ESTIMATE Division Mhaisal Pump House On. No.2, Sangl; Sub Division Ujjani Canal Sub-Division NO.33 Kuchi Sanction Estimate No.- Fund Head Maharashtra Krishna Vally Development Corporation I Pune. Major Head 4701 Capital Outlay on Major & Medium Project Minor Head II Main Canal And Branches Service Head Krishna Koyana Lift Irrigation Scheme (Mhaisal Part) Departmental Head SH Road Crossing I This estimate is framed in the office of the Executive Engineer Mhaisal Pumphouse On. 2 Sangli, for the probable expenditure that will be incurred for the construction 'of SH RB on Distributories I Minor I SUbminor on Jath Main Canal Name of worrk : Construction of SH Road Crossing Of Hiware Walekhindi Dy @ ch3630--m of Mhaisallift irrigation scheme. Administratively approved under No. Dated Techenicaly sanctioned under No. Dated Estimate is prepared b U.D.Kande / Contractor,Pune and Checked by S.P.Kulkarni Sect.Engineer ( Call or Authority) General Oiscription 1) The rates are adopted as per B&C. DSR 2008-09 2) The general discription is attached separataly. Ujjani Canal Sub-Division NO.33 Kuchi

Upload: dangkiet

Post on 09-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

ESTIMATE

Division Mhaisal Pump House On No2 Sangl Sub Division Ujjani Canal Sub-Division NO33 Kuchi

Sanction Estimate Noshy

Fund Head Maharashtra Krishna Vally Development Corporation I Pune

Major Head 4701 Capital Outlay on Major amp Medium Project

Minor Head II Main Canal And Branches

Service Head Krishna Koyana Lift Irrigation Scheme (Mhaisal Part)

Departmental Head SH Road Crossing I

This estimate is framed in the office of the Executive Engineer Mhaisal Pumphouse On 2 Sangli for the probable expenditure that will be incurred for the

construction of SH RB on Distributories I Minor I SUbminor on Jath Main Canal

Nameof worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

of Mhaisallift irrigation scheme

Administratively approved under No Dated

Techenicaly sanctioned under No Dated

Estimate is prepared b UDKande ContractorPune and

Checked by SPKulkarni SectEngineer

( Call or Authority)

General Oiscription

1) The rates are adopted as per BampC DSR 2008-09 2) The general discription is attached separataly

Ujjani Canal Sub-Division NO33

Kuchi

I

(b

l

-

t) b

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

RECAPITULATION SHEET

Sr No

1

2

3

Prepared By

UDKande ConlraclorPune

Name of Work

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

Add 2 Contegencies

Add 1 WCEsst

Gross Total Rs SayRS

Estimated Cost

i shy

SubUjjani Canal Sub-Division No33

Kuchi Pump House On No2

bull Sanglic--

Superintending Engineer Technically Sanctioned for K K L IRRProject Circle R t 0 I R s e r bull upees I

Sang I bullbull bullbull

only under TORN0 For20r 0 -201i I

-tI

Eg1_Pump

Division No

Name of wonk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the estimate is Technically amp Arithmatically checked 100 in Subdivision office amp Division office

2 Certified that the strata is classified as per the Trial pits and found 100 correct

3 Certified that the Canal Bed levels are verified with latest approved CBL Statement and found correct

4 Certified that the Design Discharge is verified with latest approved Cut off Statement and found correct

5 Certified that the leads provided in the estimate are personally verified by me and found correct

6 Certify that the adequate and good quality of materials are available with the lead shown in the Estimate

7 Certified that the rates adopted are as per ID DSR 2009-10 And BampC DSR 2008-09

SubUjjani Canal Sub-Division No33

Mhaisal Pump House Dn No2

Kuchi Sangli

Name of worrk Construction of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the rates adopted are as per ID DSR 2009-10 And B amp C DSR 2008-09

2 Certify that the Leads and lifts proposed are generally in order in the Estimate

Superintending Engineer KKLIRRProject Circle

Sangli

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

I

(b

l

-

t) b

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

RECAPITULATION SHEET

Sr No

1

2

3

Prepared By

UDKande ConlraclorPune

Name of Work

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

Add 2 Contegencies

Add 1 WCEsst

Gross Total Rs SayRS

Estimated Cost

i shy

SubUjjani Canal Sub-Division No33

Kuchi Pump House On No2

bull Sanglic--

Superintending Engineer Technically Sanctioned for K K L IRRProject Circle R t 0 I R s e r bull upees I

Sang I bullbull bullbull

only under TORN0 For20r 0 -201i I

-tI

Eg1_Pump

Division No

Name of wonk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the estimate is Technically amp Arithmatically checked 100 in Subdivision office amp Division office

2 Certified that the strata is classified as per the Trial pits and found 100 correct

3 Certified that the Canal Bed levels are verified with latest approved CBL Statement and found correct

4 Certified that the Design Discharge is verified with latest approved Cut off Statement and found correct

5 Certified that the leads provided in the estimate are personally verified by me and found correct

6 Certify that the adequate and good quality of materials are available with the lead shown in the Estimate

7 Certified that the rates adopted are as per ID DSR 2009-10 And BampC DSR 2008-09

SubUjjani Canal Sub-Division No33

Mhaisal Pump House Dn No2

Kuchi Sangli

Name of worrk Construction of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the rates adopted are as per ID DSR 2009-10 And B amp C DSR 2008-09

2 Certify that the Leads and lifts proposed are generally in order in the Estimate

Superintending Engineer KKLIRRProject Circle

Sangli

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

RECAPITULATION SHEET

Sr No

1

2

3

Prepared By

UDKande ConlraclorPune

Name of Work

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

Add 2 Contegencies

Add 1 WCEsst

Gross Total Rs SayRS

Estimated Cost

i shy

SubUjjani Canal Sub-Division No33

Kuchi Pump House On No2

bull Sanglic--

Superintending Engineer Technically Sanctioned for K K L IRRProject Circle R t 0 I R s e r bull upees I

Sang I bullbull bullbull

only under TORN0 For20r 0 -201i I

-tI

Eg1_Pump

Division No

Name of wonk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the estimate is Technically amp Arithmatically checked 100 in Subdivision office amp Division office

2 Certified that the strata is classified as per the Trial pits and found 100 correct

3 Certified that the Canal Bed levels are verified with latest approved CBL Statement and found correct

4 Certified that the Design Discharge is verified with latest approved Cut off Statement and found correct

5 Certified that the leads provided in the estimate are personally verified by me and found correct

6 Certify that the adequate and good quality of materials are available with the lead shown in the Estimate

7 Certified that the rates adopted are as per ID DSR 2009-10 And BampC DSR 2008-09

SubUjjani Canal Sub-Division No33

Mhaisal Pump House Dn No2

Kuchi Sangli

Name of worrk Construction of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the rates adopted are as per ID DSR 2009-10 And B amp C DSR 2008-09

2 Certify that the Leads and lifts proposed are generally in order in the Estimate

Superintending Engineer KKLIRRProject Circle

Sangli

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of wonk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the estimate is Technically amp Arithmatically checked 100 in Subdivision office amp Division office

2 Certified that the strata is classified as per the Trial pits and found 100 correct

3 Certified that the Canal Bed levels are verified with latest approved CBL Statement and found correct

4 Certified that the Design Discharge is verified with latest approved Cut off Statement and found correct

5 Certified that the leads provided in the estimate are personally verified by me and found correct

6 Certify that the adequate and good quality of materials are available with the lead shown in the Estimate

7 Certified that the rates adopted are as per ID DSR 2009-10 And BampC DSR 2008-09

SubUjjani Canal Sub-Division No33

Mhaisal Pump House Dn No2

Kuchi Sangli

Name of worrk Construction of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the rates adopted are as per ID DSR 2009-10 And B amp C DSR 2008-09

2 Certify that the Leads and lifts proposed are generally in order in the Estimate

Superintending Engineer KKLIRRProject Circle

Sangli

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of worrk Construction of Hiware Walekhindi Dy ch3630--m

CERTIFICATE

1 Certified that the rates adopted are as per ID DSR 2009-10 And B amp C DSR 2008-09

2 Certify that the Leads and lifts proposed are generally in order in the Estimate

Superintending Engineer KKLIRRProject Circle

Sangli

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

ABSTRACT SHEET

Quantity Description of Item Rate Per Amount

034

000

Item no 1 Excavation for foundation in earth soil of all types sand gravel

and soft murum including removing the excavated material upto

a distance of 50 m Beyond the building area amp stacking and

spreading as directed dewatering preparing the bed for

foundatio

II) Upto 150 m depth

In) For 150 to 300m depth

9000

8040

cum

cum

3060

000

3235

000

Item no 2 Excavation for foundation in hard nurum including removing the

excavated matrial upto a distrance of 50 m Beyond the buildind

area amp stacking and spreading as directed dewatering

preparing the bed for foundation and necessary back filling

ramming wat

II) Upto 150 m depth

In) For 150 to 300m depth

10200

9045

cum

cum

329981

000

602

000

Item no 3 Excavation for foundation in soft rock and old cement and lime

masonary foundation including removing the excavated material

upto a distrance of 50 m Beyond the building area amp stacking

and spreading as directed dewatering preparing the bed for

foundat

II) Upto 150 m depth

In) For 150 to 300m depth

I 22500

I 22110

cum

cum

135460

000

5575

000

Item no 4 Excavation for foundation in hard rock by blasting including

trimming and levelling the bed by chiselling where necessary and

removing the excavated material and stacking it in measurable

heaps within distrance of 50 m From building area lncludinq

dewat

II) Upto 150 m depth

In) For 150 to 300m depth

36000

36180

cum

cum

2006979

000

755

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

962

8105

0339

7987

Item no 5 Providing and laying in situ CC M-101 36 of trap

quartzitel gneiss metal foundation including necessary bailing out

water compacting and curing (including form work centering

and excluding dewatering by pump) etc complete

3349513

Item no 6 Providing and laying M-15 RCC of trapl granitel quartzitel

gneiss metal for cast in situ piers abutments returns wings etc

including compacting by vibrating and including formwork and

bailing out water 30997757

348230

382440

22645 cum

Item no 7 Providing and cutting bending hooking laying in position and

tieing HYSD steel bar for reinforcement as per detailed

drawings for all RCC works

Item no 8

Providing selected hard murum filling including layng in layers of 15 cm to 20 cm watering and compacting etc complete

1808550

Item no 9 Prividing and laying cement concrete pipe of IS NP2 1200 mm

in proper line level and slope including providing amp fixing collars 395075 rmt 10825055 274 in cement mortar 12 etc complete

TOTAL Rs Add bull

Add 1 Insurance

402(I Add 1 LWF

I Grand Total 510546 88

Say Rs 51054700I bull bull _ bull

05 it-

Prepared By

UDKande Pune

Sub Engineer Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi SangIi

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

JATH MAIN CANAL

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630--m

MEASUREMENTS

Item no 1 Excavation for foundation in earth soil of all types sand gravel and soft murum including

removing the excavated material upto a distance of 50 m Beyond the building area amp

stacking and spreading as directed dewatering preparing the bed for foundatio

Total Depth Of Excavation = GL - Foundation 2990 M

strata = soil = 0000 m HM= 0150 m SR = 0200 m HR = 1852 m

Upstream amp Downstream Head Wall = 2 1031 292 0000 000 Curr

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 034 Curr

I Total n 34 CUR

Item no 2 Excavation for foundation in hard nurum including removing the excavated matrial upto a

distrance of 50 m Beyond the buildind area amp stacking and spreading as directed

dewatering preparing the bed for foundation and necessary back filling ramming wat

Upstream amp Downstream Head Wall = 2 1031 292 0150 452 Cum

Staunch Wall= 2 392 05 1072 210 I Pipe Trench 1 1370 302 0622 2573 Curr

Total 3235

Item no 3 Excavation for foundation in soft rock and old cement and lime masonary foundation

including removing the excavated material upto a distrance of 50 m Beyond the building

area amp stacking and spreading as directed dewatering preparing the bed for foundat

Upstream amp Downstream Head Wall = 2 1031 292 0200 602 Cum

Staunch Wall= 2 392 05 0000 000 I Pipe Trench 1 1370 302 0000 000 Curr

Total

l

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Item no 4 Excavation for foundation in hard rock by blasting including trimming and levelling the bed

by chiselling where necessary and removing the excavated material and stacking it in

measurable heaps within distrance of 50 m From bUilding area including dewat

Upstream amp Downstream Head Wall = 2 1031 292 1852 5575 Cu

Staunch Wall= 2 392 05 0000 000

Pipe Trench 1 1370 302 0000 000 Curr Total

m

059

903 Cu0300

030005

292

392

1031

2Staunch Wall=

Item no 5 Providing and laying in situ CC M-l0136 oftrap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

Upstream amp Downstream Head Wall = 2

Total 962

m

Item no 6 Providing and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

Ups ampDs Head Wall Vertical 2 971 060 035 408 Curr

Ups ampDs Head Wall Sloping 2 971 146 221 6265 Curr Around Pipe (Credal Concrete 1 1201 158 158 2998 Curr Parapet Wall= 2 971 030 015 087

Total = 97589 Cun DEDUCTIONS

Pipe In Wall 2 084 121 -204 Curr

Pipe 1 1201 121 -1450 Curr

I Total = 81053 Cun

Item no 7 Providing and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Ups ampDs Head Wall Vertical 2 971

Ups ampDs Head Wall Sloping 2 971

035

221

000

000

680 Sqn

I 4291 Sqn

I

I

I

I I I

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Around Pipe (Credal Concrete 1 1201 158 1898 Sqn Parapet Wall= 2 971 030 015 583 Sqn

I Total Are 67716 Sqn

Qty of Steel Surface Area x 62kg I sqm Provide 10mm dia 200mm cc

= 67716 x 5 kglsqm = 33858 kg = 0339 MT =

Item no 8 Providing selected hard murum filling including layng in layers of 15 ern to 20 ern watering and compacting etc complete

Above TBl A Back Ftal Excavatical Conc Qnty+PipeArea) 33425 Curr Up To Gl B Murum 264 044

above 1X12X43XO9 4644 Total 7987

Item no9 Prividing and laying cement concrete pipe ofLS NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete I

2 14

Total

274 RM

274

bullbullbullr

I VCaual

KUCHl

(

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of worrk Construction of SH Road Crossing Of Hiware Walekhindi Dy ch3630-middotm

SrNo ittem Quantity

4 Bed Level BL m 644449

8 S1 m 1 1500

12 iNatural Surface Level NSL m 645971

2 of crossinn m 60middotmiddotmiddotmiddot middot middot middot r middotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddot r middotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddotmiddotmiddot middotmiddotmiddotmiddotmiddot middot

6 Bearino TMA2 20bullbull bullbullbullbullbullbullbullbullbull bullbull middotmiddotmiddotmiddotmiddot middot middot middot middotmiddotmiddotmiddot middotmiddotmiddotmiddot middot middot middot middot middotmiddotmiddotmiddotmiddot

Soil Strata I Trial Pit Results 1 Depth of Soft soil m o 2 Depth of Hard murum m 015 3 Depth of Soft Rock m 02 4 Depth of Hard Rock m 1852

Page 1

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

01 DESIGN 1 Assume a pipe diamter = D = 1200

TT= 314 Area of Pipe = TT 14 x D 2 =

3144x(12001000)2 113 sq m FSD 075 m Use Two pipes to carry total discharge

c r= r- hd = 450

600 h=thd = 150-- 0

FSD = 750

Sin a = Perpendicular 1hypoteneus= hd 1r = 025 Sin a = 025 Hence a = 959 degree

180-2xa= 16082 Length of Segment BCD = L = x TT x r 1180 =

L= 16082x314x600180 0842 m

Area of segment above FSD = Area of BCD = L x h x 23 = 0842x450x23= 0253 sq m

Total Area upto FSD = Area of pipe - Area of segment upto FSD = 11304-0253= 08774 sq m

Since we are using two pipes n = 2 Total Area up to FSD = 17548 sq m

02 Calculate the Afflux Afflux = V21788 + 001524) x [(A2a 2)-1]

10521788+001524)x(A2a2)-1middot= A = area of flow of canal = (2x15xO75+09)+09)2xO75=

A = 1519 sq m a = area of pipe upto FSD = 1755 sq m

Afflux = 0077 x -0251 -0019 m -19 mm

03 Find area and Wetted perimeter for FSD plus Afflux h = New FSD 075+-0019= 0731 m hd = 368-300 = 131

Sin a = Perpendicular 1hypoteneus= hd 1r = 0218333 Hence a = 131 degree

Angle = 180 - 2 x a = 1538 Length of Segment BCD = L = x TT x r 1180 =

L = 1538x314x1180 0805 m

Area of segment above FSD = Lx h x 23 = h = 300 - 68 = 232 m

Area of segment above FSD = 0805x2321000x23= 0125 sq m

Page 2

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

04 Area of segment below FSD =Area of Pipe less area above segment 11304-0125=

10054 sq m For Two pipes Area = 20108

05 Perimeter =Cir Of Pipe less Length of chord L of segment above FSD Perimeter = 314x120011000-0805=

1884 minus 0805 = 1079 m For Two pipes Perimeter = 2158 m

06 R = AlP 0931789 m 07 Number of rows n Two 2 08 Velocity through pipe = q 1a X 2 =

0791 msec 09 Calculation of Losses in the Structure shy

Head loss at entry h1 = Cdx(v22-v)2xg=

Cd = 05 V2 = 0791 rnsec V1 = 105 msec

h1 = 05x(0791 2-1052)(2x981)= -0012 m

Head Loss at Exit =h2 = 2 x h1 = -0024 m Frictional Loss in Pipe

hf = Lx (QCr) 181 199462 x d 481 = Where L = 5 m Q = 0151 cumec Cr = 065 for RCC pipesand D = 0900 m hf = 5 x (0151065) 181 199462 x (060) 481 = hf= 0005 m Losses are worked out for one pipe Since we are using two pipes the losses shall be doubled Total Loss = 2 x (h1 + h2 + hf) = -0062 m

Actual provided 0 mm Loss due to structure = -62 mm Afflux due to structure = -19 mm Since both Afflux amp Head Loss are negligible Hence it is ok

10 Bed Width at Junction = n x d + 2 x n x t + (n-1) x Gap= Where n is rows of pipes = 2 no

dis dia of pipe = 1200 mm t is the thickness of pipes - 80 mm

G gap between two rows = Key 300 mm Bed Width at Junction = 2x1200+2x2x80+(2-1)x300=

3020 mm

Page 3

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

11 length of Head wall = TBL-CBL and GL-CBL which ever is more shy

1522 m 4 x (TBL - CBL) or (GL-CBL) + BW at Junction + 2 x Key =

4x(645971-644449)+3020+2x300= 9709 mm

12 length of Stauch wall = nXd+2xnxt+(n-1)xGap + 2 x Key

3620 mm 13 length of Transition - Splay 1 10

(bed width of junction - Bed width of canal)2 x 10 = (3020-900)2x10

10600 mm 14 Controlling levels

Pipe Invert level = CBl = 644449 m Natural Surface Level = G L = 645971 m Top of the Bank Level = TBL = 645399 m Top of the pipe Level - CBL + d + t =

645729 m Min Murum Cover = 34 x d = 450 mm Wearing coat = 100 mm Top of Road level = 646279 mm

Slope for joining GL to Road formation LevI 1 in 30 Difference between Road and Ground Levels = Road Level - GL =

0308 0308 m Length of Connection bet Road amp Ground Level 0

Min Murum Bedding = 12 x d = 0 mm Bottom of Pipe Level = 644369 m Staunch Wall Foundation Level 300 mm below murum filling = 0 mm Staunch Wall Foundation = 644369 m Staunch Wall top width = 200 m Staunch Wall foundation width = 500 m foudation depth= 150 m Head wall foundation shyHeight of Foundation below the

Bottom of Pipe = 300 mm Foundation Depth = 300 mm Head Wall Foundation Level = 643769 m Top of Head wall = 646779 m 500 mm above Road Level incl 150 mm coping Top Width of Head wall = 600 mm With 750 x200 x 150 guard Stone 1Pillars Foundation Projection = 300 mm

mm

Page 4

0308

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

15 Stability Analysis of Head Wall

Guad Stones 2000 mm 750 X 200 X 150 mm

646779 I

646279 Road Format I

NSL

I I

645971

I2710 --------1-----------------middot2210

I ICBL 644449 I I I

A 1720 300 Ipa x Rx 21 644069 bull I 09476

300 643769 IB

2920

BaseWidth Moments about A RL 644069 m b= 232

Particulars Force r - - - L Arm I Moments -----------------------------------r------------ --------------------r---------

H V + ve - ve

middotmiddot -------------I------------+------------t------------ -------------------+----------------I---------------t-------------1-----------shy

W3 I 172 221 21 050 399 175 6971

1385 257 16933 232

19253 X = 1 = 139

a) B3 = 0773333 TRUE 1546667 2b3= Design OK e = b2 - x = -023 023

b) P max = Wb x (1+ (6xe I braquo = 9519 Design OK within SBCapacity c) P min = Wb x (1- (6xe 1braquo = 2418 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding =IM + ve 1 IM - ve = 25290752 = 729992952 Design O K

e) Factor of safety against sliding = 15 FS sliding =IM + ve 1 IM - ve = x I WI I V =

0333 x 2062 1562 = 1795727182 Design O K

Page 5

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Base Width Moments about B RL 643769 m B= 292

Particulars L Arm Moments ------------------------------------------- ----- --------_-------- --------------- --------------- ---__------ -_ _-------shyH V + ve va _----------i------------+------------t------------ ---------------- -------shy

W1 06 271 24 1 390 06 2341 ------------l--------------------------T------------ ------------------------------------T---------------r-----------------------shy

W2 172 221 24 050 456 147 6721

r W5 03 292 24 1 210 146 3070 middot middotmiddotmiddot middot

------------1------------------------------------

27335 X = I = 1714

a) B3 = 0973333 TRUE 1946667 2b3= Design OK e = b2 - x = -0254 0254

b) P max = Wb x (1+ (6xe I b)) = 8313 Design OK within SBCapacity c) P min = Wb x (1- (6xe I b)) = 2611 Design OK Possitive Value to P min d) Factor of safety against overturnir 15

FS sliding + ve I - ve = 25290752 = 760 Design O K

e) Factor of safety against sliding = 15 FS sliding + ve I - ve = x r W I V =

0333 x 2062562 = 1676613472 Design O K

Sectional Eaglll bull er Vjani Canal No KUeHl

Page 6

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

I LEAD S TAT E MEN T (km-4) Name of worrk Construction of VRB Of Hiware Walekhindi Dv ch3630--m

km-4 - As per B ampC DSR 2008-09

Sr No Material Sources Lead in KM Total Net Lead Charges

Initial Lead Charges

Unit

1 Sand Balundgi 72 80712 12964 67748 Cum

2 Metal Revnal 24 33284 12964 20320 Cum

3 Cement Jath 22 22179 9260 12919 MT

4 Rubble Local 100 7876 12964 000 Cum

5 Steel Jath 22 22179 9260 12919 MT

6 Water Local 5 8642 8642 000 1000 Ltr

7 Murum Local 2 000 000 000 Cum

8 Pipe

Miraj 72 13773 2212 11561 Cum600rnm

9 Pipe

Miraj 72 26904 4321 22583 Cum800mm

10 Pipe

Miraj 72 26904 4321 22583 Cum900mm

11 Pipe

Miraj 72 26904 4321 22583 Cum1000mm

12 Pipe

Miraj 72 80713 12964 67749 Cum1200mm

Royalty Charges 3534 -3534 Increase in Cost of 11

Cement bullbull

Head Lead for 100 m 1585 Lead for 500 m 3297 Lead for 30 m 610

Loading amp Unloading 5335 MT

2100 30716 8946 21770 Rubble For Structure Local

ement Lead Charges 1KM 363 Initial Lead for Water 1166

1) Certified that the lead charges for different materials are as per for super Passage at ch 45460 statement (vide letter CE (SP) 1CE-4Jath Canal62591 I 2) Certified that the lead charges for different materials are as per approved lead for super Passage at ch 45460 statement (vide letter SE KKLlPC sanglil PB - 41 Jath lead4199 1Dt03092005) 3) Certified that the sufficient quantity of material will be availabel from quarries

UPrepared By al bullbullr

Sub

ound Correct U D Kande

Pune

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

Krishna Koyna Lift Irrigation Project Circle

SangIi

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS No1

ITEM No1 shyExcavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated material upto a distance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including showing and strutting etc complete

1) Basic Rate Rs 9000 Cum (PWD DSR 2008-09 PND 175 I no 1 )

Total RS 9000 SayRs Cum

Prepared By Cor ct

U D Kande Pune Sub

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS No 2

ITEM No2 shyExcavation for foundation in hard nurum including removing the excavated matrial upto a distrance of 50 m

Beyond the buildind area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling ramming watering including shoring and strutting etc complete

1) Basic Rate (PWD DSR 2008-09 PND 175 I no

2)

Rs 10200 Cum

Total RS SayRs

10200 Cum

Prepared By Technically Checked Found Correct

Sub Divisional Engineer Ujjani Canal Sub-Division No33

Kuchi

U D Kande

Pune

Mhaisal Pump House Dn No2 Sangli

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS No3 ITEM No3 shyExcavation for foundation in soft rock and old cement and lime masonary foundation including removing the excavated material upto a distrance of 50 m Beyond the building area amp stacking and spreading as directed dewatering preparing the bed for foundation and necessary back filling with available earth murum ramming watering including shoring and strutting etc complete

1) Basic Rate Rs 22500 Cum (PWD DSR 2008-09 PNG 175 I no 4)

Total Rs 22500 SayRs _ Cum

Technically Checked ampPrepared By Cr c

u D Kande

Pune Sub Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2

Kuchi Sangli

I

I

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS No4 ITEM No4 shyExcavation for foundation in hard rock by blasting including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within distrance of 50 m From building area including dewatering and back filling with available earth murum ramming watering etc complete

1) Basic Rate Rs 36000 Cum (PWD DSR 2008-09 PND I no 5)

Total Rs 36000 SayRs Cum

Prepared By fcchnicaHy Checked amp found Correct

u D Kande Pune Sub Divisional Engineer Exec ive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

l

RATE ANALYSIS No6

ITEM No6 shyProviding and laying M-15 RCC of trap granite quartzite gneiss metal for cast in situ piers abutments returns wings etc including compacting by vibrating and including formwork and bailing out water

1) Basic Rate Rs 320000 Cum (PWD DSR 2008-09 PNO 181 I no 37)

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Metal 09 09 Cum 20320 18288

2) Sand 045 045 Cum 67748 30487

3) Cement 0295 0295 MT 12919 3811 Total Rs 52586

Additional Royalti Charges For Sand 045 10600 477

Additional Royalti Charges For Metal 09 3534 3181

Total Rs 380536

Add 050 VAT 1903

Total Rs 382439

Say Rs I I

ctl_E t

Technically Checked IPrepared By Correct

UDKande Pune Sub

Djjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

l

i

RATE ANALYSIS No7

ITEM Providing and laying in situ CC M-I0l36 of trap granite quartzite gneiss metal foundation including necessary bailing out water compacting and curing (including form work centering and excluding dewatering by pump) etc complete

1) Basic Rate Rs 284635 Cum (PWD DSR 2008-09 PND 176 I no 15)

Add lead charges

Material Qty Qty for item Unit Charges Amount

1) Metal 094 094 Cum 20320 19101

2) Sand 047 047 Cum 67748 31842

3) Cement 02025 02025 MT 12919 2616

Total Rs 53558

Additional Royalti Charges For Sand

Additional Royalti Charges For Metal

Add 050 VAT

cbullbullbullEbullbullmiddotbull

Prepared By

U D Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

047 10600 4982

094 3534 3322

Total Rs 346497

1732

Total Rs 348230

SayRs I Cum -

rcchnlcally rhecKed amp Quod Correct

Mhaisal Pump House Dn No2 Sangli

l

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS 9

ITEM No9 shyProviding and cutting bending hooking laying in position and tieing HYSD steel bar for reinforcement as per detailed drawings for all RCC works

Rate Analysis For Basic Rate Of Steel

Ref Procedure Adopted As Per sanction Estimate No 22309 by CE(SP)Pune

1) Labour Charges ( PWD SOR 2008-09PNO 182 I no 44 )

Rs 264200 1Cum

Basic Rate as per SEPWDPune Letter No 2332 at 30312010 is Rs 37000 1shy

2) Material 1) Steel 105 3700000 38850

2) Binding Wire 4 KgMT 48 19200

3) Initial Lead 105 926 Total

9723

3913923

Add Sundries Add Overheads

05

10

Total

19570 391392

IMTTotal Rate l5~~middot ershy4 6 1MT

12919Add Lead Charges For Steel 1 MT 12919

Total Rate

Add VAT 05 2 CC

n scu r

Prepared By

UD Kande

Pune Sub Ujjani Canal Sub-Division No33

Kuchi

Say Rs 1MT

Mhaisal Pump House Dn No2

Sangli

Qund Correct

Total Rate

-

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS 10

ITEM No 10 shyProviding selected hard murum filling including layng in layers of 15 em to 20 em watering and compacting etc complete

1) Basic Rate Rs 19000 Cum (PWD SOR 2008-09 PNO 173 I no 10 )

Add Royalty Charges For Murum 3534 3534 Total Rate 22534

Add VAT 05 113

Total Rate 22647

Say Rs 22645 Cum bulla EI

Prepared By

found Correct

UDKande Pune Sub Divisional Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

i

RATE ANALYSIS 17

ITEM No 17 -Prividing and laying cement concrete pipe ofLS NP2 900 rom in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 203500 Rmt ( PWD SOR 2008-09 PNO 172 I no 6d )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 22583 22583 2) Sand 00021 00021 Cum 67748 142 3) Cement 00016 00016 MT 12919 021

Total Rs 22746

Add Royalty Charges For Sand 106 00021 022

Total Rs 226268

Add VAT 05 1131 Total Rs 227400

Say Rs I 227400 i

I Rmt

Sctlo1

-rnmd CorrectPrepared By

D Kande I Pune Sub Executive Engineer

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

RATE ANALYSIS 19

ITEM No 19 -Prividing and laying cement concrete pipe of1S NP2 1200 mm in proper line level and slope including providing amp fixing collars in cement mortar 12 etc complete

1) Basic Rate Rs 325000 Rmt ( PWD SOR 2008-09 PNO 172 I no 6f )

Add lead charges

Material Qty Qty for item Unit Charges Amount 1) Supply Of Pipe 1 1 M 67749 67749 2) Sand 00044 00044 Cum 22583 099 3) Cement 00032 00032 MT 67748 217

Total Rs 68065

Add Royalty Charges For Sand 106 00044 047

Total Rs 393112

Add VAT 05 1966 Total Rs 395077

Prepared By s hecked

SayRs 395075 I Rmt

U D Kande

Pune Sub

Pound Correct

Ujjani Canal Sub-Division No33 Mhaisal Pump House Dn No2 Kuchi Sangli

Superintending Engineer

KKLIRRProject Circle Sangli

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of worrk constrr of SH Road Crossing Of Hiware Dy ch3630--m

gt1

BL

13700 )1 n COPING M-15 20 rso x iso

D size I eoo I I I III

646629 1

eaee soc130 SLOPE JOINING IP AT TBl

SR

644069

643769 644069

643769

STAUNCHWALL SECTIONOF HEAD WALL

SECTION AT A - A

o -e-

o GL 645971 o

o

U o w Z

0

rn( oB

300

GUARD STONE OF 750 X 200 X 150 ------- g r I I-- - _ __ _

I 0 I I I I I

I I I I ISL 64520 SPLAY 1 in 10

I I I I I I

I I I I I I I I

I I I I I 1111 I I I I

CANAL FLOW I 1 1 I I I I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ I I

I I I bull o ----- ----

toaccommodate SR amp IPlevels I

0

Sub-PLAN

Ujani Canal Sub-Dv No 33 bullbullbullbull EI KUeHl

TRIAL PIT DATA oarGL

osaon

t oz

152

0680

I 0

Z 0

0 W

11 z 0

w 0 gt

WZ

0 u

I

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

--

h

~ ~ I IbIIII

bb ob

b6)

b b

ob b

__ ---_

-ill

j I Ih b

middot U I

bbo -

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

shy

I

~

r

i

II Umiddot

IJ

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

ame of work Construction of VRB at Ch Hivare - Walekhindi Dy Km NO4

SUB-ESTIMATE -2 (DIVERSION) ABSTRACT

Description Rate I UnitQuantity I Unit Amount

4500ICum

25920ICum

Item No1shyProvding earthwork for embankment Withl approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller completeI(Rate Analysis No1) Item No2shySupplying 60 rnilimetre trap stone over metal at the side inclduing conveying stacking complete by blasting

I(Rate Analysis No2) Item No3shySupplying 40 milimetre trap stone metal dl~cum

broken at the side including conveying and stacking complete by blasting

I(Rate Analysis No3) Item No4-Supplying hard murum at the side including conveying and stacking complete I(Rate Analysis No4)

~

Item No5shySupplying soft murum at the rod side conveying and stacking complete

I(Rate Analysis No5) Item No6shySpreading130 milimetre metal including sectioning complete (DSR Rate 2008-09 Add Vat 050

1800t

Total Rs Say Rs 1810

Item No7shySpreading milimetre rnetal including sectioning complete (DSR Rate 2008-09 51148) 18 Add Vat 050 009

Total Rs 1809 Say Rs 1810

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

I I Description Rate I Unit AmountQuantity I Unit

Item No8shySpreading hard murum on the19500ICum formation over the road formation for side width and oversize metal includign sectioning etc compelte (DSR Rate 2008-09 Add Vat 050 006

Total Rs 1106 Say Rs 1105

Item No9shy1620ICum Spreading blindage of soft murum over

the water bound macadam surface etc complete (DSR Rate 2008-09 50149) 11Add Vat 050 006

Total Rs Say Rs

Item No10-48600ISqm Compacting the sub grade 1 gravel 1

over size metal ( 200 milimetre loose) tgt layer with power roller including

necessary labour material and artifical waterino complete (DSR Rate 2008-09 75 Add Vat 050

Total Rs 754 Say Rs

Item No11-45000ISqm Compacting the sub grade 1 gravel 1

over size metal ( 100 milimetre loose) - layer with power roller including necessary labour material and artifical waterinq complete (DSR Rate 2008-09 Add Vat 050 003

Total Rs 653t Say Rs 655

Item No12-45000ISqm Compacting the hard murum size width

layer on each side with power roller

including arthficial watering complete

(DSR Rate 2008-09 60149) 24I

Add Vat 050 001 Total Rs

Say Rs Total Rs

215500

I

~ U Ujani Canal Sub-Dv No 33

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

SUB-ESTIMATE -2 (DIVERSION)

MEASUREMNT No Length Breadth Height Quantity

Item No1-Provding earthwork for embankment with approved materials obtained from departmental land and other source including all lifts and leads laying in layers of 20 centimetre to 30 centimetre thickness breaking clods dressing to the required lines curves grades and sections compacting with power roller complete

DIVERSION 1 x 810 + 1150 x 075 = 88200 Cum 2

Item No2shySupplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

DIVERSION 1 x 120 x 405 x 020 = 9720 Cum

Item No3shySupplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

DIVERSION 1 x 120 x 375 x 010 = 4500 Cum

Item No4shySupplying hard mururn at the rod side including conveying and stacking complete

SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720 SIDE WITH 1875 + 2175 2 =2025 2 x 120 x 2025 x 020 = 9720

13 Qty(9720 + 9720) = 6480

25920 Cum

Item No5shySupplying soft murum at the rod side including conveying and stacking complete

14 Qty of 6480 1620

1620 Cum

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Item No6shySpreading 60 milimetre metal including sectioning complete

Qty as per Item NO3 1 x 195 = 195 Cum ( 9750 + 9750)

Item No7shySpreading 6040 milimetre metal including sectioning complete

Qty at per Item No4 9720 + 9720 x 1 = 6480 Cum 3

Item No8shySpreading hard rnurum on the rod formation over the road formation for side width and oversize metal includign sectioning etc compelte

Qty as per Item NO4 1 x 195 = 195 Cum ( 9750 + 9750)

Item No9shySpreading blindage of soft murum over the water bound macadam surface etc complete

Qty as per Item No5 1 x 1620 = 1620 Cum

Item No10shyCompacting the sub grade gravelover size metal ( 200 milimetre loose) layer with power roller inclUding necessary labour material and artifical watering complete

DIVERSION 1 x 120 x 405 = 48600 Sqm

Item No11shyCompacting the sub grade gravelover size metal ( 100 milimetre loose) layer with power roller including necessary labour material and artifical watering complete

APPROACH 1 x 120 x 375 = 45000Sqm

Item No12shyCompacting the hard murum size width layer on each side with power roller including arthficial watering complete

2 x 120 x 1875 = 45000Sqm

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

3

RATE ANALYSIS No1

Item No1-

Provding earthwork for embankment with approved materials obtained from

departmental land and other source including all lifts and leads laying in layers of 20

centimetre to 30 centimetre thickness breaking clods dressing to the required lines

curves grades and sections compacting with power roller complete

1) Completed item rate as per DSR 2008-09 Item No 29 -Page No

2) Add VAT 045 Cum

Total Rate

Say Rate Cum

Vjani Canal Sub-Dv No 33 KUCHI

Technically Checkell

found Pum

No2

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No2

Item No2shy

Supplying 60 milimetre trap stone over size metal at the rod side inclduing conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 16500 Cum Item No 41 Page

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km -For 24 Km -

bullbull -Deduct initial lead 12- - 12964

Net Lead =

20322 = 20322 x 1 =

Total _

2) Add VAT 050

Total Rate

Say Rate

Technically CanalSub-Dv No 33 ampfoundcorrecl KUCHl _

SPKulkarnI Pump House SecLEngr(II)

No2

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of work Construction of VRB at Ch Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No3

Item No3shy

Supplying 40 milimetre trap stone metal hand broken at the rod side including conveying and stacking complete by blasting

1) Completed item rate as per DSR 2008-09 17500 I Cum Item No 43 Page No 147

2) Additional lead charges for 60 mm metal for 24 Km For 25 For 20 Diff For 5 Km for 1 Km

For 24 _ - Deduct initial lead 1291gt4 V

Net Lead =

- x = 1

Total Cum

2) Add VAT 050 Cum

f

Total Rate Cum

Say Rate Cum

UjaniCanalSub-Dv No 33 KUeHl

TechnIcally Checked amp correct

SPKulkarni SectEngr(H) Pump House

No2 Sangli

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Narne of work Construction of VRB at Ch of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No4

Item No4shy

Supplying hard rnurum at the rod side including conveying and stacking complete

raquo 1) Completed item rate as per DSR 2008-09 7300 Cum

Item No No

--omiddot---middotmiddotmiddotmiddotmiddot--middotmiddot-middotmiddotmiddot-middot----- 2) Additional lead charges for Murum for

x 1 bull _ Cum bullbullbullbull bull bullbull - bull

Total Cum

2) Add VAT 050 Cum

Total Rate I Cum

Say Rate

UjaniCanal Dv No KUeHl

TechnIcally Checked found correct

SectEng r(II) Pump House

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km

Tecllnlcllly Checked

bullKulkarni

__

-

1h -

Itz b bull bull

bull

___ _

-J

I J

I _T _

Name of work Construction of VRB at of Hivare - Walekhindi Dy Km No4

RATE ANALYSIS No5

Item No5shy

Supplying soft murum at the rod side including conveying and stacking complete

1) Completed item per DSR 2008-09 7000 Cum Item No 46 Page No

=

Total I Cumr 2) Add VAT 050 - Cum

Total Rate I Cum

SayRate

Ujani CanalSub-De No 33 KUeHl

Executive Engineer MhaisalSctEngr(II)

n

2)

bull __

Additional lead charges for Murum for 2 Km