Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici
Preliminary Report
19 October, 2012
For
Burak Marine
Aliağa İzmir TURKEY ESN 560-036
Customer Representative: Burak ALDEMİR
GE Field Service Representative: Adnan LEBLEBİCİ Mehmet AKIN (Granite)
All technical recommendations and information contained in this report are based on GE manuals that have been developed and approved for use with GE engines and parts that have been operated and maintained in accordance with GE technical documentation and recommendations. GE has no technical knowledge of, nor obligation for, non GE-approved parts and repairs. Accordingly, this report is not intended to apply to non GE-approved parts and repairs, nor to any parts that may be directly or indirectly affected by non GE-approved parts and repairs.
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici
CONCLUSIONS & RECOMMENDATIONS
The purpose of this visit was to perform a visual and borescope Inspection. The engine visually was found in satisfactory conditions. The compressor, combustor and power turbine stage 1 & 6 blades & nozzles were inspected. This periodic borescope inspection was completed in reference to GEK 97310 Vol I, Chapter 5-3.
Outage Data: Engine Data:
ESN 560-036 Engine Fired Hours Package Total Hours
Model LM2500PI Engine Fired Starts Package Fired Starts
Trips Total Trips
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 3
DETAILS AND DATA
Purpose of visit:
This inspection was completed in reference to GEK 97310 Vol I, Chapter 5-3.5.
Daily Activities
Friday, 19 Oct 2012 Units are original packages that were removed and moved to warehouse. Engine was kept at warehouse almost 1 year without preservation. HP compressor, combustor and HP turbine borescope ports were removed. Only 1 fuel nozzle were removed and inspected. Found it in good shape. Feeder tubes are fine. Clearance is correct. HP compressor was found fairly dirty but no anomaly detected. T2/PT2 Probe: was secure and no damage, corrosion or obstructions were observed The inner and outer panels are fully intact with no distortion or other defects noted. No distortion was visible in the dome plate and the dome plate inner and outer overhangs were fully intact with no cracks or missing material. Thermal barrier coat was missing from numerous trumpet splash plates in varying degrees and some slight erosion was noted on the edges of the trumpet splash plates in the area were the thermal barrier coat is missing. Found a crack at 6 o’clock position on inner liner, out of limits. See picture. Some erosion and discoloration was found. 1st stage HPT blades: nothing abnormal was observed on flow path concave side and leading edges. Some loss of coating was detected. 2nd stage HPT blades: nothing abnormal was observed on flow path concave side and leading edges.
1st stage HPT nozzles: Cooling holes on HP S1 nozzles are mostly clogged. See picture… PT was visually inspected. First stage blades as thoroughly as possible without rotating the power
turbine (inspection was made using a flexible borescope through the Pt5.4 ports). No cracking, nicks, dents, corrosion or erosion was observed. Both igniters have been removed and inspected. No anomaly found. Engine external status: engine shows an external dirtiness in general.
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 6
VSV actuator RHS Package roof
VSV torque lever
HP recoup
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 8
Borescope Pictures
High Pressure Compressor
Midspan Stage 0
Stage 1 Stage 2
Stage 3 Stage 4
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 9
Stage 5, salt residue Stage 6,
Stage 6 Stage 8
Stage 9 Stage 11, nick
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 10
Stage 12 Stage 13
Stage 15 Stage 16
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 11
Combustor
Swirler Coating delamination, swirler (#4 fuel nozzle)
Inner liners A crack found at 6 o’clock position on inner liner
Discoloration carbon build up at swirlers
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 12
HPT
S1 nozzles, cooling holes are clogged S1N
Some dirt/ salt on blades Dirt on shrouds
S1 blades TE
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 13
S2 blades S2 blades, salt residue
Power Turbine
PT Stage 1 PT Stage 1, salt residue
PT Stage 1 PT Stage 1
Aero Energy LM2500SAC Report
Report completed by – Adnan Leblebici 14
GENERAL INSPECTION RECORD GAS TURBINE
IGV and VSV lever arms were found free of side-to-side movement on all stages.