Who We Are
• Johnson Economics
• Angelo Planning Group
• SERA Architects
• Kittelson & Associates
• City Project Manager
• City Staff
2
Project Foundations
“The City of Gladstone is requesting funding for a Downtown
Revitalization Plan for the Portland Avenue area that makes up
the city’s historic downtown core. This area includes the
commercial portion of the Gladstone Town Center designated in
the Metro 2040 Growth Concept and is currently suffering
under-development and under-utilization. The City is seeking to
foster an improved economic and residential climate and create
a more pedestrian- and bicycle-friendly downtown while
preserving the area’s existing commercial base and character.
The City is excited about this opportunity to begin to create a
more livable and vibrant downtown and looks forward to working
with the citizens of Gladstone, Clackamas County, and our
neighbors in Oregon City and Milwaukie, and Metro on this
project."
3
- Metro Grant Application
Project Foundations
• Parking Study (2006)
• Downtown Retail Market Analysis (2007)
• Conceptual Streetscape Design (2008)
• Urban Renewal Plan Amendment (2008)
• Storm water Master Plan (2014)
• Traffic Sign/Marking Review (2016)
• Parks Plan (On-going)
• Transportation System Plan (On-going)
4
Plan Overview
A vision for the “Public Sphere” and “Private Sphere”
Public Improvements
• The “streetscape”
• City-funded improvements to streets and sidewalks
Private Improvements
• Decisions by individual property owners over time
• Code recommendations add flexibility for owners
6
Spectrum of Change
7
Slow investment
• Same building types
• Fewer businesses
• Quieter
• More accessible
• Status Quo
• Less justification for
public investments
More investment
• 2-3 story buildings
• New businesses
• More residents, activity
• More things in proximity
• More justification for
public investments
We’re here….
8
July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
PM PROJECT MANAGEMENTPM.1 Kick-off Meeting (PMT Meeting #1) XPM.2 Form Committee Rosters
PM.3 Goals and Objectives Memo
PM.4 Project Schedule
PM.5 Public Involvement Plan
PM.6 PMT Meetings X X X 20-AprPM.7 CAC Meetings 21-Sep 2-Nov 8-Feb 20-AprPM.8 TAC Meetings 14-Sep 12-Oct 4-Jan 20-Apr
TASK 1 PUBLIC OUTREACH July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
1.1 Stakeholder Meetings 16-Nov 18-Jan1.2 Public Open Houses 26-Oct 23-Feb1.3 Project Website
1.4 Storefront & Window Displays
TASK 2 EXISTING CONDITIONS July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
2.1 Plan and Regulatory Review
2.2 Code Audit
2.3 Land Use and Transp. Base Mapping
2.4 Project Area Tour X2.5 Opp. and Constraints Mapping
2.6 Existing Conditions Memorandum
TASK 3 MARKET ANALYSIS AND DEV. ANALYSIS July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
3.1 Real Estate Market Analysis
3.2 General Development Conditions
3.3 Development Conceptual Plans
3.4 Financial Feasibil ity Analysis
3.5 Market Analysis and Dev. Memo
TASK 4 TRANSPORTATION ANALYSIS July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
4.1 Transportation Plans Review
4.2 Prioritization of Transp. Projects
TASK 5 CONCEPT PLAN ALTERNATIVES July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
5.1 Land Use and Trans. Alternatives
5.2 Evaluate and Select Preferred Alt.
TASK 6 IMPLEMENTATION TOOLS July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
6.1 Research Implementation Tools
6.2 Implementation Tools Memo
TASK 7 FINAL DELIVERABLES July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
7.1 Downtown Revitalization Plan
7.2 Transportation Design Plan
7.3 Implementation Strategy
2016 2017
Report
Report Report
Report
Alternatives
Refined Alternative
Discussion Draft
Draft and FinalPlan Documents
Project Steps
• Existing Conditions analysis
• Market Analysis
• Community Outreach and Survey
• Opportunities and Constraints
• 3 Draft Plan Alternatives
• Final Plan Concept
9
Project Vision Statement
Downtown Gladstone is a unique, lively, and accessible community
center that celebrates the history of the city while accommodating the
needs of residents, businesses, and visitors with a mix of uses.
• Portland Avenue is a successful mixed use corridor where
housing in various forms integrates harmoniously with a mix of
restaurants, shops, and civic buildings, services, and gathering
spaces.
• The corridor is a vibrant destination as well as a connection to
other Gladstone neighborhoods, the Clackamas River, regional
trails and natural areas, and nearby attractions outside of the city.
• Portland Avenue welcomes residents and visitors alike to
Downtown Gladstone with a unifying streetscape design and
easy and safe accessibility by foot, bike or car.
10
Revitalization Plan Concept
11
Downtown Core:
streetscape and
development area
Connect to
waterfront park
Reconnect to
Oregon City
Neighborhood-scale infill
housing in the C2 zone
Dartmouth enhanced as
the key neighborhood
access street
Modified development
code makes permitted
uses more likely
Streetscape and
public features
create “gateway”
nodes
Improved Trolley
Trail connections
Lane and streetscape
improvements
throughout
Downtown Core: Existing
12
Disjointed sidewalk improvement;
little space for outdoor activity
Some storefronts lack
activity and vitality
Vacant/parking lots at key
locations in downtown
Wide street causes high speeds, unsafe biking,
difficult pedestrian crossings, and narrow sidewalks
Opportunity for new businesses
in vacant storefronts
Redevelopment
opportunities on key
blocks
Downtown Core: Concept
13
Widen to 19’ sidewalk
with tree plantings
Parallel parking and
street seats area
Shared, slow speed two-lane street –
can be closed for “festivals” & events
Storefront improvement
of existing businesses
Mixed-use housing and
commercial buildings
New City Hall / Library
civic development
Active commercial uses
along Portland Avenue
Transportation Elements
15
Mixed-Use Corridor:
improved two-lane street
with bicycle lanes
Future Trolley Trail
connection and
potential bridge rebuild
Downtown Core “Festival Street”;
curbless; two-lanes
Downtown Core
(curbed; two-lanes)
“Gateways” at
main intersections
16
• “Festival Street” with curbless sidewalks, bollards
• Shared travel lanes, remove center turn lane
• Street is narrowed to allow wider sidewalks
Downtown Core
(Exeter to Clarendon)
17
Downtown Core
(Clarendon St. to Arlington St.)
• Same widths, with curbed sidewalks
• Shared travel lanes, remove center turn lane
• Street is narrowed to allow wider sidewalks
• Add bike lanes, remove center turn lane
• Width of street and sidewalks unchanged
• Sidewalks improved piecemeal as properties redevelop
18
Mixed Use Corridor
(Abernathy Ln. to Exeter St.)
19
Major Street Projects
Street Segment Blocks StreetSidewalk
Redevelopment
Estimated
Cost
Mixed Corridor
(Abernathy to
Exeter)
5
Re-striping,
Corner
curbs/ramps
City project; or
as properties
redevelop
$1,080,000
DT Core
(Exeter to
Clarendon)
2Repave,
remove tracksCity project $3,050,000
DT Core
(Clarendon to
Arlington)
2Repave,
remove tracksCity project $1,325,000
TOTALS: 9 $5,455,000
Parking Solutions
20
• 2006 Parking Plan
• Zone A: 4-hour limit
• Customer-focused
• Zone B: No limit
• Explore a public parking lot
Potential Streetscape Elements
21
• Wide sidewalks, seating, active uses
• Swales/ stormwater landscaping
• Curb extensions
• Crosswalk marking/paving
• Pavement textures
• Public plaza space
• Street furniture
• Street art
Land Use Elements
36
Encourage new development within
existing limits on scale/height
• Maintain 35’ (three story) height limit
• Reduce minimum landscaping
requirements
• Reduce minimum parking
requirements
Land Use Elements
37
Clarify and improve standards for
residential development
• Downtown core: no residential on
ground floor
• C-2 zone:
• Permit residential outright (currently a
conditional use permit is required)
• Reduce minimum front setback from
20’ to 5’
• Establish design standards for ground
floor of residential close to sidewalk
• Increase maximum density standard
Land Use Elements
38
Enhance design standards for new
commercial development
• Prohibit drive-throughs
• Require more windows on ground
floor of commercial
• Clarify requirement for location of
main entrance
Next Steps
• Finalize Downtown Revitalization Plan
• Planning Commission considers – July 2017
• City Council considers for adoption – Sept 2017
40
Downtown Core: Concept
41
Widen to 19’ sidewalk
with tree plantings
Parallel parking and
street seats area
Shared, slow speed two-lane street –
can be closed for “festivals” & events
Storefront improvement
of existing businesses
Mixed-use housing and
commercial buildings
New City Hall / Library
civic development
Active commercial uses
along Portland Avenue
Recommended Plan Concept
42
Downtown Core:
streetscape and
development area
Re-establish
waterfront park
Reconnect to
Oregon City
Neighborhood-scale infill
housing in the C2 zone
Dartmouth enhanced as
the key neighborhood
access street
Reduced parking reqs.
permit more varied
development
Streetscape and
development creates
“gateway” node