HEROES OF THE UAE CASE STUDY -2012 SERVICE CITY

AXIOM TELECOM

  

                          

  

Location  Employees  Washroom   Wash Basin 

Shower Lighting      (Tube light)  (Bulbs)  

AC        (Split units)

Dubai, UAE  54  9  11 10 T – 167 nos   B‐ 27 nos 

46

 

Company Profile  

Case Study Index Sector – Telecommunications Employees – 54 in Dubai, UAE Building Type ‐ Warehouse Intervention – Trainings/Awareness Energy savings:  Less than 10%  10% ‐30%  More than 30% 

About the Case Study: The  key  purpose  of  the  case  study  was  to recognize  exemplary  efforts  by  the organization  to  promote  energy   conservation/efficiency  and  encourage  their learning’s with other organizations  in the UAE through  information  sharing.  A  case  study seemed  like  the best approach because  it has helped  us  identify  areas  in which  our  efforts could have the greatest impact. 

Service City, established  in 2003 by Mr. Faisal AlBannai,  is  dedicated  to  providing  the  best  aftersales service to its customer. We are part of the AlBannai  Group  of  companies,  a  rapidly  growingconglomerate that started its operation in 1960 inDubai.  Today  this  visionary  group has diversifiedits arms into various sectors resourced with morethan  2000  employees.  Al  Bannai  Enterprises  issuccessfully  established  in  industries  likeTelecommunications,  Hospitality,  Security  &Surveillance etc. under its umbrella 

We  play  a  vital  role  in  providing  the  after  salesservices  and  trainings.  We  expanded  ouroperations  to  India  in  2007.    Both  our  locationsare  certified  for  ISO  9001:2008  and  ISO14001:2004.Employing approximately 54 staffs atService  City,  Dubai  we  aim  to  provide  a  safeworking  environment,  encourage  our  employeesto reach  their  full potential and reward  them  fortheir  contribution  to  our  business  success.  Thescope  of  the  data  presented  in  this  case  studyincludes only the Dubai operations.  

Building Information 

Location: Umm Ramool Rashidiya, Dubai Building Type: Warehouse type (rented space) Area: 1988.60 sq. m. with false ceiling roofing Utility Bills: Individual meters, DEWA bills received and monitored on a regular basis. Office Equipment’s: List available.  

  

Our services generate lower environmental impacts and we have taken necessary initiatives to further reduce these impacts by continuously monitoring them as our environmental key result areas  (EKRA).  By managing  and  improving  performance  in  relation  to  these  areas  we  will develop  our  services  to  better meet  our  customers’  needs  and  attract more  people  to  use them.  

Design and Implementation  

The  energy  and  water  conservation  initiatives  started  at  Service  City  through  awareness trainings,  round  table  discussions  and  brainstorming  sessions.  The  following  were  our  key strategies to achieve energy and water savings in line to our corporate strategy, 

           

            

 The results of the leadership and education strategies were presented in the following aspects, 

 

Leadership  Education 

Leadership  displayed  by  the management  and  EMS  team, played  a vital  role  in  enhancing  the  energy conservation  efforts.  Most  of  the savings were  achieved  through  simple measures  adopted  at  the  user  level, getting  support of  the management  in educating the user group on the simple methods  of  energy  and water  savings and  the  resulting positive  impact were very important.  

Educating  the  users  brought  about awareness and a sense of responsibility which contributed to the cost‐effective approach  to  achieve  energy  and  cost savings. To further promote energy and water conservation, education was also seen  as  an  important  element  for  the success;  energy  and  water conservation  initiatives  were propagated  at  all  levels  of  the organization.  

Energy & WaterSavings 

 

Energy and Water Conservation Measures 

Staff Awareness and Engagement 

Our employees involve themselves in various programs and carry out projects for the benefit of their internal and external customers, and for the success of the organization. Few of the awareness and employee engagement projects are listed below,   

1. The ISO 14001:2004 certification and regular assessments helped us improve our environmental performance. 

2. Water conservation techniques training by Engr. Hisham Bukhari of Dubai Municipality gave an insight on the subject importance. 

3. Mandatory EMS awareness trainings executed on a half yearly basis to enhance employee awareness. 

4. EMS awareness developed in new employees by Induction trainings. 5. Visual displays including wall posters/stickers and PC screensavers helped employees to 

continue the contribution of new initiatives in achieving improved environmental results. 

6. To improve on the employee opinion contributions we implemented the Employee suggestions portal. 

7. Based on the CSR interest and know how, employees were nominated as CSR champions for planning and implementing programs. 

8. To enhance participation we developed the point system in the form of Employee Involvement Index which was used as a tool during performance appraisals for rating CSR program involvement. 

9. We pass on appreciations through emails, newsletters, weekly meetings and gatherings which indeed makes the employees feel positive of what they are doing. 

10. We encourage the employees to share the environment initiatives with family and friends as a source to spread the importance of environmental issues and impacts. 

11. Team building activities carried out to maximize the employee contribution as part of the team. 

12. Best suggestions implemented were rewarded as part of the Rewards and Recognition program. 

13. Reward and recognition programs in place to enhance employee motivation and morale. 

14. Employees at supervisory levels authorized and empowered to take decisions at their levels. 

15. Situational leadership skills among the team have enhanced their confidence levels.  

Lighting retrofits  Majority  of  the  energy  savings  can  be  achieved  through  the  elimination  of  unwanted  or excessive lighting fixtures or by the substitution of electric lighting by CFL or natural daylight. In addition,  a  large  portion  of  the  energy  savings  can  be  obtained  by  inducing  a  sense  of 

responsibility  into the users who then make sure to turn off  lights when  it  is not needed. The following steps were taken to reduce electricity consumption by the building lighting systems: 

We have taken the following steps to reduce electricity consumption: 1. The  exterior  lighting  i.e.  the  main  gate  lights  of  the  company  were  replaced  with 

fluorescent tube(36W) to conserve electricity;  2. Lightings  in  all  areas were  analyzed  and  changes were  implemented  in  the  common 

areas such as corridors, washrooms, reception, staircases, waiting lounges. (4 tubes in a bracket were reduced to 2 tubes). 

3. Lights switched off in unoccupied rooms. 4. Installation  of  energy  efficient  lightings  in  the  conference  room,  20W  tubes  replaced 

with 3W LED lamp to save electricity. 5. Visuals displayed in the form of awareness stickers on the power switch. 

 

Water Saving devices  Water  conservation  seminar was  given  at  Service  City  by  Engr. Hisham  Bukhari  from Dubai Municipality.  The  event was  an  awareness  program  and  also  a  practical  demonstration  on different  water  conservation  techniques  being  promoted  jointly  by  Dubai Municipality  and other  government  and  non‐government  organizations.  At  the  start  of  the  seminar  each participant was given a cistern bag and tap valves. He also demonstrated on the different water saving techniques by the use of different water controlling valves, cistern bags, etc.  

 We have taken the following steps to reduce water consumption:  

1. Installed  tap  regulators  to  increase  the  pressure  and  reduce  the water  flow. Water consumption in wash basins has been reduced by 50%.    

2. Water bottles mounted in Flush tanks to limit the water flow (low flush requires only 1.6 gallons ie.6 liters per flush). 

3. Annual  maintenance  contract  signed  for  the  building  maintenance  in  order  to  fix maintenance issues immediately. 

4. Regular checks done  for water pipes and other systems  for  leaks, and provide  regular maintenance to the building’s plumbing system.  

 Air conditioning 

To help us keep our bills and our energy consumption as low as possible, we have taken the following steps to maintain the Air conditioner usage efficiently:  

1. Temperature control set to 25‐26C. 

2. Introduced the Annual maintenance contract and regular duct cleaning schedules in place. 

6. AC switched off in unoccupied rooms. 7. We make sure that the windows and doors are closed. 8. We make sure that the AC is switched off at the end of day. 9. Windows in the Mezzanine floor tinted to reduce the temperature inside the room. 10. In the future expansions we are planning to look into solar AC options. 

 Other Energy consuming items  

1. We provide trainings internally and to external participants at our Regional Training Centre to Unplug chargers when not in use. 

2. The computers are turned off at the close of business and when not in use. 3. Maintenance team internally nominated for carrying out the regular maintenance of the 

equipment’s. 4. Awareness given on switching off high consumption devices when not in use. 5. Make  sure equipment  is used efficiently  in  the office area. Eg. Copiers,  fax machines, 

computers, printers etc.  6. Turning off all electrical equipment’s to stand‐by modes when not required. 7. Purchase department is made aware and is solely responsible in the purchase of energy 

efficient equipment’s. 8. Regularly  conduct  inspections  of  all  departments  to  make  sure  those  energy 

conservation methods are being followed.  

Other factors 

Energy savings was not meant to be achieved through  infrastructure improvement, optimizing the operation of  lighting and equipment’s. This was accomplished after analyzing the existing operation schedule and optimizing the operation of the systems based on their requirements.   

1. The work schedules of the Repair factory team was altered based on the analysis of the electricity consumption during  the operating hours  (24x7).Adopting change  in working hours from 24 hours to 10 hours and change in working days for the office staff from 6 to 5 days a week has made  it possible to minimize energy consumption caused by the unnecessary and unwarranted operation of the building systems.  

2. The operating hours of the air conditioners and lightings were reduced on an average of 30% without  affecting  the  operational  efficiency &  productivity  by  realigning  certain input‐output processes and by running process improvement programs.  

 

 

 

 

 

As evident from the case study, the energy savings project has been successful in achieving the goal  of  energy  conservation  through  simple  strategies  by  involving  everyone  within  the organization.  Among  the  various  energy  saving measures,  the  few  valuable  and  important lessons learned that can be outlined are:  

1. Further  to  the  implementation of  ISO 14001:9004, energy  savings were  calculated by creating  a  proper  baseline  that  takes  into  account  the  energy  consumption  in  the building before and after the implementation of energy conservation measures. 

2. Convincing on the benefits,  implications and higher cost efficiency  from organizational activities  in CSR were  few of the challenges  faced at the  initial stage. Teamwork along with Top Management support has helped us develop  the CSR strategy  to ensure  the success of the initiatives. 

3. It was  important  to  identify  a  team  (CSR Champions)  and  give  them  responsibility  so that he/she can play a  leadership role  in planning and  implementing  the project  in an effective fashion.  

4. While quantifying energy savings  from  the measures was  important, documenting  the experience of employees &  visitors  in  the building  through  verbal  surveys  and  taking steps to address reasonable grievances were very helpful  in maintaining the morale of employees and making them feel part of the ongoing initiative.  

5. While  considering  the  changes  in  the  lighting modifications,  it was  very  important  to ensure that the illuminance levels were maintained as per national/international lighting standards so that measures don’t result in negative productivity impacts. 

6. The cost savings achieved were shared  in  the annual reports and meetings and hence encouraged  the management  and  employees  to  contribute  and  support  towards  the environmental cause. 

7. The additional policies developed  for Water, Electricity and Waste management were regularly monitored and audited as part of ISO 14001:2004. 

8. It  was  very  important  for  Service  City  to  develop  an  operation  and  maintenance schedule for repair and replacement of the building systems. 

9. Pilot  project  initiated  at  Service  City  and  extended  across  the  Service  department followed by our corporate office.  

10. Bench mark study done for CSR initiatives and a 5 year plan with 25 objectives and 100 commitments  were  developed  to  take  the  CSR  culture  to  the  next  level  within  the group. 

11. Internal trainings and CSR workshop participation opportunities provided to employees to spread the awareness on CSR benefits and programs. 

12. ‘Kaizen portal’ developed  for employees  to post  their  suggestions with  regard  to any improvements. 

 

Lessons learned 

13. We  constantly  improve  our  initiatives  through  the  Employee  involvement  index, appreciations during performance review, rewards and recognitions programs etc. 

14. Further  to  the  energy  conservation  awareness,  implementation  and  cost  savings achieved,  our  corporate  office  has  planned  to  opt  for  energy  efficient  equipment purchases for all the divisions across the group in the future. 

15. Develop Green building designs as part of our new corporate office layout plan. 16. In‐house Green day programs and participation was one way of involving all employees 

as part of the environment programs and gift vouchers were distributed as an incentive for employee motivation. 

 To  achieve  this  goal,  Service  City  developed  a  company‐wide  carbon  emissions  reduction strategy.    It decided  to  focus on  those activities  that  it could directly control and measure  to target for efficiency study: facility/operations energy usage (electricity and water), flights usage (business travel), vehicle usage (fuel consumption) and materials usage (paper and toner).  On identifying  the  carbon  impact  of  these  activities’,  initiatives  were  undertaken  to  promote conservation and cut down on waste.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Illustrations 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Water conservation techniques training by Engr. Hisham Bukhari of Dubai Municipality on 4th March 2006 educated all employees on 

the water conservation measures and ultimately saving water. 

 

 

  

As part of our annual training calendar, we implement half yearly awareness EMS trainings for all employees. An energy conservation technique training was conducted by our internal trainer Mr Janaka Peiris on 15th March 2009. 

 

   

Awareness Trainings Initial awareness trainings 

implemented by Dubai Municipality in 2006.The learning’s were taken forward by internal trainers during mandatory half yearly EMS trainings 

for all employees. 

Water Savings Further to the awareness trainings, EMS programs were in place and visuals were displayed in the washrooms for reassuring the 

importance of controlling the water consumption. 

Further to the water conservation techniques training, water tap regulators were distributed by Dubai Municipality. As part of the EMS programs the regulators were installed in the water taps to reduce the water consumption. The increase in pressure of the water flow would reduce 

the water consumption.  

  

All the flush tanks were converted to low flush by adjusting the height of the float and fixing water bottles inside cisterns to 

reduce the consumption of water.  

 

     

 

 

 

 

 

 

 

 

Energy SavingsFurther to the awareness trainings, as part of the EMS programs we have implemented few electricity saving methods to reduce energy 

consumption. 

As a communication medium we have implemented different types of EMS posters

and banners in the company premises. This has helped our staffs as well as the 

visitors to be more aware of the environmental issues.  

 

 

 

As part of the EMS programs, retrofit changes were implemented in all common areas such as corridors, washrooms, reception, lobby, and 

stairs. etc. (4 tubes in a bracket were reduced to 2 tubes in unoccupied 

areas.)  

Conference room retrofits changes resulted in the reduction of 86% of the total power consumption. The total LED lamps installed consumes only 156 W of power; earlier the Tubes were consuming 1120 W. As a result of this EMS initiative we were able to save energy by 964 

Watts. Please refer to the below table.  

Power Consumption Savings Plan with LED Lamps 

Energy consumption  Before EMS activity  After EMS activity 

Light Type  20W Tubes  3W LED Lamp 

Quantity  56 Nos   52 Nos  Total Consumption  1120W  156W 

Total Energy Savings   964 W Energy Reduction   86 % 

 

 

Energy Savings in view of the conservation project were initiated with the goal of reducing energy  consumption  by  15%  during  the  year  2009.  Thus  the  strategies  and  techniques described earlier were  carefully applied and performances were monitored. As a  result, the energy consumption was measured to be reduced by 17.1% for electricity and 17.8% for water in 2009 respectively. Please refer to the below table.  

 

          Energy Consumption 

Theoretical  Actuals 

Before  EMS 

activity 

After EMS activity  2008  2009 

Energy consumption per day (KWh)  1412  1040  1098  910 

Energy consumption per month (KWh)  42366  31196  32938  27314 

Energy consumption per year (KWh)  508398  374347  395260  327767 

        Yearly savings (KWh)  11647  67493  

Nearly 67,493 kilowatt‐hours (KWh) and 48,459 gallons have reduced in 2009, a savings of more than AED 8,835 for electricity costs and AED 5,399 for water costs was observed in 

2009. 

  

Energy  saving  techniques  and  changes  in  work  schedule  implemented.  In  addition, behavioral changes  in the user group (e.g. switching off  lights and equipment’s when not needed) have also resulted in energy savings.    

        

 

 

 

 

 

 

 

 

 

   

  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Conclusion 

 Service  City  team  acknowledges  the  contributions  of Dubai Municipality  for  sharing  the  informationabout  the  energy  conservation  initiatives with  us  and  for  their  tremendous  support  that made  thecompilation of  this case study possible. “Service City CSR  team  is committed and we all need  to  takesmall steps to restore global damage.  We would be working with our corporate team (Axiom Telecom) on the implementation of the recently developed Five year CSR plan which comprises of various projects spread across the five pillars of our CSR strategy of which Energy reduction and Waste management is one of the key projects in reducing the carbon footprint. 

 At the end of the workday we pledge to make sure that lights, air conditioning and office equipment’s are switched off in the premises and would take necessary steps in reducing our carbon footprint.