finalenvironmentclearance.nic.in/writereaddata/eia/15092020z...final environmental impact assessment...
TRANSCRIPT
-
FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT
FOR
PROPOSED UNIT
OF
M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol,
Dist: Gandhinagar (Gujarat)
[Proposed Product: Pigment Green 7 @ 100 MT/M]
Schedule-5(f) & Category – A TOR Letter No.: IA-J-11011/369/2018-IA-II(I), Dated-31/12/2018
Study Period: October-November-December, 2018
PREPARED BY
BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001, ISO 14001 & OHSAS: 18001 CERTIFIED COMPANY]
(QCI/NABET Certificate No. NABET/EIA/1921/RA 0156)
CORPORATE OFFICE
28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank, Phase I, GIDC Estate, Vatva, Ahmedabad – 382445. Gujarat, India Phone No: +91 79 29295043, 40083051/52 Fax: +91 79 40083053 , Email: [email protected] , [email protected]
URL: www.bhagwatienviro.com
-
Annexure - A_NABET Accreditation Certificate
I
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
INDEX
Table of Contents
Clause No. Content Page No.
ANN - A NABET Accreditation Certificate I
CHAPTER 1. 1 to 23 INTRODUCTION
1.1 INTRODUCTION 1
1.2 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT 1
1.3 PURPOSE OF THE STUDY 3
1.4 IDENTIFICATION OF PROJECT PROPONENT 4
1.5 BRIEF DISCRIPTION OF NATURE SIZE, LOCATION OF THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY, RIGION
4
1.6 SCOPE & METHODOLOGY OF STUDY 5
1.7 STUDY AREA 7
1.8 APPLICABLE ENVIRONMENT REGULATIONS 8
1.9 STRUCTURE OF EIA 8
1.10 COMPLIANCE OF TOR 10
CHAPTER 2 24 to 88 PROJECT DESCRIPTION
2.1 INTRODUCTION 24
2.2 TYPE OF PROJECT 24
2.3 NEED OF THE PROJECT 25
2.4 LOCATION 26
2.5 PHOTOGRAPH OF THE PROPOSED PROJECT SITE 33
2.6 JUSTIFICATION OF SITE SELECTION 35
2.7 SIZE OR MAGNITUDE OF OPERATION 36
2.8 PRODUCT DETAILS 36
2.9 RAW MATERIAL REQUIREMENT 37
2.10 RAW MATERIAL STORAGE 38
2.11 HANDLING OF RAW MATERIAL & PRODUCT 40
2.12 MODE OF TRANSPORTATION FOR RAW MATERIAL 40
2.13 MANUFACTURING PROCESS DETAILS, CHEMICALS REACTIONS & MASS BALANCE
41
2.14 RESOURCE REQUIREMENT 45
2.15 LAND USE BREAKUP FOR TOTAL PLOT AREA 46 2.16 LIST OF PLANT MACHINERIES FOR PROPOSED PRODUCTION ACTIVITY 47
2.17 DETAIL OF MAN POWER REQUIREMENT 47
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
2.18 POWER REQUIREMENT 48
2.19 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION 48
2.20 PLANT WATER REQUIREMENT & EFFLUENT GENERATION 50
2.21 CHARACTERISTICS OF EFFLUENT 53
2.22 DETAIL OF EFFLUENT TREATMENT PLANT 55
2.23 FLUE GAS EMISSION 56
2.24 PROCESS GAS EMISSION 59
2.25 FUEL REQUIREMENT 59
2.26 FUGITIVE EMISSION CONTROL 60
2.27 HAZARDOUS WASTE MANAGEMENT 61
2.28 NOISE POLLUTION 63
2.29 LIST OF HAZARDOUS CHEMICALS 64
2.30 SAFETY & OCCUPATIONAL MEASURE FOR STORAGE &HANDLING OF THE RAW MATERIAL & PRODUCT
67
2.31 ACTION PLAN FOR TRANSPORTATION OF RAW MATERIALS AND PRODUCTS INCLUDING HAZARDOUS CHEMICALS
73
2.32 COST OF THE PROJECT 75
2.33 GREENBELT DEVELOPMENT 76
2.34 SCHEME FOR RAIN WATER HARVESTING 77
2.35 SOLVENT RECOVERY SYSTEM 84
2.36 REGULATORY FRAME WORK 86
2.37 SUMMARY 88
CHAPTER 3. 89 to 187 DESCRIPTION OF ENVIRONMENT
3.1 INTRODUCTION 89
3.2 STUDY AREA & STUDY PERIOD 89
3.3 METHODOLOGY OF BASELINE STUDY 96
3.4 FREQUENCY AND METHODOLOGY FOR MONITORING 97
3.5 ENVIRONMENTAL STANDARDS OF THE REGION 99
3.6 BASELINE ENVIRONMENT 99
3.7 AIR ENVIRONMENT 99
3.7.1 AMBIENT AIR QUALITY (AAQ) IN THE STUDY AREA 99
3.7.2 THE LOCATION OF AAQ STATIONS 100
3.7.3 BASE LINE DATA 100
3.7.4 SAMPLING ANALYSIS 110
3.8 METEOROLOGY 111
3.9 BASELINE DATA 111
3.9.1 AMBIENT TEMPERATURE 111
3.9.2 WIND SPEED 111
3.9.3 WIND DIRECTION 111
3.9.4 RELATIVE HUMIDITY (RH) 116
3.9.5 CLIMATE & RAIN FALL 116
3.9.6 TOPOGRAPHY 117
3.9.7 MIXING HEIGHT 118
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
3.10 ATMOSPHERIC STABILITY 119
3.11 NOISE ENVIRONMENT 119
3.12 WATER ENVIRONMENT 130
3.13 LAND ENVIRONMENT 136
3.14 TYPES OF SOIL 137
3.15 LAND USE PATTERN 144
3.16 SEISMICITY OF THE STUDY AREA 147
3.17 HYDROGEOLOGY 148
3.18 ECOLOGY 151
3.19 SOCIO ECONOMIC ENVIRONMENT 160
3.20 ECONOMIC ATTRIBUTES 171
3.21 AVAILABILITY OF BASIC AMENITIES 177
3.22 SOCIO ECONOMIC SURVEY 183
CHAPTER 4. 188 to 245 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 INTRODUCTION 188
4.2 IMPACT IDENTIFICATION 189
4.2.1 ENVIRONMENTAL PARAMETER 189
4.2.2 IDENTIFICATION MATRIX 191
4.3 IMPACT PREDICTION AND ASSESSMENT WITH MITIGATIVE MEASURE
195
4.4 AIR ENVIRONMENT 196
4.5 WATER ENVIRONMENT 228
4.6 SOLID/HAZARDOUS WASTE 231
4.7 NOISE ENVIRONMENT 233
4.8 LAND/SOIL ENVIRONMENT 235
4.9 TOPOGRAPHY 238
4.10 HYDROLOGY & GEOLOGY 238
4.11 ECOLOGY 239
4.12 SOCIO ECONOMIC ENVIRONMENT 241
4.13 HEALTH & SAFETY 242
4.14 TRAFFIC STUDY & ITS IMPACT 243
CHAPTER 5. 246 to 248 ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITES)
5.1 SITE ALTERNATIVES 246
5.2 ALTERNATIVES FOR TECHNOLOGIES 247
CHAPTER 6. 249 to 261 ENVIRONMENTAL MONITORING PROGRAM
6.1 PREAMBLE 249
6.2 MONITORING OF ENVIRONMENT 249
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
6.3 WORK ZONE MONITORING ARRANGEMENT FOR HAZARDOUS CHEMICALS
252
6.4 CHEMICALS WHICH ARE EXPOSED TO WORKERS DIRECTLY OR INDIRECTLY
254
6.5 INFRASTRUCTURAL REQUIREMENT & PROCUREMENT SCHEDULES 254
6.6 CORPORATE ENVIRONMENTAL RESPONSIBILITY 255
6.7 ENVIRONMENTAL POLICY 256
6.8 ENVIRONMENTAL MANAGEMENT CELL 257
6.9 ADMINISTRATIVE ACTIONS & DOCUMENTATION 260
6.9.1 ANALYSIS 260
6.9.2 REPORTING SCHEDULE 260
6.9.3 ENVIRONMENTAL MONITORING EXPENDITURE 260
CHAPTER 7. 262 to 317 ADDITIONAL STUDIES
7.1 PUBLIC CONSULTATION 262
7.2 ACTION PLAN WITH COMMITMENTS IN TIME BOUND MANNER FOR ISSUED RAISED DURING PUBLIC HEARING
263
7.3 RISK ASSESSMENT 265
7.4 IDENTIFICATION OF HAZARDS 267
7.5 SAFE PRACTICES [HANDLING, STORAGE, TRANSPORTATION AND UNLOADING OF CHEMICALS]
287
7.5.1 DRUMS 287
7.5.2 MEASURES TO AVOID EVAPORATION 287
7.5.3 SAFETY SYSTEMS 287
7.5.4 STORAGE & HANDLING OF HAZARDOUS CHEMICAL 287
7.5.5 TRANSPORTATION/UNLOADING 288
7.5.6 SAFETY INSTRUCTION FOR TRANSPORTATION OF HAZARDOUS MATERIAL
288
7.6 SPILL CONTROL 289
7.7 EFFECT AND CONSEQUENCE ANALYSIS 289
7.7.1 OPERATING PARAMETERS 289
7.7.2 INVENTORY 290
7.7.3 LOSS OF CONTAINMENT 290
7.8
GENERAL SAFETY MEASURES AND SPECIFIC SAFETY MEASURES ADOPTED FOR TRANSPORTATION, STORAGE & HANDLING (SPILLAGE AND LEAKAGE) OF HAZARDOUS CHEMICALS ARE LISTED AS FOLLOWS
291
7.9 OCCUPATIONAL HEALTH & SAFETY PROGRAM 292
7.10 MONITORING PROGRAM 293
7.11 ONSITE & OFFSITE DISASTER PREPAREDNESS & EMERGENCY MANAGEMENT PLAN OF THE INDUSTRY
301
7.12 SOCIAL IMPACT ASSESSMENT 316
CHAPTER 8. 318 to 326
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
PROJECT BENEFITS
8.1 INTRODUCTION 318
8.2 IMPROVEMENT IN PHYSICAL INFRASTCTURE 318
8.3 IMPROVEMENT IN SOCIAL INFRASTCTURE 318
8.4 CORPORATE SOCIAL RESPONSIBILITY (CSR) & SOCIO-ECONOMIC DEVELOPMENT
319
8.5 DIRECT REVENUE EARNING TO THE NATIONAL AND STATE EXCHEQUER
324
8.6 INFRASTRUCTURAL BENEFIT 325
8.7 OTHER TANGIBLE BENEFITS 325
8.8 EMPLOYMENT POTENTIAL 325
CHAPTER 9. 327 ENVIRONMENTAL COST BENEFIT ANALYSIS
9.1 COST BENEFIT ANALYSIS 327
CHAPTER 10. 328 to 377 ENVIRONMENTAL MANAGEMENT PLAN
10.1 INTRODUCTION 328
10.2 THE EMP 328
10.3 OBJECTIVES OF EMP 329
10.4 PRE- PROJECT ENVIRONMENTAL MANAGEMENT PLAN 332
10.5 ENVIRONMENTAL MANAGEMENT DURING OPERATION 334
10.5.1 AIR POLLUTION 341
10.5.2 STORAGE &TRANSPORTATION OF RAW MATERIAL 342
10.5.3 FUGITIVE EMISSION 342
10.5.4 SOLVENT MANAGEMENT PLAN 342
10.5.5 NOISE POLLUTION 344
10.5.6 WATER QUALITY 345
10.5.7 HAZARDOUS/SOLID WASTE MANAGEMENT 347
10.5.8 ECOLOGY & BIODIVERSITY 348
10.5.9 SOCIO ECONOMIC ASPECTS 349
10.5.10 HYDROGEOLOGY, GROUND WATER & WATER CONSERVATION 349
10.5.11 GEOLOGY 350
10.5.12 SOIL CONSERVATION 350
10.5.13 RISK & HAZARDS MANAGEMENT 351
10.6 GREENBELT DEVELOPMENT 351
10.7 HEALTH AND SAFETY 355
10.8 OCCUPATIONAL HEALTH HAZARDS. 355
10.9 DETAILS OF OCCUPATIONAL HEALTH SURVEILLANCE 362
10.10 HAZARDOUS IDENTIFICATION AND PREVENTIVE MEASURES 363
10.11 EXPENDITURE ON ENVIRONMENTAL MATTERS 368
10.12 CONCEPT OF WASTE MINIMIZATION, RECYCLE / REUSE / 369
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
RECOVER TECHNIQUES, ENERGY CONSERVATION AND NATURAL RESOURCES CONSERVATION
10.13 CHECKLIST IN THE FORM OF DO’S AND DON’T 372
10.14 SOCIO ECONOMIC DEVELOPMENT ACTIVITY 375
10.15 INFRASTRUCTURE FACILITIES TO THE LABOURS DURING CONSTRUCTION PHASE
375
10.16 ODOUR CONTROL MEASURES 376
CHAPTER 11. 378 to 396 SUMMARY & CONCLUSION OF EIA REPORT
11.1 SALIENT FEATURES OF THE PROJECT 379
11.2 AIR ENVIRONMENT. 382
11.3 WATER ENVIRONMENT 384
11.4 NOISE ENVIRONMENT 385
11.5 HAZARDOUS WASTES 387
11.6 ECOLOGY 387
11.7 SOCIO ECONOMIC ENVIRONMENT 388
11.8 LAND USE 388
11.9 TOPOGRAPHY 389
11.10 GREENBELT DEVELOPMENT 389
11.11 SOIL QUALITY 390
11.12 ENVIRONMENTAL MANAGEMENT PLAN 391
11.13 CONCLUSION 396
CHAPTER 12. 397 to 398 DISCLOSURE OF CONSULTANT ENGAGED
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
List of Figures / Maps
Fig/Map No. Content Page No.
CHAPTER: - 1
1.1 METHODOLOGY OF EIA STUDY 7
CHAPTER: - 2
2.1 MAP OF GUJARAT 27
2.2 MAP OF GANDHINAGAR DISTRICT 28
2.3 5 KM & 10 KM RADIOS MAP OF THE PROJECT SITE 29
2.4 LAYOUT PLAN 30
2.5 GOOGLE IMAGE OF M/S .SHREY INDUSTRIES 31
2.6 TOPOGRAPHY MAP OF M/S. SHREY INDUSTRIES 32
2.7 PROJECT IMPLEMENTATION SCHEDULE 49 2.8 WATER BALANCE DIAGRAM 52
2.9 EFFLUENT TREATMENT PLANT DIAGRAM 55
2.10 FIRE HYDRANT DIAGRAM 72
2.11 SYSTEMATIC DESIGN OF THE RW HARVESTING STRUCTURES 81
2.12 SOLVENT RECOVERY SYSTEM 85
CHAPTER: - 3
3.1 STUDY AREA MAP OF BASE LINE STUDY FOR 5 KM RADIUS AND 10 KM RADIUS
92
3.2 TOPOSHEET MAP 93
3.3 SAMPLING LOCATIONS MAP 95
3.4 WIND ROSE DIAGRAM. 112
3.5 WIND CLASS FREQUENCY DISTRIBUTION GRAPH 115
3.6 GEOLOGICAL STRUCTURE OF GUJARAT STATE 137
3.7 LAND USE / LAND COVER MAP OF 10 KM RADIUS AREA AROUND PROJECT SITE
146
3.8 SEISMIC ZONES OF GUJARAT 147
3.9 FOREST VEGETATION MAP OF GUJARAT 158
3.10 NATIONAL PARK AND SANCTUARIES OF GUJARAT 159
3.11 POPULATION DETAILS 167
3.12 LITERACY DETAILS 167
3.13 EMPLOYMENT PATTERN 172
3.14 MAIN WORKER EMPLOYMENT PATTERN 172
CHAPTER: - 4
4.1 ISOPLETHS OF SPM 217
4.2 ISOPLETHS OF SO 2 219
4.3 ISOPLETHS OF NOx 221
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
4.4 ISOPLETHS OF HCl 223
4.5 ISOPLETHS OF Cl2 225
CHAPTER: - 6
6.1 ENVIRONMENT MANAGEMENT CELL 258
CHAPTER: - 7
7.1 EMERGENCY MANAGEMENT CHART FOR ONSITE EMERGENCY 304
CHAPTER: - 10
10.1 FLOW CHART OF EMP 331
10.2 SCHEMATIC DIAGRAM OF PROPOSED WASTE WATER TREATMENT- ZLD SYSTEM
346
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
List of Tables
Table No. Content Page No.
CHAPTER:- 1
1.1 TOR COMPLIANCE 11
CHAPTER:- 2
2.1 LOCATION OF THE PROJECT 26
2.2 SALIENT FEATURES OF THE PROJECT SITE 24
2.3 NEAREST INDUSTRIES OF THE PROJECT SITE 35
2.4 LIST OF PRODUCT 36
2.5 PACKING & FINAL APPLICATION OF PRODUCTS 37
2.6 DETAIL OF RAW MATERIALS 37
2.7 CHEMICALS NAME & PHYSICAL FORM OF RAW MATERIAL 38
2.8 PHYSICAL & CHEMICAL PROPERTIES OF RAW MATERIALS 39 2.9 DETAIL OF SOURCE 45
2.10 LAND USE BREAK UP FOR TOTAL PLOT AREA 46
2.11 LIST OF PLANT MACHINERIES FOR PROPOSED PRODUCTION ACTIVITY 47
2.12 DETAILS OF MAN POWER 48
2.13 DETAIL OF WATER CONSUMPTION & EFFLUENT GENERATION 50
2.14 CHARACTERISTICS OF INDUSTRIAL EFFLUENT 53
2.15 DETAIL OF PROPOSED EFFLUENT TREATMENT PLANTS UNITS 55
2.16 FLUE GAS STACK DETAIL 56
2.17 EMISSION RATE OF THE POLLUTANTS 57
2.18 PROCESS GAS STACK DETAIL 59
2.19 FUEL DETAIL 59
2.20 DETAIL OF HAZARDOUS WASTE MANAGEMENT 61
2.21 TYPICAL NOISE LEVELS OF EQUIPMENT 63
2.22 LIST OF HAZARDOUS CHEMICALS 64
2.23 DETAIL OF FIRE EXTINGUISHERS 70
2.24 DETAIL OF FIRE-WATER PUMP 71
2.25 DETAIL OF PROVISION FOR FIRE-FIGHTING SYSTEM 71
2.26 ANTIDOTES OF CHEMICALS 73
2.27 CAPITAL COST & RECURRING COST OF THE PROJECT FOR EMP 75
2.28 DETAIL OF SOLVENT RECOVERY 85
CHAPTER:- 3
3.1 NAME OF VILLAGES IN THE STUDY AREA 90
3.2 ENVIRONMENT ATTRIBUTES & FREQUENCY OF MONITORING 97
3.3 LOCATION OF AMBIENT AIR QUALITY MONITORING STATIONS 100
3.4 AMBIENT AIR QUALITY RESULTS (MIN, MAX, AVG AND 98%) FOR INDIVIDUAL LOCATIONS
101
3.4(a) AMBIENT AIR QUALITY ANALYSIS REPORT FOR THE MONTH OF OCTOBER 103
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
TO DECEMBER 2018
3.4 (b) VOC & OTHER GASES ANALYSIS REPORT FOR THE MONTH OF OCTOBER TO DECEMBER 2018
107
3.5 DETAILS OF AMBIENT AIR QUALITY MONITORING AND ANALYSIS PROCEDURE
110
3.6 WIND ROSE (FREQUENCY DISTRIBUTION DATA) 113
3.7 WIND ROSE FREQUENCY COUNT 114
3.8 RELATIVE HUMIDITY 116
3.9 RAINFALL PATTERN AT GANDHINAGAR RAIN GAUGE STATION 117
3.10 HOURLY MIXING DEPTH OVER INDIAN REGION 118
3.11 AMBIENT NOISE LEVELS WITHIN STUDY AREA 120
3.12 NOISE LEVEL IN THE STUDY AREA 122
3.13 LOCATION OF WATER QUALITY MONITORING STATION 131
3.14(a) WATER QUALITY ANALYSIS RESULT FOR GROUND WATER 133
3.14(b) WATER QUALITY ANALYSIS RESULT FOR SURFACE WATER 135
3.15 ANALYSIS RESULTS OF SOIL SAMPLE 139
3.16 STANDARD SOIL CLASSIFICATION 143
3.17 LAND USE DISTRIBUTION IN STUDY AREA (10 KM RADIAL ZONE) 145
3.18 HYDRO GEOLOGICAL CHARACTERISTICS AQUIFER 150
3.19 LIST OF COMMONLY FOUND FLORA IN THE STUDY AREA 153
3.20 BIRD SPECIES REPORTED DURING THE STUDY 155
3.21 MAMMALS SPECIES REPORTED DURING THE STUDY 157
3.22 POPULATION DETAILS 164
3.23 LITERACY DETAILS 168
3.24 EMPLOYMENT PATTERN AND MAIN WORKER EMPLOYMENT PATTERN 173
3.25 MAIN WORKER EMPLOYMENT PATTERN 175
3.26 AVAILABILITIES OF BASIC AMENITIES ACTIVITIES 177
3.27 MAIN COMMODITIES IN THE STUDY AREA 181
3.28 NAME OF VILLAGE FOR SURVEY IN THE STUDY AREA 185
CHAPTER:- 4
4.1 IMPACT IDENTIFICATION MATRIX 193
4.2 IMPACT PREDICTION MATRIX 194
4.3 BASIS OF EMISSION RATE CALCULATIONS 199
4.4 MAXIMUM COMPUTED GROUND LEVEL CONCENTRATION 203
4.5 CUMULATIVE CONCENTRATION DUE TO INCREMENTAL GLC’S 204
4.6 THE 1ST HIGHEST 24 HR AVERAGE CONCENTRATION VALUES OF PM10 207
4.7 THE 1ST HIGHEST 24 HR AVERAGE CONCENTRATION VALUES OF SO2 209
4.8 THE 1ST HIGHEST 24 HR AVERAGE CONCENTRATION VALUES OF NOx 211
4.9 THE 1ST HIGHEST 24 HR AVERAGE CONCENTRATION VALUES OF HCl 213
4.10 THE 1ST HIGHEST 24 HR AVERAGE CONCENTRATION VALUES OF Cl2 215
4.11 TOTAL WATER REQUIREMENT FOR PROPOSED PROJECT 230
4.12 TOTAL WASTE WATER GENERATION 230
4.13 SOLID/HAZARDOUS WASTE GENERATION AND DISPOSAL MODE 232
4.14 TRAFFIC STUDY 243
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
4.15 ASSESSMENT OF PROPOSED TRAFFIC LOAD 244
CHAPTER:- 6
6.1 ENVIRONMENTAL MONITORING PLAN 250
6.2 CORPORATE ENVIRONMENTAL RESPONSIBILITY 255
6.3 RESPONSIBILITY OF EMC 259
6.4 CAPITAL COST & RECURRING COST OF THE PROJECT FOR EMP 261
CHAPTER:- 7
7.1 AREA WISE IDENTIFIED HAZARDS, PRECAUTIONS TAKEN WITH MITIGATION MEASURES
278
7.2 MONITORING PROGRAM FOR OCCUPATIONAL HEALTH AND SAFETY 294
7.3 POSSIBLE EMERGENCY - SPILLAGE IN CHEMICAL STORAGE AREA (SPILL CONTROL PLAN)
297
7.4 POSSIBLE EMERGENCY – TOXIC GAS RELEASE 300
CHAPTER:- 10
10.1 BUDGETARY EXPENDITURE FOR GBD 353
10.2 PLANT SPECIES FOR GREEN BELT DEVELOPMENT 354
10.3 DETAILS OF FIRE EXTINGUISHER 359
10.4 DETAILS OF FIRE WATER PUMP 359
10.5 DETAILS OF PROVISION FOR FIRE-FIGHTING SYSTEM 360
10.6 CAPITAL COST & RECURRING COST OF THE PROJECT FOR EMP 368
CHAPTER:- 11
11.1 SALIENT FEATURES OF PROJECT SITE 380
11.2 DETAIL OF SOURCE 382
-
Prepared By: - Bhagwati Enviro Care Pvt. Ltd.
Annexure
Annexure No. Topic Page No.
1 APPROVED TOR FOR EIA STUDY FROM MOEF&CC, NEW DELHI. 399
2 RISK ASSESMENT STUDY REPORT 408
3 NATIONAL AMBIENT AIR QUALITY STANDARDS 456
4 ICMR STANDARD FOR DRINKING WATER 458
5 NATIONAL AMBIENT NOISE QUALITY STANDARDS AND OSHA’S PERMISSIBLE LIMIT FOR NOISE
459
6 LAND SUPPORTING DOCUMENTS 460
7 UNDERTAKING OF CONSULTANT 488
8 UNDERTAKING OF M/S. SHREY INDUSTRIES 489
9 MEMEBRSHIP CERTIFICATE 490
10 MATERIAL SAFETY DATA SHEET 491
11 ADEQUACY REPORT OF SCHEDULE II 530
12 WILD LIFE CONSERVATION PLAN 537
13 ON SITE EMERGENCY PLAN 545
14 TREATABILITY STUDY REPORT 586
15 NABL CERTIFICATE 598
16 MOEF ACCREDIATION CERTIFICATE 599
17 FORM – 1 (FILLED DURING APPLICATION FOR TOR) 601
18 PRE-FEASIBILITY REPORT 617
19 ADDITIONAL ATTACHMENT 629 20 MOM OF PUBLIC HEARING 720 21 DETAIL OF PUBLIC HEARING 731
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 1
CHAPTER 1
INTRODUCTION
1.1 Introduction
M/s. SHREY INDUSTRIES is a proposed unit located at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat). In their proposed unit, they will manufacture Pigment Green 7 @ 100 MT/M. Proposed unit is located outside notified industrial area So, the manufacturing of Synthetic organic chemical (Pigment Green 7) falls under Category “A” of EIA Notification issued in September – 2006. For this the unit needs Environmental clearance from Ministry of Environment Forest & Climate Change. The Final EIA studies are carried out as a part of process to obtain Environmental Clearance Certificate for the proposed project. Unit believes in sustainable development and equally concern about environment preservation and pollution control and proposes to provide adequate Environmental Management System to meet desired norms prescribe by statutory authority. In order to assess the Environmental Impacts of the proposed project, M/s. SHREY INDUSTRIES Entrusted Bhagwati Enviro Care Pvt. Ltd, Ahmedabad (NABET Accredited) to undertake Final Environmental Impact Assessment Study for various components of the Environment viz., Air, Water, Noise, Land and Socio-economics. This Report presents base line data collected for October-November-December 2018 for Air, Water, Noise, Land etc., for identification and assessment of the impacts.
1.2 Identification of project and project proponent
Environment Impact Assessment or EIA is a study to predict the effect of a proposed projection or its expansion activity on the environment. It is a management tool to facilitate appropriate decision; an EIA compares various alternatives for a project and seeks to identify the one, which represents the best combination of economic and environmental costs and benefits.
It helps to identify possible environmental effects of the proposed project, proposes measures to mitigate adverse effects and predicts whether there will be significant adverse environmental effects, even after the mitigation is implemented. By considering environmental effects and mitigation early in the project planning cycle, environmental assessment has many benefits, such as protection of environment, optimum utilization of resources and saves overall time and cost of the project.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 2
On 27th January 1994, the Union Ministry of Environment and Forests (MoEF), Government of India, under the Environmental (Protection) Act 1986, promulgated EIA Notification making Environmental Clearance (EC) mandatory for expansion or modernization of any activity or for setting up new projects listed in Schedule of the notification and its subsequent amendments. On 14th September 2006, a new legislation was passed, which has objectives such as “To formulate a transparent, decentralized and efficient regulatory mechanism; to incorporate necessary environmental safeguards at planning stage; to involve stakeholders in the public consultation process and to identify developmental projects based on impact potential instead of the investment criteria”
The developmental activities requiring Environmental Clearance (EC) are:
All new projects/activities listed in Schedule;
Expansion and modernization of existing projects or activities listed in the Schedule to this Notification with addition of capacity beyond the limits specified for the concerned sector, that is, projects or activities which cross the threshold limits given in the Schedule, after expansion or modernization;
Any change in product - mix in an existing manufacturing unit included in Schedule beyond the specified range.
The projects or activities shall require prior environmental clearance from the concerned regulatory authority, as the Central Government in the Ministry of Environment and Forests for matters falling under Category „A‟ in the schedule and at State level the State Environment Impact Assessment Authority (SEIAA) for matters falling under Category „B‟ in the said Schedule, before any construction work, or preparation of land by the project management except for securing the land, is started on the project or activity.
As per the provisions of the new re-engineered EIA Notification of 2006, the company requires to obtain prior Environmental Clearance from the State Level Environmental Appraisal Authority or from the Ministry of Environment & Forests, New Delhi as stated in the said Notification. This Proposed project falls under Synthetic organic Chemical Industry which is listed in Schedule and falls under Clause No. 5 (f) of Category “A” (Located outside notified industrial area / estate) of Schedule as stated in Environmental Impact Assessment Notification published on 14th September 2006 and its vide amendment. As specified in sub paragraph (ii) of paragraph 2, of the stated Notification of the Government of India, Proposed project requires prior environmental clearance from the Ministry of Environment Forest Climate change as, Proposed project is located outside the notified industrial area [Clause No. 5 (f)] of Category “A”. For this the industry is required to submit draft
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 3
Environmental Impact Assessment Study report to State Pollution Control Board, Gujarat for Public hearing and final EIA report to Ministry of Environment Forest & Climate change, New Delhi.
In order to assess the Environmental Impacts arising due to the proposed project, the company has appointed M/s. Bhagwati Enviro Care Pvt. Ltd., Ahmedabad to undertake the Environmental Impact Assessment for various components of the Environment.
The growing demand of the various kinds of Dyes and Dyes Intermediates in the domestic as well as international markets has provided a strong basis to M/s. SHREY INDUSTRIES for their proposed unit located at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat). The proposed project will help in the following aspects.
To earn a substantial amount of foreign exchange through business development, manufacturer & sales of fine chemical products.
To generate adequate employment for people in neighbouring areas.
To generate indirect employment.
1.3 Purpose of the study
The project activities are listed in serial No. 5 (f) of the schedule of EIA Notification, 2006 (synthetic Organic Chemical industries). Since the proposed project is coming up outside the notified industrial area, it is categorized as category „A‟ and needs the Environmental clearance from Ministries of Environment Forest Climate Change.
The Environmental study undertaken is aimed at identifying existing Environmental conditions; predicting Environmental impacts associated with the proposed unit and suggesting mitigation measures to mitigate the adverse Environmental impacts. The different activities that are likely to take place have been analyzed and proposed mitigation measures are assessed for their adequacy. Proposed mitigation measures have been considered where necessary.
The study also aims at reflecting the acceptability of the project to different stockholders and at incorporating the concerns raised by them into impact assessment and of the subsequent comprehensive Environmental management Plan and suggest the preventive and mitigative measures to minimize the adverse impacts on the environment and to maximize the beneficial impacts.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 4
1.4 Identification of project and project proponent
M/s. Shrey Industries is located at S. No. 111 & 112, Plot No. 7 & 8, Village- Dhanot, Ta – Kalol, Dist – Gandhinagar, Gujarat. The unit has proposed to manufacture Pigment Green 7 @ 100 MT /M. the Land area is 3366 Sq. meter.
M/s. Shrey Industries is promoted by 03 partners having more than 20 Year of experience in chemical industries for manufacturing, marketing, Finance etc.
Sr. No.
Name Designation Educational Background
Residential Address
1. Shree
Kantilal
Hirabhai
Rathod
Partner BA LLB 10 Devine Bunglows,
B/h. JBR Arcade,
Science city road,
Sola, Ahmedabad
2. Shree
Ashishkumar
Jayantibhai
Patel
Partner Dip.
Pharmacy
A-402, Vertis flat, B/h.
Astha bunglows,
Science city road,
Sola, Ahmedabad
3. Shree
Sanjaykumar
Bhogilal Patel
Partner BSc
Chemistry
5, Saral Sapphire
bunglows, vastral,
Ahmedabad
1.5 Brief description of nature size, location of the project and its importance to country, region
Nature & Size of the project: M/s. SHREY INDUSTRIES is a proposed unit located at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat). In their proposed unit, they will manufacture Pigment Green 7 @ 100 MT/M.
Propsoed unit is located outside notified industrial area So, the manufacturing of Synthetic organic chemical (Pigment Green 7) falls under Category “A” of EIA Notification issued in September – 2006. For this the unit needs Environmental clearance from Ministry of Environment Forest & Climate Change.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 5
Project Location
The Project Site is located at Survey No. 111 & 112, Plot No. 7 & 8, Village:
Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat).
Latitude : 23o18‟13.27” N (23.303687)
Longitude : 72o25‟38.61” E (72.427391)
Importance to country, Region:-
In our country, they had found the high quality of material with low rate compare to others so due to that respective India is having large Market demand in India as well as abroad. Based on their informal survey of the market with our current customers and various traders, they have found that there is a big potential for the range of the products they are planning. To meet the current market requirement M/s. SHREY INDUSTRIES has intended to do proposed manufacturing activity at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat).
The final application of the product is in chemical industries and textile industries for printing and dyeing. The supply of CPC Pigment Green 7 is in domestic and industrial market all over India.
1.6 Scope & Methodology of study:
An attempt has been made to carry out a Final Environmental Impact Assessment Study for M/s. SHREY INDUSTRIES.The Scope of EIA adopted for SHREY INDUSTRIES is based on the standard TOR approved by MoEF&CC, New Delhi AND generic structure of environmental impact assessment document as stated in the Appendix III of the EIA Notification 2006 (S.O. 1533), Ministry of Environment and Forests, Government of India.. The copy of the same is attached here with.
Under the scope of EIA, it covers:
A brief description of project site, its surrounding environment and proposed project facilities.
To endow with detail description of the raw materials and manufacturing process for proposed product.
Collection and Assessment of existing environmental baseline status based on the project information, field survey relating to air quality, meteorology, water quality, socio-economic aspects, flora & fauna, existing land use pattern etc. within study area.
Identification of Impacts due to the proposed project.
Prediction and evaluation of the environmental impacts that may result from project development.
Outline the Environmental Management Plan (EMP) to mitigate the adverse impacts due to the proposed project.
Preparation of Risk Assessment Report.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 6
Methodology for EIA:
The methodology adopted for carrying out the Environmental Impact Assessment for the proposed project has been based on the Guidelines issued by Ministry of Environment and Forest (MOEF). An effective EIA calls for identification of environmental parameters likely to be impacted, depending on the activities to be carried out during construction and operation phase of the project.
Generation and collection of baseline data for valued Environmental components as per approved TOR.
Identification and quantification of significant Environmental impacts due to the project and associated activities.
Evaluation of impacts due to proposed expansion activities and preparation of an Environmental impact statement.
Preparation of appropriate Environmental Management Plan (EMP) surrounding strategies for minimizing identified adverse impacts along with budgetary provisions to be made by the project authorities for implementation of mitigation measures.
Delineation of post Environmental Quality Monitoring Programme (EQMP) along with organizational setup required for monitoring the effectiveness of mitigation measures.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 7
Figure 1.1: Methodology of EIA Study
1.7 Study area
To decide whether proposed action is likely to cause significant adverse environmental effects; the concept of EIA is practiced. Before proceeding the baseline Environmental status, it is important to know the boundary limits and framework where data can be effectively utilized in impact assessment. In keeping with the nature and size of the industry, based on our submitted TOR application and Terms of Reference Issued by MOEF & CC, New Delhi the study area for detailed studies is an area within a radius of 10 Kms with the Project Site at the center. A Map of the Study Area is presented in Figure No. 1.3
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 8
1.8 Applicable Environment Regulations:
The project will abide and function under the purview of the following Rules, Acts & Regulations which are formulated by the Govt. of India to protect the environment and development in a sustainable way.
The Water (prevention & Control of Pollution) Act, 1974
The Water (Prevention & Control of Pollution) Cess, Act, 1977
The Air (Prevention & Control of Pollution) Act, 1981
The Environmental (Protection) Act, 1986
Environmental Impact Assessment Notification dated 14th September, 2006 and subsequent amendments.
Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.
Solid Waste Management Rules, 2016
The MSIHC (Manufacture, Storage and Import of Hazardous Chemicals) rules 1989 and amendment in 2000
Chemical Accident (Emergency Planning, Preparedness and Response) Rules, 1996
Noise Pollution (Regulation and Control) Rules, 2000 and its amendments
1.9 STRUCTURE OF EIA:
This EIA report has been prepared on the basis of available on-site primary data (survey/ monitoring) and secondary/literature data. The EIA report contains project features, baseline environmental setup, assessment of environmental impacts, and formulation of mitigation measures, environmental management and monitoring plan with risk & assessment Report. The report includes 12 Chapters. The structure of the EIA Report with necessary tables, drawings and annexure is as follows:
Chapter 1: Introduction
This chapter provides background information on need of project, need of EIA study and brief of the project. The scope and EIA methodology adopted in Preparations of EIA report have also been described in this Chapter. It also covers the identification of project & project proponent, brief description of nature, size, location of the project and its importance to the country and the region. Scope of the study details about the regulatory scoping carried out as per the generic structure given in the EIA Notification, 2006.
Chapter 2: Project Description
This chapter deals with the project details of the proposed products, with type of project, need for the project, location, size & magnitude of operation including associated activities required by and for the project, proposed
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 9
schedule for approval and implementation, including technical details of raw material, quality and quantity etc.
Chapter 3: Description of the Environment
This chapter presents the existing environmental status of the study area around the proposed project including topography, drainage pattern, water environment, geological, climate, transport system, land use, flora & fauna, socio-economic aspects, basic amenities etc. Environmental assessment of the project site in regard to its capability to receive the proposed project is also discussed in this Chapter.
Chapter 4: Anticipated Environmental Impacts and Mitigation
Measures
This chapter describes the overall impacts of the proposed project activities and underscores the areas of concern, which need mitigation measures. It predicts the overall impact of the proposed project on different components of the environment viz. air, water, land, noise, biological, and socio-economic.
Chapter 5:Analysis of Alternatives (Technology & site)
This chapter describes the site selection criteria and analysis of propsoed alternative technologies.
Chapter 6: Environmental Monitoring Program
Technical aspects of monitoring the effectiveness of mitigation measures have been given in this Chapter.
Chapter 7: Additional Studies
This chapter deals with the Public consultation & Risk assessment carried out for the proposed manufacturing plant. Unit is not located in notified area so, public consultation is required.
Chapter 8: Project Benefits
This chapter deals with the benefits to the local surrounding people due to proposed project.
Chapter 9: Environment cost benefit Analysis
During the scoping stage; no recommendation of environmental cost benefit analysis is suggested by the appraisal committee.
Chapter 10: Environmental Management Plan
This chapter details the inferences drawn from the environmental impact assessment exercise. It describes the overall impacts of the proposed activities during construction and operation phases and underscores the
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 10
areas of concern, which need mitigation measures. It also provides mitigation and control measures for environmental management plan (EMP) for minimizing the negative environmental impacts and to strengthen the positive environmental impacts of the proposed project.
Chapter 11: Summary & Conclusion of EIA Report
This chapter provides the summary and conclusions of the EIA study of the Proposed project with overall justification for implementation of the project and also explanation of how, adverse effects will be mitigated.
Chapter 12: Disclosure of Consultants Engaged
This chapter provides the disclosure of consultants engaged to carry out the EIA study along with other additional studies.
1.10 COMPLIANCE OF TOR
As per the requirements of the notification, an application in Form 1 was
submitted to Ministry of Environment and Forest Climate Change on
21/11/2018. The „TOR‟ was issued on 31/12/2018 for preparation of EIA/EMP.
A copy of the TOR is included in Annexure -01 of this EIA Report. As per
TOR project was considered under “A” category. (Based on the additional
information, in view of the MoEF & CC‟s OM vide No.IA-J-11011/369/2018-IA-
II(I) committee asked to prepare EIA – EMP report as per the EIA notification
2006.)
The EIA study has been conducted in-line with the Standard ToR given by
MoEF&CC and taking into consideration the structure of the report given in
the EIA Notification 2006. The compliance to the same has been presented in
Table 1.1.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 11
Table: 1.1: TOR COMPLIANCE GENERIC TERMS OF REFERENCE (TOR) IN RESPECT OF INDUSTRY SECTOR
1. Executive Summary (Generic
Structure as per Appendix III A)
For Executive summary
Please Refer Chapter -11
of EIA Report.
378-396
2. Introduction
i. Details of the EIA Consultant
including NABET accreditation
Please Refer Annexure –
A
I
ii. Information about the project
proponent
Please Refer Section 1.4
of Chapter 1.
4
iii. Importance and benefits of the
project
For Importance, Please
Refer Section 1.5 & 2.3 of
Chapter 1 & 2.
For benefits, please refer
chapter 8.
04
25
318-326
3. Project Description
i. Cost of project and time of
completion.
Please Refer Section 2.32
of Chapter 2.
Time of Completion: 06
months after obtaining EC
& CTE.
75
ii. Products with capacities for the
proposed project.
Please Refer Section 2.8
of Chapter 2.
36
iii. If expansion project, details of
existing products with capacities
and whether adequate land is
available for expansion, reference
of earlier EC if any.
This is a Proposed Unit.
For Product details,
Please refer section 2.8 of
chapter 2.
For Land breakup, please
refer Table No.2.10
36
46
iv. List of raw materials required and
their source along with mode of
transportation.
Please Refer Section 2.9
of Chapter 2.
37
v. Other chemicals and materials
required with quantities and storage
capacities.
Please Refer Section
2.10,2.11 & 2.12 of chapter
2
38-40
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 12
vi. Details of Emission, effluents,
hazardous waste generation and
their management.
For Air Emission: Please
Refer Section 2.23-2.26 of
Chapter 2.
For Water consumption
& Effluent Generation:
Please Refer Section 2.20-
2.22 of Chapter 2.
For Hazardous Waste
Generation: Please Refer
Section 2.27 of Chapter 2.
56-60
50-55
61
vii. Requirement of water, power, with
source of supply, status of
approval, water balance diagram,
man-power requirement (regular
and contract).
Please Refer Table 2.9 of
Chapter 2,
For water balance
Diagram, Please Refer Fig
2.8 of Chapter 2,
For manpower details,
Please Refer table 2.12 of
Chapter 2.
45
52
48
viii. Process description along with
major equipments and machineries,
process flow sheet (quantities) from
raw material to products to be
provided.
For Process Description &
for Process flow diagram,
Please Refer section 2.13
of chapter 2.
41
ix. Hazard identification and details of
proposed safety systems.
Please Refer Section
10.10 of Chapter 10.
Please refer section 7.4 of
chapter 7.
363
267
x. Expansion/modernization
Proposals:
This is a Proposed Unit. ---
a. Copy of all the Environmental
Clearance(s) including Amendments
thereto obtained for the project from
MOEF/SEIAA shall be attached as
an Annexure. A copy of the
compliance of conditions stipulated
in all the existing Environmental
clearances including Amendments
shall be provided. In addition, status
of compliance of Consent to
Operate for the ongoing /existing
Not Applicable because of
Proposed unit.
---
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 13
operation of the project from SPCB
shall be attached with the EIA-EMP
report.
b. In case the existing project has not
obtained Environmental clearance,
reasons for not taking EC under the
provisions of the EIA Notification
1994 and/or EIA Notification 2006
shall be provided. Copies of
Consent to Establish/No Objection
Certificate and Consent to Operate
(in case of units operating prior to
EIA Notification 2006, CTE and CTO
of FY 2005-2006) obtained from the
SPCB shall be submitted. Further,
compliance report to the conditions
of consents from the SPCB shall be
submitted.
Not Applicable because of
Proposed unit.
---
4. Site Details
i. Location of the project site covering
village, Taluka/Tehsil, District and
State, Justification for selecting the
site, whether other sites were
considered.
Please Refer Fig 2.1 to 2.3
of chapter 2.
For Justification for
selecting the site, Please
Refer Section 2.6 of
Chapter 2.
27-29
35
ii. A Toposheet of the study area of
radius of 10km and site location on
1:50,000/1:25,000 scale on an
A3/A2 sheet. (Including all eco-
sensitive areas and environmentally
sensitive places).
Please Refer Fig 2.6 of
chapter 2.
32
iii. Details w.r.t. option analysis for
selection of site.
Not done. ---
iv. Co-ordinates (lat-long) of all four
corners of the site.
Please Refer Table No. 2.1
of chapter 2.
26
v. Google map-Earth downloaded of
the project site.
Please Refer Fig 2.5 of
chapter 2.
31
vi. Layout maps indicating existing unit
as well as proposed unit indicating
storage area, plant area, greenbelt
area, utilities etc.
Please Refer Fig 2.4 of
chapter 2.
30
vii. Photographs of the proposed and Please Refer Section 2.5 33
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 14
existing (if applicable) plant site. If
existing, show photographs of
plantation/greenbelt, in particular.
of Chapter 2.
viii. Land use break-up of total land of
the project site (identified and
acquired), government/private -
agricultural, forest, wasteland, water
bodies, settlements, etc shall be
included. (Not required for industrial
area).
Please Refer table 2.10 of
Chapter 2.
46
ix. A list of major industries with name
and type within study area (10km
radius) shall be incorporated. Land
use details of the study area.
For list of major
industries, Please Refer
Table 2.3 of Chapter 2.
For Land Use Details,
Please Refer section 3.15
of Chapter 3.
35
144
x. Geological features and Geo-
hydrological status of the study area
shall be included.
For Geological features,
Please Refer Section 3.13
of Chapter 3 and
For Geo-hydrological
status of the study area,
Please Refer Section 3.17
of Chapter 3.
136
148
xi. Details of Drainage of the project up
to 5km radius of study area. If the
site is within 1 km radius of any
major river, peak and lean season
river discharge as well as flood
occurrence frequency based on
peak rainfall data of the past 30
years. Details of Flood Level of the
project site and maximum Flood
Level of the river shall also be
provided. (Mega green field
projects).
Unit will achieve zero liquid
Discharge by sending
treated effluent to
Common Spray Dryer
Facility at Chhatral
Environment Management
System Pvt. Ltd. Dhanot
for spray drying.
---
xii. Status of acquisition of land. If
acquisition is not complete, stage of
the acquisition process and
expected time of complete
possession of the land.
Land Supporting
Document is enclosed in
Annexure 06.
460
xiii. R&R details in respect of land in line
with state Government policy.
Not Applicable ----
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 15
5. Forest and wildlife related issues (if
applicable):
i. Permission and approval for the use
of forest land (forestry clearance), if
any, and recommendations of the
State Forest Department. (If
applicable).
Not Applicable
ii. Land use map based on High
resolution satellite imagery (GPS) of
the proposed site delineating the
forestland (in case of projects
involving forest land more than 40
ha).
For land Use details of
the study Area, Please
Refer Section 3.15 of
Chapter 3.
144
iii. Status of Application submitted for
obtaining the stage I forestry
clearance along with latest status
shall be submitted.
Not Applicable -----
iv. The projects to be located within 10
km of the National Parks,
Sanctuaries, Biosphere Reserves.
Migratory Corridors of Wild Animals,
the project proponent shall submit
the map duly authenticated by Chief
Wildlife Warden showing these
features vis-à-vis the project location
and the recommendations or
comments of the Chief Wildlife
Warden-thereon.
Not Applicable. No,
National Parks,
Sanctuaries, Biosphere
Reserves. Migratory
Corridors of Wild Animals,
located within 10 Km of the
Study Area.
-----
v. Wildlife Conservation Plan duly
authenticated by the Chief Wildlife
Warden of the State Government for
conservation of Schedule I fauna, if
any exists in the study area.
Wildlife Conservation Plan
submitted for Schedule I
species is enclosed in
Annexure 12
537
vi. Copy of application submitted for
clearance under the Wildlife
(Protection) Act, 1972, to the
Standing Committee of the National
Board for Wildlife.
6. Environmental Status
i. Determination of atmospheric
inversion level at the project site and
site-specific micrometeorological
Please Refer Table No. 4.6
to 4.10 of Chapter 4.
207-215
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 16
data using temperature, relative
humidity, hourly wind speed and
direction and rainfall.
Please Refer Fig No. 4.1 to
4.5 of Chapter 4.
For Micrometeorology data
Please Refer Section 3.8
of Chapter 3.
217-225
111
ii. AAQ data (except monsoon) at 8
locations for PM10, PM2.5, SO2,
NOX, CO and other parameters
relevant to the project shall be
collected. The monitoring stations
shall be based CPCB guidelines and
take into account the pre-dominant
wind direction, population zone and
sensitive receptors including
reserved forests.
For Monitoring Station,
Please Refer table No. 3.3
of Chapter 3.
AAQ data of 8 locations is
given in table No. 3.4(a) of
Chapter 3.
100
103
iii. Raw Data of all AAQ measurement
for 12 weeks of all stations as per
frequency given in the NAQQM
Notification of Nov. 2009 along with
- min., max., average and 98%
values for each of the AAQ
parameters from data of all AAQ
stations should be provided as an
annexure to the EIA Report.
AAQ data of 8 locations is
given in table No. 3.4(a) of
Chapter 3.
Min., Max., Average and
98% values for each of the
AAQ parameters from data
of all AAQ stations is
shown in table No. 3.4 of
Chapter 3.
103
101
iv. Surface water quality of nearby
River (100m upstream and
downstream of discharge point) and
other surface drains at eight
locations as per CPCB/MoEF & CC
guidelines.
For Surface water quality,
please refer table 3.14(b)
of chapter 3.
135
v. Whether the site falls near to
polluted stretch of river identified by
the CPCB/MoEF & CC, if yes give
details.
Not Applicable ---
vi. Ground water monitoring at
minimum at 8 locations shall be
included.
Please Refer Table No.
3.14(a) of Chapter 3.
133
vii. Noise levels monitoring at 8
locations within the study area.
Please Refer Table No.
3.12 of Chapter 3.
122
viii. Soil Characteristic as per CPCB
guidelines.
Please Refer Table No.
3.15 of Chapter 3.
139
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 17
ix. Traffic study of the area, type of
vehicles, frequency of vehicles for
transportation of materials,
additional traffic due to proposed
project, parking arrangement etc.
Please Refer Section 4.14
of Chapter 4.
243
x. Detailed description of flora and
fauna (terrestrial and aquatic)
existing in the study area shall be
given with special reference to rare,
endemic and endangered species. If
Schedule-I fauna are found within
the study area, a Wildlife
Conservation Plan shall be prepared
and furnished.
Please Refer Table no.
3.19 of Chapter 3.
For, Wildlife Conservation
Plan please refer
annexure-12
153
537
xi. Socio-economic status of the study
area.
Please Refer Section 3.19
of Chapter 3.
160
7. Impact and Environmental
Management Plan
i. Assessment of ground level
concentration of pollutants from the
stack emission based on site-
specific meteorological features. In
case the project is located on a hilly
terrain, the AQIP Modeling shall be
done using inputs of the specific
terrain characteristics for
determining the potential impacts of
the project on the AAQ. Cumulative
impact of all sources of emissions
(including transportation) on the
AAQ of the area shall be assessed.
Details of the model used and the
input data used for modeling shall
also be provided. The air quality
contours shall be plotted on a
location map showing the location of
project site, habitation nearby,
sensitive receptors, if any.
For Assessment of ground
level concentration, Please
Refer Table 4.4 of chapter
4.
AQIP modelling is not
applicable.
For Cumulative impact,
please refer Table 4.5 of
chapter 4.
Details of the model:
AERMOD.
For input data, please refer
table No. 4.3 of chapter 4.
For air quality contours,
Please refer Fig. 4.1, 4.2,
4.3, 4.4, 4.5 of Chapter 4.
203
204
199
217-225
ii. Water Quality modeling - in case of
discharge in water body
Not Done.
iii. Impact of the transport of the raw
materials and end products on the
surrounding Environmental shall be
Please Refer Section 4.14
of Chapter 4.
243
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 18
assessed and provided. In this
regard, options for transport of raw
materials and finished products and
wastes (large quantities) by rail or
rail-cum road transport or conveyor
cum-rail transport shall be
examined.
iv. A note on treatment of wastewater
from different plant operations,
extent recycled and reused for
different purposes shall be included.
Complete scheme of effluent
treatment. Characteristics of
untreated and treated effluent to
meet the prescribed standards of
discharge under E(P) Rules.
Please Refer Section 2.20-
2.22 of Chapter 2.
50-55
v. Details of stack emission and action
plan for control of emissions to meet
standards.
Please Refer Section 2.23-
2.25 of Chapter 2.
56-59
vi. Measures for fugitive emission
control.
Please Refer Section 2.26
of Chapter 2.
60
vii. Details of hazardous waste
generation and their storage,
utilization and management. Copies
of MOU regarding utilization of solid
and hazardous waste in cement
plant shall also be included. EMP
shall include the concept of waste-
minimization, recycle/reuse/recover
techniques, Energy conservation,
and natural resource conservation.
For Details of hazardous
waste generation and
their storage, utilization
and management,
Please Refer Section 2.27
of Chapter 2.
Due to proposed unit, we
had not done any MOU
with other industries.
For, concept of waste-
minimization,
recycle/reuse/recover
techniques, Energy
conservation, and natural
resource conservation -
Please Refer Section
10.12 of Chapter 10.
51
369
viii. Proper utilization of fly ash shall be
ensured as per Fly Ash Notification,
2009. A detailed plan of action shall
be provided.
There will be no generation
of fly ash.
--
ix. Action plan for the green belt Please Refer Section 10.6 351
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 19
development plan in 33 % area i.e.
land with not less than 1,500 trees
per ha. Giving details of species,
width of plantation, planning
schedule etc. shall be included. The
green belt shall be around the
project boundary and a scheme for
greening of the roads used for the
project shall also be incorporated.
of Chapter 10.
Please Refer Section 2.33
of chapter 2
76
x. Action plan for rainwater harvesting
measures at plant site shall be
submitted to harvest rainwater from
the roof tops and storm water drains
to recharge the ground water and
also to use for the various activities
at the project site to conserve fresh
water and reduce the water
requirement from other sources.
Please Refer Section 2.34
of Chapter 2.
77
xi. Total capital cost and recurring
cost/annum for Environmental
pollution control measures shall be
included.
Please Refer table No.2.27
of Chapter 2.
75
xii. Action plan for post-project
Environmental monitoring shall be
submitted.
Please Refer table No. 6.1
of Chapter 6.
250
xiii. Onsite and Offsite Disaster (natural
and Man-made) Preparedness and
Emergency Management Plan
including Risk Assessment and
damage control. Disaster
management plan should be linked
with District Disaster Management
Plan.
Please Refer Section 7.11
of Chapter 7.
Risk Assessment Report is
enclosed in Annexure -02.
301
408
8. Occupational health
i. Plan and fund allocation to ensure
the occupational health & safety of
all contract and casual workers.
Please Refer table 10.11
of Chapter 10
368
ii. Details of exposure specific health
status evaluation of worker. If the
workers' health is being evaluated
by pre designed format, chest x
rays, Audiometry, Spirometry, Vision
Please Refer Section 10.9
of Chapter 10.
362
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 20
testing (Far & Near vision, color
vision and any other ocular defect)
ECG, during pre placement and
periodical examinations give the
details of the same. Details
regarding last month analyzed data
of above mentioned parameters as
per age, sex, duration of exposure
and department wise.
iii. Details of existing Occupational &
Safety Hazards. What are the
exposure levels of hazards and
whether they are within Permissible
Exposure level (PEL). If these are
not within PEL, what measures the
company has adopted to keep them
within PEL so that health of the
workers can be preserved.
Please Refer Section 10.8
of Chapter 10.
355
iv. Annual report of heath status of
workers with special reference to
Occupational Health and Safety.
After Proposed activity of
the project, all the data of
the medical checkups of
workers will be kept as per
Form 37.
----
9. Corporate Environmental Policy
i. Does the company have a well laid
down Environmental Policy
approved by its Board of Directors?
If so, it may be detailed in the EIA
report.
Please Refer Section 6.7of
Chapter 6.
256
ii. Does the Environmental Policy
prescribe for standard operating
process / procedures to bring into
focus any infringement / deviation /
violation of the Environmental or
forest norms / conditions? If so, it
may be detailed in the EIA.
Please Refer Section 6.7
of Chapter 6.
256
iii. What is the hierarchical system or
Administrative order of the company
to deal with the Environmental
issues and for ensuring compliance
with the Environmental clearance
conditions? Details of this system
Please Refer Figure 6.1 of
Chapter 6.
Please refer Table No. 6.2
of chapter 6.
258
255
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 21
may be given.
iv. Does the company have system of
reporting of non compliances /
violations of Environmental norms to
the Board of Directors of the
company and / or shareholders or
stakeholders at large? This reporting
mechanism shall be detailed in the
EIA report.
Please Refer Section 6.7
of Chapter 6.
Please refer Table No. 6.2
of chapter 6.
256
255
10. Details regarding infrastructure
facilities such as sanitation, fuel,
restroom etc. to be provided to the
labour force during construction as
well as to the casual workers
including truck drivers during
operation phase.
Please Refer Section
10.15 of Chapter 10.
375
11 Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of
the project cost) shall be earmarked
towards the Enterprise Social
Commitment based on Public
Hearing issues and item-wise details
along with time bound action plan
shall be included. Socio-economic
development activities need to be
elaborated upon.
The industry will provide
2.0 % of the project cost
Towards the Enterprise
Commitment. Socio
Economic development
activities.
Please section 8.4 of
chapter 8.
-----
319
12. Any litigation pending against the
project and/or any direction/order
passed by any Court of Law against the
project, if so, details thereof shall also
be included. Has the unit received any
notice under the Section 5 of
Environmental (Protection) Act, 1986 or
relevant Sections of Air and Water
Acts? If so, details thereof and
compliance/ATR to the notice(s) and
present status of the case.
There was no any litigation
pending against the project
and/or any direction/order
passed by any Court of
Law against the project.
------
13. 'A tabular chart with index for point wise
compliance of above TOR.
Given herewith in Section
1.10 of Chapter 1.
10
Specific terms of Reference for EIA studies for synthetic organic chemicals Industry
1. Details on solvents to be used,
measures for solvent recovery and for
Please refer Section 2.35
of Chapter 2
84
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 22
emissions control.
2. Details of process emissions from the
proposed unit and its arrangement to
control.
Please refer Section 2.24
of Chapter 2
59
3. Ambient air quality data should include
VOC, other process –specific
pollutants* like NH3*, chlorine*, HCl*,
HBr*, H2S*, HF*,etc.,(*-as applicable)
Please refer Table No.
3.4(a) & (b) of Chapter 3
101
4. Work zone monitoring arrangements for
hazardous chemicals.
Please refer section 6.3 of
Chapter 6.
252
5. Detailed effluent treatment scheme
including segregation of effluent
streams for units adopting
'Zero' liquid discharge.
Please refer section 2.20 to
2.22 of Chapter 2
50-55
6. Action plan for odour control to be
submitted.
Please refer Section 10.16
of chapter 10.
376
7. A copy of the Memorandum of
Understanding signed with cement
manufacturers indicating clearly
that they co-process organic
solid/hazardous waste generated.
Not Applicable. Because
generated Hazardous
waste will be sold to
Authorized industries
having rule 9 permission &
ETP waste will be send to
TSDF site.
----
8. Authorization/Membership for the
disposal of liquid effluent in CETP and
solid/hazardous waste in
TSDF, if any.
Please refer Annexure: 9
for Membership
certificates. Unit will
become member of nearest
TSDF site.
490
9. Action plan for utilization of MEE/dryers
salts.
Not Applicable ----
10. Material Safety Data Sheet for all the
Chemicals are being used/will be used.
Please refer Annexure: 10 491
11. Authorization/Membership for the
disposal of solid/hazardous waste in
TSDF.
Unit will become member
Of nearest TSDF site.
----
12. Details of incinerator if to be installed. No any incinerator to be
installed.
----
13. Risk assessment for storage and
handling of hazardous
chemicals/solvents. Action plan for
handling
& safety system to be incorporated.
Please refer Annexure: 2 408
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 23
14. Arrangements for ensuring health and
safety of workers engaged in handling
of toxic materials.
Please refer Section 7.5
of chapter 7.
287
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
24
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
CHAPTER 2
PROJECT DESCRIPTION
2.1 Introduction
M/s. SHREY INDUSTRIES is a proposed unit located at Survey No. 111 &
112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat). In
their proposed unit, they will manufacture Pigment Green 7 @ 100 MT/M.
Considering scale of unit and its categorization, according to EIA notification
dated 14th September 2006, by Ministry of Environment & Forest (MoEF),
Government of India, their proposed manufacturing activity is falls under
Synthetic Organic Chemicals – Schedule 5(f) & cat -A. For that unit needs
Environmental clearance from Ministry of Environment Forest & Climate
Change.
In order to assess the Environment Impacts of the proposed project, M/s.
SHREY INDUSTRIES entrusted Bhagwati Enviro Care Pvt. Ltd, Ahmedabad
(NABET Accredited) to undertake Final Environmental Impact Assessment
Study for various components of the Environment viz., Air, Water, Noise,
Land and Socio-economics. This Report presents base line data collected for
October-November-December-2018 for Air, Water, Noise, Land etc., for
identification and assessment of the impacts.
2.2 Type of Project
The project is neither an interlinked project nor an interdependent project. As
per the EIA Notification, 2006 & subsequent amendments, the proposed
project comes under category „A‟ listed at item 5(f)“Synthetic organic
chemicals industry (dyes & dye intermediates; bulk drugs and intermediates
excluding drug formulations; synthetic rubbers; basic organic chemicals, other
synthetic organic chemicals and chemical intermediates)”. The project is
located outside the notified industrial area for manufacturing of Pigment
Green 7 @ 100 MT /M. Therefore, the category of the proposed project
comes under category „A‟.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
25
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
2.3 Need for the Project
These products are widely used in textile industries for printing and dyeing. With a rapid growth of industrialization, the demand of various pigments has also increased significantly over a period of time. Based on the informal survey of the market with potential customers and various traders, the company has found that there is a big demand in the market for the range of the product being planned. Today, increased focus is being laid on environmental friendliness and at the same time the industry is ensuring greater customer focus through technical services and marketing capabilities, in order to face global competition. To meet the current market requirement M/s. SHREY INDUSTRIES has intended to do proposed manufacturing activity at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat).
Specific site selection criteria of the unit have been given below.
Plot size is suitable for proposed project.
Availability of the set up and the utility and support facilities within the
same premises.
The project site is well connected by road to Kadi-Chhatral State
highway 2.53 km, S away from project site & Ahmedabad-Mehsana
National Highway 1.0 km, E away from project Site.
The proposed unit is located in Industrial Estate, including Availability
of infrastructure facility like power, water supply, road, manpower etc.
There are no ecological sensitive areas located within 10 km radius of
the project site.
No any national park or wild life sanctuary located within 10 km radius
of the project site.
Availability of good communication and transport facilities.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
26
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
2.4 Location
The location of the project is as shown here in Table 2.1.
Table No. 2.1
Location of The Project
Sr. No.
Description Information
1 Latitude 23o18‟13.27” N (23.303687)
North 23.304019 East 23.303480
South 23.303466 West 23.303728
2 Longitude 72o25‟38.61” E (72.427391) North 72.427431 East 72.426895
South 72.427404 West 72.427530
3 Plot. No. Plot No. 7 & 8, Survey No: 111 & 112
5 Village Dhanot
5 Ta Kalol
6 Dist Gandhinagar
7 State Gujarat
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
27
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.1
Map of Gujarat
GANDHINAGAR
DISTRICT
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
28
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.2
Map of Gandhinagar District
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
29
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.3
5 KM & 10 KM Radios map of the project site
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
30
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.4
Layout Plan
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
31
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.5
GOOGLE IMAGE OF M/s. SHREY INDUSTRIES.
Latitude: 23o18‟11.12” N (23.303089), Longitude: 72o25‟37.13” E (72.426981)
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
32
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Figure No. 2.6
Topography Map of M/s. SHREY INDUSTRIES.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
33
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
2.5 Photographs of the proposed project site.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
34
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Table No. 2.2
Salient Features of the Project Site
Sr. No.
Features Description
1 Location Plot No. 7 & 8, S. No. 111 & 112, Village – Dhanot, Ta – Kalol, Dist - Gandhinagar
2 Geographical Location Elevation above MSL 70.71 m
Toposheet No. F43A07, F43A08, F43A11, F43A12
Latitude Longitude
23.30335 72.42674
23.30336 72.42727
23.30375 72.42722
23.30290 72.42666
3. Infrastructure Setup (Aerial Distance from project Site)
Description Distance (Km)
A Nearest village Dhanot Bileshwarpura Indrad
1.38 km, S 1.47 km, SE 2.39 km, WSW
B Nearest town Chhatral 2.72 km, SE
C Water Body Creek / Nalah / lake /Pond /reservoir /canal/ Rivers / Stream / Estuary / Sea
Narmada Canal 6.01 km, S
D Highway Kadi - Chhatral State Highway Ahmedabad - Mehsana National Highway
2.53 km, S 1.20 km, E
E Railway Line Ahmedabad - Mehsana
5.39 km, E
F Railway Station Pansar 5.39 km. E
G Airport Ahmedabad 32.89 km, SE
H Heritage Site No heritage site within 10 km radius --
I National park / wild life sanctuary / Reserve Forest land
No National park / wild life sanctuary / Reserve Forest land within 10 km radius.
--
J Anganwadi / School / College /Institute etc.
Dhanot 1.38 km, S
K Defence Installation None ---
L Place of interest / None ---
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
35
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Tourist Place
M Displacement of Population
None ---
N Seismic Zone As per the earth quack sensitivity index, the unit is situated in Zone III having moderate Damage Risk (MSK -VII)
---
Table No. 2.3
Nearest Industries from the Project Site
2.6 Justification of Site Selection
In our country, they had found the high quality of material with low rate compare to others so due to that respective India is having large Market demand in India as well as abroad. Based on their informal survey of the market with our current customers and various traders, they have found that there is a big potential for the range of the products they are planning.
To meet the current market requirement M/s. SHREY INDUSTRIES has intended to do proposed manufacturing activity at Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat).
Specific site selection criteria of the unit have been given below.
Plot size is suitable for proposed project.
Sr. No.
Name of Industries
Address Type of Unit
1 Sonu Industries 71/3, B/H Ravi Estate, GIDC, Gujarat State Hwy 41, Dhanot, Gujarat 382729
Manufacturer of BOPP Self Adhesive Plain & Printed Tapes
2 Purnima Enterprise
Plot No-1 Nilkanth Industrial Estate, At-Dhanot, Ta: Kalol, Dist-Gandhinagar-382729 (Gujarat)
Chemical Manufacturing Unit
3 Anju Dye Chem Plot No. 108/3-4, Ravi Industrial Estate, Village- Bileshwarpura Kalol-Mehsana Highway, Gandhinagar-382729,
Dyes Manufacturing Unit
4 Bright Resin Pvt. Ltd.
Ravi Industrial Estate, Bileshwarpura, Ta. Kalol, Dist. Gandhinagar
Resin Manufacturing Unit
5. Chhatral Enviro Management System, Pvt Ltd.
Village – Dhanot, ta – Kalol, dist – Gandhinagar.
Common Spray Drying facility.
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
36
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Availability of the set up and the utility and support facilities within the
same premises.
The project site is well connected by road to Kadi-Chhatral State
highway 2.53 km, S away from project site & Ahmedabad-Mehsana
National Highway 1.0 km, E away from project Site.
The proposed unit is located in Industrial Estate, including Availability
of infrastructure facility like power, water supply, road, manpower etc.
There are no ecological sensitive areas located within 10 km radius of
the project site.
No any national park or wild life sanctuary located within 10 km radius
of the project site.
Availability of good communication and transport facilities.
2.7 Size or magnitude of operation:-
The size and magnitude of operation is includes Product profile including
chemical name of product, Product CAS No. product Qty and Product
Application , Raw material requirement, raw Material Storage Details,
Properties of Raw materials etc. All the details are covered in next topics.
2.8 Product Details:-
This unit will engaged in manufacturing of Pigment Green 7 with the total
capacity of 100 TPM. Details of product along with Capacities List of products
along with capacity and end use are given in below Table No. 2.4 & table
No. 2.5
Table No. 2.4
List of Product
NAME OF PRODUCT WITH ITS CHEMICAL NAME and QTY
Sr. No.
Product Name Chemical Name CAS No.
Quantity (MT/Month)
1. Pigment Green 7 Phthalocyanine Green 1328-53-6 100
-
Final Environment Impact Assessment of Proposed Manufacturing unit by M/s. SHREY INDUSTRIES At
Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat)
37
Prepared By M/s. Bhagwati Enviro Care Pvt. Ltd.
Table No. 2.5
Packing and Final Application of Products
Sr. No.
Name of Product CAS No. Type of Packing Final
application of product
1. Pigment Green 7 1328-53-6
HDPE Bags packing of 25 Kg/50 Kg With inner liner & 500 kg jumbo bags
In chemical industries and textile Industries for printing and dyeing.
2.9 Raw material requirement:-
List of Raw Materials, with consumption for manufacturing of Proposed
Products, is given in Table No. 2.6
Table No. 2.6
Detail of Raw Materials
Sr. no.
Name of the
Products
Name of the Raw Materials
CAS no. of raw
materials.
Quantity
MT/MT MT/Month
1 Pigment Green 7
Aluminum Chloride 7446-70-0 1.825 182.5
Cupric Chloride 7447-39-4 0.080 8.000
Salt 7647-14-5 0.397 39.70
Copper Phthalocyanine blue
147-14-8 0.555 55.50
Emulsifier ---- 1.270 127.0
Caustic flakes 1310-73-2 0.060 6.000
Mono Chloro Benzene
108-90-7 0.040 4.000
Chlorine 7782-50-5 0.079 7.900