1. PROPOSED POSITION
: Mechanical Engineer
2. NAME
: ASMADI 3. DATE OF BIRTH
: September 8, 1957
4. NATIONALLY
: Indonesia
5. EDUCATION
: Mechanical Engineer, Technical Faculty of
Sunan Giri University, Surabaya Indonesia.
6. OTHERS TRAINING
: Technical Training Course in the field of
Value Engineering, Cost Control, Editing
Design and JIG Indonesia Jan,1990
Training Course in the field of leader ship
Professional management, Indonesia
March, 1996
7. LANGUAGE AND DEGREE
: Indonesia - Mother tongue
OF PROFICIENCY English - Excellent
8. MEMBER SHIP OF
: Member of Indonesia Society of Engineer PROFESSIONAL
9. EMPLOYMENT RECORD
:
From Nov, 1999 up to 2009Employer.
: Dinas Pekerjaan Umum (PU)Position held and Description of
Duties. Detailed design of the hydro mechanical
Works Reviewed the contractor's.
Construction schedule, equipment schedule
for mechanical works.
Supervised and evaluated of the
contractor's construction works and
prepared methodology of heavy equipment
operation in connection with installation of
the sluice gate.
Calculation the bill and quantities of the
Hydro mechanical equipment.
Supervised and monitoring of the works
Progress, daily, weekly, monthly and
prepared progress report to be submitted to
team leader.
10. DETAILED TASK ASSIGNED IN WORK UNDERTAKEN WHICH BEST
THIS PROJECT. ILLUSTRATES CAPABILITY TO HANDLE THE
TASK ASSIGNED.
1. To review the contractor's
Construction program for
mechanical works including
review design and assembling
at the factory.
2. To review contractor's schedule
on equipment, manpower, and
material arrangement for
mechanical works and to check
works efficiency periodically
3. To supervise the quality control
By the contractor for mechanical
works at working site and at the
factory in co-operation with the
Government project office.
4. To prepare daily, weekly and
Monthly quality control report of
mechanical works and to submit
to the team leader.
PLTA Ir. H. Juanda Project : 5x32.6 MW 1 x 25 MW
Employer : PJT
Client : Pt. Catur Bina
Oct, 08-2012 up to March ,30-2013 6 monthResponsible for Special Study and Rehabilitation of Hydromechanical Electrical.
Turbine and Access.
: 6 Units
Intake and Maint. Gates: 8 Units Hollow Jet Valve.
: 2 Units Tower crane.
: 2 Units Stop log
: 8 Units
Draft Tube Gate.
: 4 UnitsHis duty covered :
(1) Supervised and quality control of the
contractor's construction works for steel
conduit or penstock construction.
(2) Prepared methodology of heavy
equipment operation in connection with installation or replacement of the steel slide gate, rubber. Draf tube gate include WPS and PQR. etc.
TOMO Irrigation Project Employer : PU
Client : Pt. Kalini P
Sept, 02-2012 up to Oct, 04-2012 1 month Welding Engineer.
Responsible for review welding and quality
control (QA/QC) of the mechanical works :
Steel penstock 1600 mm in diameters x 200 meters. His duty covered :
(1) Supervised and quality control of the
contractor's construction works for steel
conduit or penstock construction.
(2) Prepared methodology of welding operation in connection with installation of the steel penstock include WPS and PQR. etc.
Asahan I PLTA Project : 2 x 90MW Employer : PT. Bajradaya
Jan, 26-2009 up to Aug,30-2012 43 months
Mechanical Engineer.
Responsible for review design and quality
control (QA/QC) of the mechanical works :
- Turbine and Accessories : 2 Units - Draft Tube Gates : 2 Units - Steel Liner or Penstock: 6.2 mx600m l - Butterfly Inlet Valves : 2 Units
- Stop Logs
: 6 Sets
- Intake gate
: 1 Unit
- Racking equipment
: 1 Unit - Hollow Jet Discharge Valve : 1 Unit
- Over Head Crane
: 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, Turbine etc.
(4) Calculated the bill and quantities of the
Dam hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Ponre-Ponre Dam Project South Sulawesi Employer : PU
Client : Pt. Metttana
Jan 2005 up to Jan 2009 60 Months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Maintenance Gate. : 2.2x2.2m = 1 unit - Intake Gate and Hoist : 2.2x2.2m = 1 unit - Intake gate for siphon pipe 3 x3m = 2 Units - Siphon Steel Pipe : 1.60 m x220 m - Trash Rack
: 4x4.5 m = 1 Unit - Flushing gates and Hoist 1.5x1.5m = 2 Units
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, siphon pipe.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Pelaparado Dam NTB Project Employer : PU
Client : Pt. Mettana
June 2000 up to April 2004 30 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate and Hoist. : 2.2x2.5m = 1 Unit - Steel penstock : 2.0 m x 200 m - Trash Rack : 2.2x5.5m = 1 Unit - Bonneted Slide Gate : 2.0x2.0m = 1 Unit - Jet Flow Gate and Monorail hoist : 0.6m
- All Electrical
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, penstock, etc.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Benanain Weir NTT Project Employer : PU
Client : Pt. Mettana
April 2002 up to Dec 2004 20 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate, - Flushing Gate and Hoist : 1.5x 1.5m = 2 Units - Trash Rack : 5.0x12 m = 1 Unit - Regulating Gate and Hoist : 2.5x2.0m = 2 Unit - Upper and Lower Gates : 2.0x2.0m =3 Units
- Monorail Hoist : 1 Unit - All Electrical
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, Electrical, etc.
(4) Calculated the bill and quantities of the
Dam hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Tilong Dam NTT Project Employer : PU
Client : Pt. Mettana
Feb 2000 up to April 2002 26 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate and Hoist. : 2.0x2.0m = 1 Unit - Steel penstock : 1.2mx 250m - Trash Rack : 2.2mx4.5m = 1 Unit - Bonneted Slide Gate : 1.5x1.5m = 1 Unit
- All Electrical
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, penstock, etc.
(4) Calculated the bill and quantities of the
Dam hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Batu Bulan Dam NTB Project Employer : PU
Client : Pt. Mettana
Nov 1999 up to Dec 2002 25 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate and Hoist. : 2.0x2.0m = 1 Unit - Flushing Gate and Hoist : 1.5x1.5m = 1 Unit - Trash Rack 2.0x3.5m = 1 Unit - Jet Flow Gate : 0.7m - Bonneted Slide gate : 2.0x2.0m = 1 Unit
- Monorail Hoist : 1 Unit
- Turbin (Micro Hydro) Lonyok 50 KW
- All Electrical
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates, Electrical, etc.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Telaga Tunjung Dam Project (Design) Employer : PU
Client : Pt. Binakarya
July 1999 up to Oct 1999 4 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works : - Steel Conduit
- Trash Rack
- Bonneted slide gate - Stop log
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Prepared methodology of heavy
equipment operation in connection with
installation of the steel conduit.
(3) Calculated the bill and quantities of the
hydro mechanical equipment. Sangiran Dam Project Employer : PU
Client : Pt. Binakarya
February 1999 up to May 1999 4 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works : - Stop log : 1.5x1.5m = 2 Units - Bonneted slide gate : 1.25x1.25m = 2 Units - Electrical - Monorail Hoist : 1 Unit His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the steel conduit.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Flood Semarang Project (Design) Employer : PU
Client : Asia Pasific
October 1998 up to Jan. 1999 4 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works : - Trash Rack and Stop log - Slide Gates and Screw Pump
His duty covered :
(1) Reviewed the contractor's contraction
schedule, Design preparation, equipment
schedule for Mechanical works.
(2) Prepared methodology of heavy
equipment operation in connection with
installation of the Slide gates.
(3) Calculated the bill and quantities of the
hydro mechanical equipment.
Nawangan Dam Project : Employer : PU Client : Pt. P. Karya
June 1998 up to Sept. 1998 4 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works : - Intake Gate : 8.0x6.0m = 3 Units - Sluice Gates : 0.7x0.7m = 3 Units
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Flood Way Dam Project East Java Employer : PU
Client : Pt. P. karya
October 1997 up to May 1998 8 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Spillway Gates : (15 m x 7.5m). = 5 Units - Stop Log : (15m x 1.75m) = 5 sets - Monorail Hoist : 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Bili-Bili Multi Purpose Dam Project South Sulawesi Employer : PU/PLN
Client : Pt. Binakarya
October 1996 up to Sept 1997 12 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Spillway Gates : 12.0x 8m = 2 Units. - Guard Gate : 2.5x2.5m = 1 Unit - Steel Penstock : 3.7m x 300m - Trash Rack : 9.5mx 15m - - Slide Gate : 1.2x1.2m = 1 Unit - Bulk Head Gate : 4.5x4.5m = 1Unit
- Turbins and Accs : 20 MW
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Darma Dam Project Employer : PU Client : Pt. Binakarya
Nov 1995 up to Sept 1996 10 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate: 3.0x3.0 m = 1 Unit. - Guard Gate : 0.9m = 1 Unit : - Trash Rack : 3.5x3.5m = 1 Unit -
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the gates.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader Bila Irrigation Project South Sulawesi Employer : PU
Client : Pt. Indahkarya July 1993 up to Jan 1994 7 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate
: 3.0x2.5m = 3 Units. - Under Sluice Gate : 3.0x1.5m = 3 Units - Trash Rack : 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the Sluice gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Pertamina Plant Project at Cilacap
End of April 1992 up to June 1993
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Pressure Vessel : 15 Bar - Fuel Tank : 10000 m3 - Heat Exchanger.: 1500 m2
His duty covered :
(1) Responsible for review design and
Recommendation of the mechanical works
for tank wall & valves equipment.
(2) Evaluation of quantity and quality of steel
materials for the tank wall and valves
equipment.
(3) Determined the leaked test procedure for
quality control and their results of the
valves installation.
(4) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate installation.
(5) Calculated the bill and quantities of the
Dam hydro mechanical equipment.
Sidorejo Nyrtec Project Central Java Employer : PU
Client : Pt. Indahkarya
August 1991 up to April 1992 8 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Avio Gate (Automatic System) - Amil Gate (Automatic System) - Avis Gate (Automatic System)
- Distributor Gate
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the AVIO, and AVIS gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader
Dumpil Dam Project Central Java Employer : PU
Client : Pt. Indahkarya
Sept. 1989 up to Octl 1990 12 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Fixed Wheel Gate (10 mx7.5 m) : 5 Units - Sluice Gate and Hoist (2.5mx3.0m) : 1 Unit - Stop log (10 mx 1.6m) : 5 Units - Gantry Crane Hoist : 1 Sets
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader
Riam Kanan Weir Project Central Java Employer : PU Client : Pt. Yodyakarya Sept 1988 up to Augt 1989 11 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate and Hoist : 2.5x2.5m = 4 Units - Upper Gate and Hoist : 2.5x3.5m = 4 Units - Lower Gate and Hoist : 2.5x1.5m = 4 Units - Trash Rack : 2.0x 5 m = 1 Unit - Waste way Gate and Hoist = 3x3m = 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader
Sedadi Weir Project Central Java Employer : PU Client : Pt. Indahkarya April 1988 up to Augt 1989 15 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Intake Gate : 2.25x2.25m = 3 units - Sluice Gate : 2.25x1.5m = 3 units - Trash Rack = 1 Unit - Stop log : 2.25x1.2m = 2 sets - Monorail Hoist : 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader
Sugar Plant Project Client : Pt. Brt Ind. June 1989 up to Dec 1989 7 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Cook Pan. - - Over Head Crane : 20 Tons - Fuel Tank : 20000 m3 l - Juice Heater
His duty covered :
(1) Responsible for review design and
Recommendation of the mechanical works
for tank wall & valves equipment.
(2) Evaluation of quantity and quality of steel
materials for the tank wall and valves
equipment.
(3) Determined the leaked test procedure for
quality control and their results of the
valves installation.
(4) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate installation.
(5) Calculated the bill and quantities of the
hydro mechanical equipment. Pertamina Plant Project at Cilacap Client : Pt. Brt Ind. Feb 1988 up to Sept 1988 8 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Pressure Vessel : 50 Bar - Fuel Tank : 15000 m3
- Heat Exchanger.: 2000 m2
His duty covered :
(1) Responsible for review design and
Recommendation of the mechanical works
for tank wall & valves equipment.
(2) Evaluation of quantity and quality of steel
materials for the tank wall and valves
equipment.
(3) Determined the leaked test procedure for
quality control and their results of the
valves installation.
(4) Prepared methodology of heavy
equipment operation in connection with
installation of the intake gate installation.
(5) Calculated the bill and quantities of the
hydro mechanical equipment.
Wadas Lintang Dam Project Employer : PU
Client : Pt. Brt Ind. May 1987 up to Nov 1987 7 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
Draft Tube Gate : 2.5x 1.5m = 1 Unit
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the Draft Tube gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader
Talang Dam Project Employer : PU
Client : Pt. P. karya Nov 1986 up to March 1987 7 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Hoisting Equipment 40 tons. - Steel Slide Gate : 8x8.0m = 4 Units
- Trash Rack
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the Steel Slide Gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader. PLTU Tello Project : 2 x 12.5 MW Employer : PLN
Client : Pt. Brt Ind.
March. 1985 up to Juj. 1986 16 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Steam drum and water drum. - Steel structure and Colum. - Piping - Trash Screen
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy equipment operation in connection with installation of the Steel structure, steam/water drum.
(4) Calculated the bill and quantities of the
mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader. PLTU T. Perak Project : 2x 50 MW
Employer : PLN
Client : Pt. Brt Ind. March. 1984 up to Jun. 1985 15 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Steam drum and water drum. - Steel structure and Colum.
- Piping
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the Steel structure, colum, Piping etc.
(4) Calculated the bill and quantities of the
mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team LNG Project (ABB)
Employer : Pt. Bontang
Client : Pt. Brt Ind. Feb. 1982 up to Jan. 1984 23 months
Mechanical Engineer.
Responsible for review design and quality
control of the mechanical works :
- Pressure Vessel Equipment : 30 Bar. - Heat Exchanger 2500 m2.
- Piping
- Ducting.Piping
His duty covered :
(1) Reviewed the contractor's contraction
schedule, equipment schedule, for
Mechanical works.
(2) Supervised and quality control of the
contractor's construction works for steel
construction.
(3) Prepared methodology of heavy
equipment operation in connection with
installation of the Vessel, HE etc.
(4) Calculated the bill and quantities of the
mechanical equipment.
(5) Supervised works progress monitoring,
Daily, weekly & monthly progress report
and submitted to the Co-team leader.
116