Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

Upload: zachary-dodd

Post on 31-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

Fulvio Lecci

Link It Program Manager

Technical Area - ENAV

Link2000+ Workshop – Brussels 10, 11 October 2007

Page 2: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

210th october 2007 - Brussels

The approach to data

link ENAV commitment

In 2001 ENAV decided to commit to Link2000+

Initial studies to define basilar requirements

Designed Airspace Network ownership

Data Link Approach

Business Case to demonstrate data link feasibility Safety Assessment process FTS, Data Link HMI Definition & Prototyping Operational Implementation

Page 3: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

310th october 2007 - Brussels

Designed Airspace

UIR Roma (FL290 – 460)

UIR Milano (FL296 – 460)

Managed by Roma ACC••

LI RF

LI RA

LI CG

LI CJ

LI RN

LI RZ

LI MJ

LI MF

LI MC

LI ME

MILANO UIR

ROMA UIR

Page 4: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

410th october 2007 - Brussels

Safety Assessment stepsOperational environment and related servicesFunctional Hazard Assessment to identify risk

level of the new functionalities

CPDLC HMI Functional Requirements Functional Requirements Document for the

use of L2k+ baseline services (DLIC,ACM,ACL,AMC)

Safety Assessment process

Page 5: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

510th october 2007 - Brussels

Data Link HMI Definition & Prototyping Prototype of a new Human Machine Interface Related working methods for the use of the datalink services Based on the one currently in operation in Rome ACC

Efficiency Analysis Analyse the impact of data link communications on ATCOs

Workload. Definition and validation of new controller’s tasks by Real Time

simulations.

Safety Objectives Validation Specific Safety Scenarios were developed and injected in the

RTS Validation of FHA Safety Objectives compliance with the

Hazards identified in the FHA and in the ED120

FTS/RTS: step by step approach

Page 6: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

610th october 2007 - Brussels

Innovative Control Working Position solutions supporting Data Link services for testing CPDLC operations

FTS/RTS: HMI prototyping

ACL message: authorized to level … (UM19, UM20, UM21)

AB button on ALV or Modo C field label:

ALV menu to send clearances.

AB button on clearance level of right column (DL mode):

DL message will be sent.

In the label a yellow frame will close ALV field.

Pilot has receveid clearance.

Pilot will answer WILCO.

When WILCO message will be received from system, yellow frame around ALV field get off.

Page 7: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

710th october 2007 - Brussels

2 2 Real Time Simulation (Human-in-the-loop) and 1 Fast Time Simulation (SICTA and ENAV Experimental Centre)

11stst Real Time Real Time Simulation exercise aiming to define and evaluate new controller’s tasks (qualitative and quantitative approach), to feed FTS

A Fast Time Simulation exercise to evaluate the

efficiency and the potential increase of sectors capacity, based on preliminary indications from 1st RTS

22ndnd Real Time Real Time Simulation exercise to evaluate Safety and Human Factors aspects

FTS/RTS: main activities

Page 8: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

810th october 2007 - Brussels

Constant decrease of workload in each of future (CPDLC) scenario

Progressive and regular decrease of the voice communications amount

Decrease of time duration of voice communication

Increase of Sectors Capacity up to 12.8% (with 100% of traffic D/L equipped). The different results in term of capacity depend on the typology of Sectors (e.g. Feeder of Roma TMA) and the characteristic of traffic (e.g. overfly)

Slight reduction of improvement margins in case of non-nominal scenario

FTS/RTS: main results of FTS

Page 9: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

910th october 2007 - Brussels

FTS/RTS: evidence of results of FTS

Page 10: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1010th october 2007 - Brussels

Airspace EnvironmentAirspace Environment 2 sectors (EWU & OVS)2 sectors (EWU & OVS) 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of

same ATSU)same ATSU) Traffic SampleTraffic Sample

3 levels of traffic (75%, 100% & 130% of sector capacity as reported to 3 levels of traffic (75%, 100% & 130% of sector capacity as reported to CFMU)CFMU)

2 percentage of aircraft D/L equipped (50% & 75%)2 percentage of aircraft D/L equipped (50% & 75%) ATC Working MethodsATC Working Methods

Baseline (R/T modality)Baseline (R/T modality) Baseline + CPDLC modalityBaseline + CPDLC modality Baseline + CPDLC modality with task sharing between EXE & PLNBaseline + CPDLC modality with task sharing between EXE & PLN

OrganizationsOrganizations 23 exercises with 8 ATCO in rotation 23 exercises with 8 ATCO in rotation

Non-Nominal EventsNon-Nominal Events : Military Area and Bed Weather Conditions Faults Injections (e.g. Misdirection of message, corruption of Faults Injections (e.g. Misdirection of message, corruption of

message) message)

FTS/RTS: human in the loop simulations

Page 11: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1110th october 2007 - Brussels

FTS/RTS: Roma ACC sectors

Feeder EastFeeder East

Roma ACCRoma ACC

Feeder WestFeeder West

Marsiglia/TunisiMarsiglia/Tunisi

Page 12: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1210th october 2007 - Brussels

Over the Shoulders Observation Safety & Human Factors Experts

Questionnaires

Human Factors post run (based on NASA TLX and SASHA)

Human Factors Survey

Safety post run

Personal Interview

Instantaneous Self Assessment (ISA)

Debriefing post run

Debriefing post simulation sessions

Eye Tracking

Eye Tracking

The map of hot-spot shows the areas which are mostly fixed by ATCO during a run

FTS/RTS: evaluation activities

Page 13: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1310th october 2007 - Brussels

FHA Safety Objective Validation

Identification and evaluation of the effects of Hazards on the basis of ATCO behaviours and feedback

Evalutation of the effective risk related to more critical Hazards (e.g. Misdirection of message, Corruption of Flight Level message)

Supported by proof the Severity of Operational Consequences and the Safety Objectives derived from the FHA

Identification of some mitigation means to apply in design and implementation of new HMI

FTS/RTS: output of SO validation

Page 14: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1410th october 2007 - Brussels

Measurement of workload through the “Instantaneous Self Assessment”

Compared the Baseline scenario (R/T modality) with the D/L scenario (R/T + CPDLC modality)

Evident reduction of workload in the

organizations with CPDLC

0

20

40

60

80

100

120

140

160

180

Very Low Low Normal High Very High No Answer

ORG 02 R/T

ORG 17 D/L

Cumulative ISA ORG 02 - R/T mode

No Answ er Very High +High +Normal +Low +Very Low

Cum

ulat

ive

ISA

(%)

NoAnswer Very High High Normal Low Very Low

Cumulative ISA ORG 17 - D/L mode

No Answ er Very High +High +Normal +Low +Very Low

Cum

ulat

ive

ISA

(%)

No Answer Very High High Normal Low Very Low

FTS/RTS: evidence of results of ISA

Page 15: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1510th october 2007 - Brussels

Human Factors Trust of ATCO in the CPDLC

Significant reduction of workload and voice communications

Increase of Situational Awareness

Positive ATCO feedback on HMI usability

FTS/RTS: main results of RTS

Page 16: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1610th october 2007 - Brussels

Contract objectives

Implementation of DLIC, ACM, ACL, AMC Initial CPDLC services will be implement in Roma

ACC using VDL2 network

Implementation of data link network A new network supporting VDL2, AOA, ACARS

protocol will be developed and implemented

Implementation of D-ATIS and DCL D-ATIS and DCL will be implement in Fiumicino and

Malpensa airport using ACARS protocol

Operational Implementation

Page 17: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1710th october 2007 - Brussels

Implementation Phases

Definition, Testing, Implementation of Multimode Ground Station New VHF, VDL, ACARS Ground Station to manage ATS and AOC messages. Partnership Agreement with ARINC.

Implementation of data link network Network of initial 10 MGS to cover Roma UIR and most important airport, starting from

Fiumicino and Malpensa. MGS will be connected together and integrated in ENAV network using E-Net transport

services (ENAV program to implement ATM network connections)

Upgrade of the HMI Data link new functionality will be implement in operational HMI used in Roma ACC.

Pre-operational phase in PSA Pre-operational phase will be performed in PSA of Roma ACC (Test, Simulation and training

room) Assess operational validation of CPDLC services. Training sessions for controllers.

Operational phase CPDLC services will be implement in Upper sectors managed by Roma ACC.

Operational Implementation

Page 18: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1810th october 2007 - Brussels

Timing of data link implementation

Operational Implementation

08 0907 10 11

Project Definition

Development and testing of MGS

System and Network Implementation

Operational Rome UIR

Pre-Operational Phase in Rome PSA

Pre-Operational phase in Fiumicino & Malpensa

Operational phase in Fiumicino & Malpensa

Other airport and ACCs

Page 19: Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

1910th october 2007 - Brussels

Operational Implementation

ATN network

ACSPnetwork(ACARS)

E-NET transport network

E-NET transport network

MGS

MXP Main

MGS

MXP backup

MGS

Linate

MGS

Maccarese

MGS

Lampedusa

MGS

Erice

MGS

Alghero

MGS

Carbonara

MGS

FCO Main

MGS

FCO Backup

MGS

Crotone

MGS

Caraffa

ATN Air/Ground router ATN Air/Ground router

ATN Ground/Ground router ATN Ground/Ground router

Air Server(En-route

ATN services)

CWP 1

Rome ACC

FDPRDP

CWP n

NetworkManagement

PerformanceManagement

Billing

Firewall

Air Server(Tower

ACARS Services)

CWP 1

FCO Tower (the same at MXP Tower)

CWP n

Network support elements

Local area network

ATISServer

Local area network

otherCSP/ANSP