greater tubatse municipality · greater tubatse municipality appointed procurement dynamics (pty)...

43
LOCAL ECONOMIC DEVELOPMENT STRATEGY GREATER TUBATSE MUNICIPALITY

Upload: others

Post on 16-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

LOCAL ECONOMIC DEVELOPMENT STRATEGY

GREATER TUBATSE MUNICIPALITY

Page 2: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

2

TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................................ 3 SECTION 1: INTRODUCTION ................................................................................................................. 5

1.1 BACKGROUND ........................................................................................................................ 5 1.2 LED POLICY AND LEGISLATIVE FRAMEWORK ............................................................... 6 1.3 METHODOLOGY ..................................................................................................................... 6 1.4 STRUCTURE OF THE REPORT ............................................................................................ 7

SECTION 2: BASELINE REVIEW........................................................................................................... 9 2.1 SOCIAL PROFILE .................................................................................................................... 9 2.2 ECONOMIC PROFILE ............................................................................................................. 9 2.3 SPATIAL ANALYSIS .............................................................................................................. 10 2.4 INFRASTRUCTURE STATUS .............................................................................................. 11 2.5 THE ENVIRONMENT ............................................................................................................. 11

SECTION 3: GREATER TUBATSE LED STRATEGY ...................................................................... 12 3.1 TARGETED DEVELOPMENT OBJECTIVES ..................................................................... 12

3.1.1 Accelerated Economic Growth ......................................................................................... 12 3.1.2 Employment Creation ........................................................................................................ 13 3.1.3 Poverty Reduction .............................................................................................................. 15

3.2 LED STRATEGY BUILDING BLOCKS ................................................................................ 16 3.2.1 Sector development ........................................................................................................... 16 3.2.2 Economic infrastructure support ...................................................................................... 24 3.2.3 Social development ........................................................................................................... 26 3.2.4 Institutional/governance .................................................................................................... 28

SECTION 4: IMPLEMENTATION PLAN AND INSTITUTIONAL OPTIONS .................................. 31 4.1 IMPLEMENTATION AND PRIORITISATION ..................................................................... 31 4.2 INSTITUTIONAL OPTIONS .................................................................................................. 33

4.2.1 Internal Arrangements ....................................................................................................... 33 4.2.2 External Arrangements ..................................................................................................... 34

4.3 RESPONSIBILITIES AND IMPLEMENTATION PARTNERS .......................................... 36 ANNEXURE: SECTOR DEVELOPMENT MAPPING .......................................................................... 38 REPORT 1: BASELINE REVIEW .......................................................................................................... 39 REPORT 2: DEVELOPMENT POTENTIAL ANALYSIS ................................................................... 40 REPORT 3: FORMULATING GTM LED STRATEGY ......................................................................... 41 REPORT 4: IMPLEMENTATION PLAN AND INSTITUTIONAL ARRANGEMENTS .................... 42

Page 3: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

3

EXECUTIVE SUMMARY Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic Development Strategy (LED) for the Municipality. The LED is a component of the Municipality’s overall strategic plan as outlined in the Integrated Development Planning process. The strategy provides the Municipality with guidelines to create and facilitate economic development, realise the underlying economic development potential, and encourage private sector investment and job creation. The total population in the area is approximately 270 117. A very large proportion of the labour force in Tubatse Municipality is unemployed (73%) - based on an expanded unemployment definition) and 42.7% of the total households has no income. Development constraints in the Municipality include inter alia lack of education and skills, and lack of infrastructure. Furthermore, health services were also found to be lacking. Weak capacity within the municipality as well as absence of land tenure for investment in rural areas was also seen as development constraints. These constraints need to be addressed to ensure sustainable economic growth and development in Greater Tubatse. The sector which contributed the most to the GGP in the local economy is the mining sector (34.1%) followed by government services (14.0%), finance and business services (13.2%), manufacturing (10.5%) and the trade & hospitability sector (10.2%). In light of the key sectors identified in Greater Tubatse Municipality and the existing opportunities identified, the LED Strategy advocates four programmes for economic development. This comprises (1) Sector Development, (2) Economic Infrastructure Support, (3) Social Development, and (4) Institutional/Governance Reform. These programmes have been identified during the process of consultations with various role players including government authorities, the community, and local businesses. The cluster development approach as articulated in the Provincial Growth and Development Strategy also served as a guideline. These programmes are further supported by strategic thrusts and relevant projects. The projects that have been identified in the LED are aimed at economic development by ensuring that more job opportunities are created, skills development takes place and that opportunities are created for SMME development. Priority projects were identified based on the developmental goals identified below and the project prioritization methodology as articulated in Annexure 3.

Page 4: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

4

The following table indicates the programmes along with strategic thrusts identified. Table 1: GTM LED Strategy programmes & thrusts PROGRAMME THRUSTS 1. Sector Development

1.1 Mining Cluster Development 1.2 Horticulture Cluster Development 1.3 Meat Cluster Development 1.4 Tourism Cluster Development 1.5 Nodal Development 1.6 Informal Sector Development

2. Economic Infrastructure Support

2.1 Roads & Transport 2.2 Water 2.3 Electricity 2.4 Telecommunications 2.5 Infrastructure Investment Plan 2.6 Enterprise Development

3. Social Development

3.1 Education and Skills Development 3.2 Housing 3.3 Health

4. Institutional/Governance Reform

4.1 Regulatory Framework 4.2 Waste & Environmental Management 4.3 Financial Management 4.4 LED Directorate Capacity Building

To ensure that the identified projects are implemented, a dedicated LED Directorate is proposed. The latter will be headed by the Director: LED and supported by Manager: LED and LED Coordinators/Officers specialising in Policy & Research, Skills Development, Tourism Development & Marketing, Agriculture & Cooperative Development and Trade & SMME Development & Support. The establishment of an LED Forum would further aid the Municipality in the implementation of LED driven projects. The proposed mining, tourism, agriculture and trade & SMME working groups would serve as anchor sub structures within the Forum to coordinate and support LED initiatives.

Page 5: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

5

SECTION 1: INTRODUCTION Section 1 gives a broad orientation towards the purpose of the report, policy framework, and the methodology that was followed. The following aspects are thus discussed in this section:

• Background to the study • LED policy and legislative framework • Methodology

1.1 BACKGROUND Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic Development Strategy (LED) for the Municipality. The main purpose of this project is to develop an integrated LED strategy that is linked to relevant planning frameworks such as the IDP, the Limpopo Growth and Development Strategy, the Provincial Spatial Framework, the National Spatial Development Perspective and ASGISA. The strategy should further tackle a range of development challenges, including, among others:

• High level of poverty and unemployment in Greater Tubatse Municipality • Business support services and inadequate entrepreneurial skills • Collaboration between formal business sector and emerging business

sector • Limited private investment in the job-rich sectors despite significant

business opportunities • Creating opportunities for the marginalised • Facilitating youth and women development • Promoting and supporting rural development initiatives • Urban renewal programmes.

The specific objectives of this project as stated in the terms of reference are:

• To develop an LED strategy that will: o Address the economic development objectives of the municipality

through the identification and co-ordination of opportunities for development, and

o Become the basis for the municipality to partner with other stakeholders (civic, business, NGOs, labour, etc) through formal LED forums representing all the identified stakeholders and other interested groups.

• Over and above the identified economic development issues, the LED strategy will also be an important basis for:-

Page 6: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

6

o Development of Platinum City 2015 Growth Plan (infrastructure planning and development)

o Feasibility study for establishment of Local Economic Development Agency.

1.2 LED POLICY AND LEGISLATIVE FRAMEWORK Local economic development planning derives its focus from various government legislation and policy. Section 152 of South African Constitution, requires municipalities to promote social and economic development. Section 153 of the Constitution mandates municipalities to structure and manage their administration, budgeting and planning processes to give priority to the basic needs of the community, and to promote the social and economic development of the community. Municipalities are expected to develop local economic development strategies as means of exploiting economic opportunities within their areas of jurisdiction. Municipal LED strategies are further aimed at creating an enabling environment for business creation, expansion and retention. We also emphasize here the legislative directives that relate to coherence and alignment with planning frameworks of other spheres of government. For example, the Municipal Systems Act (32 of 2000) 24(1) states that ‘The planning undertaken by a municipality must be aligned with, and complement, the development plans and strategies of other affected municipalities and organs of state so as to give effect to the principles of cooperative government contained in section 41 of the Constitution.’ Accordingly, there must be alignment between the Tubatse LED strategy with those of other neighbouring municipalities, the Sekhukhune 2025 Development Strategy and the Integrated Development Plans (IDPs), Medium-Term Revenue and Expenditure Framework (MTREF), the Limpopo Growth and Development Strategy, and the National Spatial Development Perspective (NSDP), among others. 1.3 METHODOLOGY The strategy was formulated through a process that goes through 4 phases as described below:

Phase1: Stakeholder mobilisation and baseline review Phase 2: Development Potential Analysis Phase 3: LED Strategy formulation Phase 4: Implementation plan and institutional options

Page 7: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

7

Phase 1: Stakeholder mobilization and baseline review This stage involved mobilizing stakeholders from various sectors such mining, agriculture, the trade sector and local community representatives The baseline review went beyond mere statistical data analysis primarily because reliable and useful information is not readily available at a disaggregate level of a local municipality. The outcome of the review was a clear picture of the economy of Tubatse, what the key drivers of growth are; how they can be supported; constraints to present and future growth of the key sectors; how the economic activity shapes the demographic profile of the area presently and into the future; what infrastructure exists and its adequacy for present and future economic activity. This culminated in a status quo report of the Municipality. Phase 2: Development potential analysis The purpose of this step was to identify the lead sectors for potential development, the business linkages, and analyse the need for cluster development and diversification into other sectors such as tourism. Phase 3: LED Strategy formulation The formulation of the strategy involved the consolidation of the baseline review and the potential analysis into a coherent framework that identifies what can and cannot be done; the phasing into stages the actions that must be taken to ensure growth and development. This included functional programme per lead sector identified in previous phases and action plan towards addressing the identified development opportunities. The strategy will also have targets focused on unlocking the development potentials, exploiting comparative and competitive advantages. Phase 4: Implementation Plan and Institutional Options The aim of this step was to identify various funding sources, developing institutional structures for implementing the LED Strategy, as well as identifying various development initiatives, which would attract businesses and industries to the area. This step also describes the roles of the LED Directorate within the municipality and how to implement the LED with the aid of external resources. 1.4 STRUCTURE OF THE REPORT The remaining structure of the report includes the following sections:

• Section 2 – Baseline Review

Page 8: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

8

The baseline review provides a brief analysis of the socio-economic situation in Tubatse. The analysis covers issues such as economic and social indicators including contribution to GGP, education, employment, infrastructure, spatial, etc.

• Section 3 – GTM Local Economic Development Strategy Key economic sectors in Tubatse are identified and development objectives are briefly outlined. Furthermore LED Strategy programmes are provided. Each programme is supported with thrusts and projects.

• Section 4 – Implementation Plan and Institutional Arrangements This section provides guidelines with regards to the implementation of projects in Tubatse. Anchor projects are identified and then prioritized. Suggestions on strengthening the capacity to implement LED projects successfully in Tubatse are further articulated.

Page 9: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

9

SECTION 2: BASELINE REVIEW This section provides an analysis of the socio-economic situation in Greater Tubatse Municipality. The following aspects are analysed:

• Social profile • Economic profile • Spatial analysis • Infrastructure status • Environmental conditions

2.1 SOCIAL PROFILE It has been shown that the population of GTM is the largest and the fastest growing. Various sources of information have pointed to a possibility of in-migration into Tubatse from neighbouring municipalities in search of opportunities in the mining sector. Another trend was observed of migration within Tubatse from outlying areas to areas that are better served with infrastructure and access to services. This suggests that areas like Burgersfort are going to have to plan for a much faster growing population than the rest of the municipality. On the other hand, the rate of skills development was found to be lagging behind the needs of industry and the quality of education largely questionable. Health services were also found to be lacking. This suggests a need for investment in social infrastructure alongside increased investment in economic infrastructure. There is a need of paying particular attention to the movement of people, and planning accordingly. 2.2 ECONOMIC PROFILE Tubatse Municipality has significant mining and manufacturing (ferro-chrome smelting) sectors, but unemployment is still considerably above the provincial average. Information from media releases suggest that new mining developments that have already been announced could reduce unemployment from 73% (expanded unemployment rate definition) in 2001 to 44% in 2010. Further reduction in the unemployment rate will depend on effective intervention by public sector institutions to facilitate economic sector diversification through competitive cluster value-chain development. This implies upstream development in the manufacturing and trade sectors to provide essential items in the mining supply chain by local entrepreneurs. It also implies side-stream

Page 10: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

10

development in the form of construction and urban renewal. This approach is consistent with the Limpopo Growth and Development Strategy. Constraints to cluster development include:

Lack of infrastructure, with reference to water reticulation and availability, road conditions, electricity and sanitation.

Land ownership limitations in former homeland areas and inappropriate land-use management.

The shortage of skills, particularly in the local labour force and among unemployed people.

Institutional capacity limitations in local government, with specific reference to economic development management capacity.

2.3 SPATIAL ANALYSIS The main issues that have a direct or indirect impact on spatial development, or are a result of the current spatial development pattern in Greater Tubatse Municipal Area, are the following:

• Informal and marginal economic activities are normally not the first choice of participants, but are the result of limited options due to limited formal sector opportunities, education and capital;

• The natural resource base and economy of the Greater Tubatse Municipal Area is not yet fully developed and therefore cannot support the local population, forcing a large percentage of people in the economically active age cohorts to seek employment opportunities outside of the municipal area;

• The scarcity of arable land forces communities to cultivate steep slopes and other environmentally unsuitable areas, which increases the occurrence of erosion with the resultant loss of fertile soils;

• Rapid low density urban sprawl sterilises land that may have been used for agricultural and mining purposes;

• Buying power limitations in settlements discourage investment in trading outlets, which leads to a leakage of buying power;

• A second implication of the low levels of buying power is the inability of the community to pay taxes (e.g. property tax) for even the most basic level of services. This situation also weakens the financial viability of the local municipality and makes it difficult to provide the necessary social services and municipal infrastructure in the area;

• The majority of land in the municipal area is held in trust for communities. Traditional authorities have a major influence on the manner in which land is made available to individuals for settlement, as well as the use thereof for economic purposes (e.g. mining, agriculture, tourism, etc.). Most of these decisions are made on an ad hoc basis and usually without any consideration of the impact it may have on the spatial pattern and the rendering of cost-effective and efficient services to communities.

Page 11: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

11

• There is no formal security of tenure in the rural areas. • Land claims are a major factor influencing development in the area.

2.4 INFRASTRUCTURE STATUS There is a significant backlog in economic infrastructure in Greater Tubatse. Of particular concern is the roads condition and access to water. In addition electrical and telecommunication connectivity is inadequate, particularly for residential use. This provides an investment opportunity for Tubatse, whose current infrastructure investment in respect of roads, water and waste, electricity and telecommunications is marginal. Tubatse Municipality will need a single overarching plan for physical infrastructure that would provide the vehicle for sector expansions and development and integrated settlement. 2.5 THE ENVIRONMENT There are three main factors that are likely to continue to pose an environmental threat in GTM namely: development, climate changes, and waste management. The developments that are taking place are not without a cost to the environment. The development phase of mining and the production phase will pose serious threats to the environment unless well managed. The national regulations for the management of the environment, including water and air pollution seem adequate and all that is necessary is their enforcement. The changes in the climate will undoubtedly affect the environment in an unimaginable way. Although most of GTM has only experienced between 1.6 to 1.7 degrees increase in the temperature, if past trends are expected to continue, this could lead to a rapid loss of water resources and other bio species. A further decline in the contribution of agriculture to GGP would result.

Page 12: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

12

SECTION 3: GREATER TUBATSE LED STRATEGY The purpose of this section is to provide the local economic framework which includes development programmes and associated projects, which are aimed at regenerating Greater Tubatse economy. Opportunities for economic development in the area were identified through consultation, desktop studies and business interviews. These opportunities are categorized into projects to support each programme and thrust in this section. This section focuses on the following aspects:

• Targeted development objectives • Brief analysis of programme and projects

3.1 TARGETED DEVELOPMENT OBJECTIVES 3.1.1 Accelerated Economic Growth The economy of Greater Tubatse depends highly on mining, government services, manufacturing, finance, trade, transport and communication sectors (see table below). The relative contribution of agriculture and construction is very low. Mining contribution is both directly and indirectly through spin-offs or multiplier effects within the other economic sectors, for instance the increase in demand for housing and elated infrastructure services for the mineworkers. This sector is expected to expand exponentially in the next five years. Thus, interventions have been articulated that should support acceleration of the development of this sector and its subsequent contribution to local economic growth. Table 2: Sector GGP Contribution in Tubatse, 2005

SECTOR GGP CONTRIBUTION

% CONTRIBUTION

Mining and Quarrying R1 500 million 34.1 Government Services R614 million 14.0 Finance, Real Estate and Business Services R581 million 13.2 Manufacturing R460 million 10.5 Trade, Repairs, Hotels and Catering R450 million 10.2 Transport, Storage and Communication R310 million 7.0 Personal Services R167 million 3.8 Water and Electricity R114 million 2.6 Agriculture R145 million 3.3 Construction R57 million 1.3 TOTAL R4 398 million 100

Source: Own calculations

Page 13: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

13

Although agriculture seems to dominate most land use, most of the land that is under cultivation is used for subsistence purposes. Only a small percentage of the land is under commercial farming. Amongst others, the scarcity of water is the reason why agriculture is the least contributor to the GGP of the local economy. Moreover the status of land ownership and the fact that large percentage of the land in Tubatse is under land claims hampers the development of the agriculture sector. Assessing the agriculture potential in the municipality could help unlock some of the factors that inhibit the full usage of the land. The horticulture and meat cluster development interventions proposed in this document can go a long way in securing the livelihoods of most of the rural poor and marginalised communities. There is also the trade sector, which includes all kinds of retail businesses. This is, however, affected negatively by low employment levels, which impacts on the buying power of the people. Tourism has a potential to boost the local economy but has not been fully exploited yet, and still needs coordination. Development potential interventions have been proposed in this study and if implemented successfully will assist in unlocking economic opportunities. Besides the sectoral interventions, the LED Strategy advocates an integrated intervention mechanism that includes instruments such as skills development, infrastructure investments, enterprise development programmes, institutional reform, etc. to grow the economy of Tubatse. Although desk-top analyses suggest that the Tubatse economy has grown at a rate of 4% in 2005, local observation suggests that is must be higher than the national average. In the absence of a local survey, it is therefore assumed that the current economic growth rate is 5%. The target for economic growth therefore becomes 6% per year from 2007 to 2009 and 6.5% from 2010 onwards. 3.1.2 Employment Creation According to the census of 2001 (see table 3 below), there were 19,227 persons employed in Tubatse Municipality in that year and 30,678 persons who were actively looking for work but who could not find it. This means that according to the strict or official definition of unemployment, the unemployment rate in Tubatse in 2001 was 61%, compared to a similar 61% for Sekhukhune District as a whole and 36% in Limpopo. In addition to the unemployed, there were 21,530 discouraged work seekers. These are people who would like to work, but no longer make any active effort to

Page 14: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

14

find work, either as a result of previous disappointments or due the lack of resources to travel and apply for work. The labour force according to the strict definition, excludes the discouraged work seekers. This number comes to 49,905 persons, which was 18.5% of the municipal population of 270,116 persons in 2001. The international rule of thumb regarding this relationship in developing areas is between 25% and 30%. The 18.5% relationship therefore seems artificially low. When the discouraged work seekers are added, the expanded labour force is estimated as 71,435 persons, which is 26% of the population and exactly on the international norm. The expanded labour force is therefore considered to be a more accurate reflection of the actual labour supply situation in Tubatse Municipality. According to the expanded definition, which includes discouraged work seekers, the unemployment situation is much worse at 73% in Tubatse, 72% in Sekhukhune and 49% in Limpopo. Strict unemployment in Limpopo has improved slightly from 36% in 2001 to 30.1% in September 2005 (LFS). It is possible that the situation has also improved even more in Tubatse and the district unemployment rate is projected at between 54% and 57%, depending on the level of local recruitment. The issue of local unemployed persons being competent for the new jobs that are created is crucial in terms of local economic development. A level of up to 40% foreign labour is normal for mining companies in cases where local labour does not qualify in terms of job requirements or where local persons are unwilling to work underground. This issue is important not for the sake of promoting social tension within communities, but because it requires a particular focus in terms of skills development among unemployed persons. The strict labour force in Tubatse is growing at a rate of approximately 650 persons per year (2002 -2014), whereas the expanded labour force is growing at 930 persons per year. These are the number of jobs that have to be created for the unemployment rate not to become worse according to the two different definitions. If a strict unemployment rate of 30% is to be achieved in 2014 (half of the 61% in 2001), then there should be 41,400 jobs in Tubatse Municipality by then (70% of 59,142). A growth rate of 1.3% is assumed for every year, based on population growth projections for the municipality that were commissioned from the Bureau for Market Research at UNISA. This implies 1700 new jobs every year from 2002 to 2014. If the expanded (more realistic) definition is used, and a target of 36% is set for 2014 (half of 72%), then there should be 54,080 jobs in Tubatse Municipality by then (64% of 84,500). The expanded definition implies that 2,680 new jobs need to be created every year from 2002 to 2014.

Page 15: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

15

Table 3: GTM Labour Market

2001 Employed 19227 2001 Unemployed 30678 2001 Strict Unemployment Rate 61%2001 Strict Labour Force 49905 2001 Discouraged Workers 21530 2001 Expanded Labour Force 71435 2001 Expanded Unemployment Rate 73%2014 Target for Expanded Unemployment Rate 36%2007-2014 Target for Job Creation Per Year (expanded unemployment rate) 26802007-2014 Target for Job Creation Per Year (strict unemployment rate) 1700

The magnitude of the job creation need indicates that significant interventions are required for any meaningful impact to be made on the current high level of unemployment. 3.1.3 Poverty Reduction According to the Limpopo PGDS, Sekhukhune District (of which Greater Tubatse is part thereof) is one of the areas with the highest number of people in poverty. This is attributed to the fact that this district draws people from the rural areas in search of work. Migrant labour and job expectations are therefore distorting the poverty profile of the district. This is, however, alarmingly high and it has a significant bearing on the level of human development. Distribution of income is highly skewed. It is evident from table below that a very large proportion of households in Tubatse Municipality (42.7%) has no income and has to rely on relatives for handouts. Only 27.4% of households earned above R9,600 per year in 2001, which was the poverty datum line at the time. This is consistent with the high level of unemployment and is also symptomatic of the sectoral economic structure of Tubatse Municipality. Table 4: Income Distribution in Tubatse Municipality; 2001 Income Level Total No income 23997 R1 - R4 800 4263 R4 801 - R9 600 12540 R9 601 - R19 200 6393 R19 201 - R38 400 4624 R38 401 - R76 800 2712 R76 801 - R153 600 1090 R153 601 - R307 200 371 R307 201 - R614 400 108 R614 401 - R1 228 800 33 R1 228 801 - R2 457 600 79 R2 457 601 and more 21 Total 56229

Source: Stats SA; Census 2001

Page 16: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

16

Considering that the majority of the people of the area are unemployed, unskilled or semi-skilled and still live in poverty, this poses significant socio-economic challenges. The demographic and economic profile of the area in the baseline review assessment suggested that urgent programmes of action against poverty are required. This would include, firstly, attainment of the above goals of growing the economy that can generate jobs. Secondly, identification and description of poverty pockets in the area for maximum impact of suggested interventions. Informal sector and enterprise development programmes, social development interventions such as targeted skills development, education and health and institutional interventions are advocated and successful implementation thereof would address poverty in Tubatse. In this regard poverty is viewed here as a multi-dimensional phenomenon requiring more than simply an income-based solution. 3.2 LED STRATEGY BUILDING BLOCKS 3.2.1 Sector development The main objective of the proposed interventions under this programme is to encourage current and future sectoral expansion activities in the area and to develop an economic base, which could provide business and employment opportunities for the local community.

3.2.1.1 Mining cluster development There is a pipeline of mining development projects in Tubatse Municipality that could increase the current platinum mines from two to twelve by 2015 and that could double the capacity of the three ferro-chrome smelters. The strategic thrust behind mining cluster development is to adopt the cluster value-chain development approach, as a vehicle to raise the international competitiveness and investment rating of the mining industry in Tubatse Municipality in order to accelerate sustainable job creation and economic growth and to reduce poverty. Proposed targets include:

• Creation of 700 jobs per jobs for the local community; • 20% local procurement within the mining supply chain by 2010; • Increased percentage contribution to GGP from 34.1% to 50%; • Accelerate economic growth from the current 5%1 to 6% between 2007

and 2009 and to 6.6% from 2010 onwards; 1 Although desk-top analyses suggest that the Tubatse economy has grown at a rate of 4% in 2005, local observation suggests that is must be higher than the national average. In the absence of a local survey, it is therefore assumed that the current economic growth rate is 5%. The target for economic growth therefore becomes 6% per year from 2007 to 2009 and 6.5% from 2010 onwards.

Page 17: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

17

• Growth in sectoral investment by 5% per annum; and • Establishment of a dedicated Mining Cluster Working Group by July 2007.

Strategic interventions to achieve the abovementioned targets include:

• A Procurement/Business Development Support Plan linked to the proposed Steelpoort Mining Supply Park;

• Mining Skills Development to promote the recruitability of local labour; • Facilitation of access to infrastructure for mining developments; and • Formation of a Mining Cluster Working Group to combine and integrate

public and private sector contributions to development and to align the interventions of various public development institutions for greater impact.

The action plan for business development support for local emerging entrepreneurs to successfully participate in the mining supply chain must include the identification of products and services; the identification and screening of entrepreneurs and the facilitation of appropriate support services to the screened entrepreneurs. These support services refer to training, access to finance and access to business premises. Training refers to business skills, as well as technical skills that are appropriate to the particular product or service that is being traded. It is essential that the skills development initiatives for mining cluster development should be extended to illiterate unemployed persons. The adult basic education and training programme of the Limpopo Department of Education in Tubatse should be considerably expanded. Training of unemployed persons by the Department of Labour in Limpopo should include an option that is relevant to mining. A more functional relationship needs to be facilitated between the mining SETA (MQA) and employers in order to improve access to and the efficient application of skills development levies within Tubatse Municipality. Finally, Tubatse Municipality should facilitate the nomination of a local person, preferably from the mining industry, to serve on the Limpopo Skills Development Forum that is chaired by the Department of Labour. Roads rehabilitation, water supply, energy usage and housing were identified as key infrastructural needs for the mines. However, given the limited local budgets it is proposed that Tubatse engage effectively with infrastructure implementing agencies and further consider the development of public-private partnerships, where possible Comprehensive action plans for business development support, skills development & infrastructure facilitation interventions are outlined in Phase 4 report. The primary role of Tubatse Municipality is to establish a Mining Cluster Working Group whose purpose would be co-ordination of policy issues and integration of

Page 18: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

18

operational issues among all stakeholders in support of accelerated mining development in Tubatse. These operational issues include infrastructure provision, spatial development, skills development and business development support for emerging entrepreneurs in the mining supply chain. The mandate of the proposed Working Group is discussed in detail in Phase 4 report. The municipality should further consider a visit to the City of Sudbury in Northern Ontario, Canada in order to obtain first hand experience of international best practice with regard to mining cluster development.

3.2.1.2 Tourism cluster development It is recommended that Tubatse Municipality should adopt two different strategies with regard to tourism cluster development. The first is to promote a small number of high-impact projects as identified in the Sekhukhune Tourism Development Strategy and the second is to promote small, local community tourism projects that can be financially sustainable. Proposed targets include:

• Creation of 140 jobs per year for the local community; • Increased percentage contribution to GGP to 8%; • Accelerate economic growth from the current 5% to 6% between 2007 and

2009 and to 6.5% from 2010 onwards; • Growth in sectoral investment by 5% per annum; • Establishment of a dedicated Tourism Cluster Working Group by July

2007; and • Establishment of one tourism flagship project every year between 2007

and 2010. Strategic interventions to achieve these targets include:

• The development of the Tjate Heritage Project; • Development of a mountain resort at Echo Caves; • Development of a tourist route that would link Tjate and Echo caves with

smaller tourist attractions throughout Tubatse and with tourist routes outside Sekhukhune; and

• Establishment of a tourism working group for Tubatse. The proposed action plan for Tjate Heritage Project is that stakeholders (public and private) should be called together under the auspices of the Limpopo Heritage Resource Agency to facilitate the implementation of the Tjate Heritage Management Plan and to develop an economically viable model for the provision of infrastructure at this site.

Page 19: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

19

The proposed action plan for the Echo Caves Mountain Resort is for Tubatse Municipality to arrange an exploratory discussion with the owners of the current facility at Echo Caves, with the Planning and Economic Development department of Sekhukhune District Municipality and with the Tourism Branch of the Limpopo Department of Economic Development, Environment and Tourism. The purpose of the exploratory discussion should be to establish the willingness of the current owner to participate in the development of an expanded mountain resort and escarpment adventure route as envisaged in the Sekhukhune District Tourism Development Strategy. The Southern Drakensberg is a case study on sustainable and successful adventure tourism destination development from which Tubatse Municipality can learn from. Table mountain in Cape Town, Mount Kilimanjaro and The Blue Mountains near Sydney Australia, are also good examples to learn from. The evidence suggests that environmental impact has to be given particular attention. The proposed action plan for Route Development is to appoint a suitable consultant to investigate, assess and recommend options for route development with Tjate Heritage Site and the Echo Caves Mountain Resort as two major anchor projects. Smaller tourist attractions, such as Mahubahube and Mankele (see previous planning documents), as well as other heritage sites, should be assessed from a feasibility point of view. The consultant should also prepare a management plan for the route in the event that a feasible route option can be developed. It is essential that the route should link with other tourist routes outside Tubatse Municipality. A site visit to Kamoka Route (Sun Valley Tourism) should be considered, as it could be useful to assist Tubatse Municipality with the route development process. There are several other tourism route concepts to learn from. For example, Route 62 is probably the best case study of a successful route as a direct marketing drive for a particular geographical area.

3.2.1.3 Horticulture cluster development The strategic thrust behind horticulture cluster development is to improve the competitiveness of this sub sector and to create opportunities for small emerging farmers. Proposed targets include:

• Creation of 170 jobs per year for the local community • 20% procurement within the horticulture supply chain from local

entrepreneurs by 2010 • Increased percentage contribution to GGP from 3.3% to 5%; • Accelerate economic growth from the current 5% to 6% between 2007 and

2009 and to 6.5% from 2010 onwards;

Page 20: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

20

• Growth in sectoral investment by 5% per annum; and • Establishment of a dedicated Horticulture Cluster Working Group by July

2007. The proposed strategic interventions to achieve these targets include:

• Mapping the local horticulture cluster value chain and identifying cluster opportunities for local enterprises;

• Establishment of a Horticulture Cluster Working Group mandated to combine and integrate public and private sector contributions to development and to align the interventions of various public development institutions for greater impact

• Integrating the progress that is made with horticulture cluster development in Tubatse with the local economic development plan for Sekhukhune District and with the Limpopo Growth and Development Strategy.

The action plan to map the horticulture value chain can be derived from the standard methodology for cluster development that is recommended in the PGDS. It requires the appointment of a competent consultant to undertake a study to map horticulture sub-sector value chain and to identify opportunities for local enterprises. Detailed study contents are outlined in Phase 4 report. The action plan to form a horticulture work group is for Tubatse Municipality and the Tubatse Office of the Limpopo Department of Agriculture to invite all commodity groups in the municipal area to an information meeting where the cluster development process is explained and any information regarding the cluster mapping process is provided. The consultant for the horticulture mapping process should also be present. An interim working group should be elected or nominated after the information meeting. The task of the working group should be to deal pro-actively with the results of the cluster mapping process, that is promote the development of new opportunities, lobby for the removal of constraints, facilitate the provision of essential infrastructure and skills development programmes and build networks with other relevant organizations. The composition of the working group can change as the need arises and as the cluster development process gathers momentum. The action plan for the integration of progress with regard to horticulture cluster development in Tubatse with that of Sekhukhune and for this to be reflected in the PGDS, is to request the Manager Planning and Economic Development at Sekhukhune District Municipality to participate in the horticulture cluster working group. This office will then be responsible for communication with the Office of the Premier regarding the PGDS.

Page 21: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

21

3.2.1.4 Meat cluster development

The strategic thrust informing meat cluster development is improvement of the competitiveness of this sub sector and to creation of opportunities for small emerging farmers. Proposed targets include:

• Creation of 170 jobs per year for the local community • 20% procurement within the meat supply chain from local entrepreneurs

by 2010 • Increased percentage contribution to GGP from 3.3% to 5%; • Accelerate economic growth from the current 5% to 6% between 2007 and

2009 and to 6.5% from 2010 onwards; • Growth in sectoral investment by 5% per annum; and • Establishment of a dedicated Meat Cluster Working Group by July 2007.

The proposed strategic interventions to achieve these targets are:

• Development of a Farmer Livestock Support Programme that focuses on cattle, goats and game production;

• Assessing the feasibility of a Feed Production Facility and Feedlots; • Assessing the feasibility of a Meat Processing Centre/Abattoir

The main purpose of the livestock farmer support model should be to improve the productivity and competitiveness of cattle, goat and game farming in Tubatse Municipality. This requires exploration of farmer support models and establishment of a suitable combination of livestock farmer support activities that is appropriate for Tubatse. The following five critical elements should be included in the model:

1) Balanced feed intake (hence the improved feed production referred to above)

2) Breeding cycle management (to improve effective reproduction) 3) Genetic improvement (to improve herd quality) 4) Water supply (to provide more drinking points for animals in communal

areas) 5) Crime prevention (to remove the disincentive for livestock farming that

arises from persistent livestock theft). The proposed action plan for feed production and feedlots for each of these three, cattle, goats and game, is to assess the demand for feed and use of local raw materials (e.g. lucerne and sorghum) to produce feed for livestock requirements and commissioning a study that assesses the viability of a local fee production facility and feedlots.

Page 22: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

22

Still further down the value chain the feasibility of a local abattoir should be considered. Meat packaging and distribution options should be assessed and marketing channels should be evaluated in conjunction with commercial cattle farmers in Tubatse. Tubatse Municipality should play a role by mobilising appropriate development assistance for support to emerging livestock farmers and facilitating the formation of a Meat Cluster Working Group. The task of this working group should also be to deal pro-actively with the results of the livestock farmer support process, that is promote the development of new opportunities, lobby for the removal of constraints, facilitate the provision of essential infrastructure and skills development programmes and build networks with other relevant organizations.

3.2.1.5 Nodal development

The proposed objective is to adopt the spatial hierarchy as proposed in spatial frameworks at the provincial, Sekhukhune District and Tubatse Municipality levels in order to promote nodes where manufacturing value-added activities can occur and where commercial facilities will be available to retain purchasing power in the local economy. It is also essential that sustainable communities should be promoted at these selected nodes, in the sense that residential property rights, employment opportunities, essential urban infrastructure, shopping and recreational facilities should all the available within a functional local environment. Family residential property development and the provision of suitable recreational facilities are particularly important to encourage the permanent settlement of employees with their families. Mining growth points have a tendency to attract single employees who leave their families behind and migrate on a weekly basis. This has inherent social challenges, but also keeps the proportion of earnings that is circulated in the local economy at a minimum. Congestion in Burgersfort must also be addressed. The central business district has become so dysfunctional due to its inability to cope with the demands of growth, that new investment is probably being discouraged. The proposed targets include:

• Creation of 240 jobs per year for the local community; • Accelerate economic growth from the current 5% to 6% between 2007 and

2009 and to 6.5% from 2010 onwards; and • Growth in investment by 5% per annum.

The proposed strategy is to develop nodal development plans as per the provincial, district and local SDF frameworks’ node priority/growth hierarchy and to appoint competent project managers to facilitate and co-ordinate the planning and implementation of all the infrastructure, residential, economic, social, spatial

Page 23: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

23

and institutional aspects of development in the following nodes, particularly in the context of the cluster development proposals that have been made in this report. Table 5: Higher Order Settlement Classification in Tubatse Municipality Settlement Classification Burgersfort Provincial Growth Point (1st order) Steelpoort District Growth Point Mecklenburg Municipal Growth Point Orighstad Municipal Growth Point Driekop Municipal Growth Point Batau-Praktiseer Population Concentration (2nd order) Ga Masha Population Concentration (2nd order) Kgautswana Third order service point Mophalema Third order service point Mampuru Third order service point Malokela Third order service point

Source: Limpopo Spatial Rationale, 2002 The project managers should mobilize additional resources for this purpose through the nodal status of Sekhukhune District in terms of the Integrated and Sustainable Rural Development Strategy until all the standards for a provincial growth point are achieved as indicated in the Tubatse Spatial Development Framework. A proper township establishment process has to be undertaken for the eight of the proposed nodes (excluding Burgersfort, Steelpoort and Orighstad). Township establishment processes should be done in terms of the relevant legislation to formalise the nodes for residential settlement and the business services that are associated with municipal growth points. Considering the scarcity of land for economic and development purposes in the area, it is important that the municipality embark on a parallel process to design an effective land use management plan that should ensure that recommended interventions on nodal development are implemented successfully. This should be done in conjunction with current landowners (especially traditional leaders).

3.2.1.6 Informal sector development The proposed development objective is to provide sustainable livelihood opportunities in the informal sector (second economy) for most of the people who cannot be accommodated in the formal sector (first economy). The proposed targets are:

• Creation of 200 jobs per year for the local community; • Increased percentage contribution to GGP to 20% per annum; and

Page 24: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

24

• Accelerate economic growth from the current 5% to 6% between 2007 and 2009 and to 6.5% from 2009 onwards.

The proposed strategic intervention is to formulate and implement an informal sector development strategy in such a manner that every one of the 11 development nodes of Tubatse Municipality, as identified in the nodal development section above, has a designated informal activity operating area, with support services; and with opportunities for informal economy operators to make a successful transition to the formal economy. 3.2.2 Economic infrastructure support Infrastructure development is identified in the IDP for Tubatse as a priority. Roads are vital for the transportation of goods, services, and local labour. While water infrastructure and resources constitute a primary means of production especially in agriculture and mining. Electricity is a means of production and enabler of economic activity in all sectors and there should be a reliable supply to ensure efficient production for business enterprises. Proposed target include increased percentage of GGP spent on infrastructure by the public and private sectors to an average of between 8 and 10% per annum from 2007 until 2014.

3.2.2.1 Roads and Transport The objective is to ensure good road access into and within the area as part of an economic strategy of upliftment and improvement.

Key interventions include (1) establishment of effective dialogue with Implementing Agencies such as Roads Agency Limpopo, SANRAL and the district municipality to ensure the prioritisation of the needs of GTM, (2) the development of an Integrated Road and Transport Plan to create linkages between road and other transport systems for Tubatse Municipality, and (3) consideration of rail infrastructure development as an alternative means of transportation, especially for freight. In the short to medium term Tubatse Municipality should facilitate the upgrading of R37 (between Burgersfort and Polokwane) and R555 (between Burgersfort and Steelpoort). This should be a key priority for all economic infrastructure support interventions.

3.2.2.2 Water Supply The objective is to provide uninterrupted water supply for residential and business use

Page 25: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

25

Proposed options for addressing the water issue include improving efficiency of water usage, water transfer schemes, development of groundwater, recycling of treated sewage effluent for industrial use and re-allocation of water from other uses through trading. Options that are obviously not feasible should not be considered further, while implementation of the most suitable options will need to be fast-tracked to meet the rapidly increasing demands. Environmental Impact Assessments (EIA) of the feasible options, including a socio-economic impact assessment would have to be undertaken and consultation with DWAF should be prioritised to fund and implement these options. The municipality should therefore work closely with DWAF and the GSDM as the water services authority for prioritisation of the uses as informed by LED strategy priorities. Promotion of partnerships between the municipality and the Local Government, Water & Related Services Sector and Construction Education & Training Authorities should further serve to equip local community and enterprises with the necessary skills to participate in the proposed water supply projects.

3.2.2.3 Electrification The proposed intervention serves to ensure that the Municipality provides reliable and economical electricity for both residential and industrial use. Tubatse Municipality must work closely with ESKOM to ensure that they prioritise uses that will unlock economic potential and contribute positively to social development. Preliminary investigations show that ESKOM is confident that it will have sufficient electricity supply for both economic and social purposes. In addition to residential uses, the municipality must ensure that health facilities and schools are connected to the national grid as this has long-term positive spin-offs.

3.2.2.4 Telecommunication

The aim is to improve the connectivity of the local area. As the very basic, access to voice services is important and must be addressed immediately followed by broadband connectivity as part of the long-term strategy. The recommended way forward is for the municipality to keep up to date with the process of awarding of Under Serviced Area License (USAL) as it should in the long run be a solution to the connectivity problems. Proposed actions to be pursued include:

• Supporting ICT infrastructure development interventions; • Bargain with Telkom, Neotel, GSM network operators for better coverage

of the area and for better prices.

Page 26: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

26

• Promote ICT based business opportunities in collaboration with public institutions such as the CSIR’s Meraka Institute.

• Providing Multipurpose Community Information Centres that comprises internet, e-mail, telephones, etc.

3.2.2.5 Infrastructure Investment Plan

Infrastructure spending patterns in Tubatse are not always linked to or informed by local economic priorities. Whereas the large businesses, like the mines, can provide clear guidance with regard to their requirements such as water and the resulting decision to build De Hoop dam, the needs of the smaller businesses are not that visible. Therefore the infrastructure budgets need to be informed annually by the LED priorities of Tubatse Municipality. It is proposed that the Municipality should invest in a detailed Infrastructure Investment Plan that would quantify the need for infrastructure, guided by this report and other frameworks. The proposed plan should conform to best practice for infrastructure investment and should support strategic thrusts as contained in other government programmes such as ASGISA, NSDP, GSDM LED Strategy and Limpopo GDS.

3.2.2.6 Enterprise development The strategic thrust behind enterprise development in Tubatse is to formalise the organisation of informal and formal businesses in the municipality and to up-skill and improve the quality of offerings by local enterprises Proposed interventions include facilitation to the establishment of a formal trade/business association and development of a Supplier Development Programme (SDP) that is informed by local area issues. The aim of the SDP would be to up-skill and improve the quality of offerings by the local enterprises (especially for identified procurement opportunities in different sectoral clusters). 3.2.3 Social development The proposed interventions serve to equip the local community with relevant education and training and to further improve their well being so that they can actively participate in the local economy.

3.2.3.1 Education and skills development

The proposed skills development intervention serve to encourage the municipality to produce trained and competent workforce to take advantage of opportunities derived from various sectors in the local economy.

Page 27: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

27

The proposed strategic interventions include development of a Skills Development Strategy, consideration of an Employment & Skill Development Agency (ESDA) and youth and women empowerment development strategy. The proposed course of action with regard to the Skills Development Strategy is to commission a study and to tap into underutilized resources that have been dedicated to the National Skills Development Strategy and to focus these resources on the project proposals that have been identified specifically for Greater Tubatse Municipality. This course of action should cover both the up-skilling of currently employed persons and appropriate training for unemployed persons. This would require a closer collaboration with the relevant SETAs including, amongst others, the Mining Qualification Authority (MQA) Tourism and Hospitality SETA (THETA), Agricultural SETA (AgriSETA), Local Government SETA (LGSETA) and the Wholesale and Retail Education and Training Authority (WRSETA). Together with these SETAs, GTM and its local stakeholders should determine the training needs, and development mechanisms for meeting the training needs. With regard to the proposed ESDA, the way forward is for Tubatse to prepare a pre-feasibility study together with the department of Labour so as to assess its developmental impact locally. Youth and women empowerment is a priority issue in all government development policies as youth and women empowerment and youth development are critical to economic stability. The development of mentorship and support programmes that link the youth and women with skills to jobs or entrepreneurial support would serve as the way forward for Tubatse Municipality. Umsobomvu Youth Fund has established mentoring programmes countrywide and it should be the ideal institution to partner with in order to empower the local youth and women. GTM must work closely with the Department of Education to ensure that educational problems are addressed holistically.

3.2.3.2 Housing

The purpose of the articulated housing intervention is to ensure that the local community is provided with proper housing. Secure housing is an IDP priority in the municipality as the housing backlogs are high and lack of access to land worsening. It is proposed that Tubatse should develop a Housing Development Strategy to address the challenges faced by communities in particular at the entry level. Key to the strategy should be the resolution of the land issue to facilitate development. This would entail bringing landowners both private and public

Page 28: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

28

around the table and getting their support for the strategy and showing how it is in their interest to release the land for development as failure to do so will lead to rapid increase of the informal sector

3.2.3.3 Health The purpose of the advocated intervention is to encourage the municipality to ensure improved health services to the local population. The recommended way forward is for the municipality to establish an effective dialogue with the provincial and the district health authorities with a view to jointly assessing local health facilities condition and recommending strategies to alleviate the challenges. 3.2.4 Institutional/governance Dysfunctional and unclear regulations create high transaction costs for local businesses and possible investors. Municipalities need to support the local businesses and possible investors in creating an enabling environment for achieving their economic potential by offering a platform for businesses to have confidence in expanding and investing in Tubatse. It is also important to address environmental requirements for the municipality. Development can have both positive and negative implications for the environment, a balance that needs management. Research shows that municipalities experiencing growth and development such as in Tubatse, face the challenges of the ‘brown’ issues agenda, such as air, soil, and waste pollution, noise, and traffic congestion. These have a direct and immediate effect on human health and safety, especially for the poor, and for business productivity. Moreover, Greater Tubatse Municipality has limited financial resources. Yet this municipality is tasked with the provincial and district agenda of sustainably growing the local economy whilst improving the quality of life of its local population. It is therefore essential that the municipality should consider a sound local financial management plan that would support economic development.

3.2.4.1 Regulatory framework

The purpose of regulatory interventions is to ensure that there is administrative and regulatory flexibility to allow firms to adapt to relevant procedures and standards without incurring prohibitive costs. The way forward is for Tubatse Municipality to undertake a local business enabling environment survey to identify and highlight policies and practices that hinder business development. The Municipality should further consult with other

Page 29: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

29

government business regulatory organisations whose policies have an impact on the operations of local enterprises.

3.2.4.2 Waste Management Plan The purpose of this institutional plan is to address pollution and possible threats to the environment. The way forward is for the municipality to design a waste management plan. The purpose of such a plan would be to systematically formalise waste disposal in Tubatse, particularly at villages, so as to reduce environmental pollution. The plan should, among others, serve to identify highly affected areas and establish relevant sites for waste disposal at nodal points. Furthermore, the community has to be educated on the use of sites through the use of, for example, an Environmental Awareness Campaign. Alternative methods of waste removal such as a community-based system should be considered. This has been proven to be a high impact initiative in that it enhances service delivery and create jobs at the same time.

3.2.4.3 Financial soundness and management The aim is to grow the finances of the municipality and to develop the management of the municipality’s finances. The municipality is currently sustained through intergovernmental fiscal transfers and grants (comprising sixty five percent of budget revenue). There is a need for financial management capacity and information systems plan that will improve the tax base, through, for example, service fees (rates) and other charges for the area. The proposed action plan is to commission a financial capacity building study for the municipality that will serve as guideline to mobilize and apply funds in an effective manner. The study should identify alternative means to finance capital projects from own revenue rather than reliance of the municipality upon grants. Furthermore, creditworthiness is critical to support financial viability of the municipality, as it enables it to access market-based credit instruments to finance development. Due to the current situation of having a low revenue base the municipality would find it difficult to borrow in capital markets other than the public sector development finance institutions such as the DBSA. The municipality should consider inclusion of creditworthiness assessment in the proposed study to assist them with their status and develop an improvement strategy for the future.

Page 30: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

30

3.2.4.4 LED Directorate capacity building

The purpose is to develop the capacity of Tubatse Municipality LED Unit in order to implement and coordinate the LED strategy successfully. Internally, a dedicated Local Economic Development Directorate (reporting directly to the Municipal Manager) and an Interdepartmental Forum (to enhance LED implementation and avoid duplication) are proposed. Externally, a Local Economic Development Forum is advocated as a broader stakeholder forum with the aim of providing input on municipal policies, strategies, delivery processes and other strategic programmes. The LED Forum would be assisted by sector working groups in Mining, Trade & SMMEs, Tourism and Agriculture development.

Page 31: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

31

SECTION 4: IMPLEMENTATION PLAN AND INSTITUTIONAL OPTIONS

The purpose of this section is to map the implementation path and advocate prioritisation of key projects to unlock development potential in Tubatse. Furthermore this section identifies institutions that are necessary to support the implementation of Greater Tubatse Municipality LED Strategy. An overview of internal and external institutional options is provided and the mandates and responsibilities relevant to each institutional arrangement are defined. 4.1 IMPLEMENTATION AND PRIORITISATION Implementation of this LED strategy urges the need to establish the proposed institutional drivers. These establishments need to be accompanied by a political ambition to ensure success. This ambition can be initiated and developed through the inclusion of all interested and affected parties, stakeholders and role players during the planning and implementation phases. By including all of these, a political will, interest and communication are stimulated which, all together will contribute to the success of the strategy. Another important aspect for successful implementation is to ensure that all involved take ownership of the programmes and projects. Without the taking of ownership of a programme and/or project, success cannot be seen at the end of the tunnel. It is also important to incorporate the monitoring and evaluation elements of the strategy into the performance management system of Greater Tubatse Municipality, to ensure accountability and responsibility for implementation. The process below provides general preliminary actions that are required to start implementation of the LED Strategy. 1. Finalization of project action plans (as detailed in Phase 4 report) by the

responsible institution/official(s) 2. Risk assessment of projects 3. Final choices of projects for implementation 4. Establishment of the coordinating and organizational bodies for

implementation 5. Determining the role, reporting mechanisms and funding for the coordinating

institution/official (s)

Page 32: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

32

6. Setting up institutional mechanisms for implementation 7. Implementing the selected projects 8. Monitoring and evaluating implemented projects The LED Strategy has identified projects that should be regarded as having highest priorities and should be addressed in the immediate future as depicted in the tables below. These projects have been identified as having the potential to have the largest immediate impact in the area and requires the involvement and facilitation from the Municipality to ensure increased economic development. The methodology used to prioritize the projects is comprehensively covered in Phase 3 report. Table 6: Social, Economic and Institutional impact of Sector Development Projects

Project Social Economic Institutional Total RankProcurement Plan 80 100 85 265 Very High Mining Skills Development Plan 100 80 30 210 High Mining Infrastructure Support 100 95 85 280 Very High Tjate Heritage 70 90 20 180 Medium Echo Caves 70 90 20 180 Medium Route development 70 90 20 180 Medium Horticulture cluster mapping & opportunities

70 100 20 190 Medium

Livestock FSP 70 100 30 200 High Feed Production & Feedlots 40 90 20 150 Medium Meat processing centre/Abattoir 40 100 20 160 Medium Urban Development Plans 70 100 65 235 High Informal Sector Development Strategy

90 100 45 235 High

Table 7: Social, Economic and Institutional impact of Economic Infrastructure Support Projects

Project Social Economic Institutional Total RankIntegrated Road and Transport Plan

30 90 100 220 High

Infrastructure Investment Plan 30 90 100 220 High Dialogue with Implementing Agencies

30 90 100 220 High

Water Resources Development 70 75 75 220 High Supplier Development Programme 100 90 45 235 High ICT Infrastructure strategy 100 85 20 205 High Trade/Business Association 30 20 20 70 Low

Table 8 : Social, Economic and Institutional impact of Social Development Projects

Project Social Economic Institutional Total RankSkills Development Strategy 80 50 85 215 High Job Placement Agency 80 30 20 130 MediumYouth and Women Empowerment Plan

80 50 20 150 Medium

Housing Development Strategy 30 30 100 160 MediumDialogue with Health Authorities 30 90 100 220 High Dialogue with Education Authorities

30 90 100 220 High

Table 9: Social, Economic and Institutional impact of Institutional/Governance Reform Projects

Project Social Economic Institutional Total RankBusiness Enabling Environment 20 90 90 200 High Waste Management Plan 50 20 100 170 Medium

Page 33: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

33

Financial Soundness & Management

70 85 90 245 High

LED Directorate Capacity Building 20 90 90 200 High

4.2 INSTITUTIONAL OPTIONS 4.2.1 Internal Arrangements

4.2.1.1 LED Directorate It is proposed that the LED Unit be a Directorate on its own, reporting directly to the Office of the Municipal Manager. More importantly, as a strategic Directorate, it requires a Head/Director, who will be able to represent economic development issues in management and in other related structures effectively. It requires someone who will effectively mobilise resources to implement the strategic objectives of the LED Strategy, and also to drive the economic vision of the municipality as a whole, without him/her being overloaded with non-LED related issues. The Director will be supported by two (2) technical experts who will serve as Unit Managers in Policy and Research Unit and Enterprise Support Unit. The former Unit will be mandated to (1) manage, coordinate and monitor economic related policies, (2) coordinate and commission socio-economic research, (3) identify LED constraints and opportunities and mitigating strategies, and (4) coordinate the monitoring and evaluation framework of the LED department. Two (2) coordinated would be required to serve within this Unit. The duties and responsibilities of officials required to serve within this Unit are comprehensively described in Annexure 5. The mandate of the Enterprise Support Unit would be to (1) facilitate and coordinate all municipal LED related projects, (2) facilitate growth of agricultural and cooperative development projects, trade and SMMEs development, mining projects, and tourism sector, and (3) skills development. Four (4) Sector-specific Development Officers would be required to serve within the Enterprise Support Unit. The duties and responsibilities of officials required to serve within this Unit are comprehensively described in Annexure 5.

4.2.1.2 Interdepartmental relations The LED Directorate should also work closely together with other departments to guarantee the alignment of efforts and to avoid duplication of work. For example, Land Development, which deals with Spatial Development Frameworks (SDFs); Strategic Support Service Department, which manages, oversee and monitor IDP as well as maintenance and coordination of the intergovernmental relations; as

Page 34: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

34

well as Technical Service department, which provides procurement services, infrastructure development and service delivery. 4.2.2 External Arrangements

4.2.2.1 LED Forum This will be a formal structure consisting of key stakeholders from the mining, tourism, agriculture, trade and SMMEs and representatives from the local community, Tubatse Municipality, Sekhukhune District Municipality and Limpopo Provincial Government. The proposed Sector/Sub sector Cluster Working Groups would be part of this Forum. Central to the goals of the Forum would be working towards achieving the alignment of different policies and programmes of various stakeholders for successfully implementation of Greater Tubatse Municipality LED Strategy In a nutshell the Forum would: • Function as broader stakeholder forum; • Identify economic development bottlenecks hindering the development of

GTM’s economy; • Identify interventions to address those constraints; • Provide relevant direction and assistance to sectoral working groups; • Provide input on other municipal policies, strategies, and delivery processes,

e.g. IDP, crime prevention plan, etc; • Meet twice a year to discuss economic related problems; • Serves as a growth coalition where matters hampering the local economy are

discussed and resolutions sought. The functions of the proposed working groups include: • Serving as a stakeholder forum of the sector; • Identifying and communicating issues hampering business development of

each sector in the GTM; • Identifying interventions to address those constraints; • Consulting with the broader LED Forum; • Developing and implementing the intervention strategies; • Participating in the implementation of all by-laws; • Establishing and maintaining partnerships to facilitate LED activities.

Members of the Mining Cluster Working Group should include: • Departmental Managers for Local Economic Development and for Technical

Services at Sekhukhune District Municipality,

Page 35: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

35

• Head of Technical Services at Tubatse Municipality • Representative of the Planning Division in the Office of the Premier in

Limpopo, • Mining directorate in the Limpopo Department of Economic Development,

Environment and Tourism, • Representative of the DME Provincial office in Limpopo, • DWAF planning manager for Sekhukhune District, • Department of Labour Employment and Skills Development Manager for

Limpopo, • Steelpoort Producers Forum, • Sustainable Development Managers of all mines in Sekhukhune District, • Representative of Eskom, • Representative of Spoornet, • Representative of the Roads Agency Limpopo, • Representative of DBSA for Sekhukhune District, • Representative of Trade and Investment Limpopo for the mining sector, and • Representatives of business development support and finance institutions in

Limpopo. Members of the Agriculture Cluster Working Group should include: • Department managers for Local Economic Development in GSDM and

Tubatse • Representative of Limpopo Department of Agriculture • Representative of Greater Sekhukhune Department of Agriculture • Representative of commercial farmers in Tubatse • Representative of small emerging farmers in Tubatse • Representative of Trade and Investment Limpopo for agriculture sector • Representatives of business development support and finance institutions in

Limpopo. Members of the Tourism Cluster Working Group should include: • Department managers for Local Economic Development in GSDM and

Tubatse • Representative of Limpopo Dept of Arts & Culture, • EPWP Coordinator, • Limpopo Heritage Resource Agency, • Sekhukhune Royal House, • Representative of Limpopo Tourism Parks Board, • African Heritage Consultants, • Bapedi Heritage Development, • Representative of Limpopo Department of Economic Development,

Environment and Tourism, and • Representative of Trade and Investment Limpopo for tourism sector.

Page 36: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

36

Members of the Trade & SMME Development Working Group should include: • Representatives of business development support and finance institutions in

Limpopo (e.g. LIBSA, SEDA, LIMDEV, etc.). • Department managers for Local Economic Development in GSDM and

Tubatse • Representative of SMMEs in Tubatse

4.2.2.2 Intergovernmental relations

The facilitation of communication and cooperation between GTM and other spheres of government, particularly the district municipality is ineffective currently, and needs to be revived. The proposed LED Directorate has to work towards aligning its programmes to those of district, provincial and national government. In addition, sharing of information and expertise with other spheres of government should be advocated. It is advisable that Tubatse Municipality should commit itself to structures such as the District’s Intergovernmental Forum, LED Forum and other strategic forums. 4.3 RESPONSIBILITIES AND IMPLEMENTATION

PARTNERS The table below depicts the responsibilities and implementation partners of the proposed interventions as articulated in Greater Tubatse Municipality Local Economic Development Strategy.

Programmes/Projects Responsibility Implementing Partner(s) Sector development

Procurement/Business Development Support Plan

Head of LED Trade & SMME Development & Support Officer

Mining Cluster Working Group LED Resource Centre (Turfloop) DPLG International Business Development Experts

Skills Development Head of LED Skills Development Officer

Mining Cluster Working Group

Infrastructure Support Head of Technical Services Mining Cluster Working GroupTjate Heritage Head of LED Tourism Cluster Working GroupEcho Caves Head of LED

Tourism Development and Marketing OfficerTourism Cluster Working Group

Route development Head of LED Tourism Development and Marketing Officer

Tourism Cluster Working Group

Cluster Mapping & Opportunities Head of LED Agriculture and Cooperative Development Officer

Agriculture Cluster Working Group

Livestock FSP Head of LED Agriculture and Cooperative Development Officer

Agriculture Cluster Working Group

Feed Production and Feedlots Head of LED Agriculture and Cooperative Development Officer

Agriculture Cluster Working Group

Page 37: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

37

Meat Processing Centre Head of LED Agriculture and Cooperative Development Officer

Agriculture Cluster Working Group

Nodal Development Plans Head of LED Chief Town Planner

Representative of Provincial and District DLGH

Informal Sector Development Strategy Head of LED Trade and SMME Development & Support Officer

LED Resource Centre (Turfloop) Trade & SMME Development Working Group

Economic Infrastructure Support Dialogue with Implementing Agencies Head of Technical Services Representative of Limpopo Dept of Transport,

SANRAL, Road Agency Limpopo, and GSDMIntegrated Road & Transportation Plan Head of Technical Services Representative of Limpopo DoT, SANRAL, Road

Agency Limpopo, GSDM Water Sources Head of Technical Services Representative of DWAF, GSDMDialogue with ESKOM Head of Technical Services Representative of ESKOM, GSDMICT Infrastructure Strategy Head of Technical Services Representative of Limpopo Department of

Communications, ICASA Infrastructure Investment Plan Head of Technical Services and LED Representative of GSDM, DBSABusiness Association Head of LED

Trade and SMME Development & Support Officer

Representatives of business development support and finance institutions in Limpopo (e.g. LIBSA, SEDA, LIMDEV, etc.).

Supplier Development Programme Head of LED Trade and SMME Development & Support Officer

Representatives of business development support and finance institutions in Limpopo (e.g. LIBSA, SEDA, LIMDEV, etc.).

Social Development Skills Development Strategy Head of LED

Skills Development Officer Representatives of provincial and district Department of Labour

Employment & Skills Development Agency

Head of LED Skills Development Officer

Representatives of provincial and district Department of Labour

Youth and Women Empowerment Head of LED Skills Development Officer

Representatives of provincial and district Department of Labour

Housing Development Strategy Head of Technical Services and LED Representatives of provincial and district DPLGHDialogue with Department of Health Head of Technical Services and LED Representatives of provincial and district

Department of Health Dialogue with Department of Education & SETAs

Head of Technical Services and LED Skills Development Officer

Representatives of provincial and district Department of Education and SETAs

Institutional/Governance Business Survey Head of LED

Trade and SMME Development & Support Officer

Representatives of business development support and finance institutions in Limpopo (e.g. LIBSA, SEDA, LIMDEV, etc.).

Waste Management Plan Head of Technical Services and LED Representatives of Limpopo DEDET, DWAFFinancial Capacity Building Plan Chief Financial Officer Representative of the GSDM’s Department of

Finance LED Directorate Capacity Building Municipal Manager

Head of ELD Procurement Dynamics

Page 38: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

38

Annexure: Sector Development Mapping

Page 39: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

L o ca lit y M a p s

D a te : 2 1 J u ne 2 0 0 7D ra w in g no . : 2Pro je c t n o . : 0 0 0 4R e f n o .: c :\G i sp d ata \ c lien t\0 0 0 4 \ pro jec t s\ tu b a ts e o rw sd p .ap r

M ap Pr od u c ti on :iN VI R O M A PPo lo kw a n eC ha r les S to p fo rth /M ar ie t j ie S m i tT e l: 0 15 - 2 9 6 4 8 5 4

3 0 3 6 9 K ilo m e ter s

S ca le 1 : 15 0 0 00

S ek hu k h u n e

F e ta k go m o

M a k hu d u tam a g aT u b a ts e

G ro b le rs d a l

L im p o p o

M a gop eDu bli n

M p hap e

S en tl ha ne

M a ts oo ngM o ts an eRa m a lla ne E xt

Sen tlha ne E xt M o sol aRa m a lla ne

Ts w e re ng

Led i ngw e

M a re d iLek g w ar eng M o ts an e Ex t 1

M a nk el e

M o tsan e Ex t 2

Seh wi tin gM a re d i E x t 1

Ra di m ps heG a- M o te ne

Ha ben g

Sen y ath o

M o dub en gM o tloul e la

D ith ab ane ngP itsan en g

S eb epeDi th ab ane ng E xtS eo k od ib en g

G a- M o kgo thoG a- M m a m o golo

G a- P h as ha Leg ab eng

S eo k od ib en g

M a lo k e la

Ts id in ts i

M o s hi r a Lef ah l aM a adis w an e

G a- M a m pa M a re tlwa ne ng Len kw ane ng

Seh uny ane

Pou ng

M a gak a l a

M a s heg en g

Pen ge

B ots hab elo

Ser or on g

Sek it lo ngP las en g

D ith wa iin gTw i ck en ha m

Sha kun gM a ts iri

M a gak a la Ex t 1

G a- M a k go pa

G a- M a k go pa E xt 1

Di pu r ur un g

G a- K g we te

O l d W elte v re de M y n

M o ra pa nen g

G a- M a s ha be la

M a nto p i

Seh la be ng

G a- M a s et e E xt 1M a k gak e

D ith ab ane ngDi to be le ng G a- M a s et e

Ta un gLep ell e

G a- M a s his h iP id im a

M o rg en zo n

S w ale M a ots i

G a- M o r abaSek o pu ngM o dim o lle

M a ts ak a ne G a- Po di le M o tsha na

M a s ehw a nen gM a ntsa k an e

G a- M a k of aneM a ny ak a

M a le k gw ar a na

M o hlop e

Leb oe ng

M a k gw ar en g

Ta un g E x t 1

Ta un g Ex t 2

M a nts a kan e E x t 1Tsw e ny an e

Nt s wa ne ng

Sek o pu ng E xt 1M o s ego M a far af ar a

Tid in tits a ne M a gab an eng

G a- Se pek e

G a- S e la l a

M a k ota s en gM a dik an e

M o kobo l a

M a tad iM a far af ar a E xt 1G a- M a ap ea

Seu we

Phir i ng E x t 1Lek g w ar engDi th o l on g

M o ts ep ul an a

M o ntw an en g

M a k opu ng

M a tok o m a ne

Leg ab engPhi r ing Ex t 2

M a k gal a ne

G a- M a hl o k wa ne

M a bot s haP hi r ing

D iph a le

M o tl o loG a- M a r oga Ex t

M a nog e

G a- M o du pi

G a- M a r oga

M a hl as h i

Pr eto ri a F ar m

G a- M a k hw a e

M a la en eng Ex t 1

M a bela ne - M a fog o

G a- R ib a

Th usa nan gG a- P h ahla

G a- M o to d i

M a s ehl e ng

Stas

G a- M a pe a K go tl op ongM a k gop a

M a s hil av e leA l ver ton

G a- O r i aM a k gw ar en g

S w al e

S ek i ti

P r aktis ee r

M a gol e go

Dr i ek o p

S he nya nen gM o pha lem a M o k utu ng

G a- K h ow an e

Cr oss in g M o oiho ekM o tl ai lane

G a- K o be

P ul ase ngNk o s i

M a naw a nen g

Th ab ane ng

S eh la k u

M a diba nen gRi ba C r os s

D ith ab ane ng

Both as h oe kD ino ts i

M a ak go ng ywa ne

M a shi bi s h aneM o hl ake

M a sak en g

G a- M a m pha hlan eM a thi be ng

Balo t s an eng

G a- M a ese ngM a le ga le

Kga uts w a na

Leo l o

G a- M a no k e

M a ngin engS eb it s an e

M a sham th an eG eluk s Lo cation ATsa tan e

M a nde l a

Ho epa kr ant z

G a- M o k ad iM a gem en g

Bata u

Di fa ga te

Ts a tan e Ex t 1M a s eles e l eng

S ek e leG a- M a ila M ap it s an e

Ra m p he la ne

M a nga ne ngM o di k ets i

Sam c or R es id en ts

Di se s aneM a ru la ne ng

M a ti m a tsat s iG a- M a go lego

M o la po ng

M a s it eG a- M o k go ad iK a- M abu l e

Leg oto ng

S c ho on oor d

G a- M o hl a la

S tok in gJ ane F ur s e

G a- S e k ele

M a pod i le

E m k hon dw en i

G a- Ph as haTo kak g om o E x t

G a- M o ga s ho a S enkg ap udi

Sop ey a na

Ts o pa nen g

M a kger uG a- M o ga sho a M an am an e

G a- R ata u M a m p ur u

A nn ex A

Bots hab el o

M a ntl he nya neM a m p ur u E x tG a- M a lak a B

M a pho ph a

G a- M a lak a

G a- M a ep a

G a- R ata u

G a- M p ha na

Ts a k an e

G a- R ant ho

G a- M a s ha

G a- M a lek a na

Koto llo

H la la ne kahleM a s ev en

Pata nt swa ne

Lek o ro k or w an eng

Leh lak on g

To k ak g om o AM a pod ile LC H

M a le an eng LC H

M a la en eng

M a ra re ng LC H M a ra re ng

Sofa y aM a deir a

M o etlad im o LC H

E na ble

M a k gau ng

S efik e ng LC H

W o rc e s ter

Tu rk ey Z o ne 4

Tu rk ey Z o ne 3 E x t.

Tu rk ey Z o ne 3

Lon do nTu rk ey Z o ne 2

Tu rk ey Z o ne 1

B uts han a

M o el a lan e

San ten g

Sed ow a

Th e O aksTh e W il lo w s

M a bins A

M a bins B

M e tz

Fin a l e

Ro s tok

M a hl ab engRo stok Ex t 1

M a hl ab eng E xt 1

M o ei je l i jkM m asi k w e

Lekg w ar eng

Ts h iben gM o nam et san a

M o nam et s i G a- M o kgo tho

G a- Se le pe

M o s ots iG a- M a no tw an e

P asc h as k r aa l

Pas c h as kr aa l Ex t 1

M a k opa

M a k opa

Ts w e re ng

M a pula nen g

M o hla le t s i Ex tG a- S e ro k a

Ts ib eng B

Bur ge rs f or t

W i nt er v e ld M i n e

S tee l po or t

O rig hs ta d

Boe rb oo m s kr aa l

Ka l k fo nte in

Buff e l sho ek

Buff el sho ek

DR IEK O P

CE YL O N

JED D O

RIET V AL E Y

E L AN D SF O N TE IN

BL Y D ER IV IER PO O R T

W IN T ER V EL D

LE D OV IN E

TH IO N V IL L E

PER T H

KL IPR O TS

FI N SB U R Y

APIES B OO M E N

GL E N O R A

GR O O T FO N T EIN

LU N C A R TY

CL E R M O N T

TW E EF O N T EIN

ZW A K W A TE R

VYG EB O OM

IN -D E -D IE PT E

G O U D M Y N

DE R B R O C H EN

BO S C H H O EK

NO O IT G E D AC H T

VAA L H O EK

O N VE R W AC H T

FA U G H A B A L LA G H

DR E SD EN

RIET V LE Y

DO O R N H O EK

HE N D R IK S PL AA TS

O PE N AF

BU F F EL S FO N T EIN

EE R S TE G E LU K

S U F FO L K

W IT G A T B O O M

LO U IS E V IL L E

LIS S AB O N

TO W N L AN D S O F L YD EN B U R G

LO T E

M AR EE SB U R G

W AK K ER S D AL

ST EEN V EL D

LO T C

LO T D

RIET F ON T E IN

HE R M AN S B UR G

ST ER K F ON T E IN

ST EEL P O O RT P AR K

SPI T SK OP

SC H U IN S

BO O Y SE ND A L

HA R T EB EE ST VL AK T E

BU F F EL S D RIF T

PO N IES K R AN S

HE L EN A

DO O R N B O SC H

DO O R N B O O M

W AL H AL L A

G O E D E V E R W AC H T IN G

O L IF A N TS G E R AA M TEUY SE D O O R N S

NO R M AD A L E

BO VE N OP

W EL G E VO ND E N

VYG EN H O E K

RO Z EN K R AN Z

DW AR S R I V IER

NA AU W P O O R T

KR A AIB OS C H

DE B A D

DIE P G E Z ET

BE T 'EL

FR A AIU IT Z IC H T

HE R M AN S D AL

CH IEF T AIN S PL A IN

KL IPK L O O F

KA SP ER SN E KEL AN D SD O OR N

BU F F EL S H OE K

DR A AIK R AA L

EL D O R A DO

G O E D E V O O R U IT Z IC H T

FR ISC H G E W A AG D

HE B R ON

O H R IG ST A D

BO O M P L AA TS

RO OD E PO O R T

LO T A

LO T B

KL IP P U N T

KL IPP LA AT D R IF T

W IN T ER H O E K

CO N C OR D IA

VILJ OE N S H O O P

KL E IN F O NT E IN

LO N G S IG H T

ST ER K ST R O O M

PAA R D EK R AA L

P EA C H T R EE

BU F F EL K L O O F

RO OI D R AA I

UIT K O M S T

S T . G E O R G E

RU S H O L M E

PIET ER SB U R G

BU T T O N S H O PE

LE ID E N B UR G

PO T L O O D SP RU IT

VR O E G G EN O E G

BE R G H O EK

G R O O T B O O M

SAB IES H OE K

G O E D GE D AC H T

KA L K F O N T EIN

BE R G F O NT E IN

RIC H M O N D

SH EB A

M O O IP LA AT S

ST R YD F O N T EIN

W AT ER V AL

AN N EX G R OO TB O O M

KR U G ER S H O O P

AAP IESD O OR N D R AA I

J OH A N N ESB E R G

S M ITS K U IL EN

ST EE L P O O RT S DR IF T

FR A N K FO R T

O L IF A N TS H OE K

RO T U ND A CR E EK

KL IPH E U VE LM O R G E N Z ON

ST EYN S VER W A C H T

KR A N SK L O O F

W IL D EB E ESK R A AL

ST ER K S P R UIT

VR AA IU I T Z IC H T

W IL D EB E EST K R A AL

W EL T EVR E D EN

DE G R O O T EB O O M

OL IF A N TS PO O R T JE

PAA R D EPL A AT S

M AP O C H SG R O N D E

VL AK F O N T EIN

BE ET G E K R AA L

RO O IK R AN S

FO R M O S A

RIET V AL Y

M O O IF O N T EIN

KL IPF O N TE IN

RU S TP L AA TS

TH O R NC L IF F EBE N D IG O H EIG H T S

M O O IM E IS JES FO N T EIN

NA T AL SH O O P

SAC R A M EN T O C R EE K

SH EE PR U N

BL A C K H IL L

BE R G K A N T

DE K U IL E N

M AG SV IL L E

BE L VED E R E

RO O D E K R AN S

BO ER B O OM K R AA L

EN K E L D E D O O R N S

BR A N D D R AA I

LIT TL E J O K ER

W IL D E B E ES T H O EK

KE N N ED Y' S VA LE

CA T ER H AM

G R O O T FO N T E IN BE R G

J AC K T O N

HA AK D O O R N D R AA I

KL IPF O N TE IN H O EK

BR E YT EN B A C HS K R AA L

BU F F EL S VL EY

S C H AA PK R AA L

KR U G ER SP O S T

VAN D ER M ER W E S R E EF

M O U N T P R O SP EC T

VITO W N

G R AN IT E H IL L

KO PP IE SK R AA L

RO O D E W AL S HO EK

HO N IN G N ES TK R A N S

M O U N T AIN T O P

DE K A F F ER SK R A AL

EILA N D

M O D D ER S P R U IT

BO S C H F O N T EIN

M O ST ER T H O EK

M O O IH O EK

TR IAN G L E

LE EU W V AL L EI

KL O N D Y K E

BA K ER S B L I SS

PICA R D IE

BA B E R

LA N G EN SM A L

P L AT L AN D

LA N G E M AR K

S PE K B O O M D R IF T

DO N H U R

LO N G R ID G E

TU S SC H EN -IN

PR IN S O L IER

KL E IN P LA AT S

RIV IER P L AA S

SM U T SF IE L D

UN A L IE N AT ED ST AT E L AN D

UIT V A LG R O N D

59 5K T

31 JT

4 35 K T

7J T

54 6K T

3 90K T

1 97 J T

2 93 K T

8J T

44 1K T

56 2K T

29 5K T

2 1J T

1 67 J T

30 6K T

9JT

28 1K T

3 05 K T

16 3J T

3 92 K T

452 K T

16 4J T

5 07 K T

3 77 K T

36 6K T 1 58 J T

1 52 K T

51 4K T

15 6J T

19 8J T

43 JT

51 2K T

29 2K T

4 14 K T

32 7K T

31 0K T

495 K T

1 JT

3 39K T

35 5K T

3 18K T

31 6K T

43 6K T

3J T

4 7J T

33 7K T

46J T

4 87 K T

6 0J T

48 3K T

3 48 K T

31 1K T

34 5K T

54 3K T

47 4K T

2 94 K T

6 JT

1 0J T

229 K T

36 JT

3 94K T

3 38 K T

47 8K T

5 5J T

30 3K T

304 K T

41 3K T

52 4K T

11 JT

30 0K T

37 2K T

55 5K T

48 6K T

30J T

48 2K T

2J T

54 8K T

35 9K T

48 JT

33 3K T

2 9JT

18 JT

2 2J T

3 91 K T

317 K T

51 JT

34 1K T

15 3J T

4 51K T

3 99 K T

4 4J T

36 8K T

3 78 K T

5 JT

4 5JT

48 1K T

3 35 K T

28 JT

30 1K T

4 11 K T

2 98 K T

44 8K T

35 2K T

2 96 K T

55 8K T

45 0K T

4 37 K T

1 69 J T

38 2K T

4 88 K T

350 K T

3 46K T

3 4J T

5 51 K T

4 60 K T

2 01 J T

2 04J T

3 54K T

349 K T

20 2J T

5 53 K T

4 90 K T

4 43K T

39 3K T

3 63 K T

3 3J T

3 19K T

56 0K T

5 00J S

52 7K T

51 0K T

5 44K T

1 9J T

2 00 J T

44 7K T

442 K T

3 60 K T

4 91 K T

30 7K T

4 92 K T

38 3K T

37 3K T

36 7K T3 87 K T

2 4J T

3 5J T

1 54 J T

30 9K T

33 6K T

2 06 J T

31 2K T

5 59 K T

3 57K T

3 95 K T

19 6J T

35 6K T

3 43 K T

51 6K T

3 96 K T

57 JT

5 54 K T

5 15 K T

2 0J T

35 3K T

5 25K T

16 8J T

5 09 K T

4 84 K T

5 49K T

5 20 K T

3 70 K T

5 61K T

55 6K T

5 45 K T

31 3K T

38 9K T

38 5K T

52 6K T

15 1J T

3 74 K T

444 K T

4 1J T

52 JT

40 0K T375 K T

4 85 K T

38 6K T

17 JT

5 22K T

43 9K T

3 61 K T

5 3J T

4 38 K T

407 K T

58 JT

4 2J T

1 57 J T

21 1J T

2 12J T

15 9J T

52 3K T

2 03J T

17 9J T

39 JT

3 62K T

4 09 K T

52 8K T

4 89K T

20 5J T

54 7K T

4 08 K T

34 0K T

1 3J T

45 9K T

5 18 K T

1 5J T

3 88 K T

5 50K T

54 4J S

2 5J T

34 4K T

1 61 J T

4 77 K T

518 J S

52 1K T

431 K T

9 72 J S

49 4K T

74 9J T

51 1K T

5 4J T

29 7K T

16 5J T

39 7K T

9 56 J S

4 49 K T

49 3K T

SAB IE

LY D EN B U R G

951 J S

59 JT

91 3J S

1 62 J T

552 K T

9 59J S

26 JT

38 4K T

3 80 K T

0J T

O H R IG ST A D

30 8K T

34 7K T

9 55J S

27J T

44 6K T

5 01 J S

50 9J S

5 17 J S

51 1J S

ST EEL P O O RT

5 23 J S

5 15 J S

5 19 J S

1 2J T

5 04 J S

5 05J S

BU R G ER SF O R T

521 J S

PAR C E L ID EN T IF IER 74

27 8K T

PAR C E L ID E N T IF IER 8 3

1 60 0 00 01 2 6J T

Ko r en v e ld e n

M e tz

Tu r ke y

Pa ry s

Str a sb u r g

Ca li fo r n ia

Sa d o w a

Bu lw e r

No o i ig e d a c h t

E n ab le

Fin a le

Pen g e

Lo n d o n

Ste l len b oc h

W or ce s te r

O ste n d

Str ea t ha m

Th e O a ks

Bism a r ck

Ca lla is

G ibr al ta rCe re s

Avo ca

Ba z ain e

M ol tke

Lo r r aine

Rive rs id e

E en z aam

Aap jes b o o m

Ch e dle

An n esle y

Li ve rp o o l

Du n st ab le

Fra n kf ort

Bo s ch po o r t

Kl ip fo nt ein

Th e E lm s

J ag d lu s t

Did sb u r y

Kra n s k lo o f

M oe ije lu k

Ro s to k

Tw ee f o nt ein

Za m e n lo op

Ir o n s to n e

G o ed g e d a ch t

ste r ks pru i t

Jo bs ko p

Du b l in

Th e W i llo w s

M a r ga te

Him ala ya

W in te rs ve ld

Ze e ko e g at

Br ak fo n tein

Pa sc h as K ra al

De K a m p

On ver w ac h t

Ba lm o ra l

Ho u n s lo w

Pa tr icr o ft

Bo k ha lv a

Ro l fo n tein

Ed e n d a leQ u ar tz h il l

Um loe an es s tad

Zw itse r lan d

M an ut saW el tevr e d en

Ro o d e p o o rt

Fe s an t L a ag te

Kr o m e lle b o o g

Fe rn klo o f

M id d elp un t

Diep k lo o f

Ha ak d o o r n H o e k

Fo ch a be rsM a le k sk ra a l

Ch o r lt on

Zw ar tk op p ies

Go d w in to n

Per k eo

Th er o n h il l

An la g e

Zo n n e sc hy n

M a g ne ts V la kt e

Ed in b u r gh

Ha a kd o o rnh o ek

Sk i ld e rk ra ns

G EL U K S L O C A T IO N

22 7K T

CR O W N LA N D OW

1 10 K T

1 22 K T

10 5K T

228 K T

091 K T

1 20K T

4 40 K T

2 58 K T

1 06 K T

2 70 K T

19 5K T

1 96 K T

0 99K T

2 54 K T

2 19 K T

60 2K T

07 5K T

10 0K T

09 7K T

1 12 K T

2 55 K T

8 84 K S

12 1K T

116 K T

2 75 K T

17 6K T

2 53 K T

779 K S

19 8K T

174 K T

19 4K T

2 76 K T

1 17 K T

114 K T

17 5K T

1 13K T

256 K T

8 43 K S

10 7K T

25 9K T

07 9K T

87 8K S

104 K T

324 K T

33 2K T

26 4K T

4 66K S

2 30 K T

84 8K S

46 5K S

0 73K T

2 00 K T

10 8K T

2 63 K T

192 K T

20 2K T

875 K S

131 K T

10 9K T

13 4K T

19 7K T

260 K T

41 9K S

4 06 K T

2 65 K T

2 78 K T

41 2K T

36 5K T

60 4K T

09 6K T

41 7K S

2 26 K T

19 9K T46 4K S

13 5K T

0 83 K T

26 2K T

12 3K T

4 12 K S

07 8K T

4 01K T

2 49 K T

1 18 K T

847 K S

08 6K T

25 7K T

421 K S

8 82 K S

4 18 K S

47 2K S

11 5K T

0 81 K T0 94 K T

08 2K T

1 37 K T13 2K T

5 06 K S

08 5K T

28 2K T

2 91 K T

47 3K S

0 84 K T

411 K S

33 1K T

463 K S

08 0K T

2 72 K T

12 6K T

13 0K T

22 0K T

0 90K T

5 07 K S

25 0K T

32 9K T

0 92 K T

3 23 K T

22 2K T

36 3K T

88 0K S

1 19 K T

50 8K S

21 6K T

0 77 K T4 10K S

54 2K S

2 84K T

12 4K T

098 K T

42 0K S

3 30K T

2 52 K T

5 09 K S

2 18 K T

40 3K T

413 K S

23 3K T

28 3K T

2 21 K T

2 90K T

09 5K T

1 25 K T1 29 K T

28 5K T

53 9K S

2 74 K T

36 4K T

2 71 K T

325 K T

128 K T

1 36 K T

26 8K T

5 41 K S

40 4K T

543 K S

27 3K T

54 4K S

4 05 K T

40 9K S

883 K S

2 01 K T

2 67 K T

2 23K T

51 2K S

27 7K T

225 K T

26 6K T

21 7K T 232 K T

2 96 K T

4 13 K T

51 3K S

40 7K T

3 33K T

36 2K T

26 1K T

9 04 K S

51 9K S

00

42 3

1

030

0

0

6

0

1

410

37

0 40

0

00

0

0 96

0

0

0

0

38

1

139

2

0

0

0

78

23

0

0

981

2

0

0

0 0

24

26

4

97

0

121227

0

10

4228

6

84

2

0

713

5

25

69

3

2120

11

0

19

0

18

0

17

161591

0

2

0

0 0

22

0

1

0

0

0

0

0

0

11

1

0

62

0

6160595857565554

0

53

0

4252 4140353639 3738

0

0

1

21

0

20

1

19

0

141516017

9

3 2

01

0

1

80

0

0

0

0

0

0

0

0

0

0

1

0

1

6 71

1959

0

1

0

181621 5

0

87

10

0 0

0

0

0

0

0

00

20

1

0

0 00

0

1

0

01

00

0

2

0

00

0

0

0

0

0

0

0

0

0

1

0

1

01

00

1

0

0

0 0 0

0

0

1

0

0

11

0

0

4

00

303

22

1

20

0

0

3

2

1 00

0

0

8 20

0

11

2

0

0

2

0

0

0

29

1

0 2

0

2

0

0

04

13

0

11

3

213

0

201

4

0

0

1

0

0

1

0

2

0

0

0

0

28714

3 0

0

2

1

0

00

1

0

0

0

0 1

0

00

2 122 11

1

0

1

033

29

1

0

0

0

0

2

8

2

20

27

2

1

4

9

1

406

529

1

328

3

0

0

122

2313

1415 1617

5

18

2

1121

1

131920

0

0

15

3

100

0

145

3

4

16

0

0

9

10

7

16

1

20

4

21

95

12

0

25

21

0

1

14

0

1

8 0

0

11

1310

3

1

9

00

18 17

8

116 0

24

33

0

21 13

715

6

0

5

0

254 20

18

0

13

0

1

26

0

2

51

0 1 0

2

1710 3

6

20

8

00

291

24 20

4

38

0

519

10

1714

0

1517

22

21

1

41616

111

0

28

62901

0

20

1912

21195

3132

0315 316

4

0

1

00

5

8

3

3 2352

295

7

1

5

0

0

289

1

0

0

314

2294

288 317207330

1

247251

2463282541

6

299

0

204240

250287285 318260

249

5

2532520

0

239115

109238

11493

0

27362 30

319

90

261

320 0322

329 6011232233

0237 59

321

1

1029

241

230

58323236265 7210010897

0

286

1

7157266 7056105 6968

0

55229

2867

1

54

340

66753 65

228

1152

6

514

22750

14

0

121449

22448267

21247

997

3412822262

5

211 22538

223

304

312222

0 0

221220344

303140

10

4

0

219218120

1

0

269140206 123280

0

252 270 305

113

4215

0

278277

4

11

109

0

7

10

111271

336

5 4614

9

14298

3 9

9 03116216

1811101112

0

0

1315

814

3 16

0

12

30

13

0

32

0

21

2

33

0

0

1

0

01725

0

3

7

10

545

5

6

1

0

0

12

0 4

1

1

28

7 00

2

31

214

1

21

16

0

29

15

31

14

61

2

8

41011

2

23 24116 5

12

0

0

511

210

17

0

15

618 5

1912

3

0

0

2

02

101921

6

0

20

29

713

5

306

225

014 8

0

11

240

25

0

4 2315

273 1

9 26

8

19

0

0

0

1716

11

22 1

35

120 17 9

21 4 81018

28

0 720

0

2212

372 311219

0

0

40

8

11

61

112123

159

10

0

14

1017

9

95

1325

25

7 1

21

1

2419

9

12

6

24

0

11

32

15

14

725

30 6 1

1

0

1016

2022

7

226

317 73

34

0

24

22

0

21

33

34

0353610

0

0

1

011

24

8

1323

5

4 98

18

253

17

32 6

7

41

92

0

391328

5

8

3

2729

0

42

0

18

6

18

1

1527

1412

2626

4140

42

39

33 14

164

8

32

1

1

15

22

0

120

412

6

9

1

8

0

0

25

171 2

11

11

1 13

113

3

43

42 19

0

1

4

15

0

103

435

15

15

1

14

3

118

4

11

10

0

216

1

10

2

21228

0

21

214

11 603

0

21

14

5

2

12 2

15

27

3

16

17

18

5

13

20

3

1917

0

6

5

811

4

0

109

2

03 4

619

3010

2

10

2

151

1

031

92

0

250

00 23

1

5

2

63

80

27

29

21 24

2

76

1

1417

2

6

7 13

7

3

328

4 5 2

8

0

1823126

0

016

10

8

21

917

2

8

4

1

03

19

3

0

9

1

20

4

130

63

2836

8

1015

32

11

23

0 0

1

2

0

1

1

3

10

5 2810 1

2

27

16

26

0

14

2

2512

0

615

15

0

29

7 9

44

16

8

11

3

1

211

10

5

257 26

0

2728

8

29

35

3

12134

1437

9

530

4 1520

103

3

616

0

13 17411

182242

56

41

2

0

323 613

0

0

3

12 1

0

24

821

4

2023

229

0

1

4

107

30

1

0

2

21

36

65

0

22

51

4

1 451612

0

31 19

118 15

0

2416

1

17

3

18

0

2

20

19

819

1521

0

19

0 0

22

11

21

0

23713

23

11101 21

9 19

0

0

28 242

14 237104

2527291 26

1215

30

2534 30

2

31

1326 35 3233

2

0

410

41106

36

3

403

33

38

0

5

839

9

00

8181 1 427980 43327

2

825

0 78

2

0

44 69

3

2

83 7

628 6814

2

1

84 4791

1

705

3

9 9 90 8589

7

7788 76

1

06

0

71

12

647 7587

463

1

22 73 72 66 6586 62

3

74

0

101

20

9223 61

17

216

100

103

0

4

0

14

9324

13 911 6012

9711

1

999410

25 3 5996

0

9 98

39

5826

6

0

39 57951

27

2

56107

1

7 5428

1

5315

298 7

151

23

30 55 50226

449

31

5

0

48618

517

32 52102102

110

19

33 122

116

39

34

1

1144

0

20

03

0

421

5

3536

4

21

13

1

312

0

379

10 11

38

52 10

83

0

194051

18

0

3

81

36 3926 83884 28 1329254 12 40

3

35

11 1

8716 26

0

27 59

0

1

501125 13

124

0

0

8 18

26

255 97

32

0

1

0

24256 102

41

15

23

925711

33118

0

86

1

16

142

750 123

2585

119

12

739

8

0

1411

53

030

7611598

3938

4

17

7431

31

20 64

0

625263377

21879

142

942

2320 542243

201

0101

15 7834

72676

70259

76638 18 34480

29

2415

993642

0

555262260

14890261

264 057

1214 57

2

40

2

828

240

10147263

100255 124 4414 102

125

0

5 95130

0

51561 52103

3711

1

9854

14

99

119

4630 124

8

1443116

129

16

707 6

252

23

68104

109 124

0105

63

60

1232

119

0

0

117

1249

74 60

7

720

61265

8

10 6971

1

9

145 88200253 2625 13

32118 270 13

2

73740 018117

6

92271

25

3

7702

9317

7675267116 269

0

0

106

113

149

4660 272

1 0266

78

1

0 107

3

12116

80 79273 220

1140 108

7

19

8113

82

0

1115268 3

1

10930277

257

83

1

12084

91465

11015

85240

36

870 3 11110

86274

337

14113 5911221

401212

0

5812121 191

2

0

278 6222

0

111 2807

15 13112 110

1100

1094

5

20

0

19 1143164

122 279 3 13

0

2758

6

6

29419281276

56

7 4

123282

0

0

320 3518124

365

55

34

2127

0

0

2

4

153

634

27

27

6

0

7 35

17

28154 12 0480

150 2832

017 8

136290 2018

265 4

11

28516

1017125 0

3

1

135

0

236

015

1712284

4289 10126

286

0

106 4

0

13482910

14133

8

1

287 9

16 17

127 25 13 99

20288

10156 220

M ots e

L ep e llan e

B ly de r iv ie r

M o un g w

Ohr igs t ad riv ier

M oh la le t si

Mo lom

a h la p i

O li fa n ts r iv ie r

M oo p e tsi

Spe k b oomr iv i e r

S t ee lp o or t riv ie r

Mo n a me ts i

Vy e

h oe k

r ivi e

r

Bu f fe l sk lo o fd a m

Ohr ig s ta d ri vi e r

St ee l po ortr iv ie r

D er B oc h em D a m

O h rig s tad D amBu ffe lk lo o f D am

D r . E is e le n D am

Vy eh oe k D am

AS A M e ta lsFe rro ch ro m e S m e lte r

D er B ro c h en P la tin u m

B o o ysen d a l P la tin u m

Eve rs t S o ut hPla tin u m M in e

Tw o R iv ers P la t in u m

Tu b at se F e rro ch ro m eSm el te r

La n ex C h ro m e M in e

St ee lp oo r t C h ro m e M in e

G ro o tb o o mPla tin u m

Xst ra te F e rr o ch ro m eSm el te r

K en n ed y 's V a le

M a reesb u rg P la t in u m

Mo d ikw a P latin u m M ine

M o t o to lo P la tin u m

Sp i tsk op P la tin u m

Tw eef o nt ein C h ro m e M ine

Eve res t N or thSy lvan ia

AS A Me ta lsC h ro m e S m e lt er

M a tib id i ( 45 0)

M a tib id i ( 45 1)

M a tib i di ( 45 3)

M a tib id i ( 45 4)

M a tib id i ( 45 5)

M a ti bi d i ( 45 6)

M a ti bi d i ( 45 7)

M a ti b id i ( 45 8)

M a ti b id i ( 45 9)

M a ti bi d i ( 46 0)

S koo np la as ( th ab a C hw e u L m )

P i lg r im 's R es t Tp a

M a shi sh in g

Kell ys v il le

S ab ie

Ly de nb ur g E x t2

S khil a

Ly de nb ur g E x t6

Lyde nb ur g

M a ru la P la tin um M in e

Tja te M in e

Tw ic ken h amPla tin u m M in e

r

Tjate H er ita ge P r oje ct

rK le in D r ak e ns be r gE sc a rp m e nt

N

L e g e n d

L I M P O P O P R O V IN C E

L im p op o P ro v in c eD e p a r t m e n t o f W a te r A f fa ir s a n d F o r e st r y

P lan n in g a nd In fo rm a t io n

Ba s e D a ta :

C o m p iled B y :

T U B A T S E M U N I C I P A L I T YL E D P ro p o s a ls

W at e rb er g

C ap ri co rn

V h em b e

M o p a n i

S ek h u k h un e

P r o v in c ia l B o u n d ar ie sD istr ic t M u n icip a l B o u n d a r ie sL o ca l M u n ic ip al it ie sC o m m u n it ie sF a rm D iv is io n sM ain F ar m sR i v e rsD a m s

R o a d sG r av e l R o a d sM ain R o a d s

L E D P ro p o s a l s:1 . M i n in g C l u s t e r

T u b a ts e L o c a l M u n ic ip a l ity

P ip el in e o f M in in g P r o jec t s 2 0 0 6A d v a n c ed E x p lo r a tio nF ea s ib il it y S t u d yO p er a t io n a lP r e fe a sib i li ty S tu d yU n d er C o n s tr u c tio n

2 . H o rti c u l tu r e C lu s te rO h r i g s ta d R iv e r V a lleyS p ek b o o m R iv e r V a lleyO l ifa n ts R iv e r

3 . M e a t C l u s t e rE n t ir e M u n ic ip a l A r e a

4 . T o u ri s mT ja te H e r ita g e P r o je c tK le in D r a k e n sb er g E sc a r p m en t

r

5 . N o d a l D e v e l o p m e n t

#

P r o v in c ia l G r o w t h P o in tD is tr i c t G r o w th P o in tM u n ic ip a l G r o w th P o in tP o p u la tio n C o n c e n tr a t io n P o in tsS e r v ic e P o in ts

6 . In f o r m a l E c o n o m y D e v e l o p m e n tA ll N o d a l D e v elo p m e n t P o in t s

r

Page 40: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

39

Report 1: Baseline Review

Page 41: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

40

Report 2: Development Potential Analysis

Page 42: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

41

Report 3: Formulating GTM LED Strategy

Page 43: GREATER TUBATSE MUNICIPALITY · Greater Tubatse Municipality appointed Procurement Dynamics (Pty) Ltd (in collaboration with Glen Steyn & Associates) to undertake a Local Economic

Greater Tubatse Local Economic Development Strategy

Report compiled by Procurement Dynamics in collaboration with Glen Steyn & Associates May 2007

42

Report 4: Implementation Plan and Institutional Arrangements