hydrogeology supplement no. 1 groundwater mounding

14
HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING Overlake Village Regional Stormwater Infiltration Facility Redmond, Washington Prepared for: City of Redmond c/o Otak, Inc. 10230 NE Points Drive, Suite 400 Kirkland, Washington 98033 Prepared by: AMEC Environment & Infrastructure, Inc. 11810 North Creek Parkway North Bothell, Washington 98011 June 2014 Project No. 4-917-17625-A

Upload: others

Post on 16-Jan-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING Overlake Village Regional Stormwater Infiltration Facility

Redmond, Washington

Prepared for:

City of Redmond c/o Otak, Inc. 10230 NE Points Drive, Suite 400 Kirkland, Washington 98033

Prepared by:

AMEC Environment & Infrastructure, Inc. 11810 North Creek Parkway North Bothell, Washington 98011

June 2014

Project No. 4-917-17625-A

Page 2: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

AMEC Environment & Infrastructure, Inc. 11810 North Creek Parkway N Bothell, Washington 98011 (425) 368-1000 Phone (425) 368-1001 Facsimile www.amec.com \\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\OVS Supplement 1 140625.docx

June 25, 2014 Project No. 4-917-17625-A City of Redmond c/o Otak, Inc. 10230 NE Points Drive, Suite 400 Kirkland, Washington 98033 Attention: Mr. Cheyenne Covington, P.E. Subject: Hydrogeology Supplement No. 1: Groundwater Mounding with Adjacent Building Foundation Overlake Village Regional Stormwater Infiltration Facility 2525 152nd Avenue NE Redmond, Washington Dear Cheyenne:

AMEC Environment & Infrastructure, Inc. (AMEC), is pleased to submit this supplemental letter describing additional groundwater modeling for the Overlake Village Regional Stormwater Infiltration Facility. The purpose of this evaluation was to provide hydrogeologic information related to future development near the Overlake Village Stormwater Infiltration Vault. This information will be used by the City to determine if easements are needed beyond the current right-of-way to protect the infiltration capacity of the vault.

AMEC’s scope of work for this supplement included groundwater mounding analysis performed using a finite-element model of site hydrogeologic conditions. Time-series inflow hydrographs for stormwater entering the vault were provided by Otak, Inc. (Otak), and used as input to the finite-element model. Results of the model were used to predict elevated groundwater levels and pore-water pressures on a future adjacent basement due to stormwater infiltration through the stormwater infiltration vault. AMEC previously reported preliminary modeling results in our earlier Hydrogeology and Geotechnical Engineering Report, dated December 19, 2013 (Report). This supplemental letter summarizes the additional analyses performed and presents the results of those analyses.

This supplemental letter has been prepared for the exclusive use of the City of Redmond (City), Otak, and their consultants, for specific application to this project, in accordance with generally accepted geotechnical engineering practice. Please refer to the earlier Report for additional details on the modeling approach and objectives of the project.

Page 3: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

AMEC Project No. 4-917-17625-A 2 \\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\OVS Supplement 1 140625.docx

DESCRIPTION OF ADDITIONAL MODELING

The proposed infiltration vault will be constructed within the City right-of-way, under the Plaza Street. However, potential commercial development could occur adjacent to the southeast portion of the City right-of way, and development could include a deep basement, such as a parking garage. The City would like to gain a better understanding if or how stormwater infiltrating through the Overlake Village Station Infiltration Vault might be impacted by development of adjacent parcels. The purpose of this study was to simulate groundwater mounding during a major storm event, and then predict how the groundwater mounding and design infiltration rates would change with an adjacent deep basement.

The supplemental groundwater mounding analyses involved two major changes from the previous modeling:

· The two-dimensional modeling space was modified to represent a cross-section through the width of the proposed vault. This modification was possible now that the shape and size of the vault have been determined. The cross-section allowed modeling of a potential basement southeast of the vault and unrestricted infiltration to the northwest of the vault. The location of this groundwater modeling cross-section is shown on Figure S1-1.

· Time-series inflow hydrographs were used as stormwater in-flow to the vault in order to model variable-rate inflow. The previous analyses assumed a constant head of water in the vault and modeled the long-term steady-state infiltration rate through the vault. This earlier approach was used because inflow to the vault had not been determined, and because the long-term steady-state infiltration rate would represent the slowest and most conservative rate for design. The preliminary design was developed using an iterative process to determine the size of the vault. Now that the size of the vault has been determined, variable-rate inflows can be used to predict the groundwater mounding due to stormwater infiltration through the vault. Since flow into the vault may only have a short duration, steady state conditions may not be achieved, which would mean the groundwater mound may be smaller than would be predicted based on a steady-state condition.

AMEC also assisted Otak with estimated potential extra costs for waterproofing a basement due to impacts by groundwater mounding above the static groundwater elevation.

GROUNDWATER MODELING METHODS AND ASSUMPTIONS

Modeling was performed using the same finite-element code SEEP/W (Geo-Slope International, Inc.) as was used for our previous study. SEEP/W simulates water flow in variably saturated, porous media by considering the nonlinear relationships between water content, hydraulic conductivity, and matrix suction. The geometry of the model was revised from the Report. The previous model used a two-

Page 4: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

AMEC Project No. 4-917-17625-A 3 \\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\OVS Supplement 1 140625.docx

dimensional axisymmetric space, since the size and shape of the vault were not known at that time. Now that the approximate size and shape of the vault have been determined, the two-dimensional space was revised to represent a cross-section through the width of the proposed vault, as shown in Figure S1-1. This approach allowed better representation of the potential for groundwater mounding in relation to adjacent underground structures.

The soil and hydraulic properties remained the same as used in the previous model. The new cross-section model was checked by analyzing long-term, steady-state infiltration rates for constant-head water conditions in the vault and found to be equivalent to the axisymmetric model.

Most of the numerical modeling assumptions are the same as stated in the Report. The supplemental analyses were conducted using the following new or changed assumptions:

· The footprint of the infiltration vault is approximately 34 feet by 333 feet, with a 1.5-foot-wide perimeter footing and a 4-foot-wide interior wall footing encroaching into the vault footprint. Therefore, the available area for infiltration is approximately 8,960 square feet.

· The time-series inflow hydrograph was provided by Otak. We understand that Otak reviewed storm hydrograph data from a 50-year period and chose a time period of 250 hours that represents one of the maximum storage depths within the infiltration vault, since it includes a storm with a high peak flow as well as “back-to-back” storm events that create a high volume of stormwater over a short period of time.

· The flow into the vault was converted to a unit flux flow by dividing the time series hydrograph data by the vault infiltration area.

· The infiltration vault was modeled as a free-flow structure so that when inflow was greater than infiltration, water would be stored in the vault to mimic the actual design.

· The potential basement adjacent to the vault was positioned 15 feet laterally away from the vault and extended down to elevation 302 feet. The basement floor elevation of 302 feet was selected because this is 3 feet above the static groundwater table, which would allow construction above the groundwater table and provide three levels of underground parking.

· The basement was modeled as 300 feet wide so that it encompasses most of the adjacent parcel width.

· The initial condition is a groundwater table at elevation 299 feet below the center of the vault with a 0.2 percent gradient drop to the southeast (from left to right of the model cross section).

· The model domain extends 410 feet beyond the infiltration vault, which was greater than the extent of groundwater mounding for all of the analyses.

Page 5: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

AMEC Project No. 4-917-17625-A 4 \\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\OVS Supplement 1 140625.docx

AMEC collaborated with Otak on the groundwater mounding analysis so that the time-series inflow hydrograph was used appropriately as input, and the resulting variable storage volume in the vault was consistent with Otak’s stormwater analysis. Iteration of various scenarios was performed to check the analysis and design assumptions, such as:

· Calibrating the cross-section model without a basement to the previous axisymmetric model using steady-state infiltration;

· Comparing steady-state infiltration through the vault with and without a basement adjacent to the vault; and

· Comparing the differences between a 50-foot-wide basement and a 300-foot-wide basement.

For the previous study, the model was calibrated based on actual measurements from field infiltration testing, all of the analyses were performed using the calibrated soil hydraulic conductivity values to determine the static infiltration rates for head conditions within the vault of 1 foot to 18 feet. The resulting infiltration rates were reduced by the correction factor of 0.5, as described in the Report. The design correction factor was applied in reverse for the current analysis. Otak used the reduced infiltration rates to design the surface water collection area and to size the vault. Since the inflow rate is a given input, the current analyses needed to use reduced soil hydraulic conductivities to properly account for the design correction factors. The soil hydraulic conductivities were reduced by 50 percent, and steady-state analysis confirmed that the results matched the recommended design rates given in the previous Report. The reduced hydraulic conductivities create a larger (higher and wider) groundwater mound and thus yield conservative results appropriate for preliminary design.

RESULTS FROM THE GROUNDWATER MOUNDING ANALYSIS

After calibrating the cross-section model, we then added a basement adjacent to the vault and analyzed how the basement impacts the infiltration rates. We compared the long-term, steady-state infiltration rates through the vault with and without a basement adjacent to vault, using constant head water levels in the vault. As can be seen by the results presented in Table S1-1, the basement only caused a small reduction in the infiltration rate, about 6 percent for the unfactored infiltration rates shown in Table S1-1, and about 3 percent for the reduced infiltration rates used for design.

The time-series inflow hydrograph provided by Otak represented a 250-hour period (approximately 10 days) of severe storm conditions. The period was selected because of the large volume of water entering the vault over a short period of time, which represents a maximum stage within the vault near 18-foot and a severe groundwater mounding situation. The hydrograph is shown in Figure S1-2 along with the conversion to a unit influx based on the 8,960-square-foot infiltration area of the vault. These values were used as input into the hydrogeologic model.

Page 6: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

AMEC Project No. 4-917-17625-A 5 \\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\OVS Supplement 1 140625.docx

The results of hydrogeologic modeling are displayed in Figures S1-3 through S1-6 and are discussed further below.

Figure S1-3 displays pore pressure at the bottom of the vault. Because the vault is open space, it also represents the water level in the vault. The scale on the left side represents the pressure head at the bottom of the vault (or depth of water inside the vault), while the scale on the right is total head at the bottom of the vault. Notice that the total head rises from the static groundwater table up to the bottom of the vault within a few hours, meaning that the soil beneath the vault becomes saturated quickly. The pressure head greater than or close to 0 feet indicates the soils below the vault stay fully or nearly fully saturated throughout the period of the hydrograph. Water is stored in the vault for about 75 hours during the large storm events, and reaches the maximum depth (18 feet of water) for a short period of time.

Figure S1-4 displays pore pressure at the bottom of the basement wall next to the vault. The pressure head scale on the left axis is set to 0 feet at the basement floor, which is noted as elevation 302 feet on the right-hand axis. The peak pressure is approximately 18.5 feet of head above the basement floor. Note that pressure head greater than zero feet (i.e., total head higher than the bottom of the basement) has a duration of about 140 hours (6 days), which is somewhat longer than occurs in the vault, because the basement extends to a lower elevation.

Figure S1-5 displays a cross-sectional view through the vault and basement at snapshots in time. The cross-section views show the groundwater level, water level in the vault, water pressure at the bottom of the basement shown in height of water, and groundwater total head contour lines. The 20-hour snapshot shows conditions when enough stormwater has infiltrated to saturate the soil below the vault. The 99-hour snapshot shows the conditions at the peak of groundwater mounding. Notice that groundwater mounding extends the entire width of the basement, but drops in elevation to near static levels at the far side. The 215-hour snapshot shows conditions when the groundwater mound is no longer above the basement floor.

Figure S1-6 is an expanded view of the vault and basement at the peak of the groundwater mounding (99-hour snapshot). Notice that the groundwater mound rises above the basement floor and against the basement wall to an elevation of approximately 320 feet. Design of a basement at this location will need to accommodate this groundwater pressure.

CONCLUSIONS

Modeling infiltration through the stormwater vault with a time-series inflow hydrograph based on selected storm events provides a more accurate prediction of the elevations and durations of groundwater mounding. The results of our analyses predict that groundwater will rise significantly near

Page 7: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING
Page 8: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Seepage Analysis Results.xlsx

Overlake Village Regional Stormwater FacilityRedmond, Washington

Infiltration Rate with Basement (inches/hour)

1 12.7 12.12 14.0 13.23 15.1 14.34 16.4 15.45 17.6 16.56 18.7 17.67 19.9 18.78 21.1 19.89 22.3 20.910 23.4 22.011 24.6 23.112 25.8 24.213 27.0 25.314 28.1 26.415 29.3 27.616 30.5 28.717 31.7 29.818 32.8 30.9

Height of Water in Vault (feet)

Infiltration Rate without Basement (inches/hour)

TABLE S1-1

Steady-state Infiltration Rates

Page 9: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

OVS-B-03

E 360-B-36

MW-1

UICW-PS-10

MW-PS-8

MW-PS-12

MW-PS-3

520A

A

'

APPROXIMATE FOOTPRINT OF

THE INFILTRATION VAULT

B

B

'

MW-PS-7

298.53

298.71

298.69

298.51

298.61

298.76

298.27

152

ND

A

VE

NU

E N

E

E 360-B-34

MW-PS-11

G

W

M

G

W

M

PROJECTION:

DATUM:

TITLE

PROJECT

CLIENT LOGO

FIGURE No.

11810 North Creek Parkway North

Bothell, WA, U.S.A. 98011-8201

AMEC Environment & Infrastructure

REV. NO.:

PROJECT NO:

CLIENT:

DWN BY:

CHK'D BY:

DATE:

SCALE:

CITY OF REDMOND

AS SHOWN

NONE

NONE

HWB

JRS

SITE AND EXPLORATION PLAN

S1-1

1

4-917-17625-A

JUNE 2014

OVERLAKE VILLAGE REGIONAL STORMWATER FACILITY

Redmond, Washington

LEGEND

UNDERGROUND INJECTION CONTROL WELL FOR INFILTRATION

TESTING BY AMEC

UICW-PS-10

GEOLOGIC CROSS-SECTION LOCATION

A A'

OBSERVATION WELL BY AMEC

MW-PS-11-12

BORING BY HJH

ORS-B-03

BORING BY HJH

E360-B-34

OBSERVATION WELL BY HJH

E360-B-36

OBSERVATION WELL BY GEOENGINEERS

MW-1

OBSERVATION WELL BY GEOENGINEERS

MW-PS-3,7,8

STATIC GROUNDWATER LEVEL ELEVATION 12/5/13

298.61

GROUNDWATER MODELING CROSS-SECTION LOCATION

GWM GWM

Page 10: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Copy of Figures S-2 to S-6_MAW.xlsxS-2 6/19/2014

APPLIED INFLOW RATE Overlake Village Regional Stormwater Facility

Redmond, Washington

S1-2 Project No.: 4-917-17625-A Date: 6/19/14 By: LH

Figure

0

1

2

3

4

5

6

7

8

0 50 100 150 200 250

Flow

rate

into

the

Vaul

t (cu

bic

feet

per

seco

nd)

Time (hour)

0

0.5

1

1.5

2

2.5

3

0 50 100 150 200 250

Uni

t flu

x at

the

bott

om o

f the

Vau

lt (c

ubic

feet

per

hou

r per

sqau

re fo

ot )

Time (hour)

Divided by the vault infiltration area

Page 11: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Copy of Figures S-2 to S-6_MAW.xlsxS-3 6/19/2014

295

300

305

310

315

320

325

330

-15

-10

-5

0

5

10

15

20

0 50 100 150 200 250

Tota

l Hea

d (N

AVD

88

feet

)

Pres

sure

Hea

d (fe

et)

Time (hours)

Pore Pressure at Bottom of Vault, Reduced Hydraulic Conductivity

PORE PRESSURE IN VAULT WITH A BASEMENT

Overlake Village Regional Stormwater Facility Redmond, Washington

S1-3 Project No.: 4-917-17625-A Date: 6/19/14 By: LH

Figure

Page 12: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Copy of Figures S-2 to S-6_MAW.xlsxS-4 6/19/2014

287

292

297

302

307

312

317

322

-15

-10

-5

0

5

10

15

20

0 50 100 150 200 250

Tota

l Hea

d (N

AVD

88

feet

)

Pres

sure

Hea

d (fe

et)

Time (hours)

Pore Pressure at Bottom of Basement, Reduced Hydraulic Conductivity

PORE PRESSURE AT BOTTOM OF A BASEMENT

Overlake Village Regional Stormwater Facility Redmond, Washington

S1-4 Project No.: 4-917-17625-A Date: 6/19/14 By: LH

Figure

Page 13: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Copy of Figures S-2 to S-6_MAW.xlsxS-5 6/19/2014

300

302

Infiltration Vault Basement

Distance from Infiltration Vault Centerline (feet)-450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400

Elev

ation

(NAV

D 88

) (fe

et)

255265275285295305315325335345

302

304

Infiltration Vault Basement

Distance from Infiltration Vault Centerline (feet)-450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400

Elev

ation

(NAV

D 88

) (fe

et)

255265275285295305315325335345

308

308

312

312

316

Infiltration Vault Basement

Distance from Infiltration Vault Centerline (feet)-450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400

Elev

ation

(NAV

D 88

) (fe

et)

255265275285295305315325335345

SNAPSHOTS OF TOTAL HEAD CONTOURS WITH A BASEMENT

Overlake Village Regional Stormwater Facility Redmond, Washington

S1-5 Project No.: 4-917-17625-A Date: 6/19/14 By: LH

Figure

AT 20 HOURS

AT 99 HOURS

AT 215 HOURS

Page 14: HYDROGEOLOGY SUPPLEMENT NO. 1 GROUNDWATER MOUNDING

\\SEA-FS1\WordProc\_Projects\17000s\17625 Otak\17625-A\Copy of Figures S-2 to S-6_MAW.xlsxS-6 6/19/2014

308

308

312

312

316

Infiltration Vault Basement

Distance from Infiltration Vault Centerline (feet)-450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400

Elev

ation

(NAV

D 8

8) (f

eet)

255265275285295305315325335345

314

314

316

318

320 322

324 326

Infiltration Vault

Basement

-50 0 50 100El

evat

ion

(NAV

D 88

) (fe

et)

255

265

275

285

295

305

315

325

335

345

TOTAL HEAD CONTOURS AT 99 HOURS WITH A BASEMENT

Overlake Village Regional Stormwater Facility Redmond, Washington

S1-6 Project No.: 4-917-17625-A Date: 6/19/14 By: LH

Figure

Lithology: (L1): Glacial Till (Saturated/Unsaturated) (L2): Advance Outwash (Saturated/Unsaturated) (L3): Advance Outwash (Saturated)

Boundary Conditions: (B1): Specified Total Head = 299.82 feet (B2): Specified Total Head = 298.18 feet (B3) :Specified Total Head = 316 feet (B4), model bottom and ground surface: No Flow

Distance from Infiltration Vault Centerline (feet)