2
Surface Transportation Summary•Administration’s surface transportation
reauthorization proposal is the centerpiece of the FY 2012 budget.
•Provides $556 billion, six-year proposal to improve the Country’s highways, transit, and rail infrastructure and to ensure that these systems are safe.
•Includes $50 billion “Up-Front” economic boost that would foster job creation.
![Page 3: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/3.jpg)
3
FHWA Summary
•Budget request represents first year of Administration’s surface transportation reauthorization proposal$336 billion from FY 2012-2017 for
highway programs48% increase over SAFETEA-LU
•FHWA FY 2012 budget request is $70.5 billion$42.8 billion plus $27.7 billion “up
front” funding
![Page 4: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/4.jpg)
4
Highlights
• Proposal provides funding to:Modernize our highway system and create jobs.Focus investment on safety, state of good repair,
and livability.Establish a performance-based highway
program.Encourage innovations that will shorten project
delivery and accelerate the deployment of new technologies.
Simplify the highway program structure by consolidating over 55 programs to 5 core programs.
![Page 5: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/5.jpg)
5
Highway Safety Improvement Program•Continues Highway Safety Improvement
Program ($2.2 billion)States may use up to 25% (10% currently)
for non-infrastructure (e.g. EMS, education) safety projects in their Strategic Highway Safety Plan.
Ends transfers of HSIP funds to other (non-safety) programs unless performance targets are met.
States must spend 10% of their HSIP funding on rural safety projects.
![Page 6: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/6.jpg)
6
National Highway Program
• Targets investment to maintain state of good repair and operational performance on roads critical to national interest.
• Provides flexibility to the States for making transportation investment decisions on the larger system of Federal-aid eligible highways.
• Streamlines and consolidates portions of several existing programs including Interstate Maintenance, National Highway System, Highway Bridge, Surface Transportation Program.
![Page 7: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/7.jpg)
7
Enhanced National Highway System• Redefines the NHS as 220,000-mile network that
includes: Interstate System. All principal arterials. Intermodal connectors.Other roads important to strategic defense policy.
• Expands network that would carry 55% of all traffic and 97% of all truck-borne freight.
• Consistently defined network of national interest that would operate as a cohesive highway system to support interstate commerce and economic competitiveness.
![Page 8: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/8.jpg)
8
Highway Infrastructure Performance Program•Establishes formula and performance
based program ($16.75 billion)Maintains infrastructure condition and
performance on the expanded NHS network.
Performance focus on pavement and bridge conditions, and safety.
![Page 9: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/9.jpg)
9
Flexible Investment Program
•Establishes formula-based program ($15.6 billion)
•Provides flexibility to the States to replace or improve highway infrastructure, improve operational performance, and build or expand needed transportation facilities
•Funds can be used on any Federal-aid eligible highways (~995,000 miles) and off-system bridges.
![Page 10: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/10.jpg)
10
Livable Communities
• Establishes place-based planning, policies, and investments to increase transportation choices and access.
• Funds transportation projects to improve quality of life in rural and urban areas, and improve air quality in metropolitan areas.
• Combines eligibilities of previously separate programs under three programs: $3.4 billion formula-based program. $500 million discretionary grant program for livable
communities. $200 million discretionary capacity building grant
program.
![Page 11: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/11.jpg)
11
Performance Management Process• Establishes a performance-based Federal-aid highway
program.• Focuses initially on safety, pavement and bridge conditions.• Requires the Secretary to establish quantifiable performance
measures and national performance goals.• States to work in partnership with FHWA to set state targets. Safety – incorporates State Strategic Highway Safety Plans. Pavements/Bridges – requires risk-based asset management
plan for enhanced NHS.• Provides additional flexibility when targets are met.• Requires performance improvement plan when targets not
met.
![Page 12: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/12.jpg)
12
Transportation Leadership Awards• New competitive grant program ($1.3 billion) that
will assist State departments of transportation, metropolitan planning organizations, tribal governments and other transportation agencies to make the reforms necessary to institutionalize best practices and innovations in transportation policy.
• The program will reform the way transportation investments and decisions are made and implemented to better realize performance outcomes and to integrate performance management into the budget and project selection process.
![Page 13: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/13.jpg)
13
Other Key Provisions
• Accelerated project delivery Includes provisions to improve project delivery in
the areas of environmental review, permitting, integrating transportation planning and environmental review of transportation projects and efficiencies in contracting.
Builds on SAFETEA-LU provisions and expands on efforts under Every Day Counts to use innovative approaches and existing flexibilities.
• Freight policy Establishes a National Freight Transportation
Policy and designates a National Freight Transportation System.
Broader State flexibility on the use of HIPP and FIP funds to improve performance of designated national freight corridors.
![Page 14: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/14.jpg)
14
Other Key Provisions
• National Infrastructure Bank Finances transportation projects of national or
regional significance Leverages resources to achieve maximum return
on federal funds. Funded at $5 billion annually. Within USDOT and governed by board of officials
from USDOT and other federal agencies.
![Page 15: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/15.jpg)
15
Transportation Trust Fund
•Expands the Highway Trust Fund into a new Transportation Trust Fund that includes:Highway AccountMass Transit AccountRail Account Infrastructure Bank Account
•Existing HTF revenues will continue to be dedicated to highways and transit.
•The President is committed to working with Congress to ensure that funding for surface transportation does not increase the deficit.
![Page 16: FY 2012 President’s Budget Released February 14, 2011](https://reader036.vdocuments.mx/reader036/viewer/2022072012/56649e405503460f94b31876/html5/thumbnails/16.jpg)
16
For More Information
• DOT/FHWA Budget Highlights: http://www.dot.gov/budget/2012/fy2012budgethighlights.pdf
• FHWA Congressional Justification: http://www.dot.gov/budget/2012/budgetestimates/fhwa.pdf
• President’s Budget (DOT/FHWA overview and detailed budget account information): http://www.whitehouse.gov/omb/budget/Overview