Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
1
Failure to
conduct meeting
on schedule
Governance
&
Management
Staff are divided into
two shifts. Moreover,
teachers teach till 2 pm
even on Thursdays.
Because of these,
committee members
may have difficulty of
coming together to sit
for a meeting.
Possible
This may delay
the approval of
documents
Real time
clarification of
business
pertaining to ELC
operation may
not be possible
Decisions made
without a quorum
will not be valid.
Moderate
Maximize the use of
communication media
available at the college.
Identify the availability of all
members by looking at each
individual’s timetable, and set
the meeting on the day and
time when all members are
available.
Coordinate with the
Timetabling Committee to
allot one common free slot for
meetings.
ELC
Committee/Leve
l/Program
Coordinators
September
to June 2018
2
Inadequacy in
the number of
research papers
(in-house) for
the ELT
JOURNAL
Governance
&
Management
There may be
difficulty in
convincing the staff to
contribute research
papers. This will
negatively affect the
content and timely
publishing of ELT
Journal.
Possible
This will affect
the content and
the publication of
the Journal on
time.
Major
To request the Staff
Development Committee to
encourage teachers who do
workshop or presentation to
submit their material in the
required format for publishing
in the journal.
Website and
Publication
Committee
November
2017
3
Inadequacy in
the number of
articles for the
ELC Newsletter
Governance
&
Management
Lack of interest from
staff and students to
submit articles will
lead to insufficient
number of articles to
be published in the
ELC Newsletter.
Possible
This will affect
the content and
the launch of the
Newsletter on
time.
Major
Request coordinators to
coordinate with the staff to
contribute and to create
awareness among students
through level meetings.
Website and
Publication
Committee
November
2017
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 2 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
4
Inadequacy in
monitoring the
implementation
of the ELC Risk
Management
Plan.
Governance
&
Management
Due to the large
number of ELC
Committees, the RMC
might not be able to
closely monitor the
implementation of the
ELC RMP.
Likely
This will affect
the timely
submission of
reports.
Major
Develop a mechanism for
monitoring the implementation
of the ELC – RMP.
Risk
Management
Committee
December
2017
5
Delayed
approval of the
ELC Risk
Management
Plan (RMP).
Governance
&
Management
Committee Heads and
Coordinators may not
be able to submit their
respective Risk
Management Plan on
time.
Likely
This will impede
the timely
implementation
of the ELC –
RMP.
Moderate
Divide among the RMC
members the task of assisting
the committees in the
development of their
respective Risk Management
Plan (RMP).
Closely monitor the
development of the RMPs of
the committees.
Risk
Management
Committee
October
2017
6
Discrepancy
between the
desired
outcome and
the result of
evaluation on
the
implementation
of the existing
Governance
&
Management
Staff failure to
complete Feedback
on time re:
Awareness on
Approved Policies
and Effectiveness
on Implementation
of Policies and
Procedures.
Possible
Delay ELC-
PMC in
submitting
Annual Report
and submission
of evidence for
Self-
Assessment
Group Report
Writing
Critical
Coordinate with MOODLE
Team on the Status of the
Feedback
Coordinate with Data Mgt
Committee on completing
the Report
ELC-PMC
Data Mgt.
Committee
End
of
Sem
1
(2017
-
2018)
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 3 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
policies and
procedures Newly arrived staff
may not be properly
informed with the
ELC policies and
procedures in the
beginning.
Likely
May affect the
result of the
awareness and
satisfaction rating
of the
effectiveness of
implementation
of Policies and
Procedures
Critical
Orientation should be given to
the new staff and a follow up
is to be made compulsory to
check the improved work
behaviour of the staff
ELC-PMC &
Staff Induction
Committee
End of
AY
(2017-
2018)
Staff/Committee
Heads may fail to
follow the existing
Policies and
Procedures
Management
Framework
Possible
May affect the
satisfaction rating
of the
implementation
of Policies and
Procedures
Critical
Provide Awareness Program
of the existing Policies and
Procedures Management
Framework
ELC-PMC and
IQAC
End of
AY
(2017-
2018)
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 4 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
7
Unable to
submit the
required reports
/documents on
time
Governance &
Management
Some planned
activities like planning
& conducting surveys
might not have been
implemented.
Circumstances may
delay the submission
of ELC
committee/coordinator
reports which will
eventually affect the
preparation and
submission of ELC
reports to the College
Council/QAU.
Almost
Certain
This will affect
the Operation of
the center.
Preparation of the
relevant
documents such
as Operational
Plans,
Department
Action Plan, OP
Achievement
Report, Annual
report and etc.
will be affected.
Major
Assign committee members to
different operational/strategic
areas to closely monitor and
assist in the implementation of
Plans.
IQAC
Coordinator
Throughout
the
Academic
Year
Governance &
Management
Delay in the collection
of data Possible
This will delay
the completion of
reports and the
implementation
of the suggested
improvement
actions.
Major Fixing submission dates and
sending frequent reminder.
DMC
Coordinator and
members
October
2017
Governance &
Management
Lack of time to
prepare the reports. Possible
This will delay
implementation
of the suggested
improvement
actions.
Major Proper planning
DMC
Coordinator and
members
October
2017
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 5 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
Governance
&
Managemen
t
The computers
provided to the
supporting staff at
registration office are
very old and slow.
Almost
certain
This will impede
the timely
completion of
work at the
registration office
Major
Provide computers with
sufficient/up-to-date
configuration
ELC
Administration
By the
end of
current
semester
Governance
and
Managemen
t
This is a newly
established committee,
so the members of the
committee are not very
familiar with some
documents or reports
to be submitted.
Possible
This will delay
the completion of
related reports
and the
implementation
of the suggested
improvement
actions.
Major To coordinate with the IQAC
for orientation.
I&CE
Coordinator
Novemb
er 2018
Governance
and
Managemen
t
There may be a
delay in the
submission of
required documents
from the key
personnel. Without
the necessary
documents,
comprehensive
reports won’t be
submitted on time.
Almost
Certain
Acting on the
suggestions for
improvement
will also be
delayed. This
will greatly
affect the
operation of the
center.
Preparation of
Audit Portfolio
will also be
adversely
affected.
Major
To inform the concerned
committee heads/
coordinators to prepare the
required documents
GFP-WG
Members
Septemb
er 2017
to March
2018
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 6 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
8
Lack of
awareness of
the content
of all the
documents
relevant to
the allotted
scope of the
GFP Audit.
Governance
and
Management
Group members
may have different
interpretations of
the content and
scope of the GFPA
related documents
Possible
This will
create
confusion to
the members
as to what
documents
will be
prepared.
This may
produce
analogous
documents.
Moderate
To conduct a meeting or
brainstorming with the
GFP-WG to address the
issues.
GFP-WG
Coordinator
When
necessary
9
Inconsistency in
the forms used
in the center.
Governance &
Management
Some forms are not
duly submitted for
review.
All proposed forms or
documents need to be
cross checked or
reviewed to ensure
that they are aligned
with the OP KPIs.
Almost
Certain
There will be an
inconsistency in
the results. Some
of the targets
might not be
achieved.
Major
Inform all concerned
committees to submit all
proposed forms to the IQAC
for review.
Implement mechanism to
follow-up on the procedures
Head of Center
Throughout
the
Academic
Year
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 7 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
10
Inadequacy of
the health and
safety
awareness and
training
program.
Governance
and
Management
The health & safety
awareness and training
program may not be
successful due to:
unavailability of
resource persons;
and
unavailability of the
required equipment
for training.
Likely
Lack of
awareness in
relation to H& S
Moderate
Coordinate with the Staff
Development Committee
regarding the need for the
program.
Coordinate with the College
Health & Safety Committee
Health &
Safety
Committee
Throughout
the
academic
year.
11
Inadequacy of
inspection
report.
Governance
and
Management
There is a lack of
specialized people to
conduct inspection.
Likely
Not able to know
what needs
consideration
from
Administration
Moderate
Request for H&S related
training.
Establish linkage with other
agencies for possible provision
of assistance for effective H&
S inspection.
Health & Safety
Committee
Throughout
the
academic
year.
12
Lack of proper
coordination
between
Examination
Committee and
Level
Coordinators
teachers and
students
Governance
and
Management
Level coordinators are
the executives and the
representatives of their
respective levels. They
are responsible for
course planning,
implementation,
monitoring and
evaluation, but they
have no role in matters
related to assessment.
For instance, Level
Coordinators and the
teachers are not
consulted on ToS,
change in exam
Almost
Certain
Assessment
differs from
teaching. This
leads to lack of
trust and creates a
hostile
environment in
the Centre.
Critical
Level coordinators should
represent their respective
levels in Examination
Committee meetings.
Involve teachers and
students in the preparation
of Table of Specifications
for exams.
ELC
Administration
Current
semester
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 8 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
schedules, change in
assessment
procedures, etc.
13
Lack of
coordination
between PFP
and GFP
timetabling
poses
challenges in
timetabling.
Governance
and
Management
Course plan of post-
foundation programme
is not shared with the
Timetabling
committee.
Post–Foundation
classes scheduled in
ELC building do not
appear on Lantiv
timetables and they
clash with foundation
schedules.
Possible
Clashes between
GFP classes and
PFP classes
Moderate
Establish a mechanism for
preparing timetables for both
General Foundation Program
and Post-Foundation Program
classes.
HoS ELP,
PFC
GFPCs
ELC - TC
Every
semester
14
Network failures
during mostly
required
moments
Governance
&
Management
Network problems and
failures make the flow
of work at the
registration office
difficult at certain
most needed occasions
like admission and
registration times
Almost
certain
This will affect
the timely
completion of
work related to
registration
department
Major
Request ETC through ELC
Administration to increase the
speed and quality of the
network
ELC
Registration
Office
Educational
Technology
Center
By the end
of the
current
semester
15
Lack of required
reports and links
in CIMS
Governance
&
Management
Some reports and links
required to access
necessary data of the
students are
unavailable in the
Ministry System.
Almost
certain
Delayed
submission of
comprehensive
reports.
Major
Request through College
Registration Department to
update the CIMS with
necessary changes.
ELC
Registration
Office
College
Registration
Department
By the end
of current
semester
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 9 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
16
Inadequacy of
the invigilation
schedule
Governance
&
Management
ELC registration staff
don’t get information
about the teachers who
are on leave before the
preparation of the
exam invigilation
schedule.
Likely
Adverse effects
on the
effectiveness of
exam
invigilation.
Moderate A standardized mechanism for
preparing invigilation schedule
should be developed.
Head of Section,
English
Language
Program (ELP)
By the end
of current
semester
17
Inadequacy of
the new course
books to
achieve the GFP
Learning
Outcomes
(LOs)
Student
Learning by
Coursework
Programs
The contents and
activities in the course
book “Pathways” are
beyond the level of
proficiency of the
students. Moreover, it
does not match with
most of the prescribed
GFP Learning
Outcomes. This will
pose challenges in the
achievement of the
learning outcomes.
Almost
certain
This might
demotivate the
GFP students to
learn and result
to low level of
English
proficiency
among them.
Critical
Skill Coordinators will be
assigned for each skill and
teachers will work in “skill
groups” to prepare
supplementary materials to
fill the gaps in the Course
books and facilitate 100%
attainment of the LOs.
Employ student-centred
learning approach. Provide
supplementary materials to
help students develop their
knowledge and skills.
Skill & Level
Coordinators
Teachers
ICRC
Throughout
the
semesters
18
Low level of
English
proficiency
among students
Student
Learning by
Coursework
Programs
New assessment
specifications have
been introduced to the
General Foundation
Program. This may
pose challenges on the
part of the students and
Likely
High percentage
of failures among
GFP students
Critical
More supplementary materials
will be prepared and there will
be classes for revision before
exams. Also, remedial classes
will be conducted for those
who are interested to learn
more.
Level teachers
Throughou
t the
semesters
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 10 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
cause low performance
in all integrated skills.
Teachers will be advised to
refer to the new assessment
specifications in preparing
supplementary materials and
activities and do as many
activities in class as possible.
Level Teachers
Throughou
t the
semesters
19
Course book
material
mismatches
with the
assessment
Student
Learning
By
Coursework
Programs
Level 4 Exam is both
an Achievement test as
well as a Proficiency
test. The Course book
material does not
match with the task
types of Level 4
assessment.
Almost
Certain
Students may feel
that exams are
difficult and
unable to perform
well in exams.
Major
Prepare practice activities that
help students understand the
assessment pattern and format
of the test.
Teachers
Exam Writers
Level
Coordinators
20
Inadequacy of
some
supplementary
materials
Student
Learning by
Coursework
Programs
Some supplementary
materials prepared by
some teachers do not
meet the criteria.
Possible Faulty materials Major
Coordinate with the Staff
Development Committee to
conduct workshop on
designing supplementary
materials as per the LOs
Staff
Development
Committee &
ICRC
Beginning
of the
second
semester
21
Lack of time to
prepare and
review enough
supplementary
materials to
cover the LOs
in different
levels.
Student
Learning by
Coursework
Programs
Committee members
and staff struggle to
find time to prepare
and review all the
required materials for
different levels.
Almost
Certain
Not enough
supplementary
materials or
materials without
proper review
Major
Use the first two weeks of the
first and the second semester
entirely for the preparation of
materials.
ICRC & the
staff
Beginning
of the
semesters
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 11 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
22
Behavioral and
classroom
management
problems
Student
Learning by
Coursework
Teachers may find it
difficult to control the
class and get students
come on time.
Possible
Teachers will not
be able to finish
their lessons as
they plan.
Moderate
Students will be rigidly
assessed on their punctuality,
participation and discipline.
Level Teachers
Throughout
the
semesters
23
Excessive
absenteeism and
tardiness among
students
Student
Learning by
Coursework
Students may miss
Thursdays’ classes as
this is the first time
students finish their
classes at 2 pm and
have 3 hours on
Thursdays instead of 2
hours
Likely
Students will not
get enough
practice before
exams and might
not perform well
because of
missing classes.
Major
Students will be advised on the
importance of coming to all
the classes to do well in their
exams.
Level Teachers
Mr. Momen
(Counsellor)
Throughout
the
semesters
24
Insufficiency of
data needed to
review the
implementation
of the General
Foundation
Program (GFP)
Student
Learning by
Coursework
Students may not
respond to the
feedback questionnaire
on Moodle
Almost
certain
Non-availability
of data Critical
Apprise the students through
their representatives the aims
and importance of giving
feedback
Staff-
representatives
& student
representatives
at their
respective levels
November
2017
Student
Learning by
Coursework
Programs
Respondents may
answer the
questionnaire
perfunctorily and it
may affect the
reliability of the data
Likely
Data collected
may be
unreliable.
Major
Inform the respondents the
importance of their feedback
through staff and students
representatives
Staff-
representatives
& student
representatives
at their
respective levels
January
2018
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 12 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
25
Failure to
satisfy the
reliability
requirement for
students’
feedback on
matters related
to the course
and teaching
Student
Learning by
Coursework
Programs
Respondents may not
be capable of judging
the appropriacy of
course books,
workbooks, teacher’s
worksheets, learning
outcomes, spacing of
units/topics etc. while
giving their feedback
Possible
Data collected
may be
unreliable.
Moderate
Ensure that students
understood the questions in the
feedback tool.
Monitor and review the
feedback collected from the
student representatives on the
course, course delivery, course
assessment and resources.
Staff-
representatives
at each level
March
2018
26
Continuous
classes hinders
the learning
ability of
students
Student
Learning
By
Coursework
Programs
Due to shift system,
students have 5
continuous periods in
a day. It is affecting
their learning ability.
Students lose
concentration and
cannot focus on their
studies.
Likely
It affects the
student’s learning
ability.
Major
General Foundation
programme should run in a
single shift.
Classes for all levels should be
scheduled from 8 am to 3 pm
with some free slots within the
shift.
Head of
Centre
ELC
Timetabling
Committee
Last
Week of
current
semester
27
Shortage of time
to cover the
course
Student
Learning
By
Coursework
Programs
The course book
material does not fit
comfortably in the
time available for the
course.
Likely
Unable to
develop the
student's
knowledge and
skill.
Major
Adjust the program
structure.
There should be only two
semesters in an academic year.
ELC
Administration
Every
semester
28
Constant
replacement of
teachers is
affecting
student’s
learning
Student
Learning
By
Coursework
Programs
Students register in a
group with a choice of
teachers.
Changing of
foundation teachers
even after the
commencement of
classes.
Likely
Replacing
teachers after
students’
registration
defeats the
whole purpose
of online
registration.
Major
Teachers’ allocation should
be planned properly.
Math HoS &
Coordinator
Last week
of every
semester
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 13 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
29
Lack of safe
lockers and
shredders for
the examination
Committee
Student
Learning by
Coursework
Programs
The committee needs
lockers with keys to
keep the exams safely.
The committee also
needs shredders to
destroy the discarded
drafts of the exams
confidentially.
Possible
Affects the
security and the
confidentiality of
the exams
Critical
Request for safe lockers and
shredders from the college
administration through the
ELC Administration
Examination
Committee &
College
Administration
ASAP
30
The lack of a
suitable
recording room
Student
Learning by
Coursework
Programs
The listening scripts
are recorded in the
meeting room and it
affects the quality
since students and
staff are around
making noise. Also,
the system is not very
suitable for recording.
Likely
Affects the
quality of the
listening exam
tape scripts
Major
Request for a proper recording
room from the college
administration through the
ELC Administration.
Examination
Committee &
College
Administration
asap
31
No common
free slot for
voice actors for
recording.
Student
Learning by
Coursework
Programs
The new timetable
demands teachers to
teach till 2.00 on
Thursdays too and it
makes the committee
difficult to arrange a
common free slot for
recording.
Almost
Certain
Affects the exam
dates Major
Identify possible voice actors.
Request for a common free
time slots on Thursdays for
voice actors and exam writes.
Examination
Committee
Timetabling
Committee
During
timetable
preparation
32
Lack of
common time to
conduct staff
development
program
Staff & Staff
Support
Services
Shift system does not
allow to have a
common free slot for
all teachers.
Possible Staff gathering is
difficult Moderate
Allot a common free slot for
all teachers on a specific day
of a week.
HoS, ELP
TC, ELC
Last
week of
current
semester
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 14 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
33
Unable to
submit the Staff
Appraisal
Consolidated
Report to the
ELCC
Staff and
Staff
Support
Services
Late submission of
the duly-filled staff
appraisal form from
the administrators,
key personnel and
the teachers.
Possible
This will affect
the timely
preparation and
distribution of the
Individual Staff
Performance
Appraisal Report.
Major
Level and Program
Coordinators should
disseminate deadlines earlier
and inform the teachers to
adhere to it.
Staff Appraisal
Committee
Coordinator
Level/ Program
Coordinators
May 2018
34
Lack of
awareness
among staff
Research and
Consultancy
The staff may not be
aware of the research
activities conducted in
the Centre.
Likely
The research
targets may not
be fully
accomplished.
Major
Posting relevant information
on the website.
Sending mails to the teachers
informing them of the events
and activities.
RCC
Coordinator and
members
Throughout
the
Academic
Year
35 Lack of funding Research and
Consultancy
Since there aren’t any
dedicated funds to the
research wings of the
college, it is difficult
to organize activities
that involve external
resource persons.
Possible
A few research
projects that
require funding
may not be
carried out.
Moderate
The Centre needs to
channelize their existing funds
in such a way that RCC gets
some funds to conduct
activities that involve external
resource persons.
ELC Admin
1/12/17
36
Deficient
Motivation and
Less
Participation of
the Faculty
Researchers
Research and
Consultancy
Research doesn’t seem
to be one of the top
priorities of the
Center. Only a few
teachers participate in
research activities.
Likely
There will be
fewer research
activities in the
Centre.
Moderate
To submit a proposal for
giving rewards to deserving
research articles.
RCC
Coordinator 1/6/2018
37 Laxity in
monitoring.
Student &
Student
Reports on monitoring
either from the Level
Coordinators or the
concerned heads have
Almost
Certain
This will
negatively affect
the whole
implementation
Major
The Form designed by Miss
Susanne and concurred by the
Level Coordinators will be
used.
Level
Coordinators Year-round
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 15 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
Support
Services
been relaxed as
compared to the first
semester of
implementation of the
ASP.
of the program
since teachers are
naturally pushed
when the
monitoring is
intensified.
HoS for C and
TM
38
Students’ poor
attendance in
actual
remediation
classes
Student &
Student
Support
Services
Students lack of
interests leads to poor
attendance in remedial
lessons which may
lead to not achieving
the LOs, failing the
exams, and high
retention rate.
Almost
Certain
This will impede
the objective of
the program in
particular, and the
Centre in general
because they are
the main
recipients of the
program.
Subsequently,
their absence will
mean non-
implementation
of the ASP’s
vision of helping
underachievers.
Major
An intensive counselling
process by the counsellors and
the skill teachers shall be
manifested.
Intensive monitoring on the
extent of implementation on
this factor shall be done.
Skill Teachers
Counsellor
Level
Coordinators,
HoS for C &
TM
Year-
round
39
Lack of free
slots to conduct
co-curricular or
Extra-curricular
activities
Student and
Student
Support
Services
Due to continuous
classes in both the
shifts, the Centre is
unable to provide free
time for students.
Likely
Cannot carry out
co-curricular or
extra-curricular
activities.
Major
Allot a common free slot for
all students on a specific day
of a week.
HoC, ELC
TC, ELC
By the end
of 1st
Semester
40 Inappropriatene
ss of utilized
Student &
Student
Non validation of TMs
- As a result of
empowering teachers
to design their own
Likely The
inappropriateness
of teaching due to
Minor
Skill teachers should prepare
the TM a week before the
actual remediation class and
submit the material to their
Skill Teachers
A week
prior to the
conduct of
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 16 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
ASP Teaching
Materials (TMs)
Support
Services
TMs for the Academic
Support Program
(ASP), TM’s
validation is not
addressed and the
reliability of the
material is not
determined.
Non-analysis of the
level of difficulty of
TMs
Teacher’s lack of
interest in creating
appropriate materials.
non-validation
and the absence
of addressing an
appropriate TM,
i.e. based on their
level will
negatively affect
the teaching-
learning process
and in effect will
not serve the
purpose of
remediation.
The non-
creativeness of
teacher’s way of
designing TMs
will also have a
negative impact
to
underachievers.
Level Coordinator for expert
validation.
An orientation of designing
TMs for slow learners can be
conducted through a level
meeting. It will emphasize the
use of chunking method and
the simplification of language.
For teacher’s lack of
creativeness in TM
development, a common folder
shall be designed by selected
lecturers so teachers can
readily use ample validated
TMs. Prior to this task, a
committee on TM’s
development and validation
shall be formed.
Level
Coordinator
remediation
classes.
41 Unable to utilize
some available
resources
General
Support
Services and
Facilities
Some available
resources can be used
in a better way. EL
108 is used as a store
room. EL 206 is
allotted to Registration
Office. These rooms
can be used as regular
classrooms.
Possible
ELC resources
are not properly
utilized.
Moderate Needs proper planning of
available rooms in the Centre
HoS, ELP
ELC
Timetable
Committee
Last
week of
current
semester
Ibra College of Technology
ENGLISH LANGUAGE CENTRE
Risk Mitigation Report
A.Y. 2017-2018
ICT/ELC/Area: Governance & Management /Risk Mitigation Report/AY 2017-2018 Page 17 of 17
GM-Form-01-03
Item
No. Risk Area Description
Likelihood
Rating
Risk
Consequence
Consequence
Rating Suggestion for Mitigation Responsibility Target Date
42
Writing in the
new course
book
General
Support
Services
and
Facilities
Students might write
in the original books
given to them and this
will make the books
useless after one
semester.
Likely
The books cannot
be used again for
the coming
semesters.
Critical
Students are advised not to
write in their books and they
will sign an undertaking to
keep the books clean.
Level Teachers,
ELC Admin
The
beginning
of each
semester
43
Persistent
problems
with classroom
resources
General
Support
Services and
Facilities
Every semester
classroom resources
(e.g. ACs, projectors)
fail to work properly.
Likely
This adversely
affect teaching
and learning.
Major
Incidents should be reported
immediately.
A status report on the
resources should be prepared
on a regular basis.
Learning Resources should be
monitored and maintained
efficiently.
Teachers
Learning
Resources
Committee
ELC
Administration
Maintenance
Department
Throughout
the
semesters
Unable to schedule
classes in some
classrooms (EL 318)
due to issues with
classroom resources.
Likely
ELC resources
are not fully
utilized.
Major
Communicate the urgent need
for complete overhaul of
classroom resources in
general, and ACs in particular.
Timetabling
Committee
HoC, ELC
Maintenance
Dept.
1st Semester
44
Lack of full
time medical
facilities at the
Centre
General
Support
Services
and
Facilities
College Clinic opens
from8 am – 3 pm only.
There are instances
when some students
passed out and
required medical aid
after 3 pm.
Likely
May lead to an
emergency
situation
Major
The Center should have
facilities for providing first-
aid, a wheelchair and a
stretcher. Staff should get
some training on first-aid.
ELC
Administration Immediately