- 1 - Signature of Contractor No. of Corrections Executive Engineer FOR OFFICIAL USE ONLY GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT CHIEF ENGINEER HYDRO ELECTRIC PROJECT (ELECTRICAL), MUMBAI. SUPERINTENDING ENGINEER Vidarbha Hydro Electric & Lift Irrigation Circle, Nagpur. BID DOCUMENT FOR BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning of 33KV outdoor switchyard equipment for Lalnala Lift Irrigation Scheme. Executive Engineer Vidarbha Hydro Electric & Lift Irrigation Division, Nagpur TEL.& FAX – 0712-2450532 Email – [email protected] Feb - 2012 Price Rs. 10500/-(including VAT)

Upload: others

Post on 23-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 1 -

Signature of Contractor No. of Corrections Executive Engineer

FOR OFFICIAL USE ONLY

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

CHIEF ENGINEER

HYDRO ELECTRIC PROJECT (ELECTRICAL), MUMBAI.

SUPERINTENDING ENGINEER

Vidarbha Hydro Electric & Lift Irrigation Circle, Nagpur.

BID DOCUMENT

FOR

BID No. EE/VHELIDN/ /2011-12

Design , Supply, erection, testing and commissioning of 33KV outdoor

switchyard equipment for Lalnala Lift Irrigation Scheme.

Executive Engineer

Vidarbha Hydro Electric & Lift

Irrigation Division, Nagpur

TEL.& FAX – 0712-2450532

Email – [email protected]

Feb - 2012

Price Rs. 10500/-(including VAT)

Page 2: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 2 -

Signature of Contractor No. of Corrections Executive Engineer

FOR OFFICIAL USE ONLY

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

BID DOCUMENT

FOR

BID No. EE/VHELIDN/ /2011-12

Design , Supply, erection, testing and commissioning of 33KV outdoor

switchyard equipment for Lalnala Lift Irrigation Scheme.

.

Downloaded by M/s ________________________________________________

________________________________________________

Page 3: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 3 -

Signature of Contractor No. of Corrections Executive Engineer

INDEX

Section

No.

Particulars Page No.

I. Press Notice (Marathi & English) 4 to 6

Detailed Tender Notice 7 to 9

II. Instructions to tenderers 10 to 17

III. B-1 Tender Form 18 to 24

IV. Schedule A 25 to 27

V. Schedule B 28 to 34

VI. Schedule C 35 to 50

VII. Appendices 51 to 63

VIII. Conditions of B-1 Contract 64 to 91

IX. Special Conditions of Contract 92 to 122

X. General Information & Technical Specifications 123 to 202

XI. Drawings 203 to 207

Page 4: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 4 -

Signature of Contractor No. of Corrections Executive Engineer

SECTION -I

BID NOTICE AND DETAILED BID NOTICE

Page 5: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 5 -

Signature of Contractor No. of Corrections Executive Engineer

ÊxÉÊ´ÉnùÉ ºÉÖSÉxÉÉ ¨É½þÉ®úɹ]õÅ ¶ÉɺÉxÉ

VɱɺÉÆ{ÉnùÉ Ê´É¦ÉÉMÉ

ÊxÉÊ´ÉnùÉ Gò. EòÉ.+./Ê´ÉVÉÊ´É´É=˺ÉÊ´ÉxÉÉ/04/2012 - 13 Main Portal : http://maharashtra.etenders.in

WRD Portal: http://wrd.maharashtra.etenders.in

¨É½þÉ®úɹ]õÅÉSªÉÉ ®úÉVªÉ{ÉɱÉÉÆSªÉÉ ´ÉiÉÒxÉä EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, Ê´Énù¦ÉÇ VɱÉÊ´ÉtÖiÉ ´É ={ɺÉÉ ËºÉSÉxÉ Ê´É¦ÉÉMÉ, xÉÉMÉ{ÉÚ®ú nÖù®úv´ÉxÉÒ ´É ¡ìòCºÉ Gò. 0712-2440058 , 2450532, E-mail :

[email protected]

½äþ ¨É½þÉ®úɹ]õÅÉiÉ xÉÉånùhÉÒEÞòiÉ +ºÉ±É䱪ÉÉ {É®ú´ÉÉxÉÉvÉÉ®úEò Ê´ÉtÖiÉ EÆòjÉÉ]õnùÉ®úÉEòbÚ÷xÉ JÉɱÉÒ±É xɨÉÚnù Eäò±ªÉÉ|ɨÉÉhÉä EòɨÉÉSªÉÉ, iªÉÉÆSÉÒ {ÉÚ́ ÉÇ +½ÇþiÉÉ ÊxÉζSÉiÉ Eò®úhªÉɺÉÉ`öÒ +ÉìxɱÉÉ<ÇxÉ |ɺiÉÉ´É ¨ÉÉMÉÊ´ÉiÉ +ɽäiÉþ. {ÉÚ́ ÉÇ +½ÇþiÉÉ nùºiÉÉ´ÉäVÉ ´É®úÒ±É ºÉÆEäòiɺlɳýÉ´É®ú Ênù.22.6.2012 {ÉɺÉÚxÉ ={ɱɤvÉ ½þÉä́ ÉÚ ¶ÉEòiÉÒ±É.

<Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉÉ ºÉÆEäòiÉ ºlɳýÉ´É®úÒ±É EòÒ-bä÷]ÂõºÉ xÉÖºÉÉ®ú EòÉ]äEòÉäú®ú{ÉhÉä +¨É±ÉÉiÉ +ÉhɱÉÒ VÉÉ<DZÉ. <SUÖôEò ÊxÉÊ´ÉnùÉEòÉ®úÉÆxÉÒ <Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉÉ ºÉÆnù¦ÉÉÇiÉ {ÉÖføÒ±É ºÉʴɺiÉ®ú ¨ÉÉʽþiÉÒºÉÉ ö̀Ò ´É®úÒ±É ºÉÆEäòiɺlɳýÉ´É®ú ºÉÆ{ÉEÇò Eò®úÉ´ÉÉ. VÉä ÊxÉÊ´ÉnùÉEòÉ®ú {Éʽþ±ªÉÉÆnùÉSÉ <Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉäiÉ ¦ÉÉMÉ PÉäiÉ +ɽäþiÉ iªÉÉÆxÉÉ ´É®úÒ±É ºÉÆEäòiÉ ºlɳýÉ´É®ú Ênù±É䱪ÉÉ ¨ÉÉMÉÇnù¶ÉÇEò iÉi´ÉÉxÉÖºÉÉ®ú |ÉlÉ¨É Êb÷VÉÒ]õ±É º´ÉÉIÉ®úÒSÉä ºÉ]õÔÊ¡òEäò]õ, ªÉÖVÉ®ú +ɪÉb÷Ò ´É {ÉɺɴÉbÇ÷ |ÉÉ{iÉ Eò¯ûxÉ PÉähÉä +ɴɶªÉEò +ɽäþ.

<Ç-ÊxÉÊ´ÉnùÉ (b÷É>ðxÉ ±ÉÉäb÷ / +{É ±ÉÉäb÷) ºÉƤÉÆvÉÒ EòɽþÒ ºÉ½þɪªÉiÉÉ +ɴɶªÉEò +ºÉ±ªÉÉºÉ ¡òÉäxÉ xÉÆ.020-41466666 <Ç-ÊxÉÊ´ÉnùÉ EòɪÉÇ|ÉhÉɱÉÒ ¨ÉnùiÉ EòIÉ, [email protected] ªÉÉÆSªÉɶÉÒ ºÉÆ{ÉEÇò ºÉÉvÉhªÉÉiÉ ªÉÉ´ÉÉ.

|ɺiÉÉ´É ºÉÉnù®ú Eò®úhªÉɺÉÉ`öÒ ÊxÉÊ´ÉnùÉEòÉ® ªÉÉÆxÉÒ Eäò±É䱪ÉÉ +ÉÌlÉEò JÉSÉÉÇºÉ VɤÉɤÉnùÉ®ú xÉ ®úɽþiÉÉ EòÉähÉiÉɽþÒ BEò ËEò´ÉÉ ºÉ´ÉÇ |ɺiÉÉ´É ¡äò]õɳýhªÉÉSÉä ËEò´ÉÉ ºÉÆ{ÉÚhÉÇ |ɺiÉÉ´É |ÉÊGòªÉÉ ®úqù Eò®úhªÉÉSÉä +ÊvÉEòÉ®ú ¶ÉɺÉxÉÉxÉä ®úÉJÉÚxÉ ä̀ö´É±Éä +ɽäþiÉ.

+. Gò.

EòɨÉÉSÉä xÉÉ´É +ÆnùÉVÉÒiÉ ®úCEò¨É ¯û. (±ÉIÉ)

<ºÉÉ®úÉ ®úCEò¨É ¯û.

(±ÉIÉ)

EòɨÉÉSÉÉ +´ÉvÉÒ

EòÉä-ªÉÉ {ÉÚ́ ÉÇ +½ÇþiÉÉ nùºiÉÉ´ÉäVÉÉSÉÒ ´Éì]õºÉ½þ ËEò¨ÉiÉ (xÉÉ{É®úiÉÉ´ÉÉ)

1 2 3 4 5 6

1 ±ÉɱÉxÉɱÉÉ ={ɺÉÉ ËºÉSÉxÉ ªÉÉäVÉxÉÉ ªÉälÉÒ±É 33 Eäò.´½þÒ. ¤ÉÉÁ Eò³ýªÉÆjÉSªÉÉ ={ÉEò®úhÉÉÆSÉä ºÉÆEò±{ÉxÉ, {ÉÖ®ú´É`öÉ, =¦ÉÉ®úhÉÒ, SÉÉSÉhÉÒ ´É EòɪÉÉÇÎx´ÉiÉÒEò®úhÉ Eò®úhÉä

288.22 1.50 6 ¨ÉʽþxÉä

¯û. 7350/-

EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, Ê´Énù¦ÉÇ VɱÉÊ´ÉtÚiÉ ´É ={ɺÉÉ ËºÉSÉxÉ Ê´É¦ÉÉMÉ, xÉÉMÉ{ÉÚ®ú.

Page 6: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 6 -

Signature of Contractor No. of Corrections Executive Engineer

PRESS NOTICE

Government of Maharashtra

Water Resources Department

BID NO. EE/VHELIDN/04/2012-13

Main Portal : http://maharashtra.etenders.in

WRD Portal: http://wrd.maharashtra.etenders.in Online pre-qualification documents are invited from the licensed electrical contractor

registered in Maharashtra for and on behalf of Governor of Maharashtra form for the following work by the Executive Engineer, Vidarbha Hydro Electric & Lift Irrigation

Division, Nagpur. Ph – 0712-2450532 [email protected] The blank pre-qualification document is available on web site from 22.6.2012

The e-tendering process will be strictly governed by the schedule of key dates available on

the web site. Interested tenderers are requested to visit web site for futher details.

The tenderers participating first time in e-Tendering process will have to procure

Digital Signature Certificate, Username & Password from competent authorities as per

guideline mentioned on homepage of the website.

If any assistance is required regarding e-Tendering (upload / download) please

contact Phone No. 020-41466666, e-tendering help desk , [email protected],

The Government reserves the right to reject any or all the bids or annul the process

without assigning any reason and without being responsible for the cost incurred by the

tenderer in preparing his Bid.

Executive Engineer

Vidarbha Hydro electric & lift Irrigation Division,

Nagpur

Sr. No

.

Name of work

Estimated Cost Rs.

(Lakh)

Earnest Money Rs.

(Lakh)

Time limit for

completion of work

from date of work

order

Cost of blank PQ

document Including

VAT (Non-

refundable)

1 2 3 4 5 6

1

Design , Supply, erection,

testing and commissioning of

33KV outdoor switchyard

equipment for Lalnala Lift

Irrigation Scheme.

288.22 1.50 6 Month 7350/-

Page 7: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 7 -

Signature of Contractor No. of Corrections Executive Engineer

DETAILED TENDER NOTICE

Government of Maharashtra

Water Resource Department

BID NO. EE/VHELIDN/04/2012 - 13

Main Portal : http://maharashtra.etenders.in

WRD Portal: http://wrd.maharashtra.etenders.in

Online digital signed pre-qualification documents are invited from the licensed

electrical contractor registered in Maharashtra for and on behalf of Governor of Maharashtra

for the following work by the Executive Engineer, Vidarbha Hydro Electric & Lift Irrigation,

Division, Nagpur. Ph.0712-2450532 [email protected]

The blank pre-qualification document is available on web site from 22.6.2012

P.Q. DOCUMENT SCHEDULE

1) The Pre-Qualification Document is available on e-tendering web site of WRD Portal : http://wrd.maharashtra.etenders.in

2) The cost of Pre-Qualification Document to be downloaded from the website is Rs.7350/-

(Rs. Seven Thousand Three Hundred Fifty Only) and will be paid by the tenderer in cash or

DD in the name of the Executive Engineer, Vidarbha Hydro Electric & Lift Irrigation

Division, Nagpur in their office.

3) The scanned copy of the receipt towards the cost of PQ document is to be uploaded along

with document.

4) Hard copy of uploaded document along with requisite supporting documents should be

submitted in the office of the Superintending Engineer, Vidarbha Hydro Electric & Lift

Irrigation Circle, Wainganganagar, Ajani, Nagpur-440003 on or before the last date and

time of uploading of PQ document. The PQ document will be rejected if cost of PQ

document and hard copy as mentioned above, are not received within stipulated time.

Pre-Qualification Document will be opened in the office of the Superintending Engineer,

Vidarbha Hydro Electric & Lift Irrigation Circle, Nagpur 5) The bidder will have to prove his Financial and Technical capability by uploading the

necessary “Information/Documents” as mentioned in Pre-Qualification Document. After scrutiny of the PQ document with supporting documents uploaded by the bidder on website, a

list of qualified bidder will be prepared and only qualified bidder will be communicated in this regard. Pre-qualified bidders will be allowed to participate in Price Bid by downloading

the Price Bid document.

Sr.

No

.

Name of work

Estimated

Cost Rs.

(Lakh)

Earnest

Money

Rs.

(Lakh)

Time limit

for

completion

of work

from date

of work order

Cost of

blank PQ

document

Including

VAT

(Non-refundabl

e)

1 2 3 4 5 6

1

Design , Supply, erection,

testing and commissioning of

33KV outdoor switchyard

equipment for Lalnala Lift

Irrigation Scheme.

288.22 1.50 6 Month 7350/-

Page 8: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 8 -

Signature of Contractor No. of Corrections Executive Engineer

(B) PRICE BID DOCUMENT SCHEDULE

1. The Price Bid Document is available on e-tendering web site of WRD Portal

http://wrd.maharashtra.etenders.in

2. The cost of each Price Bid Document to be downloaded from website is Rs. 10500/- (Rs.

Ten Thousand Five hundred Only) and will be paid in cash or DD by the tenderer in the

name of the Executive Engineer, Vidarbha Hydro Electric & Lift Irrigation Division,

Nagpur.

3. The scanned copy of the receipt towards the cost of price bid document. should be

uploaded along with Price Bid document.

4. EMD in the form of /FDR/Bank Guarantee in Original along with hard copy of uploaded

Documents as per Envelope No. I & II should be submitted in the office of the

Superintending Engineer, Vidarbha Hydro Electric & Lift Irrigation Circle,

Wainganganagar, Ajani, Nagpur-440003 on or before the last date and time of uploading

of Price Bid. The Price Bid will be rejected if cost of price bid document and EMD in the form of FDR/Bank Guarantee in Original along with hard copy as mentioned above are

not received within stipulated time. 5. Price Bid Document will be opened in the office of the Superintending Engineer,

Vidarbha Hydro Electric & Lift Irrigation Circle, Nagpur (C) 1. All subsequent changes in the tender schedule, corrigendum/amendment if any shall be

available only on web site and not published in the news paper. Hence bidders are advised to visit web site until the Pre –Qualification document / Price Bid is finally opened.

2. In case of any dispute between uploaded document and copy submitted by bidder, Pre – Qualification document / Price Bid Document uploaded by bidder on web site will be

treated as final.

3. Bidders are not allowed to make any changes in the uploaded document after last date

and time of uploading. If found so, his tender will be rejected outright & he will be

liable

for other legal action.

4. The Government reserves the right to reject any or all the bids or annul the process

without assigning any reason and without being responsible for the cost incurred by

the bidders in preparing his PQ document / Price-Bid.

Executive Engineer

Vidarbha Hydro electric & lift Irrigation Division, Nagpur

Sr.

No.

Name of work

Estimat

ed

Cost Rs.

(Lakh)

Earne

st Mone

y Rs.

(Lakh

)

Time

limit for completi

on of

work

from

date of

work

order

Cost of

blank PQ document

including

VAT

(Non-

refundabl

e)

1 2 3 4 5 6

1

Design , Supply, erection, testing and

commissioning of 33KV outdoor switchyard

equipment for Lalnala Lift Irrigation Scheme.

288.22 1.50 6 Month 10500/-

Page 9: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 9 -

Signature of Contractor No. of Corrections Executive Engineer

SECTION -II

INSTRUCTIONS TO TENDERERS

Page 10: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 10 -

Signature of Contractor No. of Corrections Executive Engineer

Instructions to Tenderers for e-tendering The details can be viewed and downloaded online directly from the Government of

Maharashtra e-tender Portal http://maharashtra.etenders.in on Sub Portal http ://

wrd.maharashtra.etenders.in

1. Detail tender notice can be seen on the notice board in the office of the Executive

Engineer, Vidarbha Hydro Electric & Lift Irrigation Division, Nagpur. Blank Price Bids are

available on the Government of Maharashtra website http://maharashtra.etenders.in through

Sub Portal of http://wrd.maharashtra.etenders.in. The competent authority reserves all rights

of rejecting any or all tender without assigning any reason.

2. Only those tenderers who are short listed in pre-qualification stage are

eligible for participating in price bid. The cost of price bid is Rs. 10500 /- only and will be

paid by the contractor in the office of the “Executive Engineer, Vidarbha Hydro Electric &

Lift Irrigation Division, Nagpur '' EMD in the form of Bank Guarantee in Original along with

hard copy of uploaded Documents as per Envelope No. I & II should be submitted in the

office of the Superintending Engineer, Vidarbha Hydro Electric & Lift Irrigation Circle,

Nagpur on or before the last date and time of uploading of Price Bid. The Price Bid will be

rejected if cost of price bid document and EMD in the form of DD/Bank Guarantee in

Original along with hard copy as mentioned above are not received within stipulated time.

EMD in the form of Bank Guarantee shall also be scanned & uploaded in Envelope No. 1

without which Envelope No.2 will not be opened.

3. It is necessary to give the undertaking as follows by the tenderer, that he will not make any

changes in tender documents downloaded from website. If it is done the tender of such

tenderer will be rejected and the tenderer who made such changes are liable for action as per

Rules. Tender documents published on website are considered as authentic and legal

documents in case of any complaint about the tender.

4. It is necessary to give undertaking as follows "I have seen detailed drawings of

works on website. It is part of tender documents. I have visited the site and I am

well conversant to site condition. I have quoted my offer by considering all these

things. I am ready to sign the tender & drawings before depositing security deposit and taking

work order if my tender is accepted.”

Page 11: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 11 -

Signature of Contractor No. of Corrections Executive Engineer

5. In order to participate in the tenders floated using the Electronic Tender Management

System (ETMS), all bidders are required to get enrolled on the ETMS portal

http://mahrashtra.etenders.in

6. The bids submitted online should be signed electronically with a Digital Certificate to

establish the identity of the bidder bidding online. The tenderer has

to obtain the Digital Certificate. For information required for Digital Certificate he may

contact ETMS Help Desk.

7. For submitting the bids online, the bidders are required to make online payment using the

electronic payments gateway service Bid Submission Fee Rs.1038/-. The different modes of

electronic payments accepted on the ETMS is available and can be viewed online on the

ETMS Website httip://maharashtra.etenders.in.

8. The activities of Tender purchase/Download, Preparation of Bid (Submit Bid Hash online),

Submission of Bids, Submission of EMD and other Documents will be governed by the time

schedules given under “Key Dates”.

9. The Bidders has to submit (Upload, Scan, Copies/fill) his offer/credentials online as

required in the tender/prequalification in the online templates in relevant envelopes.

10. The Bidders may refer e-Tendering Tool Kit available online to perform their

online activities http://maharashtra.etenders.in

11. Manner of submission of Price Bid & its accompaniments

The tenderer shall submit the tender documents in two sealed envelope system as

below.

Envelope No.1

The following documents shall be uploaded in envelope No.1

a) Scanned copy of receipt of Rs 10500 /- as cost of blank tender form

b) Scanned copy of earnest money deposit in the form of FDR/Bank Guarantee.(In Appendix

G1)

c) Scanned copy of valid certificate of registration as licensed electrical contractor issued by

Government of Maharashtra.

d) List of technical person with the contractor (in Appendix A),

e) List Machineries and Plants immediately available with the tenderer for use on this work

(in Appendix B).

Page 12: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 12 -

Signature of Contractor No. of Corrections Executive Engineer

f) List of machinery proposed to be used for work but not immediately available

(in Appendix E) .

g) Declaration of the Contractor.(in Appendix F )

h) Scanned copy of the registration under clause No - 8 and 9 of the Value Added Tax Act -

2005 is obligatory for registered contractor and the same should be submitted in Envelope

No.1. If not submitted 4% tax or as per rules in force will be deducted from bills if contract

is awarded.

All the above documents shall be uploaded in the envelope No.1. If these documents are

not found, envelope No.2 will not be opened.

Envelope No.2

The second envelope shall contain only the Price bid, including the common set of

conditions/stipulations uploaded by the department duly signed by the tenderer . A bid

submitted without this would be considered as invalid. The tenderer should quote his offer on

B-1 form (at relevant place) of the tender as percentage of estimated rates at the appropriate

place on tender documents to be

submitted only in Envelope No.2. Tenderer should not quote his offer anywhere else, directly

or indirectly in Envelope No.1.

12. Opening of tenders.

The bids will be opened on date and time as stipulated in detail tender notice in the

Office of The Superintending Engineer, Vidarbha Hydro Electric & Lift Irrigation Circle,

Nagpur in the presence of Tenderers or their authorized representatives, if they intend to

remain present.

Following procedure will be adopted for opening of tenders.

Envelope No.1

First Envelope No.1 of the bid will be opened online to verify it containts as per

requirement. If various documents contained in this envelope do not meet the requirement as

mentioned in 11, then Envelope No.2 will not be opened.

Envelope No.2

This envelope shall be opened immediately after opening of Envelope No.1, only if

containts of Envelope No.1 are found to be acceptable to the department.

13. Key Dates:

The tenderers are strictly advised to follow the Dates and Times as indicated in the

Time Schedule in the Notice Inviting Tender. All the online activities are time tracked and

Page 13: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 13 -

Signature of Contractor No. of Corrections Executive Engineer

the e-Government Procurement System enforces time-locks that ensure that no activity or

transaction can take place outside the Start and End Dates and Time of the stage as defined in

the Notice Inviting Tenders.

( Note :- Award / Work Order will be Done Manually by The Department.)

14. The tenderers shall study the guidelines regarding e-tendering to get clarify

e-tendering procedure.

Guidelines to Contractors Regarding Government of Maharashtra – tendering system

1. Registration of the Contractors:

The Contractors registered in Maharashtra in relevant categories and Classes are eligible to

participate in this open tender process. Contractors are required to get enrolled on the Portal

http://maharashtra.etenders.in & sub portal http://vidc.maharastra.etender.in and get and

empanelled in relevant sub portal. After submitting their enrollment request online, the

enrollment shall be required to be approved by the Representative of the Service Provider.

After the approval of enrollment, the Contractors shall have to apply for empanelment online

which shall be required to be approved by the Nominated Authority of

Maharashtra/Department. Only after the approval in the relevant Category / Class, the

Contractor shall be able to participate in the Open Tenders online. Open Tenders in which

eligible Contractors may enroll on the Portal in registered category shall be able to participate

in such Tenders. The online Enrollment of such Contractors shall be required to be approved

by the Representative of the Service Provider. The approval of enrollment of Contractors is

done by the Representative of the Service Provider upon submission of mandatory documents

by the Contractors. The Contractors may obtain the list and formats of required documents

from the Nodal Officer of e-Tendering System for Government of Maharashtra / Service

Provider.

2. Obtaining a Class II – Digital Signature Certificate:

The Bids required to be submitted online should be signed electronically with a Class

II –Digital Signature Certificate to establish the identity of the Bidder bidding online. These

Digital Certificates are issued by an approved Certifying Authority, authorized by the

Controller of Certifying Authorities, Government of India. A Digital Signature Certificate

may be used in the name of Authorized Representative of the Organization. A Digital

Certificate is issued upon receipt of mandatory identity proofs. Only upon the receipt of the

required documents, a Digital Signature Certificate can be issued. Bid for a particular Tender

may be submitted only using the Digital Signature Certificate, which is used to encrypt the

Page 14: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 14 -

Signature of Contractor No. of Corrections Executive Engineer

data and sign the hash during the stage of Bid Preparation and Hash Submission. In case,

during the process of a particular Tender, the Authorized User looser his / her Digital

Signature Certificate (i.e. due to virus attack, hardware problem, operating system problem);

he / she may not be able to submit the Bid online. Hence, the Authorized User is advised to

back up his / her Digital Signature Certificate and keep the copies at safe place under proper

security to be used in case of emergencies. In case of online tendering, if the Digital

Signature Certificate issued to the Authorized User of a Firm is used for signing and

submitting a Bid, it will be considered equivalent to a no objection certificate / power of

attorney to that User. The Digital Signature Certificate should be obtained by the Authorized

User enrolling on the behalf of the Firm on the e-Tendering System for Government of

Maharashtra. Unless the Digital Signature Certificate is revoked, it will be assumed to

represent adequate authority of the Authority User to bid on behalf of the Firm for the

Tenders processed by the Maharashtra as per Information Technology Act 2000. The Digital

Signature of this Authorized User will be binding on the Firm. It shall be the responsibility of

Partners of the Firm to inform the Certifying Authority or Sub Certifying Authority, if the

Authorized User changes, and apply for a fresh Digital Signature Certificate. The procedure

for application of a Digital Signature Certificate will remain the same for the new Authorized

User.

• The same procedure holds true for the Authorized Users in a Private / Public Limited

Company. In this case, the Authorization Certificate will have to be signed by

theDirectors of the Company. (process of procuring Digital Certificate will take

minimum 4/5 days)

3. Set up of Computer System:

In order to operate on the e-Tendering System for Government of Maharashtra. The

User’s Computer System is required to be set up. A Help File on setting up of the Computer

System can be obtained from the Service Provider or downloaded from the Home Page of the

Portal http://maharashtra.etenders.in. The Bidders may refer e_Tendering Tool Kit available

online to perform their online activities as mentioned below. In case of any query he may

contact Help Desk for the same.

4. Online Viewing of Detailed Notice Inviting Tenders:

The Contractors can view the detailed Notice Inviting Tenders and the detailed Time

Schedule (Key Dates) for all the Tenders processed by Maharashtra using the e-tendering

System for Government of Maharashtra on http://maharashtra.etenders.in.

5. Online Purchase / Download of Tender Documents:

Page 15: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 15 -

Signature of Contractor No. of Corrections Executive Engineer

The Tender documents can be purchased / downloaded by registered and eligible

Contractors from the e-Tendering System for Government of Maharashtra available on

http://maharashtra.etenders.in.

6. Submission of Bid Seal (Hash) of Online Bids:

Submission of Bids will be preceded by submission of the digitally signed Bid Seals

(Hashes) as stated in the Tender Time Schedule (Key Dates) In the detailed Tender.

7. Generation of Super Hash:

After the expiry of the time of submission of digitally signed Bid Seals (Hashes) by the

Contractors has lapsed, the Bid round will be closed and a digitally signed Super Hash will be

generated by the Authorized Officers of the Department. This is equivalent to sealing of the

Tender Box.

8. Decryption and Re-encryption Online Bids:

Contractors have to decrypt their Bids and immediately re-encrypt their Bids online and

upload the relevant Documents for which they generated the respective Hashes during the

Bid Preparation and Hash Submission stage after the generation of Super Hash within the

date and time as stated in the Notice Inviting Tenders (Key Dates). The Bids of only the

Contractors who have submitted their Bid Seals (Hashes) within the stipulated time, as per

the Tender Time Schedule (Key Dates), will be accepted by the e-Tendering System for

Government of Maharashtra. A Contractor who has not submit his Bid Seals (Hashes)

within the stipulated time will not be allowed to submit his Bid.

For submitting the Bids online, the contractors/bidders are required to make online

payment using the electronic payments gateway service Bid Submission Fee Rs. 1024 /- The

different modes of electronic payments available on the e-tendering portal.

9 Submission of Earnest Money Deposit:

Contractors have to submit the Earnest Money Deposit in a Sealed Physical

Envelope and the same should reach the Office of the concerned Official before the last Date

and Time as Stated in Tender Documents. Contractors are required to keep their Earnest

Money Deposit ready as the details of the Earnest Money Deposit instrument are required to

be entered during the Bid Preparation and Hash Submission stage. The details of the Earnest

Money Deposit shall be verified during the Tender Opening event and only those Contractors

whose online Earnest Money Deposit details shall be found matching with the physical

Earnest Money Deposit instrument shall be short listed for opening of other envelopes.

Page 16: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 16 -

Signature of Contractor No. of Corrections Executive Engineer

B-1 TENDER FORM

Page 17: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 17 -

Signature of Contractor No. of Corrections Executive Engineer

Form B-1

PERCENTAGE RATE TENDER &

CONTRACT FOR WORKS

DEPARTMENT : Water Resources Department

CIRCLE : Vidarbha Hydro electric & lift Irrigation Division,

Nagpur

NAME OF WORK : Design , Supply, erection, testing and commissioning of

33KV outdoor switchyard equipment for Lalnala

Lift Irrigation Scheme.Tal Samudrapur & Dist

Wardha

General Rules and Directions for the Guidance of Contractors: 1.0 All works proposed to be executed by contract shall be notified in all form of

invitation of tender pasted on a board hung up in the office of the

Superintending Engineer and signed by the Superintending Engineer .

This form will state the work to be carried out as well as the date of submitting

and opening tenders, and the time allowed for carrying out the work, also the

amount of earnest money to be deposited with the tender and the amount of

security deposit to be deposited by the successful tenderer, and the percentage,

if any, to be deducted from bills. It will also state whether a refund of a quarry

fees, royalties, octroi dues and ground rents will be granted. Copies of the

specifications, designs and drawings, estimated rates, scheduled rates and any

other documents required in connection with the work shall be signed by the

Superintending Engineer for the purpose of identification and shall also be

open for inspection by contractors at the office of the Superintending Engineer

during office hours.

Where the works are proposed to be executed according to the specifications

recommended by a contractor and approved by a competent authority on behalf

of the Governor of Maharashtra such specifications with designs and drawings

shall form part of the accepted tender.

2.0 In the event of the. tender being submitted by a firm, it must be signed by each

partner thereof, and in the event of the absence of any partner, it shall be signed

on his behalf by a person holding a power of attorney authorising him to do so.

Page 18: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 18 -

Signature of Contractor No. of Corrections Executive Engineer

i) The contractor shall pay along with the tender the sum of Rs.150000

/-(Rupees: -One Lakh Fifty Thousand only) as and by way of earnest

money. The contractor may pay the said amount by forwarding along with

the tender* BG/Demand Draft /call deposit receipt or short term deposit

receipt for a period of one year of any Nationalised /scheduled Bank for

the like amount in favor of the Executive Engineer Vidarbha hydroelectric

and lift Irrigation Division Bhandara. The said amount of earnest money

shall not Carry any interest whatsoever.

ii) In the event of his tender being accepted, subject to the provisions of sub-

clause (iii) below, the said amount of earnest money shall be appropriated

towards the amount of security deposit payable by him under conditions

of General Conditions of Contract.

iii) If, after submitting the tender, the contractor withdraws his offer, or

modifies the same or if after the acceptance of his tender the contractor

fails or neglects to furnish the balance of security deposit without

prejudice to any other rights and powers of the government hereunder, or

in law, Government shall be entitled to forfeit the full amount of the

earnest money deposited by him.

iv) In the event of his tender not being accepted, the amount of the earnest

money deposited by the contractor shall, unless it is prior thereto forfeited

under the provisions of sub-clause (iii) above, be refunded to him on his

passing receipt therefore.

(* Strike out which is not required)

3. Receipts for payments made on account of any work, when executed by a firm,

should also be signed by all the partners except where the contractors are

described in their tender as a firm, in which case the receipt shall be signed in

the name of the firm by one of the partners, or by some other person having

authority to give effectual receipts for the firm.

4. Any person who submits a tender shall fill up the usual printed form stating at

what percentage above or below the rates specified in schedule ‘B’

(memorandum showing items of work to be carried out) he is willing to

undertake the work. Only one rate of such percentage on all the estimated rates

/ scheduled rates shall be named. Tenders which - propose any alteration in the

works specified in the said form of invitation to tender, or in the works

specified in the said form of invitation to tender, or in the time allowed for

carrying out the work, or which contain any other conditions, of any other

conditions, of any sort, will be liable to rejection. No printed form of tender

shall include a tender for more than one works but if contractor who wish to

tender two or more works, they shall submit separate tender for each. Tenders

Page 19: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 19 -

Signature of Contractor No. of Corrections Executive Engineer

shall have the name and number of the work to which they refer, written

outside the envelope.

5. The Superintending Engineer or his duly authorised Assistant shall open

tenders in the presence of contractors who have submitted tenders or their

representatives who may be present at the time, and he will enter the amounts

of the several tenders in a comparative statement in a suitable form. In the

event of a tender being accepted the contractor shall for the purpose of

identification, sign copies of the specifications and other documents mentioned

in rule-1. In the event of the tender being rejected, the competent officer shall

authorise to refund the amount of the earnest money deposited to the contractor

on his giving a receipt for the return of the money.

6. The officer competent to dispose of the tenders shall have the right of rejecting

all or any of the tenders without assigning any reason, thereof.

7. No receipt for any payment alleged to have made by a contractor in regard to

any matter relating to this tender or the contract shall be valid and binding. on

Government unless it is signed by the Executive Engineer .

8. The memorandum of work to be tendered for and the schedule of materials to

be supplied by the Department and their rates shall be filled in and completed

by the office of the Executive Engineer .

before .the tender form is issued. If a form issued to an intending tenderer has

not been so filled in and completed he shall request the said office to have this

done before he completes and delivers his tender.

9. All works shall be measured net by standard measure and according to the rules

and customs of the Department and without reference to any local custom.

10. Under no circumstances shall any contractor be entitled to claim enhanced rates

for items in this contract.

11. All corrections and additions or pasted slips should be initialed.

12. The measurements of work will be taken according to the usual methods in use

in the Department and no proposal to adopt alternative methods will be

accepted. The Executive Engineer's decision as to what is the usual method in

use in the Department will be final.

13. The tendering contractor shall furnish a declaration along with the tender,

showing all works for which he has already entered into contract, and the value

of work that remains to be executed in each case on the date of submitting the

tender.

14. Every Tenderer shall furnish along with the tender, information regarding the

income tax circle or ward of the district in which he is assessed to income tax

the reference to the number of assessment and the assessment year and a valid

Income Tax clearance certificate.

Page 20: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 20 -

Signature of Contractor No. of Corrections Executive Engineer

15. In view of the difficult position regarding the availability of foreign exchange

no foreign exchange would be released by the department for the purchase of

plant and machinery required for, the, execution of the work contracted for

(GCB/PWD/CFM/l058-62517 dated 26.9.1959).

16. The contractor will have to construct shed for storing controlled and valuable

materials issued to him under schedule ‘A’ of the agreement, at the work site,

having double locking arrangement. The materials will be taken far use in the

presence of the Department person. No materials will be allowed to be

removed from the site of work.

17. Successful tenderer will have to produce to the satisfaction of the, accepting

authority a valid and current licence issued in his favour under the provisions

of contract labour (Regulation and Abolition Act, 1970) before starting work,

failing which acceptance of the tender will be liable for withdrawal and earnest

money will be forfeited to Government.

18. The contractor shall comply with the provisions of the Apprentices Act 1961

and the rules and orders issued there under from time to time. If he fails to do

so his failure will be a breach of the contract and. the Superintending

Engineer/Executive Engineer may in his discretion cancel the contract. Tile

contractor shall also be liable, for any pecuniary liability arising on account of

any violation by him of the provisions of the Act.

19. Wherever the world Water Resources Department appears in this contract the

Water Resources Department of the Government of Maharashtra shall be

implied.

Page 21: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 21 -

Signature of Contractor No. of Corrections Executive Engineer

B-1 TENDER FORM

PERCENTAGE RATE TENDER & CONTRACT FOR WORKS

TENDER FOR WORKS

Name of work : Design , Supply, erection, testing and commissioning of 33KV outdoor

switchyard equipment for Lalnala Lift Irrigation Scheme.Tal

Samudrapur & Dist Wardha

Total amount put to tender as estimated by department –Rs 28822470/-

1. I/We hereby tender for the execution, for the WRD (Government of Maharashtra

undertaking) (hereinbefore and hereinafter referred to as ‘Corporation’) of the work

specified in the under written memorandum within the time specified in such written

memorandum at *______________________________________________________

_____________________________________________________________________

_____________ percent below/above the estimated rates entered in Schedule ‘B’

(memorandum showing items of work to be carried out) and in accordance in all

respect with the specifications, designs, drawings and instructions in writing referred

to in Rule-1 hereof and in clause 12 of the annexed conditions of contract and agree

that when materials for the work are provided by the Government such material and

the rates to be paid for them shall be as provided in Schedule ‘A’ hereto.

(* In figures as well as in words)

Page 22: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 22 -

Signature of Contractor No. of Corrections Executive Engineer

Memorandum

2) I/We agree that the offer shall remain open for acceptance for a minimum

period of 90 days from the date fixed for opening the same and thereafter until

it is withdrawn by me/us buy notice in writing duly addressed to the authority

opening the tenders and sent by registered post A.D. or otherwise delivered at

the office of such authority, Demand Draft/Treasury Bank Challan No. and

date or Deposit at call receipt No. and date or term deposit receipt for a period

of one year receipt No____________ date _________ in respect to the sum of

Rs. -------------/- in words (Rs. -------------------------------- Only) representing

the earnest money is herewith forwarded. The amount of earnest Money shall

not bear interest and shall be liable to be forfeited to the Government .

a) If several sub-works are included they

should be detailed in a separate list.

General description

Design , Supply, erection,

testing and commissioning of

33KV outdoor switchyard

equipment for Lalnala Lift

Irrigation Scheme.Tal

Samudrapur & Dist

Chandrapur

b) Estimated cost 288.22 Lakh

c) The amount of E.M. to be deposited shall

be in accordance with the provisions of

para 204 and 205 of the M.P.W. manual

Earnest Money @1/2% 1.50 Lakh

d) This deposit shall be in accordance with

paras 211 and 212 of the M.P.W. manual

Security Deposit

i) Cash or Bank Guarantee or

TDR (not less than the amount

of E.M.) @ 2%

5.77 Lakh

ii) to be deducted from current

bills 2%

5.77 Lakh

Total 4% 11.54 Lakh

e) This percentage where no security deposit

is taken, will vary form 5% to 10%

according to the requirement of the case

where S.D. is taken. See note-1 to clause

of conditions of contract.

Percentage, if any to be

deducted from bills so as to

make up the total amount

required as security deposite by

the time, half the work, as

measured by the cost, is done.

NIL

f) Give schedule where necessary showing

dates by which the various items are to be

completed.

Time allowed for the work from

the date of written order to

commence

6 months

Page 23: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 23 -

Signature of Contractor No. of Corrections Executive Engineer

Should I/We fail to (i) abide for the stipulation to keep the offer open for

the period mentioned above.

Or

(ii) sign and complete the contract documents as required by the Engineer and

furnish the S.D. as specified in item (d) of the memorandum contained in

paragraph (i) above within the time limit laid down in clause (1) of the annexed

General conditions of contract. The amount of earnest money may be adjusted

towards the security deposit or refunded to me/us if so desired by me/us in

writing, unless the same or any part thereof has been forfeited as aforesaid.

3) Should this tender be accepted, I/We hereby agree to abide by and fulfill all the

terms and provisions of the conditions of contract annexed hereto so far as

applicable and in default thereof to forfeited and pay to government the sums

of money mentioned in the said conditions.

Receipt No __________ Dated _____________ .from the Government treasury

or sub-Treasury at ________________ in respect of the sum of Rs.

*______________________________________________________ is

herewith forwarded representing the E.M. (a) the full value of which is to be

absolutely forfeited to Government should I/We not deposit the full amount of

S. D. specified in the above memorandum, in accordance with clause I (A) of

the said conditions,

otherwise the said sum of Rs ____________________________________

__________________________________________shall be refunded or the

bank guarantee shall be returned.

* Amount to be specified in words and figures.

* Strike out (a) if no cash security deposit is to be taken.

Contractor: Signature of the contractor

Address: before submission of tender

Dated the Day of 2012

(Witness) Signature of the witness

Address to contractor’s signature

(Occupation)

The above tender is hereby accepted by me for and on behalf of the Governor of

Maharashtra.

Dated the Day of 2012

Signature of the accepting officer

Page 24: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 24 -

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE - A

Page 25: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 25 -

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE - A

(Not Applicable)

NAME OF WORK: Design , Supply, erection, testing and commissioning of 33KV

outdoor switchyard equipment for Lalnala Lift Irrigation

Scheme. Tal Samudrapur & Dist Wardha

Schedule showing (approximately) the material to be supplied from the stores for the

work contracted to be executed and the rates at which they are to be charged for.

Sr.

No.

Particulars Quantities Rate at which the material

will be charged to the

contractor

Place of

Delivery

Unit Rate

1 2 3 4 5 6

1 Nil Nil Nil Nil Nil

Note: The person of the firm submitting the tender should see that the rates in the

above schedule are filled up to date by the Executive Engineer, Incharge on

the form prior to the submission of the tender.

Page 26: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 26 -

Signature of Contractor No. of Corrections Executive Engineer

CONDITIONS FOR SCHEDULE – A

(Not applicable)

1. The person or the firm submitting the tender should see that the rates in the

above schedule area filled up by Executive Engineer on the issue of the form

prior to the submission of the tender.

2. The charges for conveyance of the materials from the place of site of work will

be born by the contractor. All the material shall be made available for delivery

on working days during the office hours.

3. The quantities noted in schedule 'A' is the actual and bonafide use this work.

4. All the materials mentioned in schedule ‘A’ required for the work shall be

taken form the Department only. The materials form the outside sources in lieu

of the material from the outside sources in Schedule 'A' shall not be allowed

except under written permission from the Executive Engineer. The samples of

such materials shall be tested at the contractors cost. The materials not

confirming to the required standard shall be removed by the contractor at once

from the site of work at his cost.

5. No claim for extra payment on account of delay in supply of the materials will

be entertained.

Page 27: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 27 -

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE - B

Page 28: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 28 -

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE – B

Name of Work : Design , Supply, erection, testing and commissioning of 33KV outdoor

switchyard equipment for Lalnala Lift Irrigation Scheme.Tal Samudrapur & Dist

Wardha.

Qty Unit Description Rate Each Amount

3 Nos Item No 1

SF6 Gas Circuit Breaker Supply

Erection , Testing and Commissioning

of 36 KV rated insulation class BIL,

170 KV Peak 630 A, 17.5 KV ,

Breaking Capacity 3 Phase 50 Cycles, three single Pole gang operating

mechanism outdoor SF6 Circuit Breaker with suitable operating mechanism

complete (As per rate analysis)

720500 No 2161500.00

1 No Item No 2 Isolator with Earth blade Supply, Erection , Testing and

Commissioning of 36 KV rated Insulation class BIL, 170 KV Peak 200

A, (with Maximum current capacity of

17.5 KV for 2 Secs) 3 Phase Double

break center post rotating outdoor type

isolator with earth blades along with

supporting , insulators , base channels

manual operating mechanism terminal

connectors etc.

(As per rate analysis)

195655 No 195655.00

4 Nos Item No3 Isolator without earth blade

Supply Erection , Testing and

Commissioning of 36 KV rated

installation class BIL, 170 KV Peak 200

A, (with Maximum current capacity of

17.5 KV for 2 Secs)3 Phase 50 Hz

center post rotating outdoor type isolator without earth blades along with

supporting , insulator , base channels manual operating mechanism terminal

connectors etc. (As per rate analysis)

180500 No 722000.00

9 Nos Item No 4 Current Transformer Supply Erection , Testing and

Commissioning of 36 KV rated insulation class Single phase 50 cycles,

3 cores hermetically sealed outdoor type

CT Having Current ratio of 50/1-1-1

Amps

(As per rate analysis)

128550 No 1156950.00

12 Nos Item No 5 Lightening Arrestors

Supply Erection , Testing and

Commissioning of 30 KV rated

insulation class BIS 170 KV Peak

89995 No 1079940.00

Page 29: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 29 -

Signature of Contractor No. of Corrections Executive Engineer

Single Phase 50 Hz Valve Type LA

station Type, outdoor, Lightening

arrestor along with surge counter and

insulation base complete

(As per rate analysis)

1 Lot Item No 6 Bus Bar Material

Supply Erection , Testing and Commissioning of Bus bar material

suitable ACSR conductor suspension /

tension insulators , post insulator,

hardware, power connector clamps etc ,

as required to complete the work as per

layout

(As per rate analysis)

195650 Lot 195650.00

1 Lot Item No 7 Junction Boxes

Supply Erection , Testing and

Commissioning of Junction boxes for

each equipment in a Bay including

wiring, cabling connecting, clamp

terminal connection etc, and also

marshalling boxes one for each bay

(As per rate analysis)

115000 Lot 115000.00

1 No Item No 8 Feeder Control and Relay

Panel

Supply Erection , Testing and Commissioning of 33/6.6 KV Feeder

Control and Relay Panel to be located inside pump house as per Specification

annexure I attached (As per rate analysis)

715000 No 715000.00

2 No Item No 9Transformer Control and

Relay Panel

Supply Erection , Testing and Commissioning of 33/6.6 KV

Transformer Control and Relay Panel to be located inside pump house as per

Specification annexure I attached

(As per rate analysis)

735000 No 1470000.00

Item No 10 LT Power and Control

Cables

176

Mtr.

10.1 1.1 KV Grade Armoured

Aluminium Conductors

a) Supplying ad Erecting PVC

armoured cables 4core 16 sq. mm alluminum conductor with continuous

5.48 sq. mm. (12 SWG) G.I. earth wire complete erected with glands and Lugs

on wall / Trusses/ pole or laid in provided trench pipe as per

specification No CBLT/ AL (As per rate analysis)

222.60

Mtr

39177.60

641.30 Mtr. b) Supplying Erecting PVC armoured cable 2 core 4 sq. mm aluminum

119.70 Mtr 76763.61

Page 30: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 30 -

Signature of Contractor No. of Corrections Executive Engineer

conductor with continuous 5.48 sq. mm.

(12 SWG) G.I. earth wire complete

erected with glands and Lugs on wall /

Trusses/ pole or laid in provided trench

pipe as per specification No CB-LT/ AL

(As per rate analysis)

109 Mtr. c)Supplying Erecting PVC armoured

cables 2 core 2.5 sq. mm aluminum conductor with continuous 5.48 sq. mm.

(12 SWG) G.I. earth wire complete

erected with glands and Lugs on wall /

Trusses/ pole as per specification No

CB-LT/ AL (As per rate analysis)

116.55 Mtr 12703.95

10.2 Supply Erecting , Testing and

Commissioning of Control Cables

(Copper) (As per rate analysis)

308 Mtr. 1) 2 C x 2.5 sq. mm 149.10 Mtr 45922.80

246.40 Mtr. 2) 5 C x 2.5 sq. mm. 214.00 Mtr 52729.60

410.30 Mtr. 3) 4 C x 2.5 sq. mm. 195.00 Mtr 80008.50

836 Mtr. 4.) 5 C x 4 sq. mm. 274.00 Mtr 229064.00

1843.60 Mtr. 6) 14 C x 2.5 sq. mm. 514.00 Mtr 947610.40

176.00 Mtr. 7) 4 C x 4 sq. mm 282.45 Mtr 49711.20

880 Mtr Item no.11 XLPE CABLE

1)Supply erection, testing and

commissioning of 6.6 KV (E), 1x 240

Sq.mm. aluminium conductor

unarmoured single core 11KV grade

XLPE cable

(As per rate analysis)

1210.00 Mtr 1064800.00

24

8

2) Termination Kit

Supplying, erecting, testing and

commissioning of Heat shrinkable

termination Kit for termination of 1 x

150sq.mm alluminium XLPE cable at

440 Volt ACDB and transformer LV terminals

a) Indoor Kit b) Outdoor Kit

(As per rate analysis)

8300.00

8300.00

No.

No

199200.00

66400.00

3 Nos Item No. 12 Potential Transformer Supply, erection, testing and commissioning of 33KV rated insulation

class, single phase 50HZ two core hermetically seated, outdoor type

voltage transformer having voltage rates

33 KV/ 110V/ 110V/

(As per rate analysis)

108640 No.

325920.00

2 Nos Item No. 13 Vacuum Circuit Breaker:

Supply, erection, testing and commissioning of totally enclosed

single bus bar floor mounting metal clad indoor non extensible type flush

fronted, Horizontal isolators, Horizontal

1415240 No. 2830480.00

Page 31: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 31 -

Signature of Contractor No. of Corrections Executive Engineer

draw out vacuum circuit breaker

suitable for installation in 50HZ, 6.6KV,

630 A, 25 KA effectively earthed supply

system comprising of housing for

Breaker mechanically interlocked safety

shutters, 6 No insulating plugs and a

VCB trolley with three vacuum interrupters and epoxy support

insulators and self aligning finger type isolating contracts truck having

integrated lock in device for inspection and withdrawal of VCB complete with

necessary interlocks manual charged independent, spring closing / spring

tripping, trip free operating mechanism,

with manual closing and tripping push

buttons, mechanical indicators V 12.

Breaker “closed/open ” spring “Charged / Discharged ” mechanical operation

counter, electrical release coil, breaker operated auxiliary switch with 2 No and

2 NC contact type 230 VAC / DC operated motorized mechanism +

manual operated mechanism.

01- Bus bar chamber with aluminums

bus bar (PVC sleeved / powder coated)

02- Electrical closing coil suitable for

110 VDC

03- Electrical shunt trip coil 110 VDC –

01 No

04- 230 V AC 80 watts rated space

heater with on / off switch and

thermostat 02 Nos.

05- Rear cable box for 3 single core 6.6

KV XLPE cable

06- Side cable box for outgoing cables (6.6 KV XLPE cables

07- Current transformer: Epoxy cast current transformer of core 1

class 1 accuracy and core 2 class 5P 10 STR of CT 25 KA for 1.0 sec and 15

VA burden (Ratio) to be informed by purchaser before order placement- 03

Nos.

8-Potential Transformer :

Epoxy cast type 3 phase potential

transformer with ratio

(6900/110) V/ 3 class of Acc 1.0

Burden 100 VA

Metering / Indications

09- Analogue ammeter with S/S size

144 sq mm

10- Analogue voltmeter with S/S size

144 sq mm

11- Analog type KWH meter W/o MDI

Page 32: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 32 -

Signature of Contractor No. of Corrections Executive Engineer

with Acc class 1.0

12- breaker ON / OF indicating lamps.

13- TCH lamps

14- TNC Switch

15- R-Y-B-Phase indicating lams

16 -Spring changed indications

17-Panel Indication Lamp 18- 20/c & 1E/F relay w/0 instantaneous

Equivalent of CD4-31 (make Ashida ER eqvt.)

19: High Speed tripping relay equivalent of VAJH 13 (Make Ashida

ER eqvt.) 20: -Trip Circuit Supervision Relay

equivalent of VAX31 (make Ashida ER

reqvt.

21.Auxiliary Relay for transformer fault

annunciation (OTIWTI Alarm / Trip Buchnolz Alarmtrip) equivalent of

VAA21 (make Ashrida ER/eqvt) – 3 NOS

(As per rate analysis)

18 MT Item No 14: Steel Structure

Supply, erecting, testing and

Commissioning of Galvanized steel

structure required for equipments

Gantry towers along with hardware such

as nut bolts washers foundation bolt etc

required for towers gantry structures with extended peak and supporting

structures for all equipments complete as per specification.

(As per rate analysis)

185000

MT 3330000.00

1 Lot Item No 15: Mandatory spares tools

and Tackles supplying at site set of spare and maintenance tools and tackles

given in schedule B part I and II(As per rate analysis)

526400 Lot 526400.00

3 MT Item No. 16 Cable Racking supplying erecting at site of work cable racking

made from MS angles/channels of appropriate size for routing the LT

power and control cables and 6.6 KV

XLPE cables from switch yard to pump

house above ground and also

embedment in switchyard and pump

house

(As per rate analysis)

155000 Nos 465000.00

Item No : 17 Cable Trays Supplying

and erecting at site Galvanized

perforated cable trays (16SWG) for

laying power and control cables inside

switchyard in trenches and from

Page 33: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 33 -

Signature of Contractor No. of Corrections Executive Engineer

switchyard to control room and inside

control room in pump house including

suitable clamps for power and control

cables required to complete the work as

per specification

(As per rate analysis)

498 Mtr 1) 450mm wide 915.00 Mtr 455670.00

50 Mtr 2) 300 mm wide 690.00 Mtr 34500.00

72 Mtr 3) 150 mm wide 425.00 Mtr 30600.00

1 Lot 4) Bends ,risers and tees 115000 Lot 115000.00

2 Nos Item No 18 : Power Transformer

:Supply Erection, Testing and

Commissioning of 2MVA 33/6.6 KV 3

Phase 50Hz ONAN outdoor core type

power transformer with high voltage

bushing suitable for connection of

ACSR conductor and LV side cable end

box suitable for termination of 1x 240

sq.mm XLPE cables, complete with

fittings and accessories Supply of rails

base plate anchor bolts required for

entire length of rails including first

filling of oil and Supply of 10%

additional quantity of oil in non

refundable drums vector group

Ynyno(As per rate analysis)

4550500 Nos 9101000.00

2 MT Item No . 19 : Earthing system

Supply, Erection Testing and

Commissioning of earthing system in

switchyard with 50x10mm GI strip for

connecting structures and equipments

from earthing grid GI shield wire and

various size of clamps required for

completion. (As per rate analysis)

155000 Nos 310000.00

Page 34: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 34 -

Signature of Contractor No. of Corrections Executive Engineer

1 No Item No.20: Station Transformer Supply, Erection, Testing And Commissioning of 33 / 0.433 KV, 3 phase 50 Hz of oil immerged naturally cooled indoor/outdoor type copper wound station transformer of 160 KVA capacity connected delta on HV side and star on LV side with neutral brought out on load side Standard mountings required for transformer are given below. The mountings are to be selected from them and any addition if required. Thermometer Pocket

1) Off load tap changing gear. 2) Oil Conservator with lifting

holes and cap and plain oil level gauge

3) Silica gel dehydrating Breather

4) Oil drain valve 5) Thermameter Pocket 6) Oil filter Valve 7) Lifting arrangement 8) Two earthing terminals 9) Diagram and rating plate 10) Plain Bidirectional rollers 11) Air vent 12) Explosive vent 13) Terminal Arrangement 14) Bushing with Lugs and /or

Cable end box on LV side 15) HV cable end box and/or HV

bushings(As per rate analysis)

345800 No. 345800.00

176 Mtr Item no.21 XLPE cable 3.3

KVSupplying, erecting, testing and

commissioning of 1 x 150 Sq.mm 3.3

KV grade single core XLPE(E)

Alluminium armoured cable on wall or

ceiling or laid in provided trench/pipe in

an approved manner. (As per rate

analysis)

1120.00 Mtr 197120.00

4

Item No.22 Termination

KitSupplying, erecting, testing and

commissioning of Heat shrinkable

termination Kit for termination of 1 x

150sq.mm alluminium XLPE cable at

440 Volt ACDB and transformer LV

terminals(As per rate analysis)

a) Indoor Kit b) Outdoor Kit

7300.00

No

No

29200.00

Page 35: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 35 -

Signature of Contractor No. of Corrections Executive Engineer

4 7300.00 29200.00

1 set Item No.23 D.O. Fuse Supplying and erecting approved make, 33 kV out door type drop out fuse with insulator complete with fuse holders, fuse barrel with metal fitting, fuse element mounted on M.S. channel with working current of 15Amps capacity complete

erected on provided cross arm. (As per

rate analysis)

20793.15 No. 20793.15

Total Amount 28822469.81

Add 3 % Contingency 864674.09

Grand Total 29687143.90

Say Rs 29687144/-

In Word: - Rupees Two Crore Ninety Six Lack Eighty Seven Thousand One Hundred Forty Four only

Page 36: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 36 -

Signature of Contractor No. of Corrections Executive Engineer

.

Part A LIST OF MANDATORY SPARES

Description Quantity Rate Amount

a) FOR CIRCUIT BREAKER:

1. Closing coils 2 No 13000.00 26000.00

2. Tripping coils 2No. 13000.00 26000.00

3. SF6 gas refilling device 1 No. 30000.00 30000.00

4. SF6 gas bottle 9 kgs 2 Nos. 45000.00 90000.00

5. Set of various gaskets used in assembly of breaker

1 Set. 15000.00 15000.00

b) FOR ISOLATOR :

1. Set of male/female contacts for each phase of one complete isolators.

2 Set. 22000.00 44000.00

2. Auxiliary switches 10 NO + 10 NC 2 Set. 12000.00 24000.00

3. Set of stack of insulator required for one phase of isolator.

2 Set. 6500.00 6500.00

c) FOR BUS BAR MATERIAL:

1. Tension insulator strings comprising of

required no. of insulators for one phase complete with hardware.

1 Set 7500.00 7500.00

d) FOR RELAY AND CONTROL PANEL:

1. Push buttons 10 Nos. 400.00 4000.00

2. 8 Way annunciation fascia windows 2 Nos. 12000.00 24000.00

3. Bulb for indicating lamps 25 Nos. 50.00 1250.00

4. Colour plastic domelens for lamp of various

colours

10 Nos 100.00 1000.00

5. Resistors for indicating lamps 10 Nos 75.00 750.00

6. HRC fuse/MCB/MCCB of associated

rating for control circuits (10 Nos. of each

rating for fuses and 1 No. for MCCB/MCB)

1 Set 10000.00 10000.00

e. For Power Transformer

1) Filter valve 2) Explosion vent diaphragm 3) Oil temp. indicator

1 Nos 1 Nos

1 Nos

6900.00 6000.00

25000.00

6900.00 6000.00

25000.00

Page 37: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 37 -

Signature of Contractor No. of Corrections Executive Engineer

4) Winding temp. Indicator 5) Magnetic oil Level gauge 6) Breather 7) 33 kV bushing 8) Neutral bushing (HV side) 9) Buchholz relays.

1 Nos

1 Nos

2 Nos

2 Nos

2 Nos

1 Nos

.

30000.00

25000.00

4500.00

7500.00

2500.00 30000.00

30000.00

25000.00

9000.00

15000.00

5000.00 30000.00

Total 461900.00

Part B LIST OF MAINTENANCE TOOL

Sr.

No.

Description Quantity Rate Amount

1 1000 Volt megger Battery operated/Hand

operated

1 No 4500.00 4500.00

2 2500/5000 Volt megger Battery/AC/DC

in addition to Hand operated

1 No. 8000.00 8000.00

3 Earth tester battery operated /AC/DC

supply operated

1 No. 5000.00 5000.00

4 Telescope ladder for street light pole 1 No. 35000.00 35000.00

5 Digital display multimeter battery

operated 0-5 AC/DC 0-1000V range

AC/DC 4 resistance range, input

resistance not less than 1 ohm

1 No 6000.00 6000.00

6 Tong Tester 1 No. 6000.00 6000.00

Total 64500.00

Total of part A & part B 461900.00 + 64500.00 = 526400.00

Note :- The quantities mentioned in of schedule B are approximate and for estimation

purpose only. The payment will be made as per actual quantity utilized for execution of

work.

Page 38: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 38 -

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE ‘C’

Page 39: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 39 -

Signature of Contractor No. of Corrections Executive Engineer

Guaranteed Performance and Technical Particulars

Schedule ‘C’

(a) This schedule is intended to indicate factually the contractors’ proposals at the time of

tendering. The equipment and the plant shall complete with these particulars unless the prior

approval of the Engineer’s Representative has been obtained for any deviations.

(b) The contractor is particularly requested not to repeat the details called for by this schedule

in any separate specifications of his own. He may, however, add any additional

specifications, not covered in forms of schedule of Technical Particulars, if so desired on

separate sheets.

(c) All the information required under this section shall invariably by given by the Tenderer.

Page 40: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 40 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDICES

Page 41: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 41 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX- ‘A’

Details Of Technical Personnel With The Contractor

Sr.

No.

Description Name Length of

Service in

The firm

Qualifications Professional

experience and

details of works

carried out

Remark

1

Project manager/ chief

Executive/ General

Manager/Dy. General

Manager/ Asst. Gen-

Manager.

1)

2)

2

Works manager/ mech.

Sr. Engr/Elec. Sr. Engr/

Sr. Executive

Manager/works

Executive

1)

2)

3)

4)

3

Engineer (Mech) 1)

2)

3)

4)

5)

Page 42: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 42 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX –A(Contd.)

Sr.

No.

Description Name Length of

Service in

the firm

Qualifications Professional

experience and

details of works

carried out

Remark

4

Engineer (Electrical) 1) 2)

3)

4)

5)

5

Supervisors 1)

2)

3)

4)

5)

6)

Page 43: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 43 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX –B

Details Of Plants & Machinery Proposed To Be Used For Work Immediately Available With Tenderer

Note : If no machinery available with the firm please give details as to how the firm will manage to get the same.

Sr

No

Name of

Equipment

No.

Of

Units

Kind of

Make

Capacity If already Owned If to be

purchased

(When ? Month

& Year)

Remarks

Age and

Condition

Location Probable

Date of

Availability

1 2 3 4 5 6 7 8 9 10

Page 44: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 44 -

Signature of Contractor No. of Corrections Executive Engineer

APENDIX – C ( NOT APPLICABLE)

Details Of Works Of Similer Type And Magnitude Carried Out By The Tenderer, During Last 5 Years

Sr

No.

Name of work Place and

Country

Tendered

Cost

Period of completion

as per contract and

actual period of

completion

Date of

completion

Whether material like

Conductor Cable ,

Insulator etc. was

supplied

Remark

1 2 3 4 5 6 7 8

Note : Certificates from Owners , in support of successful completion of works by the Contractor, shall be attached.

Page 45: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 45 -

Signature of Contractor No. of Corrections Executive Engineer

APPENIDIX – D (NOT APPLICABLE)

Details Of Other Works Tendered For And In Hand On The Date Of Submission

Sr.

No

Name of Work Place Work in Hand Works Tendered for Remarks

Sr

No.

Name of work Place

and

Country

Tendered

Cost

Rs. Lakh

Cost of

remaining

work

Rs. Lakh

Anticipated

date of

completion

Rs. Lakh

Estimated

Cost

Rs.Lakh

Date by

which

decision is

expected

Stipulated

date of

period of

completion

1 2 3 4 5 6 7 8 9 10

Note : Certificates from Owners , in support of successful completion of works by the Contractor, shall be attached.

Page 46: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 46 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX –E

Details Of Plants & Machinery Proposed To Be Used For Work But Not Immediately Available

Note : If no machinery available with the firm please give details as to how the firm will manage to get the same.

Sr

No

Name of

Equipment

No.

Of

Units

Kind of

Make

Capacity If already Owned If to be

purchased

(When ? Month

& Year)

Remarks

Age and

Condition

Location Probable

Date of

Availability

1 2 3 4 5 6 7 8 9 10

Page 47: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 47 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX -F

Declaration Of The Contractor

1.0 I/We ______________________________ Contactor(s) , hereby undertake

that I/We shall pay the labourers engaged on the work as indicated in Annexure – A

to section 2 – Details Tender Notice , wages as per Minimum Wages Act. 1948 and

amendments thereto applicable to the zone in which work lies and act accordingly. I

/ We also undertake to abide by the various laws in force and extend necessary

facilities and amenities to the staff and workers employed by me/us.

2.0 I / We hereby declared that I / We have made myself / ourselves

thoroughly conversant with the local condition regarding all materials and labour on

which I / We have bidded my / our rates for this work. The specification of this work

have been carefully studied and understood by me / us before submitting this tender.

Signature of the Contractor

Page 48: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 48 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX – G

Model Form Of B. G. Bond

B. G. Bond

1.0 This deed of Guarantee is made on the __________________ by

____________________________________ having his head office at

__________________ (hereinafter called the ‘said Contractor (s) from the demand

under the terms and condition) of agreement dated __________________made

between ___________________________

__________________________ and ___________________________

For ________________________ ( hereinafter called ‘the Agreement ) of additional

security deposit for the due fulfillment by the said Contractors of the terms and

condition contained in the said agreement on production of a Bank Guarantee for

Rs.____________ ( Rs. ____________________only).We _____________________________ (hereinafter referred to as ‘The Bank’) at the

request of _____________________ ( Contractor ) do hereby undertake to pay to the Vidarbha Irrigation Development Corporation hereinafter referred to as

Corporation, an amount not exceeding Rs. _________________ against any loss or damage caused to or suffered by the Corporation by reasons of any breach by the

said Contractor of any of the terms or conditions in contained in the said Agreement. 2.0 We , _____________________________ ( indicate the name of bank) do

hereby undertake to pay the amount claimed is due and payable under this guarantee without any demur , merely on a demand from the Corporation stating that the

amount claimed is due by way of loss or damage caused to or would be caused to

or suffered by the Corporation by reason of breach by the said Contractor (s) of the terms of condition contained in the said Agreement or any reason of the

Contractors(s) failure to perform the said agreement. Any such demand made on the bank shall be conclusive as regards the amount due & payable under this guarantee

shall be restricted to an amount not exceeding Rs. _____ 3.0 We undertake to pay to the Corporation any money so demanded not

withstanding any dispute or dispute raised by the Contractor (s) Supplier(s) in any suit or proceeding pending before any court or tribunal relating thereto, our liability

under this present being absolute and unequivocal. The payment so made by us

under this bond shall be valid discharge of our liability for payment there under and

the Contractor (s), Supplier(s) shall have no claim against us for making such

payment.

4.0 We , _________________________________ (indicate the name of Bank)

further agree that the guarantee herein contained shall remain in full force and effect

during the period that would be taken for the performance of the said Agreement and

that it shall continue to be forcible till all the dues of the Corporation under or by

virtue of the said Agreement have been fully paid and its claims satisfied or

discharged or till _________________ ( office / Corporation ) of

____________________________ ( indicate the name of Administrative Officer )

certifies that terms and conditions of the said Agreement have been fully and properly carried out by the said Contractor(s) and accordingly discharges this

guarantee unless a demand or claim under this guarantee is made on us in writing on or before the ________________ we shall be discharged from all liability under

this guarantee thereafter.

5.0 We , ___________________________ ( indicate the name of Bank ) further agree with the Corporation that the Corporation shall have the fullest liberty without

our consent and without affecting in any manner our obligations hereunder to vary

any of the terms and conditions of the said Agreement or to extend time of

Page 49: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 49 -

Signature of Contractor No. of Corrections Executive Engineer

performance by the said Contractor from time to time or postpone for any time or from time to time any of the powers exercisable by the Corporation against the said

Contractor(s) and to forth or enforce any terms and conditions relating to the said Agreement and we shall not to be relieved from our liability by reason of any such

variation or extension being granted to the said Contractor(s) or for any forbearance,

act or commission on the part of the Corporation or any indulgence by the

Corporation to the said Contractor or by any such matter or thing whatsoever which

under the law relating to surety would but this provision have effect of so relieving

us.

6 . This guarantee will not be discharged due to the change in the constitution of

Bank or the change in the constitution of the Contractors /Suppliers.

7. We _________________________________________(indicate the name of

Bank ) lastly undertake not be revoke this guarantee during its currency expect with

the previous consent of the Corporation in writing. Date the ____________ Day of ________________200

For __________________________

(Indicate the Name of Bank)

Page 50: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 50 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX – H

Certificate

I certify that I have gone through various points of Schedule and I have cognizance

of them while quoting prices in schedule B (Price Schedule). I understand that in

case of any ambiguity / non-clarity / mistakes etc. in price schedule, the department

will not entertain any subsequent clarifications.

Signature of Tenderer

Name :

Designation :

Address :

Page 51: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 51 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX – IA

Departure From Technical Specifications

ITEM NO CLAUSE NO TEXT AS PER TENDER DEPARTURE REMARKS

Page 52: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 52 -

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX -IB

Work Programme

Sr.

No

Particular of Work Time limit for

completion as per

Tender

Period of Completion of

work, quoted by the

Tenderer.

1

Design , Supply, erection, testing and commissioning of 33KV

outdoor switchyard equipment for Lalnala Lift Irrigation

Scheme.Tal Samudrapur & Dist Wardha

6 months

Page 53: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 53 -

Signature of Contractor No. of Corrections Executive Engineer

SECTIOIN-VIII

CONDITIONS OF B-1 CONTRACT

Page 54: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 54 -

Signature of Contractor No. of Corrections Executive Engineer

B-1 TENDER FORM

Conditions of Contract

Security Deposit

P.W.D. Resolution

No. CAT-1087/ CR-

94/ Bldg-2 dt.

14/6/89

Note (* This will be

the same percentage as that in the tender

at (e)

Clause- 1: The person/persons whose tender may be

accepted (hereinafter called the contractor, which

expression shall unless excluded by or repugnant to the

context include his heirs, executors, administrators &

assigns) shall, (a) within 10 days (which may be extended

by the Superintending Engineer concerned up to 15 days

if the Superintending Engineer thinks fit to do so) of the

receipt by him of the notification of the acceptance of his

tender deposit with the Executive Engineer (if deposited

for more than 12 months) of sum sufficient which will

made up the full security deposit specified in the tender or (b) (Permit Government at the time of making any

payment to him for work done under the contract to deduct such as will amount to 4% (Four percent) of all

money so payable such deductions to be held by Government by way of security deposit). Provided

always that in the event of the contractor depositing a lump sum by way of security deposit as contemplated at

(a) above, then and in such case, if the sum so deposited shall not amount to 4% (Four percent) of the total

estimated cost of the work, it shall be lawful for Govt. at

the time making any payment to the contractor for work done under the contract to make up the full amount of 4%

(Four percent) by deducting a sufficient sum from every such payment as last afore said until the full amount of

the security deposit is made up. All compensation or other sums of money payable by the contractor to

Government under the terms of his contract may be deducted from or paid by the sale of sufficient part of his

security deposit or from the interest arising there from or

from any sums which may be due or may become due to

Government to the contractor under any other contract or

transaction of any nature or any account whatsoever and

in the event of his security deposit being reduced by

reason of any such deduction or sale as aforesaid, the

contractor shall, within ten days thereafter, make good in

cash or Government securities endorsed as aforesaid, any

sum or sums which may have been deducted from or

raised by sale of his ,security deposit or any part thereof,

The security deposit referred to, when paid in cash may,

at the cost of the depositor, be converted in to interest

bearing securities provided that the depositor has expressly desired this in writing.

If the amount, of the security deposit to be paid in a lump sum within the period specified at (a) above is not paid,

the tender contract already accepted shall be considered as cancelled and legal steps taken against the contractor

for recovery of the amounts.

The amount of the security deposit lodged by a contractor

shall be refunded along-with the payment of the final bill,

Page 55: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 55 -

Signature of Contractor No. of Corrections Executive Engineer

if the date up to which the contractor has agreed to maintain the work in good order is over. If such date is

not over only 90% amount of security deposit shall be refunded along with the payment of the final bill. The

amount of security deposit retained by the Government

shall be released after expiry of period up to which the

contractor has agreed to maintain the work in good order

is over. In the event of the contractor failing or neglecting

to complete rectification work within the period up to

which the contractor has agreed to maintain the work in,

good order then, subject to provisions of clause 17 and 20

hereof' the amount of security deposit retained by

Government shall be adjusted to wards the excess cost

incurred by the Department on rectification work.

Additional Security Deposit

In case contractors offer is more or less than 90% of the

estimated cost as stated at schedule ‘B’. Additional security deposit in the form of irrevocable Bank

Guarantee for a stipulated period and for and amount equivalent to 10% of difference between 90% of the

estimated cost of work. and “Cost o0f Work as per the contractor’s offers”.

Non submission of the above additional security deposit will result into forfeiture of the E.M.D.

If the amount of the security deposit to be paid in a lump

sum and additional security deposit in form of irrevocable Bank Guarantee is not paid within the period specified at

(a) above the tender/contract already accepted shall be considerd as cancelled and legal steps taken against the

contractor for recovery of the amount. The amount of security deposit and additional security deposit lodged by

the contractor shall be refunded after the defects liability period is over. In the event of the contractor failing for

neglecting to complete rectification work within the

period, then subject to provisions of clauses 17 and 20

here of the amount of security deposit retained by

Government shall be adjusted towards the excess cost

incurred by the department on rectification work.

The additional security shall be refunded to the contractor

on issuing of the completion certificate by the Engineer-

in-charge a stipulated in clause No.7 if the contract shall

from time release the additional security deposit in part

which are in proportion to amount of the completed work.

Compensation for

delay

Clause - 2: The time allowed for carrying out 'the work

as entered in the tender shall be strictly observed by the

contractor and shall be reckoned from the date on which the order to commence the work is given to the

contractor. The work shall through the stipulated period of the contract be proceeded with, with all due diligence

(time being deemed to be essence of the contract) on the part of the contractor) and the contractor shall pay as

compensation an amount equal to one percent or such smaller amount as the Superintending Engineer (whose

decision in writing shall be final) may decide, of the

amount of the estimated cost of the whole work as shown

Page 56: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 56 -

Signature of Contractor No. of Corrections Executive Engineer

by the tenderer for every day that the work remains uncommenced, or unfinished after the proper dates. And

further to ensure good progress during execution of the work, the contractor shall be bound, in all cases in which

the time allowed for any work exceeds one month to

complete.

of the work of the time

-do- -do-

-do- -do-

Note : The quantity of the work to be done within a particular

time to be specified above shall be fixed and inserted in

the blank space kept for the purpose by the officer

competent to accept the contracts after taking into

consideration the circumstances of each case and abide by the programme of detailed process laid down by the

Executive Engineer. The following proportion will usually be found suitable:

In 1/4, 1/2, 3/4, of the time

Reasonable progress of Earth Work 1/6, 1/2, 3/4 of The

total value of the work to be done.

Reasonable progress of masonry work 1/10, 4/10, 8/10 of

the total value of the work to be done.

In the event of the contractor failing of comply with this conditions, he shall be liable to pay as compensation an

amount equal to one percent or such smaller amount as the Superintending Engineer (whose decision in writing

shall be final) may decide. of the said estimated cost of the whole work of for every day that the due quantity of

work remains incomplete provided always that the total

amount of compensation to be paid under the provisions

.of this clause shall not exceed 10 percent of the

estimated cost of the work as shown in the tender.

Superintending Engineer should be the final authority in

this respect. Irrespective of the fact that the tender is

accepted by the Chief Engineer, Addl. Chief Engineer/

Superintending/ Executive Engineer or Assistant

Engineer/ Deputy Engineer.

Action when whole

of Security deposit is

forfeited.

Clause -3: In any case in which under any clause of this

contract the contractor shall have rendered himself liable

to pay compensation amounting to the whole of this

security deposit whether paid in one sum or deducted by installments or ill the case of abandonment of the work

owing to serious illness or death of the contractor or any ether cause the Engineer on behalf of the Governor of

Maharashtra, shall have power to adopt any of the following courses, as he may deem best suited to the

interest of Government. a) To rescind the contract (for which rescission notice in

writing to the contractor under the 1ead of Executive

Engineer shall be conclusive evidence) and in that case

Page 57: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 57 -

Signature of Contractor No. of Corrections Executive Engineer

the S.D. of the contractor shall stand forfeited and be absolutely at the disposal of Government.

b) To carry out the work or any part of the work departmentally debiting the contractor with the cost of the

work, expenditure incurred on tools, and plant and

charges on additional supervisory staff including the cost

of work charged establishment employed for getting the

unexecuted part of the work completed and crediting him

with the value of the work done departmentally in all

respects in the same manner and at the same rates as if it

had been carried out by the contractor under the terms of

his contract. The certificate of the Executive Engineer as

to the costs and other allied expenses to be incurred and

to the value of the work 50 done departmentally shall be

final and conducive against the contractor.

c) To order that the work of the contractor be measured up and to take such part thereof as shall be unexecuted

out of this hands, and to give it to another contractor to complete in which case all expenses incurred on

advertisement for fixing a new contract agency) additional supervisory staff including the cost of work

charged establishment and the cost of the work executed by the new contract agency will be debited to the

contractor) and the value of the work done or executed

through the new contractor shall be credited to the contractor in all respects and in the same manner and at

the same rates as if ir had been carried out by the contractor under the terms of his contract. The certificate

of the Executive Engineer as to all the cost of the work and other expenses incurred as aforesaid for or in getting

the unexecuted work done by the new contractor arid as to the value of the work so done shall be final and

conclusive against the contractor. In case the contract

shall be rescinded under clause

(a) above the contactor shall not be entitled to recover or

be paid) any sum for any work therefore actually

performed by him under this contract unless and until the

Executive Engineer shall have certified in writing the

performance of such work and the amount payable to him

in respect thereof and he shall only be entitled to be paid

the amount so certified. In the event of either of the

courses referred to in clause (b) or (c) being adopted and

the cost of the work executed departmentally or through a

new contractor and other allied expenses exceeding the

value of such work credited to the contractors the amount of excess shall be deducted from any money due to the

contractor, by Government under the contract or otherwise howsoever or from his security deposit or the

sale proceeds thereof provided, however, that contractor shall have no claim against Govt. even if, the certified

value of the work done department or through a new contractor exceeds the certified cost of such work and

allied expenses, provided always that w lich ,ever of the

three courses mentioned in clause (a), (b) or (c) is

Page 58: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 58 -

Signature of Contractor No. of Corrections Executive Engineer

adopted by the Executive Engineer, the contractor shall have no claim to compensation for any loss sustained by

him by reason of his having purchased or procured any materials, or entered into any arrangement or made any

advance on account of or with a view to the execution of

the work or the performance of the contract.

Action when the

progress of any

particular portion of

the work is

unsatisfactory

Clause-4: If the progress of any particular portion of any

work is unsatisfactory the Executive Engineer shall

notwithstanding that the general progress of the work is

in accordance with the conditions mentioned in clause 2

be entitled to take action under clause 3 (b) after giving

the contractor 10 days notice in writing. The contractor

will have no claim for compensation, for any loss

sustained by him owing to such action.

Contractor remains liable to pay

compensation if action not taken

under clause 3 & 4

Clause-5 : In any case in which any of the powers conferred upon the Executive Engineer by clause 3 & 4

here of shall have become exercisable and the same shall not have been exercised the non-exercise thereof shall not

constitute a waving of any of the conditions hereof and such powers shall notwithstanding be exercisable in the

event of any future case of default by the contractor for which under any clause hereof he is declared liable to pay

compensation amounting to the whole of his security

deposit and the liability of the contractor for past and future compensation shall remain unaffected. In the event

of the Executive Engineer taking action under sub-clause (b) or (c) of Clause 3, he may, if he so desires, take

possession of all any tools and plant, materials and stores in or upon the work of the site thereof or belonging to the

contractor, or procured by him and intended to be used for the execution of the wor1.t or any part thereof paying

or allowing for the same in account at the contract rates,

or in the case of contract rates not being applicable at

current market rates to be certified by the Executive

Engineer whose certificate thereof shall be final. In the

alternative the Executive Engineer, may after giving

notice in writing to the contractor or his clerk of the

work, foreman or other authorised agent require him to

remove such tools and plant, materials, or stores from the

premises within a time to be specified in such notice, and

in the event of the contractor failing to company with any

such requisition, the Executive Engineer ER may remove

them at the contract’s expenses or sale them by auction or

private sale on account of the contractor and at his risk in all respects and the certificate of the Executive Engineer

as to the expenses of any such removal and the amount of the proceeds and expense of any such sale shall be final

and conclusive against the contractor.

Extension of time Clause-6 : If the contractor shall desire an extension of the time for completion of work on the ground of his

having, been unavoidably hindered in its execution or on

any other ground he shall apply in writing to the

Page 59: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 59 -

Signature of Contractor No. of Corrections Executive Engineer

Executive Engineer before the expiration of the period, stipulated in the tender or before the expiration of 30 days

from the date on which he was hindered as aforesaid or on which the cause for asking for extension occurred,

whichever is earlier and the Executive Engineer or in the

opinion of Superintending Engineer, or Chief Engineer as

the cause may be if in his opinion, there were reasonable

grounds for granting an extension, grant such extension,

as he thinks necessary or proper. The decision of the

Executive Engineer in this matter shall be final.

Final Certificate Clause-7 : On the completion of the work the contractor

shall be furnished with a certificate by the Executive

Engineer (hereinafter called the Engineer-in-charge) of

such completion, but no such certificate shall be given nor shall the work be considered shall be given nor shall

the work be considered to be complete until the contractor shall have removed, from the premises on

which the work shall have been executed, all scaffolding surplus materials and rubbish, and shall have cleaned off,

the dirt from all wood work, doors, windows, wall, floor, or other parts of any building in or upon which the work

has been executed or of which he may have had possession for the purpose executing the work, nor un till

the work, shall have been measured by the Engineer-in-

Charge or where the measurement have been taken by his subordinates until they have received approval of the

Engineer-in-Charge, the said measurements being binding and conclusive against contractor. If the

contractor shall fail to comply with the measurements of this clause as to the removal of scaffolding surplus

materials and rubbish, and cleaning of dirt on or before the date fixed for the completion of the work the

Engineer-in-Charge may at the expenses of the

contractor, remove such scaffolding surplus materials and

rubbish, abd dispose off the same as he thinks fit and

clean off such dirt as aforesaid and the contractor shall

forthwith pay the amount of all expenses so incurred, but

shall have no claim in respect of any such scaffolding or

surplus materials as aforesaid except for any such

actually realised by the sale thereof.

Payment on

intermediate

certificate to be

regarded as advances.

Clause-8: No payment shall be made for any work

estimated to cost less than rupees one thousand till after

the whole of work shall have been completed and a

certificate of completion given. But in the case of works estimated to the cost more than rupees one thousand the

contract or shall on submitting a monthly bill therefore be entitled to receive payment proportionate to the part of

the work than approved and passed by the Engineer-in-Charge, whose certificate of such approval and passing of

the sum so payable shall be final and conclusive against the contractor. All such intermediate payments shall be

regarded as payment by way of advance against the final

payments only & not as payments for work actually done

Page 60: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 60 -

Signature of Contractor No. of Corrections Executive Engineer

and completed and shall not preclude the Engineer-in-Charge from requiring any bad, unsound imperfect or

unskillful work to be removed or taken away and reconstructed or re-erected nor shall any such payment be

considered as an admission of the due performance of the

contractor any part thereof in any respect or the occurring

of any claims nor shall it conclude determine or effect in

any other way the powers of the Engineer-in-Charge as

to, the final settlement and adjustment of the accounts or

otherwise, or in any other way vary or effect the contract.

The fined J bill shall be submitted- by the contractor

within one month of the date fixed for the completion of

the work, otherwise the Engineer-in-Charges certificate

of the measurements and of the total amount payable for

the work shall be final and binding on all parties.

Payment at reduced rates on a/c of items

of work not accepted as completed to be at

the direction of the Engineer-in-charge

Clause-9: The rates for several items of work estimated to cost more than Rs. 1000/- agreed to within shall be

valid only when the item concerned is accepted as having been completed fully in accordance with the sanctioned

specifications. In cases, where the items of work are not accepted as so completed by the Engineer-in-charge may

made payments on account of such items at such reduced rates as he may consider reasonable in the preparation of

final or on account bills.

Bill to be submitted

monthly

Clause-10: A bill shall be submitted by the contractor in

each month or before the date fixed by the Engineer-in-charge for all work executed in the previous months, and

the Engineer-in-charge shall take or cause to be taken the requisite measurements for the purpose of having the

same verified & the claim so far as it is admissible, shall be adjusted, if possible, within tell days from the

presentation of the bill. If the contractor does not submit

the bill within the time fixed as aforesaid, the Engineer-

in-charge, may depute a subordinate to measure up the

said work in the presence of the contractor or his duly

authorised agent whose counter signature to the

measurement list shall be sufficient warrant and the

Engineer-in-charge may prepare a bill from such list

which, shall be binding on the contractor in all respect.

Bills to be on printed

forms

Clause-11: The- contractor shall submit all bills on the

printed forms to be had on application at the office of the'

Engineer-in-charge. The charges to be made in the bills

shall always be entered at the rates specified in the tender or in the case of any extra work ordered in pursuance of

these conditions and not mentioned or provided for in the tender at the rates hereinafter provided for such work.

Stores supplied by

Government

Clause-12: If the specification or estimate of the work

provides for the use of my special description of materials to be supplied from the store of the

Departmental Store or if it is required that the contractor

shall use certain stories to be provided by the Engineer-

Page 61: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 61 -

Signature of Contractor No. of Corrections Executive Engineer

in-charge (such material and store and the prices to be charged therefore as hereinafter mentioned being so far as

practicable for the convenience of the contractor but not so as in any way to control the meaning of effect of this

contract specified in the schedule or memorandum hereto

annexed) the contractor shall be supplied with such

materials and stores as may be required from any sums

then due, or thereafter to become due to the contractor

under the contract, or otherwise, or from the security

deposit or the proceeds of the sale thereof if the security

deposit is held in Government securities, the same or a

sufficient portion thereof shall in that case be sold for the

purpose. All materials supplied to the, contractor shall

remain the absolute property of Government & shall on

no account be removed from the site of the work, and shall at all times be open for inspection by the Engineer-

in-charge. Any such materials unused and in perfectly good condition at the time of completion or termination

of the contract shall be returned to the Departmental store of the Engineer-in-charge so requires by a notice in

writing given under his hand but the contractor shall not be entitled to return any such materials except with

consent of the Engineer-in-charge and he shall have no claim for compensation on account of any such materials

supplied to him as aforesaid but remaining unused by him

or for any wastage in or damages to any such materials.

Clause-12(A) : All stores of controlled materials such as

cement, steel, etc., supplied to the contractor by Government should be kept by the contractor under lock

and key and will be accessible for inspection by the Executive Engineer or his agent at all the times.

Works to be

executed in

accordance with

specifications

drawings, orders etc.

Clause-13: The contractor shall execute the whole and

every part of the work in the most substantial and

workman like manner, and both as regards materials and

every other respect in strict accordance with

specifications. the contractor shall also confirm exactly,

fully, & faithfully to the de-signs; drawings and

instructions in writing relating to the work sign by the

Engineer-in-charge and lodged in his office and to which

the contractor shall be entitled to have access for the

purpose of inspection at such office or on the site of work

during office hours. The contractor will be entitled to

receive three sets of contract drawings and working drawings as well as one certified copy of the accepted

tender along with the work order free of cost. Further copies of the contract Drawings and workings if required

by him, shall be supplied at the rate of Rs.______ per set of contract drawings and Rs.________ per working

drawing except where otherwise specified.

Alternations in

specifications &

Clause-14: The Engineer-in-charge shall have power to

make any alteration in or additions to the original

Page 62: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 62 -

Signature of Contractor No. of Corrections Executive Engineer

designs not to invalidate contracts.

Rates for works not

entered in estimate

or schedule of rate of

the district

specifications, drawings, designs and instructions that may appear to him to be necessary or advisable during

the progress of the work and the contractor shall be bound to carry out the work in accordance with any

instructions in this connection which may be given to him

in writing signed by the Engineer-in-charge and such

alteration shall not invalidate the contract, and any

additional work which the contractor may be directed to

do in the manner above specified as part of the work shall

be carried out by the contractor on the same conditions in

all respects on which he agreed to do the main work, and

at the same rates as are specified in the tender for the

main work. And if the additional and altered work

includes any class of work for which no rate is specified

in this contract, then such class of work shall be carried out at the rates entered in the Schedule of rates on the Dn.

or at the rates mutually agreed upon between the Engineer-in-charge and the contractor, whichever are

lower. If the addl. or altered work for which: no rate is entered in the schedule of rates of the Division is ordered

to be carried out before the rates are agreed upon then the contractor shall within the seven days of the date of

receipt by him of the order to carry out the work, inform the Engineer-in-charge of the rate which it is his intention

to charge for such class of work. And if the Engineer-in-

charge does not agree to this rate, he shall, by notice in writing be at liberty to cancel his order to carry out such

class of work and arrange to carry out, in such 'manner as he may consider advisable provided always that if the

contractor shall commence work or in cure any expenditure in regard thereto before the rates shall have

been determined as lastly hereinbefore mentioned, then in such case, he shall only be entitled to be paid in respect

of the work carried out or expenditure incurred by him

prior to the date of the determination of the rate as afore

said according to such rate or rates as shall be fixed by

the Engineer-in-charge. In the event of a dispute, the

decision of Superintending Engineer of the circle will be

final.

Where, however, the work is to be executed according to

the designs, drawings and specifications recommended

by the contractor and accepted by the competent

authority, the alterations above referred to shall be within

the scope of such designs, drawings, & specifications

appended to the tender.

Extension of time in

consequence of additions or

alternations.

The time limit for the completion of the work shall be

extended in the proportion that increase in its cost occasioned by alterations or additions bears to the cost of

the original contract work, and the certificate of the Engineer-in-charge as to such proportions shall

conclusive.

No claim to any Clause - 15.: (1) If at any time after the execution of the

Page 63: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 63 -

Signature of Contractor No. of Corrections Executive Engineer

payment or compensation for

alteration in or restriction of work

contract documents the Engineer shall for any reason whatsoever (other than default on the part of the

contractor for which the Government is entitled to rescind the contract) desires that the whole or any part of the

work speeded in the tender, should be suspended for any

period of that the whole or part of the work should not be

carried out, at an he shall give to the contractor a notice

in writing of such desire and upon the receipt of such

notice the contractor shall forthwith, suspend or stop the

work wholly or in part as required after having due regard

to the appropriate stage at which the work should be

stopped or suspended so as not to cause any damage or

injury to the work already done or endanger the safety

thereof provided that the decision of the Engineer as to

the stage at which the work or any part of it could be or could have been safely stopped or suspended shall be

final and conclusive against the contractor. The contractor shall have no claim to any payment or in

compensation whatsoever by reason of or in pursuance of any notice as aforesaid, on account of any suspension,

stoppage or curtailment except to the extent specified hereinafter.

(2) Where the total suspension of work ordered as

aforesaid continued for continuous' period exceeding 90

days the contractor shall be liberty to withdraw from the contractual obligations under the contract so far it

pertains to the unexecuted part of the work by giving a 10 days prior notice in writing to the Engineer, within 30

days, of the expiry of the said period of 90 days, of such intention and requiring the Engineer to record the final

measurement of the work already done and to pay final bill. Upon giving such notice the contractor shall be

deemed to have been discharged from .his obligations to

complete the remaining unexecuted work under his

contract. On receipt of such notice, the Engineer shall

proceed to complete the measurements and make such

payment as may be finally due to the contractor within

period of 90 days from a receipt of such notice in respect

of the work already done by the contractor. Such payment

shall not in any manner prejudice the right of the

contractor to any further compensation under the

remaining provisions of this clause.

(3) Where the Engineer required to contractor to suspend

the work for a period in excess of 30 days at any time or

60 days in the aggregate, the contractor shall be entitled to apply to the Engineer within 30 days of the resumption

of work after such suspension for payment of compensation to the extent of pecuniary loss suffered by

him in respect of working machinery remained idle on the site or on the account of his having and to pay the

salary or wages of labour engaged by him during the said period of suspension provided always that the contractor

shall not be entitled to any claim in respect of any such

working machinery, salary of wages for the first 30 days

Page 64: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 64 -

Signature of Contractor No. of Corrections Executive Engineer

whether consecutive or in the aggregate, or such suspension or in respect or any suspension whatsoever

occasioned by unsatisfactory work or any other default on his part. The decision of the Engineer-in-charge in this

regard shall be final and conclusive against the

contractor.

No claim to

compensation on

account of loss due

to delay in supply of

material by

Government

(4) In the event of -

(i) Any total stoppage of work on notice from Engineer

under sub-clause (1) in that behalf.

(ii) Withdrawal by the contractor from the contractual

obligations complete the remaining unexecuted work

under sub-clause (2) on account of continued suspension

of work for a period exceeding 90 days.

OR

(iii) curtailment in the quantity of item or items or items

originally tendered on account of any alteration, omission on substitution in the specifications, drawings, designs or

instructions under clause 14 (1) where such curtailment exceeds 25% in quantity and the value of the quantity

curtailed beyond 25% at the rate for the item specified in the tender is more than Rs. 5000/-.

It shall be open to the contractor, within 90 days from the service of (i) the notice of stoppage of work or (ii) the

notice of withdrawal from the contractual obligations under the contract on account of the continued suspension

of work (iii) notice under clause 14 (1) resulting in such curtailment to produce to the Engineer satisfactory

documentary evidence that he had purchased or agreed to purchase material for use in the contracted work before

receipt by him of the notice of stoppage, suspension or

curtailment and require the Government to take over on

payment such material at the rates determined by the

Engineer, provided, however such rates shall in no case

exceed the rates at which the same was acquired by the

contractor. The Government shall thereafter take over the

material so offered, provided the quantity offered, are not

in excess of the requirements of the unexecuted work as

specified in the accepted tender and are of quality and

specifications approved by the Engineer.

No claim to

compensation on account of loss due

to delay in supply of material by

Government

Clause - 15(A): The contractor shall not be entitled to

claim any com pension from Government for the loss suffered by him on account of delay 'by Government in

the supply of materials entered in Schedule ‘A’ where such delay is caused by

i) Difficulties relating to the supply of railway wagons.

ii) Force measure.

iii) Act of God.

Page 65: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 65 -

Signature of Contractor No. of Corrections Executive Engineer

iv) Act of enemies of the state or any other reasonable

cause beyond the control of Government in the case of such delay in the supply of materials, Government shall

grant, such extension of time for the completion of the

work as shall appear to the Executive Engineer to be

reasonable in accordance with the circumstances of the

case. The decision of the Executive Engineer as to the

extension of time shall be accepted as final by the

contractor.

Time limit for

unforeseen claims

Clause - 16 : Under no circumstances whatever shall the

contractor be entitled to any compensation from

Government on any account unless the contractor shall

have submitted a claim in writing to the Engineer-in-charge within one month of the case of such claim

occurring.

Action and compensation

payable in case of bad work

PWD Resolution No.

CAT 1087/ CR-94/ Bldg-2 dt. 14/06/89

Clause 17: If any time before the security deposit or any part thereof is refunded to the contractor, it shall appear

to the Engineer-in-charge or, his subordinate in charge of the work, that any work has been executed with unsound,

imperfect or unskillful workmanship or with materials of inferior quality, or that any materials or articles provided

by him for the execution of the work are unsound, or of a

quality inferior to that contracted for, or are otherwise not in accordance with the contract, it shall be lawful for the

Engineer-in-charge to intimate this fact in writing to the contractor and then notwithstanding the fact that the

work, materials or articles complained of may have been inadvertently passed, certified and paid for the contractor

shall be bound forthwith to rectify, or remove and reconstruct the work 30 specified in whole or in part, as

the case may require or if so required, shall remove the

materials or articles so specified and provided ocher

proper and suitable materials or articles at his own charge

and cost and in the event of his failing to do 'so within a

period to be specified by the Engineer-in-charge in the

written intimation aforesaid, the contractor shall be liable

to pay compensation at the rate of one percent on the

amount of the estimate for every day not exceeding 10

days, during which the failure so contains and incase of

any such failure the Engineer-in-charge may rectify or

remove and re-execute the work or remove and replace

the materials or articles complained of as the case may be

at the risk and expense in all respects of the contractor, should the Engineer-in-charge consider that any such

inferior work or materials as described above may be accepted or made use of it shall be within his discretion

to accept the same at such reduced rates as he may fix therefore.

Work to be open to

inspection

Clause - 18: All works under or in course of execution or

executed in' pursuance of the contract ,shall at all times

be open to the inspection and supervision of the

Page 66: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 66 -

Signature of Contractor No. of Corrections Executive Engineer

Contractor or

responsible agent to be present

Engineer-in-charge and his subordinates and the contractor shall at all times during the usual working

hours, and at all other times at which reasonable notice of the intention of the Engineer-in-charge and his

subordinate to visit the work shall have been given to the

contractor, either himself be present to receive orders and

instructions or have responsible agent duly accredited in

writing present for that purpose. Orders given to the

contractors duly authorised agent shall be considered to

have the same force and effect as if they had been given

to the contractor himself.

Notice to be given

before work in

covered up

Clause - 19 : The contractor shall give not less than five

days notice in writing to the Engineer-in-charge or his

subordinate in charge of the work before covering up or otherwise placing beyond the reach of measurement any

work in order that the same may be measured and correct dimensions thereof taken before the I same is so covered

up or place beyond the reach of measurement and shall not cover up or place beyond the reach of measurement

any work without the consent in writing of the Engineer-in-charge or his subordinate-in-charge of the work, and, if

any work shall be covered up or placed beyond the reach of measurement without such notice hewing been given

or consent obtained the same shall be uncovered at the

contractors expenses, and in default thereof no payment or allowance shall be made for such work or for the

materials with which the same was executed.

Contractor liable for damage done & for

imperfections

PWD Resolution No.

CAT 1087/ CR-94/

Bldg-2 dt. 14/06/89

Clause -20 : If during the period of months/years from the date of completion as certified by the Engineer-in-

charge pursuant to clause- 7 of the contract or_________ or_________ months/years, after commissioning the

work, whichever is earlier, in the, opinion of the

Executive Engineer, the said work is defective in any

manner whatsoever, the contractor shall forthwith on

receipt of notice in that behalf from the Executive

Engineer, duly commence execution and completely

carry out at his cost in every respect all the work that may

be necessary for rectifying and setting right the defects

specified therein including dismantling & reconstruction,

of unsafe portions strictly in accordance with and in the

manner prescribed and under the supervision of the

Executive Engineer. In the event of the contractor failing

or negating to commence execution of the said

rectification work within the period prescribed therefore in the said notice and/ or to complete the same as

aforesaid as required by the said notice, the Executive Engineer get the same executed and carried out

departmentally or by any other agency at the risk on account and the cost of the contractor. The contractor

shall forthwith on demand pay to the Government the amount such costs, charges and expenses sustained or

incurred by the Government of which the certificate of

the Executive Engineer shall be I final and binding of the

Page 67: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 67 -

Signature of Contractor No. of Corrections Executive Engineer

contractor. Such costs, charges and expenses shall be deemed to be arrears of land revenue and on the event of

the contractor failing or neglecting to pay the same on demand as aforesaid without prejudice to any other rights

and remedies of the Government, the same may be

recovered from the contractor as arrears of land revenue.

The Government shall also be entitled to deduct the same

from any amount which may then be payable or which

may thereafter become payable by the Government to the

contractor either in respect of the said work on any other

work whatsoever or from the amount of security deposit

retained by Government.

Contractor to supply

plant, ladder,

scaffolding etc.

And is liable for

damages arising

from non provisions of light, fencing etc.

Clause-21: The contractor shall supply at his own cost all

material (except such special materials if any as may in

accordance with the correct, be supplied from the departmental stores), plant, tools, appliances, implements,

ladders, cardage, tackle, scaffolding and temporary work, requisite or proper for the proper execution of the work,

whether in the original, altered or substituted from, and whether included in the specification or other documents

forming part of the contract or referred to in these conditions or not and which may be necessary for the

purpose of satisfying or complying with the requirements of the Engineer-in-charge as to any matter as to I which

under these conditions he is entitled to be satisfied, or

which is entitled to require together with the carriage there for to and from the work. The contractor shall also

supply without charge the requisite number of persons with the means and materials necessary for the purpose of

setout works and counting, weighting and assisting in the measurement or examination at any time and from time

to time of the work or the materials, failing which the same may be provided by the Engineer-in-charge at the

expenses of the contractor and the expenses may be

deducted from any money due to the contractor under the

contract or from his security deposit or the proceeds of

sale thereof, or of a sufficient portion thereof. The

contractor shall provide all necessary fencing and lights

required to protect the public from accident and shall also

be bound to bear the expenses of defense of every suit,

action or other legal proceeding, that may be brought by

any person for injury sustained owing to neglect of the

above precautions and to pay any damages and cost

which may be awarded in any such suit action or

proceedings to any such person or which may with

consent of the contractor be paid for compromising any claim by any such person.

List of machinery in contractor's possession and which they propose to use en the works should be submitted

along with the tender.

Clause -21 (A): The contractor shall provide suitable

scaffolds and working platforms gangways and stair ways

Page 68: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 68 -

Signature of Contractor No. of Corrections Executive Engineer

and shall comply with the following regulations in connections therewith.

(a) Suitable scaffolds shall be provided for workmen for

all works that cannot be safely done from a ladder or by

other means.

(b) A scaffold shall not be constructed taken down or

substantially altered except:

(i) Under the supervision. of a competent and responsible

person; and

(ii) as far as possible by competent workers possessing

adequate experience in this kind of work.

(c) All scaffolds and appliances connected therewith and ladders shall

(i) be of sound material;

(ii) be of adequate strength having regard to the loads &

strains to which they will be subjected; and

(iii) be maintained in proper condition.

(d) scaffolds shall be so constructed that no part thereof

can be displaced in consequence of normal use.

(e) Scaffolds shall not be over-loaded and so far as practicable the load shall be evenly distributed.

(f) Before installing lifting gear on scaffolds special

precautions shall be taken to ensure the strength and

stability of the scaffolds.

(g) Scaffold shall be periodically inspected by the

competent person.

(h) Before allowing a scaffold to be used by his workmen

the contractor shall, whether the scaffold has been erected

by his workmen or not, take steps to ensure that it

complies fully with the regulations herein specified.

(i) working platform, gangways, stairways shall

(i) be so constructed that no part thereof can sag unduly

or unequally;

(ii) be so constructed and maintained having regard to the prevailing conditions as to reduce as far as practicable

risks of persons tripping or slipping; and.

(iii) be kept free from any unnecessary obstructions,

Page 69: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 69 -

Signature of Contractor No. of Corrections Executive Engineer

(i) In the case of working platform, gangways, working places and stairways at the height exceeding 3 meters.

(i) Every working platform, and every, gangway shall be

closely boarded unless other adequate measures are taken

to ensure safety;

(ii) Every working platform and gangway shall have

adequate width; and

(iii) Every working platform, gangway, working place

and stairway shall be suitable fenced.

(k) Every opening in the floor of a building .or in a

working platform shall except for the time and to the

extent required to allow the excess of persons or the

transport or shifting of materials be provided with suitable means to prevent the fall of persons or materials.

(1) When persons are employed' on roof where there is a danger of falling from a height exceeding 3 mtrs. Suitable

precautions shall be taken to prevent the fall of persons or materials.

(m) Suitable precautions shall be taken to prevent persons

being struck by articles which might fall from scaffold or other working places.

(n) Safe means of access shall be provided to all working platforms and other working places.

(o) The contract(s) will have to make payments to the

labors as per Minimum wage;) Act.

Clause -21 (B): The contractor shall comply with the following regulations as regards the Hoisting Appliances

to be used by him:-

(a) Hoisting machine and tackle, including their

attachments, anchorages and support shall

(i) be of good mechanical construction sound material

find adequate strength and free from patent defect, and

(ii) be kept in good repair and in good working order.

(b) Every rope used in housing or lowering materials or

as a means of suspension shall be of suitable quality and

adequate strength and free from patent defect. (c) Hoisting machine and tackle shall be examined and

adequately tested after erection on the site and before use and before re-examined in position at interval to be

prescribed by the Government.

(d) Every chain, ring, hook, shackle swivel and pulley block used in hoisting or lowering materials or as a

means of suspension shall be periodically examined.

Page 70: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 70 -

Signature of Contractor No. of Corrections Executive Engineer

(e) Every crane driver or hoisting appliance operator shall be properly qualified.

(f) No person who is below the age of 18 years shall be in

control of any hoisting machine, including any scaffold

which, of give signals to the operator.

(g) In the case of every hoisting machine and of every

chain, ring, hook, shackle swivel and pulley block used in

hoisting of lowering or as means of suspension, the safe

working load shall be ascertained by adequate means.

(h) Every hoisting machine and all gear referred to in

proceeding regulation shall be plainly marked with the

safe working load.

(i) In the case of hoisting machine having a variable safe working load, each safe working load and the conditions

under which it is applicable shall be clearly indicated.

(j) No part of any hoisting machine or of any gear referred to in regulation (g) above shall be loaded beyond

the safe working load except for the purpose of testing.

(k) Motors, gearing transmissions,. electric wiring and

other dangerous part or hoisting appliances shall be provided with efficient safeguards.

(1) Hoisting appliances shall be provided with such

means as will reduce to minimum and the risk of the accidental descent of the load.

(m) Adequate precaution shall be taken to reduce to a

minimum the risk of any part of a suspended load

becoming accidentally displaced.

Measure for

prevention of fire

Clause -22: The contractor shall not set fire to any

standing jungle, trees, brushwood or grass without a

written permit from the Executive Engineer. When such

permit is given, and also in all cases when destroying cut

or dug up trees brush-wood, grass etc. By fire; the

contractor shall take the necessary measure to prevent

such fire spreading to or otherwise damaging surrounding

properly. The contractor shall make his own

arrangements for drinking water for the labour employed by him.

Liability of

contractor for any damage done in or

outside work area

Clause -23: Compensation for all damages done

intentionally or unintentionally by contractor's labour whether in or beyond the limits of Government property

including any damage caused by the spreading of fire mentioned in clause 22 shall be estimated by The

Engineer-in-charge or such other officer as he may

appoint and the estimate of the Engineer-in-charge

Page 71: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 71 -

Signature of Contractor No. of Corrections Executive Engineer

subject to the decision of the superintending Engineer on appeal shall be final and the contractor shall be bound to

pay the amount of the assessed compensation on demand failing which; the same will' be recovered from the

contractor as damages in the manner prescribed in

Clause-1 or deducted by the Engineer-in-charge front any

sums that may be due or become due from Government

to contractor under this contract or otherwise.

The contactor shall bear the expenses of defending any

action or other legal proceeding that may be brought by

any persons for injury sustained by him owing to neglect

of precautions to prevent the spread of fire and he shall

pay any damages and cost that may be awarded by the

court in consequence. Employment of

female labour

Clause -24: The employment of female labours on works

in neighborhood of soldiers barracks should be avoided - as far as possible

Work on Sunday Clause -25: No work shall be done on a Sunday without

the sanction in writing of the Engineer-in-charge.

Work not to sublet

Clause -26: Contractor may be rescinded and security deposit forfeited for subletting it without approval or

bribing a public officer or if contractor becomes

insolvent. The contract shall not be assigned or sublet without the written approval of the Engineer-in-charge.

And if the contractor shall assign or sublet his contract, or attempt so to do, or become insolvent or commence any

proceeding to get himself adjudicated and insolvent or make any composition with his creditors, or attempt so

to. do or if bribe, gratuity, gift, loan, perquisite, reward or advantage, pecuniary or otherwise shall either directly or

indirectly be given, promised or offered by the contractor

or any of his servants or agents to any public officer or

person in the employment of Government in any way

relating to his office or employment or if any such officer

or person shall be become in any way directly or

indirectly interested in the contract, the Engineer-in-

charge may there upon by notice in writing rescind the

contract, and the security deposit of the contractor shall

there upon stand forfeited and be absolutely at the

disposal of Government and the same consequence, shall

ensure as if the contract had been rescinded under

Clause-3 hereof and in addition the contractor shall not

be entitled to recover or be paid for any work therefore actually performed under the contract.

Sum payable by way

of compensation to be considered as

reasonable compensation

without reference to

actual loss.

Clause -27: All sums payable by a contractor by way of

compensation under any of these condition shall be considered as a reasonable compensation to be applied to

the use of Government without reference to the actual loss or damage sustained, and whether any damage has or

has not been sustained.

Page 72: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 72 -

Signature of Contractor No. of Corrections Executive Engineer

Changes in the constitution of firm

to be notified

Clause -28: In the case of tender by partners, any change in the constitution of a firm shall be forthwith notified by

the contractor to the Engineer-in-charge for his information.

Direction and

control of the

Superintending

Engineer

Clause -29: All works to be executed under the contract

shall he executed under the direction and subject to the

approval in .ill respects of the Superintending Engineer of

the Circle, for the time being, who shall be entitled to

direct at what point or points and in what manner they are

to be commenced, and from time to time carried on.

Clause -30: Except where otherwise specified in the

contract and subject to the powers delegated to him by

Government under the code, rules then in force, the decision of the Superintending Engineer of the Circle for

the time being shall be final, conclusive, and binding on all parties to the contract upon all question relating to the

meaning of the specifications designs, drawings and instructions herein before mentioned and as to the quality

of workmanship or materials used on the work, or as to any other question, claim, right matter, or thing

whatsoever, if any way arising out of, or relating to the contract, designs, drawings, specifications, estimates,

instructions, orders, or these conditions, or otherwise

concerning the works, or the execution, or failure to execute the same, whether arising during the progress of

the work, or after the completion of abandonment thereof

(2) The contractor may within thirty days of receipt by him of any order passed by the Superintending Engineer

of the circle as aforesaid appeal against it to the Chief Engineer concerned with the contract, work of project

provided that

(a) The accepted value of the contract exceeds Rs.10

lakhs (Rs. Ten Lakhs).

(b) Amount of claim is not less than Rs. 1.00 Lakh

(Rs.One lakh).

(3) If the contractor is not satisfied with the order passed

by the Chief-Engineer as aforesaid, the contractor may,

within thirty days of receipt by him of any such order,

appeal against it to the concerned Secretary, public works

Department/ Irrigation Department who if convinced that prima facie the contractor's claim rejected by

Superintending Engineer/Chief Engineer is not frivolous and that there is some substance in the claim of the

contractors as would merit a detailed examination and decision by the standing Committee shall put up to the

Standing Committee at Government level for suitable decision (vide P.W. circle No. CAT-I086-CR-110/Bldg-

2-dated 7.5.1986).

Clause -31: The contractor shall obtain from the

Page 73: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 73 -

Signature of Contractor No. of Corrections Executive Engineer

Departmental stores, all stores and articles of European or American manufacture which may be required for the

work or any part thereof or in making up any articles required therefore or in connection therewith unless he

has obtained permission in writing from the Engineer-in-

charge to obtain such stores and articles elsewhere. The

value of such stores and articles as may be supplied to the

contractor by the Engineer-in-charge will be debited to

the contractor in his account at the rates shown in the

Schedule in Form-A attached to the contract and if they

are not entered in the said schedule they will be debited

to him at cost price which for the purpose of this contract

shall include the cost of carriage and other expenses

whatsoever which shall have been incurred in obtaining

delivery of the same at the stores aforesaid. Lump sum in

estimate

Clause -32: When the estimate on which a tender is made

includes lump sums in respect of parts of the work the contractor shall be entitled to payment in respect of the

items of work involved or the part of .the work in question at the same rates as are payable under this

contract for each, item, or if the part of work in question is not in the opinion of the Engineer-in-charge capable of

measurement, the Engineer-in-charge may as his discretion pay the lump sum amount entered in the

estimate and the certificate in writing of the Engineer-in-

charge shall be final and conclusive against the contractor with regard to any sum or sums payable to him under the

provision of this clause.

Actions where no specification

Clause -33: In the case of any class of work for which there is no such specification as is mentioned in Rule-l

such work shall be carried out in accordance with, the Divisional Specifications &. in the event of there being

to. Divisional Specification then in such case the work

shall be carried out in all respects in accordance with all

instructions & requirements of the Engineer-in-charge.

Definition of work Clause -34: The .expression works or work where used

in these conditions shall unless there be something in the

subject or context repugnant to such construction, be

construct to mean the work or works contracted to be

executed under or in virtue of the contract, whether

temporary or permanent and whether original altered

substituted or additional.

Contractor’s percentage whether

applied to net or gross amount of bill

Clause -35: The percentage referred to in the tender shall. be deducted from/added to the gross amount of the

bill before deducting the value of any stock issued.

Refund of quarry fees & royalties

Clause -36: All quarry fees, royalties, octroi dues and ground rent for stacking materials, of any, should be paid

by the contractor, who will, however, be entitled to a refund of such of the charges as are permissible under

rules, on obtaining a certificate from the Engineer-in-

charge that the materials were required for use on

Page 74: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 74 -

Signature of Contractor No. of Corrections Executive Engineer

Government work.

Compensation under workmen’s

compensation Act.

Clause -37: The contractor shall be responsible for and shall pay any compensation to his workmen’s payable

under the workmen compensation Act 1923 (VIII of

1923) (hereinafter called the said Act.) for injuries caused

to the workmen. If such compensation is payable paid by

Government as principle under sub-section(1) of section

12 of the said act on behalf of the contractor, it shall be

recoverable by Government from the contractor under

sub-section (2) of the. said section. Such compensation

shall recovered in the manner laid down .in clause-1

above.

Clause -37 (A): The contractor shall be responsible for and shall pay the expenses of providing medical aid to

any workmen who may suffer a bodily injury as a result of an accident. If such expenses are incurred by

Government, the same shall be recoverable .from the contractor fort with and be deducted without prejudice to

any other remedy of Government from any amount due or that may become due to the contractor.

Clause -37 (B): The contractor shall provide all

necessary personal safety equipment and first aid

apparatus available for the use of the persons employed

on the site and shall maintain the same in condition

suitable for immediate use at any time and shall comply, with the following regulation, in connection therewith.

(a) The workers shall be required to use the equipment so

provided by the contractor and the contractor shall take

adequate steps to ensure proper use of the equipment by

those concerned.

(b) When work is carried on in proximity to any place

where there is a risk or drawing all necessary equipment

shall be provided and kept ready for use and all necessary

steps shall be taken for the prompt rescue of any person

in danger.

(c) Adequate provision shall be made for prompt first aid

treatment of all injuries like to be sustained during the

course of the work.

Clause -37 (C): The contractor shall duly comply with the provisions of the' Apprentices, Act-1961 (III of 1961)

the. rules made there under and the orders that may be issued from time to time under the Act the said rules and

on his failure or neglect to do so, he shall be subject to all the liabilities and penalties provided by the said Act arid

said Rules

Page 75: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 75 -

Signature of Contractor No. of Corrections Executive Engineer

Claim for quantities

entered in the tender or estimates

Clause -38 :

(1) Quantities shown in the tender are approximate and no claim shall be entertained for quantities of work

executed being either more or less than those entered in

the tender or estimate.

(2) Quantities in respect of the several items 'shown in the

tender are approximate and no revision in the tendered

rate shall be permitted in respect of any of the items so

long as, subject to any special provision contained in the

specifications prescribing different percentage of

permissible variation in the quantity of the item does not

exceed the tender quantity by more than 25% and so long

as the value of the excess quantity beyond this limit at the rate of the item specified 'in the tender is not more than

Rs. 5000/-

(3) The contractor shall if ordered in writing by the Engineer-in-charge so to do, also carry out any quantities

in excess of the limit mentioned in sub-clause (2) hereof on the same conditions as & in accordance with the

specifications in the tender and at the rates (i) derived from the rates entered in the current schedule of rates and

in the absence of such rates, (ii) at the rate prevailing in

the market, the said rates being increased or decreased as the case may be by the percentage which the total

tendered amount bears to the estimated cost of the work as put to tender based upon the schedule of rates

applicable to the year in which the tenders were invited. For the purpose of operation of this clause, this cost shall

be taken to be Rs. __________ (in words Rs. _________ ____________________________)

(4) Claims arising out of reduction in the tendered

quantity of any item beyond 25% will be Governed by

the provision of clause 15 only when the amount of such,

reduction beyond 25% at the rate of the item specified in

the tender is more than Rs. 5,000/- (The clause is Not

applicable to extra items).

Employment of

Famine labour etc.

Clause -39 : The contractor shall employ any famine

convict or other labour of a particular kind of class if

ordered in ,writing to do so by the Engineer-in-charge.

Claim for compensation for

delay in starting the work

Clause -40: No compensation shall be allowed for any delay caused in the, starting of the work on account of

acquisition of land or in the case of clearance works, on account of any delay in according to sanction of

estimates.

Claim for compensation for

delay in execution of

work

Clause -41: No compensation shall be allowed for any delay in. the execution of the work on account of water,

standing in barrow pits or compartments. The rates are

inclusive for hard or cracked soil, excavation in mud,

Page 76: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 76 -

Signature of Contractor No. of Corrections Executive Engineer

soil, water standing in borrow pits and no claim for an extra rate shall be entertained, unless otherwise expressly

specified.

Entering upon or

commencing any

portion of work

Clause -42: The contractor shall not enter upon or

commence any portion of work except with the written

authority and instructions of the Engineer-in-charge or of

his subordinate incharge of the work. Failing such

authority the contractor shall have no claim to ask for

measurement of or payment for work.

Minimum age of

persons employed,

the employment of

donkeys and for other animals and

the payment of fair wages.

Clause --43 :

(i) No contractor shall employ any persons who are under

the age of 14 years.

(ii) No contractor shall employ donkeys or other animals

with breeching of string or thin rope. The breeching must be at least three inches wide and should be of tape

(Newar).

(iii) No animal suffering 1rom sores, lameness or emaciation or which, is immature shall be employed on

the work.

(iv) The Engineer-in-charge or his agent is authorised to

remove from the work any person or animal found working which does not satisfy these conditions and no

responsibility shall be accepted by Government for any delay caused in the completion of the work by such

removal.

(v) The contract of shall pay fair and reasonable wages to the workmen employed by him, .in the contract

undertaken by him. In the event of any dispute arising

between the contractor and his workmen on the grounds

that the wages paid are not fair and reasonable, the

dispute shall be referred without delay to the Executive

Engineer who shall decide the same. The decisions of the

Executive Engineer shall be conclusive and binding on

the contractor but such decision, shall not in any way

affect the condition in the contract regarding the payment

to be made by Government at the sanctioned tender rates.

(vi) Contractor shall provide drinking water facilities to

the workers, similar amenities shall be provided to the

workers engaged on large work in urban areas.

(vii) Contractor to take precaution against accidents which takes place on account of labour using loose

garments while working near machinery.

Method of payment Clause -44: Payment to contractors shall be made by cheque drawn on any treasury within the Division

convenient to them provided the amount exceeds Rs. 10/-

. Amount not exceeding Rs. 10/- will be paid in cash.

Page 77: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 77 -

Signature of Contractor No. of Corrections Executive Engineer

Acceptance of

conditions compulsory before

tendering the work

Clause -45 : Any: contractor who does not accept these

conditions shall not be allowed to tender for works.

Clause -46: If Government declares a states of scarcity or

famine to exit in any village situated within 10 miles of

the work; the contractor shall employ upon such parts of

the work, as are suitable for unskilled labour, any person

certified to him by the Executive Engineer, or be any

person to whom the Executive Engineer may have

delegated this duty in writing to be in need .of relief and

shall be bound to pay to such person wages not below the

minimum which Government may have fixed in this

behalf. Any disputes which may arise in connection with the implementation of this clause; shall be decided by the

Executive Engineer whose decision shall be final and binding on the contractor.

Clause - 47: The price quoted by the contractor shall not

in any case exceed the control price, if any, fixed by Government or reasonable price which it is permissible

far him to charge private purchaser for the same class and description the controlled price or price permissible under

Hoarding and Profiteering Ordinance 1948, as amended

from time to time, if the price quoted exceeds the controlled price or the price permissible under Hoarding

and Profiteering Prevention Ordinance, the contractor will specifically mention this fact in his tender along with

the reasons for quoting such higher prices. The purchaser at his discretion will in such case exercise the right of

revising the price at any stage so as to confirm with the controlled price on the permissible, under Hoarding and

Profiteering Prevention Ordinance. This discretion will

be exercised without prejudice to any other action that

may be taken against the contractor.

Clause. -47 (A): The tendered rate shall be inclusive of

all taxes, rates and cases and shall also be inclusive of the

tax, leviable in respect of works contract under the

provisions of the Maharashtra Sales Tax on transfer on

property in goods involved in the execution of works

contract Act. 1985 (Maharashtra Act No. XIX of 1985)

Clause -48 : The rates to be quoted by the contractor

must be inclusive of sales tax. No Extra payment on this account will be made to the contractor

Clause -49 : Incase of materials that may remain surplus

with the contractor from those issued for the work contracted for, the date of ascertainment of the materials

being surplus will be taken as the date of sales tax will be recovered on such sale.

Maharashtra Act Clause -50: The contractor shall employ the unskilled

Page 78: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 78 -

Signature of Contractor No. of Corrections Executive Engineer

XIX of 1985, Clause regarding Turnover

Tax vide P.W.D. Circular No. CAT

1086/CR-330 Bldg-2

Dt. 10/06/1987

labour to be employed by him on the said work only from locally available labours and shall give preference to

those persons enrolled under Maharashtra Government employment and self employment department's scheme.

Provided, however, that if the required unskilled labours

are not available, locally, the contractor shall in the first

instance employ such number 'of persons as is available

and thereafter may with previous permission, in writing

of the Executive Engineer in charge of the said work,

obtain the rest of the requirement of unskilled the labour

from outside the above scheme.

Clause -51: Wages to be paid to the skilled and unskilled

labourers engaged by the contractor.

(1) The contractor shall pay the labours skilled and unskilled according to the wages prescribed by the

minimum wages Act of 1948 applicable to the area in which the work of the contract is located.

Clause- 52: All amounts whatsoever which the contractor is liable to pay to the Government in

connection with the execution of the work including the

amount payable in respect of (i) materials and, or stores supplied/issued hereunder by the Government to the

contractor (ii) hire charges in respect of heavy plant, machinery and equipment given on hire by the

Government to the contractor for execution by him of I the work and or on which advances have been given by

the Government to the contractor shall be deemed to be arrears of the Lapd Revenue and' the Government may

without prejudice to any other rights and remedies of the

Government recover the same from the contractor as

arrears of Revenue.

Clause -53 : The contractor shall duly comply with all

the provisions of the contract labour (Regulation and

Abolition) Rule 1971. If the contractor fails neglects to

pay wages at the said rates or makes short payment and

the Government makes such payment of wages in full or

part thereof less paid by the contractor as the case may

be, the amount so paid by the government to such

workers shall be deemed to be arrears of Land Revenue

and the Government shall be entitled to recover the same as such from the contractor or deduct same from the

amount payable by the Government to the contractor hereunder of from any other amount payable by the

Government.

Clause - 54: The contractor shall engage apprentices such as bricks layer,-carpenter, wireman, plumber, as

well as black smith as recommended by the State

Apprenticeship Adviser Director and Technical

Page 79: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 79 -

Signature of Contractor No. of Corrections Executive Engineer

Education, Dhobi Talav, Bombay No.1 on the construction work (Government of Maharashtra,

Education Dept. No. TSA-5172/ T-56689 Dt.7/7/1972).

Clause - 55: The tendered rates shall be inclusive of all

taxes, rates and cesses and shall also be inclusive of the

tax leviable in respect of works contract under the

provision of rule 58 of sale or transfer of property in

goods involved in the execution of works contract act ,

1985 as revised and applicable as per the Maharashtra

value added tax (VAT) ACT - 2005 for the purpose of

leavy of tax .

Clause - 56 :

(a) Anti Malaria and other health measures shall be as directed by the Joint Direction of Health Services, Pune.

(b) Contractor shall see that the mosquito genic

conditions are not created so as to keep vector population to minimum level.

(c) Contractor shall carry out anti maleria measures in the area as per guidelines prescribed under National Maleria

Erudition programme and as directed by the Joint

Director (M&F) of Health Services, Pune.

(d) In the case of default in carrying out prescribed anti malaria measures resulting in increase in malaria

incidence, contractor shall be liable to pay to Government the amount spent by Government on an antimalaria

measures to control the situation in addition to fine.

(e) The contractor shall make sufficient arrangement for

draining away the suliage water as well as water coming

from the bathing and washing places and shall dispose of

this water in such a way as not to cause any nuisance. He

shall also keep the premises clean by employing

.sufficient number of sweepers.

The contractor shall comply with all rules, regulations,

bye -laws and directions given, from time to time by the'

local or public authority in connection with this work and

shall pay fees or charges which are laviable on him

without any extra cost to Government.

Clause - 57: (a) A contractor shall have to furnish

income tax clearance certificate before his tender is considered and also income tax assessment number and

date under which these are assessed. (b) Deduction of income tax at 2% of the value of the

work done will be made from the contractor's R. A. bills and surcharge at the rate of 15% on income tax will be

deducted or as per prevailing rules.

(c) Deduction of VAT Tax at 2 % or 4 % as per

Page 80: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 80 -

Signature of Contractor No. of Corrections Executive Engineer

applicable of rule will be deducted from the contractor's R.A. Bill or as per prevailing rules.

Clause - 58 : (a) The contractor shall make arrangements

to supply fuel for domestic use to all labours engaged on

the site and prevent labours from cutting trees for the

purpose of fuel. It the contractor's labours found cutting

trees, the contractor shall be held responsible for the same

and shall be punished as per the provisions in the Forest

Conservation Act, 1980

Page 81: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 81 -

Signature of Contractor No. of Corrections Executive Engineer

SPECIAL CONDITIONS OF CONTRACT

Page 82: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 82 -

Signature of Contractor No. of Corrections Executive Engineer

SPECIAL CONDITIONS OF CONTRACT 9.1 Definitions In the contract (as hereinafter defined the following words and expressions will have the meanings

hereby assigned to them. a) Approved/ Approval - This means approved in writing.

b) Construction plant -This means all equipment, appliances or things of whatsoever

nature required for the execution, completion or maintenance of the work or of temporary

works, but does not include materials of the work or of temporary work, but does not include

materials or others things intended to form part of the permanent work.

c) Contract - This means the general and special conditions of contract, specifications, drawings,

tender, including the schedules of quantities and tender prices, the formal agreement and all

addendum and attachments related to the above.

d) Contractor - This means the particular person, firm or Corporation with whom the

contract has been made for executing the works, defined in the contract.

e) Day - This means a day from midnight to midnight.

f) Drawings -This means the drawings referred to in the specifications, and any modification

of such drawings approved in writing by the Engineer- in-Charge and such other drawings as

may from time to time be furnished or approved in writing by the Engineer-in-Charge. g) Engineer/Engineer-in-Charge -Engineer or Engineer –in-Charge means the Executive

Engineer-in-Charge of the work. The authorized representative of the Engineer-in-Charge shall have the powers specifically delegated by the Engineer-in-Charge and orders given by the

authorized representative shall be considered to have the same force and effect as if they had been given by the Engineer-in-Charge.

h) Government/Corporation/Department

This means Government of Maharashtra/ Vidarbha Irrigation Development Corporation, Nagpur.

i) I.S.S.

This means latest revised edition of Indian standard specifications.

j) Month

This means from the beginning of a given date of a calendar month to the end of the preceding date

of the next calendar month.

k) Temporary Works

This means all temporary works of every kind required for the performance of the contract.

l) Works This means the works to be executed in accordance with the contract.

m) Site

This means the lands and other place on, under , in or through which the works are to be executed or

carried out and any other lands or places provided by the Corporation for the purposes of the

contract together with such other places as may be specifically designated in the contract or

subsequently approved as forming part of site.

n) Chief Engineer

Chief Engineer Shall mean Chief Engineer (Electrical) Hydro Projects Water Recourses Department, Mumbai - 400023.

o) Superintending Engineer

This means the Superintending Engineer of the Circle in overall Charge of works pertaining to the contract.

p) Specifications

Page 83: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 83 -

Signature of Contractor No. of Corrections Executive Engineer

Specifications shall mean the specification for material of works as specified in the tender document.

q) Week This means seven consecutive days.

r) Contract Time

The number of consecutive calendar months as specified in this document for supply of goods or

equipment and completion of works commencing from the date of notice to proceed.

s) Notice of Proceed

The written notice by the Government Corporation to the Contractor authorizing him to proceed

with the work and establishing the date of commencement of work.

t) Headings And Marginal Headings

The headings and marginal headings in the contract are solely for the purpose for facilitating

reference and shall not be deemed to be part thereof or taken into consideration in the interpretation

or construction thereof or of the contract.

9.2 Interpretations

Words imparting the singular only also include the plural and vice versa unless, this is repugnant to

the context. Wherever, the term Specification’s is used apart from specified standard specifications, it shall mean the specifications or plan prepared for a particular item referred to, for the instructions

to the Contractor in executing that item of work.

9.3 Contractor to inform himself fully The Contractor shall be deemed to have carefully examined the work and site conditions, the

Special Conditions, the Specifications, schedules and drawings and shall be deemed to have visited the work site, and also got fully acquainted himself with details required, raw finished, bought out

material/equipment required for this work, local conditions , ancillary works required to be done etc.

before quoting the offer. If he shall have any doubts as to the meaning of any portion of the special conditions or the scope of

work or the specifications or any other matter concerning the contract, he shall in good time, set forth the particulars thereof and submit them to the Engineer-in-Charge. The Engineer-in-Charge

generally means the Executive Engineer directly in-Charge of the work, but also means the Superintending Engineer Chief Engineer for exercising powers under this contract.

9.4 Sufficiency of Tender

The tenderer shall be entirely responsible for the sufficiency of the rates quoted by him in his

tender.

9.5 Stating of Rates

The rates shall be written both in words and in figures. The tenderer shall also show the totals of

each item and the grand total of the whole tender Corrections, if any, shall be made by crossing out,

initiating, dating and rewriting. The tenderer shall also show the totals of each schedule. In the case

of conflict between the figures and words in the rates, the later shall prevail.

9.6 Tender Validity Period

The tender shall be valid for a period of not less than 90 days from the date of opening of the same

and thereafter until the same is withdrawn by a notice in writing by the tenderer.

9.7 Use and Care of site

All and required shall be arranged by the Contractor from private Land Owner Revenue department at his own cost and no claim on this account shall be entertained.

All areas of operation, including those of his staff and Labour Colonies, in case handed over to the

Contractor shall be cleared and handed over back in good condition to the Engineer-in-Charge

Page 84: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 84 -

Signature of Contractor No. of Corrections Executive Engineer

except the areas under works constructed for the Engineer-in-Charge, the contract shall make good, to the satisfaction of the Engineer-in-Charge, any damage or alterations made to areas which he has

to hand over back or to other property or land handed over to him for the purpose of this work. The lands shall as hereinbefore mentioned, be handed over back to the Engineer-in-Charge within

three months after the completion of the work under this contract or the termination of the Contract

whichever is earlier. Also no land shall be held by the Contractor longer than the Engineer-in-

Charge shall deem necessary and the Contractor shall, on due notice by the Engineer –in-Charge

vacate and return the land which the Engineer-in-Charge may certify as no longer required by the

Contractor for the purpose of the works. In case the lands are not handed over back to the

Department within the time limit, specified above, penal rent as may be decided by the Engineer-in-

Charge will be recoverable.

The vegetation and forest is noticeable in project area. The Contractor should take utmost care for

the preservation of this vegetation and forest. Any damage in this vegetation and forest will have to

be compensated by the Contractor and decision from Engineer-in-Charge will be final and binding

on Contractor.

9.7.1 Cleaning Up

The Contractor shall at all times keep the construction areas and his colony and storage free from accumulation of waste or rejected materials.

Prior to the completion of the work, the Contractor shall remove all rubbish from and around the premises and all tools, scaffolding equipment and materials which are not part of permanent

structures except otherwise asked for or as provided under any other clauses of this contract, the premises will be left in a manner fully satisfactory to the Engineer-in-Charge.

9.7.2 Period and Hours of work The work shall be done usually during the day time. In the interest of progress if it is felt necessary

to work during night, the Contractor shall obtain specific permission of the Engineer-in-Charge. If

the work is to be done at night, prior permission of Engineer-in-Charge should be obtained and adequate lighting arrangement shall be made as directed by the Engineer-in-Charge.

9.8 Electric Power

Electric power will not be made available from the Department. The Contractor shall have to arrange power supply at his own cost wherever required. The Contractor will have to lay and

maintain the distribution lines and wiring for the works at his cost by observing all requirement of the Indian Electricity Act, 1910, 1948 and Indian Electricity Rules, 1956 and rules in existence from

time to time. The layouts and methods of laying the line and wring shall have the prior approval of

Engineer-in-Charge.

The nature of the connected load shall have the prior approval of the Engineer-in-Charge.

The Contractor shall be and remain answerable and liable for any loss or damage or injury to any

person or any property of the Corporation or of others caused by or arising from the failure of

observance of Indian Electricity Act, 1910, 1948 and Indian Electricity Rules, 1956 and rules in

existence from time to time. The Contractor shall not claim anything extra either due to non-

availability of supply or due to interruptions in supply of electric power.

9.9 Water

Since the project is on the bank of river /reservoir ample water is available throughout the year

which will be allowed to be lifted, free of cost. However, water lifting arrangements are required to be made to the extent required by the Contractor at his own cost. Necessary drainage arrangements

to keep his colony and space around clean and hygienic will have to be made by the Contractor at his cost.

Fresh and potable drinking water shall be made available by the Contractor to all persons working at work spots in clean and hygienic, earthen or other pots at all working places and in sufficient

quantity. Water available is untreated and all necessary treatment to water for making it potable and safe for

drinking by his staff, Labours and other dependents on Contractors shall have to be done by the

Contractor. Disinfection of all drinking water by chlorination will be obligatory.

Page 85: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 85 -

Signature of Contractor No. of Corrections Executive Engineer

9.10 Communications

The Contractor will make his own arrangement for all his communication needs such as telephone, fax or cable, etc. at his site office and his residential area. Corporation will assist the Contractor in

getting the above facilities, in case he faces any difficulties.

9.11 Fencing, Lighting and Ventilation

The Contractor shall be responsible for the proper lighting, fencing, guarding and necessary health

and safety measures while executing all works under this contract and for proper provision of

temporary roadways, guards, footways, fences, caution notices etc. as far as the same may be

rendered necessary by reasons of the work, for the accommodation of workmen, foot passengers or

other traffic and of Owners and occupiers of adjacent property and of the public and shall remain

responsible for any accidents that may occur on account of his failure to take proper and timely

precaution.

Maintenance of Services After all the work under this contract is completed and accepted as such, in case the Engineer-in-

Charge so directs, the Contractor shall maintain the lighting, ventilation, communication facilities etc. upto a date determined by the Engineer-in-Charge, but not longer than for a period of twelve

months. A reasonable charges for such maintenance otherwise not required by the Contractor for his purposes under the Contract will be borne by Corporation. As regards the reasonableness of

such charges, the decision of the Engineer-in-Charge shall be final and binding on the Contractor.

9.12 Layout of Construction Roads The Contractor shall have to submit detailed plan to the Engineer-in-Charge, showing the layout of

the work site, roads and approach roads proposed by him, before he starts the actual work. Such a

road layout plan will be scrutinised by the Engineer-in-Charge and any modifications suggested by him will be binding on the Contractor. If it is decided by the Engineer-in-Charge to have some of

the roads proposed by the Contractor as common roads for common use of Corporation and other Contractors or convenient and for compact and planned layout of work site, the Contractor will be

bound to construct them and allow them to be used simultaneously by other Contractors and Departments. In case of disputes, the decision of the Engineer-in-Charge shall be final and binding

on the Contractor.

9.13 Contractor not to dispose off soil etc.

The Contractor shall not sell or otherwise dispose off or remove except for the purpose of this

contract, sand, stone, clay, ballast, earth rock or other substance or materials which may be obtained

from the excavation made for the purpose of this contract or any produce from the site. All such

substance, materials and produces shall be the property of Corporation and shall be disposed off in a

manner and at a place shown in the drawings or as and where the Engineer-in-Charge may direct.

9.14 Gold/Silver, Minerals, Oils, Relics, etc. found on the site

All gold, silver, oil or other minerals of any description and all precious stones, coins treasure,

relics, antiquities and other similar things which shall be found in or upon the site, shall be property

of Government and the Contractor shall duly preserve the same to the satisfaction of the Engineer-

in-Charge and shall from time to time, deliver the same to such person or persons as the Engineer-

in-Charge may appoint.

9.15 Evaluation of Tender Evaluation & Comparison of the offers shall be carried out on total cost for the cost quoted in

Envelope No. 2. No change in the prices after the opening of the Envelope No.2 will be allowed.

9.16 Notices and Instructions

The Contractor shall furnish the postal address of his site office. Any notice or instruction to be

given to the Contractor under the terms of the contract shall be deemed to have been served, if it has

Page 86: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 86 -

Signature of Contractor No. of Corrections Executive Engineer

been delivered to his authorised agent or representative at site of work or sent by registered letter to the site office or to the address of the firm last provided by the Contractor.

Notices, How to be given? Where any legal or other notice or any other document or any other direction is to be given to or

served upon the Contractor, it shall be deemed to be duly given or served, if it shall have been either

delivered to him personally or to his recognised agent or Works Manager (including in the case of

company, the Secretary of such Company) or delivered at or sent through the post , addressed to the

last known place of business, or abode of the Contractor, a notice, or other documents which shall

be so given to or so served on any one of the partners in such firms , shall be deemed to have been

given or served on all of them.

Work Order Book

The Contractor shall maintain bound work order book at work site as the Engineer-in-Charge may

direct. This work order book shall have machine numbered pages in triplicate.

The Contractor shall make them available to the Engineer-in-Charge or his representative, whenever

called for. Executive Engineer or his representative may record order about works, in this book, leaving the

original copy in the book and removing the second and third copy with him. The Contractor or his authorised representative, shall also sign this work order, in token of it’s acceptance.

All orders recorded in these work order book, shall be deemed to have been served on the Contractor. On completion of the work all the work order books may be handed over to the

Executive Engineer. In the event of refusal of the Contractor’s representative on the sport to sign the work order book,

Engineer-in-Charge shall take the necessary further steps in respect of further communication and control, modification or stoppage of work as deemed fit at the entire responsibility of the

Contractor.

9.17 Category of contract Present Contract shall be treated as ‘ Works Contract’ for all purposes.

The contract shall in all respects be constructed and operated as a contract as defined in the Indian Contract Act 1872 and all payments thereunder shall be made in Rupees.

9.18 Contract Documents and Matters to be treated Confidential All documents, correspondence, decisions and orders concerning the contracts shall be considered

as confidential or restricted in nature by the Contractor and he shall not divulge or allow access to

them by any unauthorised person

9.19 Purpose of Drawings and Specifications and Conformation thereto and Errors,

Omissions, Discrepancies etc.

The contract drawings read together with the contract specifications are intended to show and

explain the manner of executing the work and to indicate the type of class of material to be used.

The work shall be carried out in accordance with the directions of Engineer-in-Charge and in

accordance with the drawings and specifications which form part of the contract and in accordance

with such further drawings, details and instructions as may from time to time be given by the

Engineer-in-Charge.

It shall be the responsibility of the Contractor to promptly bring to the notice of the Engineer any

error or discrepancies in the contract documents and obtain his orders thereon. In case of errors, omissions and /or disagreement between written and scaled dimensions on the

drawings or between the drawings and specifications, the following orders of preference shall apply. - Between actual scaled and written dimensions or description on drawings and corresponding

one in the specification, the latter shall be adopted. -Between the quantities in schedule of quantities and those arrived at from the drawings, the former

shall apply. - Between the written description of the item in the schedule of quantities and the detailed

specifications of the same item, the latter shall be adopted.

Page 87: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 87 -

Signature of Contractor No. of Corrections Executive Engineer

The information in connection with the works and work site as well as specifications are contained in this book of contract in general and in particular in two parts, viz special conditions and

specifications for item of work. In case of any discrepancy or repugnancy in the clauses in these sections, the specifications will prevail over special conditions.

The special conditions of contract and the specifications shall prevail over various clauses of B-1

tender form.

In all cases of omissions and /or doubts or discrepancies, in the dimensions or description of any

item, a reference shall be made to the Engineer-in-Charge whose elucidation, elaboration or

decision shall be considered as authentic and final subject of the clause 30 of B-1 form. The

Contractor shall be held responsible for any errors that may occur in the work through lack of such

reference.

9.20. Errors, Omissions, Discrepancies.

(a) In case of error, omission and/or disagreement between and scaled dimensions on the drawings or between the drawings and specifications, the following orders or preference shall apply.

* Between actual scaled and written dimensions or description on drawing and

corresponding one in the specification, the latter shall be adopted. * Between the quantities in the schedule of the quantities and those arrived at from the

drawings, the former shall apply. * Between the description of the item in the schedule of the quantities and the detailed

specifications of the same item the later shall be adopted.

(b) The information in connection with the work and work site as well as specification are

contained in this book of contract in general and in particular in two parts viz. special condition and specification for item of work. In case of any discrepancy or repugnancy in the

clauses in these sections the specifications will prevail over special condition.

(c) The special condition of contract and the specification shall prevail over various clauses of B-1 tender form.

(d) In all cases on omissions and/or doubts or discrepancies in the dimensions or description

of any item, reference shall be made to the Engineer-in-charge whose elucidation,

elaboration or decision shall be considered as authentic and final subject to the clause 30

of B-1 form. The contractor shall be held responsible for any error that may occur in the

work through lack of such reference and precaution.

9.21 Modifications

The Executive Engineer may order modifications at any time before the completion of the work.

For all modifications, the Executive Engineer will issue revised plans or written instructions or both

and no modifications shall be made unless so authorised. It should be made amply clear that some

of the dimensions will be finalised only after model experiments

9.22 Signed Drawings, No Authority to the Contractor

Signed drawings alone shall not be deemed to be an order for work unless it is entered in the agreement or schedule or drawings under proper attestation of the Contractor and the Engineer or

unless it has been sent to the Contractor by the Engineer with a covering letter confirming that the drawings is an authority for work in the contract.

9.23 Contract Drawings , Specifications, Supply to the Contractor

On acceptance of the tender , three sets of contract drawings and working drawings as well as one certified copy of the accepted tender will be supplied to the Contractor free of Charge within one

week. On request by the Contractor and at the discretion of Engineer-in-Charge, the Contractor may

Page 88: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 88 -

Signature of Contractor No. of Corrections Executive Engineer

be supplied additional copies of contract documents to be charged at the rate of Rs.1500/- (Rs.One thousand five hundred only) per set.

The drawings which form part of this contract show the works to be done in such details as possible

to do for the present. They will be supplemented or superseded by such additional detailed drawings

as may be necessary as the work progresses. The Contractor shall carry out the work in accordance

with these additional and/or revised drawings as the case may be at the applicable rates as per the

contract. The Contractor shall be supplied a maximum number of three copies of each of the such

working drawings free of Charge. Should the Contractor require any additional copy for his use, the

same may be supplied at the discretion of Engineer-in-Charge and the Contractor will be charged

Rs.500/- per set of contract drawings; and Rs. 100/- for each of such additional copy of each

drawing.

The Contractor shall check all drawings carefully and intimate the Engineer-in-Charge immediately

any errors or omissions discovered. The Contractor shall not take advantage of any kind of errors or omissions in the drawings supplied.

For the purpose of manufacturing towers and equipment structures the Contractor is required to prepare his own shop floor drawings based on the Tower equipment structure drawing given along

with contract agreement.

9.24 Reference to Standard Specifications The specifications of the work as enclosed with this contract document are drawn with a specific

reference to site conditions and do not every where include the details of the standard tests ad procedures which are already laid down and available in the current Indian Standard Specifications.

Wherever such details are not specified in this contract, the provision under current Indian Standard

Specifications and/or the Standard Specifications (1970) of the Government of Maharashtra shall be deemed to be applicable.

9.25 Departure from Technical Specifications

Should the Tenderer wish to depart from the provisions of the Technical Specifications, he shall clearly mention such departures under Appendix - IA and Appendix - IB enclosed giving his

reasons therefore. Unless this is done, the plant offered shall be deemed to comply in every respect with this specification and all the terms and conditions of the specifications shall apply in to.

9.26 Field Office Records

The Contractor shall maintain at his site office uptodate copies of all drawings, specifications and

other contract documents and any other supplementary data complete with all the latest revision

thereof. The Contractor shall also maintain in addition, the continuous record of all changes to the

above contract documents, drawings, specifications, supplementary data, etc. erected at the field

and on completion of his total assignment under the contract shall incorporate all such changes on

the drawings and other engineering data to indicate as installed, conditions of the equipment

furnished and erected under the contract. Such drawings and engineering data shall be submitted to

the Engineer in required number of copies.

9.27 Time schedule for supply and Erection

Time schedule for supply and erection of work under this contract shall be as follows. The delay in work from this schedule will attract the provisions of ‘compensation for delay’ vide clause 2 of

printed B-1Tender Form.

Time Schedule

Page 89: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 89 -

Signature of Contractor No. of Corrections Executive Engineer

Sr. No.

Particulars of work Period of work

1 Design , Supply, erection, testing and

commissioning of 33KV outdoor switchyard

equipment for Lalnala Lift Irrigation

Scheme.Tal & Dist Chandrapur

6 months

Tenderer shall fill up work program in Appendix - IB

9.28 ROLE AND RESPONSIBILITY

This contract will before supply installation at site, testing and commissioning of 33/6.6

KV second bay and other allied essential equipment. The contractors expected to play a full

role in taking responsibility for the proper co-ordination between various manufacturers.

9.29 Work Programme

Work and progress Schedule

The time schedule programme is given in Appendix -IB based on which physical programme is

prepared. If the tenderer does not agree with this program, he shall submit his own programme without changing total period of tender along with tender documents with sufficient time span for

the activities to be carried out and with the best sequence.

In case, it is found necessary to alter this programme agreed in contract document, including the changes in the sequence of the items, the Contractor shall submit in good time a revised program

incorporating necessary modifications proposed.

The Contractor shall give a detailed work programme within 14 days of the notice to proceed with

the work. This program will include manufacture of equipment, testing of the equipment at factory,

transporting of the equipment to site installation of the equipment pre-commissioning of the

equipment, test for guaranteed performance, etc. Such programme shall be finalised in consultation

with Engineer with due consideration of other works in progress.

Additional detailed programme if required for each quarter of the year shall be submitted to the

Engineer-in-Charge and got approved. The Engineer-in-Charge is further empowered to ask for

more detailed programme, say week by week for any items of special importance, and Contractor

shall supply the same as and when asked for without delay.

The submission of the works programme and approval to it by the Engineer-in-Charge shall not

relieve the Contractor of any of his duties or responsibilities under the Contract, like timely completion, the damages due to flood or other natural calamities, etc. The Contractor shall not be

entitled for any claims for any damages caused, due to particular works programme, It is the entire responsibility of the Contractor to frame the programme after anticipating the rains, floods etc.

Actual work turned out shall be mainly taken into account and not just the sum total of the various payment made to the Contractor. The advance on the material brought to the site for work will be

accounted for while arriving at the progress achieved by the Contractor in terms of proportion of the total work tendered for.

9.30 REFERENCE WORKS AND BENCH MARKS :

The basic centre lines, reference points and bench marks will be fixed by the Engineer-in-Charge.

The Contractor shall establish at his cost, suitable points , additional reference lines and bench

marks as may be necessary. The Contractor shall remain responsible for the sufficiency and

accuracy of all his bench marks and reference marks. He shall take precautions to see that the

reference lines or points and bench marks fixed by the Corporation are not disturbed by his work

and shall make good the damage if any at his cost.

Page 90: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 90 -

Signature of Contractor No. of Corrections Executive Engineer

9.31 PASSING OF FOUNDATIONS ETC.:

After the completion of the work of erection of equipment and before finally grouting the foundation all levels ands alignments will be checked and passed by the Executive Engineer. No

concrete grouting shall be laid unless the foundation is so passed. No concreting shall commence

unless the centering and the reinforcement is checked and passed by the Engineer-in-Charge.

9.32 COMMUNICATIIONS AND NOTICES BY CONTRACTOR :

All communications and / or notices pertaining to works and concerning matters, such as passing

and approving of foundation, equipment, construction, drawing , measurements, mark-outs, etc.

shall not be addressed by the Contractor to an officer below the rank of Sub-Divisional Officer. All

such notices communications etc. shall be addressed in good time so as not to hold up the work.

9.33 SETTING OUT WORKS :

The Contractor shall be responsible for the correct setting out of all works at his cost. The Contractor shall execute the work true to alignment, grade and levels as shown in the drawing and

as directed by the Engineer and shall check these at frequent intervals. The Contractor shall provide free of cost, all facilities like labour, instruments, etc. and all operation to the Engineer, to check all

dimensions, alignments, grades and levels. This shall not absolve the Contractor of his own responsibility of maintaining the accuracy of the work.

9.34 ACCURACY OF LINES, LEVELS AND GRADES

The Contractor shall be responsible for the true and proper setting out of the work and for the correctness of the position, levels, dimension, alignment of all parts of the work and for the

provisions of all necessary instruments, appliances and labour in connection with this.

For the purpose of setting out, one permanent bench mark shall be established by the Corporation near the site, the value of which shall be given to the Contractor by the Engineer-in-Charge on

demand by the Contractor. Similarly the reference line in the form of centre line of junction wall and of some other components, if found by the Engineer-in-Charge for complete setting out of the

structure shall be given. All the setting out shall be with reference to this bench mark and reference line.

If at any time during the progress of works, the error shall appear or arise in the position, level, dimension or alignment of any part of the work, the Contractor shall rectify such error to the

satisfaction of Engineer-in-Charge without any extra cost to the Corporation.

The periodical checking of these by Corporation staff shall not absolve the Contractor of his

responsibility regarding accuracy. In case of deviation, the Contractor shall make good to the

discrepancy at his own cost and without any compensation for the additional work involved.

Wherever such discrepancies, if any, are found to arise between the works of different Contractors

at the junction of their works, the relative liability to set right their respective discrepancies shall be

fixed by the Engineer-in-Charge, whose decision shall be final and binding on the Contractors

concerned. The Engineer-in-Charge shall further have the unquestioned right to rectify the

discrepancies and recover the costs from the Contractor or Contractors according to proportions as

he may consider reasonable.

It is the responsibility of Contractor to preserve the benchmark and the reference points established

for setting out.

9.35 NON-COMPLIANCE OF CONTRACT CONDITIONS:

If the Contractor shall neglect or fail to proceed with the workers, with due diligence or he violates any of the provisions of the contract, the Engineer-in-Charge may give notice to the Contractor,

identifying deficiencies in performance and demanding corrective action. The Engineer-in-Charge, shall also clearly state in the notice the nature of action that shall be taken, if Contractor fails to

fulfill by necessary corrective action.

Depending on nature of default the Engineer-in-Charge at his discretion, shall have two options,

regarding action to be taken in case of default by Contractor. He shall withhold any of the payment

Page 91: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 91 -

Signature of Contractor No. of Corrections Executive Engineer

due to the Contractor or shall terminate the contract in whole or in part. But Engineer-in-Charge shall, clearly mention in his notice, the action that shall be taken if the Contractor fails to take the

corrective action. The period of 14 days shall be given to the Contractor to take such corrective action after the issue of such notice.

No claims for compensation of any sort, from Contractor will be entertained for withholding the

bills indefinitely till specified requirements are complied with by the Contractor.

After the issue of the notice about default by the Contractor, the Contractor shall not remove, from

the site any plant, equipment and materials. The Corporation shall have a lien on all such plants,

equipments and materials, from the date of such notice, till deficiencies have been corrected.

9.36 SUPPLY OF MATERIALS BY THE CORPORATION:

(NOT APPLICABLE)

The quantities of the materials to be supplied by the Corporation shown in schedule ‘A’ are approximate. The quantities actually required for the works and reasonable requirements for all

preliminary and ancillary works incidental to the main work will be supplied by the Corporation as per stipulation in the Schedule ‘A’

The Contractor shall be responsible for all transport and storage of materials from the place of issue

and shall bear all the related costs. The Engineer shall be entitled at any time to inspect or examine all such materials and the Contractor shall provide access and all necessary assistance as may be

required.

All material issued to the Contractor and not used on the works shall remain the property of the

Corporation. The Contractor shall not remove such materials from the site, without prior written approval of the Engineer.

The Contractor shall place firm indents for his monthly requirements for these materials at least 3

months in advance. The Contractor shall keep accurate record of Corporation materials used on the work in suitable

manner, Whenever such materials issued to the Contractor are excess of the requirement, the Contractor shall return such surplus materials to the place of issue at his cost. The materials

returned by the Contractor shall be credited to him at the rates at which these were originally issued

less any deterioration or damage which may have caused the said materials while in the custody of

Contractor. If on completion of work, any other liability which the contractor will incur as result of

his failure to Contractor fails to return the materials , the ,Engineer may in addition to return these

materials by a written notice to the Contractor may Charge him for such surplus materials not

returned at double the issue rate.

9.37 ESSENTIALITY CERTIFICATE :

For procurement of materials, where requested by the Contractor, Corporation will provide an

essentiality certificate for the same. This will, however, not be considered as a condition for not

adhering to the delivery Schedule as agreed to in the tender.

9.38 TOOLS AND PLANT FOR ERECTION, TESTING ETC : The Contractor shall provide all types of tools, lifting tackles, erection appliances or any machine

that may be required for installation of the complete equipment under this contract. The equipment required for handling and erection work such as mobile crane, compressors, etc. If available with

the Corporation at the site of work, will be made available to the Contractor on hire basis. The hire charges shall be charged at the prevailing rates and as per rules of the Corporation.

The Contractor shall execute the agreement bond as prescribed by the Corporation, and shall agree

to the specific rates of hire and supervision charges in force on the day of transaction in writing

before machinery is taken out of the Corporation’s yard by him.

Page 92: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 92 -

Signature of Contractor No. of Corrections Executive Engineer

The Contractor shall pay irrevocable bank guarantee for a value equal to 25% of the cost of the similar new machinery for a period equal to period of hire plus three months.

The machinery shall be entirely in the custody of the Corporation. It shall be issued to the

Contractor at the yard where it is stationed. The machinery will not be allowed to leave the work

area on any account. All machinery so hired will be entirely operated and maintained by the

Corporation in consideration of the hire charges to be paid by the Contractor.

If any equipment is to be used in excess of 8 (eight) hours per day, permission of the Engineer-in-

Charge shall be obtained in advance.

Reckoning of working hours will start from the time the machinery leaves Corporation yard, where

it has to return daily and in other cases, when the machinery actually starts working. Closing time

of working will be when it returns to the Corporation yard or actually ceases working for the day,

respectively.

Log books shall be maintained by the Engineer or his authorised representative for each place of equipment in, the form laid down by the Engineer. The Contractor or his duty authorised agent

shall verify and sign in the log book or on the machinery duly slip in lieu thereof, daily. If the Contractors representative fails to sign the log biik, the entries made by the Corporation

representative shall be binding on the Contractor. Any compliant or representation regarding the recorded working hours must be submitted in writing within 24 hours of the close, of the shift. The

Engineer’s decision regarding such disputes pertaining to working hours shall be final and binding on the Contractor. Complaints or representations made after lapse of 24 (Twenty Four) hours limit

shall not be considered. The log books shall form the basis for raising debits against the Contractor.

All expenses in respect of oil, fuel, grease, cotton waste etc, shall be borne by the Corporation.

Crew for operating the equipment shall be provided by the Corporation. All minor and major repairs shall be carried out by the Corporation to keep the equipment in working condition.

However, in case of any breakage, damages, slips etc which may occur due to the negligence of Contractor’s labor, equipment or staff or by reason, for which Corporation personnel are not

responsible, the cost of such damages shall be recovered from the Contractor. The decision regarding fixing of responsibility for any damages shall rest with the Engineer-in-Charge and

decision given by him shall be binding on the Contractor. Equipment shall be given on hire only when these can be spared. No claim on account of sickness

or non availability of machinery shall be entertained.

In case of damage to the equipment during haulage to site of work from Corporation stores or

servicing yard, full cost of repairs shall be recovered from the Contractor when damage is due to

rough handling. The damage to trucks/tippers due to bad haulage roads will also be recovered from

the Contractor Decision of the Engineer-in-Charge regarding cost of repairs and cause of damage

shall be final and binding on the Contractor.

A truck, tipper, tanker and any other equipment may be hired for a single day at a time and the

minimum charges to be levied will be 8(eight) hours when mileage is not applicable.

Machinery shall not be hired for less than a day time an minimum charges for hire will be that for

four hours per day.

9.39 LIABILITY FOR DEFECTS:

The Contractor shall be responsible to make good at his own expenses including labour, material, transport, replacement, dismantling, re-erection etc, any defects which may develop or may be

noticed before the expiry of Twelve months from the certified date of completion and which is attributable to the Contractor in the opinion of the Engineer-in-Charge. All notices of such defects

shall be given to the Contractor promptly. In case the Contractor fails to make goods such defects, all expenses consequent thereof and incidental thereto shall be borne by the Contractor.

Page 93: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 93 -

Signature of Contractor No. of Corrections Executive Engineer

In the event of Contractor commissioning a portion of work, the liability of the Contractor under this clause for those portions shall extend for a period of 12 Twelve months from the actual dates on

which such portion of the works are commissioned.

9.40 HANDING OVER OF WORK

All the work and materials, before finally taken over by Corporation will be the entire liability of

the Contractor for guarding, maintaining and making good any damages of any magnitude. Interim

payments made for such work will not alter this position. The handing over by the Contractor and

taking over by the Executive Engineer or his authorised representative will be always in writing of

which copies will go the Executive Engineer or his authorized representative and the Contractor. It

is however, understood that before taking over such work, Corporation will not put it into regular

use as distinct from casual or incidental one, except as specifically mentioned elsewhere or as

mutually agreed to.

(a) Work of construction and erection of 33/6.6 KV switchyard after commissioning will be handed over to Department.

(b) Subletting of work shall be only with prior approval/permission of the Engineer-

in-charge, such permission shall not absolve the contractor from contractual obligations.

9.41 LIABILITY FOR ACCIDENTS TO PERSONS: It shall be Contractor’s responsibility to protect against accidents on the work site. He shall

indemnify the Corporation against any claims for damage to the property, injury to workers or any others persons, deaths etc.On the occurrence of an accident resulting in death or which is so serious

as to be likely to result in death, the Contractor shall within 24 hours, report in writing to the

Engineer-in-Charge, the facts stating clearly about the circumstances’ in which accident has occurred and the subsequent action taken. Other minor accidents causing minor injuries and loss to

property should be communicated in writing, promptly to the Engineer-in-Charge. In all cases the Contractor shall indemnify the Corporation against all losses or damage we resulting directly or

indirectly from the Contractor’s failure to report in the manner aforesaid. This includes penalties or fines if any, payable by the Corporation as a consequence of failure to give notice under the

Workmen’s Compensation Act or failure to conform to the provisions of the said Act in regard to such accidents.

In the event of accident in respect of which compensation may become payable under the

Workmen’s Compensation Act VIII of 1923 including all subsequent modifications thereof,

Engineer-in-Charge may retain the sums of money as may in the opinion of Engineer-in-Charge be

sufficient to meet such liability out of the amounts payable to the Contractor. These sums shall be

recovered from the immediate payment due to the Contractor in one installment or in more than one

installments. The decision of the Engineer-in-Charge regarding this shall be final and binding on

the Contractor. On receipt of award from the Labour Commissioner, the balance amount shall be

reimbursed to or recovered from the Contractor.It should be noted that though the Corporation is a

Principal employer, the complete responsibility of compensation shall be on the Contractor.

9.42 FIRE EXTINGUISHERS AND HOSES :

The Contractor’s agent shall inspect the entire site including storage areas for fire hazards, if any,

and furnish and maintain fully charged fire extinguishers of the appropriate type, supplemented with temporary fire hoses wherever an adequate water supply exists at the places where burning, welding

or other operations that may cause a fire, are being performed.

9.43 PROTECTION OF ADJOINING PREMISES The Contractor shall protect the adjoining site against structural, decorative and other damages that

could be caused by the execution of these works and make good at his cost any such damage.

9.44 UNFAVOURABLE WORKING CONDITIONS

Page 94: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 94 -

Signature of Contractor No. of Corrections Executive Engineer

The Contractor shall confine all his field operations to those works which can be performed without subjecting the; equipment and materials to adverse effects, during inclement weather conditions like

Monsoon, storms etc and during other unfavorable construction conditions. No field activities shall be performed by the Contractor under conditions which might adversely affect quality and

efficiency thereof, unless special precautions or measures are taken by the Contractor in a proper

and satisfactory manner in the performance of such works and with the concurrence of the Engineer

Such unfavorable construction condition wi8ll in no way relieve the Contractor of his responsibility

to perform the works as per the schedule.

9,45 OTHER CONTRACTORS FOR THE WORK :

Corporation has the right to split-up the project work detailed in the work and Site Conditions, into

district items and this contract shall apply only to those items which shall have been specified in this

contract. Should Corporation enter into contracts with other Contractors for specified items of the

project work, each Contractor shall co-operate with others to the fullest extent and shall allow others

every facility and co-operate for execution of their works simultaneously and satisfactorily as intended in the designs, specifications and drawings. Should there be a dispute or disagreement

between the Contractors for any cause whatsoever, the same shall be referred to the Engineer-in-Charge whose decision regarding the co-ordination, co-operation and facilities to be provided by

any of the Contractors to others shall be final and binding on all parties and such a decision or decisions shall not vitiate any contract nor absolve the Contractor of his responsibilities under the

contract nor from the grounds for any claim of compensation.

9.46 ACCESS TO SITE AND WORK AND CO-OPERATION WITH

OTHER CONTRACTORS

The Engineer-in-Charge may, if he considers fit, from time to time, enter on any lands which may be in the possession of the Contractor under the contract for the purpose of executing any works not

included in the contract and may execute such works not included in this contract by agents or by other Contractors at his option and the Contractor shall in accordance with the requirements of

Engineer-in-Charge afford all reasonable facilities for execution to the works, including occupation of lands, structures or otherwise to any other Contractor employed by the Corporation and his

workmen or for the workmen of the Corporation who may be employed in the execution on or near the site of work not included in the contract, or of any contract in connection with or specially to the

works and in default, the Contractor shall be liable to the Corporation for any delay or expenses

incurred by reason of such default. The Contractor shall not however, on account of any such

modified, new or extra work executed by or for the sake of the Corporation be entitled to claim

relief from the obligation to execute the works. The Contractor shall also co-operate with other

Contractors with all fairness and mutual understanding and use the common facilities like access

roads to quarries, water supply arrangements etc.The Contractor shall also not cause advertently or

inadvertently any obstruction or impediments in the progress of the other works being executed by

Corporation or through other agencies. In the event of dispute regarding the claim, the

responsibility liabilities etc, in respect of such facilities, the decision of the Engineer-in-Charge shall

be final.

In cases where performance of the erection work by the Contractor affects the operation of the

system facilities of the Corporation, such erection work of the Contractor shall be scheduled to be performed only in the manner stipulated by the Engineer and the same shall be acceptable at all time

to the Contractor. The Engineer may impose such restrictions on the facilities provided to the Contractor such as electricity, water etc, as he may think fit in the interest of the Corporation and

the Contractor shall strictly adhere to such restrictions and co-operate with the Engineer.

The Engineer shall be notified promptly by the Contractor of any defects in the other Contractor’s work that could affect his own work. The Engineer shall determine the corrective measures, if any,

required to rectify this situation after inspection the works and such decisions by the Engineer shall

be binding on the Contractor.

Page 95: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 95 -

Signature of Contractor No. of Corrections Executive Engineer

9.47 CO-ORDINATION WITH OTHER CONTRACTORS

The Contractor should note that there will be other agencies including Corporation, working in the same area for works other than that included in this contract. The Contractor shall co-operate with

these agencies to the fullest extent and shall allow them reasonable facility and co-ordination for

execution of work, simultaneously and satisfactorily as intended in the contract conditions,

specifications and drawings.

Should there be a dispute or disagreement between the Contractor and other agencies for any cause

whatsoever, the same shall be referenced to the Engineer-in-Charge whose decision regarding co-

ordination and facilities to be provided by all the Contractors to others shall be final and binding on

all parties and such decision shall not vitiate any contract or absolve the Contractor of his

responsibility under the contract, and shall not form ground for any claim or compensation.

9.48 OTHER WORKMEN

The Engineer shall have full authority to depute workmen on work site to execute other works not included in the contract. The Contractor shall offer every reasonable facility to enable such

workmen to carry out the other works, provided that such works shall be carried out in such a manner as not to impede the progress of the works included in the contract.

The Contractor, however, shall not be liable for any damage which may happen to or be occasioned by such other works provided, he complies with the instructions in connection therewith and

provided that the damage is not caused by the Contractor or his workmen.

9.49 INCOME TAX Income tax is to be deducted from the sums to be paid to the Contractor for works carried out at two

per cent of the gross amount or at rate revised from time to time and surcharge & education cess etc

on income pay as per prevailing Government orders issued from time to time. Income Tax Certificate shall be issued generally within 45 days from the deduction of Income Tax.

9.50 SALES TAX AND DUTIES

The rates quoted by the Contractor shall be deemed to be inclusive of Sales Tax and duties on all the equipments and the material that will have to be purchased for performance on this contract.

The tendered rates shall be inclusive of all taxes, rates and cess and shall also be inclusive of the tax leviable in respect of the works contract under the provision of the Maharashtra Sales Tax (on

transfer of property in goods involved in the execution of Works Contract). Act 1985 (Maharashtra

Act XIX of 1985) as already mentioned in clause 55 of printed B-1 form.

9.51 SALES TAX CLEARANCE CERTIFICATE

The service tax paid by the contractor will be reimbursed by the departmet to the contractor on

actual basis on providing documentary evidence of the payment.

9.52 TAXES AND DUTIES

The Contractor shall unless otherwise specifically provided in the contract pay all duties, tolls,

octroi duties, quarry fees, royalties and other taxes on all materials and articles that he may use.

A Certificate to the extent that the equipment being supplied under this order pertains to Lift

Irrigation Scheme of Corporation will be issued by the Corporation.

MVAT Registration Certificate in appropriate Form as issued by Maharashtra State Sales Tax Act 2005. The MVAT on transfer of property in goods involved in the execution of works

contract ( Re-enacted Act 2005) from sales tax department. The rates of all the items of execution, commissioning, testing & trial shall be inclusive of all

taxes and levies such as income tax, M.V.A. tax, Excise duty etc. however service tax will be paid as per scheduled - B to the service tax registered contractor. or as per prevailing rates.

9.53 ACCESS TO THE CONTRACTOR’S BOOKS:

Whatever it is considered necessary by the Engineer-in-Charge to ascertain the actual cost of

execution of any particular item of work or supply of plant or material he shall direct the Contractor

Page 96: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 96 -

Signature of Contractor No. of Corrections Executive Engineer

to produce the relevant documents, such as pay-rolls, records of personnel, invoices of materials and any and all other data and documents relevant to the item or necessary to determine its cost etc, and

the Contractor shall when so required furnish information, pertaining to the aforesaid items in the mode and manner that may be specified.

9.54 BREACHES ON PART OF CORPORATION NOT TO ANNUL CONTRACT:

No breach or non-observance on the part of Corporation of any of the conditions contained herein

shall annul this contract or discharge the Contractor from the observance and performance thereof,

but on application by the Engineer-in-charge, an extension of time may be given to the Contractor in

respect of such breach or non-observance by the Corporation, which shall be governed by clause 6

of B-2 form.

The Contractor shall not, however, be entitled to consideration or any extension of time for any item

of the work unless the Contractor shall have made an application in writing to the Engineer-in-

Charge within one month of the arising of the cause needing such extension, but the Engineer-in-Charge may at his discretion, which shall be conclusive, waive the condition regarding this period

of one month.

9.55 OBSERVANCE OF LAWS, LOCAL REGULATIONS, NOTICES AND

ATTACHMENTS:

All local laws in force at the time of entering into the contract and those enacted thereafter shall be binding on the Contractor and he shall abide by the same .

The Contractor shall conform to all laws of land, regulations and bye-laws of any local authority. He shall before making any variations from the drawing or specifications, that may be

necessitated for so conforming give the Engineer written notice, specifying the variation proposed

to be made and the reasons for making them and apply for instructions thereon, In case the Contractor shall not receive such instruction within 7 days from receipt of notice, he shall proceed

with the work conforming to the provisions, regulations or bye-laws in question and any variation in the drawing or specifications so necessitated shall be dealt with under respective clause in the

tender. The Contractor shall give all notices required by the said acts, regulations or bye-laws and pay all fees in connections therewith.

He shall also ensure that no attachments are made against materials or works related to the contract.

In every case referred to in this clause, the Contractor shall protect and indemnify Corporation

against any claim or liability arising from or based on the violation of such law, ordinance, regular

degree or attachment by him or by his employees.

9.56 PATENTS RIGHTS, ETC:

The Contractor shall fully indemnify the Corporation against all actions, suits, claims, demands,

costs, charges and expenses arising from or incurred by reason of any infringement for any letters,

patent designs, trade mark or name, copy right or other protected rights in respect of any machine,

plant, work material, thing or system or method of using, fixing working or arrangement used or

fixed or supplied by the Contractor, but this indemnity shall not extend or apply to any action, suit,

claim demand, cost charges or expenses arising from or incurred by reason of use of the works or

any part thereof otherwise than in the manner or for a purpose contemplated by the contract. All royalties and other similar payments which may have to be paid for the use of any such machine,

plant, work, material, thing, system or method as aforesaid (Whether payable in one sum or by installments or otherwise) shall be covered by the contract price and payable by the Contractor.

In the event of any claim or demand being made or action or suit brought against the Corporation in respect of any such matter as or matters aforesaid, the Contractor shall be duly notified thereof, and

he shall conduct all negotiations for the settlement of such claims or demand and such action of suit shall also be conducted by him and as far as the Corporation shall think proper, to the supervision

and control of the Corporation through the officer duly authorized on behalf of Corporation.

Page 97: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 97 -

Signature of Contractor No. of Corrections Executive Engineer

9.57 INSURANCE:

a) The Contractor shall unless otherwise specified by the Engineer, insure the plant and shall keep it insured against destruction or damage by fire, earthquake, flood, storm under exposure to weather or

through riot, civil commotion, war rebellion, theft etc, for the full value of the plant and materials

until the plant is taken over.

b) The insurance for the equipment shall be effected by the Contractor with Government Insurance

Fund or their authorized insurance company on behalf of the Corporation covering the risks towards

handling transit, storage at site, retransforming upto place of erection, testing and commissioning of

the equipment at site and also for further period of 24 months, for replacement value of the plant

and material. The address of Govt, Insurance fund is as below:

Director of Government Insurance, MHADA Building, Kalangar, Bandra (East) Mumbai.

The tenderer shall note that Insurance effected through any other company will not be accepted. The Contractor shall take the policy in the name of the consignee of the Corporation. The insurance

policy then will be assigned to the Contractor for further operation. The insurance shall be full and shall cover any loss or damage in accordance with what is said above.

The damaged materials will be set right or replaced by the Contractor free of cost. The claims arising out of composite insurance policy shall be dealt with or handled by the Contractor at his own

cost after receipt of preliminary damage/loss intimation given by the Corporation or damage/loss noticed by the Contractor himself.

c) Third Party Insurance: In addition to above, the Contractor shall indemnify the Corporation against the loss or damage to the property of the third party and /or injuries to the third person which

may arise out of or in consequences of transport, storage and erection, testing and commissioning of the goods/equipment.

The amount of third party insurance to be provided shall be as under

FOR CONTRACT VALUE OF

Upto Rs.50

lakhs

Above Rs.50

lakhs & upto

Rs.100 lakhs

Above Rs.100

lakhs

Per person in case of

fatal disability

1,00,000 2,00,000 3,00,000

Property damage for

occurrence

5,00,000 10,00,000 25,00,000

Total cumulative

during policy period

5,00,000 10,00,000 25,00,000

The terms of special policy for this purpose shall include a provision whereby in the event of any

claim being brought or made against the Corporation in respect of which the Contractor would be

entitled to receive indemnity under the policy the insurer will indemnify the Corporation against

such claims and any cost, charges and expenses in respect thereof.

9.58 SAFETY PROVISIONS:

The Contractor will notify the Engineer of his intention bring on the site any equipment or any

container, with liquid or gaseous fuel or other substance which may create hazard. The Engineer shall have the right to prescribe the conditions under which such equipment or container may be

handled and used, during the performance of the works and the Contractor

Page 98: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 98 -

Signature of Contractor No. of Corrections Executive Engineer

shall strictly adhere to such instructions. The Engineer shall have the right to inspect any construction plant and to forbid its use, if in his opinion, it is unsafe. No claim due to such

prohibition shall be entertained by the Corporation.

Where it is necessary to provide and/or store petroleum products or petroleum mixtures and

explosives, the Contractor shall be responsible for carrying out such provision and or storage in

accordance with the rules and regulations laid down in petroleum Act 1934 and further amendments

of Explosive Act 1948 and petroleum and carbide of calcium manual published by the chief

Inspector of Explosives of India. All such storage shall have prior approval of the Engineer. In

case any approvals are necessary from the Chief Inspector of Explosives or any statutory authorities,

the Contractor shall be responsible for obtaining the same.

9.59 ELECTRICAL SAFETY REGULATIONS

In no circumstances will the Contractor interfere with fuses and electrical equipment belonging to

the Corporation or other Contractors. Before the Contractor connects any electrical appliances to any plug or socket belonging to the other Contractor or Corporation he shall-

Satisfy the Engineer that the appliance is in good working condition Inform the Engineer of the maximum current rating, voltage and phases of the appliances.

Obtain permission of the Engineer detailing of sockets to which the appliances may be connected. The Engineer will not grant permission to connect until he is satisfied that

The appliance is in good condition and is fitted with a suitable plug. The appliance is fitted with a suitable cable having two earth conductors. One of which shall be an

earthed metal sheath surrounding the cores. No electric cable in use by the Contractor/ Corporation will be disturbed without prior permission.

No weight of any description will be imposed on any such cable and no ladder of similar equipment

will rest against or be attached to it. No work will be carried out on any live equipment. The equipment must be made safe and a permit

to work is issued by the Engineer before any work is carried out. The Contractor shall employ the necessary number of qualified, full time electricians to maintain his

temporary electrical installation. The Contractor shall comply with the provision of the Indian Electricity Rules and Indian Electricity

Acts in force in respect of electrical installations. The Contractor shall at his own expense arrange for the safety in his operations as required including the provisions of the safety code published by

the Central Water Commission, New Delhi (latest edition). In case the Contractor fails to make

such arrangements, the Engineer shall be entitled to cause them to be provided and to recover the

cost thereof from the Contractor.

All the connections made shall be got checked from authorized Electrical Inspector & a

certificate shall be obtained prior to submission of the bill.

9.60 (a) Terms of payment

The mode of payment to the contractor for the works to be executed shall be as per

detailed below:

(i) 80% contract price will be released after supply of material at site

(ii) 10% after erection.

(iii) Remaining 10% after successful - testing and commissioning of

Installation

(b) Bill and Payments:

Interim payments made commissioning and satisfactory performance will be treated as advance payments. A normally one R.A. Bill will be paid to the contractor in a month.

However depending on delivery, frequency of payment of bill may be altered. A bill shall be submitted by the contractor each month on or before fifth day of the month for

all works executed in the previous month and the Engineer-in-charge shall take or cause to be taken the requisite measurement for the purpose having the same verified and then payment will

be made. In respect of items such as spares/maintenance tools and tackles the payment

Page 99: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 99 -

Signature of Contractor No. of Corrections Executive Engineer

will be made only for the entire work is completed and spares/maintenance tool & tackles supplied.

The format of running bill on which the bills are to be submitted by the Contractor will be supplied

to the Contractor by the Corporation. Printed copies of the bill forms as per this format shall be

arranged by the Contractor at his cost. The bills in five copies shall be submitted to the concerned

Executive Engineer in the standard proforma only. The payment of bills shall be made subject to the

availability of funds. no claim shall be entertained for any delay in payment of bills.

SECURITY DEPOSIT.

The Security deposit accumulated from deductions from the running account bill may from time to

time and at any time on application by and at the cost of the Contractor, be converted

into interest bearing Corporation securities, approved by and in the name of the Corporation Should the market value of the securities fail, for any reason whatsoever below that specified, the

Contractor shall make good the same in cash or as may otherwise be acceptable whenever called upon to do so or to replace the security by other acceptable to the Engineer-In-Charge.

The Contractor shall bear all charges for commission and brokerage incidental to the purchase, safe custody, withdrawal and collection of interest on these securities.

9.62 NO INTEREST ON MONEY DUE TO THE CONTRACTOR.

No omission by the Engineer to pay the amount due upon measurements or otherwise shall vitiate or

make void the contract nor shall the Contractor be entitled to interest on any guarantee bond or payment in arrears nor on any balance which may on the final settlement of his account be found

due to him.

9.63 EXTRA ITEMS:

Extra items of work shall not vitiate the contract. The Contractor shall be bound to execute extra

item of work as directed by the Engineer-In-Charge. The rates of extra items will be governed by

the provisions of clause 14 and 30 of conditions of contract. The escalation is payable for extra

items.

9.64 PRICE VARIATION CLAUSE : Not applicable

9.65 RELEASE OF CLAIMS:

After completion of work and prior to final payment, the Contractor shall furnish to the Engineer a

certificate for release of claims against the Corporation arising out of the contract, other that claims

specifically identified, evaluated and exempted from the operation of the release by the Contractor.

9.66 CERTIFICATE OF COMPLETION OF WORK

As soon as work is completed, the Contractor shall give notice of such completion to the Engineer.

Within three months of receipt such notice, the Engineer shall furnish the Contractor with a certificate of completion or otherwise.

9.67 COMPLETION DRAWINGS

Page 100: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 100 -

Signature of Contractor No. of Corrections Executive Engineer

The Contractor shall furnish to the Engineer before the works are taken over by the Corporation, the drawings of the works as completed, in sufficient details to enable the Corporation staff to maintain,

dismantle, reassemble and adjust all the parts of the works. In addition the Contractor shall furnish reproducible tracings of the above completion drawings. The works shall not be considered to be

completed for the purpose of taking over by the Corporation until such instructions and drawings

have been supplied to the Corporation.

9.68 CONTRACTOR DYING, BECOMING INSOLVENT, BANKRUPT, INSANE

OR IMPRISONED.

In the event of the death, insanity, insolvency, imprisonment of the Contractor or where the

Contractor being a partnership firm becomes dissolved or a Contractor goes into liquidation, the

contract may be terminated by notice in writing pasted at the site of the works and advertised in one

issues of the local newspaper. All acceptable works shall be paid for after

recovering all the Contractor’s dues to Corporation there from, at appropriate rates to the person or

persons entitled to receive and give a discharge for the payment. If the Contractor becomes bankrupt or has receiving order made against him or compound with his

creditor or being a Corporation commences to be wound up not being a voluntary winding up for the purpose only of amalgamation or reconstruction to carry on its business under receiver for the

benefit of the creditors or any of them the Corporation shall be at liberty. a) To give such liquidator, receiver or other person the option of carrying out the contract

subject to his providing a guarantee for the due and faithful performance of the contract upto an amount to be determined by the Corporation.

OR

b) To terminate the contract forthwith by notice in writing to the Contractor or to the liquidator or to any person in whom the contract becomes vetted and to act in the manner as provided as the

clause nos 3 and 4 of the B-1 tender. If the Contractor shall die or commit any act of bankruptcy or being a Corporation commences

winding up except for reconstruction purposes or carry on its business under a receiver, the executors, successors or other representatives in law of the estate of the Contractor or any such

receiver, liquidator or any person whom the contract may become vested, shall forthwith give notice thereof in writing to the Corporation and shall for one month, during which he shall take all

reasonable steps to prevent a stoppage of work , have the option of carrying out this contract subject

to his or their providing such guarantee as may be required by the Corporation, but not exceeding

value of the work for the time being remaining unexecuted. In the event of stoppage of work, the

period of the option not exercised, the contract may be terminated by Corporation by a notice in

writing to Contractor or his successor. The power and provisions reserved by Corporation in this

contract of taking of the work out of the Contractor’s hand shall immediately become operative.

Copy of such notice shall be pasted on work site and advertised in newspaper.

9.69 PERSONNEL OF THE CONTRACTOR.

The Contractor shall at all times, maintain on the work, a staff of duly qualified engineers and

supervisors of sufficient experience of similar other jobs to assure that the quality of work turned

out shall be as intended in the specifications. The Contractor shall also maintain at the work, a Works Manager of sufficient status, experience and office and duly authorise him to deal with all

aspects of the day to day work. All communications and commitments by this Works Manager shall be absolutely binding on the Contractor.

The Contractor shall supply to the Engineer-in-Charge details of names, qualifications and

experience in regards to all supervisory staff employed by the Contractor and notify changes when made and satisfy the Engineer-in-Charge regarding the quality and sufficiency to staff thus

employed.

Page 101: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 101 -

Signature of Contractor No. of Corrections Executive Engineer

The Engineer-in-Charge will have the unquestionable right to ask for changes in the quality and number of Contractor’s staff. The Contractor shall on the written directives as the Engineer-In-

Charge, remove from the works any person employed thereon, who may in the opinion of the Engineer-in-Charge be incompetent or has misconducted himself. Such person shall not be

employed again, on the work, without the written permission of the Engineer-In-Charge. The

Contractor shall have to submit information regarding proof of payment of Professional Tax and the

clearance certificate in format vide Appendix – I to Section – VII.

9.70 UNDERTAKING UNDER CONTRACT LABOUR ACT:

The Contractor shall furnish the undertaking towards implementation of Contract Labour Act as

given in Appendix –F .

9.71 PHOTOGRAPHS OF THE WORKS

The Contractor will not be allowed to take photographs showing field work or the general location of the work. The Engineer, may however, at his discretion, allow a few construction photographs to

be taken for the purpose of the Contractor’s record. Prior approval of the Engineer-in-Charge should be obtained in such cases and also in case such photographs are to be exhibited in public literature

and calendars etc. in all such cases, negatives of the photos shall be submitted to the Engineer, after taking approved number of copies and the negative will become the absolute property of the

Corporation.

9.72 THE CONTRACTOR TO SUPPLY AND BE RESPONSIBLE FOR THE

SUFFICIENCEY OF THE MEANS EMPLOYED.

The Contractor shall supply and take upon himself the entire responsibility of the sufficiency of the tools, lifting tackles, handling equipment, machinery, implements and generally of all the means

irrespective of whether such means may or may not have been approved of or recommended by the Engineer-in-Charge and the Contractor must accept all risks of accidents or damages from whatever

cause they may arise, until the completion of this contract.

9.73 COVERING OF WORK

The Contractor shall give not less than seven days notice in writing to the Engineer-in-Charge of the

work which is proposed to be covered up or placed beyond the reach of measurements so that the

measurements may be taken before the work is covered up or placed beyond the reach of

measurements. No work shall be covered up or placed beyond the reach of

measurements, before ensuring that the measurements of work to be covered up are recorded. Any

work covered up or placed beyond the reach of measurements without such notice having been

given or consent obtained, the same shall be uncovered at the Contractor’s expenses and in default

thereof no payment or allowance shall be made for such work or for materials with which the same

was executed.

9.74 QUANTITIES OF WORK

The quantities of work under the various items in the Schedule - B. Schedule of Quantities and Bid Rates as estimated by the Corporation, have been provided as could be reasonably anticipated and

should be taken as indicative only. The amount of work will depend upon the actual conditions that will be encountered in the construction and the results of detailed design which will continue to be

refined as more field data and information comes to hand. If the work is started by the Corporation,

the quantities put to tender shall be reduced to the extent the work is done by the Corporation upto

Page 102: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 102 -

Signature of Contractor No. of Corrections Executive Engineer

the date of starting the work by the Contractor. No claims due to reduction in quantity on this will be entertained.

9.75 SUNDAYS AND HOLIDAYS

No work shall be done on weekly local holidays or in other Government holidays duly gazette or on

holidays observed by local usage without the prior sanction of the Engineer – in –Charge.

Withholding of such sanction shall not form any grounds for compensation or extension of time

limit.

If on the other hand, the Engineer – in –Charge directs that the work shall be proceeded with on

days and during hours otherwise not permissible under this contract; the Contractor shall proceed

with the works as directed, without in any way violating this contract or forming any grounds for

compensation or claim.

The Contractor shall in the dealing with labour at all times during the period of this contract, have

due regard to local festivals and other customs.

9.76 JURISDICTION OF COURT FOR DISPUTES: Disputes, if any, arising out of this contract shall be subject to the jurisdiction of the High Court of

Mumbai ,Bench at Nagpur.

9.77 LIMIT OF CONTRACT:

Equipment furnished shall be complete in every respect with all mountings, fittings, fixtures and

standard accessories normally provided with such equipment and / or needed for erection, completion and safe operation of the equipment as required by applicable National and International

codes though they may not have been specifically mentioned in the detailed specifications. All similar standard equipment provided, shall be interchangeable with one another.

9.78 DESIGN CO-ORDINATION:

The Contractor shall be responsible for the selection and design of appropriate equipment to provide

the best co-ordination performance of the entire system. The basic design requirements and detailed

out in item wise specification. The design of various components, subassemblies and assemblies

shall be so done, that it facilitates easy field assembly and maintenance. All the rotating components

shall be so selected that the natural frequency of the complete unit is not critical at or close to the

operating range of the unit.

PLANS, DRAWINGS AND OTHER DATA AND APPROVAL FROM ELECTRICAL

INSPECTOR :

(a) Drawings /Data to be furnished for APPROVAL.

The Contractor shall submit within 6 weeks of placement of work order three sets of final versions

of following drawings/designs to the Engineer-in-charge for approval. (b) Any changes in the approved layout will be subject to further approval.

(c) The approval of drawings however will not relieve the contractor from his responsibility for any errors or omissions under the contract.

9.79.2 APPROVAL FROM ELECTRICAL INSPECTOR:

The Contractor is required to get approved the various drawings for the installation or work covered

in the scope from the concerned Electrical Inspector within 15 days from notification of the award.

The Legal fee of the electrical inspector will be born by the department.

Page 103: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 103 -

Signature of Contractor No. of Corrections Executive Engineer

9.79.3

Each drawing submitted by the Contractor shall be clearly marked with the name of the Engineer and the name of the project. If standard catalogue pages are submitted, the applicable

items shall be indicated therein. All titles, noting. Markings and writing on the drawings shall be in

English. All dimensions should be in Metric Units.

All manufacturing and fabrication work in connection with the

Equipment prior to the approval of the drawings shall be at the Contractor’s risk. The Contractor

may make any changes in the design which are necessary to make the equipment conform to the

provisions and intent of the contract and such changes will again be subjected to the approval by the

Engineer. Approval of Contractors drawings or work by the Engineers shall not relieve the

Contractor of any of the responsibilities and liabilities under the contract.

Subsequently, on completion of erection work the entire installation shall be got approved

by the Contractor from the concerned Electrical Inspector. and abtain the written permission before charging and commissioning completed installation.

Any charges/official fees etc. required for approval of installation by Electrical Inspector shall be borne by the Contractor. It is deemed that all these expenses are included in his/their tender

offer. Any extra payment or reimbursement will not be paid by the Corporation.

9.80 QUALITY AND MATERIAL:

The quality of workmanship produced by skilled knowledgeable and experienced workman, mechanics and artisans is required for the work Particular attention shall be

given to the appearance and finish of exposed work. The decision of the Engineer with regard to the

quality and adequacy of workmanship shall be binding on the Contractor.

All materials and equipment incorporated in the work shall be new Equipment not covered by details requirements in the contract documents shall be of the best commercial quality, suitable for

the purpose intended and approval by the Engineer-in-Charge, prior to use in the work. The Contractor shall provide proper storage facilities and exercise such measures as will ensure the

preservation of the required quality and fitness of all material and equipment.

The equipment to be supplied under this contract will be only from the makes, acceptable to the

Corporation, as per schedule of acceptable makes for different components as per

Annexure IV. The Contractor should state which make he proposes to supply under this contract.

No makes other than those specified in Annexure - IV of Section X or as approved

MSETCL/Department will be accepted. Any tender which includes any other make or equivalent

make is liable to be treated as non responsive.

A If it shall appear, that the work has been executed with unsound, imperfect or of an

inferior quality or otherwise not in accordance with the contract documents, the Contractor shall at

his own cost rectify, reform, remove or reconstruct the same , whole or in part as may be, directed

by the Engineer, whether or not, the value of any such work of material shall have been included in

any payment made to the Contractor. The Executive Engineer may, if he thinks fir, allow such work

to be paid at reduced rates and his decision will be final and binding, provided further that the rates and his decision will be final and binding, provided further that the rates fixed by the Engineer, be

not acceptable to the Contractor, he shall have the option to replace the defective work or materials with ones in accordance with the specified standards.

9.81 GAURANTEE PERIOD:

In the event of an emergency, where, in the judgment of the Engineer delay would cause serious

loss or damage, repairs or adjustments may be made by the Engineer or a third party chosen by the

Engineer without advance notice to the Contractor and the cost of such work shall be paid by the

Page 104: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 104 -

Signature of Contractor No. of Corrections Executive Engineer

Engineer, the Contractor will be notified promptly and he shall assist wherever possible, to make the necessary corrections. This shall not absolve the Contractors liability under the terms and conditions

of the contract.

The cost of any special or general overhaul rendered necessary during the operation period due to

defects in the plant or defective work carried out by the Contractor shall be borne by the Contractor.

In the case of these defective parts which are not repairable at site but are essential for the

commercial operation of the equipment, the Contractor and the Engineer shall mutually agree to a

program of replacement or renewal which will minimize interruption to the maximum extent in the

operation of the equipment. Decision of the Engineer in this respect shall be final.

At the end of the guarantee period, the Contractor liability ceases except for latent defects in respect

of goods supplied by sub-Contractors to the Contractor. Where a longer guarantee (more than 12

months ) is provided by the sub-Contractors, the Corporation shall be entitled to the benefit of such longer guarantee.

9.82 PERFROMANCE GUARANTEE OF THE EQUIPMENTS

The performance guarantee of the equipment under the scope of the contract are detailed separately

in the item wise specifications and in schedule B. These guarantees shall supplement the general performance guarantee provisions covered under special conditions of contract.

9.82.A. Should the Engineer consider, if necessary, in order to satisfy himself as to the quality of

work the contract shall at any time during the continuance of the contract dismantle or dis-assemble

any part of work and make such inspection possible to such an extent as the Engineer may direct and the Contractor shall make good the same at his cost and to the satisfaction of the Engineer.

9.83 TEST, INSPECTION AND REJECTION OF DEFECTIVE

MATERIALS AND WORKS: The Contractor shall without extra cost provide samples and co-operate in the testing of materials

and inspection of work. The Engineer shall have access at all times to the places where components are being manufactured for use under the contract, to determine that manufacturer is proceeding in

accordance with drawings and the Engineer shall also have access at all times to the places of

storage.

Further, Contractor shall not without written authorization, permit entry on site of work of any

person except authorized representative of the Corporation or the Engineer or the Contractor’s staff

and labour directly engaged on and in connection with the work.

The tests and inspections of major items specified in Schedule-B at Contractor’s Manufacturer’s

works or sub-works shall be witnessed by two representatives of the Engineer in-charge. The

Contractor will provide the cost of travel, lodging and boarding of the Inspectors. The travel shall be

arranged generally by Air, 1st class Railway or Car. The Corporation reserves the right to appoint

and deploy the services of the outside agency or any other reputed agency in association with the

Corporation for said purposes, however charges for the services of the outside agency will be borne

by the Corporation. The acceptance of the test shall be entirely with the Engineer or his authorized

representative. Intimation of not less than 15 days shall be given by the suppliers for this purpose.

The equipment should be dispatched only after the approval of test reports by the Executive Engineer. In-charge.

9.83. A) The test report of manufacturer’s factory inspector certifying that the equipment is

manufactured as per specifications of the tenderer shall be furnished by the Contractor. 9.83. B) Contractor can not be relieved from the responsibility even if the drawing and quality are

approved by the Engineer-in-Charge for the

purpose of guarantee and quality of equipment / work.

Page 105: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 105 -

Signature of Contractor No. of Corrections Executive Engineer

9.84 REGISTRATION AND STATUTORY INSPECTION:

All registration and statutory inspection fees, if any in respect of his work pursuant to this contract shall be to the account of the Contractor. However, any registration, statutory inspection fees,

lawfully payable under the provision of any statutory laws and its amendments from time to time

during erection in respect of the plant and equipment ultimately to be owned by the Corporation,

shall be borne by the Corporation, Should any such inspection or registration need to be re- arranged

due to the fault of the Contractor or his Sub-Contractors, the additional fees for such inspection and

/ or registration shall be borne by the Contractor.

9.85 INSTRUMENTATION:

In case, it is proposed to have any instrumentation work, the instruments and their accessories will

be procured and installed by the Corporation as per programme framed by the Engineer-in-Charge.

Care should be taken by the Contractor to protect these instruments as well as their connections

during various stages of work. The Contractor shall also extend all facilities for installation of the instruments shall stand included in the relevant items of tender. No claim, however shall be

entertained due to any delay or obstruction that might be created due to installation or observation.

9.86 STANDARD OF ACCEPTANCE OF BENCH TESTS : The acceptance of performance test for verification of guaranteed technical particulars shall be

governed by relevant IS. If during the test it is found that the equipment does not meet the required guaranteed performance,

the equipment will be out rightly rejected. The same equipment may be accepted only after making necessary modification, alterations, and retesting to meet the guaranteed performance at the

Contractor’s cost.

9.87 STANDARD OF ACCEPTANE OF FIELD TESTS:

The acceptance of performance test shall be governed by relevant IS. If during the test it is found that the transformer and other equipment does not meet the required

guaranteed performance, the equipment will be dismantled, transported to manufacturers works for modification, alteration, etc. and be transported to site, reassembled, reinstalled & recommissioned

to the satisfaction of the Engineer by the Contractor at his cost.

9.88 TRANSPORTATION:

9.88.1 The Contractor, wherever applicable, shall after proper painting, pack and crate all

equipment in such a manner as to protect them from damage and deterioration in transit by road , or

rail and during storage at the site till the time of erection. The Contractor shall be held responsible

for all damages due to improper packing. While packing all the materials, the limitations from the

point of view of availability of railway wagons, size and other modes of transport should be taken

into account . The packing and protection should be in conformity and requirement of Insurance

Companies and Transport Agencies.

9.88.2 The Contractor should prepare detailed packing list of all packages and

Containers, bundles and loose material forming each and every consignment dispatched to site. The

Contractor shall further be responsible for making all necessary arrangements for loading, unloading

and other handling , right from his works to the site and also till the equipment is erected, tested and commissioned. He shall be solely responsible for proper storage and safe custody of all equipment.

9.88.3 All demurrage, wharfage and other expenses incurred due to delayed

clearance of the material or any other reason shall be borne by the Contractor. 9.88.4 Delivery of goods shall be made by the contractor in accordance with programme to suit the

completion period for the work. The equipment shall not be dispatched until dispatch instructions are given by the engineer.

9.89 PROTECTION TO PLANT:

Page 106: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 106 -

Signature of Contractor No. of Corrections Executive Engineer

All coated surfaces shall be protected against abrasions, impact, discoloration and other damages. All exposed threaded portions shall be suitably protected with either a metallic or a non-metallic

protecting device. All ends of all valves & piping and conduits, equipment connections shall be properly sealed with suitable devices to protect them from damage. The parts which are likely to get

rusted due to exposure to weather should also be properly treated in a suitable manner.

9.90 PRESERVATIVE SHOP COATING:

9.90.1 All exposed metallic surface subject to corrosion shall be

protected by shop application of suitable coating. All surfaces which will not be easily accessible

after the shop assembly, shall before hand be treated and protected for the life of the equipment.

All surfaces shall be thoroughly cleaned of all mill scale, oxide and other coating and prepared in

the shop. The surfaces those are to be finish painted after installation or require corrosion protection

until installation shall be shop painted with at least two coats of primer. Transformers and other

electrical equipment, if included shall be shop finished with one or more coats of primer and two coats of high grade resistance enamel. The finished colours shall be as per manufacturers

standards to be selected and specified by the Engineer.

9.90.2 Shop primer for all steel surfaces shall be selected, after obtaining specific approval of the Engineer regarding the quality of primer proposed to be applied.

9.90.3 All other steel surfaces which are not to be painted shall be

coated with suitable rust preventive compound subject of the approval of the Engineer.

9.91 MATERIALS HANDLING AND STORAGE :

9.91.1 All the equipment furnished under the contract and arriving at site shall be promptly received, unloaded and transported in the storage spaces by the

Contactor.

9.91.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of any damage, shortage, discrepancy, etc for the purpose of Engineer’s information

only. The Contractor shall submit to the Engineer every week a report detailing all the receipts during the week. However , the Contractor shall be solely responsible for any shortages or damage

in transit, handling and or in storage and erection of the equipment at the site.

9.91.3 The Contractor shall maintain an accurate and exhaustive record detailing out the lose of all

equipment received by him for the purpose of erection and keep such record open for the inspection

of the Engineer at ant time.

9.91.4 all equipment shall be handled very carefully to prevent any damage or loss, No bare wire

ropes, slings, etc, shall be used for unloading and /or handling of the equipment without the specific

written permission of the Engineer. The equipment stored shall be property protected to prevent

damage either to the equipment or to the floor where they are sorted. The equipment from the store

shall be moved to the actual location at the appropriate time so as to avoid damage of such

equipment at site.

9.91.5 All electrical panels, control gears, motors and such other devices shall be properly dried by

heating before they are installed and energized. Motor bearings, slip rings, commutators and other exposed parts shall be protected against moisture ingress and corrosion during storage and

periodically inspected. Heavy rotating parts in assembled conditions, shall be periodically rotated to prevent corrosion due to prolonged storage.

9.91.6 All the electrical equipment, such as motors, generators, etc. shall be tested for insulation

resistance at least once in three months from the date of receipt till the date of commissioning and a record of such measured insulation values maintained by the contractor. Such record shall be open

for inspection by the Engineer.

Page 107: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 107 -

Signature of Contractor No. of Corrections Executive Engineer

9.91.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected and stored in a suitable manner to prevent damage or deterioration in quality by storage.

9.91.8 All the materials stored in the open or dusty location must be covered with suitable weather

proof and flame proof covering material wherever applicable.

9.91.9 The Contractor shall be responsible for making suitable indoor storage facilities to store all

equipment which require indoor storage. Normally all the electrical equipment, such as motors,

control gears, generators, exciters and consumable like electrodes, lubricants, etc. shall be stored in

the closed storage space. The Engineer, in addition, may direct the Contractor to move certain other

materials which in his opinion will require indoor storage, to indoor storage areas which the

Contractor shall strictly comply with.

9.92. CONTRACTOR’S MATERIAL BROUGHT ON THE SITE:

9.92. 1 The Contractor shall bring to site all equipment, components, parts,

materials, including construction equipment, tools & tackles for the purpose of the works under intimation to the Engineer. All such goods shall, from the time of their being brought, vest in the

engineer, but may not on any account be removed or taken away by the Contractor or his sub- Contractors without the written permission of the Engineer. The Contractor shall nevertheless be

solely liable and responsible for any loss or destruction thereof and damage there to.

9.92.2 The Corporation has a lien on such goods for any sum or sums which may at any time be due or owing to Corporation by the Contractor under, in respect of

or by reasons of the contract. After giving a fifteen (15) days notice in writing of his intention to do

so, the Engineer shall be at liberty to sell and dispose of any such goods in such a manner as he shall think fit including public auction or private treaty & to apply the proceeds in or towards the

satisfaction of such sum or sums due as aforesaid.

9.92.3 After the completion of the works, the Contractor shall remove from the site under the direction of the Engineer the materials such as construction

equipment, erection tools and tackles scaffolding, etc. with the written permission of the Engineer. If the Contractor fails to remove such materials, within (15) fifteen days of issue of a notice by the

Engineer to do so, than the Engineer shall have the liberty to dispose of such materials and credit the

proceeds there of to the account of the Contractor.

9.93 PROTECTIVE GUARDS:

Suitable guards shall be provided for protection of personnel on all exposed rotating and/or

moving machine parts. All such guards with necessary spaces & accessories shall be designed for

easy installation & removal for maintenance purposes.

9.94 NOISE AND VIBRATION:

The equipment supplied & erected by the tenderer will comply with the best design & erection practice & its working shall be within permissible noise & vibration levels. The vibration shall not

exceed the limits specified in the relevant standard of American Hydraulic Institution or B. S. (British standards).

9.95 EQUIPMENT BASES :

Page 108: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 108 -

Signature of Contractor No. of Corrections Executive Engineer

A cast iron or welded steel base plate shall be provided for all equipment which is to be installed on a concrete base unless otherwise agreed to by the Engineer. Each base plate shall support the unit

and its drive assembly and shall be of a neat design with pedestal anchoring the unit.

9.96 RATING PLATES, NAME PLATES AND LABELS :

Each main and auxiliary item of tower is to have permanently attached to it in a conspicuous

position a rating plate of non-corrosive material upon which is to be engraved an identifying

manufacturer’s name, equipment, type or serial number, together with details of the loading

conditions under which the item of tower in questing has been designed to operate and such diagram

plates as may be required by the Engineer.

9.97 Deleted

9.98 OPERATION AND MAINTENANCE INSTRUCTIONS:

The Contractor shall furnish to the Engineer on or before the delivery of the plant to the site or

Corporation store, the operation and maintenance instructions, erection manual, instructions for conservation of materials stored at site together with the detailed, drawings of spares and units and

other sketches in sufficient derails to enable the Corporation’s staff to operate the plant in a smooth and trouble free manner and to maintain, dismantle, reassemble and adjust all the parts or units. The

Contractor shall also furnish the maintenance Schedule for preventative maintenance of plant. The plant shall not be considered as taken over by Corporation until the operation and maintenance

instructions have been supplied to the Engineer.

9.99 MAINTENANCE TOOLS AND TACKLES :

The Contractor shall supply with the equipment complete sets of all special tools and tackles for the erection, assembly, disassembly and maintenance of the equipment as per Schedule B. However,

these tools and tackle shall be separately packed and brought on to site.

9.100 SPARE PARTS:

a) The Contactor will provide a list of spare parts and tools for proper maintains and operation of machine for a period of five years Following commissioning of the

whole system giving full particulars of the spare parts with the price of each item separately. The

Contractor shall undertake to supply during aforesaid period of five years, the said spare parts

and tools at prevailing list prices.

b) The Contractor shall either have adequate servicing and spare parts

facilities in India in respect of the equipment to be supplied or shall arrange to provide such

facilities simultaneously with supply of the equipment.

c) The Contractor shall undertake to supply the necessary maintenance Equipment and spare

parts at any time during the life of the machine.

d) The Contractor shall warrant that before going out of production of the spare parts he will

give adequate notice to the Corporation so that the latter may order their requirement of spares in

one lot if the Corporation so desires. e) The Contractor shall further guarantee that if he goes out of production of spare parts then

he will make available the blue prints, drawings of the parts and specifications of materials at no cost to the Corporation, if and when required in connection with equipment to enable the

Corporation to fabricate or procure spare parts from other sources. f) The cost of spare parts will not be considered in evaluation tenders un less otherwise stated

in Schedule `B’ and in the specifications.

9.101 ROLE AND RESPONSIBILITY:

Page 109: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 109 -

Signature of Contractor No. of Corrections Executive Engineer

The contract will be for supply erection and commissioning of the bay and allied electrical equipment. The Contractor is expected to play a full role in taking responsibly for the proper co –

ordination between various manufacturers.

9.102 ACCIDENT OR INJURY TO WORKMAN :

Corporation shall not be liable for or in respect of any damage or compensation payable at

law in respect of or in consequence of any accident or injury to any workman or other

person in the employment of the Contractor or any of this subcontractors save and except and

accident or injury resulting from any act of default of the Corporation. Contractor shall indemnify

and keep indemnified Purchaser against all Such damages and compensations, save and except as

aforesaid and against all claims, proceedings ,cost, charges and expense whatsoever in respect there

of or in relation thereto. Contractor shall insure against accident etc. to workmen provided always

that in respect of a person employed

by any of his sub-contractors the Contractor’s obligations to insure as aforesaid under this clause

shall be satisfied it the sub-Contractor shall have insured against the liability in respect of such persons in such manner that the Corporation is indemnify under the policy ,but the Contractor shall

required sub-contractor to produce to the Contractor through Contractor when require, such policy or policies of insurance and the receipt for the payment of the current premium.

9.103 TRAINING OF THE PURCHASER’S ENGINEERS (Not Applicable)

Successful tenderers will be required to grant facilities for training four Engineers to be nominated by the Corporation for manufacturing, repairs and maintenance of equipments included

in this specifications period of such training shall be minimum seven days and charges towards lodging and boarding plus to and fro first class train fair from work site to place of training shall be

arranged by the tenderer. The cost is deemed to have been included in the offer /quoted prices.

Training programme will be communicated to Contractor. In case the Contractor fails to provide training programme a panel recovery at Rs.2500/- per day will be charged.

9.104 WARRANTY

The supplier shall warrant that the goods supplied and installed under the contract are new, unused, of the most recent or current models and incorporate all recent improvements in design and

materials unless provided otherwise in the contract. The supplier shall further warrant that the goods supplied under this contract shall have no defects arising from design ,materials or workmanship.

This Warranty shall remain valid for 12 months after the date of commissioning. Supplier shall be

solely responsible for setting rights the defects in basic design ,manufacture and/or installation

observed during warranty period and execute remedial measures or replace free of cost the defective

goods or its components.

The purchaser shall promptly notify the supplier in Writing of any claim arising under this warranty

.Upon receipt of such notice the supplier shall with all reasonable speed repair of replace defective

goods or parts thereon without cost of the Purchaser.

If the suppler, having been notified, fails testing remedy the defect (S) with in reasonable period

Purchaser may proceed to take such remedial action as may be necessary at the supplier’s risk &

cost and without prejudice to any other rights which the purchaser may have against a supplier

under the contract

iv) In the event of an emergency where in the Judgment of the purchaser delay would cause serious loss or damage repairs or adjustment may be made by the purchaser or third party chosen by

the purchaser without advance notice to the Supplier & the cost of such work shall be paid supplier, or by the surety. In the event of such action being taken by the purchaser, the supplier will be

notified promptly & he shall assist whenever possible in making the necessary correction. this shall not relieve the supplier from liability under the terms and condition of contract

v) If it become necessary for the supplier to replace or renew any defection portions of the plant under this clause, the provision of this clause shall apply to the

portion of the plant so replaced or renewed until the expiration of the twelve (12) months from date

of such replacement or renewal supplier shall extend the warranty of the plant by corresponding

Page 110: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 110 -

Signature of Contractor No. of Corrections Executive Engineer

period during which plant could not be operated due to reason of replacements, repairs, renewals and testing period thereon if any.

vi) The cost of any special or general, overhaul rendered necessary during the guarantee period due to defects in the plaint or defective installation work carried out by

the supplier or under his supervision, shall be born by the supplier without extra cost of the

purchaser.

vii) The acceptance of equipment by purchaser shall in no way relieve the supplier of his

obligation under this clause.

viii) In case of those defective parts which are not repairable at site

but are essential for commercial operation of equipment, the supplier & the Purchaser shall mutually

agree to a programme of replacement or renewal which minimize interruption in the operation of the

equipment.

ix) The specifications for Electrical works are tentative. On approval of detailed designs of

equipments and components by the competent authorities the specifications are likely to be changed. The relevant specifications will be binding to the contractor and no extra claims on this

regard will be entertained.

9.105 Power charges during testing and trial.

After completion of construction activity and installation of all electrical equipment. contractor shall have to given successful testing and trial for operation of the scheme. The power

charges during such testing and trial will be born by Department.

Page 111: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 111 -

Signature of Contractor No. of Corrections Executive Engineer

GENERAL INFORMATION AND TECHNICAL

SPECIFICATIONS

Page 112: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 112 -

Signature of Contractor No. of Corrections Executive Engineer

GENERAL INFORMATION AND TECHNICAL SPECIFICATIONS

PROJECT DESCRIPTION:

The LALNALA Lift Irrigation Scheme, located in Dist. Wardha envisages a pump

house with 3 Nos. of vertical turbine pumps of capacity 450 HP each. Each pump is driven

by 6.6 KV inductions motor. The pump house is required to be provided power supply at 6.6

kV for operation of the pump motors being installed under a separate contract. Power supply

by means of single circuit transmission line at 33 kV level will be arranged up to the

proposed outdoor switchyard located at about 60 m. near to the pump house. The power

supply at 33 kV is required to be stepped down to 6.6 kV in the switchyard and this power

supply at 6.6 kV shall be extended to the pump house by means of 6.6 KV XLPE cables,

connected between L.V. side of the step down transformers in the switchyard and 6.6 kV

switchgear panels inside the pump house. The outdoor switchyard to be provided under this

specification shall have one incoming line bay and a bus with two transformer bay.

The scope of these specifications includes the work of Supply and installation , testing

and commissioning of 33 Kv outdoor switchyard equipment for Lalnala Lift Irrigation Scheme Tal

Samudrapur Dist:- Wardha

Service Conditions:

The equipment to be supplied against this specification shall be suitable for

satisfactory continuous operation under the following tropical conditions.

(i) Maximum ambient temperature in oC 46

(ii) Minimum ambient temperature in oC 6.0

(iii) Yearly average temperature in oC 36

(iv) Relative humidity in rainy season 100%

(v) Maximum annual rainfall (in mm) 1400

(vi) Maximum wind velocity (Km/hour) 10.60

(vii) Altitude above mean sea level 252.0 m

(viii) Seismic level (horizontal acceleration) (Zone III as per I.S.)

Page 113: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 113 -

Signature of Contractor No. of Corrections Executive Engineer

Detailed Scope of Work:

The scope of work shall comprise of the following:

Completing the work of 'Design, Supply, proper, packing and loading, delivery to site by

road and unloading at site, handling, storage, watch and ward at site and installation at site . As per

schedule B

2. INFORMATION ABOUT WORK SITE :

1. Location of work : Near Kora Village in Tah. Samudrapur &

District Wardha, which is 30 km from

Jam town on Nagpur- Chandrapur Road.

2. Nearest Railway Station : Butibori Railway station

3. Roads : Nagpur- Chandrapur Road

4. Telephone & Telegram Facility: At about 10 km from work site.

5. Petrol & Diesel Pumps : At 10 km from work site

Page 114: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 114 -

Signature of Contractor No. of Corrections Executive Engineer

LALNALA LIFT IRRIGATION PROJECT

TECHNICAL SPECIFICATION OF 33 kV SWITCHYARD EQUIPMENTS.

1.00 SCHEME :

For power supply to Lalnala Lift Irrigation Scheme, 33 kV out door switchyard has to be

constructed 60 meters away from pump house with 2 Nos of 2 MVA 33/6.6Kv 3 phase 50

Hz Power Transformer.. The interconnection between L. V. side of transformer and the 6.6

kV H.T. switch gear panel in pump house will be by means of 6.6 kV, 240 sq. mm.,

armoured, aluminium conductor, single core XLPE Cables

2.00 SCOPE OF WORK :

The work covered under this Specification shall comprise but not limited to the following

2.1 Manufacture, test before dispatch, proper packing, delivery to site including

loading/unloading, insurance till commissioning, storage, watch & ward, erection; testing

and commissioning of 33 kV outdoor switchyard consisting of following equipments of 33

Kv out door switchyard Lalnala Lift Irrigation Scheme.

Description Quantity Unit

Item No 1 SF6 Gas Circuit Breaker

Supply Erection , Testing and Commissioning of 36

KV rated insulation class BIL, 170 KV Peak 630 A,

17.5 KV , Breaking Capacity 3 Phase 50 Cycles,

three single Pole gang operating mechanism out

door SF6 Circuit Breaker with suitable operating

mechanism complete (as per comparative statement)

3 No

Item No 2 Isolator with Earth blade

Supply Erection , Testing and Commissioning of 36 KV rated Insulation class BIL, 170 KV Peak 200 A,

(with Maximum current capacity of 17.5 KV for 2

Secs)

3 Phase Double break center post rotating outdoor

type isolator with earth blades along with supporting

, insulators , base channels manual operating

mechanism terminal connectors etc. (as per

comparative statement)

1 No

Item No 3 Isolator without earth blade 4 No

Page 115: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 115 -

Signature of Contractor No. of Corrections Executive Engineer

Supply Erection , Testing and Commissioning of 36 KV rated installation class BIL, 170 KV Peak 200

A, (with Maximum current capacity of 17.5 KV for 2 Secs)3 Phase 50 Hz center post rotating out door

type isolator without earth blades along with supporting , insulator , base channels manual

operating mechanism terminal connectors etc. (as

per comparative statement)

Item No 4 Current Transformer

Supply Erection , Testing and Commissioning of 36

KV rated insulation class Single phase 50 cycles, 3

cores hermetically sealed outdoor type CT Having

Current ratio of 50/1-1-1 Amps (as per comparative

statement )

9 No

Item No 5 Lightening Arrestors

Supply Erection , Testing and Commissioning of 30

KV rated insulation class BIS 170 KV Peak Single

Phase 50 Hz Valve Type LA station Type, outdoor,

Lightening arrestor along with surge counter and

insulation base complete

12 No

Item No 6 Bus Bar Material

Supply Erection , Testing and Commissioning of

Bus bar material suitable ACSR conductor

suspension / tension insulators , post insulator,

hardware, power connector clamps etc , as required

to complete the work as per layout

(as per comparative statement )

1 Lot

Item No 7 Junction Boxes

Supply Erection , Testing and Commissioning of Junction boxes for each equipment in a Bay

including wiring, cabling connecting, clamp terminal

connection etc, and also marshalling boxes one for

each bay

(As per comparative statement )

1 Lot

Item No 8 Feeder Control and Relay Panel Supply Erection , Testing and Commissioning of

33/6.6 KV Feeder Control and Relay Panel to be

located inside pump house as per Specification

annexure I attached (as per comparative statement

)

1 No

Item No 9Transformer Control and Relay Panel

Supply Erection , Testing and Commissioning of

33/6.6 KV Transformer Control and Relay Panel

to be located inside pump house as per Specification

annexure I attached (as per comparative statement )

2 No

Item No 10 LT Power and Control Cables

10.1 1.1 KV Grade Armoured Aluminium

Conductors

a) Supplying ad Erecting PVC armoured cables

4core 16 sq. mm alluminum conductor with

176.00

Mtr

Page 116: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 116 -

Signature of Contractor No. of Corrections Executive Engineer

continuous 5.48 sq. mm. (12 SWG) G.I. earth wire complete erected with glands and Lugs on wall /

Trusses/ pole or laid in provided trench pipe as per specification No CBLT/ AL (as per CSR 2011-12

Item No 7-1-16 add 5 % for other than Distt. HQ )

b) Supplying Erecting PVC armoured cable 2 core

4 sq. mm aluminum conductor with continuous 5.48 sq. mm. (12 SWG) G.I. earth wire complete erected

with glands and Lugs on wall / Trusses/ pole or laid

in provided trench pipe as per specification No CB-

LT/ AL (as per CSR 2011-12 Item No 7-1-2 and add

5 % for other than Dist. HQ)

641.30 Mtr

c) Supplying Erecting PVC armoured cables 2 core

2.5 sq. mm aluminum conductor with continuous

5.48 sq. mm. (12 SWG) G.I. earth wire complete

erected with glands and Lugs on wall / Trusses/ pole

as per specification No CB-LT/ AL (as per CSR

2011-12 Item No 7-1-1 and adding 5 % for other

than Distt. HQ)

109 Mtr

10.2 Supply Erecting , Testing and

Commissioning Control Cables (Copper)

1) 2 C x 2.5 sq. mm.(CSR ITEM No.7-2-1) 308 Mtr

2) 5 C x 2.5 sq. mm. 246.40 Mtr

3) 4 C x 2.5 sq. mm. 410.30 Mtr

4.) 5 C x 4 sq. mm. 836 Mtr

6) 14 C x 2.5 sq. mm. 1843.60 Mtr

7) 4 C x 4 sq. mm. .(CSR ITEM No.7-2-9) 176.00 Mtr

Item no.11 XLPE CABLE

1) Supply erection, testing and commissioning of 6.6

KV (E), 1x 240 Sq.mm. aluminium conductor

unarmoured single core 11KV grade XLPE cable

880 Mtr

2) Termination Kit

Supplying, erecting, testing and commissioning of

Heat shrinkable termination Kit for termination of 1

x 150sq.mm alluminium XLPE cable at 440 Volt

ACDB and transformer LV terminals a) Indoor Kit

b) Outdoor Kit

24 8

No. No

Item No. 12 Potential Transformer:

Supply, erection, testing and commissioning of

33KV rated insulation class, single phase 50HZ two core hermetically seated, outdoor type voltage

transformer having voltage rates 33 KV / 110V / 110V

(As per comparative statement )

3 No.

Item No. 13 Vacuum Circuit Breaker: Supply, erection, testing and commissioning of

totally enclosed single bus bar floor mounting metal clad indoor non extensible type flush fronted,

Horizontal isolators, Horizontal draw out vacuum

circuit breaker suitable for installation in 50HZ,

2 No.

3 3 3

Page 117: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 117 -

Signature of Contractor No. of Corrections Executive Engineer

6.6KV, 630 A, 25 KA effectively earthed supply system comprising of housing for Breaker

mechanically interlocked safety shutters, 6 No insulating plugs and a VCB trolley with three

vacuum interrupters and epoxy support insulators and self aligning finger type isolating contracts truck

having integrated lock in device for inspection and

withdrawal of VCB complete with necessary

interlocks manual charged independent, spring

closing / spring tripping, trip free operating

mechanism, with manual closing and tripping push

buttons, mechanical indicators V 12. Breaker

“closed/open ” spring “Charged / Discharged ”

mechanical operation counter, electrical release coil,

breaker operated auxiliary switch with 2 No and 2

NC contact type 230 VAC / DC operated motorized

mechanism + manual operated mechanism.

01- Bus bar chamber with aluminums bus bar (PVC

sleeved / powder coated) 02- Electrical closing coil suitable for 110 VDC

03- Electrical shunt trip coil 110 VDC – 01 No 04- 230 V AC 80 watts rated space heater with on /

off switch and thermostat 02 Nos. 05- Rear cable box for 3 single core 6.6 KV XLPE

cable 06- Side cable box for outgoing cables (6.6 KV

XLPE cables

07- Current transformer:

Epoxy cast current transformer of core 1 class 1

accuracy and core 2 class 5P 10 STR of CT 25 KA

for 1.0 sec and 15 VA burden (Ratio) to be informed

by purchaser before order placement- 03 Nos.

8-Potential Transformer :

Epoxy cast type 3 phase potential transformer with

ratio

(6900/110) V/ 3 class of Acc 1.0 Burden 100

VA

Metering / Indications

09- Analogue ammeter with S/S size 144 sq mm 10- Analogue voltmeter with S/S size 144 sq mm

11- Analog type KWH meter W/o MDI with Acc class 1.0

12- breaker ON / OF indicating lamps.

13- TCH lamps

14- TNC Switch

15- R-Y-B-Phase indicating lams

16 -Spring changed indications

17-Panel Indication Lamp 18- 20/c & 1E/F relay w/0 instantaneous Equivalent

of CD4-31 (make Ashida ER eqvt.) 19: High Speed tripping relay equivalent of VAJH

13 (Make Ashida ER eqvt.) 20: -Trip Circuit Supervision Relay equivalent of

VAX31 (make Ashida ER reqvt. 21.Auxiliary Relay for transformer fault

Page 118: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 118 -

Signature of Contractor No. of Corrections Executive Engineer

annunciation (OTIWTI Alarm / Trip Buchnolz Alarmtrip) equivalent of VAA21 (make Ashrida

ER/eqvt) – 3 NOS

(As per Comparative statement)

Item No 14: Steel Structure

Supply, erecting, testing and Commissioning of Galvanized steel structure required for equipments

Gantry towers along with hardware such as nut blots

washers foundation bolt etc required for towers

gantry structures with extended peak and

supporting structures for all equipments complete

as per specification. (As per Comparative statement)

18 MT

Item No 15: mandatory spares tools and Tackles supplying at site set of spare and maintenance tools

and tackles given in schedule B part I and II

(As per comparative statement)

1 Lot

Item No. 16 Cable Racking supplying erecting at

site of work cable racking made from MS

angles/channels of routing appropriate size for

routing the LT power and control cables and 6.6 KV

XLPE cables from switch yard to pump house

above ground and also embedment in switchyard and

pump house ( As per Comparative statement)

3 Nos

Item No : 17 Cable Trays Supplying and erecting

at site Galvanized perforated cable trays (16SWG)

for laying power and control cables inside

switchyard in trenches and from switchyard to

control room and inside control room in pump house

including suitable clamps for power and control

cables required to complete the work as per

specification

(as per comparative statement )

5) 450mm wide

498 Mtr

6) 300 mm wide

50 Mtr

7) 150 mm wide

72 Mtr

8) Bends ,risers and tees 1 Lot

Item No 18 : Power Transformer :

Supply Erection, Testing and

Commissioning of 2mm 33/6.6 KV 3 Phase 50H2

ONAN outdoor core type power transformer with

2 Nos

Page 119: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 119 -

Signature of Contractor No. of Corrections Executive Engineer

high voltage bushing suitable for connection of

ACSR conductor and LV side cable end box suitable

for termination of 1x 240 sq.mm XLPE cables,

complete with fittings and accessories Supply of

rails base plate anchor bolts required for entire

length of rails including first filling of oil and

Supply of 10% additional quantity of oil in non

refundable drums vector group Ynyno (as per

comparative statement )

Item No . 19 : Earthing system Supply, Erection

Testing and Commissioning of earthing system in

switchyard with 50x10mm GI strip for connecting

structures and equipments from earthing grid GI

shield wire and various size of clamps required for

completion.

(as per comparative statement )

2 Nos

Item No.20: Station Transformer Supply,

Erection, Testing And Commissioning of 33 / 0.433 KV, 3 phase 50 Hz of oil immerged naturally cooled

indoor/outdoor type copper wound station transformer of 160 KVA capacity connected delta on

HV side and star on LV side with neutral brought out on load side Standard mountings required for

transformer are given below. The mountings are to be selected from them and any addition if required.

Thermometer Pocket

1) Off load tap changing gear.

2) Oil Conservator with lifting holes and cap

and plain oil level gauge

3) Silica gel dehydrating Breather

4) Oil drain valve

5) Thermameter Pocket

6) Oil filter Valve

7) Lifting arrangement

8) Two earthing terminals

9) Diagram and rating plate

10) Plain Bidirectional rollers

11) Air vent 12) Explosive vent

13) Terminal Arrangement 14) Bushing with Lugs and /or Cable end box on

LV side

15) HV cable end box and/or HV bushings

1 No.

Item no.21 XLPE cable 3.3 KV Supplying, erecting, testing and commissioning of 1

176 Mtr

Page 120: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 120 -

Signature of Contractor No. of Corrections Executive Engineer

x 150 Sq.mm 3.3 KV grade single core XLPE(E)

Alluminium armoured cable on wall or ceiling or

laid in provided trench/pipe in an approved manner.

Item No.21Termination Kit

Supplying, erecting, testing and commissioning of

Heat shrinkable termination Kit for termination of 1

x 150sq.mm alluminium XLPE cable at 440 Volt

ACDB and transformer LV terminals

a) Indoor Kit

b) Outdoor Kit

4

4

No

No.

Item No.22 D.O. Fuse

Supplying and erecting approved make, 33 kV out

door type drop out fuse with insulator complete with

fuse holders, fuse barrel with metal fitting, fuse element mounted on M.S. channel with working

current of 15 Amps capacity complete erected on provided cross

arm.

1 No.

Item No 23 : Mandatory spares tools and Tackles

supplying at site set of spare and maintenance tools and tackles given in schedule B part I and II

(As per comparative statement)

1 Lot

2.2 Manufacture, test before despatch, proper packing, delivery to site including loading/unloading,

insurance till commissioning storage, watch & ward ,erection, testing and commissioning ,of

control and relay panels for following :

1. 33 kV Breaker Control 1 No. Inside pump house

Panel. of Lalnala.

2. 33/6.6 kV Transformer 2 No, Inside pump house

Control and protection Panel. of Lalnala.

3. Spares for above panels. 1 Set.

----------------------------------------------------------------------------------------------------------------------------------

2.3 Manufacture, test before despatch, proper packing, delivery to site including loading and

unloading, insurance till commissioning, storage ,watch & ward ,'proper laying, clamping and

termination of necessary control and L.T. power cables between various equipment, junction

boxes, marshalling boxes and panels located inside pump house,switchyard and elsewhere.

2.4

The Preparation of CABLE SCHEDULE is also included in the scope of supplier. Contractor

shall submit the Power & control cable schedule for approval incorporating length of each

cable to be laid for scheme.

Page 121: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 121 -

Signature of Contractor No. of Corrections Executive Engineer

2.4 Design, manufacture, test before dispatch, proper packing, delivery to site

including loading/unloading, insurance, storage, watch & ward, erection of galvanized cable

trays and clamps for cable laying.

2.5 Design, fabrication and erection of cable racking of M.S. angles/channels of appropriate

size.

2.6 Preparation of layout drawings of various equipment showing therein clearance,

foundation details, all dimensions etc. and also of cable trenches, racking arrangement etc.

2.7 Design and preparation of civil foundation drawings to enable the purchaser to construct the

foundation accordingly.

2.8 It will be the responsibility of the successful tenderer to obtain statutory clearances of the

appropriate authorities for execution and commissioning of works mentioned in the

specification. Formalities/Approval of drawings and obtaining clearance certificate from

Electrical Inspector shall be the responsibility of the tenderer. Any expenditure, inspection

fees etc. required to be incurred on this account shall be borne by the Tenderer and the same

shall be deemed to have been included in the prices quoted by the Tenderer.

2.9 SPARES FOR LALNALA SWITCHYARD :

A) LIST OF MANDATORY SPARES

Description

Quantity

Rate Amount

a) FOR CIRCUIT BREAKER:

1. Closing coils 2 No 13000.00 26000.00

2. Tripping coils 2No. 13000.00 26000.00

3. SF6 gas refilling device 1 No. 30000.00 30000.00

4. SF6 gas bottle 9 kgs 2 Nos. 45000.00 90000.00

5. Set of various gaskets used in assembly of breaker

1 Set. 15000.00 15000.00

b) FOR ISOLATOR :

1. Set of male/female contacts for each phase of one complete isolators.

2 Set. 22000.00 44000.00

2. Auxiliary switches 10 NO + 10 NC 2 Set. 12000.00 24000.00

3. Set of stack of insulator required for one phase of isolator.

2 Set. 6500.00 6500.00

Page 122: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 122 -

Signature of Contractor No. of Corrections Executive Engineer

c) FOR BUS BAR MATERIAL:

1. Tension insulator strings comprising of

required no. of insulators for one phase complete with hardware.

1 Set 7500.00 7500.00

d) FOR RELAY AND CONTROL PANEL:

1. Push buttons 10 Nos. 400.00 4000.00

2. 8 Way annunciation fascia windows 2 Nos. 12000.00 24000.00

3. Bulb for indicating lamps 25 Nos. 50.00 1250.00

4. Colour plastic domelens for lamp of various colours 10 Nos 100.00 1000.00

5. Resistors for indicating lamps 10 Nos 75.00 750.00

6. HRC fuse/MCB/MCCB of associated

rating for control circuits (10 Nos. of each

rating for fuses and 1 No. for MCCB/MCB)

1 Set 10000.00 10000.00

e. For Power Transformer

Filter valve Explosion vent diaphragm Oil temp. indicator Winding temp. Indicator Magnetic oil Level gauge Breather 33 kV bushing Neutral bushing (HV side) Buchholz relays.

1 Nos

1 Nos

1 Nos

1 Nos

1 Nos

2 Nos

2 Nos

2 Nos

1 Nos

.

6900.00

6000.00

25000.00

30000.00

25000.00

4500.00

7500.00

2500.00

30000.00

6900.00

6000.00

25000.00

30000.00

25000.00

9000.00

15000.00

5000.00

30000.00

Total 461900.00

B) LIST OF MAINTENANCE TOOL

Sr.

No.

Description Quantity Rate Amount

1 1000 Volt megger Battery operated/Hand

operated

1 No 4500.00 4500.00

2 2500/5000 Volt megger Battery/AC/DC

in addition to Hand operated

1 No. 8000.00 8000.00

3 Earth tester battery operated /AC/DC

supply operated

1 No. 5000.00 5000.00

4 Telescope ladder for street light pole 1 No. 35000.00 35000.00

Page 123: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 123 -

Signature of Contractor No. of Corrections Executive Engineer

5 Digital display multimeter battery

operated 0-5 AC/DC 0-1000V range

AC/DC 4 resistance range, input

resistance not less than 1 ohm

1 No 6000.00 6000.00

6 Tong Tester 1 No. 6000.00 6000.00

Total 64500.00

E) Power Transformer 2 MVA

2.10 It is not the intent to completely specify details of the design and construction of various

equipment. However, the equipment shall conform in all respect to high standards of

engineering, design and workmanship. It shall be capable of performing continuous commercial

operation in a manner acceptable to the purchaser who will interpret the meanings of drawings

and specification and shall have power to reject any work or material which, in his judgment is

not in accordance with all components necessary for their effective and trouble free operating.

Such components shall be deemed to be within the scope of supplier's supply, irrespective of

whether these are specifically brought in this specification and/or commercial order or not.

3.0 2 No.33/6.6 kV, 2 MVA, 3 phase, 50 cycle/sec. ONAN cooled, outdoor type power

transformer fitted with off load tap changer on H.V. side for voltage variation ±10% in steps

of 1.25%, 3 Nos. high voltage bushings suitable for connections to ACSR conductors,

complete with first filling of oil and various fittings as per specification and confirming to

standards in accordance with clause No. 3.00. This transformer shall be installed at Lalnala

Switchyard.

4.00 AUXILIARY POWER SUPPLY :

The auxiliary electrical equipment shall be suitable for operation at following supply which

will be made available by the purchaser.

A.C.-415 V, 3 phase, 4 wire, 50 Hz, neutral grounded.

D.C. - D.C. source from battery at 110 V, central point earthed.

The above supply system may have following variations -

A.C. Supply voltage + 10%

Frequency variation - 3% to +5%

Combined A.C. and frequency +/- 10%

Variation

D.C. Supply voltage variation -15% to + 10%

Page 124: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 124 -

Signature of Contractor No. of Corrections Executive Engineer

5.00 DETAILED TECHNICAL SPECIFICATIONS :

5.1 SF-6 CIRCUIT BREAKERS :

5.1.1. The breaker shall conform to the specific technical requirements mentioned below -

----------------------------------------------------------------------------------------------------------------

Sr. No. Items Switchyard at Lalnala

----------------------------------------------------------------------------------------------------------------

1. Type SF-6

2. Number of Poles 3

3. Installation outdoor

4. (a) Rated Voltage 33/36 kV

(b) System Voltage 33 kV

5. System frequency 50 Hz

6. Continuous current rating(A) 630

7. System neutral grounding Effectively Earthed.

8. Mounting On hot dip galvanized steel

support structures to be

supplied by the supplier.

9. Type of operation Three single poles, gang operated.

10. Height of concrete plinth 300 mm.

above ground level (to be

provided by the Purchaser).

11. Min. height of the lowest 2500 mm.

part of the support insulator

from ground level

12. Rated operating duty cycle. 0-0.3 Sec-CO-3 min-CO

as per IEC 56.

13. Maximum closing time 150 ms.

14. Maximum total break time 100 ms.

at rated breaking capacity.

15. 1.2/50 micro-second impulse 170 kV

withstand voltage.

16. One minute power frequency 275 kV (rms)

Page 125: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 125 -

Signature of Contractor No. of Corrections Executive Engineer

withstand voltage

17. a) Short circuit current & duration. 17.5 KA / 2 Seconds.

b) Percentage D.C. component Corresponding to minimum

opening time as per IEC-56.

18. Permissible limit of temperature.

a)Maximum permissible temperature. 90°C

b) Temperature rise at a

maximum temperature not exceeding 45°C

19. Rated control voltage 110 V.DC.

----------------------------------------------------------------------------------------------------------------

The breaker will be required to break small inductive currents and line charging current

without causing excessive over voltage, and charging current without re strike.

The breaker shall consist of three single phase units linked together mechanically. The basic

design, shall be such that the closing and tripping time of individual pole shall be constant,

under all conditions for faults or normal tripping, at specified range of pressure and

temperature. All the three phases will be required to open or close at a time and within the

specified range of pole discrepancy.

The breaker shall be suitable for local as well as remote operation from the control room

in pump house. In addition to this, there shall be provision for local manual closing and

tripping in case of failure of control supply. Also provision shall be made for emergency

tripping from supervisory panel. The operating mechanism shall be spring charging type

by electrical duty. The entire operating mechanism, control circuitry, spring charging motor

etc. as required, shall be housed in an outdoor type (water proof) sheet steel box.

The box shall conform to the degree of protection IP-55 of IS 2197 and shall be mounted on

a separate concrete plinth of approx. 300 mm. height being provided by the purchaser.

5.1.2 CONTROL CIRCUITS :

The breaker control circuit shall include the following features :-

1. Electrically independent trip circuit.

2. One local/remote selection switch.

3. Conveniently located manual emergency trip.

Page 126: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 126 -

Signature of Contractor No. of Corrections Executive Engineer

4. While opening and/or closing, all the three poles shall operate simultaneously.

5. Anti.-pumping feature.

6. Independence of trip circuit from local/remote selection.

7. Alarms, .indications, monitoring equipments and interlocks as specified elsewhere.

8. Auxiliary switches.

Each operating mechanism of the circuit breaker shall be provided with

auxiliary switches with ten ( 10) NO and ten (10) NC contacts exclusively for the

purchaser use with continuous current rating of at least 10 A D.D breaking capacity

of the contacts shall be min. 2 A with circuit time constant less than 20 milli seconds

at the rated D.C voltage. Normal position of auxiliary switches refers to contact

position when circuit breaker is open

9. Interlocking.

10. Trip circuit supervision for pre trip as well as post trip.

5.1.3 ALARMS AND INDICATIONS :

Potential free contacts shall be provided, duly wired upto the operating mechanism

housing/control cabinet for the following alarms and indications on the control panel.

ALARMS :

1. General leakage of SF6 Gas.

2. Low pressure of SF6 Gas.

3. Control circuit unhealthy.

4. Auxiliary D.C. Supply failure.

5. Local Breaker Back operated.

INDICATIONS :

i) Breaker ON/OFF.

ii) Spring charged.

MECHANICAL INDICATION :

Page 127: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 127 -

Signature of Contractor No. of Corrections Executive Engineer

The operating mechanism shall be provided with the following mechanical

indications/counters.

i) Breaker ON/OFF.

ii) Operation counter to register the no. of breaker operations

5.1.4 SF-6 GAS AND FEATURES :

The SF-6 breakers, shall, be supplied with first filling of SF-6 gas, which shall have

excellent insulating and nonpoisonous arc extinguishing property.

Following features shall be provided for monitoring of SF-6 gas in the breaker.

i) SF-6 gas density meter with two potential free contacts of suitable rating. One of

these contacts shall be used for annunciation of low density. The other -contact shall

be used by the Supplier to ensure breaker Lock out in the event of low SF-6 gas

density. The successful tenderer shall furnish a chart showing relation between

pressure and density of SF-6 gas, as well as settings for alarm and lockout.

ii) Suitable pressure gauges shall be provided for SF-6 gas. Gauge dials shall be clearly

visible with naked eye to an observer standing on ground.

iii) Adequate number of pressure switches shall be provided for monitoring pressure of

SF-6 gas. The pressure switches shall be provided with sufficient number of potential

free NO and NC contacts for purchaser's use in control, protection and alarm circuit.

The tenderer shall furnish along with the bid, detailed schematic drawing showing all types

of control , protection, monitoring schemes to be employed by him. The successful tenderer

shall be required to modify the schemes, if necessary, after discussions with the purchaser.

Closing coil shall operate correctly at all values of voltage between 85% and 110% of the

rated control voltage and trip coil shall operate correctly at values of voltage between 70%

and 110% of the rated control voltage.

5.1.5 TAKE OFF TERMINAL PADS

5.1.5.1 Terminal pads shall be provided with silver plating of at least 25 microns thickness if these

are made of metal other than Aluminum. No such plating shall be required if the terminal pad is

Page 128: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 128 -

Signature of Contractor No. of Corrections Executive Engineer

made out of Aluminum, The pads shall be suitably designed to take the approximate terminal loads,

even under worst conditions of operation.

5.1.5.2. The breaker shall be designed to withstand the rated terminal load, wind load / earth

quake load and short circuit forces. The short circuit forces to be considered for the design shall be

based on length of bus bars consisting of conductors and phase to phase spacing shown below :

---------------------------------------------------------------------------------------------------------------------

Voltage Between live parts and Phase to phase

grounded structures spacing.

----------------------------------------------------------------------------------------------------------------

36 kV 2000 mm 1500 mm,

----------------------------------------------------------------------------------------------------------------

5.1.5.3 The current density adopted for the design of the terminal pad shall in no case

exceed 1.6 A/Sq.mm. for copper pad and 1.0 A/Sq.mm, for pad made of other

material.

5.1.5.4 The vertical clearance of lowest terminal pads from ground level (including concrete

foundation plinth) shall be as given below. In no case the height less than indicated

will be accepted.

33 kV breaker - 3700 mm

5.1.6 PORCELAIN HOUSING :

5.1.6.1 The porcelain housing for the interrupter shall be of a single piece construction without any

joint. It shall be made .of homogeneous, vitreous porcelain of high mechanical and dielectric

strength. Glazing of porcelain shall be of uniform brown or dark brown colour with smooth

surface arranged to shed away rain water or condensed water particles (fog).

Breaking units shall be mounted on insulator column of three/four insulators in each column.

5.1.7 GALVANIZING :

Page 129: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 129 -

Signature of Contractor No. of Corrections Executive Engineer

All ferrous parts including nuts, bolts, plain and spring washers of size M 10 and above,

support channels, structures etc. shall be hot dip galvanized confirming to latest IS. 2629 or

any other equivalent authoritative standard. All other fixing nuts, bolts, washers of size

below M 10 shall be made out of stainless steel.

5.1.8 MOUNTING :

5.1.8.1 The design and supply of support structure, required for mounting the circuit breaker in

purchaser's switchyard, shall be in the supplier’s scope. The supplier’s scope

also includes foundation bolts, nuts, plain washers, spring washers etc. necessary for the

support structure. The support structure can be lattice type and shall be made out of hot dip

galvanized steel, wheel mounted type support shall not be accepted. The support structure

shall be installed on a concrete plinth of 300 mm. height to be arranged by the purchaser.

The height of the support structure shall meet the following requirements.

I) Vertical clearance of lowest terminal pad as specified in Clause 5.1.5.4.

ii) Minimum height of 2200 mm. above the top of concrete plinth (This is a Statutory

Regulation).

5.1.8.2. The circuit breaker shall be connected to adjacent equipment in the switchyard

through ACSR MINK conductor.

5.1.8.3 The loading data to be considered by the supplier for design of support structure shall

include the following :

i) Dead weight of the circuit breaker structure, Bus bars.

ii) Operational steady state and impact loading.

iii) Wind load on the circuit breaker structure, bus bars.

iv) Short circuit forces.

The support structure shall be designed on the basis of applicable Indian / International

Standards and codes of practice.

5.1,8.4 The successful tenderer shall furnish following details along with first lot of

drawings to be submitted by him.

i) Mechanical loading data considered for design of support structure. This data

Page 130: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 130 -

Signature of Contractor No. of Corrections Executive Engineer

should be supported by calculations,

ii) Detailed structural design calculations.

iii) Loading Data necessary for the purchaser to design foundations.

5.2 ISOLATOR :

5.2.1. STANDARD :

Isolators shall conform to Indian Standard specification No. IS-1818-1972 or latest

amendment thereof.

5.2.2 TYPE & RATING :

Isolators shall be suitable for following :-

Type : Outdoor, Double break 3 pole.

Rated Voltage : 36 kV r m s

System Voltage : 33 kV

Rated frequency : 50 c/s.

Rated normal current : 200 Amps.

Short circuit current and duration : 17.5 KA (r.m.s) for 2 sec.

Insulation level : 170 kV peak.

One minute power frequency

withstand voltage : 70 kV(peak) r m s.

Operating Mechanism : manual .

The equipment shall be capable of carrying fault current corresponding to maximum

breaking capacity of the circuit breakers for a period of 3 seconds.

The Isolator shall be equipped with self aligning high pressure contacts. The shape of the

contact shall be such as to avoid pitting caused by discharge due to residual capacitive

charges in the line.

The frame work shall be corrosion resistant.

Page 131: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 131 -

Signature of Contractor No. of Corrections Executive Engineer

5.2.3 TYPE & DESIGN :

The isolators shall be outdoor type, three post double break (centre rotating) motor operated,

mounted on channel iron base. The isolators shall withstand the impulse and power

frequency test voltage as per relevant standards.

5.2.4 OPERATION MECHANISM :

The isolator shall be provided with manually operated mechanism, gang operated through

crank and reduction gear, for main switch and lever/hand on the operating shaft for earth

switch. The isolator shall be operated with minimum force and ease. The operating

mechanism shall provide quick, simple and effective operation. The operating mechanism

shall be suitable to hold the main switch and earth switch in closed or opened position at any

circumstances.

5.2.5 TERMINALS :

Isolators shall be provided with suitable terminal arrangement at each end for connecting of

ACSR conductor, Guide eyes of galvanized steel and suitable for connecting the ACSR

conductor shall be provided at both ends. All current carrying connections shall be multi bolt

type using bolts and nuts of suitable rustless non-magnetic material with suitable spring

washers.

5.2.6 CONTACTS :

The design and arrangement of contact shall be such that adhesion does not occur and shall

be subject to approval of purchaser. Copper/brass parts forming a contact face shall be

coated with silver,

5.2.7 GALVANIZING :

All iron and steel parts shall be hot dip galvanized. All pins in rotating and- moving parts of

the operating mechanism shall be non rusting steel provided with brass bushings.

All bolts and nuts for attaching the base of mechanism assembly, to the switch parts and for

mounting the switch base and operating mechanism etc. shall be supplied.

Page 132: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 132 -

Signature of Contractor No. of Corrections Executive Engineer

5.2.8 AUXILIARY CONTACTS :

The isolators shall be provided with following auxiliary contacts for indications, interlocking

etc,

i) Main blade contacts 12 N/O contacts & 12 N/C contacts.

ii) Earth blade 6 N/O contacts & 6 N/C contacts.

They shall be completely wired and terminals brought out on the terminal blocks of the

operating control cubicle of the disconnector.

The disconnector shall remain in position in case of heavy shocks due to earthquake.

5.2.9 INTERLOCKS :

Suitable electrical and mechanical interlocking system shall be provided to ensure following

conditions :-

(a) It shall be possible to operate the isolator only after the mechanism of the

corresponding circuit breaker has been locked in the open position,

(b) It shall be possible to operate the circuit breaker only after all the isolators associated

with it have been locked in either the closed or open position.

(c) Operation of the earth switch shall be possible only when the isolator is in open

position.

Full details of the inter-locking system proposed shall be given by the successful

tenderer.

5.2.10 INSULATORS :

The insulators used for isolating switches shall be made of the best electrical quality

porcelain. The porcelain shall not engage directly with hard metal and where necessary, an

approved yielding material shall be interposed between the porcelain and fittings. All fixing

material used shall be of approved quality and applied in an approved manner and shall not

enter into chemical action with metal parts or cause fracture by expansion in service. Where

cement is used as a fixing medium, cement thickness shall be as small and even as possible

Page 133: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 133 -

Signature of Contractor No. of Corrections Executive Engineer

and proper care shall be taken to correctly centre and , locate the individual parts during

cementing.

Clamps and fixtures made of malleable steel shall be galvanized. All bolts and nuts unless

otherwise approved shall be locked by means of lock nuts or other approved means. Threads

of all bolts shall be greased before erection.

5.2.11 GROUNDING SWITCHES/EARTH BLADES :

The relevant isolators shall be provided with Triple pole, gang operated grounding blade

with necessary operating mechanism, down-take rod, guide bearing and operating mechanism,

auxiliary switch, wiring up to the terminal box and marshalling kiosk, with locking mechanism

either in 'ON' or 'OFF' position.

5.3 INSTRUMENT TRANSFORMERS :

The insulation of the instrument transformer shall be so designed that the internal insulation

shall have higher electrical withstand capability than the external insulation. The dielectric

withstand values specified in this specifications are meant for fully assembled instrument

transformer.

The porcelain housing shall be of a single peice construction without any joint or coupling.

The housing shall be made of homogeneous, vitreous porcelain of high mechanical and

dielectric strength.

Insulating oil required for first filling of the instrument transformers shall be covered in

supplier's scope of supply. The oil shall meet the requirements of IS-335 with latest

amendments, if any.

The instrument transformers shall be vacuum filled with oil after processing and thereafter

hermetically sealed to eliminate breathing and to prevent air and moisture from entering the

tanks.

Page 134: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 134 -

Signature of Contractor No. of Corrections Executive Engineer

The instrument transformers shall be complete with all fittings, drain and sampling valves,

earthing terminals, terminal box etc. and shall withstand satisfactorily dielectric test voltage,

corresponding to basic insulation level.

Instrument transformer provided with nitrogen cushion for compensation of oil volume

variation shall be provided with prismatic type oil sight window at suitable location so that

the oil level is clearly visible with naked eye to an observer standing at ground level. If

metal bellow is used for the above purpose, a ground glass window shall be provided to

monitor the position of metal ballow.

For compensation of variation in volume of the oil due to temperature variation ,nitrogen

cusion or Stainless Steel hallows shall be used. Rubber diaphragms shall be permitted for

this purpose.

Metal tanks of instrument transformers shall be provided with two separate earthing

terminals for bolted connection by 50 x 8 mm flats for connection to station earth-mat,

Instrument transformers shall be provided with suitable lifting arrangement to lift the entire

unit. Lifting arrangement (lifting eye) shall be positioned in such a way so as to avoid any

damage to the porcelain housing or the tanks during the process of lifting for installation/

transport. The general arrangement- drawing shall show clearly the lifting arrangements

provided, such as lifting eye, guide etc.

5.3.1 CURRENT TRANSFORMERS :

Current transformers shall be as per technical specification given below.

--------------------------------------------------------------------------------------------------------------------------------

St. No, Item Switchyard at Lalnala

--------------------------------------------------------------------------------------------------------------------------------

1. 2. 3.

--------------------------------------------------------------------------------------------------------------------------------

1. Type of C.T./Installation Single phase/Dead tank/Four core/

outdoor / oil Filled & Hermetically

sealed.

2. Type of mounting Pedestal type

3. Suitable for system frequency 50 Hz

Page 135: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 135 -

Signature of Contractor No. of Corrections Executive Engineer

4. Method of earthing the

system to be connected. Effectively earthed.

5. Rated continuous current (A) 120% of the rated primary

current.

6. Acceptable limit of tempera- As per IS 2705

ture rise above the specified

ambient temperatures for

continuous operation at rated

current.

7. Current Ratio, 80 /1/1/1/1 A

Purpose. Protection & metering.

8. Rated insulation class, 36 kV {r.m.s.)

9. Basic insulation level. 170 kV(Peak).

10. 1 Min dry power frequency

withstand voltage primary 70 kV (r,m.s,)

11. Power frequency over voltage As per clause 7.4 & 7.5

withstand requirement for of IS-2705 (part-I 1981)

secondary winding.

1.2 Minimum creepage distance of 25mm/kV of highest

porcelain housing, system voltage.

13, Rated short time current 17.5 KA (r. m. s.)/ 2 Sec.

and duration.

14. Core details core C.T.

Core No. I II III IV

Purpose. Protection Protection Metering Spare

Burden (VA). 30 30 40 30

Class of accuracy. 5P10 PS 0.5 PS

Page 136: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 136 -

Signature of Contractor No. of Corrections Executive Engineer

The C,T,. secondary terminals shall be brought out in a weather proof terminal box. The

terminal box shall be provided with a removable gland plate and glands, Polarity shall be

invariably marked on each primary and secondary terminal, Facility shall be provided for

short circuiting and grounding of the C,T, Secondary terminals inside the terminal

The glands shall be suitable for 1100 volts grade, PVC insulated, PVC sheathed, multi core,

4 sq.mm. stranded copper conductor armoured PVC cable. The terminal box shall be dust

and vermin proof..

The C,T. characteristic shall be such as to provide satisfactory performance for burdens

ranging from 25 % to I00 % of rated burden over a range of I0% to I00% of rated current in

case of metering CT and up to the accuracy limit factor/knee point voltage in case of

protection CT.

Note : Details of Power Transformer : 2.No., 4 MVA, 33/6.6 kV, 3 Phase, 50Hz, YNyno, ONAN

cooled. Any additional detail, if required shall be furnished to successful Tenderer.

5.3.2 POTENTIAL TRANSFORMERS :

The Potential transformer shall be as per technical specifications given below :

1. Type. Single phase/outdoor type/oil

filled & hermetically sealed.

2. Type of Pedestal type

mounting.

3. Rated voltage

factor. 1.5 for 30 seconds

4. Core details Core-I for metering,

& purpose. Core - II for protection.

Core - III for spare,

5. Class of Metering - 0.5

accuracy. Protection - 0.5

6 . Voltage ratio. 33. kV / 110 V / 110 V / 110 V

√3 √3 √3 √3

7. (a) Rated Voltage. 36 kV.

(b) System Voltage. 33 kV.

Page 137: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 137 -

Signature of Contractor No. of Corrections Executive Engineer

8. Basic 170

Insulation

level (KVP).

9 One minute dry

power frequency

withstand voltage

(kV r.m.s.)

Primary terminal 70

Secondary terminal 2

10. Min. creepage 25 mm/kV of highest

distance (mm) system voltage.

11. Burden (VA)

Core - I 100

Core - II 100

The P.T. Secondary terminals shall be brought out in a weather proof terminal box. The

H.R.C. fuses meant for protection of secondary windings shall also be located in the terminal

box. The terminal box shall be provided with removable gland plate and glands suitable for

1100 volts grade PVC insulated, PVC sheathed, multi core , 2.5 sq. ram. stranded, copper

armoured cable. The terminal box shall be dust and vermin proof. Polarity shall be

invariably marked on each potential transformer at the secondary terminals in the terminal

box.

The N-end of primary shall be connected to earth through a link which can be removed for

testing purposes.

5.4 LIGHTNING ARRESTORS :

The lightning arrestors shall be as per specifications given below :

1. Type Zinc oxide gapless type

lightening arrestor

long duration class III

2. Installation Out-door.

Page 138: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 138 -

Signature of Contractor No. of Corrections Executive Engineer

3. Nominal System 33 kV

Voltage

4. System highest 36 kV

Voltage

5. Rated voltage of 30 kV r.m,s.

arrester,

6. Rated frequency, 50 Hz.

7. No of phases, 3

8. System neutral Effectively earthed neutral

earthing, grounding system.

9. Nominal discharge 5000 Amps.

current

10. Maximum line to Not exceeding 80% of highest

earth voltage, system voltage of 36 kV.

11. Mounting. Pedestal.

12. Equipments to Power transformers, and 33 kV

be protected, switchgear equipment

13. Maximum 1.2/50 108 kV peak.

microsecond impulse

spark over voltage.

14. Whether overhead

shield wire on

switchyard equipments

provided.

Lightning attester shall be equipped with surge counter, and insulating base. Arrestor shall

ensure endurance for discharging multiple strokes, long duration discharges and switching

surges. The arrester units shall be perfectly sealed to prevent atmospheric influences.

5.5 GALVANIZED STEEL STRUCTURES :

5.5.1 The galvanized steel structures shall be of lattice type of fabricated construction. They shall

be hot-dip galvanized.

The quality of hot-dip galvanization shall be determined by tests given in IS 728-1959

"Methods for determination of weight, thickness and uniformity of coating on Galvanized

Page 139: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 139 -

Signature of Contractor No. of Corrections Executive Engineer

articles other than wires and sheets". All punching / drilling work shall be completed and the

burrs shall be removed before putting the members for galvanizing.

5.5.2 The structure for each equipment shall be complete with necessary bolts, nuts, washers etc.

for foundation and also for mounting of equipment.

All the structures shall be designed to withstand following conditions :

1) WIND PRESSURE LOADING :

Wind pressure in any horizontal direction of 150 kg/mm2 on 1.5 times the projected area of

each member of one face of built up column and on net area of other portions of the

structure. On all the conductors and insulators carried by the structure, the wind pressure

shall be allowed at the rate stated above on 2/3 times the projected area.

2) GRAVITY LOADING :

This wilI consist of the dead weight of all conductors and apparatus carried by the structures

including structure's own dead weight.

3) TENSION LOADING :

Tension in the conductor and ground wire shall not exceed 900 Kg.

4) FACTORS OF SAFETY

All structures must be designed with a minimum factor of safety of 2.5 under the

maximum conditions of loading referred above, based on the yield points of the materials as per

relevant IS.

5.5.3 The quantity of steel structure mentioned under clause Sr. No. 6 is tentative. The payment

will be made @ unit rate on the basis of the actual quantity arrived at after detailed design.

5.6 BUS BAR MATERIAL :

a) CONDUCTOR :

The conductor shall be stranded ACSR MINK and shall conform to relevant Indian

or British standard specification.

b) CLAMPS :

The various clamps required shall conform to the following specifications.

Page 140: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 140 -

Signature of Contractor No. of Corrections Executive Engineer

The clamps shall be of low grade aluminum alloy, complete with nuts, bolts,

washers. The joints between the copper terminal and ACSR conductor shall be

ensured through bi-metallic plates. Sufficient contact pressure should be maintained

to ensure low contact resistance but not so great as to cause relaxation of the joints

by cold flow. The design of the joint between the clamp and the conductor or

equipment terminal should be such that the pressure is maintained within the said

range under all conditions of services.

To avoid excessive local pressure, the contact pressure should be evenly distributed

by using pressure plates or washers of adequate area and thickness.

All the edges and corners shall be rounded off to avoid corona effect due to

sharpness.

Bimetallic joints should be protected from the effects of electrolytic action.

The resistance of the clamps shall be very low.

c) BUSH INGS :

The high voltage bushings used in circuit breaker, instrument transformers and other

equipment covered in these specifications shall conform to the latest edition of

British Standard Specification No. BS 223 or equivalent Indian Standard

Specification 2099.

The rating of high voltage bushings shall be properly coordinated with the ratings of

equipments for which they are to be used.

The bushings shall be of porcelain oil filled condenser type and shall have ample

insulation, mechanical strength and rigidity for satisfactory operation under

climatic conditions specified in clause No, 2.00 Under Annexure-I , "Service

Conditions". Oil filled bushing shall be free from oil leakage and shall be provided

with suitable sight guage to show the oil level in the bushing. Approved means shall

be provided to ensure that the correct oil level is maintained. It shall be provided

with convenient means for sampling

Page 141: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 141 -

Signature of Contractor No. of Corrections Executive Engineer

and draining the oil. The bushing shall be designed to prevent accumulation of

explosive gases and to provide adequate oil circulation to remove internal heat. The

bushings shall be so designed that there will be no undue stress on any part due to

temperature variations. Adequate means shall be provided to accommodate

expansion of the conductor.

The, bushing shall be entirely free from radio disturbances when operating at

voltage up to 10 % above the rated voltage and shall be free from corona effects. All

bushings shall be equipped with suitable terminals of approved type and size.

The porcelain used in construction of bushing shall be homogeneous, free from

lamination, hair cracks, cavitations and other flaws or imperfections that might be

thoroughly vitrified, tough and impervious to moisture. The glazing of the porcelain

shall be free from imperfections such as blisters and burns.

d) INSULATORS :

All post, suspension and tension insulators as required for 33 kV switchgear and

other connections shall conform to Indian Standard specification No, 7311971 with

latest amendment thereof. The tension and suspension fittings (Hardware) shall be as

per IS 2486 (Part I & II) 1971, with basic insulation

Level of 170 kV (peak)and one minute, power frequency with-stand voltage of 70

kV r. m. s.

All the insulators shall be complete with necessary hardware fittings. The

suspension and tension insulators shall be so arranged that the maximum loading on

them does not exceed 200 kg. and 900 kg. respectively. Every suspension and

tension insulator string for 33 kV system shall be provided with arcing horns both on

the conductor and disc and at the structure and disc. The design and location of the

arcing horns shall be such that it will reduce the liability of damages to the

conductor, clamps and insulators units under all flash over conditions and it shall not

present a foot-hold or porch for large birds. The design of arcing horns together with

Page 142: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 142 -

Signature of Contractor No. of Corrections Executive Engineer

complete description and data shall be submitted to the purchaser for approval before

use.

The porcelain shall not engage directly with hard metal and where necessary, an

approved material shall be interposed between the porcelain and fittings. All fixing

material used shall be of approved quality and applied in an approved manner and

shall not enter into chemical action with the metal parts or cause fracture by

expansion in service. Where cement is used as fixing medium, cement thickness shall

be taken to correctly centre and locate the individual parts during cementing.

The arrangements of connections and method of joining them to the apparatus shall

be such that the expansion or contraction of the connections shall not subject the

associated apparatus to any stress.

Joints between bus and tee off connections shall securely clamp the conductor and

at the same time provide, ample contact surface for carrying the full rated ,current

of the, equipment. The design of the joints and connectors shall facilitate the

breaking of these joints, when required. Special care shall be taken to avoid the

possibility of any electrolytic action between conductors, clamps and materials of the

apparatus. The connector should be bi-metallic wherever necessary.

As the ACSR conductor is to be used for switchyard connections, the suspension

insulators, strings, clamps, jumper connection etc. shall be suitable for connections

between ACSR conductors. Two sets of earthing rods for 33 kV shall be provided for

temporary earthing of the bus conductor or circuit connections during outage and

repairs.

Any other minor items, forming the part and parcel of bus bar material, shall be

deemed to be included in the scope, though not specifically stated here.

Page 143: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 143 -

Signature of Contractor No. of Corrections Executive Engineer

5.7 EARTHING MATERIALS :

Not applicable

5.8 SUPPORTING INSULATORS :

Wherever required sufficient numbers of Support insulators alongwith supporting structures

etc. shall be provided in 33 kV Switchyard to restrict the length of jumper connections.

5.8.1 JUNCTION BOXES/MARSHALLING BOXES :

Each equipment shall be provided with a junction box as near as possible to the

equipment. In addition one marshaling box shall be provided. Box shall be fabricated from

sheet metal steel and shall be outdoor type , weather and vermin proof with hinged door and

lock. They shall be duly painted from inside and outside as per standard industrial type

painting.

Each box shall have detachable gland plates for incoming and outgoing cables. Each box

shall contain adequate terminal strips for cable connections. The terminals shall be of

ELMAX - 10 type or equivalent with 20 % extra terminals.

5.9 CONTROL AND RELAY PANELS :

5.9.1 CONSTRUCTION DETAILS:

Panels shall be free standings, floor mounting type and shall be of simplex design with doors

at the rear. For the transformers and Incoming feeders, suitable types of control and relay

panels shall be offered. All the panels shall be of same height of 2250 mm. Panels shall be

made of rigid welded structural frames, enclosed completely with smooth finished hot rolled

sheet steel of thickness not less than 2mm. for front, rear, sides, top and bottom portions.

There shall be sufficient reinforcement to provide level surfaces, resistance to vibration and

rigidity during transport and installation. Panels shall, be completely metal enclosed and

shall provide a degree of protection not less than IP 44 in accordance with IS 2147. Each

simplex panel shall be provided with hinged full doors at the back. The doors shall be

provided with 3 point locks operated by suitable handle. Bottom plates of the panels shall

Page 144: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 144 -

Signature of Contractor No. of Corrections Executive Engineer

be provided with removable gland plates to allow cable entries from the bottom. Gland

plates shall be suitable for fixing the cable glands at an elevated height, of at least 200 mm.

above the base frame.

Design, material selection and workmanship shall be such as to result in neat appearance,

both inside and outside, with no welds, rivets or bolt heads apparent from outside. Steel

sheets shall be suitably treated to achieve neat appearance and long life. Final painting of

panels shall be done with synthetic enamel paint of light grey color to shade No. 631 as per

IS-5 for exterior and white for interior.

5.9.2 WIRING, FUSES AND TERMINAL BLOCKS :

All wiring shall be carried out with 1100 volts grade, single core, multistrand, flexible,

copper wires, PVC insulation, Conductor size shall be 6 Sq.mm. Armoured for C.T. circuits

and 2.5 sq.mm for other circuits, wiring troughs may be used for routing the cables. Wire

numberings and colour code for wiring shall be as per IS 373.

Terminal connectors for control wiring shall be stud type made of brass. Terminal blocks

shall be of clip-on design made out of non-trackable insulating material of

1100 V grade. At least 20% spare terminals shall be provided on each terminal block.

All fuses shall be HRC cartridge type, mounted on plug-on type fuse bases. Fuse bases

shall have imprints of the fuse rating and voltage. No fuse shall be provided on DC negative

and AC neutral. Links shall be provided for-DC negative and AC neutral. Tenderer may

alternatively offer MCBS/MCCBS in place of fuses.

All front mounted as well as internally mounted items including fuses shall be provided

with individual identification labels. Labels shall be mounted directly below the respective

equipment and shall clearly indicate the equipment designation.

5.9.3 LAMP/HEATER AND EARTHING :

Each panel shall be provided with one cubicle illumination lamp controlled by door operated

switch. Space heater along with control switch shall also be provided in each panel. Both the

lamp and the heater shall be suitable for 240 Volts, Single Phase, A.C. operation. One 5

Page 145: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 145 -

Signature of Contractor No. of Corrections Executive Engineer

Ampere, three pin socket along with control switch shall be provided in each panel. Each

panel shall be provided with one earth bus of size 25 x 3 mm. (minimum). The earth bus

shall be of. copper. All metallic cases of relays, meters, instruments etc. shall be connected

to this bus independently.

Bill of material for each Panel : The material for feeder control panel and transformer relay and

control panel is as below:

Sr.

No.

Description 33 kV

incoming

feeder control

panel

Transformer relay

and control panel

1 2 3 4

1 Circuit label 1 No. 1 No.

2 Ammeter 96 Sq.mm. 2400 scale 1 No. 1 No.

3 Voltmeter 96 Sq.mm. 2400

scale 1 No. 1 No.

4 Ammeter selector switch 1 No. 1 No.

5 Voltmeter selector switch 1 No. 1 No.

6 Discrepancy control for C.B. 1 No. 1 No.

7 Local/remote selector switch 1No 1No.

8 Amber indicating lamp for trip circuit healthy 1 No. 1 No.

9 Push button for trip circuit healthy test 1 No. 1 No.

10 White indicating lamp for spring charged 1 No. 1 No.

11 Mimic diagram section 1 Set 1 Set

12 Triple pole non-directional combined O/C &

earth fault relay (IDMTL 3 second relays)

--- 1 Set

13 Local breaker back up relay 1 No. ----

14 Alarm scheme consisting of alarm relays, auto

trip indicating lamp and accept/reset push

button

1 Set 1 Set

15 Alarm bell 1 No. 1 No.

16 P.T.fuse fail indicating lamp 1 Set ----

17 Space heater alongwith control switch 1 Set 1 Set

18 Cubicle illumination lamp alongwith door operated control switch

1 Set 1 Set

19 T.N.C. switch for C.B. 1 No. 1 No.

20 Power plug alongwith control switch 1 Set 1 Set

21 Wiring alongwith HRC fuses/MCB /MCCB

terminal blocks and terminal connectors

1 Set 1 Set

22 Flasher relay for discrepancy switch 1 Set 1 Set

23 33 kV breaker trip circuit supervision relay 1 No. 1 No.

24 Breaker lockl out relay for SF-6 gas density. 1 No. 2 No.

25 6 way alarm/facia blocks 2 Nos. 3 Nos.

26 High speed trip relay 1 No. 2 Nos.

27 Differential relay ---- 2 No.

28 Relay for D.C.fail supervision with push

button, bell, lamps etc.

1 Set 1 Set

29 Frequency meter 1 No. ----

30 Indicating MW meter 1 No. ----

31 kW meter and RKVAh meter with reverse running stop

1 No. ----

Page 146: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 146 -

Signature of Contractor No. of Corrections Executive Engineer

Note :- 1. All the necessary auxiliary relays, triping relays, flag relays, annunciation, matching

CTs/PTs, indicating lamps, flicker relays, test blocks etc. as per actual requirement after detailed

engineering are deemed to be included so as to complete the scheme in all respects.

2. It is not obligatory on the part of the tenderer to provide three separate panels for

accommodating all controls/ protections/ annunciations as given in the bill of material. Tenderer can

offer one panel with three compartments/ sections in order to accommodate all the items covered in

the bill of material.

5.9.5 SCHEME FEATURES :

Trip circuit supervision scheme shall be provided in, circuit breaker. The Scheme shall be

such that it will be possible to test the healthiness of the trip circuit, irrespective of whether

the breaker is in the closed or open condition.

Discrepancy switches shall be such that when the circuit breaker is "ON" and the switch is in

close position and also when the circuit breaker and the switch are both in "OPEN" position,

the lamp shall be off. Whenever there is discrepancy between breaker position and the

switch position, the lamp shall flash till the time the switch is reset. Flasher relay used shall

be of reputed make. Discrepancy switch shall be robust enough, and shall be of reputed

make, approved by the Department. In case the switch does not have adequate contacts,

suitable auxiliary relays shall be included in the scope.

Suitable voltage selection scheme to select the correct P.T. supply shall be provided for

switchyard. P.T. Supply to all the panels including the incomer shall be routed through the

voltage selection scheme. When one of the P.T. fails, the same shall be indicated

automatically by the respective P.T. fail indicating lamp.

5.9.6 MIMIC DIAGRAM :

Mimic diagram depicting the actual scheme and the relative. position of circuit breakers and

isolators shall be provided on control panel. Mimic diagram shall be neatly painted with

tariff yellow colour to shade No. 368 as per IS 05. The mimic shall have 105 mm width.

Discrepancy control switch for the circuit breaker shall be mounted within the mimic,

indicating the circuit breaker position.

Page 147: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 147 -

Signature of Contractor No. of Corrections Executive Engineer

5.10 L.T. CONTROL AND POWER. CABLES :

The cables shall be of 650/1100 V, 1.1 kV, grade, H.R. PVC insulated. The conductor for

power cables and control cables shall be of copper. The cables shall conform to relevant I.S.

5.10.1 CONDUCTOR :

The copper conductors of cables shall have the shape as under :

Cross Section Shape

i) Up to 2.5 Sq. mm. Solid - Circular.

ii) 4 sq. mm. and above up to Multi stranded Hard

16 sq. mm. drawn copper-circular.

iii) Above 16 sq. mm. As per approval of the

Engineer- In charge.

5.10.2 INSULATION :

The conductors should be insulated with high quality H.R. PVC base compound conforming

to IS-58310 (1984). The I.S.I. number should be marked on outer sheath of cables at specific

intervals.

5.10.3 CORE IDENTIFICATION :

Core may be identified by following colour schemes for P.V.C. insulations :

1- Core - Red/Yellow/Blue or Black.

2- Core - Red and Black.

3- Core - Red, Yellow and Blue.

4-core or 3 ½ core - Red, Yellow, Blue & Black

(Reduced Neutral Core shall be Black.)

5-Core - Red, Yellow, Blue, Black & Gray.

For cables having more than 5 cores - Two adjacent cores (counting core and direction core)

in each layer shall be blue and yellow respectively and remaining cores gray.

Page 148: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 148 -

Signature of Contractor No. of Corrections Executive Engineer

5.10.4 CONDUCTOR JOINTS :

It should be ensured that no conductor joints are allowed for entire length of each cable.

5.10.5 CABLE ROUTING :

The cables will be laid/installed in air on the cable trays supported by cable racks to be

supplied by the supplier.

5.10.6 PACKING AND MARKING

L.T.H.R. PVC insulated power and PVC control cables shall be supplied in specified lengths

with tolerance of 5% over total required quantity.

The packing may be in accordance with the manufacturers standard practice but

acceptable to the Insurance Authorities. The inner or take off ends of each cable shall be

sealed and enclosed under a metallic cap for its .protection against damages.

Care shall be taken that the drum is sufficiently strong for the protection of cable during

transit. The drum shall be securely battened.

The items of cable which are in less quantity should be supplied in one lengths on the drums.

5.11 G.I. PERFORATED CABLE TRAYS & ACCESSORIES :

G.I. perforated-cable trays and accessories shall be manufactured from 14 SWG steel

sheets/rolled sheets duly punched for perforations.

5.11.1 The galvanizing of cable trays shall be by hot-dip method and shall be of best quality. There

should not be any burrs or uneven surfaces on the galvanized cable trays on account of the

provision of the slot, perforation or on account of cutting of trays during manufacturing as

this may damage the cables during installation.

5.11.2 Each cable tray should be of 2.5 M length and should have side edge of 20 mm, on both of

its side. The trays will be fixed/erected on M.S. Angle, by means of G.I. Nut/Bolts (bugadi

bolts and nuts) of 8 mm size.

Page 149: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 149 -

Signature of Contractor No. of Corrections Executive Engineer

5.11.3 The perforations of trays should be of size 10 mm x 20 mm elliptical for proper ventilation

of cables laid on the trays and also for fixing the trays with cable racks by means of nut /

bolts.

5.11.4 The cable trays should have good performance against atmospheric conditions like

rain, heat and humidity. The tenderer while making offer, shall carefully consider the service

conditions, given in detailed technical specification for continuous trouble free long life

durability of C.I. cable trays, especially about the galvanizing process.

5.11.5 The number and width of cable trays shall be such so as to allow neat, clean fixing of cables

with sufficient clearance for ease of erection and maintenance as well as not to result in

bunching of the cables.

5.11.6 Suitable number of bends, Tee-off of G.I. Sheets shall be provided as per layout of cable

routing

5.11.7 GALVANIZING :

Cable trays and accessories shall be galvanized by applying hot dip galvanizing process. The

quality of hot dipped galvanizing shall be in conformity with relevant ISS/Code of practice. -

The weight of zinc coating shall be equivalent/not less than 610 gm. of zinc per sq. meter of

surface. The zinc coating shall be smooth, clean and uniform in thickness and free from

defects. The preparation of galvanizing itself shall not adversely affect the mechanical

properties of the coated material.

All drillings, punching, cutting, bending of parts shall be completed and all burrs shall be

removed before the galvanizing process is applied.

5.12 CABLE RACKING :

The cable shall be laid in trenches over the galvanized trays supported by M.S.

angle/channels of sufficient size. The details of trenches and laying/clamping arrangement

shall be subject to approval by the purchaser.

The M.S. supporting arrangement shall be finally painted with aluminum paint after

applying coat of red oxide.

Page 150: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 150 -

Signature of Contractor No. of Corrections Executive Engineer

All the material for laying, clamping and earthling etc. shall be included in the scope of

supplier.

5.13 SPARES/ MAINTENCE TOOLS & TACKLES:

The items of spares proposed to be stocked for normal maintenance of equipment for first

five years are listed in Part-IIA & PartII B of Schedule- B enclosed.

It is obligatory on part of tenderer to quote the unit item wise ex-works prices of all the

aforesaid items in specification.

5.14 AUXILIARY TRANSFORMER

Supplying and erecting AC three phase 160 KVA , 33 kV/O.44 kV, 50 Hz, oil immersed and

naturally cooled indoor/outdoor type copper wound distribution transformer of specified capacity,

connected delta on HV side and star on LV side with additional neutral brought out on load side.

Recommended standards: The following list shows Indian accepted standards.

IS 335: 1963 Dielectric Strength

IS 2026 part I 1977 Specification for Transformer

IS 2026 part II 1977 Specification for type of cooling and permissible temp. rise of

transformer

IS 2026 part III 1981 . Specification for insulation level and dielectric strength of

transformer

IS 2026 part IV 1977 Specification for terminal marking tapping and connections

IS 1180 part I 1989 Specification for outdoor type three phase distribution transformer

IS 10028 Part I 1985 Code of practice for selection installation and maintenance of

transformers

CBIP/TAC Manuals

Material:

1. Copper wound Transformer with Delta connection on HV side and star connection on LV side

complete with Manufacturer's test certificates

2. Standard mountings required for transformer are shown below. The mountings are to be selected

from them and any additional if required.

• Off load tap changing

• Oil conservator with fitting holes and cap and plain oil level gauge

• Silica gel dehydrating breather

• Oil drain valve

• Thermometer pockets

• Oil filter valve

• Lifting arrangement

• Two earthing terminal

• Diagram and rating plat

Page 151: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 151 -

Signature of Contractor No. of Corrections Executive Engineer

• Four bi directional plain rollers

• Air vent

• Explosion vent

• Terminal arrangement

• Bushing with fugs and/or cable end box on LV side

• HV cable end box and/or HV bushing

• The transformer losses shall be as mentioned in Table No 10.1/1

Method of Construction:

The contractor should intimate name of manufacturer and make of the Transformer and location of

the manufacturer factory to engineer in charge prior to delivery of thl3 transformer. After

manufacturing of the transformer, the agency/contractor shall intimate the engineer-in-charge for

carrying out the inspection.

After receipt of intimation engineer-in-charge or his representative should inspect the Transformer

at manufacturer factory and shall carry out the following tests jointly in presence of concern

contractor.

1) Open Circuit test

2) Short Circuit test

3)' Specific Resistance Test

4) Insulation Resistance of HV, LV, in between HV and LV, Winding and Body.

5) Dielectric Strength and acidity test of Transformer oil.

The test results of joint inspection shall be recorded on the test report of Transformer with its Sr.

No. prior to delivery of the Transformer to site.

Necessary work of plinth and or for D.P. structure with D.O. set, L.A., A.B. switch should be

completed before dispatch of the transformer. The channel arrangement on plinth is to be done.

Earthing arrangement should be completed. The Transformer should be installed on plinths / double

pole structure/floor by arranging chains pulley block, crane etc as per IS Norms.

After installation of Transformer the stopper/lock should be provided to rollers of the Transformer.

The connection of H.T/L.T. side should be completed by provided Copper wire/ cable with

necessary lugs to avoid dose connection. The earthing (2 Nos for Neutral & 2 Nos for Body) should

be connected from distinct electrodes. The earthing should be connected by lugs/proper size of strip.

The Engineer in charge or his representative should check all-connections on H.T. side, L.T. side

and earths and insulation and earth resistance test should be carried out and results obtained shall be

recorded.

Statutory Permissions to be obtained by the Agency/Contractor:

Before commencement of work, the drawings of installation. shall be got approved from the

Electrical Inspector, I E & L Department.

The installation should be got inspected from Electrical Inspector and obtain written permission to

charge the Transformers.

Commissioning:

Page 152: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 152 -

Signature of Contractor No. of Corrections Executive Engineer

After above formalities the Transformer, should be charged/commissioned in presence of Engineer

in charge or his representative along with load trials and shall be handed over to the department for

beneficial use

After charging the Transformer, line.. phase voltages and line current shall be measured, and the

same shall be submitted.

Following test certificates shall be submitted:

1. .Manufacturer's original certificate of Transformer as stipulated in IS.

2. Test certificate for dielectric strength of oil as per IS.

3. Test results of IR values.

4. Test results of all earth electrodes.

5. Readings of Voltages & currents at the time of commissioning.

5.15 3.3 KV Cable

1. General

All material shall conform to relevant standard as per BIS and shall carry ISI mark. If any particular

category of material for which ISI mark is not available in market, it shall be as included in

approved list.

Work shall be carried out as per the method of construction specified by BIS. If there is no reference

for particular method of construction in IS, such work shall be carried out as per the approved

method of construction specified in chapter 16 of P.W. Dept. Handbook.

Material and Work not qualifying to any provision mentioned above shall be to the satisfaction of

the Engineer in Charge.

2. Cables: (Armoured)

The following list records those Indian Standards in force, which are acceptable as good practice,

and accepted standards.

SP 30: 1984 : National Electrical Code

SP 7 (Group4): 2005 National Building Code

IS 1255: 1983 Code of practice of Installation & Maintenance of armoured

cables up to 33 kV.

IS 3961: Part 2: 1967 : Recommended current ratings of PVC cables.

IS 1554: Part 1; 1988 : PVC Insulated (Heavy duty) Electric Cables; Part 1 for working

voltages up to and including 1100 Volts.

IS 1554: Part 2; 1988 : PVC Insulated (Heavy duty) Electric Cables; Part 1 for working

voltages up to and including 3.:1 kV to 11 kV.

IS 10810: Part 63; 1993 : Method for Test of cables, Part 63 Smoke density of electric

cables under fire condition.

3. Scope: (Armoured cables)

Providing armoured cable of specified voltage level, size & .specified conducting material

Aluminum including required material, hardware's for erection and erecting on wall, ceiling, RCC

slab or drawing the same through pole, pipe, laying in provided conduit, trench, ducts, trays as per

approved method of construction including glands, lugs, etc.

Page 153: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 153 -

Signature of Contractor No. of Corrections Executive Engineer

Material:

Cables:

Cables shall be PVC for L T/MP and XLPE For HT of required construction, colour, shall carry ISI

mark, IS No, manufacturer's name, size, duly embossed 1 screen printed at every meter and having

the total count of progressive length in meter at each mark.

Earth wire: Galvanized Iron (G I) wire of appropriate gauge as per Table No 7/1.

Saddles: Saddles fabricate from GI sheet of required gauge and size depending on dia of cable

either galvanized or painted with superior quality enamel black paint with necessary shearing

mechanical strength, semi circular shaped with extended piece having suitable holes for fixing.

G.I. Strip: 22 g x 25 mm width GI Strip.

Clamps: MS Clamps fabricated of required length and shape, having the size of 3/6 mm thick mild

steel having 25/50 mm width (as per size of cable), rounded ends wit), wooden I resin cast grip for

holding the cable.

Identification tags: For identifying root, connection position GI strip with identification mark 1

name embossed 1 painted' with arrangement to tie should be fixing on cable or arrangement of

ferrules to be done.

Hardware: Sheet Metal (~JA) screws of required sizes, plugs I wooden gutties, etc.

5.16 Cable Joints & End Termination Kits

1. Scope:

Providing straight through cable jointing kit of approved make and jointing cable as per the

manufacturer's instructions and duly marking name of jointer and date.

2. Material:

Joint kit: Kit manufactured by reputed manufacturer with PVC moulds made in two parts, with

epoxy compound, earth continuity lead of appropriate cross section having lugs at both ends,

aluminum ferrules of the size of the cable, cross shaped epoxy spacer, MS clips for holding the

moulds, adhesive for pasting the moulds.

3. Method of Construction:

3.1 Straight through joint Kit: L T/HT Cables

Before providing joint to the cable, the cable ends of the equivalent length of the joint moulds, shall

be prepared by removing the outer PVC insulation along with the steel armouring. The ferrule shall

then be inserted over the bare core of the cable, and shall be crimped with hydraulic I mechanical

type heavy duty crimping tool. The crimped portion shall be wrapped first with the PVC insulation

tape and then with the insulation tape used for wrapping HT conductor. The above method shall be

carried out for all the cores strictly following the colour code. The leads of the both the cables now

shall be placed into the mould by using the epoxy spacer, for having sufficient gap in-between the

leads. The earth continuity lead shall be clamped to the both ends of the cable. After covering the

cable, leads with the PVC moulds, the edges shall be clipped after applying the adhesive on the

inside face of the mould. The pasting of moulds shall be rigid and as far as possible leak proof, so

that the epoxy compound shall not spill out. Now the duly stirred epoxy compound shall be poured

and fill till the compound rises through the risers provided on the moulds. After completing the

Page 154: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 154 -

Signature of Contractor No. of Corrections Executive Engineer

above procedure, the joint shall be allowed to dry out for at least 8 to 10 hours (for epoxy compound

to get hardened) depending upon the size of cable. Before connecting to supply, the dry and

hardened joint shall be tested for its insulation level with 1000 V/ 5000 V Megger.

The cable should be fixed or laid in such manner that there should not be pressure on end of moulds

or on jointing position of cables.

3.2 Outdoor/Indoor end termination Kit: LT/HT Cables

BefClre providing end termination kit to the cable, the cable end of the equivalent length of the

moulds, shall be prepared by removing the outer PVC insulation along with the steel armouring.

The ferrule shall then be inserted over the bare core of the cable, and shall be crimped with

hydraulic I mechanical type heavy duty crimping tool. The crimping shall be done in such a manner

that there shall be no air gap. Then the crimped portion shall be wrapped first with the PVC

insulation tape and then with the insulation tape used for wrapping HT conductor. The above

method shall be carried out for all the cores strictly following the colour code. The leads of the cable

now shall be placed into the mould by using the epoxy spacer, for having sufficient gap in-between

the leads. The earth continuity lead shall be clamped to the ends of the cable. After covering the

cable leads with the PVC moulds, the edges shall be clipped after applying the adhesive on the

inside face of the moulds. The pasting of moulds shall be rigid and as far as possible leak proof, so

that the. epoxy compound shall not spill out. Now the duly stirred epoxy compound shall be poured

and fill till the compound rises through the risers provided on the moulds. After completing the

above procedure, the joint shall be allowed to dry out for at least 8 to 10 hours (for epoxy compound

to get hardened) depending upon the size of cable. Before connecting to supply, the dry and

hardened joint shall be tested for its insulation level with 1000 VI 5000 V Megger.

Mode of Measurement:

Executed quantity will be measured on number basis. (i.e. each).

5.17 TESTS :

5.17.1 TESTS AT MANUFACTURER'S WORKS :

a) TYPE TESTS :

All the equipments offered, shall be fully type tested as per relevant standards. In

case the equipment of type and design offered, has already been type tested, the

tenderer shall furnish four sets of the type tests reports along with the offer. The

Purchaser reserves the right to demand repetition of some or all the type tests in the

presence of purchaser's representatives. For the change in design type, already type

tested and the design/type offered against this specification the purchaser reserves the

right to demand, repetition of tests without any extra cost. In case the equipments

Page 155: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 155 -

Signature of Contractor No. of Corrections Executive Engineer

have not been type tested earlier, all the type tests as per relevant standards shall be

carried out by the successful tenderer in the presence of purchaser's representatives

without any extra cost.

b) ROUTINE TESTS:

All the routine tests as per relevant I.S.S. shall be carried out at the manufacturer's

works in the presence of the representatives of the Department. For major iten i.e.

SF6 breaker, transformers, CT , PT and control panel.

An advance intimation of not less than 8 days shall be given to the Department about

the readiness of the equipment for the inspection and testing. copy of the test report

certificates shall be furnished after the tests have been successfully completed.

No equipment shall be dispatched before the test certificates are approved by the

purchaser. Approval to the tests shall however not absolve the supplier from the

responsibility for guaranteed performance of the equipment.

c) TESTS AT SITE :

Testing of installation & commissioning :- The complete erected plant shall

be offered for inspection by purchaser’s Engineer. After such inspection, each

equipment and system shall be tested by the contractor in accordance with

applicable standards in presence of purchasers Engineer. THE RESULTS OF ALL

TESTS SHALL BE RECORDED FOR FUTURE REFERENCE.

1. Following physical tests shall be carried out on all the equipments

a) Check for physical damage.

b) Workmanship as per specification.

c) Completeness of installation.

d) Check name plates as per specification.

e) Check adequacy of tightness of nut, bolts, clamps and other connecting

terminals.

Page 156: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 156 -

Signature of Contractor No. of Corrections Executive Engineer

f) Check leakage of oil or air, oil level.

g) Check earth connections.

h) Check cleanness and glaze of insulating and bushing surface.

i) Check clearances between live parts and earth.

2. All the tests as per the relevant Indian Standards shall be carried out at site on. all

equipments after the erection work is completed.

ROUTINE TESTS :

The following Routines Tests will have to be carried out on each of the equipment supplied.

FOR CIRCUIT BREAKERS :

1) Measurement of Insulation Resistance of Main circuit.

2) Mechanical operating tests.

3) Checking interlocks.

4) Measurement of timings for opening/closing etc.

FOR ISOLATORS :

1) Measurement of Insulation Resistance of Main circuit.

2) Tests to prove satisfactory operation,

FOR LIGHTNING ARRESTORS :

1) Measurement of insulation resistance.

2) Noting the initial readings of surge counters.

FOR CURRENT TRANSFORMERS :

1} Verification of terminal marking and polarity.

2) Measurement of Insulation Resistance,

3) Ratio test on windings.

POTENTIAL TRANSFORMERS :

Page 157: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 157 -

Signature of Contractor No. of Corrections Executive Engineer

1) Measurement of Insulation Resistance.

CONTROL AND RELAY PANELS

1) Tolerance of panel vertically (3° to vertical), Mechanical tests for alignment,

Rigidity.

2) Checking and verification of panel wiring as per approved schematic and meggering

test.

3) Checking of electrical clearances in panels.

4) H.V. test at 2.5 kV for 1 min. or dielectric test as per IS.

5) Relay testing by secondary injection and by operating by hand to test

operation.

6) Operations of all protective circuits, contact operation of all switches, operation test

on annunciator circuits, i.e. electrical control, interlocks and sequential operation tests.

7) Routine tests on relay and associated equipment as per applicable standard.

FOR POWER AND CONTROL. CABLES :

All the acceptance tests and routine tests, high voltage tests (tests at room temperature and

water immersion test) at the manufacturer's works as prescribed in. I.S, with latest

amendment of the power and control cables shall be carried out.

For type tests, the tenderer shall have to furnish relevant type test certificates.

G.I. PERFORATED CABLE-TRAYS AND ACCESSORIES:

Routine Tests on G.I. perforated cable trays and accessories as per applicable standards.

5.17.2 The list of tests to be carried out on different equipments stated above are indicative.

Purchaser reserves the right to ask supplier to carry out such more tests at site, as may be

required by the relevant IS without any extra cost, in the presence of Purchaser's

representatives.

5.18 DRAWING/DATA TO BE FURNISHED :

Page 158: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 158 -

Signature of Contractor No. of Corrections Executive Engineer

The tenderer shall furnish four sets of relevant descriptive and illustrative published

literature/pamphlets and the following drawings, along with bid.

I) CIRCUIT BREAKER :

a) General outline showing outside dimensions, shipping dimensions, weights,

quantity of insulating media and such other prominent details.

b) Sectional views showing the general constructional features of the

circuit breaker including operating mechanism, arcing chambers, contacts

with lifting dimensions for maintenance.

c) Schematic diagrams of the scheme for control, supervision and re-closing.

d) Structural drawing, design calculation and loading data for support structures.

e) Foundation drilling plan and foundation design.

f} Type test reports in case the breaker has already been type tested.

II) INSTRUMENT TRANSFORMERS :

a) General outline and assembly drawings of the equipment.

b) SECTIONAL VIEWS SHOWING:

( i ) General constructional features of the instrument transformer and dimension of

conductor, grading stage used for primary insulation etc.

(ii) The sectional view shall show the materials/ gaskets / sealing used for perfect

hermetic sealing and arrangement for compensation of oil volume variation.

(iii) The Insulation, the winding arrangement, method of connection of the

primary/secondary terminals etc.

(iv) Porcelain housing used and its dimensions along with the mechanical and electrical

characteristics as well as volume of oil.

c) Arrangement of secondary terminal box and details of connection studs

provided.

d) Name plate.

e) Schematic drawing.

Page 159: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 159 -

Signature of Contractor No. of Corrections Executive Engineer

f) Type test report in case the equipment has already been type tested.

g) Foundation design.

III ISOLATORS :

a) General outline and assembly drawing of the Isolator operating mechanism,

structure, insulator and terminal connector.

b) Sectional views and descriptive details of items such as moving blades, contact arms,

contact springs, contact support, turn and twist mechanism, phase coupling pipes,

base plate, operating shaft, guides, swivel joint operating mechanism and its

components etc.

c] Loading diagram along with design of foundation.

d) Name plate.

e) Schematic drawing.

a) Type test reports in case the equipment has already been type tested.

(IV) REMAINING EQUIPMENTS :

1 ) Literature giving complete details of all equipments.

2) Drawing showing the dimensions of the equipments.

3) Foundation design for towers etc.

(V) 1) Layout plan and sections showing the details of switchyard.

2) Drawing showing the arrangements of supporting structures etc.

3) Key and erection diagram

4) Detailed cable schedule.

5) Layout and design of cable trenches and racking arrangement.

6) Arrangement of laying and clamping of Cables.

(Vl) CONTROL AND RELAY PANELS :

i) G.A. of indoor Transformer control and protection panel and Breaker

control panel.

Page 160: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 160 -

Signature of Contractor No. of Corrections Executive Engineer

ii) Sectional view of Transformer control and protection panel and Breaker

control panel.

iii) Typical single line diagram.

iv) Drawing/literature for protection relays control and instrumentation.

v) Write up with drawings on panel construction, Relay selection, Relay

setting calculation, tripping and annunciation scheme.

vi) Loading data for foundation design.

(VII) POWER AND CONTROL CABLES :

The tenderer shall submit alongwith each copy of the bid, technical particulars as

well as technical pamphlets, literature details/cable tables for the power and control

cables offered by him.

(VIII) G.I. PERFORATED CABLE TRAYS AND ACCESSORIES :

i) The tenderer shall submit the detailed drawings in respect of the cable trays

and accessories etc. indicating size, and other particulars required /

guaranteed.

ii) The technical particulars and details of the material offered shall be stated in

Schedule-1 of Section - II. Under Part-II (Volume-I).

5.18.1 The successful tenderer shall, within 6 weeks of placement of order, submit three sets of

final versions of all the above said drawings for purchaser's approval. The purchaser shall

communicate his comments/approval on the drawings to the supplier within reasonable

period. The supplier shall, if necessary, modify the drawings and resubmit three copies of

the modified drawings for purchaser's approval within two weeks from the date . of

Purchaser's comments. After receipts of purchaser's approval, the supplier shall submit

within three weeks, 6 prints and two good quality reproducible of the approved drawings for

purchaser's use.

5.18.2 The successful tenderer shall furnish in the form of nicely bound volumes, the manuals

covering erection, testing commissioning, operation and maintenance instructions and all

Page 161: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 161 -

Signature of Contractor No. of Corrections Executive Engineer

relevant information and drawings pertaining to the main equipment as well as auxiliary

devices. Marked erection drawings shall identify the component parts of the equipment as

shipped to enable Engineer/Purchaser to carry out erection with his own personnel. Each

manual shall also contain one set of all the approved drawings, type test, reports as well as

acceptance test report of corresponding consignment dispatched. Six sets of such manuals

shall be furnished by the tenderer.

5.18.3 The manufacturing of the equipments, shall be strictly in accordance with approved

drawings and no deviation shall be permitted without the written approval of the purchaser.

All manufacturing and fabrication work in connection with the equipment prior to the

approval of the drawings shall be at the suppliers risk.

5.18.4 Approval of drawings/work by the purchaser shall not relieve the supplier of any of his

responsibility for ensuring correctness and correct interpretation of

the drawings for meeting the requirement of the latest revisions of applicable standards,

rules and codes of practices.

5.19 2 MVA 33/6.6 KV Power Transformer

1.01 2 No. 33/6.6 kV, 2 MVA, 3 phase, 50 cycle/sec. ONAN cooled, outdoor type power

transformer fitted with off load tap changer on H.V. side for voltage variation ±7.5 % in

steps of 2.5 %, 3 Nos. high voltage bushings suitable for connections to ACSR conductors,

complete with first filling of oil and various fittings as per specification and confirming to

standards in accordance with clause No. 3.00. This transformer shall be installed at Lalnala

Switchyard.

1.02 Supply of set of spares as under:

Sr.

No.

Item Quantity

1. Filter valve 1No.

2. Explosion vent diaphragm 1 No.

3. Set of fixed and moving contacts for off-circuit tap changing gear 1set

4. Dial thermometer (Winding Temperature indicator) 1 No.

5. Magnetic oil gauge 2 Nos.

6. Breather 1 No.

7. 33 KV bushings 1 No.

8. Neutral Bushing (H.V. side) 1 No.

9. Set of various punched gaskets used in transformer 1 No.

Page 162: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 162 -

Signature of Contractor No. of Corrections Executive Engineer

10. Buchholz relay 1 No.

2.00 Type and Rating

The details regarding the type and rating together with other data are given below:

Sr. No.

Item Data

1. Rated Capacity (MVA) 2 No., 2 MVA,3 Phase

2. Type Outdoor

3. Rated voltage 33/6.6 KV

4. Frequency (50 Hz + 3%) (50Hz -5%)

5. Dry type of oil immersed type Oil immersed type with mineral oil

6. Installation Outdoor

7. Type of cooling QNAN

8. Rated voltage

H.V. Winding

L.V. Winding

33 KV

6.6 KV

9. Type of Tap Changer OFF Load tap

Changer on H.V. side in steps of

2.5 % upto ±7.5 %

10. Highest Voltage of equipment

H.V. Winding (R.M.S.)

L.V. Winding (R.M.S.)

36 KV

7.5 KV

11. Vector group YNyno

12. Method of earthing

(H. V. Side)

Neutral

Effectively solidly earthed

13. Method of earthing

(L. V. Side)

Neutral

Effectively earthed

14. Type of H. V. terminal H. V. condenser bushing

15. Type of L. V. terminal Suitable for connections to XLPE

cable

16. (i) Rating of Bushing (H.V.)

Rating of Bushing (L.V.)

100 A

1000A

(ii) Insulation levels of Bushing and

winding

H.V.

L.V.

170 KV(Peak)

75 KV (Peak)

17. Rated short duration power frequency

withstand voltage (RMS)

H.V. side

L.V.

70 KV

20 KV

18. Creepage distance of bushings 25 mm per KV for highest voltage

system

Page 163: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 163 -

Signature of Contractor No. of Corrections Executive Engineer

Sr. No.

Item Data

19. Type of mounting On Wheel mounted on Rails

20 Percentage Impedance 7.15% (Approx)

21. Over voltage operating capacity duration 125% of rated voltage for 60 sec. and 140% rated voltage for 5 sec.

22. (i) Design flux density at rated load,

frequency and voltage in Tesla

1.7

23.

(ii) Maximum flux density at in Tesla

Type of Winding Insulation

H. V.

L.V.

1.9

Graded

Fully insulated

24. System short circuit level and duration for

which transformer shall be capable to

withstand the thermal and dynamic stresses

[KA(RMS)/sec]

17.5 KA for 2 sec

25. Current density for H. V. and L. V. Not exceeding 3.0 Amp/sq. mm

26. Noise level and rated voltage and frequency As per latest NEMA standard TR-1

27. Permissible temperature rise of oil (Tap) 500C

28. Permissible temperature rise of winding 550C

29. Minimum clearance in air in mm H.V. side

a) Phase to phase

b) Phase to earth

L. V. Side

a) Phase to phase

b) Phase to earth

350

320

280

140

30. Both the transformers of same rating shall

be identical and suitable for parallel

operation without affecting adversely the

guaranteed performance

31. Equipments to be supplied shall be suitable

for satisfactory operation for continuous

rating as under:

1) Maximum ambient Temperature

2) Minimum ambient Temperature

3) Maximum yearly ambient Temperature

4) Relative Humidity

5) Maximum Annual Rainfall

6) Maximum Wind Pressure

7) Altitude above mean sea level

8) Seismic level (Horizontal acceleration)

450C

50C

340C

100% in rainy season

330 mm

150 kg/cm2

250 M

0.375g & where g is acceleration to

gravitation

Page 164: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 164 -

Signature of Contractor No. of Corrections Executive Engineer

3.00 STANDARDS

Except where specified otherwise, the equipment covered under this specification shall

comply with the following Indian Standards, including the latest amendments, if any and the

relevant other standards mentioned therein.

LIST OF STANDARDS

SR.

NO.

STAN-

DARD

REF.

NO.

TITLE

1. IS 109 Copper

2. IS 335 Specification for insulating oil for transformers and switchgear

3. IS 648 Grain oriented electrical steel sheet for magnetic circuits

4. IS 649 Method of testing steel sheets for magnetic circuits of power electrical

apparatus

5.

6.

IS

IS

1886

1271

Code of practice for installation and maintenance of transformers

Classification of insulating materials for electrical machinery and

apparatus in relation to their stability in service

7. IS 2026 Specification for power transformer (Part I to IV)

8. IS 2099 High voltage porcelain bushings

9. IS 3639 Fittings and accessories for power transformers

10. IS 1866 Code of practice for maintenance of insulating oil

11. IS 5358 Specification for hot-dip galvanized coatings of fastners

12. IS 1666 Paper covered rectangular copper conductors for transformer windings

13. IS 1576 Solid press board for electrical purposes.

4.00 LOSSES TO BE GUARANTEED AND PENALTY OF EXCESS LOSSES

The tenderer has to state guaranteed values of no load losses and load losses in respect of the

transformer in the specification. The stated guaranteed values shall then be corrected by

increasing the same to take into account permissible tolerance limit as per IS-2026.

Guaranteed maximum no load loss and guaranteed maximum load loss, in KW, at rated

output, rated voltage at 75°C of average winding temperature shall be as under :-

i) No load loss - 5.5 KW (Max)

ii) Load loss - 29 KW (Max)

These values are maximum after considering permissible tolerance as per IS-2026.

Page 165: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 165 -

Signature of Contractor No. of Corrections Executive Engineer

If the transformer does not fulfill the guaranteed values, the penalties / liquidated damages

will be applicable. The penalty will be calculated at the following rates –

i) No load loss - Rs. 314168/- per KW

ii) Load loss - Rs. 241191/- per KW

5.00 GENERAL DESIGN OF APPARATUS

5.1 DESIGN AND STANDARDIZATION:-

The transformer and accessories shall be designed to facilitate operation, inspection,

maintenance and repairs. All apparatus shall be designed to ensure satisfactory operation

under such sudden variations of load and voltage as may be met with under working

conditions on the system including those due to short circuits and earthquake forces. The

transformer shall be designed for terminal short circuit. The design shall incorporate every

reasonable precaution and provision for the safety of all those concerned in the operation

and maintenance of the equipment keeping in view the requirements of Indian Electricity

Rules.

The materials used shall be of the best quality and of the class most suitable for working

under the condition specified and shall withstand variations of temperatures and atmospheric

conditions arising under working conditions without undue distortion or deterioration or the

setting up of undue stresses in any part, and also without affecting the strength and

suitability of the various parts for the work which they have to perform.

Corresponding parts liable to replacement shall be interchangeable.

Cast iron shall not be used for chambers of oil filled apparatus or for any part of the

equipment which is in tension or subject to impact stresses.

All outdoor apparatus, including bushing insulators with their mountings, shall be designed

so as to avoid pocket in which water can collect.

Means shall be provided for the easy lubrication of all bearings and where necessary of any

mechanism or moving part that is not oil immersed.

All mechanism shall, where necessary, be constructed of stainless steel, brass or gun-metal

to prevent sticking due to rust or corrosion.

All connections and contacts shall be of ample section and surface for carrying continuously

the specified current without undue heating and fixed connections shall be secured by bolts

or set of screws of ample size adequately locked. Lock nuts shall be used on stud

connections carrying current. All taper pieces used in any mechanisms shall be of the split

type complying with IS 2393 for these items.

Page 166: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 166 -

Signature of Contractor No. of Corrections Executive Engineer

5.2 GALVANIZING

5.2.1 Galvanizing where specified shall be applies by the hot dipped process or by electro-

galvanizing process and for all part other than steel wires shall consists of a thickness of zinc

coating equivalent to not less than 610 gm of zinc per square meter of surface. The zinc

coating shall be smooth, clean and or uniform thickness and free from defects. The

preparation of galvanizing and the galvanizing itself shall not adversely affect the

mechanical properties of the coated material. The quality will be established by tests as per

IS: 2633 alternatively to galvanizing, aluminizing shall also be considered.

5.2.2 All drilling, punching, cutting, bending and welding of parts shall be completed and all burrs

shall be removed before the galvanizing process is applied.

5.2.3 Galvanizing of wires shall be applied by the hot dipped process and shall meet the

requirements of the relevant Indian Standard. The zinc coating shall be smooth, clean and of

uniform thickness and free from defects. The preparation for galvanizing itself shall not

adversely affect the mechanical properties of the wire.

5.2.4 Surface which are in contact with oil shall not be galvanized or cadmium plated.

5.3 LABELS:

Labels shall be provided for all apparatus such as relays, switches, fuses, contained in any cubicle or

marshalling kiosk.

Descriptive labels for mounting indoors or inside cubicles and kiosks shall be of material that will

ensure performance of the lettering. A matt/or satin finish shall be provided to avoid dazzle from

reflected light. Labels mounted on dark surface shall have white lettering on a black background.

Danger notices shall have red lettering on a white background. All plates shall be incorridiable

material. Labels shall be attached to panels with brass screws or with steel screw which have

received rust preventive treatment or these can be stuck with araldite also.

5.4 BOLTS AND NUTS

Steel bolts nuts exposed to a atmosphere with suitable finishes like cadmium plated or zinc plated

passivity shall be used for diameters above 6 mm. All nuts, bolts and pins shall be locked in position

with the exception or those external to the transformer.

On outdoor, equipment, all bolts, nuts and washers in contact with non-ferrous parts which

carry current shall be of brass where the transfer of current is through the bolts. If bolts and nuts are

at such places so that they are inaccessible by means of ordinary spanners, suitable special spanners

shall be provided by the suppliers.

Page 167: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 167 -

Signature of Contractor No. of Corrections Executive Engineer

5.5 CLEANING AND PAINTING

Before painting or filling with oil or compound, all un-galvanized parts shall be completely clean

and free from rust, scale and grease, and all external surface cavities on castings shall be filed by

metal deposition.

The interior of transformer tank and other oil fitted chambers and internal structural steel work shall

be cleaned of all scale and rust by short blasting or other approved method. These surfaces shall be

painted with hot oil resisting varnish or paint.

Except of nuts, bolts and washes which may have to be removed for maintenance purposes, all

external surfaces shall receive a minimum of three coats of paints.

The primary coat shall be applied immediately after cleaning. The second coat shall be of an oil and

weather resisting nature and preferably of a shade or colour easily distinguishable from the primary

and final coats and shall be applied after the primary coat has been touched up where ever

necessary. The final coat shall be of a glossy oil and weather resisting non-fading paint of shade No.

631 of IS: 5, primer paint shall be ready made zinc chrome as per IS:104 intermediate and final

coats of paint shall be as per IS:2932.

Nuts bolts and washers which may have to be removed for maintenance purposes shall receive a

minimum of one coat of paint after erection.

All interior surface of mechanism chambers and kiosk except those which have received

anticorrosion treatment shall receive three coats of paint applied to the thoroughly cleaned metal

surface. The final coat shall be light coloured anti-condensation mixture.

Any damage to paint work incurred during transport and erection shall be made good by the

contractor by thoroughly cleaning damaged portion and applying the number of coats of paint that

had been applied before the damage was caused. One coat of additional paint shall be applied by the

supplier at site, after erection testing and commissioning.

5.6 OIL

The transformer and all associated oil-filled equipment shall normally be supplied along with the

first filling of oil, besides, 10% excess quantity of oil shall also be supplied in non-returnable drums.

The filling of the transformer with oil shall be done under vacuum. The oil shall be as specified in

IS: 335, and shall be free of moisture. It shall have uniform quality throughout.

5.7 PREVENTION OF ACIDITY

The design and all materials and processes used in the construction of the transformer, shall be such

as to reduce to a minimum the risk of the development of acidity in the oil. Special measures, such

as nitrogen sealing or the use of inhibited oil shall not be restored to.

Page 168: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 168 -

Signature of Contractor No. of Corrections Executive Engineer

6.0 ELECTRICAL CHARACTERISTICS AND PERFORMANCE:

6.01 TYPE OF TRANSFORMER AND OPERATING CONDITIONS:

The Transformer shall be oil immersed and shall be of core type, suitable for outdoor installation.

The cooling shall be of ONAN type.

6.02 Transformer shall be capable of operating under natural cooled conditioned “up to the

specified load”.

6.03 The transformer shall be capable of being operated without danger on any tapping at the

rated MVA with voltage variation of ±10% corresponding to the voltage of the tapping.

6.04 The maximum flux density in any part of the core and yoke at the rated MVA, voltage and

frequency shall be such that under 10 percent continuous over voltage condition, it does not

exceed 1.9 Tesla.

The manufacturer shall state the overfluxing capability and corresponding withstand duration for

the transformer for factors 1.25 and 1.4.

6.05 RADIO INFLUENCE AND NOISE LEVEL

(i) The transformer shall be designed with particular attention to the

suppression of maximum harmonic voltage, especially the third and fifth so as

to minimize interference with communication circuit.

(ii) The noise level of transformer when energized at normal voltage and

frequency shall not exceed, when measured under standard conditions, the values

specified in CBIP recommendations.

6.06 The transformer shall be capable of being loaded in accordance with IS:6600 upto loads

of 150%. There shall be no limitation imposed by bushings, tap changers etc. or any other

associated equipments.

6.07 The transformers and all its accessories shall be designed to withstand without injury the

thermal and mechanical effects of any external short circuit to earth and of short circuits at

the terminals of any winding for a period of 2 seconds. The short circuit level of the HV system

to which the subject transformer will be connected shall be 17.5 KA for 2 seconds.

6.08 Transformer shall be capable of withstanding thermal and mechanical stresses caused by

symmetrical or asymmetrical faults on any winding.

6.09 Transformer shall be withstand, without injurious heating, voltage and frequency

fluctuations which produce the following over fluxing condition.

110% continuous

Page 169: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 169 -

Signature of Contractor No. of Corrections Executive Engineer

125% for 1 minute

140% for 5 seconds

6.1 CONTINUOUS MAXIMUM RATING AND OVERLOADS

6.1.1 Transformer shall comply as regards rating, temperature rise and overloads, with the

appropriate requirements of IS: 2026 when operating with natural cooling.

6.1.2 The transformer except where stated shall be capable of continuous operation in

accordance with IS 660 (1988)-Guide for loading of oil immersed transformers.

6.1.3 Transformer with tapping ranges extending more than 5 percent below the nominal voltage

shall meet the temperature rise limits specified in IS:2026 on all tappings on which the rated

current is not more than 95 percent of the maximum rated current on the lowest voltage tapping.

On other tapping, it shall operate continuous without injurious heating. The loading of the

transformer is to be in accordance with IS:6600 “Guide for loading of oil- immersed

Transformers”.

6.1.4 The transformer shall be suitable for continuous operation with a frequency variation

of +3% to -5% from normal 50 Hz.

6.2 ELECTRICAL CONNECTION

Transformer shall be connected in accordance with the IS Vector symbol YNynO.

7.00 CORES:

The cores shall be constructed from high grade cold rolled non-aging grain oriented

silicon steel laminations.

7.1 MAGNETIC CIRCUIT:

The design of the magnetic circuit shall be such as to avoid static discharges,

development of short-circuit paths within itself or to the earthed clamping structure and the

production of flux components to right angle to the plane of the laminations which may cause local

heating.

Every care shall be exercised in the selection, treatment and handling of core steel to ensure that as

far as practicable, the laminations are flat and the finally assembled core is free from distortion.

The oxide /silicate coating given on the steel laminations can be insulated by the manufacturers if

considered necessary.

Oil ducts shall be provided where necessary to ensure adequate cooling. The winding structure and

major insulation shall not obstruct, the free flow of oil through such ducts, where the magnetic

Page 170: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 170 -

Signature of Contractor No. of Corrections Executive Engineer

circuit is divided into pockets by cooling ducts parallel to the planes of the laminations or by

insulating material above 0.25 mm. thick tinned copper strip bridging pieces shall be inserted to

maintain electrical continuity between pockets. The frame work and clamping arrangements shall be

earthed in accordance with clause 9.0. the insulation structure for the core of bolts and core to

clamp plates shall be such as to withstand a voltage of 2000 V A.C. for one minute.

7.2 MECHANICAL CONSTRUCTION OF CORES:

All parts of the cores shall be of robust design capable of withstanding any shocks to which they

may be subjected during lifting, transport, installation and service.

All steel sections used for supporting the core shall be thoroughly sand blasted or shot blasted after

cutting, drilling and welding. Any non-magnetic or high resistance alloy be of established quality.

Adequate lifting lugs shall be provided to enable core and windings to be lifted.

Adequate provision shall be made to prevent movement of the core and winding relative to the tank

during transport and installation or while in service.

The supporting frame-work of the cores shall be so designed as to avoid the presence of pockets

which would prevent complete emptying of the tank through the drain valve, or cause trapping of air

during filling.

8.00 WINDINGS

(a) Windings shall be made using Class A paper insulated copper conductors.

(b) The conductors shall be of electrolytic grade copper free from scales and burrs.

(c) The insulation of transformer windings and connections shall be free from insulating

compounds which are liable to soften ooze out, shrink or collapse and to non-catalytic and

chemically inactive in transformer oil during service.

(d) Coil assembly and insulating spaces shall be so arranged as to ensure free circulation of oil

and to reduce the hot spot of the winding.

(e) The coils would be made up, shaped and braced to provide for expansion and contraction

due to temperature changes.

(f) The conductor shall be transposed at sufficient intervals in order to minimize eddy currents

and to equalize the distribution of currents and temperature along with windings.

(g) Tappings shall be so arranged as to preserve the magnetic balance of the transformer at all

voltage ratio

.

Page 171: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 171 -

Signature of Contractor No. of Corrections Executive Engineer

9.00 INTERNAL EARTHING ARRANGEMENTS:

9.1 GENERAL:

All metal parts of the transformer with the exception of the individual core laminations, core

bolts and associated individual clamping plates shall be maintained at some fixed potential.

9.2 EARTHING OF CORE CLAMPING STRUCTURE :

The top main core clamping structure shall be connected to the tank body by a copper strip.

The bottom clamping structure shall be-earthned by one or more of the following methods.

(a) By connection through vertical tie-rods to the top structure.

(b) By direct metal to metal contact with the tank base, maintained by the weight of the

core and windings

(c) By a connection to the top structure on the same side of the core as the main earth

connection to the tank.

9.3 EARTHING OF MAGNETIC CIRCUIT:

The magnetic circuit shall be earthed to the clamping structure at one paint only through a link

placed in an accessible position beneath an inspection opening in the tank cover. The connection to

the link shall be on the same side of the core as the main earth connections.

Magnetic circuits having insulated sectional construction shall be provided with a separate link for

each individual section where oil ducts or insulating barriers parallel to the plane of the laminations

divide the magnetic circuit into two or more electrically separate parts the ducts or barriers shall be

bridged in accordance with clause 7.1 and the magnetic circuit shall not be regarded as being

sectional construction.

9.4 EARTHING OF COIL CLAMPING RINGS:

Where coil clamping rings are of metal at earth potential, each ring shall be connected to the

adjacent core clamping structure on the same side of transformer as the main earth connection.

9.5 SIZE OF EARTHING CONNECTION:

All earthing connections with the exception of these from the individual; coil clamping rings shall

have a cross-sectional area of not less than 0.8 sq. cm. connections inserted between laminations of

different sections of core shall be a cross-sectional area of not less than 0.2 sq. cm.

Page 172: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 172 -

Signature of Contractor No. of Corrections Executive Engineer

10.00 TANK:

10.1.1 Transformer tank shall be of conventional type

10.1.2 Transformer tank and cover shall be fabricated from good commercial grade low carbon

steel suitable for welding and of adequate thickness. The tank of the transformer shall be

complete with all accessories and shall be designed so as to allow

the complete transformer in the tank and filled with oil, to be lifted by crane or jacks,

transported by road, rail or water without over straining any joints and without causing

subsequent leakage of oil.

10.1.3 The main tank body excluding tap changing compartment, and radiators shall be capable of

with standing vacuum gauge pressure of 68.0 KN/M2 (500 mm of Hg)

10.1.4 The base of each tank shall be so designed that it shall be possible to move the complete

transformer unit by skidding in any direction without injury when using plates or rails

10.1.5 The tank shall be provided with fixed under base. If the base is of channel construction it

shall be designed to prevent the retention of water. Tank stiffeners shall also be designed to

prevent retention of water.

10.1.6 Whenever possible the transformer tank and its accessories shall be designed without

pockets wherein gas may collect. Where pockets cannot be avoided, pipes shall be provided

to vent the gas into the main expansion pipe. The vent pipes shall have minimum inside

diameter of 15 mm except for short branch pipes which may be 6 mm minimum inside

diameter.

10.1.7 All joints other than those which may have to be broken shall be welded, when required they

shall be double welded. All bolted joints to the tank shall be fitted with suitable oil-tight

gaskets which shall give a satisfactory service under the operating conditions and guaranteed

temperature rise conditions. Special attention shall be given to the methods of making hot oil

tight joints between the tank and cover as also between the cover and the bushing and all

other outlets to ensure that the joints can be remade satisfactorily at the site and with ease

with the help of semiskilled labour.

10.1.8 One No detachable aluminum ladder shall be provided to ascent the top of transformer tank.

Ladder shall be fitted with clamps to the tank.

10.2 LIFTING AND HAULAGE FACILITIES

The tank shall be provided with:

a) Lifting lugs suitable for lifting the transformer complete with oil .

Page 173: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 173 -

Signature of Contractor No. of Corrections Executive Engineer

b) A minimum of four jacking lugs in accessible positions to enable the transformer complete

with oil, to be raised or lowered using hydraulic or mechanical jacks. The minimum height

of the lugs above the base shall be

500 mm.

c) Suitable haulage holes shall be provided.

10.3 TANK COVERS:

The tank cover shall be of adequate strength, and shall not be distort when lifted, inspection opening

shall be provided as necessary to give easy access to bushings or changing ratio or testing the earth

connection. Each inspection opening shall be of ample size for the purpose for which it is provided

and at least two openings one at each end of the tank, shall be provided.

The tank cover shall be sloped to prevent retention of rainwater and shall not distort when lifted.

The tank cover and inspection covers shall be provided with suitable lifting arrangements.

Unless otherwise approved, inspection covers shall not weigh more than 25 kg each.

The tank cover shall be fitted with pockets for a thermometer and for the bulb for oil and winding

temperature indicators, protection shall be provided where necessary, for each capillary tube.

The thermometer pocket shall be fitted with a captive screwed top to prevent the ingress of water.

The pockets shall be located in the position of maximum oil temperature at continuous maximum

rating and it shall be possible to remove the instrument bulbs without lowering the oil in the tank.

Compressible gasket, if sued shall have metallic steps to prevent over compression.

Guide within the tank or other satisfactory means shall be provided for directing the core and coils

as they are being lowered into or removed from the tank.

Ample space shall be provided above the tank bottom for collection of sediments.

10.4 AXLES AND WHEELS

The transformer shall be provided with wheels and axles of such dimension and so supported that

under any service condition they shall not deflect sufficiently to interfere with the movement of the

transformer. Suitable locking arrangement shall be provided to prevent the accidental movement of

the transformer.

All wheels shall be detachable and shall be cast iron or steel as required. They shall be bi-directional

type and suitable for 1676 mm gauge.

Page 174: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 174 -

Signature of Contractor No. of Corrections Executive Engineer

The wheels shall be so arranged that they can be turned through 900 when the tank is jacked up clear

of the rails or floor. Locking arrangement for short circuit and seismic condition shall be provided

so as to avoid vibration of tank.

10.5 CONSERVATION VESSELS, OIL GAUGE AND BREATHER:

A conservator complete with sump and drain valve shall be provided in such a position as not to

obstruct the electrical connections to the transformer having a capacity between highest and lowest

visible levels to meet the requirement of expansion of the total cold oil volume in the transformer

and cooling equipment from the minimum ambient temperature to 900C. The minimum indicated oil

level shall be with the feed pipe from the main tank covered with not less than 15 mm depth of oil

and the indicating range of oil level shall be from minimum to maximum.

If the sump is formed by extending the feed pipe inside the conservator vessel, this extension shall

be for least 25 mm. The conservator shall be designed so that it can completely drained by means of

the drain valve provided, when mounted as in service.

One end of the conservator shall be bolted into position so that it can be removed for cleaning

purpose.

One oil gauge magnetic type shall be provided.

The oil level when temperature reaches 300C shall be marked on the gauge.

Taps or valves shall not be fitted to oil gauge.

The oil connection from the transformer tank to the conservator vessel shall be arranged at a rising

angle of 3 to 9 degrees to the horizontal upto the Buchholz Relay and shall consist of

80 mm, inside diameter pipes as per IS:3639.

A valve shall be provided at the conservator to cut off the oil supply to the transformer after

providing a straight run of pipe for at least a length of five times the internal diameter of the pipe of

the tank side of the gas and oil actuated relay and at least three times the internal diameter of the

pipe of the conservator side of the gas and oil actuated relay.

Conservator vessel shall be fitted with a breather in which silica gel is the dehydrating agent and

designed so that

a) The passage of air is through the silica gel.

b) The external atmosphere is not continuously in contact with silica gel

c) The moisture absorption indicated by a changing in colour of the tinted crystals can be

easily observed from distance.

d) The breather shall be mounted at approximately 1400 mm above ground level

Page 175: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 175 -

Signature of Contractor No. of Corrections Executive Engineer

The relevant provisions as applicable depending on type of cooling shall prevail.

10.6 FILTER AND DRAIN VALVES, SAMPLING DEVICES AND AIR RELEASE PLUG:

The transformer shall be fitted with the following:

a) The filter and drain valves as specified

b) A drain valve to be fitted to each conservator, for diameter upto 650 mm size of the valve 15

mm.

For diameter above 650 mm. size of the valve 25 mm.

c) A robust oil sampling device shall be provided at the top and bottom of the main tank.

The sampling device shall not be fitted on the filter valves specified under (a) above.

d) one 15 mm air release plug

All other valves opening to atmosphere shall be fitted with blank flanges.

10.7 RADIATOR CONNECTIONS :

Valves and valve mountings shall be provided as specified under technical specification, depending

on type of cooling applicable.

They shall be of full way type with internal screw and shall be opened by turning counter clockwise

when facing the hand wheel.

Means shall be provided for padlocking the bottom valves in the open and closed positions. This is

required for the valves where opening devices like hand wheel, keys, etc are the integral part.

All valves except radiator valves shall be of gun metal. The radiator valves shall be of cast iron

body with gun metal fittings.

Every valve shall be provided with an indicator to show clearly the position of the valve.

All valves shall be provided with flanges having machined faces.

The drilling of valve flanges shall comply with the requirements of IS: 3639.

10.8 PRESSURE RELIEF DEVICE:

The pressure relief device shall be provided of sufficient size for rapid release of any pressure that

may be generated within the tank, and which might result in damage to the equipment. The device

shall operated at a static pressure of less than the hydraulic test pressure for transformer tank. Means

shall be provided to prevent the ingress of rain.

The relief device shall be mounted on the main tank and if on the cover, shall be fitted with skirt

projecting 25 mm. inside the tank and of such a design to prevent gas accumulation.

Page 176: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 176 -

Signature of Contractor No. of Corrections Executive Engineer

If a diaphragm is used it shall be of suitable design and material and situated above maximum oil

level.

If a diaphragm is put at base of pipe, an oil gauge is required on the stand pipe for indicating

fracture of diaphragm.

An equalizer pipe connecting the pressure relief device to the conservator, shall be provided for

relieving or equalizing the pressure at the pressure relief valve.

10.9 ACCOMMODATION For AUX. APPARATUS:

A neutral current transformer shall be provided adjacent to the neutral terminal and tank.

10.10 EARTHING TERMINAL:

Two ground pads with bolting arrangements for M.S. earthing strip shall be welded to the

transformer tank or base, ground pads shall be near the base of transformer at about 1.5 M above the

ground level and welded to one corner of the opposite tank sides. The pads shall be complete with

threaded holes with nut, bolts etc. The earthing terminals shall be capable of carrying for 4 seconds

the short circuit current of the transformer.

10.11 RATING DIAGRAM AND PROPERTY PLATES:

The following plates shall be fixed to the transformer tank at an average height of about 1750 mm

above ground level.

a) A rating plate bearing the data specified in the appropriate clauses of IS:2026

b) A diagram plate showing the internal connections and also the voltage vector relationship of

the windings in accordance with IS:2026 and in addition a plan view of the transformer,

giving the correct physical relationship of the terminals No., load voltage shall be indicated

for each tap.

All valves shall be provided with label showing the function of the valve.

c) A plate showing the location and function of all valves and air release cocks or plugs. This

plate shall also warn operators to refer to the maintenance instructions before applying the

vacuum treatment for drying. The above plates shall be of materials capable for withstanding

continuous outdoor service.

10.12 JOINTS AND GASKET:

All gaskets used for making oil tight joints shall be of proved material such as guaranteed cock

bounded with synthetic rubber or synthetic rubber gaskets.

Page 177: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 177 -

Signature of Contractor No. of Corrections Executive Engineer

11.00 COOLING:

The transformer shall be provided with ONAN type of cooling to give the rated output at rated

voltage and frequency without exceeding the limits of temperature rise as specified in IS: 2026/1972

or latest amendment thereon.

11.1 Radiators shall be mounted directly to the tank.

11.1.1 Radiators connected directly to the tank shall be detachable and shall be provided with

machined or ground flanged inlet and outlet branches, 19 mm drain plug shall be provided at

the bottom and 19 mm air release plug shall be provided at the top of each radiator for

draining and filling.

11.1.2 Valves shall be provided on the tank at each point of connection to the tank.

11.2 The oil circuit of all coolers shall be provided with the following:

a) A valve at each point of connection to the transformer tank

b) Removable blanking plates to permit the blanking off the main oil connection of each

radiator.

c) A drain valve 25 mm at lowest point of each bank of radiator.

d) A thermometer pocket fitted with a captive screwed cap on the inlet and outlet oil

branches of each separately mounted cooler tank.

e) A filter valve at the top and bottom of each cooler tank of cooler.

f) Air release plugs 15 mm.

The radiators shall be so designed that they are accessible for cleaning and painting and to prevent

accumulating of water on the outer surfaces and to ensure against formation of gas pockets when the

tank has been filled.

Tenderer shall clearly mention in his bid the details regarding radiators, their location, type quality,

no. of valves, cooling surfaces, permissible pressure and the various accessories provided for

radiators.

12.0 TAP CHANGING GEAR:

Off Load tap changing gear:

The transformer shall be equipped with manual off circuit tap changer connected to the taps on high

voltage winding for varying its effective ratio of transformation whilst the transformer is de-

energized and without producing phase displacement.

The Tapping range shall be ±7.5% in the steps of 2.5 % on either side.

Page 178: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 178 -

Signature of Contractor No. of Corrections Executive Engineer

The facilities for locking the mechanism in any of position shall be provided along with tap position

indicator. The mechanism shall be such that it will be impossible to leave a winding open on short

circuit when the operating handle is in a locked position. Warning plate indicating that switch shall

be operated only when the transformer is de-energized, shall be fitted. Rated output on all taps

without exceeding the temperature rise shall be available from the transformer.

13.00 TERMINAL & BUSHING:

13.1 H. V. BUSHINGS:

The high voltage bushing shall be of 36 kV class outdoor, oil immersed type and the neutral

bushings shall be of porcelain stem type. The high voltage bushing shall be mounted on the

detachable adopter and the neutral bushing shall be mounted directly on cover.

The electrical characteristics of bushings shall conform to the IS: 3347 and IS : 2099. They shall

have high factor of safety against leakage to ground and shall be so located as to provide adequate

electrical clearance between the bushings and grounded parts. Bushings of identical voltage ratings

shall be interchangeable. They shall be equipped with terminals of approved

type and size. All external current carrying contact terminals shall be silver plated adequately. The

insulation class of high voltage neutral bushing shall be properly coordinated with the insulation

class of the neutral of H .V. spacing between the bushings shall be adequate to prevent flashover

between the phases under all conditions of operations.

Special adjustable rod gaps shall be provided for the 33 KV terminal bushing to enable the co-

ordination of insulation level with surge diverter. The gap settings shall be fixed with reference to

the impulse strength of 33 KV.

All porcelain used in bushing shall be wet process homogenous free from lamination, cavities and

other flaws or imperfection that might effect mechanical or dielectric strength and shall be oil

vitrified through and impervious to moisture. The glazing of porcelain shall be uniform in colour

and shall be free from imperfections, burns, blisters etc.

Clamps and fittings made of steel or malleable iron shall be galvanized. All bolt threads shall be

greased before erection.

The bushing flanges shall not be of re-entrant shape which may trap air.

The minimum clearance in air between live conductive parts and live conductive part to earthed

structures shall be furnished.

All bushings shall have puncture strength greater than the dry flash over voltage.

Page 179: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 179 -

Signature of Contractor No. of Corrections Executive Engineer

The tenderer shall give guarantee withstand voltage for bushings and shall furnish the calibration

curves with different settings of co-ordination gaps to decide the actual gap setting. The tenderer's

recommendations, in this regards are invited.

14.00 ARRANGEMENT OF L.V. TERMINALS & TERMINAL BOX:

The supplier shall provide on 6.6 KV i.e. low voltage side bushings, terminals which shall be

suitable for connecting to suitable numbers of XLPE cables per phase. The details of cables will be

furnished to successful tenderer.

15.00 TEMPERATURE INDICATING DEVICE & ALARM:

The following temperature indicators shall be provided for the transformer.

i) Dial type thermometer for oil temperature with pointer to register the highest temperature

reached and adjustable alarm and trip contacts.

ii) Dial type thermometer for winding temperature indicator with a pointer to register the

highest temperature reached and the adjustable alarm and trip contacts for winding.

The temperature indicators shall be housed in the marshalling box.

1 No. of winding temperature indicator shall be provided.

Winding temperature indicator shall be suitable for operation with rating of 5 Amps., 110 volt +

10% -15% D.C. for following purpose.

i) To provide “winding temperature high” alarm.

ii) To provide “winding temperature too high” alarm and trip.

The tripping contacts of winding temperature indication shall be adjustable to close between 90°c

and 150°c and alarm contacts to close between 90°c and 120°c and both shall re-open when the

temperature has fallen by about 50°C.

It shall be possible to calibrate the scale and adjust to give commands to all contacts.

Equipment/contacts shall be accessible on removal of cover.

The temperature indicator shall be so designed that it shall be possible to check the operation of the

scale contacts and associated equipment.

Connection shall be brought from the device to terminal placed inside the marshalling box.

16.00 BUCHHOLZ RELAY:

The transformer shall be fitted with Buchholz relay with “Reed” type contacts mounted on the

conservator of feed pipe, with two auxiliary contact. The relay shall confirm to IS: 3637 or latest

amendment thereon.

Page 180: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 180 -

Signature of Contractor No. of Corrections Executive Engineer

The upper element shall be made use of for operating the alarm and the lower element for operating

the tripping.

The relay shall be provided with a test cock to take a flexible pipe connection for checking the

operation of relay.

To allow gas to be collected at ground level, a pipe approximately 5 mm in-side diameter shall be

connected to the gas release cock of the Buchholz relay and brought down to a point approximately

1.25 m above ground level, where it shall be terminated by a cock.

A machined surface shall be provided on the top of each relay to facilitate the setting of the relays

and to check the mounting angle in the pipe and the cross level of the relay.

The design of the relay mounting arrangements, and the associated pipe work shall be such that mal-

operation of the relay shall not take place under normal service conditions.

The pipe work shall be so arranged that all gas rising from the transformer shall pass into Buchholz

relay. The oil circuit through the relay shall not form a delivery path in parallel with any circulating

oil pipe, nor shall it be tied into or connected through the pressure relief vent. Sharp bends in the

pipe work shall be avoided.

Adequate clearance between oil pipe work and live metal shall be provided.

The supplier shall note that Buchholz relay with Mercury contacts will not be acceptable.

17.00 MARSHALLING BOX:

A sheet steel vermin proof, well ventilated and weather proof marshalling box of suitable

construction shall be provided for the transformer ancillary apparatus. The box shall have domed or

sloping roofs and the interior and exterior painting shall be as specified under clause “Painting”.

The door of the Kiosk shall be fitted with clear glass widow to facilitate the observations of the dial

thermometer readings.

As the marshalling kiosk is to be fitted on the transformer meant for outdoor installation, the gaskets

provided for its door shall be of such type that it seals the kiosk to make it perfectly water proof.

The marshalling kiosk shall house the following equipment:

1. Heater with thermostat control.

2. 60 W, 230 V bulb with 5A Switch.

3. 5A, 3 pin socket with switch.

4. Fuse and links.

5. Winding temperature indicator with electrical contacts for alarm and trip positions.

6. Oil temperature indicator with electrical contacts for alarm and trip position.

Page 181: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 181 -

Signature of Contractor No. of Corrections Executive Engineer

7. Terminal block with 20%spare terminal in the kiosk (Wiring diagram shall be

preferably attached/pointed on non-corrosive metal sheet attached to inside cover).

8. Gland plates for incoming and out-going cables.

All electrical connections shall be of standard copper PVC insulated as per IS : 694 Tinned copper

lugs crimped with insulating sheet shall be used for connection. The temperature indicators shall be

so mounted that the dials are not more than 1600 mm from ground level. All incoming cables shall

enter the kiosk from the bottom and the gland plate shall not be less than 450 mm from the base of

box. The gland plate associated compartment shall be sealed in suitable manner to prevent the

ingress of moisture from the cable trench.

Undrilled glands plate shall be provided for accommodating gland for incoming and outgoing

cables.

18.00 PROTECTIONS:

It is proposed to provide the following protections for the transformer.

1. Differential protection

2. Over current and earth fault protection

3. Over fluxing protection

4. Restricted earth-fault protection .The protection relays will trip the corresponding 33 kV

circuit breakers. The tenderer may recommend any additional protection which he

considers necessary.

5. Double float buchholz relay with “Reed” type contacts operating at two levels, one for

alarm and other for tripping.

19.00 CONTROL CONNECTIONS AND INSTRUMENT WIRING, TERMINAL BOARD

AND FUSES:

All wiring connections terminal boards, fuses and links shall be suitable for tropical atmosphere.

Any wiring liable to be in contact with oil shall have oil resisting insulation and the bared ends of

stranded wire shall be sweated together to prevent creepage of oil along the wire.

Page 182: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 182 -

Signature of Contractor No. of Corrections Executive Engineer

There shall be no possibility of oil entering connection boxes used for cables or wiring.

Panel connections shall be neatly and squarely fixed to the panel. All instruments and panel wiring

shall be run in PVC or non-rusting metal cleats of the limited compression types. All wiring to a

panel shall be taken from suitable terminal boards.

Where conduits are used, the runs shall be laid with suitable falls, and the lowest parts of the run

shall be external to the boxes. All conduit runs shall be adequately drained and ventilated. Conduits

shall not be run at or below ground level.

When 415 volt connections are taken through junction boxes or marshalling boxes they shall be

adequately screened and “415 VOLTS DANGER”, notices must be fixed to the outside of the

junction boxes or marshalling boxes.

All box wiring shall be in accordance with relevant ISS. All wiring shall be of PVC cable of

stranded, copper of 660 volt grade and size not less than 4 sq. mm. for C. T. leads and not less than

2.5 Sq .mm. for other connections.

All wires on panels and all multi cores cables shall have ferrules which bear the same number at

both end.

At those points of inter-connection between the wiring carried out by separate contractors, where a

change of number cannot be avoided, double ferrules shall be provided on each wire. The change of

numbering shall be shown on the appropriate diagram of the equipment.

The same ferrule number shall not be used on wires in different circuits on the same panels.

Ferrules shall be of white insulating material and shall be provided with glossy finish to prevent the

adhesion of dirt. They shall be clearly and durably marked in black and shall not be affected by

damp or oil.

Stranded wires shall be terminated with tinned Ross Courney terminals, claw washers or crimped

tubular lugs. Separate washers shall be suited to the size of the wire terminated. Wiring shall in

general be accommodated on the sides of the box and the wires for each circuit shall be separately

grouped. Back of panel wiring shall be arranged so that access to the connecting stems of relays and

other apparatus is not impeded.

Wires shall not be joined or tied between terminal points.

Wherever practicable, all circuits in which the voltage exceed 125 Volts, shall be kept physically

separated from the remaining wiring. The function of each circuit shall be marked on the associated

terminal boards.

Page 183: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 183 -

Signature of Contractor No. of Corrections Executive Engineer

Where apparatus is mounted on panel all metal cases shall be separately earthed by means of copper

wire or strip having a cross section of not less than 2 sq. mm where strips is used, the joints shall be

sweated.

Be separately earthed by means of copper wire of strip having a cross section of not less than 2 sq.

mm. where strip is used, the joints shall be sweated.

All wiring diagram for control and relay panel shall preferably be drawn as viewed from the back

and shall show the terminal board arranged as in service. All diagrams shall show which view is

employed.

Multi core cable tails shall be so bound that each wire may be traced without difficulty to its cable.

The screens of screen pairs of multi core cables shall be earthed at one end of the cable only. The

position of earthing connections shall be shown clearly on the diagrams.

All terminals board shall be mounted obliquely towards the rear doors to give easy access to

terminations and to enable ferrule number to be read without difficulty.

Terminal board rows should be spaced adequately not less than 100 mm. apart to permit convenient

access to wires and terminations.

Terminals boards shall be so placed respect to the cable gland (at minimum distance of 200 mm) as

to permit satisfactory arrangement of multi core cable tails.

Terminal boards shall have pairs of terminal for incoming and outgoing wires, insulating barriers

shall be provided between adjacent connection. The height of the barriers and the spacing between

terminals shall be such as to give adequate protection while allowing easy access to terminals. The

terminals shall be adequately protected with insulating dust proof covers.

No live metal shall be exposed at the back of the terminals boards.

All fuses shall be of the cartridge type.

Fuses and links shall be labeled.

20.00 SPARES

The list of spares required for the transformer is given separately.

The tenderer shall quote the unit prices for these spares and also total amount involved. If tenderer

considers the necessity of some additional item of spares, he should quote the unit prices for the

same indicating the recommended quantity.

The department reserves the right to order as many item of spares up to six months from date of

order, at the prices quoted in the bid.

Page 184: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 184 -

Signature of Contractor No. of Corrections Executive Engineer

21.00 FITTINGS AND ACCESSORIES

The transformer shall be provided with the following accessories and fittings:-

1) Inspection cover.

2) Rating and diagram plate.

3) Two earthing terminals.

4) Lifting lugs.

5) Drain valve with plug or blanking flange.

6) Dehydrating silica gel breather with oil Seal.

7) Oil level indicator with min. marking (magnetic type with low oil alarm contact).

8) Thermometer pocket on tank cover.

9) Oil filling hole and cap.

10) Conservator with associated accessories as detailed in specifications.

11) Air release device.

12) Jacking lugs.

13) Filter valves (Two No. with caps and adapter, one at the bottom and other at the top of

the transformer).

14) Single flanged bi-directional rollers broad gauge (1676 mm.)

15) Dial type thermometer for oil temperature with maximum pointer and adjustable alarm

and trip contacts.

16) Winding temperature indicators with maximum pointer and adjustable alarm and trip

contacts.

17) Explosion vent.

18) Double float Buchholz Relay with alarm and trip contacts with double element

arrangements and one shut off valve on conservator side.

19) Marshalling kiosk complete with accessories, spare contacts, wiring heaters, lighting,

earthing arrangement and wiring diagram etc. as detailed in this specification.

20) Pulling eyes on both sides.

21) Bottom oil sampling valve.

22) Detachable radiators.

23) Neutral C. T.

24) 3 Nos. H.V. Bushings with Bimetallic flexible connectors.

Page 185: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 185 -

Signature of Contractor No. of Corrections Executive Engineer

25) Pressure relief valve with set of initiating contacts.

26) OFF load Tap Changer.

27) 3 Nos. L.V. Bushings, suitable for XLPE cable connection.

28) 1 No. H. V. Neutral Bushing on Tank cover.

29) 1 No. detachable aluminum ladder with clamps on tank wall.

30) 1 No. L. V. neutral bushing.

31) Hydraulic jacks (4 Nos.) of suitable capacity for handling of transformer.

NOTE : The sizes of drain valves, filter valves, relief valves plugs etc. shall be as per the

recommendations of CBIP manual on Transformer.

22.00 GUARANTEE:

The equipment and its fittings, accessories etc. must be free from inherent defects in design,

workmanship and material. The tenderer shall furnish along with the tender the design data and

guaranteed performance data and technical particulars in the data sheet appended to this

specification.

TENDERER SHALL GUARANTEE UNDER PENALTYTHE LOAD LOSSES AND NO LOAD

LOSSES.

23.00 FOUNDATION:

The foundation for the transformer will be provided by the purchaser after receipt of drawings from

the Supplier. The successful tenderer shall have to furnish the technical details for the foundation,

together with the details of pockets etc. needed for the secondary concreting. The rails and other

relevant fixtures/anchors to be fixed in the foundations shall be supplied by the contractor at his

cost. Fixing of rails for foundation shall be carried out by the Department under supervision of

supplier's Engineer.

24.00 POWER SUPPLY:

The following power supply will be made available at site .

1. A.C. Supply 415 V, 3 Phase, 4wire with actual variation.

2. D.C. Supply 110 V + 10% to - 15%

Auxiliaries and General Circuits shall therefore be designed to suit the above system.

Page 186: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 186 -

Signature of Contractor No. of Corrections Executive Engineer

If any other voltage is needed, the supplier shall make his own arrangement with suitable power

converters, transformer, invertors, etc. to derive the required supply. The cost thereof is deem to

have been included in the bid cost.

25.00 PACKING AND MARKING:

1) Materials and equipments shall be prepared for dispatch in such a manner to facilitate

handling and protect them from damage in transit.

2) Before dispatch all equipment shall be properly match marked with distinctive direction

marks attached on them corresponding to those on drawing so as to ensure correct assembly

and alignment at site.

3) All parts shall be adequately match marked to facilitate field erection. Boxes and crates shall

be marked to facilitate field erection. Boxes and crates shall be marked with contract No.

and shall have packing list enclosed showing the parts contained therein.

4) All pieces weighing more than one ton shall have approximately weight marked thereon.

5) The packing shall be such that it is acceptable to the insurance authorities.

6) Tenderer shall ascertain and take into consideration the limitation of transport dimension and

weight from road as well as rail point of view.

26.00 TRANSPORT:

The Tenderer should verify the limitation on size weight for road transport upto project site and then

decide whether the transformer tank with core and winding to be dispatched duly filled with oil or

without oil. The tank shall be filled with inert gas at appropriate pressure in

Case the transformer is to be dispatched without oil. The necessary instruments required for

monitoring of the pressure of the inert gas shall be provided. In case the transformer tank with core

and winding is to be dispatched duly filled with oil, sufficient space shall be left above the oil to

take care of the expansion of oil and this spaces filled up with pure air/inert gas under atmospheric

pressure.

All external fitting such as conservator, Buchholz relay, Dehydrating Breather, Explosion vent,

Radiators, Rollers etc. which are liable to damage in transit shall be removed and packed separately.

All opening created on the tank by the removal of components shall be blanked with identifiable

blanking plates. All openings on the fittings removed shall be closed with blanking plates.

27.00 INSPECTION AND TESTS :-

Page 187: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 187 -

Signature of Contractor No. of Corrections Executive Engineer

The representative of the Purchaser shall have access to contractors and sub-contractors works at

any time during working hours for the purpose of inspection and progress of manufacture and tests

on the equipment.

The tests specified under this clause shall be carried out as per the provision of IS: 2026 and in

presence of the representative of the department. An advance intimation of not less than 15 days

shall be given to the department about the readiness of the sub-assembly / equipment for inspection

and testing.

No dispatch of the equipments shall be made unless the test certificates are approved by the

Purchaser subsequent to the inspection made by the representative.

The acceptance of approval of the test certificates of any materials / equipment shall not absolve the

contractor from the responsibility for guaranteed performance.

29.00 TESTS AT MANUFACTURERS WORKS AND AT SITE:

(AS PER IS : 2026)

29.1 ROUTINE TESTS (AT MANUFACTURER'S WORKS):

The following routine tests shall be carried out on the completely assembled transformer and

accessories, in the presence of the representative of purchaser. Oil leakage test being a routine test

shall be carried out on the transformer in presence of departments representative.

a) Measurement of winding resistance.

b) Measurement of voltage ratio and check of voltage vector relationship.

c) Measurement of impedance voltage/short circuit impedance (Principal tapping).

d) Measurement of load loss.

e) Measurement of no load loss and current.

f) Measurement of Insulation resistance.

g) Dielectric test specified in IS:2026 (Part-III) as enumerated below:

i) Separate source power frequency voltage withstand test.

ii) Induced over voltage withstand test.

h) Operational test for off circuit tap changer switch

i) Tests on insulating oil in accordance with IS: 335/1972.

B) OIL LEAKAGE TEST ON TANK (AT MANUFACTURER'S WORKS):

The tank and oil filled compartments shall be tested for oil tightness by being completely filled with

oil of a viscosity not greater than that of insulating oil to IS: 335 at an ambient temperature and

subjected to a pressure equal to the normal pressure plus 35 KN/m2 (5lb/sq.in.) measured at the base

Page 188: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 188 -

Signature of Contractor No. of Corrections Executive Engineer

of the tank. This pressure shall be maintained for a period of not less than 12 hours, during which

time no leakage shall occur. The test shall be witnessed by Purchaser's representative.

C) For bought out items suppliers test certificates shall be furnished.

29.2 TESTS BEFORE COMMISSIONNING (AT SITE) :

After erection at site, the transformer shall be subjected to the following tests:

1) Insulation Resistance.

2) Ratio Test.

3) Oil test before putting transformer into operation, the oil shall be tested as per IS : 335/1972.

4) Any other test considered essential for commissioning.

Testing equipments, measuring instruments, tools, tackles, etc. will have to be arranged by the

Supplier at his cost.

5.17 LIST OF STANDARDS :

----------------------------------------------------------------------------------------------------------------

Sr. No. Standard Ref. No. Title

----------------------------------------------------------------------------------------------------------------

I. CIRCUIT BREAKERS :

1. IS 2516 Specification for circuit breakers.

2. IEC 375 Specification and acceptance of

new supply of sulpher hexafluoride.

3. IS 2147 Degree of protection provided for

enclosure for low voltage switch

gear and control gear.

4. IS 325 Specification for 3 phase induction

motor.

5. IS 2629 Recommended practice for hot dip

galvanizing of Iron & Steel.

6. CIGRE Working Switching over voltage in EHV &

group Report UHV systems with special reference

dt.13.02.1973 to closing and reclosing of

transmission lines.

Page 189: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 189 -

Signature of Contractor No. of Corrections Executive Engineer

7. Indian 1956 Indian Electricity Rules.

Electricity

Rules.

8. IS 4379 High pressure cylinder in which

IS 7311 SF-6 is transported and stored at

site.

---------------------------------------------------------------------------------------------------------------- Sr. No. Standard Ref. No. Title

----------------------------------------------------------------------------------------------------------------

II. ISOLATOR :

1. IS 1818 Alternating current Isolators and

earthing switches.

2. IS 9921 --- do ---

3. IS 2544 Insulators.

4. IS 4759 Hot dip galvanisation coating on

structural steel.

5. IS 1473 Electroplated coating of Zinc on

Iron and Steel.

6. IS 375 Marking and arrangement for

switchgear, busbar, main collectors

and auxiliary wiring.

III. CURRENT TRANSFORMER :

1. IS 2705 Current Transformers.

2. IS 2099 High Voltage porcelain bushing.

3. IS 3347 Dimensions of porcelain .transformer

Page 190: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 190 -

Signature of Contractor No. of Corrections Executive Engineer

bushings.

q. IS 2071 Method of high voltage testing.

5. IS 335 Insulation oil for transformer and

switchgear.

----------------------------------------------------------------------------------------------------------------

Sr. No. Standard Ref. No. Title

----------------------------------------------------------------------------------------------------------------

IV. POTENTIAL TRANSFORMER :

1. IS 3156 Voltage Transformers.

2. IS 3202 Code of practice for climate

proofing of electrical equipment.

V. LIGHTNING ARRESTORS :

1. IS 3070 Lightning Arrestors for alternating

(Part-I) current, system. Part I Non Liner

1974 resistor type Lightning Arrestors.

2. IS 3070 Lightning Arrestors for alternating

(Part-ll) current system Part-ll - Expulsion

1974 type L.A.

VI. CONTROL AND RELAY PANELS :

I. IS 8686 Static Protective Electrical relays.

2. IS 2705 Auxiliary current transformer.

3. IS 3156 Auxiliary potential transformer.

Page 191: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 191 -

Signature of Contractor No. of Corrections Executive Engineer

4. IS 722 Energy meter.

5. IS 1248 Indicating Instruments.

6. IS 6875 Control Switches.

7. IS 5 Colour shade

8. IS 375 Colour Code for wiring of A.C.D.C.

& C.T.P.T. Circuits.

9. IS 2147 Degree of protection for cubicles.

10. IS 6005 Code of practice for phosphating

iron and steel.

11. IS 4483 Panel cut out dimensions for

electrical relays.

---------------------------------------------------------------------------------------------------------------- Sr. No. Standard Ref. No. Title

----------------------------------------------------------------------------------------------------------------

12. IS 9224 Fuses.

13. IS 4794 Push buttons.

14. IS 2208 H.R.C. Fuses.

VII) POWER & CONTROL POWER CABLE :

1. IS 1554(Part-I) P.V.C. insulate (heavy duty) electric

cables - voltage class including

1988 1.1 kV.

2. IS 81 30-I 984 Conductors for insulated electric

cables.

3. IS 5831-1984 PVC insulation and sheath of

electric cables.

VIII) G .I. PERFORATED CABLE TRAYS & ACCESSORIES :

1. IS 1700-1974 Steel Sheet and strips.

(Part I, II, III)

2. IS 2663-1986 Method of testing uniformity of

coating on zinc coated articles.

Page 192: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 192 -

Signature of Contractor No. of Corrections Executive Engineer

3. IS 6158-1984 Recommended practice for safe-

guarding against enbrittlement of

hot dip galvarising Iron and Steel

products.

4. IS 6159-1985 Recommended practice for design

and preparation of material prior

to galvanizing.

5. IS 2629-1985 Recommended practice for hot dip

galvanizing of Iron and Steel.

Page 193: GOVERNMENT OF MAHARASHTRA WATER RESOURCES …wrd.maharashtra.etenders.in/tnduploads/wrd/tndheader/TND... · BID No. EE/VHELIDN/ /2011-12 Design , Supply, erection, testing and commissioning

- 193 -

Signature of Contractor No. of Corrections Executive Engineer

ACCEPTABLE MAKE

Sr. No. Equipment Name of acceptable make

1 33 KV SF-6 circuit

breaker

(1) ABB , (2) Crompton Greaves, (3) BHEL (4)

MSETCL/MSEDCL Approved

2 33 KV Isolator (1) BIMCO Isolator ltd. (2) Pactil, Mumbai

(3)Kiron (4) GR power (5) Atlas Mumbai (6)

MSETCL/MSEDCL Approved

3 Lightening

Arrestor

(1) ELPRO (2) OBLUM (3) LAMCO (4)

MSETCL/MSEDCL Approved

4 Relays English Electric, ABB, GEC Alsthom India, Seimens,

Easum, Crompton greaves or MSETCL/MSEDCL

Approved

5 All other

Electrical Items

Relevant I.S.I. marked.

6 Power

transformer

M/s. Crompton Greaves Ltd., M/s. Kirloskar Electric.

M/s. Bharat Transformers, M/s. Mahati Electric, M/s

Atlanta, M/s. Nagpur wires & Transformers , M/s

EMCO transformers, M/s Andrew Yule, M/s Apex

Electrical, M/s Bharat Bijlee, Trans Fab, Industrial

meters, NGEF Ltd, TELK, IMP Power ltd

7 Current

Transformer and

potential

transformers

ITC,STERLITE,VICTRANS, POWERAGE,

CROMPTON GREAVES, GYRO OR

MSETCL/MSEDCL APPROVED

8 Control and

power Cable

M/s Polycab, Kenter, Central cable ltd, CCI, Kona,

Finolex, or MSEDCL/ MSETCL Approved