geothermal reservoir management. a thirty year practice in the paris basin
DESCRIPTION
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN. Pierre UNGEMACH and Miklos ANTICS GEOPRODUCTION CONSULTANTS (GPC) Paris Nord 2, 14 rue de la Perdrix, Lot 109, B.P. 50030 95946 ROISSY CDG CEDEX, France - PowerPoint PPT PresentationTRANSCRIPT
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
Pierre UNGEMACH and Miklos ANTICS
GEOPRODUCTION CONSULTANTS (GPC)
Paris Nord 2, 14 rue de la Perdrix, Lot 109, B.P. 50030
95946 ROISSY CDG CEDEX, France
e-mail : [email protected] , [email protected]
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SCOPE
• INTRODUCTION1. HISTORICAL OVERVIEW2. RESOURCE AND RESERVOIR SETTING3. DEVELOPMENT STATUS AND MILESTONES4. TECHNOLOGY OUTLOOK5. OPERATION AND MAITENANCE6. RISK ASSESSMENT7. RESERVOIR MANAGEMENT / ENGINEERING /
SIMULATION8. SUSTAINABILITY• CONCLUSIONS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
HISTORICAL OVERVIEW
HYDRO CAR BO NEXPR O
RESERVOIRASSESSM ENT
RISK ANALYSISFEASIBILITY
FIELDDEVELOPM EN T
RESERVOIRASSESSM ENT
UPDATE
EXPLOITATIONRECOR DS
DATABASE
RISK(RE)ASSESSMENT
W E LL L IF ES Y S TE M L IFE
E C O N O M ICV IA B IL ITY
S U S TA IN A B L ER E S E R V O IR
M A N A G E M E N TS C E N A R IO S
RESERVOIRLIFE
E NVIRO N M EN TALB ENE FITS
S O CIAL IM A G EFIS CAL
IN CE NTIVE S
PRODU CTIONM ODEL
PROCESSIN G
MO NITORINGSURVEILLANCE
CASING CONTRO LDAMAGE DIAG NOSIS
TRA CER LEAK O FF TESTSW ELL W O RK O VER
C O R RO S IO N /SCA LIN GABATEM EN T
LEGAL/INSTITUTIO NAL
FINANCINGINCENTIVES
BACKUP
ENVIRO N-M ENTALIMPACT
W E L LD E L IV E R A B IL IT IE S
P R O D U C T IO ND E S IG N
TESTING (DST)SAMPLING
DRILLINGCO RING
LO GGING
1950
1970
1975
1985
1990
2000
2005
TIME SCALE MILESTONES
F irst district heating doublet
F irst O il Shock
Com pletion of three doublets
E n f o r c e m e n t o f t h e G eotherm al Act (M in ing Law)
Second O il S hockState supported incentives
End of fie ld developm ent (52 doublets com pleted)
Issuing of a com prehensive reservo ir assessm entDebt renegotiationF irst AT I insta lla tionI m p l e m e n t a t i o n o f t h e workover waste processing line
Com pletion of the new anti-co r ros ion p ro du c tion w e ll. Im plem entation of the trip let concept
F i r s t c o m b i n e d g a s / c o g e n e r a t i o n h e a t in g p lant
10 year extension of m utual insurance contracts
C o m p l e t i o n o f t h e 1 7 cogeneration plant
34 d istrict heating doublets in operation
Design of future heat m in ing schem es
t h
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
HISTORICAL OVERVIEW
HYDROCARBONEXPRO
RESERVOIRASSESSMENT
RISK ANALYSISFEASIBILITY
FIELDDEVELOPM EN T
RESERVOIRASSESSMENT
UPDATE
EXPLOITATIONRECOR DS
DATABASE
RISK(RE)ASSESSMENT
W E LL L IF ES Y S TE M L IFE
E C O N O M ICV IA B IL ITY
S U S TA IN A B LER E S E R V O IR
M A N A G E M E N TS C E N A R IO S
RESERVOIRLIFE
E NVIRO N M EN TALB ENE FITS
S O CIAL IM A G EFIS CAL
IN CE NTIVE S
PRODU CTIONM ODEL
PROCESSIN G
MO NITORINGSURVEILLANCE
CASING CONTRO LDAMAGE DIAG NOSIS
TRA CER LEAK OFF TESTSW ELL W O RK OVER
C OR ROS ION /SCA LIN GABATEM EN T
LEGAL/INSTITUTIONAL
FINANCINGINCENTIVES
BACKUP
ENVIRON-M ENTALIMPACT
W E L LD E L IV E R A B IL IT IE S
P R O D U C T IO ND E S IG N
TESTING (DST)SAMPLING
DRILLINGCORING
LOGGING
1950
1970
1975
1985
1990
2000
2005
TIME SCALE MILESTONES
F irst district heating doublet
F irst O il Shock
Com pletion of three doublets
E n f o r c e m e n t o f t h e G eotherm al Act (M in ing Law)
Second O il S hockState supported incentives
End of fie ld developm ent (52 doublets com pleted)
Issuing of a com prehensive reservo ir assessm entDebt renegotia tionF irst AT I insta lla tionI m p l e m e n t a t i o n o f t h e workover waste processing line
Com pletion of the new anti-c o r ros ion p ro du c tion w e ll. Im plem entation of the trip let concept
F i r s t c o m b i n e d g a s / c o g e n e r a t i o n h e a t in g p lant
10 year extension of m utual insurance contracts
C o m p l e t i o n o f t h e 1 7 cogeneration plant
34 d istrict heating doublets in operation
Design of future heat m in ing schem es
t h
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESOURCE AND RESERVOIR SETTING
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONESLOCATION OF GEOTHERMAL DISTRIC HEATING DOUBLETS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONESTARGETED, ACHIEVED, FORECASTED OBJECTIVES
Target Achieved Forecast(1985) 1990 2000 2006
Operating doublets 55 43 34 34Total installed capacity (MWt) 360 260 227 200Produced heat (GWht/yr) 2,000 1,455 1,240 1,000Unit capacity (MWt) 6.5 6.0 6.7 5.9Unit yield (MWht/yr) 36,000 33,800 36,200 30,000Artificial lift wells 49 36 27 22Self-flowing wells 6 7 7 12
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (1)THE GEOTHERMAL WELL DOUBLET OF HEAT MINING
A B AW H W H
H X
P P
P W
C
IP
IW
IW
90 0-1 40 0m 14 00 -17 00m
D O G G E R G E O TH E R M A L R E S E R V O IR
U P P E RC R E TA C E U S
LO W E RC R E TA C E U S
55 °
30 ° 30 °
LU S ITA N IA N
U P P E RJU R A S S IC
M ID J U R A S S IC
A - two vertical wellsB - 1 vertical, 1 deviatedC - two deviated wells
PP production pumpIP in jection pumpHX heat exchangerPW production w ellIW in jection wellW H wellhead
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (2)EQUIPMENT PERFORMANCE AND LIFETIME RECORD
ITEM LIFE (yrs)
WELLS 20-25
XTREE VALVES 5
PRODUCTION PUMPS
ESP
HTP
4-5
5-8
INJECTION PUMP 10
PRODUCTION TUBING 6-8
DOWNHOLE CHEMICAL INJECTION LINE 5-8
PLATE HEAT EXCHANGER 10-15
FREQUENCY CONVERTER 15
SURFACE PIPING 15-20
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGSCORROSION AND SCALING
DRIVING MECHANISMS OF CASING DAMAGEAQUEOS CO2/H2S ENVIRONMENT
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
WELL DRILLING/COMPLETIONANTI-CORROSION PRODUCTION WELL DESIGN
cen tra lize rs
fibe rg lass cas ing
cem ent
expansion spool
free annu lus
seat
stee l casing
reservo ir
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGSCORROSION AND SCALING
DOWNHOLE CHEMICAL INJECTION LINESSETUPS IN ARTIFICIAL LIFT WELLS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (1)MONITORING/SURVEILLANCE OF PRODUCTION FACILITIES
• geothermal fluid• loop parameters• well deliverabilities• pump and frequency converter characteristics• inhibitor efficiencies• inhibition equipment integrity• well head integrity• surface piping control• casing inspection
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (2)WELL WORKOVER
CORROSION AND SCALING ABATEMENT
• WELL WORKOVER• casing clean up
• lining of damaged tubulars
• fishing
• reservoir stimulation
• CORROSION AND SCALING ABATEMENT• downhole chemical inhibition lines
• corrosion, scaling, microbiological inhibitors
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (3)DOGGER DATABASE
• Hosted on ORACLE platform• Data instructed locally via ACCESS interface
GLOSSARY
GENERALINFORMATIONPARAMETERS
DATAARCHIVE
HEAT PLANTEQUIPMENT
INJECTIONEAUIPMENT
PRODUCTIONEQUIPMENT
DICTIONARY
TH ER MO-CHEMICAL
MONITORING
INTERVENINGPARTIES
EVEN TS
CALIBRATION
HEAT PLANTEXPLOITATION
PRODUCTIONFIGU RES
INJECTIONFIGU RES
CASINGCONTROLCORROSIONCORROSION
TR EATMENT
ELEMENT BUBBLEPOINT
W ELLCASING
RESERVOIRPROPERTIES
GEO THERMALSITE
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RISK ASSESSMENT
• Exploration (mining, geological)
• Exploitation (technical, managerial)
• Economic/financial (market, institutional, managerial)
• Social acceptance (image)
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
INTEGRATED GEOTHERMAL RESERVOIR MANAGEMENT
DEVELOPMENT/MANAGEMENT
STRATEGY
SUSTAINABILITY
EX TE RNALITIES
OFFERRecoverable
Heat
DEMANDE xisting /potentia l
hea t loads
RISKASSESSMENT
EC ON OM IC/F IN ANCIAL/
INSTITU TIO NAL/EN VIRO NM ENTAL
Non TechnicalObstacles
ECONOMICSRESERVOIR/SYSTEM LIFE
RESERVOIRENGINEERING
PRODUCTIONTECHNOLO GY
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING ASSESSMENT OF RESERVOIR STRUCTURE
1
1
1
2
2
2
3
3
3
4
4
5
5
BR BR
b. Three layeredreservo ir
c. Sandw ichedreservo ir
In jection wellProduction well
% FLO W % FLO W100 100
34.5%
10%
30.5%
18%
5%
40%
15%
23.5%
4%
4%
13.5%
DE
PT
H
DE
PT
H
CR CR
BR
d. S ing le layerequivalent
CR
RE SERV O IR
IM PERVIO US LAYER
CR CAP RO CK
BR BE DRO CK
a. Flowm eter logging
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING. RESERVOIR LAYER STACKING
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING. TEMPERATURE DECLINE AT PRODUCTION WELL
VS. RESERVOIR EQUIVALENTS0 10 20 30 40 50 60 70
Tim e , ye a rs
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Te
mp
era
ture
de
ple
tion
, °C
S ing le layer equiva lent reservo ir
2D R eservoir
Three layered m odel. R eservoir 1 (top)
Three layered m odel. R eservoir 2 (in t.)
Three layered m odel. R eservoir 3 (bot)
S andw iched M odel. Top reservo ir
S andw iched m odel. B ottom reservoir
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERINGRESERVOIR SIMULATION
• CORE• Calibrated regional model, online with the Dogger database,
operated as a reservoir management tool• MODELLING STRATEGIES
• Regional. Overall reservoir• Subregional. Multidoublet areas• Local. Single doublet systems
• OBJECTIVES• Reservoir life• Hydrodynamic interferences• Solute transport• Sustainability assessments
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATIONSUB REGIONAL DOMAIN
TRANSMISSIVITY AND INITIAL PRESSURE/TEMPERATURE DISTRIBUTION
CACHAN-NORD
CACHAN-SUD
CHEVILLY-LARUE
FRESNES
IVRY
L'HAY LES ROSES
ORLY 1ORLY 2
THIAIS
56°C
58°C
60°C
62°C
64°C
66°C
68°C
70°C
72°C
74°C
76°C
78°C
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATIONSUB REGIONAL DOMAIN
TEMPERATURE PATTERNS (YEAR 2005)
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 110000
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
10500
11000
Puits de production
Puits d'injection
GFR-1GFR-2
GTHI-1
GTHI-2
GCA-1
GCA-2
GCA-3GCA-4
GCHL-1
GCHL-2
GHLR-1GHLR-2
0
1
2
3
4
5
6
7
8
9
10
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATIONSUB REGIONAL DOMAIN
TEMPERATURE PATTERNS (YEAR 2030)
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 110000
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
10500
11000
Puits de production
Puits d'injection
GFR-1GFR-2
GTHI-1
GTHI-2
GCA-1
GCA-2
GCA-3GCA-4 GCHL-1
GCHL-2
GHLR-1GHLR-2
0
1
2
3
4
5
6
7
8
9
10
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENTSIMULATED SCENARIOS
• WORKING ASSUMPTIONS. DESIGN FEATURES• Single/multiple well doublet/triplet heat mining arrays• Homogeneus/heterogeneus reservoir settings• Well life = 20 – 25 yrs• Reservoir life = 20 – 30 yrs (doublet/triplet thermal
breakthrough time)• Well spacing = 1000 – 1500 m• Heat mining schemes/schedules
• Existing doublet: 0-25 years• Mixed well triplet array: 25-50 years• New well doublet: 50-75 years
• DESIGN OBJECTIVE• Avoid undue premature cooling of producing wells• Achieve a minimum 75 years reservoir life
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENTSIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE. SIMULATED AREA
AULNAY-SOUS-BOIS-RDV
AULNAY-SOUS-BOIS-VGS
BONDY
CLICHY-SOUS-BOIS
GARGES LES GONESSES
LA COURNEUVE NORDLA COURNEUVE SUD
LA VILLETTE
LE BLANC MESNIL
SEVRAN
VILLENEUVE LA GARENNE
G LC N3 (P)
G LC N 4 (I)G LC S3 (P)
G LC S4 (I)
G BM N 3 (P)
G BM N 4 (I)
56°C
58°C
60°C
62°C
64°C
66°C
68°C
70°C
72°C
74°C
76°C
78°C
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENTSIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE. SIMULATED OUTPUTS (YEAR 27)
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 110000
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
GLCS1
GLCS2
GLCN1
GLCN2
GBMN1
GGMN2
(A)
(B)
(C)
(D)
0
1
2
3
4
5
6
7
8
9
10
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENTSIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE. SIMULATED OUTPUTS (YEAR 52)
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 110000
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
GCLS3
GCLS1
GCLS2
GCLN1
GCLN2
GCLN3
GBMN1
GBMN2
GBMN3
0
1
2
3
4
5
6
7
8
9
10
(A)
(B)
(C)
(D)
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENTSIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE. SIMULATED OUTPUTS (YEAR 77)
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 110000
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
GCLS1
GCLS2
GCLN1
GCLN2
GBMN1
GBMN2
(A)
(B)
(C)
(D)
GCLS3
GCLN3
GBMN3
GCLS4
GCLN4
GBMN4
0
1
2
3
4
5
6
7
8
9
10
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABILITY ISSUES (1)
•SCORE (as of year 2004)
•operating doublets 34
•success ratio 65%
•yearly geothermal heat production #1,000 GWht
•CO2 atmospheric emission savings 500,000 tons
•EXPECTATIONS•existing doublet life 75 yrs
•future GDH doublets 10-15
•geothermal heat demand projection #1,500 GWht
•Geothermal heating/cooling offer projection #2,500 GWht
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABILITY ISSUES (2)MINING INVESTMENTS (103 €)2011-2035
-Existing doublet reconditioning/lining 450-Drilling/completion of a new, corrosion resistant, production well 3,000-Miscellaneous equipments/fittings 150
TOTAL 3,6002036-2060
-Abandonment (cementing) of the initial well doublet 350-Replacement of the production well fiberglass liner 450-Drilling/completion of a new, corrosion resistant, injection well 2,750-Miscellaneous equipments/fittings 200
TOTAL 3,750
COMAPARATIVE FIGURES
Capital investments (103 €)Natural gas cogeneration plant (rated 5 MWe) / Conventional, steel cased (9”5/8), well doublet
4,600 / 3,600
Cost prices (€)MWht geothermal / MWht cogeneration 5-8 / 3-4
ECOTAX PROJECTED IMPACTS (Carbon atmospheric emission tax) 50€/t
Impact on a 30,000 MWht/yr district heating doublet 200,000
Unit price impact 7€/MWht
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
ECONOMY (1)•INVESTMENT COSTS
•Total Paris Basin (52 doublets) #500 M€
•Doublet unit costs 10 M€
•Wells 3.3 (33%)
•Heat plant/geothermal loop 0.7 (7%)
•piping/substations 6.0 (60%)
•Ratings:•40000 MWht (geothermal = 30,000 MWht)
•Revenues (45 €/MWht) 1.8 M€
•OPERATION/MAINTENANCE COSTS (103 €)
Ref: 30,000 – 35,000 MWt rated plant
#700
•Energy 400
•Power 100
•Backup/relief fossil fuels 300
•Light maintenance/equipment replacement 40
•Heavy maintenance/equipment replacement 185
•Miscellaneus 75
FINANCIAL
•High debt (90%)/low equity (10%)
•Yearly debt repayment charge #1 M€
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
CONCLUSIONS• GDH scored well• State/public sector involvement proved a decisive
impetus• Operators exhibit mature technological and
entrepreneurial skills• Exploration/exploitation risks mastered to date• Sound resource/reservoir management outline• Sustainable heat mining, up to 50-75 years ahead,
secured• Improve image• Environmental, clean air, benefits to boost fiscally
incentive measures.