Business Unit Quarterly Progress Against Operational Plan
Flinders Council
Quarter:
Period:
September
01/07/13 - 30/09/13
Anneure 9 (Item C1) October 2013
1
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Airport
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.1 Identify infrastructure objectives, standards for assets and develop a viable, asset lifecycle management and operational
model
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.3 Airport Master Plan
START DATE
2.1.3.4 Day to day
administrative activites.
Ongoing Day to day administration has been undertaken in a timely manner,
duties include aircraft landings/passenger and fees, OHS reports,
drug and alcohol reports, Airport Manual updates and bird hazard
reporting and documenting.
30/06/2014Airport Manager 1/07/2013
2.1.3.5 Seek the sale and
removal of the "house" building
from the Airport and ensure the
site is remediated as part of
sale conditions to allow for an
alternative future use of the
site.
In Progress Due to bad weather, the site has been inaccessible for inspection.
Council will seek tenders for the sale, removal and remediation of
the site during the second quarter.
30/11/2013Airport Manager5% 1/07/2013
2.1.3.6 Fund the construction
of a dedicated undercover
patient transfer facility for the
Royal Flying Doctor Service
(RFDS) to the west of the
terminal building as per the
capital works program.
In Progress Funds have been allocated for the construction of the RFDS Patient
Transfer Station and all planning approvals have been granted . Due
to grant approval being delayed for the apron extension works which
will be required to access the proposed transfer station, this project
has been delayed.
30/06/2014Airport Manager25% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.4 Capital Works Program
START DATE
2.1.4.1 Ensure a minimum of
85% of the capital works
program agreed for the Airport
is achieved.
In Progress 10.10.2013 In ground drainage works have been completed and
further open drainage works alongside both runways will be renewed
as part of the continued upgrade over coming months. Works to the
solar panels have taken place and planning for the apron and
taxiway extensions are complete.
30/06/2014Airport Manager25% 1/07/2013
October 11, 2013 Page 2 of 2
Anneure 9 (Item C1) October 2013
2
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Focus
Area:
1 Environment and Natural Asset Management - An environment that maintains its diversity, uniqueness and
attractiveness while supporting sustainable production and lifestyle.
Strategic
Direction:
1.1 Promote environmentally sustainable practice
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.4 Environmental sustainability of Council programs and operations
START DATE
1.1.4.1 Weed management
within council land improved
and work towards best practice
approach within the confines of
budget allocations available.
In Progress Control of the following weeds has been successfully undertaken on
road reserves for this growing season:
Onion Weed Asphodelus fistulosus (Declared)
Espartillo Amelichloa caudata (Declared)
African Lovegrass Eragrostis curvula (Declared)
Mullein/Aarons Rod Verbascum thapsus (a significant environmental
weed of pastures & disturbed areas)
Trials on numerous weeds and control methods are ongoing and
much work has been done to develop a geo referencing system for
weeds and rare/threatened species on road reserves across the
island.
30/06/2014Infrastructure
Manager
25% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.5 Transition to sustainable Solid Waste Management Systems
START DATE
1.1.5.1 Initiate recycling
programs that are financially
sustainable, user friendly and
environmentally appropriate for
our remote situation.
In Progress Glass and aluminium can separation is now in place and being
utilised by the community. This builds upon other areas where
separation of waste streams are already in place such as tyres,
white goods and e waste. Recycling of these goods will occur when
financially viable.
30/06/2014Infrastructure
Manager
50% 1/07/2013
1.1.5.2 Provide new waste
management facility and
service level agreement for the
Cape Barren Island
Community.
In Progress 1/10/2013
Site Planning and flora and fauna assessments are now complete. A
series of test bores have been developed to scope ground water
levels.
CBIAA and ALCT continue to be closely engaged in the project .
30/06/2014Infrastructure
Manager
25% 1/07/2013
October 11, 2013 Page 2 of 7
Anneure 9 (Item C1) October 2013
3
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Direction:
1.1 Promote environmentally sustainable practice
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.5 Transition to sustainable Solid Waste Management Systems
START DATE
1.1.5.3 Close landfill at Lady
Barron and implement a new
waste transfer station. Engage
with the community on the
proposed change, reasons for
such and new operations.
In Progress 1/10/2013
The continued burning of the Lady Barron tip and the ongoing
compliance issues associated with the site requires its immediate
closure.
Council waste management consultants provided a briefing to
Council at a workshop on the 3rd of October on the item and put
forward a series of options for consideration. Action on this item will
commence in the next reporting period.
30/06/2014Infrastructure
Manager
25% 1/07/2013
1.1.5.4 The Northern Regional
Waste Management Group has
agreed to fund a Waste
Management Strategy for the
islands. Staff to present the
strategy when complete.
Not Started Council staff and consultants have requested the NTWMG delay any
action on this item until our own explorations and strategies are
complete.
30/12/2013Infrastructure
Manager
0% 1/07/2013
1.1.5.5 The Northern Regional
Waste Management Group has
agreed to fund a fluorescent
tube landfill diversion project at
no cost to Council. Facilities for
the disposal and the removal of
fluorescent tube lights from the
Islands will be provided to the
community.
Completed Facilities for the disposal of fluorescent tubes have now been
provided.
30/06/2014Infrastructure
Manager
100% 1/07/2013
1.1.5.6 Communicate and
educate the community of the
changes to waste management
services, the reasons for the
changes and how they can
work with Council to improve
environmental outcomes from
the management of waste.
In Progress 7/10/2013 Major changes to waste management systems are
currently being explored and consultation and education will occur
as the process and systems are agreed.
30/06/2014Waste
Management
Consultant
20% 1/07/2013
October 11, 2013 Page 3 of 7
Anneure 9 (Item C1) October 2013
4
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Direction:
1.1 Promote environmentally sustainable practice
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.5 Transition to sustainable Solid Waste Management Systems
START DATE
1.1.5.7 Explore green waste
reuse options.
In Progress 1/10/2013
Council waste management consultants provided a briefing to
Council at a workshop on the 3rd of October on the item.
Scoping of equipment and staff required is underway as is
exploration of what products could be developed from the waste
stream to offset costs.
30/06/2014Infrastructure
Manager
25% 1/07/2013
1.1.5.8 Undertake a feasibility
study into the use of waste
furnaces as opposed to landfill
into the future. Assess costs
and environmental outcomes
and provide a report to Council.
In Progress 1/10/2013
Council waste management consultants provided a briefing to
Council at a workshop on the 3rd of October on the item.
Scoping on two furnace systems has been undertaken and further
work is required from a systems management perspective before a
full feasibility study is required.
30/06/2014Waste
Management
Consultant
25% 1/07/2013
October 11, 2013 Page 4 of 7
Anneure 9 (Item C1) October 2013
5
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.1 Identify infrastructure objectives, standards for assets and develop a viable, asset lifecycle management and operational
model
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.4 Capital Works Program
START DATE
2.1.4.2 Ensure a minimum of
75% of the Capital Works
program agreed is achieved.
In Progress 7/10/2013 Vertical slashing has been completed and Marshall Bay is
substantially complete with some minor works to undertake once the
road dries out.
30/06/2014Infrastructure
Manager
25% 1/07/2013
2.1.4.3 Day to day
administrative activites.
Ongoing 1/07/2013 Administration duties are being undertaken as required. 30/06/2014Infrastructure
Manager
2/09/2013
October 11, 2013 Page 5 of 7
Anneure 9 (Item C1) October 2013
6
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Direction:
2.4 Pursue “best practice” delivery model that balances cost and outcomes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.4.2 Review infrastructure management and operational procedures as basis of introduction of continuous improvement system
START DATE
2.4.2.1 Undertake assessment
with Works Manager of how to
improve bitumen sealing works
via a partnership approach with
skilled service providers/
access to modern equipment.
Completed 1/10/2013
With the introduction of the new Workplace Safety Act on January
1st 2013, a risk assessment highlighted that the existing equipment
used by Council staff for bituminous sealing was very old and of
extreme risk to operators. This combined with the average
outcomes of the preceding years sealing program has seen action
taken to bring in outside contractors to undertake the tasks required
this year.
30/06/2014Infrastructure
Manager
100% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.4.3 Service standards are provided in line with asset management plan and budget allocations provided by Council.
START DATE
2.4.3.1 Roads, bridges and
culverts are maintained and
managed in line with budget
allocations provided.
In Progress Dry weather will allow for the construction of the detour road at
Sammphire Creek and contractors are now starting tp manufacture
beams for the bridge. Construction will begin as soon as weather
permits and component manufacture is complete and contractor
availability is secured.
Bridge and culvert maintenance has been undertaken as per
AusSpan schedule.
Capital program: vertical slashing has been completed and Marshall
Bay has been substantially completed.
30/06/2014Infrastructure
Manager
25% 1/07/2013
2.4.3.2 Develop works
program, levels of service
specifications and associated
procedures in line with long
term asset management plan.
Not Started The Asset Mananagement plan is still under development . I
continue to work with the Corporate Services Manager and GM on
this important plan.
30/06/2014Infrastructure
Manager
0% 1/07/2013
October 11, 2013 Page 6 of 7
Anneure 9 (Item C1) October 2013
7
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Asset Management
Strategic
Direction:
2.4 Pursue “best practice” delivery model that balances cost and outcomes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.4.3 Service standards are provided in line with asset management plan and budget allocations provided by Council.
START DATE
2.4.3.3 Maintain all Council
owned assets to the current
legislation/regulations and
applicable
standards, so that these assets
are kept to the appropriate
service levels expected
within our community.
In Progress 30.09.2013 When the results from the Community Infrastructure
Audit are obtained, work can then commence on completing Asset
Management Plans for all community assets. This is required
before completion of the Long Term Financial Plan can be
achieved.
30/06/2014Corporate Services
Manager
25% 1/07/2013
October 11, 2013 Page 7 of 7
Anneure 9 (Item C1) October 2013
8
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Focus
Area:
1 Environment and Natural Asset Management - An environment that maintains its diversity, uniqueness and
attractiveness while supporting sustainable production and lifestyle.
Strategic
Direction:
1.1 Promote environmentally sustainable practice
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.3 Community engagement in environmental projects
START DATE
1.1.3.1 Support and facilitate
the Community Plant a Tree
Day (National Plant a Tree day)
in collaboration with Parks &
Wildlife Services, Landcare
and NRM North.
Completed 10.10.13 Council supported Parks & Wildlife Services, Landcare and
NRM North to facilitate the Community Plant a Tree Day (National
Plant a Tree day). Approximately 30 community members
successfully planted over 300 trees on the Bluff track.
31/08/2013Community
Development
Coordinator
100% 1/07/2013
October 11, 2013 Page 2 of 13
Anneure 9 (Item C1) October 2013
9
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.1 Identify infrastructure objectives, standards for assets and develop a viable, asset lifecycle management and operational
model
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.2 Review community facility portfolio with the view of developing a profile that matches contemporary and emerging needs
START DATE
2.1.2.2 Enable and assist the
local Scout Group to identify an
alternative venue and any grant
funding that is available for
their support.
Completed 10.10.13 Council has assisted scouts to relocate to the Lions Lodge. 30/06/2014Community
Development
Coordinator
100% 1/07/2013
2.1.2.3 Community Services
Hub: Work with DPAC to
develop a Community Services
Hub in Whitemark that
provides community benefit for
the access of State and
Council services.
In Progress 30.09.2013 DPAC have submitted an application to Treasury to
move the project to the next phase.
30/06/2014General Manager25% 1/07/2013
2.1.2.6 Whitemark Foreshore:
Collaborate with the PWS,
Landcare, NRM North and
other community groups and
individuals to create further
community facilities on the
Whitemark foreshore such as
the Exersite gym equipment
and extension of the Bluff
Track so to further encourage
access to health promotion
activities; and the development
of the barbeque area to assist
to build further social inclusion
and engagement.
In Progress 06.10.2013: - Site Masterplan being developed;
- Regular communication with Tasmania Medicare Local (TML)
Program staff and Fitness Trails Principal regarding the fabrication ,
delivery and installation of the TML/HIP donated 'Exersite'
permanent outdoor exercise equipment;
- Successful application of Rural Health Week grant to provide a
series of free exercise classes for the community using the exercise
equipment;
- Regular communication with TML staff to collaboratively launch the
HIP: 30 Stories in 3 Years publication at the launch of the Exersite;
- Liaised with Council staff in the preparation of the Crown Land
Services Works Application and Council's Development Application;
- Meetings with stakeholders on an as needs basis;
30/06/2014Community
Development
Officer
25% 1/07/2013
October 11, 2013 Page 3 of 13
Anneure 9 (Item C1) October 2013
10
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
2.4 Pursue “best practice” delivery model that balances cost and outcomes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.4.1 Further refine the long term asset management plan to inform sustainable service delivery and standards.
START DATE
2.4.1.1 Community Halls:
Working with Council staff to
assist to facilitate the hall
maintenance process so to
comply with all relevant
standards for the future
multi-use requirements of the
community. Support the
community to: assist in the
maintenance of the hall
through working bees; develop
future events and activities at
Emita hall; and liaise with the
Hall Committee to ensure all
health & safety, maintenance
and usuage procedures are
compliant with Council's
policies.
In Progress 02/10/13: - submission of grant application to Regional Development
Australia Round 5 for $40, 000 towards the Emita Hall upgrade and
kitchen facilities;
- Ongoing communication to the Emita Hall Committee members
which has included the opportunity to volunteer in the upgrade of the
Emita Hall and explain the procceses around this. Ongoing updates
and engagement with the Emita Hall Committee via email, phone,
face-to-face and attendance at meetings;
- Established a register of interested volunteers;
- Assisted to develop the Council's Volunteer Handbook;
- Assisted to develop Volunteer Registration Form;
- Facilitated the Volunteer Induction session; letters and email
reminders to registered volunteers;
30/06/2014Community
Development
Coordinator
25% 1/07/2013
October 11, 2013 Page 4 of 13
Anneure 9 (Item C1) October 2013
11
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Focus
Area:
4 Community Safety, Engagement and Enterprise - Through positive Council-Community partnerships, enhance
people’s security, inclusion and well-being.
Strategic
Direction:
4.2 Support effective and timely incident & emergency management planning and response
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.2.1 In conjunction with other emergency response groups, have appropriate plans and resources in place to mitigate and respond to
identified risks and incidents
START DATE
4.2.1.2 SES- Ongoing 1/10/13- currently working with Andrew Cox from TFS on a fire plan
for Flinders Island as well as fire trail updates for the Island for the
new Emergency Services map book. Another Municipal Emergency
Management Committee meeting is planned for the near future, this
hasn't happened over the past 3 months due to the unavailability of
the Northern Region SES Manager to attend.
30/06/2014Emergency
Management
Coordinator
1/07/2013
October 11, 2013 Page 5 of 13
Anneure 9 (Item C1) October 2013
12
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.1 Engage with, as necessary support and integrate into Flinders Council plans key community based service providers.
START DATE
4.3.1.2 Liaise with the Flinders
Island District High School to
develop a MOU, or an
appropriate agreement, for
Council to facilitate the
Austswim Learn to Swim
program for youth benefit.
In Progress 06/10/13: Have met with the School Principal to confirm Council’s
future involvement and coordination of the Austswim Learn to Swim
Program for the summer season 2013/14. The Principal is looking
into what process and procedures will need to be in place for
Council's involvement. It was noted that Learn to Swim Program will
need to be held during School Hours.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.3.1.3 Implement a
Community Road Safety
Partnership.
In Progress 06.10.2013:Liaised with DIER's Community Road Safety Partnership
Officer to confirm potential project funding and process;
- Met with stakeholders to review proposed actions and identify 2-3
community projects;
- Action Plan developed and submitted to DIER for confirmation to
move forward and available funding.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.3.1.6 Rural Primary Health
Service: Administer the funding
to deliver the Community
Nurse and Podiatrist services
and work with Tas Medicare
Local to identify future
community health needs that
could be funded under this
scheme.
In Progress 02/10/13: New funding arrangements with Tasmania Medicare Local
confirmed;
- Successful negotiation with new podiatry service provider and
Services Agreement drafted and signed;
- 2013-14 RPHS Service Delivery Plan complete;
- Drafted Service Agreement - TML/Council/Tasmanian Health
Organisation North for community nursing component of RPHS.
Submitted to TML for approval in August. Currently awaiting a reply
from TML to move forward;
- 12 month report 2012-13 submitted with audited financials;
- Working with TML staff to revise the Community Health Needs
Assessment with data collected early 2013 from the Health Needs
Survey. Researching Population Health Programs to assist in the
development of the revised Community Health Needs Assessment .
30/06/2014Community
Development
Coordinator
25% 1/07/2013
October 11, 2013 Page 6 of 13
Anneure 9 (Item C1) October 2013
13
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.1 Engage with, as necessary support and integrate into Flinders Council plans key community based service providers.
START DATE
4.3.1.7 Future Preventative
Health Initiatives (PHI): In
collaboration with stakeholders
assist to develop project
funding submissions to
Medicare Local to facilitate and
support an annual calendar of
PHI initiatives such as Bloke's
Day Out, Womens Health Day,
Pedometer Challenge, Flinders
Island Running Festival, Parks
& Wildlife/Heart Foundation
Walks.
In Progress - Provided support for the Flinders Island Running Festival;
- Successful grant application for Rural Health Week to provide a
series of free community exercise classes planned using the
permanent outdoor exercise equipment to be installed on the
Whitemark foreshore;
- Convening of Health Promotion Network meetings.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.3.1.8 Identify further
opportunities for, and assist the
Flinders Island District Hiigh
School with the Transition
Program.
In Progress 06.10.2013: - Council and School staff have met to discuss future
areas that Council can assist with the School's Transition Program;
- Business case currently being developed by Council and School
staff working collaboratively.
30/06/2014Community
Development
Officer
25% 1/07/2013
4.3.1.9 Identify and assist to
provide further community
engagement with the Flinders
Island Sports & RSL Club.
In Progress 06.10.2013: - Worked with the Sports Club to facilitate the Flinders
Island Running Festival weekend events.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.3.1.10 Liaise and engage
with the Flinders Island
Aboriginal Asociation Inc. to
identify and support as
necessary areas which Council
and FIAAI can collaborate for
community benefit.
In Progress 06.10.2013: Met with yadas (Young Aboriginal Drug & Alcohol
Services) and FIAAI to identify youth programs.
- Regular communication to FIAAI with regards to Council's youth
school holiday program to ensure no duplication of youth activities
and to help promote Council's programs to FIAAI members.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.2 Build civic engagement and increase civic pride through evidence based research, agreed events, programs and improved
START DATE
October 11, 2013 Page 7 of 13
Anneure 9 (Item C1) October 2013
14
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
communication with the community.
4.3.2.1 Manage Council's
online activities and re-develop
the website
Ongoing 8/10/13 The management of Council's online and social media
activities are ongoing. The website upgrade is in progress with the
wireframe, sitemap and build complete. Current work is being
undertaken on the content development and sourcing of new
imagery.
30/06/2014Communications
Officer
1/07/2013
4.3.2.2 Planning and
executing the new community
calendar and integrating into
the new website. The content
of events will be managed by
community development. A
report will be produced
measuring community uptake.
In Progress 8/10/13 The planning and build of the community calendar had is
well progressed. Final refinements are being undertaken and this
will then be integrated with the upgraded Council website. This will
be rolled out and promoted once the website is launched.
30/06/2014Communications
Officer
40% 1/07/2013
4.3.2.3 Develop and
implement a Community-wide
Volunteer Strategy
In Progress 06.10.2013: - Council Volunteer Handbook has been developed;
- Council Community Development staff and Risk Management
Officer are working collaboratively to ensure all Council Volunteers
have completed the Council Volunteer Induction program; -
Community Organisation's contact list currently being updated;
- Liaised with Employment Service Providers to assist in identifying
key volunteer opportunities within the community.
- Delivered Council Volunteer Induction to Emita Hall Committee
30/06/2014Community
Development
Coordinator
25% 1/07/2013
October 11, 2013 Page 8 of 13
Anneure 9 (Item C1) October 2013
15
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.2 Build civic engagement and increase civic pride through evidence based research, agreed events, programs and improved
communication with the community.
START DATE
4.3.2.4 Council Community
Communication Strategy:
Develop a council
communication strategy that
clearly identifies the role of the
Council, staff (including the role
of the community development
officer) within the community
and can be clearly
communicated. This will
include the projected tools,
internal and external strategic
directions that will align with
other council departments.
In Progress 8/10/13 Initial work has been completed holding a staff
communications workshop which formulated initial ideas for the
development of the community communication strategy. Further
work on this will be undertaken in the coming period.
30/06/2014Communications
Officer
15% 1/07/2013
4.3.2.5 Establish and manage
a digital image library and
related compliance
documentation for public
relations, promotion and
advertising use by Council.
In Progress 30.09.2013 Image library, compliance documentation and procedure
manual have been established. First images have been catalogued.
Overall management and data entry will be ongoing.
30/06/2014Executive Officer25% 1/07/2013
4.3.2.6 Provide support to the
community organisation
Fitness on Flinders with
regards to health benefit
related community events such
as the Flinders Island Running
Festival.
In Progress 06.10.2013: Provided support to Fitness on Flinders with the
Flinders Island Running Festival events.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
October 11, 2013 Page 9 of 13
Anneure 9 (Item C1) October 2013
16
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.2 Build civic engagement and increase civic pride through evidence based research, agreed events, programs and improved
communication with the community.
START DATE
4.3.2.7 Promote liveability and
economic viability of the
Flinders Municipality.
In Progress 06/10/13 Successful submission to present at the inaugural
Australian Age-Friendly Cities and Communities Conference
(AFCC);
- Completion of Conference presentation material by Community
development staff;
- Community Development staff submission to the Medibank Active
Tasmania Awards.
- Community Development staff facilitated, promoted and assisted in
the coordination of the community screening of the 72 Hours footage
with the Flinders Island Tourism Association.
- Community Development staff assisted to coordinate the National
Plant a Tree Day activity held at the Bluff Fitness Trail with
organisations Parks & Wildlife Services, Council and Landcare.
- Community Development staff liaised with the East Coast Odyssey
crew to assist to facilitate a School education cleanup the beach
program with organisation Two Hands; and the screening of the East
Coast Odyssey. Unfortunately, the planned events were cancelled
due to the ship not being able to dock at Flinders Island.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.3.2.8 Explore and provide
recommendations to Council
on Flinders delivering the
Australian Small Islands Forum
in 2014.
Completed A Scoping Report on the feasibility and practicalities of Flinders
Council hosting the Australian Small Islands Forum in 2014 was
presented to Council at a Councillor workshop and at the Ordinary
Council Meeting on 15 August 2013.
30/10/2013Executive Officer100% 10/07/2013
October 11, 2013 Page 10 of 13
Anneure 9 (Item C1) October 2013
17
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.2 Build civic engagement and increase civic pride through evidence based research, agreed events, programs and improved
communication with the community.
START DATE
4.3.2.9 Event Policy: Assist to
develop an event policy for
community organisations and
individuals that gives a clear
direction of relevant
compliance and policy when
putting on community events
so as to assist in encouraging
a greater number of events on
the islands.
In Progress 06.10.2013: - Working with Council staff to initiate and develop an
accounting structure that captures Council's donations to community
groups for event assistance; Further work on a specific policy will be
undertaken as the year progresses and initial scoping is completed.
30/06/2014Community
Development
Coordinator
5% 1/07/2013
October 11, 2013 Page 11 of 13
Anneure 9 (Item C1) October 2013
18
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.4 Facilitate the provision and enhancement of critical health and education facilities and service levels by state and federal
agencies and NGOs
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.4.1 Collaborate with incorporated bodies associated with key facilities and services to retain and enhance scope and level of service,
including implementation of innovative responses
START DATE
4.4.1.2 Actively participate in
the Cancer Council's Steering
group of the supportive care
model for rural and remote
communities project with other
health stakeholders and
community members to
support and facilitate future
Cancer Support Services to the
Flinders Municipality.
In Progress 06.10.2013: Actively engage in regular meetings with all
stakeholders to develop the support care model for cancer support
services in the Flinders municipality;
- Promoted and assisted in the the Cancer Council of Tasmania
cancer support Information sessions held at both Lady Barron and
Whitemark;
- Promoted and provided assistance to identify community members
interested in being involved in the Cancer Council of Tasmania 's
Volunteer Ambassador Program.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.4.2 Deliver and/or facilitate delivery of health and activity based programs and events for community and youth.
START DATE
4.4.2.1 Deliver an integrated
school holiday activities
program.
In Progress 06.10.2013: School Holiday Program questionnaire developed, sent
and collated to assist in identifying and ranking activities and
programs for Council's School Holiday Program;
- Activities towards the delivery of the October School Holiday
program - Rock Climbing Abseiling - include: Coordinating
professional instructors; development and collation of all registration
forms; completion of the Risk Management Plan; promotion and
publicity material for the activity.
- Assisted the Regional Arts branch with the Flinders Flicks
promotion of workshops and events during the July School Holidays.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
4.4.2.2 Provide support to the
community organisation, the
Flinders branch of the
Tasmanian Regional Arts, with
arts & culture related
community events such as the
Flinders Flicks Festival.
In Progress 06.10.2013: Assisted and provided support to the following Regional
Arts Branch activities and events: Flinders Flicks and Australia's
Unsung Heroes.
30/06/2014Community
Development
Coordinator
25% 1/07/2013
October 11, 2013 Page 12 of 13
Anneure 9 (Item C1) October 2013
19
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Community Development
Strategic
Direction:
4.5 Support capacity building in community organisations and facilitate the development of community enterprise
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.5.1 Identify opportunities to enhance the delivery and governance skills of community organisations and establishment of community
responses to opportunities and challenges
START DATE
4.5.1.1 Day to day
administrative activites.
In Progress 06.10.2013: all administrative duites completed successfully
through out the period.
30/06/2014Community
Development
Coordinator
25% 2/09/2013
October 11, 2013 Page 13 of 13
Anneure 9 (Item C1) October 2013
20
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Corporate Services
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.4 Pursue “best practice” delivery model that balances cost and outcomes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.4.2 Review infrastructure management and operational procedures as basis of introduction of continuous improvement system
START DATE
2.4.2.2 Develop and deliver a
Risk Management Framework,
Risk Management Policy and
an integrated Risk Register to
inform the treatment of risk
across the organisation and to
mitigate risk for employees,
Councillors and the community.
In Progress 30.09.2013 Draft Risk Management Framework has been
completed and will be discussed at the December Councillor
Workshop.
01/02/2014OH&S Risk
Management
Officer
50% 1/07/2013
October 11, 2013 Page 2 of 5
Anneure 9 (Item C1) October 2013
21
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Corporate Services
Strategic
Focus
Area:
5 Corporate Governance and Intergovernmental Relations - decisions are professionally and transparently made,
communicated and implemented to achieve defined outcomes in the interest of the community
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.1 Design and implement an integrated governance; strategic and operational planning & service delivery system
START DATE
5.1.1.1 Design and implement
a revised grant and contract
management system.
In Progress Review of current Grant and Contract Management System has
been completed.
Discussions with staff members outlining key areas for improvement
has taken place.
30/06/2014Finance Officer10% 1/07/2013
5.1.1.4 Review all Council’s
long term strategic documents
within the 3 year review
timeframe.
Not Started 10.10.2013 With the end of year processing now complete and the
Tasmania Audit Office report on road asset treatment due for
publication in November, these documents will be reviewed and
updated in the next quarter.
30/06/2014Corporate Services
Manager
0% 1/07/2013
5.1.1.5 Maintain Council’s
Property and Rates program as
and when required.
In Progress 30.09.2013 Property system is currently up to date with the rates
being raised during August. A supplementary rate notice will be
generated in October to reflect any changes to properties
concerning their valuation, subdivisions & change of owners etc.
The first rates instalment is due on 22 October 2013.
30/06/2014Corporate Services
Manager
25% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.3 Achieve a sustainable balance of income, investment and recurrent expenditure
START DATE
5.1.3.1 Develop Long Term
Financial Management Plan.
In Progress 30.09.2013 The end of financial year work is now complete with the
Tasmanian Audit Office and again the treatment of our gravel road
surface depreciation schedules has proven problematic. The
Tasmanian Audit Office will issue a report on the treatment of road
assets in November, at which time our asset management plan can
be updated to reflect these changes and model the long term
implications at an asset and financial level. Further detailed work is
also being undertaken in relation to our building and community
facilities, this information is also critical to the development of the
long term asset management plan and consequently the long term
financial plan. As this information comes to hand these critical long
term plan will be further refined and developed.
30/06/2014Corporate Services
Manager
20% 1/07/2013
October 11, 2013 Page 3 of 5
Anneure 9 (Item C1) October 2013
22
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Corporate Services
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.3 Achieve a sustainable balance of income, investment and recurrent expenditure
START DATE
5.1.3.2 Work collaboratively
with the Tasmanian Audit Office
to address depreciation issues
relating to residual values
applied to the road network.
In Progress 30.09.2013 During the reporting period a significant amount of staff
time and resources were dedicated to working with the Tasmanain
Audit Office on our depreciation treatment of gravel road surfaces .
Late advice from the Auditor General directed Officers to maintain
the same approach to the item as utilised in the previous financial
year despite there being no specific reasoning provided that the
approach taken by Council was not in compliance with the current
accounting standard or the engineering reality of the assets service
life. Given that the Tasmanian Audit Office will deliver a report on the
matter in November, all Tasmanain Councils will then have a clear
direction on how treat these assests in the future.
30/06/2014Corporate Services
Manager
50% 1/07/2013
5.1.3.3 Deliver the new Budget
Estimates for the proceeding
financial year.
Not Started 30.09.2013 Work has not commenced as this will be started in 2014
during the third quarter.
30/06/2014Corporate Services
Manager
0% 1/07/2013
5.1.3.4 Review the current
Budget Estimates as and when
directed.
Not Started 30.09.2013 Work has not commenced during this quarter. A half
yearly budget review will be done at the beginning of 2014.
30/06/2014Corporate Services
Manager
0% 1/07/2013
5.1.3.5 Deliver financial
reports as and when directed.
In Progress The first quarterly financial report will be submitted to Council at its
October meeting. This will be prepared by Council's financial
consultant in the absence of the Corporate Services Manager.
30/06/2014Corporate Services
Manager
25% 1/07/2013
5.1.3.6 Deliver financial
services including and not
limited to creditors, debtors,
rates receivables
and investments.
In Progress All financial functions are running smoothly and all statutory
requirements being complied with.
30/06/2014Corporate Services
Manager
25% 1/07/2013
October 11, 2013 Page 4 of 5
Anneure 9 (Item C1) October 2013
23
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Corporate Services
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.3 Achieve a sustainable balance of income, investment and recurrent expenditure
START DATE
5.1.3.7 Deliver the audited
Financial Statements for the
preceding financial year within
the
legislative requirement
timeframes.
Completed The 2012-13 financial statements were submitted to the Tasmanian
Audit Office within the State Government statutory requirement (by
the 15 August). Auditors were here on the island on 17-19
September with all requirements being met. The road assets were
again a topic of discussion with residual values on unsealed roads a
concern.
30/09/2013Corporate Services
Manager
100% 1/07/2013
5.1.3.8 Day to day
administrative activites.
In Progress All day to day administrative functions are running smoothly, even
though it has been very challenging for all staff at times due to long
term staff sickness and absences.
30/06/2014Corporate Services
Manager
25% 1/07/2013
October 11, 2013 Page 5 of 5
Anneure 9 (Item C1) October 2013
24
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Focus
Area:
1 Environment and Natural Asset Management - An environment that maintains its diversity, uniqueness and
attractiveness while supporting sustainable production and lifestyle.
Strategic
Direction:
1.2 Design land use and development policies that balance environmental, economic and social outcomes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.2.2 Apply the strategic objectives and criteria to specific opportunities and proposals and integrate into the marketing strategies
START DATE
1.2.2.1 Renewable Energy
Plan - continue to seek funding
and implementation of plan.
Ongoing 10/10/2013
ARENA have now reviewed the Expression of Interest put forward
by Hydro Tasmania and have invited Hydro Tasmania to submit a full
Application. The full application preparation will be progressed over
the coming months targeting late 2013, early 2014 for submission
pending state discussions.
Discussion with State treasury has formally commenced regarding
CSO impact.
30/06/2014General Manager 1/07/2013
October 11, 2013 Page 2 of 11
Anneure 9 (Item C1) October 2013
25
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
1.3 Enhance access to and use of environmental assets to ensure values are recognised
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.3.1 Protect and as required formalise public access to coastal and inland areas
START DATE
1.3.1.2 Partner with other
Government agencies to
improve access and
maintenance of tracks in key
coastal areas.
Completed Officers continue to work closely with local Parks and Wildlife staff to
improve access and maintenance of tracks in coastal areas.
1/10/2013
The Bluff Track redevelopment is completed.
The Marshall Bay track is complete.
Works proposed for this year are now complete.
30/06/2014General Manager100% 1/07/2013
October 11, 2013 Page 3 of 11
Anneure 9 (Item C1) October 2013
26
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.1 Identify infrastructure objectives, standards for assets and develop a viable, asset lifecycle management and operational
model
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.3 Airport Master Plan
START DATE
2.1.3.1 Seek the inclusion of
the Airport runway
rebuild/reseal project (as
outlined in the Airport master
Plan) to be included in State
and Federal Government
Transport Priority Plans to
assist with future funding
submissions.
In Progress 1/10/2013
The runway rebuild/reseal project is now included as a key regional
priority of the Northern Councils within the NTD Priority Projects
document. It is also a key project within the State Governments
Northern Integrated Transport Plan. Efforts continue to seek Federal
Government support, the project is shovel ready, is supported by the
Region and the State and as such should align well to receive
Federal support when funds are available.
30/06/2014General Manager90% 1/07/2013
2.1.3.2 Seek government
funding for the Airport runway
rebuild/reseal project as
outlined in the Airport Master
Plan.
In Progress 1/10/2013
To secure funding for a project of this scale Council must follow an
evidence based process of scoping the required works, outlining the
critical nature of the proposal to the ongoing viability of not just the
runway itself but the airline operators, the community and the islands
businesses. With the airport master plan complete and the runway/
pavement assessment finalised, Council staff have been actively
seeking the support of the Region and the State to list the project as
a priority to support. I can confirm that these efforts have now seen
the project listed by the Northern regional Councils via NTD as a key
priority project and its is referenced in the Department of
Infrastructure Energy and Resources "Northern Integrated Transport
Plan". Staff have initiated discussions with the new Federal Member
for Bass about the critical nature of the project to the islands and
efforts in this area will be ongoing over the coming period .
30/06/2014General Manager50% 1/07/2013
2.1.3.3 Seek Federal and
State Government funding to
complete the Apron and
Taxiway project at the Airport.
In Progress 1/10/2013
Grant application has been submitted to the Federal Department of
Infrastructure.
30/06/2014General Manager90% 1/07/2013
October 11, 2013 Page 4 of 11
Anneure 9 (Item C1) October 2013
27
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
2.2 Optimise infrastructure to support existing settlements and enhance sustainable development opportunities and remove
impediments to growth
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.2.1 Identify, research, design and implement key infrastructure projects and programs to meet the economic and environmental needs of
Council and the community.
START DATE
2.2.1.2 Airport business plan is
developed, consulted and
adopted.
In Progress 1/10/2013
Master plan completed
Draft Airport business plan complete.
Resonance Consulting have been engaged to undertake a detailed
investigation and analysis of the following three options to determine
business case:
1. Paid parking
2. Storage sheds
3. 24 hour fuel facility
Once completed this information will be used to inform the
finalisation of the airport business plan.
30/06/2014General Manager60% 1/07/2013
2.2.1.3 Undertake required
works to complete the Port
Davies Boat
Ramp.
In Progress 1/10/2013
MAST funding secured.
Designs finalised.
Development Application approved.
Contractors engaged.
Work has now started on the project.
01/02/2014General Manager60% 1/07/2013
October 11, 2013 Page 5 of 11
Anneure 9 (Item C1) October 2013
28
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
2.3 Lobby utility and access providers to meet obligations for infrastructure policy and service provision to provide for relative
equity
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.3.1 Develop base positions, identify key players, lobby and as necessary respond to opportunities and incidents
START DATE
2.3.1.1 Develop, submit and
secure annual shipping
contingency funding via DIER.
Manage the implementation of
projects funded in the
preceding years allocations.
In Progress 1/10/2013
Grant submitted as per Council resolution and funding secured for
the 2012/2013 year.
Equipment and projects from this funding to be purchased in the
2013/2014 year.
The General Manager has made preliminary enquires with Tasports
and Furneaux Freight as to a suitable ownership model or lease
agreement to support the purchase of the funded equipment.
Discussions are ongoing until such time as this can be resolved.
This will be actioned in the next reporting period.
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 6 of 11
Anneure 9 (Item C1) October 2013
29
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Focus
Area:
3 Land use, Development and Building - A productive system of land and building development that promotes
investment and activity while protecting people and the environmental characteristics of the Flinders municipal area.
Strategic
Direction:
3.1 Utilise best practice planning principles in conjunction with Flinders Councils Strategic Plan to guide detailed planning policy
and planning tools
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 3.1.1 Apply and refine as necessary the classification structure and planning principles defined in the Flinders Planning Scheme to key areas
while directly engaging with the community to further the consultation commenced with the draft Interim Planning Scheme. This will ensure
planning principles and outcomes reflect community needs and desires and provide timely strategic planning for future economic and
community development.
START DATE
3.1.1.1 Continue the
development and
implementation of the Rural
Living Strategy.
In Progress 1/10/2013
Council staff and consultant Planners continue to develop the
strategy in conjunction with a revised Structure Plan. The plans
finalisation is based upon the availability of the consultant planner
over the coming months. The Minister for Planning recently advised
Council that he has signed revisions to the Regional Land Use
Strategy whereby Flinders now has support to inform zonings based
on "localised strategy". This change is a major achievement and will
allow for the draft interim scheme as consulted with the community
to be enacted, subject to any revisions that the TPC may make post
the formal consultation process. The delivery of a revised Structure
Plan and rural living strategy will be the key localised strategic
documents utilised to inform the Draft Interim Planning Scheme prior
to submission to the Minister.
30/06/2014General Manager40% 1/07/2013
October 11, 2013 Page 7 of 11
Anneure 9 (Item C1) October 2013
30
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Focus
Area:
6 Furneaux Future - A thriving, self reliant community offering opportunities for current and following generations
while maintaining core values and attributes.
Strategic
Direction:
6.1 Implement a dynamic strategic plan and development framework to define our future and guide strategic decisions
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.2 Tourism
START DATE
6.1.2.1 Work collaboratively
with northern Regional Tourism
Organisation to drive brand
recognition, visitation and
tourism development.
In Progress 1/10/2013
TNT/Council funding agreement finalised.
Draft Destination Management Plan is under development with a
specific Flinders approach included.
TNT working on branding initiatives with local businesses and the
Tourism Association.
A partnership based marketing campaign has been developed
between Sharp Airlines, FITA, TNT, Tourism Tasmania and Council.
A request for funding is included in the October Council Agenda.
30/06/2014General Manager50% 1/07/2013
6.1.2.2 Establish and build a
collaborative relationship with
key personnel at Sharp Airlines
to increase visitation, holiday
packages, review passenger
tax to drive returns to both
Council and Sharp Airlines.
Ongoing 1/10/2013
The Sharp Airlines CEO and the General manager have regular
meetings to discuss areas of interest and strategies to increase
visitation. The passenger tax is an ongoing area of interest for both
parties and differing scenarios are being explored.
30/06/2014General Manager 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.3 Investment Attraction
START DATE
6.1.3.1 Provide assistance as
required to any investment
enquiries.
In Progress 1/10/2013
Assistance has been provided to scope the establishment of an
essential oil business on the island. Initial discussions are very
promising with a small scale still proposed to be established on the
island in the coming months. The proponents have requested
assistance in leasing a site for a short term trial. Staff will continue to
engage with the proponents and seek to assist.
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 8 of 11
Anneure 9 (Item C1) October 2013
31
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
6.1 Implement a dynamic strategic plan and development framework to define our future and guide strategic decisions
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.3 Investment Attraction
START DATE
6.1.3.2 Liaise with potential
investors/developers.
In Progress 1/10/2013
Met with several private business proponents in confidential
discussion regarding business development.
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 9 of 11
Anneure 9 (Item C1) October 2013
32
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
6.2 Achieve high recognition of a “Flinders” brand to support population growth, product sales, business development and
investment, tourism and lobbying
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.2.1 Support increased brand recognition and communications
START DATE
6.2.1.1 Work with Sharp
Airlines and FITA on cross
promotional activities that will
drive brand recognition and
conversion.
In Progress 1/10/2013
Actively involved in assisting and partnering with FITA, TNT, Sharp
Airlines and Tourism Tasmania in relation to a marketing and
promotion campaign which is included in the October agenda for
funding consideration.
30/06/2014General Manager40% 1/07/2013
6.2.1.2 Develop and manage
the Flinders Island Brand
Working Group with industry
and interested community
members. Prepare a project
brief and seek Council support
for specific brand projects to
deliver a Singular Flinders
Island Brand in 2014/2015.
In Progress 8/10/13 Initial work on the brand-working group has been
undertaken but activities have been delayed due to the scoping
required for the Australian Small Island Forum. More work on this
will be forthcoming in the next quarter.
30/06/2014Communications
Officer
5% 1/07/2013
October 11, 2013 Page 10 of 11
Anneure 9 (Item C1) October 2013
33
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Economic Development
Strategic
Direction:
6.4 Encourage catalytic development that is consistent with the strategic objectives and contributes to Council’s Vision
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.4.1 Develop and implement specific projects that will strategically advance economic opportunities for Council and Community
START DATE
6.4.1.1 Review priority projects
with and revise business cases
as required/directed.
Not Started 1/10/2013
No action on this item to date.
30/06/2014General Manager0% 1/07/2013
6.4.1.2 Develop formal
partnership with a University for
ongoing activities and research
on Flinders Island.
Not Started 1/10/2013
No action on this item to date.
30/06/2014General Manager0% 1/07/2013
6.4.1.3 Work in partnership
with DPIPWE to deliver the
Flinders Island Enterprise
Suitability mapping project to
further inform the Rural Living
Strategy.
In Progress 8/10/13 Agreement has been reached with DPIPWE and the
Enterprise Suitability Mapping Project will begin in early November
2013.
30/06/2014General Manager25% 1/07/2013
6.4.1.4 Assist the Flinders Trail
committee in further
developing the project and
seeking grant funding for its
implementation.
In Progress 8/10/13 The TQUAL grant for the Flinders Trail was unsuccessful.
Options for other funding will be explored with the committee.
30/06/2014Communications
Officer
25% 1/07/2013
October 11, 2013 Page 11 of 11
Anneure 9 (Item C1) October 2013
34
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Focus
Area:
1 Environment and Natural Asset Management - An environment that maintains its diversity, uniqueness and
attractiveness while supporting sustainable production and lifestyle.
Strategic
Direction:
1.3 Enhance access to and use of environmental assets to ensure values are recognised
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.3.1 Protect and as required formalise public access to coastal and inland areas
START DATE
1.3.1.1 Work with Landowner
and Crown Land Services to if
possible secure coastal access
at Pot Boil Road White Beach,
Lady Barron.
Not Started 1/10/2013 No progress to date. This will be actioned in the second
quarter of the financial year
30/06/2014Development
Services
Officer/EHO
0% 1/07/2013
October 11, 2013 Page 2 of 10
Anneure 9 (Item C1) October 2013
35
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Focus
Area:
2 Infrastructure - Efficient and reliable infrastructure that supports and protects production, services and lifestyle.
Strategic
Direction:
2.1 Identify infrastructure objectives, standards for assets and develop a viable, asset lifecycle management and operational
model
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.1.2 Review community facility portfolio with the view of developing a profile that matches contemporary and emerging needs
START DATE
2.1.2.1 Complete annual
health & safety audits of
Council's built assets.
Completed 1/10/2013 Annual Maintenance Statements issued and current for
all Council facilities, dated until 6/8/2014.
Place of Assembly Licences issued until Feb 2014
30/06/2014Development
Services
Officer/EHO
100% 1/07/2013
2.1.2.4 Complete an audit of
Council's community and
recreational assets and provide
a report to Council indicating
costs to keep/upgrade to a
standard safe for community
use.
In Progress 24/09/2013 - Data collection nearing completion. Working with
consultant and Community Development staff to finalise the report .
01/12/2013Development
Services
Officer/EHO
35% 1/07/2013
2.1.2.5 Explore the provision
of drinking water/bottle filling
stations at Whitemark and
Lady Barron and provide a
report to Council on
establishment and operational
costs associated.
In Progress 1/10/20103 Recent meetings with TasWater regarding their plans to
provide treated water to Whitemark and Lady Barron has impinged
on this project somewhat. There may still be the need for drinking
water to be provided to town and tourists alike, however this will
depend on the scope and quality of water that TasWater provide .
30/06/2014Development
Services
Officer/EHO
80% 1/07/2013
October 11, 2013 Page 3 of 10
Anneure 9 (Item C1) October 2013
36
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Direction:
2.2 Optimise infrastructure to support existing settlements and enhance sustainable development opportunities and remove
impediments to growth
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 2.2.1 Identify, research, design and implement key infrastructure projects and programs to meet the economic and environmental needs of
Council and the community.
START DATE
2.2.1.1 Finalise Feasibility
Study into the development of
a Waste Effluent Processing
facility.
In Progress The project has been scoped and a feasibility proposal is nearing
completion.
30/06/2014Development
Services
Officer/EHO
25% 1/07/2013
October 11, 2013 Page 4 of 10
Anneure 9 (Item C1) October 2013
37
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Focus
Area:
3 Land use, Development and Building - A productive system of land and building development that promotes
investment and activity while protecting people and the environmental characteristics of the Flinders municipal area.
Strategic
Direction:
3.1 Utilise best practice planning principles in conjunction with Flinders Councils Strategic Plan to guide detailed planning policy
and planning tools
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 3.1.1 Apply and refine as necessary the classification structure and planning principles defined in the Flinders Planning Scheme to key areas
while directly engaging with the community to further the consultation commenced with the draft Interim Planning Scheme. This will ensure
planning principles and outcomes reflect community needs and desires and provide timely strategic planning for future economic and
community development.
START DATE
3.1.1.2 Review evidence and
develop a Sea Level Rise
Policy to provide direction to
Council and planning staff on
the risk and liabiltiy issues
surrounding proposed sea level
rise and the State Coastal
Policy
In Progress 24/09/2013 - Information still being provided to Councils re this topic.
Consultant Senior Town Planner, Jo Oliver, is Council's
representative on this project and will provide documentation and
updates as more information comes to hand.
30/06/2014Development
Services
Officer/EHO
10% 1/07/2013
October 11, 2013 Page 5 of 10
Anneure 9 (Item C1) October 2013
38
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Direction:
3.5 Prepare a contemporary planning system, supporting development and people to achieve their goals while protecting
environmental values
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 3.5.1 Complete and implement the new Flinders Planning Scheme.
START DATE
3.5.1.1 Particular Purpose
Zones for Cape Barren Island
and other outer islands are
prepared, consulted and
finalised for inclusion within the
draft Interim Planning Scheme.
In Progress 24/09/2013 - CBIAAI have been contacted about times/places
suitable to hold the final round of interviews on the island for private
land owners.
ALCT have been engaged in the process and a community
information session was held in Launceston in the previous reporting
period.
30/06/2014Development
Services
Officer/EHO
30% 1/07/2013
3.5.1.2 Specific Area Plans to
be developed with individual
communities to ensure that
planning controls are relevant
and pertinant to the area and
communities.
Not Started 1/10/13 To commence after scheme is declared 30/06/2014Development
Services
Officer/EHO
0% 1/07/2013
3.5.1.3 Finalise all supporting
documentation required to be
submitted to the Tasmanian
Planning Commission for
Interim Planning Scheme
assessment to ensure time
delays are negated and
scheme is compliant.
In Progress 24/09/2013 - Particular Purpose Zones to be completed. One final
interview on Cape Barren Island to be undertaken.
Structure Plan to be revised and Rural Living Strategy to be
completed in the next reporting period.
30/10/2013Development
Services
Officer/EHO
20% 1/07/2013
October 11, 2013 Page 6 of 10
Anneure 9 (Item C1) October 2013
39
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Direction:
3.6 Provide professional application and inspection approval processes
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 3.6.1 Provide qualified advice and excellent customer service to facilitate applications, advice, approvals and inspection processes.
START DATE
3.6.1.1 Find efficiencies, both
financial and timewise, in the
processing of Development
Applications and planning
administration while
maintaining quality customer
liaison and qualified advice as
required.
Ongoing 24/09/2013 - New Development Application process in place. A
major time saving has been noted since its implementation in July.
The majority of the reports are now provided to a briefing standard
and not a full agenda item saving significant time and expense.
Time delays to applicants have been greatly improved by the revised
process.
30/06/2014Development
Services
Officer/EHO
1/07/2013
3.6.1.2 Standard Operating
Procedures are developed and
implemented to mitigate risk
and to ensure timelines are
met / exceeded and legal non
compliance is removed.
In Progress 24/09/2013 - Standard Operating Procedures have been developed
for planning and building administration, levy reporting, and dogs
notices.
30/06/2014Development
Services
Officer/EHO
80% 1/07/2013
3.6.1.3 Day to day
administrative activities.
Ongoing 1/10/2013 The majority of Standard Operating Procedures have
been drafted and are implemented as 'live' documents in a Manual.
This will allow for periods of leave or sickness of the Development
Services Co-ordinator to ensure that progression of day-to-day
activities remains.
30/06/2014Development
Services
Officer/EHO
2/09/2013
October 11, 2013 Page 7 of 10
Anneure 9 (Item C1) October 2013
40
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Focus
Area:
4 Community Safety, Engagement and Enterprise - Through positive Council-Community partnerships, enhance
people’s security, inclusion and well-being.
Strategic
Direction:
4.1 Provide professional environmental and public health services
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.1.1 Provide a program of structured inspection, compliance management, education and immunisation.
START DATE
4.1.1.1 Provide a structured
inspection program for all EHO
related facilities and activities.
Ongoing Food inspections ongoing. Most food handlers have taken
advantage of Safe Food Handler training. All food premises found
to be of high standard at this point in time.
30/06/2014Development
Services
Officer/EHO
1/07/2013
4.1.1.2 Business specific EHO
advice and assistance provided
via routine inspection program.
Ongoing 24/09/2013 - Food inspections are conducted on an annual basis
with any matters being addressed with the applicants at the time of
inspection and subsequent follow up. Food handlers courses are
ongoing on an as needs basis
30/06/2014Development
Services
Officer/EHO
1/07/2013
4.1.1.3 Education program
such as the food handlers
course continue in partnership
with the school. Other
programs developed to
mitigate major EHO identified
risks as required.
Ongoing 24/09/2013 - the school is very accommodating of holding food
handler courses on their site, however the next one is planned to be
conduced in a food premises and be more tailored to their needs.
Other programs will be developed as need and therefore this action
is on going.
30/06/2014Development
Services
Officer/EHO
1/07/2013
4.1.1.4 Immunisation program
implemented and participants
registered.
In Progress 24/09/2013 - This program was delivered in January - February of
this calendar year and Council's EHO liaised closely with the nurse
from the Doctor's Surgery to ensure that the program was correct
and concise. An immunisation workshop, put on by the State
Government, was attended to by both the EHO and Doctors Nurse.
30/06/2014Development
Services
Officer/EHO
90% 1/07/2013
4.1.1.5 EHO to provide advice
to the Health Special
Committee of Council as
required.
Completed 24/09/2013 - The Special Health Committee of Council see no need
to have the EHO present at their meetings and have agreed to call
on this advise when/as needed.
30/06/2014Development
Services
Officer/EHO
100% 1/07/2013
October 11, 2013 Page 8 of 10
Anneure 9 (Item C1) October 2013
41
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Direction:
4.1 Provide professional environmental and public health services
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.1.1 Provide a program of structured inspection, compliance management, education and immunisation.
START DATE
4.1.1.6 Seek to integrate
public health and immunisation
programs and goals with the
community health plan when it
is developed and delivered.
Not Started 30.09.2013 Community health plan is under development and until
completed this action is on hold.
30/06/2014Development
Services
Officer/EHO
0% 1/07/2013
4.1.1.7 Support new food
businesses (or food related
product development) within
the Municipality.
Ongoing 24/09/2013 - Ongoing, however also achieved. 3 new food
businesses came on line in the last period and the EHO continues to
work with new proprietors and community groups to achieve their
'food' outcomes.
30/06/2014Development
Services
Officer/EHO
1/07/2013
4.1.1.8 Support School
Kitchen Garden as required.
Ongoing 24/09/2013 - No activity this year but ongoing.
1/10/2013 Two meetings with Jan in the last fortnight have
reconfirmed Council's EHO support of the garden and programs that
may form off-shoots of the facility.
30/06/2014Development
Services
Officer/EHO
1/07/2013
4.1.1.9 Impliment a
recreational water sampling
program.Undertake beach
water sampling at major
swimming areas and areas of
stormwater outfall in the
summer period to ensure safe
recreational water use by the
community.
Not Started 1/10/2013 The program will be delivered during the months of
December-February. Recreation beaches to be nominated and
sampling undertaken for the period.
30/06/2014Development
Services
Officer/EHO
0% 1/07/2013
October 11, 2013 Page 9 of 10
Anneure 9 (Item C1) October 2013
42
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Development Services
Strategic
Direction:
4.4 Facilitate the provision and enhancement of critical health and education facilities and service levels by state and federal
agencies and NGOs
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.4.1 Collaborate with incorporated bodies associated with key facilities and services to retain and enhance scope and level of service,
including implementation of innovative responses
START DATE
4.4.1.1 Support Immunisation
programs.
Completed 24/09/2013 - Supported by EHO 30/06/2014Development
Services
Officer/EHO
100% 1/07/2013
October 11, 2013 Page 10 of 10
Anneure 9 (Item C1) October 2013
43
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Focus
Area:
4 Community Safety, Engagement and Enterprise - Through positive Council-Community partnerships, enhance
people’s security, inclusion and well-being.
Strategic
Direction:
4.2 Support effective and timely incident & emergency management planning and response
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.2.1 In conjunction with other emergency response groups, have appropriate plans and resources in place to mitigate and respond to
identified risks and incidents
START DATE
4.2.1.1 Provide administrative
support and coordination in the
event of an emergency.
Ongoing 30.09.2013 Fortunately there have been no emergencies to date. 30/06/2014Executive Officer 1/07/2013
October 11, 2013 Page 2 of 14
Anneure 9 (Item C1) October 2013
44
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
4.3 Maintain and develop productive, constructive relationships with the community and organisations involved in delivery of
strategic services and activities in the islands
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 4.3.1 Engage with, as necessary support and integrate into Flinders Council plans key community based service providers.
START DATE
4.3.1.4 Manage contributions
to the Island Employment
section of the Council website.
Not Started 30.09.2013 Work associated with this action will not commence until
the new Council website goes live in December.
30/06/2014Executive Officer0% 1/07/2013
4.3.1.5 Coordinate advertising
and administration of the
Citizens Awards program.
In Progress 30.09.2013 The Citizens Award was advertised in Island News with
a closing date for applications 30 August. Three nominations were
recieved and these were considered at the September Council
Meeting. Successful nominees will be awarded at the Flinders Show
on 18 October.
30/10/2013Executive Officer75% 1/07/2013
October 11, 2013 Page 3 of 14
Anneure 9 (Item C1) October 2013
45
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Focus
Area:
5 Corporate Governance and Intergovernmental Relations - decisions are professionally and transparently made,
communicated and implemented to achieve defined outcomes in the interest of the community
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.1 Design and implement an integrated governance; strategic and operational planning & service delivery system
START DATE
5.1.1.2 Develop and
implement an organisational
business planning process.
Completed An organisational business planning process was adopted by
Council at the July 2013 Ordinary Meeting. The details associated
are now being implemented across the organisation and will provide
a platform to ensure key dates and outputs are met by the relevant
staff members /councillors.
30/06/2014General Manager100% 1/07/2013
5.1.1.3 Support Council
Managers in the preparation
and distribution of governance
reports including plans,
policies, reports and other
governance related
publications.
Ongoing 30.09.2013 Provision of assistance and support of Council
Managers to prepare and distribute Governance reports is ongoing,
occuring in a timely fashion as and when required.
30/06/2014Executive Officer 1/07/2013
5.1.1.6 Review and revise
Council’s Policy Manual.
Ongoing 30.09.2013 Policies from the Council Policy Manual are reviewed by
Councillors on an ongoing basis.
30/06/2014Executive Officer 1/07/2013
5.1.1.7 Review current records
management practices and
develop new procedures that
are compliant with legislative
requirements. Oversee
implementation of
recommendations.
In Progress 30.09.2013 Before commencing the overall review of current
records management practices within Council, the Image Library
was identified as being of high priority. Consequently efforts were
concentrated on establishing the Image Library during this quarter.
The overall review will commence in the second quarter.
30/06/2014Executive Officer25% 1/07/2013
October 11, 2013 Page 4 of 14
Anneure 9 (Item C1) October 2013
46
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.1 Design and implement an integrated governance; strategic and operational planning & service delivery system
START DATE
5.1.1.8 Complete an audit of
all Information Technology
systems and accounts. Collate
findings and provide
recommendations for improved
service standards and cost
minimisation.
In Progress 8/1/13 The audit has been completed and upgrades on all systems
over three years have been rolled out. Currently issues are being
solved with the airport networks and setup.
30/06/2014Communications
Officer
70% 1/07/2013
5.1.1.9 Develop and
implement communication and
social media procedures and
policies to ensure accurate,
effective and compliant
communications to key
stakeholders.
In Progress 8/10/13 Development of a social media strategy has commenced
and already internal processors are taking place to ensure the
accuracy of disseminated council posts.
30/06/2014Communications
Officer
15% 1/07/2013
5.1.1.10 Develop and
implement integrated internal
communication tools. This to
include brand guidelines,
e-newsletter, email signatures,
reporting templates, publication
templates, signage etc.
Completed 8/10/13 The brand guidelines and new templates have been rolled
out to all internal staff.
30/06/2014Communications
Officer
100% 1/07/2013
October 11, 2013 Page 5 of 14
Anneure 9 (Item C1) October 2013
47
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.1 Design and implement an integrated governance; strategic and operational planning & service delivery system
START DATE
5.1.1.11 In conjunction with the
Sub Regional Alliance and
DPAC, seek to develop a
legislative compliance audit.
In Progress 1/10/2013
This item was originally put forward by the Sub Regional Alliance to
the Local Government Division of the Department of Premier and
Cabinet (DPAC) in June of this year. Since this time the Local
Government Association of Tasmania and the Sub Regional Alliance
have been working with DPAC to develop the mechanism to deliver
either annual audits or a checklist for each Council to internally audit
against. Consideration is now also being given to a "portal" where all
legislative changes/revisions and new legislation applicable to local
government can be updated and disseminated out to the sector to
ensure the sector is aware of responsibilities and implications.
30/06/2014General Manager80% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.2 Design and implement a continued professional development & productivity Improvement Program
START DATE
5.1.2.1 Finalise Enterprise
Agreement.
Completed 01/10/2013
The new Enterprise Agreement became operational on the 1st of
October and is now complete.
All staff have new position descriptions and contracts .
Individual Flexibility Agreements have been revised and agreed .
A suite of efficiencies in payroll and leave management have been
implemented.
Fair Work Australia have the required documentation and
compliance with process has been confirmed.
30/06/2014General Manager100% 1/07/2013
5.1.2.2 Revise the employee
induction process to add
greater depth and detail around
risk, Council processes and
projects, organisational
structure and relationships to
Councillors to engender
knowledge and organisational
pride.
In Progress 8/10/13 The existing Employee Induction Process has been
reviewed and a revised model is under development.
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 6 of 14
Anneure 9 (Item C1) October 2013
48
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.4 Provide best practice management and administrative support to Council decision making, implementation and evaluation
START DATE
5.1.4.1 All agenda papers and
reports provided to elected
members in compliance with
legislated time fames.
In Progress 30.09.2013 All agendas, minutes and reports have been prepared
and distrubuted within legislated time frames during this quarter.
30/06/2014Executive Officer25% 1/07/2013
5.1.4.2 Provide secretarial and
administrative support to
Council and its Special
Committees including
coordinating the preparation
and distribution of agendas and
minutes and acting as minute
secretary.
Ongoing 30.09.2013 Provision of secreterial and administrative support to
Council and its Special Committees is ongoing, occuring in a timely
fashion as and when required.
30/06/2014Executive Officer 1/07/2013
5.1.4.3 Provide General
Manager, Corporate Services
Manager, and Elected
Members with secretarial,
administrative and research
support relating to the civic and
administrative functions for
Council.
Ongoing 30.09.2013 Provision of secreterial, administrative and research
support to Council Managers and Elected Members is ongoing,
occuring in a timely fashion as and when required.
30/06/2014Executive Officer 1/07/2013
5.1.4.4 Update Council
website with current Council
publications, meeting agendas
and minutes and council news.
Ongoing 30.09.2013 Provision of secreterial, administrative and research
support to Council Managers and Elected Members is ongoing,
occuring in a timely fashion as and when required.
30/06/2014Executive Officer 1/07/2013
5.1.4.5 Assist Councillors to
regularly submit reports on
their activities to Council
meetings and to Council’s
social media platforms.
Ongoing 10.10.13 Work has not commenced on this action during this
quarter.
30/06/2014Executive Officer 1/07/2013
October 11, 2013 Page 7 of 14
Anneure 9 (Item C1) October 2013
49
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.1 Support the capacity and productivity of our organisation and a culture of professionalism, compliance, innovation and
service
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.1.4 Provide best practice management and administrative support to Council decision making, implementation and evaluation
START DATE
5.1.4.6 Develop a revised and
comprehensive post election
induction program for
Councillors – roles and
responsibilities, organizational
structure, annual plans and
departmental presentations,
governance, communications,
Council meetings ( agenda and
Notices of Motion) and code of
conduct.
Not Started 30.09.2013 Work will not commence on this action until the third
quarter, early 2014.
30/06/2014Executive Officer0% 1/07/2013
5.1.4.7 Research, plan and
prepare for development of a
new/updated strategic plan and
4 year Council Business Plan
post the 2014 “all in all out”
election. This is a critical
process to mitigate risk
associated with the State
electoral reform process and
will provide Council with an
opportunity to engage the
community early post the
election process and develop a
new long term strategic and
operational plan.
Not Started 10/10/13 Work will not commence on this action until the third
quarter.
30/06/2014General Manager0% 1/07/2013
5.1.4.8 Provide on call
Information Technology setup
and training/support for
Councillors and staff.
Ongoing 8/10/13 Significant work in this area has been completed and this
task will be ongoing.
30/06/2014Communications
Officer
1/07/2013
October 11, 2013 Page 8 of 14
Anneure 9 (Item C1) October 2013
50
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.2 Develop and maintain an influential network of external stakeholders who understand the needs and direction of Flinders
Council and are supportive
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.2.1 Identify key external stakeholders and decision makers and actively introduce Flinders opportunities, issues and proposals to them in a
timely and professional manner
START DATE
5.2.1.1 Assist with the
implementation of Council’s
Communication Strategy within
Council and the community.
Not Started 30.09.2013 No work has been undertaken on this action during this
quarter. The Executive Officer will assist the Communications
Consultant with the implementation of Council’s Communication
Strategy when it has been developed.
30/06/2014Executive Officer0% 1/07/2013
5.2.1.2 Proof all
communications related
content including web content,
communications, social media
procedures and new resident’s
kit.
Ongoing 30.09.2013 Communications related content is proofed in a timely
manner as and when required.
30/06/2014Executive Officer 1/07/2013
5.2.1.3 Source good news
stories about Council activities
and promote locally, regionally
and nationally.
Ongoing 30.09.2013 When good news stories about Council activities are
sourced they are forwarded to the Communications Consultant for
promotion.
Support has been provided to Deputy Mayor David Williams which
saw numerous TV, radio and print media articles generated. ABC
will have a reported on the island for the Flinders Island Show and
another reported will arrive the week after. A "Top things to do on
Flinders island" story has been developed and submitted to Tourism
Tasmania and Tourism Northern Tasmania for use on their websites .
30/06/2014Executive Officer 1/07/2013
October 11, 2013 Page 9 of 14
Anneure 9 (Item C1) October 2013
51
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.3 Actively participate in local government, industry and regional organisations
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.3.1 Actively participate in key strategic organisations, groups and alliances that provide value for the Flinders community and Council.
START DATE
5.3.1.1 Actively engage with
Northern Tasmania
Development.
In Progress 1/10/2013
NTD continue to actively serve Council through a range of projects
including:
Planning reform process
Northern Integrated Transport Plan
Freight review
Priority Projects development (Airport)
30/06/2014General Manager25% 1/07/2013
5.3.1.2 Actively engage with
the Sub Regional Alliance
Group.
In Progress 1/10/2013
The Sub Regional Alliance is functioning very well with key outputs
involving risk management, the corporate business planning
process and legislative audit having now been delivered across the
partner organisations. November will see the sub regional GM's visit
Flinders for the next meeting.
30/06/2014General Manager25% 1/07/2013
5.3.1.3 Actively engage with
the Local Government
Association of Tasmania.
In Progress 1/10/2013
In the reporting period LGAT have actively sought input into the
following areas/projects:
Code of Conduct Review
Dog Control Act
Long term Financial and Asset Management Planning
General Managers Roll
Handrails in public toilets and buildings
Review of Liquor Licensing Act
Cat Management Legislation
Changes to Private Certification - Permitted Use or Development
Optional Conduct of Annual General Meetings
Draft Audit Panel Orders
Award Modernisation
Role of Local Government
Constitutional Recognition
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 10 of 14
Anneure 9 (Item C1) October 2013
52
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.3 Actively participate in local government, industry and regional organisations
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.3.1 Actively participate in key strategic organisations, groups and alliances that provide value for the Flinders community and Council.
START DATE
5.3.1.4 Attend all Office of the
Energy Regulator Customer
Consultative Committee
meetings.
In Progress 1/10/2013
The GM continues to be actively engaged in this area.
During the reporting period projects of interest have included
competitive neutrality of State Government and Local Government
enterprises, reform of the energy sector in Tasmania and pricing
principles and service standards for TasWater.
30/06/2014General Manager25% 1/07/2013
5.3.1.5 Liaise regularly with
the Aboriginal Land Council
Tasmania (ALCT), Flinders
Island Aboriginal Association
(FIAA) and Cape Barren Island
Aboriginal Association
(CBIAA).
In Progress 1/10/2013
Regular discussion have taken place with ALCT in relation to
Wybalena, waste management on Cape Barren Island and the draft
interim planning scheme.
FIAA have been engaged on the renewable energy plan and the
Hydro Tas ARENA application.
Regular discussions with CBIAA on a range of locally based topics .
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 11 of 14
Anneure 9 (Item C1) October 2013
53
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
5.3 Actively participate in local government, industry and regional organisations
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 5.3.1 Actively participate in key strategic organisations, groups and alliances that provide value for the Flinders community and Council.
START DATE
5.3.1.6 Liaise with
Government Ministers,
advisers and Agencies,
Secretaries State &
Federal.
In Progress 1/10/2013
The reporting period was notable for the change of Government that
occurred at a Federal level. The new Federal Member for Bass has
been actively engaged and made aware of the priority projects and
opportunities that exist in the islands and is a keen advocate on our
behalf. Greens Senator Peter Whish-Wilson also visited the island
during the period and showed a keen interest in the renewable
energy plan and the efforts of island producers to build niche
markets for our premium products.
The announcement of a shipping subsidy to King Island Cattle
producers saw a direct approach to the Minister seeking clarification
as to why Flinders producers had not been consulted or considered.
The State was notably unaware that the cost for Flinders procurers
to transport stock off island is now on par with those of King Island .
Staff are exploring if the subsidy could be deemed anti competitive
under the National Competition Policy.
The reporting period was also notable for the visit of senior TasPorts
executives to view the redevelopment of the port area.
The visit by the Secretary of the Department of Infrastructure,
Energy and Resources was notable for the fact that Council and
DIER will now move away from tendering on a 3 year basis for the
maintenance of the Lady Barron - Whitemark State Road to a 10
year Deed of Agreement. This is a significant achievement which
provides Council with an assured revenue stream over an extended
period of time and mitigates the amount of staff time and reporting
required under the current arrangements.
30/06/2014General Manager25% 1/07/2013
October 11, 2013 Page 12 of 14
Anneure 9 (Item C1) October 2013
54
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Focus
Area:
6 Furneaux Future - A thriving, self reliant community offering opportunities for current and following generations
while maintaining core values and attributes.
Strategic
Direction:
6.1 Implement a dynamic strategic plan and development framework to define our future and guide strategic decisions
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.1 Implement and continually evaluate the Council's strategic plan
START DATE
6.1.1.1 Undertake quarterly
annual plan review meetings
with Council and key staff and
provide
departmental and staff based
reports on a quarterly basis
into the Council agenda and
meeting process.
In Progress The quarterly annual plan assessment and review is this report
provided for Council information and consideration.
Staff have delivered all reports within timeframe and utilising the new
performance management and reporting system now in place.
30/06/2014General Manager25% 1/07/2013
6.1.1.2 Assist with the
research and preparation for
delivering a new or revised
strategic plan post the 2014
election.
Not Started 30.09.2013 Work on this action will not commence until the third
quarter.
30/06/2014Executive Officer0% 1/07/2013
6.1.1.3 Planning a 'Furneaux
Vision' campaign that will be
available to all community
members to have input in to
the development of a new
council strategic plan in
2013/2014.
Not Started 10/10/13 Work will not commence on this action until the third
quarter.
30/06/2014Communications
Officer
0% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.4 Organisational collaboration and strengthening
START DATE
October 11, 2013 Page 13 of 14
Anneure 9 (Item C1) October 2013
55
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Governance
Strategic
Direction:
6.1 Implement a dynamic strategic plan and development framework to define our future and guide strategic decisions
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.4 Organisational collaboration and strengthening
START DATE
6.1.4.1 Provide input into other
Council areas where required
such as planning, works and
services, community
development and corporate
management.
Ongoing 1/10/2013
Significant amounts of time have been required in all areas. In
particular Corporate Services and Human Resource Management
have required levels of oversight and assistance beyond what would
normally be expected.
30/06/2014General Manager 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 6.1.5 Government Relations
START DATE
6.1.5.1 Liaise and lobby
Australian and State
Government Departments and
personnel on specific projects
and programs approved by the
Council.
Ongoing 1/10/2013
Management continue to liaise with Ministers and staff on a range of
topics such as renewable energy, health, shipping and transport,
roads, runways, place of assembly licensing, building regulations
and community safety.
30/06/2014General Manager 1/07/2013
October 11, 2013 Page 14 of 14
Anneure 9 (Item C1) October 2013
56
BUSINESS UNIT QUARTERLY PROGRESS AGAINST OPERATIONAL PLAN (September 13/14)Flinders Council
Business Unit Quarterly Progress Report Against Operational Plan
Natural Resource Management
Strategic
Focus
Area:
1 Environment and Natural Asset Management - An environment that maintains its diversity, uniqueness and
attractiveness while supporting sustainable production and lifestyle.
Strategic
Direction:
1.1 Promote environmentally sustainable practice
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.1 Community education and communication.
START DATE
1.1.1.1 A series of programs
and projects delivered to
increase community
engagement and awareness of
NRM.
Not Started 1.10.13 Council and NRM North to date have been unable to agree
on a funding model to support an on island facilitator.
30/06/2014General Manager0% 1/07/2013
1.1.1.2 Four community
groups (including indigenous)
engaged in NRM on ground
projects.
Not Started 1.10.13 Council and NRM North to date have been unable to agree
on a funding model to support an on island facilitator.
30/06/2014General Manager0% 1/07/2013
ACTIONS STATUS % COMP PROGRESS COMMENTS COMP DATERESP. OFFICER
Output: 1.1.2 Farm and business based planning, project implementation & evaluation
START DATE
1.1.2.1 Continuing support for
existing Property Management
Planning clusters.
Not Started 1.10.13 Council and NRM North to date have been unable to agree
on a funding model to support an on island facilitator.
30/06/2014General Manager0% 1/07/2013
October 11, 2013 Page 2 of 2