grants 8.9 pse grants management : looking forward

92
Grants 8.9 PSE Grants Management : Looking Forward

Upload: lionel-warren

Post on 25-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Grants 8.9

PSE Grants Management : Looking Forward

2

Presenter :

Barry Hickson

Product Development Manager, ESA

PeopleSoft Corporation

3

Common Component for workflow setup – Provides for a single user interface for configuring/structuring all Grants workflow processes & rules. Setup contains

• Approval/Notification Process definition

• Routing Rules

• Approval Rules/Detail

• Approval Criteria

Proposal Workflow FDD functionality delivers:

4

• Milestone Notification (E-mail)• Required Milestones - Possible to define such that they are

systematically established at generate time

• System driven E-mail notifications prior to milestone due dates based on established criteria

• Support of Ad-hoc inquiry & notifications

• Proposal Component approval process (worklist/E-mail)

• Proposal Status notification (e-mail)

Proposal Workflow FDD functionality delivers:

5

Role Type Setup for Workflow Role Type Setup for Workflow

• Role Types now a Prompt table allowing for organizational roles

6

• Approval/Notification process definition/Routing Rules• Workflow Transaction types – One defined for each of the 5 workflow

solutions provided• Proposal Component Approval

• Milestone Notification

• Proposal Notification

• Protocol Approval Process

• Protocol Committees meeting notification

• Workflow Type – Type of workflow function provided by workflow transaction

• Proposal Component Approval (Worklist & E-mail notification)

• Milestone Notification (E-mail)

• Proposal Notification (E-mail)

7

• Approval/Notification process definition/Routing Rules• Elements – Key element for workflow

• Proposal Component Approval - Component

• Milestone Notification - Milestone

• Proposal Notification – Proposal Status

• Detail – Secondary Page where user defined detail information related to current element

• Criteria – Used to define criteria for the approval process. User specifies conditions for requiring particular elements

• Routing Rules – Whose involved and what kind of action can they perform

8

Type – Milestone Notification

9

Business Unit level Proposal approval workflow definitional elements Component (multiple possible per proposal) Approval Role Approval Sequence Approval Action Workflow Action Pool List Reassign Required

10

Type – Proposal Component Approval

11

Proposal Component Approval > Details

12

Proposal Component Approval > Criteria

13

Proposal > Component > Component Info

14

Component > Stakeholders

15

Proposal > Component > Approval Info

16

Approval Info > Approval Hierarchy

17

Approval Info > Approval Status History

18

Proposal:General Info > Pending Approval

19

Component Status > Set to “In Progress”

20

Worklist

21

Approval Page

22

Worklist

23

Worklist – Pending Approval

24

Worklist – Institution Approved

25

Milestone – Setup

26

Award Profile > Milestones

27

Milestones > Contacts

28

Milestones > Notification History

29

Milestones > Notification

30

Milestones > Run Control

31

Protocol Management

FDD functionality includes: Protocol Capture (IRB & IACUC) Copy Protocol functionality Protocol Renewal Functionality Adverse event handling Complete workflow based approval process

Work Item and E-mail notifications Configurable workflow

Ability to track all history of change Inquiry on Protocols and Capture of Committee Structure

32

Protocols > Protocol Header

33

Protocols > Attachments

34

Protocol Version > Version Info

35

Protocol Version > Personnel

36

Protocol Version > Subjects

37

Version > Purpose Methods & Procedure

38

Protocol Version > Attachments

39

Protocols > Copy Protocols

40

Protocols > Copy Protocols

41

Protocols > Copy Protocols

42

Protocols > Protocol Administration

43

Protocol Administration > Agenda

44

Protocol Administration > Minutes

45

Protocol Administration > Attachments

46

Setup > Grants :Committee Admin

47

Setup > Grants :Committee Setup

48

Setup > Grants :Committee Setup

49

Setup > Grants : Protocol Type

50

Copy Proposal : Allows date override

51

F&A By Pass Option

Issue : Desire to be able to flag certain Projects as being ineligible for F&A.

Resolution : F&A bypass flag added to the Project record and F&A process amended to take into account this flags setting

52

PAG - CFDA Number Issue : CFDA # not stored on the

Award

Resolution : CFDA number added to Award Prompt table with CFDA #’s has been

created

53

PAG – Award Modifications

Issue : Award Modification needs to be changed to support multiple modification per period

Resolution (Release 8.9) : Child table added to modifications for

details Modification classification added

54

PAG – Award Modifications

55

Award Modifications for period

56

Award Modifications for period

57

Mandatory vs Voluntary Cost Sharing

Issue : Need t be able to differentiate between Manadatory & voluntary C/S

Resolution : Added a flag on the Budget details to indicate if the C/S is mandatory

58

Mandatory vs Voluntary Cost Sharing

59

PAG – Certifications Issue : Certifications within the

Proposal and Award at different levels

Resolution (Release 8.9) : Certifications added to the project level

on the award Primary Project usage for singular

value for entire award

60

Certifications

61

PAG – Subrecipients

Issue : Sub-recipient information not coming forward from Proposals

Resolution (Release 8.9) : Generate award now bringing this

information forward Sub-Recipient budget details being added to

the proposal and award side for sub-recipients

62

Subrecipients – Now brought forward

63

Fixed Priced Generation

Issue : Currently only ‘As Incurred’ type contracts can be generated from proposals

Resolution (Release 8.9) : Modifying generate process to also

allow for the generation of Fix Price Contracts

64

Optional date inserts into Commitment Control

Issue : Population of Project Start/End date population into KK needs to be optional

Resolution (Release 8.8) : Personalization setting allows for the option

of not bringing forward these date. The default is that these dates are brought

forward

65

Award End date vs Award close date

Issue : Currently the end date of the Proposal is being inserted into Commitment Control. Need to be able to allow for trailing costs

Resolution (Release 8.8) : Added # of Day to Close to BU Generate process will populated Project End

Date in KK with End Date + the number of days specified at the BU level

66

NIH Salary Cap Issue :

Need to be able to add a Salary Cap to the Sponsor Profile

Need Salary cap budget warning

Resolution (Release 8.9) : Salary Cap added to the Sponsor Profile

67

PAG – Allocation of Credit Issue : Need to be able to identify

percentage ownership of Projects

Resolution (Release 8.9) : Ability added to capture %’age ownership

by employee Ability added to capture %’age ownership

by Project Ability to capture ownership by Department

68

Allocation of Credit - Employee

69

Allocation – Department

70

Allocation > Department >Deptartment

71

Forms Initiatives

Issue : The need to support more forms

Status : Currently map to the latest NIH forms Got inventory of top requested forms

from PAG on 09/12. Have been in dialogue with Grants.gov PeopleSoft has just joined NIH eCGAP

72

Proposal Budgeting in whole dollars

Issue : Proposal Budgets currently result in decimal places which is not how users wish to budget

Resolution: Changed the Fringe process to rounds to whole

dollars Changing the C/S process to rounds to whole

dollars Changing the F&A process to rounds to whole

dollars

73

“Select All” functionality on LOC draw

Issue : Need the ability to “Select All” rows

Resolution: Billing has added this functionality in

8.9 8.9

74

Milestone Template required

Issue : Need to define milestone that should be established when award are

Resolution: Flagging of milestones as required

(optional) Amending the generate process to

bring these forward in for 8.9

75

Proposal – Usability Review

Review done of the entirement Proposal component Front loading required fields Defaulting of fields wherever possible Folding of budget header into

Proposal Less visible tabs on the proposal User preferences usage

76

Proposal - Proposal

77

Proposal - Projects

78

Proposal - Budgets

79

Proposal Budgets– Calculation & Pricing

80

Proposal - Resources

81

Proposal - Certifications

82

Proposal - Reports

83

Proposal - Attachments

84

Proposal – Location (link)

85

Proposal - Protocols (link)

86

Proposal – Component (link)

87

Proposal – Key Words (link)

88

Proposal – Reports (link)

89

Proposal – Gender & Minority Study

90

Proposal – Trainee

91

Proposal – Settings

92

Q&A

Questions

Contact Info [email protected] (925) 694-7275