by 8th November

Page 33: IGG Agenda 31st October 2012

31st October 2012 Page 33Retail Market Design Service

Harmonised Market Release 2013

Prioritisation of approved MCRs

DSOs will carry out impact assessment on the ranked MCRs

Consideration for: Development Size Development Synergy Regulatory Requirements

HRDS will present all results of prioritisation exercise at a workshop co-ordinated by HRDS.

If workshop deemed not necessary, some other form of communication will be agreed to inform MPs of the agreed release package

Approval required from Market Services Board and Regulators

Page 34: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 34

Harmonised Market Release 2013

Approved RoI Schema & Non Schema MCRs

MCR No. Version Request Description

MCR 1096 V3.0

Customer Service Special Needs – expansion of ROI code set to align with NI practice

MCR 1111 V2.0 Automated Debt Flagging Solution

MCR 1122 V2.0

Introduction of Flag into the Market Design to identify Sites with Essential Plant

MCR 175 V4.0 New Reject Reasons for Address Change Rejection

MCR 176 V2.0 E-mail Address validation

MCR 69 V1.0

Mod to XML schema to allow Market Participants communicate with full Irish Character Set

MCR 73 V3.0 Proposal to make first name mandatory on market messages

MCR 1033 V3.0

Add Market Participant Business Reference to response Market Messages from ESB Networks

Page 35: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 35Page 35

RMDS Customer Satisfaction Survey

Follow-Up Actions

Page 36: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 36

RMDS Actions

Action Target Date

Investigate inclusion of a separate Section for Releases on website Q4 2012

Increase the score of 78% for Communication/Information on Releases

Q4 2012

Include Receipt acknowledgement and information following submission of online DR

Q4 2012

Overall Improvements to Change Control Section Q4 2012

A dedicated search page for RMDS Website and investigate other alternatives for document storage.

Q4 2012

Page 37: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 37

(1 of 3) “Include Receipt acknowledgement and information following submission of online DR”

• Immediate confirmation of a submitted Discussion Request by email containing full contents of DR.

• New, more detailed “Raise a Discussion Request Online” form.

• Appropriate Help tips for those submitting a DR.

Page 38: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 38

(1a of 3) “Include Receipt acknowledgement and information following submission of online DR”

Page 39: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 39

(2 of 3) “Overall Improvements to Change Control Section”

• Filtering of all MCRs, DRs, Defect Resolution Requests and SEM Market Change Requests

• Quicker navigation to known subpages

Page 40: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 40

(2a of 3) “Overall Improvements to Change Control Section”

Page 41: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 41

(3 of 3) “A dedicated search page for RMDS Website and investigate other alternatives for document storage”

• Upgraded Search software installed

• New search tips page

• New “Documentation” Tab provides a “1-Stop Shop” for all the links to where

Documents are on the RMDS website.

Page 42: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 42

(3a of 3) “A dedicated search page for RMDS Website and investigate other alternatives for document storage”

Page 43: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 43

(3b of 3) “A dedicated Documentation Tab for RMDS Website and investigate other alternatives for document storage”

Page 44: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 44

IGG Meeting

AOB

Page 45: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 45

Next Steps

Diary dates for last IGG meeting of 2012:

Wednesday 5th December 2012 – Dublin

Dates included on Calendar of Events on RMDS website www.rmdservice.com

Page 46: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 46

Next Steps

Diary Dates for last Conference Calls of 2012:

Thursday 20th December 2012

Dates included on Calendar of Events on RMDS website www.rmdservice.com

Call details are as follows:

LoCall: 0818 301 111

Local Access: +353-(0)1- 664 8888 Guest Passcode (Pin):167172

Page 47: IGG Agenda 31st October 2012

31st October 2012 Retail Market Design Service Page 47

Thank You