CONDITIONS OF CONTRACTCONDITIONS OF CONTRACT
FOR WORKS OF CIVIL ENG. CONSTRUCTIONFOR WORKS OF CIVIL ENG. CONSTRUCTION
FIDICFIDIC RED BOOKRED BOOK 1987/921987/92
PART IPART I -- GENERAL CONDITIONSGENERAL CONDITIONS
Presented byProf. Ajit Patwardhan
April 2004
-
8/6/2019 Fidic Redfull 87&92 Correct
2/49
GENERAL PROVISIONSGENERAL PROVISIONS
1.11.1 DEFINITION AND INTERPRETATIONDEFINITION AND INTERPRETATION
EmployerEmployer meansmeans thethe person person namednamed asas suchsuch inin part part IIII ofof thesethese conditionsconditions andand thethe legallegal
successorsuccessor inin thethe titletitle toto suchsuch personperson..
ContractorContractor meansmeans thethe personperson whosewhose tendertender hashas beenbeen acceptedaccepted byby thethe employeremployer && thethe legallegal
successorsuccessor inin titletitle toto suchsuch personperson..
SubSub ContractorContractor meansmeans anyany personspersons namednamed inin thethe contractcontract asas aa subsub contractorcontractor forfor aa partpart ofof thethe
worksworks oror anyany personperson toto whomwhom aa partpart ofof workwork hashas beenbeen subsub contractedcontracted withwith thethe consentconsent ofof
engineerengineer andand thethe legallegal successorsuccessor inin titletitle toto suchsuch personperson..
EngineerEngineer meansmeans thethe personperson appointedappointed byby thethe employeremployer toto actact asas engineerengineer forfor thethe purposepurpose ofof
thethe andand namednamed asas suchsuch inin partpart IIII ofof thesethese conditionsconditions..
Contract Contract meansmeans thesethese conditioncondition (part(part II && PartPart II)II) thethe specification,specification, thethe drawing,drawing, thethe billbill ofof
quantities,quantities, thethe tender,tender, thethe letterletter ofof acceptance,acceptance, thethe contractcontract agreementagreement (if(if completed)completed) andand suchsuch
furtherfurther documents,documents, asas maymay bebe expresslyexpressly incorporatedincorporated inin thethe letterletter ofof acceptanceacceptance oror contractcontract
agreementagreement..
bill bill ofof quantitiesquantities meansmeans thethe pricedpriced andand completedcompleted billbill ofof quantitiesquantities formingforming partpart ofof thethe tendertender..
tendertender meansmeans thethe contractorscontractors pricedpriced offeroffer toto thethe employeremployer forfor thethe executionexecution andand
completioncompletion ofof thethe worksworks andand thethe remedyingremedying ofof anyany defectdefect thereintherein..
CommencementCommencement DateDate meansmeans thethe whichwhich thethe contractorcontractor receivedreceived thethe noticenotice toto
commencecommence issuedissued byby thethe engineerengineer asas perper clauseclause 4141..
-
8/6/2019 Fidic Redfull 87&92 Correct
3/49
PlantPlant means machinery apparatus and the like intended to form or forming part of the permanentmeans machinery apparatus and the like intended to form or forming part of the permanent
works.works.
Contractor equipmentContractor equipment means all appliances and things of whatsoever nature required for the executionmeans all appliances and things of whatsoever nature required for the execution
and completion of the works and the remedying of any defect therein.and completion of the works and the remedying of any defect therein.
CostCost means all expenditure properly incurred or to be incurred, whether on or off the site, includingmeans all expenditure properly incurred or to be incurred, whether on or off the site, including
overhead and other charges properly allocable thereto but does not include any allowance for profit.overhead and other charges properly allocable thereto but does not include any allowance for profit.
foreign currencyforeign currency means a currency of the country other than that in which the work is to be located.means a currency of the country other than that in which the work is to be located.
1.21.2 HEADINGS AND MARGINAL NOTESHEADINGS AND MARGINAL NOTES
The heading and marginal notes used should be assumed as coherent part of the actual clause.The heading and marginal notes used should be assumed as coherent part of the actual clause.
1.31.3 Words importing person or parties shall include team and corporation and any organization having legalWords importing person or parties shall include team and corporation and any organization having legal
capacity.capacity.
1.41.4 Word importing the singular only also includes the plural and vice versa where the context requires.Word importing the singular only also includes the plural and vice versa where the context requires.
1.51.5 NOTICES AND CONSENTS ETCNOTICES AND CONSENTS ETC
Notice, consent, approval, certificate or determination shall be in writing and the words notify, certifyNotice, consent, approval, certificate or determination shall be in writing and the words notify, certify
or determine shall be construed accordingly. Any such consent, approval, certificate or determinationor determine shall be construed accordingly. Any such consent, approval, certificate or determination
shall not unreasonably be withheld or delayed.shall not unreasonably be withheld or delayed.
-
8/6/2019 Fidic Redfull 87&92 Correct
4/49
2.12.1 ENGINEER AND ENGINEERS REPRESENTATIVEENGINEER AND ENGINEERS REPRESENTATIVE
a)a) The engineer shall carryout duties specified in the contract.The engineer shall carryout duties specified in the contract.
b)b) The engineer may exercise the authorities specified to him, which imply from the contract. ButThe engineer may exercise the authorities specified to him, which imply from the contract. Butduring the appointment of the engineer if employer has stated a need for specific approval fromduring the appointment of the engineer if employer has stated a need for specific approval fromhim (employer) to execute the powers then the engineer should acquire such permissions. Thehim (employer) to execute the powers then the engineer should acquire such permissions. Thecontractor shall take it for granted that such permissions have been taken by engineer.contractor shall take it for granted that such permissions have been taken by engineer.
2.22.2 The engineer can delegate any of his authorities vested in him to the engineers representative andThe engineer can delegate any of his authorities vested in him to the engineers representative andalso revocate such authorities from time to time.also revocate such authorities from time to time.
2.52.5 INSTRUCTIONS IN WRITINGINSTRUCTIONS IN WRITING
Instructions given by the engineer shall be in writing, provided that if for any reason the EngineerInstructions given by the engineer shall be in writing, provided that if for any reason the Engineerconsiders it necessary to give any such instruction orally. Provided further that if the contractorconsiders it necessary to give any such instruction orally. Provided further that if the contractorconfirms within 7 days such instructions in writing and if such confirmation is not contradicted by theconfirms within 7 days such instructions in writing and if such confirmation is not contradicted by theengineer in writingengineer in writing, within 7 days., within 7 days.
2.62.6 ENGINEER TO ACT IMPARTIALLYENGINEER TO ACT IMPARTIALLY
Wherever, under the contract, the Engineer is required to exercise his discretion by:Wherever, under the contract, the Engineer is required to exercise his discretion by:
a)a) Giving his decision, opinion or consentGiving his decision, opinion or consentb)b) Expressing his satisfaction or approvalExpressing his satisfaction or approvalc)c) Determining value orDetermining value ord)d) Other wise taking action which may affect the rights and obligations of the EmployerOther wise taking action which may affect the rights and obligations of the Employer
or Contractor.or Contractor.
-
8/6/2019 Fidic Redfull 87&92 Correct
5/49
HeHe shallshall exerciseexercise suchsuch discretiondiscretion impartiallyimpartially withinwithin thethe termsterms ofof thethe contractcontract andand havinghavingregardregard toto allall thethe circumstancescircumstances.. Any Any suchsuch decisions,decisions, opinion,opinion, consentconsent;; expressionexpression ofofsatisfaction,satisfaction, oror approval,approval, determinationdetermination ofof valuevalue oror actionaction maymay bebe openedopened up,up, reviewedreviewed ororrevisedrevised asas providedprovided inin clauseclause 6767..
33..11 ASSIGNMENTASSIGNMENT ANDAND SUBCONTRACTINGSUBCONTRACTING
TheThe contractorcontractor shallshall notnot withoutwithout thethe priorprior consentconsent ofof thethe employer,employer, assignassign thethe contractcontract..
44..11 SUBSUB CONTRACTINGCONTRACTING
TheThe ContractorContractor cannotcannot subcontractsubcontract thethe wholewhole ofof thethe WorksWorks.. ContractorContractor cancan subcontractsubcontract aapartpart ofof thethe WorksWorks onlyonly withwith thethe priorprior consentconsent ofof thethe EngineerEngineer.. SuchSuch consentconsent doesdoes notnotrelieverelieve thethe contractorcontractor fromfrom anyany ofof hishis obligationsobligations andand liabilitiesliabilities fromfrom thatthat partpart ofof workwork.. TheTheContractorContractor isis completelycompletely responsibleresponsible forfor thethe acts,acts, defaultsdefaults andand neglectsneglects ofof anyanysubcontractorsubcontractor..
Provided that the contractor shall not be required to obtain such consent for:Provided that the contractor shall not be required to obtain such consent for:
a)a) The provision of labourThe provision of labour
b)b) The purchase of materialsThe purchase of materials
c)c) The sub contracting of any part of the Works for which the Subcontractor is named inThe sub contracting of any part of the Works for which the Subcontractor is named inthe Contract.the Contract.
-
8/6/2019 Fidic Redfull 87&92 Correct
6/49
66..11 DRAWINGSDRAWINGS ANDAND DOCUMENTSDOCUMENTS
TheThe drawingsdrawings remainremain inin thethe custodycustody ofof thethe engineerengineer andand twotwo copiescopies areare providedprovided toto thethe contractorcontractor freefree
ofof chargecharge..
TheThe contractorcontractor shallshall supplysupply toto thethe EngineerEngineer fourfour copiescopies ofof allall Drawings,Drawings, SpecificationSpecification andand otherother
documentsdocuments submittedsubmitted byby thethe ContractorContractor andand approvedapproved byby thethe EngineerEngineer..
66..22 DRAWINGDRAWING ATAT SITESITE
OneOne copycopy ofof thethe drawingsdrawings shallshall alwaysalways bebe keptkept onon thethe sitesite byby thethe contractorcontractor..
66..33 DISRUPTIONDISRUPTION OFOF PROGRESSPROGRESSInIn casecase anyany delaydelay oror disruptiondisruption ofof planningplanning oror executionexecution worksworks isis anticipatedanticipated oror likelylikely toto occur,occur, duedue toto
lacklack ofof furtherfurther issuingissuing ofof drawingsdrawings byby thethe Engineer,Engineer, thethe ContractorContractor shallshall givegive NoticeNotice toto thethe EngineerEngineer withwith
aa copycopy ofof itit toto thethe EmployerEmployer.. TheThe ContractorsContractors noticenotice shallshall includeinclude detailsdetails ofof thethe drawingdrawing oror instructioninstruction
requiredrequired andand ofof whywhy andand by,by, whenwhen itit isis requiredrequired andand ofof anyany delaydelay oror disruptiondisruption likelylikely toto bebe sufferedsuffered ifif itit isis
latelate..
66..44 COSTCOST OFOF DELAYDELAY OFOF DRAWINGSDRAWINGSIfIf thethe EngineerEngineer failsfails toto issueissue thethe drawingsdrawings oror instructioninstruction thenthen thethe EngineerEngineer shallshall afterafter duedue consultationconsultation
withwith thethe employeremployer andand thethe contractorcontractor determinedetermine::
-- any any extensionextension ofof timetime toto whichwhich thethe contractorcontractor isis entitledentitled
-- thethe amountamount ofof suchsuch costscosts whichwhich shallshall bebe addedadded toto thethe contractorcontractor priceprice..
-
8/6/2019 Fidic Redfull 87&92 Correct
7/49
66..55 FAILUREFAILURE BYBY CONTRACTORCONTRACTOR TOTO SUBMITSUBMIT DRAWINGSDRAWINGS
IfIf thethe aboveabove delaydelay isis duedue toto failurefailure byby contractorcontractor toto submitsubmit drawingsdrawings engineerengineer shallshall taketake failurefailure byby
contractorcontractor intointo accountaccount whilewhile actingacting uponupon clauseclause 66..44..
77..11 SUPPLEMENTARYSUPPLEMENTARY INSTRUCTIONSINSTRUCTIONS
ThisThis clauseclause allowsallows thethe engineerengineer toto issueissue thethe contractorscontractors supplementarysupplementary drawingsdrawings oror instructions,instructions, andand
thethe contractorcontractor shallshall havehave toto abideabide byby itit andand workwork accordinglyaccordingly..
77..22 PERMANENTPERMANENT WORKSWORKS DESIGNEDDESIGNED BYBY CONTRACTORCONTRACTOR
WhereWhere thethe contractcontract expressesexpresses thatthat partpart ofof thethe permanentpermanent worksworks shallshall bebe designeddesigned byby thethe contractorcontractor hehe
shallshall submitsubmit toto thethe engineer,engineer, forfor approvalapproval:: suchsuch drawingsdrawings andand calculationscalculations alongalong withwith operationoperation andand
MaintenanceMaintenance manualsmanuals..
77..33 RESPONSIBILITYRESPONSIBILITY UNAFFECTEDUNAFFECTED BYBY APPROVALAPPROVAL
ApprovalApproval byby thethe engineer,engineer, accordingaccording toto thethe permanentpermanent worksworks designeddesigned byby thethe contractorcontractor shallshall notnot relieverelieve
thethe contractorcontractor ofof anyany ofof hishis responsibilitiesresponsibilities underunder thethe contractcontract..
88..11 CONTRACTORSCONTRACTORS GENERALGENERAL RESPONSIBILITYRESPONSIBILITY
TheThe ContractorContractor shallshall designdesign (to(to thethe extentextent required)required) executeexecute andand completecomplete thethe worksworks andand remedyremedy anyany
defectsdefects byby providingproviding allall superintendence,superintendence, labourlabour materials,materials, PlantPlant ContractorsContractors EquipmentEquipment andand otherother
things,things, asas specifiedspecified oror asas inferredinferred fromfrom thethe contractcontract..
-
8/6/2019 Fidic Redfull 87&92 Correct
8/49
88..22 SITESITE OPERATIONSOPERATIONS ANDAND METHODSMETHODS
TheThe ContractorContractor shallshall taketake fullfull responsibilityresponsibility forfor thethe adequacy,adequacy, stabilitystability andand safetysafety ofof allall sitesite operationsoperations
andand methodsmethods ofof contractioncontraction provided provided thatthat thethe contractorcontractor shallshall notnot bebe responsibleresponsible forfor PermanentPermanent ororTemporaryTemporary worksworks notnot designeddesigned byby himhim..
99..11 CONTRACTCONTRACT AGREEMENTAGREEMENT
TheThe contractorcontractor shallshall enterenter intointo andand executeexecute thethe ContractContract AgreementAgreement toto bebe PreparedPrepared andand completedcompleted atatthethe costcost ofof thethe EmployerEmployer..
1010..11PERFORMANCEPERFORMANCE SECURITYSECURITYIfIf contractcontract requiresrequires performanceperformance securitysecurity thethe contractorcontractor shallshall obtainobtain itit andand provideprovide toto EmployerEmployer withinwithin 2828daysdays afterafter thethe receiptreceipt ofof thethe LetterLetter ofof AcceptanceAcceptance..
1010..22PERIODPERIOD OFOF VALIDITYVALIDITY
DurationDuration ofof validityvalidity ofof performanceperformance securitysecurity isis tilltill thethe employeremployer issuesissues thethe defectdefect liabilityliability certificatecertificate ininaccordanceaccordance withwith subsub clauseclause 6262..11 toto thethe contractorcontractor.. EmployerEmployer shouldshould returnreturn thethe performanceperformance securitysecurity toto
thethe contractorcontractor withinwithin 1414 daysdays ofof issueissue ofof thethe aboveabove mentionedmentioned defectdefect liabilityliability certificatecertificate..
1010..33CLAIMSCLAIMS UNDERUNDER PERFORMANCEPERFORMANCE SECURITYSECURITY
IfIf thethe employeremployer underunder thethe performanceperformance securitysecurity makesmakes anyany claims,claims, detaileddetailed notificationnotification shouldshould bebe givengiventoto thethe contractorcontractor statingstating thethe naturenature ofof thethe defaultdefault..
-
8/6/2019 Fidic Redfull 87&92 Correct
9/49
1111..11 INSPECTIONINSPECTION OFOF SITESITE
ItIt isis assumedassumed thatthat thethe contractorcontractor hashas alreadyalready examinedexamined andand inspectedinspected thethe sitesite isis satisfiedsatisfied withwith itit beforebeforesubmittingsubmitting thethe tender,tender, withwith regardregard toto::
a)a) TheThe formform andand naturenature ofof thethe sitesite includingincluding subsub surfacesurface conditioncondition..
b)b) TheThe hydrologicalhydrological andand climaticclimatic conditioncondition..
c)c) TheThe extentextent andand naturenature ofof thethe workwork andand thethe materialmaterial;; necessarynecessary forfor thethe executionexecution..
d)d) TheThe meansmeans ofof accessaccess toto thethe sitesite andand thethe accommodationaccommodation hehe maymay requirerequire andand isis deemeddeemed totohavehave obtainedobtained allall thethe informationinformation hehe maymay requirerequire asas toto risksrisks andand contingenciescontingencies..
1212..11SUFFICIENCYSUFFICIENCY OFOF TENDERTENDER
ItIt isis assumedassumed thatthat thethe contractorcontractor hashas donedone allall thethe researchresearch workwork aboutabout thethe correctnesscorrectness andand sufficiencysufficiency
ofof tendertender relatedrelated toto executionexecution andand completioncompletion ofof thethe workwork andand thethe remedyingremedying ofof anyany defectdefect whichwhich maymayoccuroccur..
1212..22 NOTNOT FORESEEABLEFORESEEABLE PHYSICALPHYSICAL CONDITIONCONDITION
OtherOther thanthan climaticclimatic conditions,conditions, ifif contractorcontractor findsfinds anan adverseadverse physical physical obstructionobstruction ororconditioncondition whichwhich isis notnot foreseeableforeseeable byby anan experiencedexperienced contractorcontractor shouldshould informinform thethe engineerengineer..EngineerEngineer afterafter consultationconsultation withwith bothboth maymay grantgrant..
a)a) TheThe timetime extensionextension neededneeded inin thethe completioncompletion ofof thethe workwork..b)b) And And thethe amountamount ofof costcost increaseincrease neededneeded byby thethe contractorcontractor forfor thethe aboveabove reasonreason..
SuchSuch timetime andand costcost increaseincrease maymay includeinclude anyany properproper andand reasonablereasonable measuresmeasures acceptableacceptabletoto thethe EngineerEngineer whichwhich thethe contractorcontractor maymay taketake inin thethe absenceabsence ofof specificspecific instructionsinstructions fromfromthethe engineerengineer..
-
8/6/2019 Fidic Redfull 87&92 Correct
10/49
1313..11WORKWORK TOTO BEBE ININ ACCORDANCEACCORDANCE WITHWITH CONTRACTCONTRACT
UnlessUnless itit isis legallylegally oror physicallyphysically impossibleimpossible thethe contractcontract shallshall executeexecute andand completecomplete thethe
worksworks andand remedyremedy anyany defectsdefects inin accordanceaccordance withwith contractcontract toto thethe EngineersEngineers satisfactionsatisfaction..
1414..11PROGRAMMEPROGRAMME TOTO BEBE SUBMITTEDSUBMITTED
WithinWithin aa specifiedspecified timetime (in(in days),days), afterafter thethe datedate ofof thethe LetterLetter OfOf Acceptance,Acceptance, thethe contractorcontractor shallshall submitsubmit aa
programmeprogramme toto thethe engineerengineer forfor hishis consentconsent inin suchsuch aa wayway andand detaildetail asas thethe engineerengineer shallshall reasonablereasonable
prescribeprescribe forfor thethe executionexecution ofof thethe worksworks.. ItIt isis alsoalso requiredrequired thatthat wheneverwhenever thethe engineerengineer requires,requires, thethe
contractorcontractor shallshall provideprovide inin writing,writing, forfor hishis information,information, aa generalgeneral descriptiondescription ofof thethe arrangementarrangement andand
methodsmethods whichwhich thethe contractorcontractor proposesproposes toto adoptadopt forfor thethe executionexecution ofof thethe worksworks..
1414..22 REVISEDREVISED PROGRAMMEPROGRAMME
IfIf itit appearsappears toto thethe engineer,engineer, atat anyany time,time, thatthat thethe actualactual progressprogress ofof thethe worksworks doesdoes notnot conformconform toto thethe
progammeprogamme toto whichwhich consent,consent, isis givengiven;; thethe contractorcontractor atat thethe requestrequest ofof thethe engineer,engineer, isis requiredrequired toto
produceproduce aa revisedrevised programmeprogramme necessarynecessary toto ensureensure completioncompletion ofof thethe worksworks withinwithin thethe TimeTime forfor
CompletionCompletion..
1414..33CASHFLOWCASHFLOW ESTIMATEESTIMATE
TheThe contractorcontractor shallshall withinwithin timetime statedstated inin PartPart IIII provideprovide aa detaileddetailed cashcash flowflow estimate,estimate, inin quarterlyquarterly
period,period, forfor allall paymentspayments toto whichwhich thethe contractorcontractor willwill bebe entitledentitled underunder thethe contractcontract (to(to thethe engineer)engineer) andand
thethe contractorcontractor shallshall subsequentlysubsequently supplysupply revisedrevised cashcash flowflow estimatesestimates atat quarterlyquarterly intervals,intervals, ifif requiredrequired toto
dodo soso byby thethe engineerengineer..
-
8/6/2019 Fidic Redfull 87&92 Correct
11/49
1414..44..CONTRACTORCONTRACTOR NOTNOT RELIEVEDRELIEVED OFOF DUTIESDUTIES
SuchSuch cashcash flowflow statementsstatements dodo notnot relieverelieve thethe contractorcontractor ofof anyany ofof thisthis dutiesduties oror responsibilitiesresponsibilities underunder thethe
contractcontract..
1515..11CONTRACTORSCONTRACTORS SUPERITENDENCESUPERITENDENCE
TheThe contractorcontractor isis neededneeded toto provideprovide allall necessarynecessary superintendencesuperintendence duringduring thethe executionexecution ofof thethe workwork andand
thereafter,thereafter, asas longlong asas thethe engineerengineer considerconsider itit necessarynecessary forfor proper proper fulfillmentfulfillment ofof thethe contractorscontractors
obligationsobligations underunder thethe contractcontract..
IfIf thethe approvalapproval ofof ContractorsContractors representativerepresentative isis withdrawnwithdrawn byby thethe EngineerEngineer thenthen ContractorContractor shallshall replacereplace
himhim byby anyany otherother representativerepresentative approvedapproved byby thethe EngineerEngineer..
1616..11CONTRACTORSCONTRACTORS EMPLOYEESEMPLOYEES
TheThe contractorcontractor shallshall provideprovide onon thethe sitesite onlyonly skilledskilled andand experiencedexperienced technicaltechnicalassistantsassistants andand foremenforemen toto provide provide proper proper superintendencesuperintendence toto skilled,skilled, semiskilledsemiskilled
andand unskilledunskilled labourlabour asas isis necessarynecessary..1616..22ENGINEERENGINEER ATAT LIBERTYLIBERTY TOTO OBJECTOBJECT
TheThe ClientsClients engineerengineer havinghaving objectionobjection onon thethe contractorscontractors workerworker whenwhen theythey misconductmisconduct themselves,themselves, oror
areare incompetentincompetent oror negligentnegligent inin thethe proper proper performanceperformance ofof hishis dutiesduties.. SuchSuch workersworkers shouldshould bebereplacedreplaced asas soonsoon asas possiblepossible..
-
8/6/2019 Fidic Redfull 87&92 Correct
12/49
1717..11SETTINGSETTING OUTOUT
TheThe contractorcontractor hashas toto looklook afterafter aboutabout thethe accurateaccurate settingsetting outout ofof thethe worksworks andand thethe provision provision ofof allall
necessarynecessary instruments,instruments, appliancesappliances andand labourlabour inin connectionconnection withwith thethe foregoingforegoing responsibilitiesresponsibilities..
TheThe contractorcontractor shallshall rectifyrectify anyany errorerror ifif causedcaused regardingregarding settingsetting outout unlessunless itit waswas causedcaused duedue toto
incorrectincorrect datadata providedprovided byby EngineerEngineer inin writingwriting..
1818..11BOREBORE HOLESHOLES ANDAND EXPLORATORYEXPLORATORY EXCAVTIONEXCAVTION
TheThe EngineerEngineer hashas rightsrights toto askask thethe ContractorContractor toto dodo BoreholesBoreholes oror toto carrycarry outout exploratoryexploratory executionexecution ofof
worksworks ifif thethe itemitem oror provisionalprovisional sumsum forfor thethe workwork isis includedincluded inin thethe billbill ofof QuantitiesQuantities..
1919..11SAFETY,SAFETY, SECURITY,SECURITY, ANDAND PROTECTIONPROTECTION OFOF THETHE ENVIRONMENTENVIRONMENT
-- ToTo safeguardsafeguard thethe workingworking personperson fromfrom thethe danger/injurydanger/injury duringduring executionexecution..
-- ToTo provideprovide andand maintainmaintain lights,lights, guards,guards, fencing,fencing, warningwarning signssigns andand watchmanwatchman atat hishis ownown costcost..
-- ToTo protectprotect thethe environmentenvironment andand toto avoidavoid thethe publicpublic damage,damage, oror nuisancenuisance andand pollutionpollution arisingarising outout
ofof hishis methodsmethods ofof operationsoperations..
1919..22EMPLOYERSEMPLOYERS RESPONSIBILITIESRESPONSIBILITIES
TheThe employeremployer hashas toto safeguardsafeguard thethe workingworking ;;personperson andand toto avoidavoid dangerdanger toto thethe workmenworkmen inin thethe site,site, ifif hehe
employsemploys hishis ownown labourlabour oror otherother contractorscontractors toto carrycarry outout somesome workwork..
-
8/6/2019 Fidic Redfull 87&92 Correct
13/49
2020..11CARECARE OFOF WORKSWORKS
TheThe contractorcontractor hashas toto taketake carecare ofof allall thethe materialsmaterials andand plants plants atat hishis ownown riskrisk startingstarting fromfrom thethecommencementcommencement ofof thethe project project toto thethe datedate ofof issueissue ofof TakingTaking overover CertificateCertificate byby thethe EmployerEmployer..
TheThe contractorcontractor hashas toto bebe responsibleresponsible forfor thethe plantsplants andand materialsmaterials untiluntil thethe outstandingoutstanding worksworks arearecompletedcompleted duringduring DefectsDefects LiabilityLiability PeriodPeriod..
2020..22RESPONSIBILITYRESPONSIBILITY TOTO RECTIFYRECTIFY
TheThe ContractorContractor hashas responsibilityresponsibility toto rectifyrectify thethe cause,cause, otherother thanthan thethe causescauses mentionedmentioned inin subsub--clauseclause2020..44 atat hishis ownown costcost toto thethe satisfactionsatisfaction ofof thethe EngineerEngineer..
2020..33DAMAGEDAMAGE DUEDUE TOTO EMPLOYERSEMPLOYERS RISKRISKTheThe contractorcontractor shallshall rectifyrectify thethe lossloss oror damagedamage occurredoccurred duedue toto thethe causescauses mentionedmentioned inin subsub--clauseclause2020..44 oror inin combinationcombination withwith thethe otherother risksrisks.. TheThe EngineerEngineer willwill paypay anan additionaddition toto thethe contractcontract priceprice toto thethecontractorcontractor withwith aa copycopy toto thethe EmployerEmployer..
20.4 THE EMPLOYERS RISK
- War, Hostilities, Invasion, Act of Foreign enemies.
- Rebellion, Revolution, Insurrection, Military or usurped power or civil.- Ionizing radiation, Contamination by radio activity.
- Pressure waves from aircraft travelling at sonic or super sonic speed.
- Riot, disorder unless it is restricted to Employees of the Contractor or of his sub
Contractors
- The loss or damages caused to contractor due to take over of part of works by
employer.
- Loss or damage, caused due to the design of works provided by employer- The causes due to the forces of nature which could not have been foreseen by an
-
8/6/2019 Fidic Redfull 87&92 Correct
14/49
2121..11INSURANCEINSURANCE OFOF WORKSWORKS ANDAND EQUIPMENTEQUIPMENT
TheThe ContractorContractor shallshall insureinsure thethe followingfollowing
TheThe fullfull replacementreplacement costcost forfor thethe plantplant andand materialsmaterials toto bebe incorporatedincorporated inin thethe worksworks
plusplus 1515 percentpercent ofof thethe fullfull replacementreplacement costcost inin additionaddition toto bebe insuredinsured forfor thethe additionaladditionalcostscosts likelike rectificationrectification ofof lossloss oror damage,damage, ProfessionalProfessional fees,fees, DemolishingDemolishing costcost andand
removingremoving thethe debrisdebris fromfrom thethe workwork..
TheThe ContractorsContractors EquipmentEquipment andand otherother thingsthings broughtbrought toto thethe sitesite forfor aa sumsum sufficientsufficient forfor
itsits replacementreplacement..
2121..22SCOPESCOPE OFOF COVERCOVER
ForFor thethe casescases mentionedmentioned inin subsub--clauseclause 2121..11 thethe insuranceinsurance willwill bebe inin thethe jointjoint namesnames ofof thethe contractorcontractor
andand thethe employer,employer, andand shallshall covercover
(a)(a) thethe employeremployer andand thethe contractorcontractor againstagainst allall lossloss oror damagedamage otherother thanthan forceforce MajeureMajeure causescauses
statedstated inin 2121..44 fromfrom startstart ofof workwork tilltill taketake overover byby EmployerEmployer..
(b)(b) thethe contractorcontractor duringduring DefectsDefects LiabilityLiability PeriodPeriod forfor lossloss oror damagedamage causedcaused priorprior toto
beginningbeginning ofof DefectsDefects LiabilityLiability PeriodPeriod andand forfor anyany causescauses arisingarising outout ofof clauseclause 4949 && 5050relatedrelated toto DefectsDefects LiabilityLiability..
2121..33AnyAny amountamount notnot insuredinsured oror recoveredrecovered byby bothboth thethe partiesparties accordingaccording toto provisionsprovisions inin clauseclause
2020..
-
8/6/2019 Fidic Redfull 87&92 Correct
15/49
2121..44EXCLUSIONSEXCLUSIONS
ThereThere shallshall bebe nono obligationobligation ofof insuranceinsurance underunder clauseclause 2121..11 toto covercover forceforce MejureMejure issuesissues suchsuch asas
War,War, Hostilities,Hostilities, Invasion,Invasion, ActAct ofof ForeignForeign enemiesenemies..
Rebellion,Rebellion, Revolution,Revolution, Insurrection,Insurrection, MilitaryMilitary oror usurpedusurped powerpower oror civilcivil warwar..
ionizingionizing radiation,radiation, ContaminationContamination byby radioactivityradioactivity
PressurePressure waveswaves fromfrom aircraftaircraft oror otherother aerialaerial devicesdevices
2222..11DAMAGEDAMAGE TOTO PERSONSPERSONS ANDAND PROPERTYPROPERTY
TheThe ContractorContractor indemnifiesindemnifies andand holdsholds harmless,harmless, thethe EmployerEmployer onon followingfollowing issuesissues..
a)a) DeathDeath ofof oror InjuryInjury toto anyany personperson ororb)b) LossLoss ofof oror damagedamage toto anyany propertyproperty otherother thanthan WorksWorks whichwhich maymay arisearise outout ofof executionexecution andand
completioncompletion ofof thethe works,works, subjectsubject exceptionsexceptions defineddefined inin subsub--clauseclause 2222..22
2222..22EXCEPTIONSEXCEPTIONS
TheThe exceptionsexceptions referredreferred aboveabove inin 2222..11 areare
a)a) TheThe permanentpermanent useuse oror occupationoccupation ofof landland byby thethe worksworks..b)b) TheThe rightright ofof employeremployer toto executeexecute thethe worksworks overover underunder oror throughthrough thethe landland..
c)c) DamageDamage toto thethe propertyproperty duringduring thethe executionexecution ofof thethe workwork ifif thethe damagedamage isis unavoidableunavoidable inin thethe
processprocess ofof executionexecution andand remedyingremedying thethe defectsdefects asas perper thethe ContractContract..
d)d) DamageDamage toto propertyproperty andand personspersons whowho areare eithereither injuredinjured oror deaddead becausebecause ofof anyany actact oror neglectneglect ofof
thethe Employer,Employer, hishis agents,agents, otherother ContractorsContractors whowho areare notnot directlydirectly employedemployed byby thethe contractorcontractor..
-
8/6/2019 Fidic Redfull 87&92 Correct
16/49
2222..33 TheThe EmployerEmployer shallshall indemnifyindemnify thethe ContractorContractor againstagainst allall claimsclaims arisingarising outout ofof exceptionsexceptions providedprovided inin thethe
contractcontract..
23.123.1THIRD PARTY INSURANCETHIRD PARTY INSURANCE
TheThe ContractorContractor shallshall insureinsure inin thethe joint joint namesnames ofof thethe EmployerEmployer andand himself,himself, withoutwithout limitinglimiting hishis oror
EmployerEmployer obligationsobligations andand responsibilities,responsibilities, againstagainst injuryinjury oror deathdeath toto anyany person,person, lossloss oror damagesdamages toto thethe
propertyproperty arisingarising outout ofof thethe performanceperformance ofof contractcontract.. ThisThis insuranceinsurance isis notnot toto covercover thethe exceptionsexceptions givengiven
inin subsub clauseclause 2222..22
23.223.2MINIMUM AMOUNT OF INSURANCEMINIMUM AMOUNT OF INSURANCE
TheThe insuranceinsurance mademade shallshall bebe forfor atat leastleast thethe amountamount specifiedspecified inin thethe appendixappendix ofof thethe TenderTender..
2323..33CROSSCROSS LIABILITIESLIABILITIES
TheThe insuranceinsurance policy policy shallshall includeinclude aa crosscross liabilityliability clauseclause ii..ee.. separateseparate insuranceinsurance coveragescoverages areare
providedprovided forfor thethe ContractorContractor andand EmployerEmployer..
2626..11COMPLIANCECOMPLIANCE WITHWITH STATUTESSTATUTES
TheThe ContractorContractor shouldshould givegive allall noticesnotices andand paypay allall feesfees withinwithin thethe provisionsprovisions statedstated inin anyany ofof thethe NationalNational
oror StateState Statute,Statute, Ordinance,Ordinance, oror otherother lawlaw oror anyany regulation,regulation, andand ContractorContractor shouldshould confirmconfirm toto thethe rulesrules
andand regulationsregulations ofof allall publicpublic bodiesbodies andand companiescompanies whosewhose propertyproperty oror rightsrights whichwhich willwill oror whichwhich maymay getget
affectedaffected inin anyany wayway byby thethe worksworks..
Also,Also, thethe ContractorContractor shallshall keepkeep thethe EmployerEmployer indemnifiedindemnified againstagainst allall penaltiespenalties andand liabilitiesliabilities ofof everyevery
kindkind ifif thethe ContractorContractor breachesbreaches anyany ofof thethe aboveabove saidsaid provisionsprovisions..
-
8/6/2019 Fidic Redfull 87&92 Correct
17/49
2727..11FOSSILSFOSSILS
AllAll fossils,fossils, coins,coins, articlesarticles ofof valuevalue oror antiquityantiquity andand structurestructure andand otherother remainsremains oror thingsthings ofof geologicalgeological ororarchaeologicalarchaeological interestinterest thatthat areare discovereddiscovered onon thethe sitesite shallshall bebe consideredconsidered asas thethe propertyproperty ofof thethe
EmployerEmployer.. TheThe ContractorContractor mustmust taketake necessarynecessary precautions precautions toto preventprevent hishis workmenworkmen oror anyany otherotherpersonspersons fromfrom removing/damagingremoving/damaging anyany suchsuch articlearticle.. ByBy doingdoing so,so, ifif thethe ContractorContractor sufferssuffers delaydelay andand /or/orincursincurs costs,costs, thenthen thethe EngineerEngineer shall,shall, afterafter duedue consultationconsultation withwith thethe EmployerEmployer andand thethe Contractor,Contractor,determinedetermine.. IfIf anyany extensionextension ofof timetime whichwhich thethe ContractorContractor isis entitledentitled underunder ClauseClause 4444 andand thethe amountamountofof suchsuch costs,costs, whichwhich shallshall bebe addedadded toto thethe ContractContract PricePrice andand shouldshould notifynotify thethe ContractorContractor accordingly,accordingly,withwith aa copycopy toto thethe EmployerEmployer..
2828..11PATENTPATENT RIGHTSRIGHTS
TheThe ContractorContractor shallshall indemnifyindemnify thethe EmployerEmployer fromfrom allall claimsclaims thatthat maymay arisearise duedue toto infringementinfringement ofof anyanypatentpatent rightsrights oror designdesign trademark,trademark, inin respectrespect ofof anyany ContractorsContractors Equipment,Equipment, materialsmaterials oror PlanPlan usedused forforinin connectionconnection withwith thethe WorkWork..
2828..22ROYALTIESROYALTIES
TheThe ContractorContractor shallshall paypay forfor allall costs,costs, royalties,royalties, rentrent andand otherother paymentspayments oror compensation,compensation, ifif any,any, forforprocuringprocuring stone,stone, sandsand gravelgravel oror otherother materialsmaterials requiredrequired forfor thethe givengiven WorksWorks..
2929..11INTERFERENCEINTERFERENCE WITHWITH TRAFFICTRAFFIC ANDAND ADJOININGADJOINING PROPERTIESPROPERTIES
AllAll operationsoperations andand activitiesactivities necessarynecessary forfor thethe successfulsuccessful completioncompletion ofof thethe WorksWorks andand remedyingremedying anyanydefectsdefects shallshall bebe carriedcarried outout asas notnot toto interfereinterfere unnecessarilyunnecessarily withwith
-
8/6/2019 Fidic Redfull 87&92 Correct
18/49
TheThe convenienceconvenience ofof thethe publicpublic
TheThe accessaccess toto useuse andand occupationoccupation ofof privateprivate oror publicpublic roadsroads andand footpathsfootpaths ofof thethe propertiesproperties..
TheThe Contractor,Contractor, atat suchsuch situations,situations, indemnifyindemnify thethe EmployerEmployer inin respectrespect ofof allall claims,claims, soso farfar asas itit isis foundfound
thatthat thethe ContractorContractor waswas responsibleresponsible forfor itit..
3030..11AVOIDANCEAVOIDANCE OFOF DAMAGEDAMAGE TOTO ROADSROADS
TheThe ContractorContractor shouldshould useuse everyevery reasonablereasonable meansmeans toto preventprevent anyany ofof thethe roads/bridgesroads/bridges thatthat linklink thethe
routeroute toto thethe Site,Site, fromfrom beingbeing damageddamaged byby anyany traffictraffic ofof thethe ContractorContractor oror hishis SubSub--contractorscontractors..
3030..22TRANSPORTTRANSPORT OFOF CONTRACTORSCONTRACTORS EQUIPMENTEQUIPMENT OROR TEMPORARYTEMPORARY WORKSWORKS..
ContractorContractor shallshall bebe responsibleresponsible forfor andand paypay forfor thethe costcost ofof strengtheningstrengthening anyany bridgesbridges toto facilitatefacilitate thethe
movementmovement ofof ContractorsContractors EquipmentEquipment oror TemporaryTemporary WorksWorks andand thethe ContractorContractor shallshall keepkeep thethe EmployerEmployer
indemnifiedindemnified againstagainst claimsclaims thatthat maymay arisearise duedue toto damagedamage toto anyany suchsuch roadroad oror bridgebridge..
3030..33TRANSPORTTRANSPORT OFOF MATERIALSMATERIALS ANDAND PLANTPLANT
InIn spitespite ofof followingfollowing clauseclause 2020..11,, ifif anyany damagedamage occursoccurs toto anyany bridgebridge oror roads,roads, thethe ContractorContractor shallshall notifynotify
thethe Engineer,Engineer, withwith aa copycopy forwardedforwarded toto thethe Employer,Employer, aboutabout thethe occurrenceoccurrence ofof suchsuch damagedamage.. Where,Where, ififstatedstated underunder anyany lawlaw oror regulation,regulation, thethe haulershaulers ofof suchsuch materialsmaterials oror PlantPlant isis requiredrequired toto indemnifyindemnify thethe
roadroad authority,authority, andand thethe EmployerEmployer willwill notnot bebe liableliable forfor anyany costscosts oror chargescharges..
InIn otherother cases,cases, thethe EmployerEmployer shallshall negotiatenegotiate thethe settlementsettlement andand paypay anyany suchsuch claims,claims, provided, provided, ifif
Engineer,Engineer, found,found, thethe ContractorContractor failedfailed toto complycomply withwith thethe subsub clauseclause 3030..11 thenthen thethe amountamount shouldshould bebe
recoveredrecovered fromfrom thethe ContractorContractor byby thethe EmployerEmployer..
-
8/6/2019 Fidic Redfull 87&92 Correct
19/49
3030..44 WATERBORNEWATERBORNE TRAFFICTRAFFIC
IfIf atat allall thethe naturenature ofof thethe WorksWorks isis suchsuch thatthat itit requiredrequired waterbornewaterborne transporttransport thenthen thethe earlierearlier provisionsprovisionsstatedstated withinwithin thisthis clauseclause shallshall bebe interpretedinterpreted asas thoughthough roadroad includedincluded dock,dock, seasea wallwall oror otherother structurestructure
relatedrelated toto aa waterwaywaterway andand vehiclevehicle includesincludes craft,craft, adad shallshall havehave effecteffect accordinglyaccordingly..3131..11 OPPORTUNITIESOPPORTUNITIES FORFOR OTHEROTHER CONTRACTORSCONTRACTORS
TheThe ContractorContractor inin conformityconformity withwith thethe requirementrequirement ofof thethe Engineer,Engineer, affordafford allall reasonablereasonable opportunitiesopportunitiesforfor carryingcarrying outout theirtheir workwork toto:: anyany otherother ContractorContractor appointedappointed byby EmployerEmployer toto carrycarry suchsuch workwork notnotincludedincluded inin thethe contractcontract..
3131..22 FACILITIESFACILITIES FORFOR OTHEROTHER CONTRACTORCONTRACTOR
FacilitiesFacilities forfor otherother ContractorsContractors onon requestrequest fromfrom engineer,engineer, thethe contractorcontractor shallshall permitpermit thethe useuse ofof roadroadmaintainedmaintained byby himhim alongalong withwith ContractorsContractors equipmentequipment oror temporarytemporary worksworks andand anyany otherother serviceservice.. TheTheEngineerEngineer shallshall determinedetermine anyany additionaddition toto contractcontract priceprice duedue toto aboveabove provisionprovision..
3232..11 CONTRACTORCONTRACTOR TOTO KEEPKEEP THETHE SITESITE CLEARCLEAR
DuringDuring thethe executionexecution ofof thethe worksworks thethe contractorcontractor shallshall keepkeep thethe sitesite reasonallyreasonally freefree fromfrom fromfromunnecessaryunnecessary obstructionobstruction andand removeremove surplussurplus equipment,equipment, material,material, oror temporarytemporary worksworks nono longerlonger
requiredrequired..
3333..11 CLEARANCECLEARANCE OFOF SITESITE ONON COMPLETIONCOMPLETION
UponUpon thethe issueissue ofof TakingTaking OverOver Certificate,Certificate, thethe ContractorContractor shallshall clearclear awayaway allall ContractorsContractors Equipment,Equipment,SurplusSurplus material,material, rubbishrubbish andand TemporaryTemporary WorksWorks.. UnlessUnless suchsuch materials,materials, likelike ContractorsContractors EquipmentEquipmentandand TemporaryTemporary Works,Works, wouldwould bebe requiredrequired byby thethe ContractorContractor toto fulfillfulfill hishis obligationsobligations duringduring DefectsDefectsNotificationNotification periodperiod shouldshould bebe leftleft onon thethe sitesite..
-
8/6/2019 Fidic Redfull 87&92 Correct
20/49
LABOURLABOUR
3434..11 ENGAGEMENTENGAGEMENT OFOF STAFFSTAFF ANDAND LABOURLABOUR
ItIt maymay becomebecome necessarynecessary toto addadd aa numbernumber ofof subssubs--clauses,clauses, toto taketake accountaccount ofof thethe circumstancescircumstances andand localitylocalityofof thethe works,works, whichwhich coverscovers mattersmatters suchsuch asas:: PermitsPermits andand registrationregistration ofof expatriateexpatriate employeesemployees;; repatriationrepatriation toto
place place ofof recruitmentrecruitment;; provision provision ofof temporarytemporary housinghousing forfor employeesemployees;; requirementsrequirements inin respectrespect ofofaccommodationaccommodation forfor staffstaff ofof employeremployer andand engineerengineer;; standardsstandards ofof accommodationaccommodation toto bebe providedprovided;; provisionprovision ofofaccessaccess roads,roads, hospital,hospital, school,school, power,power, waterwater drainage,drainage, firefire services,services, refuserefuse collection,collection, communalcommunal buildings,buildings,shops,shops, telephones,telephones, conditionsconditions ofof working,working, ratesrates ofof pay,pay, compliancecompliance withwith labourlabour legislation,legislation, maintenancemaintenance ofofrecordsrecords ofof safetysafety andand healthhealth underunder partpart IIII ofof particularparticular conditionsconditions ofof contractcontract..
TheThe contractorcontractor hashas toto makemake hishis ownown arrangementsarrangements forfor engagementengagement ofof allall staffstaff andand labourlabour.. TheThe labourlabour cancan bebelocallocal oror otherother.. TheThe contractorcontractor hashas toto taketake carecare forfor theirtheir payment,payment, housing,housing, feedingfeeding andand transporttransport..
3535..11 RETURNSRETURNS OFOF LABOURLABOUR ANDAND CONTRACTORCONTRACTOR EQUIPMENTEQUIPMENTIfIf thethe engineerengineer requires,requires, thethe contractorcontractor shallshall deliverdeliver aa returnreturn showingshowing inin detailsdetails thethe staffstaff andand numbernumber ofof labourlabourofof eacheach classclass employedemployed timetime toto timetime byby thethe contractorcontractor onon thethe sitesite.. TheThe contractorcontractor shallshall alsoalso provideprovide allall suchsuchinformationinformation ofof contractorscontractors equipmentsequipments ifif requiredrequired byby thethe engineerengineer..
MATERIALS, PLANT AND WORKMANSHIPMATERIALS, PLANT AND WORKMANSHIP
36.136.1 QUALITY OF MATERIALS, PLANT AND WORKMANSHIPQUALITY OF MATERIALS, PLANT AND WORKMANSHIP
All material, plant and workmanship shall be as described in the contract and according to the engineersAll material, plant and workmanship shall be as described in the contract and according to the engineersinstructions. The tests may be carried out at the place of manufacture, fabrication or preparation or on the siteinstructions. The tests may be carried out at the place of manufacture, fabrication or preparation or on the siteas required by the engineer.as required by the engineer.
The contractor shall supply samples of materials, before incorporation of works for testing as may be requiredThe contractor shall supply samples of materials, before incorporation of works for testing as may be requiredby engineer.by engineer.
36.236.2 COST OF SAMPLESCOST OF SAMPLES
All samples shall be supplied by the contractor at his own cost if provided in the contract.All samples shall be supplied by the contractor at his own cost if provided in the contract.
-
8/6/2019 Fidic Redfull 87&92 Correct
21/49
36.336.3 COSTS OF TESTSCOSTS OF TESTS
-- The cost of making any test shall be borne by the contractor if such test is:The cost of making any test shall be borne by the contractor if such test is:
-- Clearly mentioned or provided in the contract.Clearly mentioned or provided in the contract.
36.436.4 COST OF TESTS NOT PROVIDED FORCOST OF TESTS NOT PROVIDED FOR
If any tests required by the engineer which is :If any tests required by the engineer which is :
Not so intended or provided for in the contract is required by engineer to be carried out at any placeNot so intended or provided for in the contract is required by engineer to be carried out at any place
other than the site or place of manufacture, fabrication or preparation.other than the site or place of manufacture, fabrication or preparation.
Shows the materials, plant, or workmanship not in accordance with the provisions of the contractShows the materials, plant, or workmanship not in accordance with the provisions of the contract
then the cost of such tests shall be borne by the contractor.then the cost of such tests shall be borne by the contractor.
36.536.5 ENGINEERS DETERMINATION WHERE TESTS NOT PROVIDED FORENGINEERS DETERMINATION WHERE TESTS NOT PROVIDED FOR
This subThis sub--clause applies where pursuant the subclause applies where pursuant the sub--clause 36.4 the engineer shall after due consultationclause 36.4 the engineer shall after due consultation
with the employer and the contractor, determine;with the employer and the contractor, determine;
Any extension of time to which the contractor is entitled and the amount of such costs, which shall beAny extension of time to which the contractor is entitled and the amount of such costs, which shall be
added to the contract price.added to the contract price.
37.137.1 INSPECTION OF OPERATIONSINSPECTION OF OPERATIONS
The engineer and any authorized person by him, shall at all times have access to the site and to allThe engineer and any authorized person by him, shall at all times have access to the site and to all
workshops and places where materials or plant are being manufactured, fabricated or prepared forworkshops and places where materials or plant are being manufactured, fabricated or prepared for
the works and the contractor shall afford facility for and every assistance in obtaining the right to suchthe works and the contractor shall afford facility for and every assistance in obtaining the right to such
access.access.
-
8/6/2019 Fidic Redfull 87&92 Correct
22/49
-
8/6/2019 Fidic Redfull 87&92 Correct
23/49
38.138.1 EXAMINATION OF WORK BEFORE COVERING UPEXAMINATION OF WORK BEFORE COVERING UP
The contractor shall afford the opportunity for the engineer to examine and measure the work whichThe contractor shall afford the opportunity for the engineer to examine and measure the work which
is about to be covered up or put out of view and to examine foundations before any part of the work isis about to be covered up or put out of view and to examine foundations before any part of the work is
placed.placed.
38.238.2 UNCOVERING AND MAKING OPENINGSUNCOVERING AND MAKING OPENINGS
The contractor shall uncover any part of work or make openings as the engineer may instruct andThe contractor shall uncover any part of work or make openings as the engineer may instruct and
shall make good such part. If any such part has been covered up or put out of view after complianceshall make good such part. If any such part has been covered up or put out of view after compliance
and is found to be executed in accordance with the contract, the engineer after consultation ofand is found to be executed in accordance with the contract, the engineer after consultation of
employer and contractor determine the amount of contractors cost of such uncovering, reinstatingemployer and contractor determine the amount of contractors cost of such uncovering, reinstating
and making good the same, shall be added to the contract price.and making good the same, shall be added to the contract price.
39.139.1 REMOVAL OF IMPROPER WORK, MATERIALS OR PLANTREMOVAL OF IMPROPER WORK, MATERIALS OR PLANT
The engineer shall have authority to issue instructions from time to time.The engineer shall have authority to issue instructions from time to time.
-- Removal from the site, of any material or plant which are not in accordance with the contract.Removal from the site, of any material or plant which are not in accordance with the contract.
-- Substitution of proper and suitable materials or plantSubstitution of proper and suitable materials or plant
-- Removal and proper reRemoval and proper re--execution, not with standing any previous test,execution, not with standing any previous test,
-- Design by he contractor or for which he is responsible is not in accordance with the contract.Design by he contractor or for which he is responsible is not in accordance with the contract.
39.239.2 DEFAULT ON THE CONTRACTOR IN COMPLIANCEDEFAULT ON THE CONTRACTOR IN COMPLIANCE
In case of default on the part of contractor the employer, shall be entitled to employ and pay otherIn case of default on the part of contractor the employer, shall be entitled to employ and pay other
person to carry out the same and all cost be determined by the engineer and shall be recoverableperson to carry out the same and all cost be determined by the engineer and shall be recoverable
from the contractor by employer.from the contractor by employer.
-
8/6/2019 Fidic Redfull 87&92 Correct
24/49
40.140.1 SUSPENSION OF WORKSUSPENSION OF WORK
The contractor shall, on the instructions of the engineer suspend the progress of work. During suchThe contractor shall, on the instructions of the engineer suspend the progress of work. During such
suspension he must protect and secure the work. Unless such suspension is;suspension he must protect and secure the work. Unless such suspension is;
-- Provided for in the contractProvided for in the contract-- Necessary in case of breach or default by the contractor.Necessary in case of breach or default by the contractor.
-- Necessary because of poor climatic conditions.Necessary because of poor climatic conditions.
-- Necessary for proper execution of work.Necessary for proper execution of work.
40.240.2 ENGINEERS DETERMINATION FOLLOWING SUSPENSION OF WORKENGINEERS DETERMINATION FOLLOWING SUSPENSION OF WORK
The engineer shall after consulting the contractor and the employer determine,The engineer shall after consulting the contractor and the employer determine,
-- Any extension of timeAny extension of time
-- The amount to be added to the contract price, due to suspensionThe amount to be added to the contract price, due to suspension..
40.340.3 SUSPENSION OF WORK FOR MORE THAN 84 DAYSSUSPENSION OF WORK FOR MORE THAN 84 DAYS
If the progress of the work is suspended for more than 84 days then the contractor can give a notice forIf the progress of the work is suspended for more than 84 days then the contractor can give a notice for
resumption of work within 28 days of receipt of order. If permission for resumption is not given within theresumption of work within 28 days of receipt of order. If permission for resumption is not given within the
said period then the contractor can consider it as termination of contract.said period then the contractor can consider it as termination of contract.
COMMENCEMENT AND DEALYSCOMMENCEMENT AND DEALYS
41.141.1 COMMENCEMENT OF WORKSCOMMENCEMENT OF WORKS
The Contractor shall commence the works as soon as is reasonably possible after the receipt by him of aThe Contractor shall commence the works as soon as is reasonably possible after the receipt by him of a
notice to this effect from the Engineer, such notice shall be issued within the time stated in the appendix tonotice to this effect from the Engineer, such notice shall be issued within the time stated in the appendix to
tender after the date of the letter of acceptance.tender after the date of the letter of acceptance.
-
8/6/2019 Fidic Redfull 87&92 Correct
25/49
42.142.1 POSSESSION OF SITE AND ACCESS THEREPOSSESSION OF SITE AND ACCESS THERE
Employer will, with the Engineers notice to commence the works, give to the contractor possessionEmployer will, with the Engineers notice to commence the works, give to the contractor possession
of so much of the site, and such access as, in accordance with the Contract, is to be provided by theof so much of the site, and such access as, in accordance with the Contract, is to be provided by the
Employer, in accordance with the programme referred to in clause 14.Employer, in accordance with the programme referred to in clause 14.
42.242.2 FAILURE TO GIVE POSSESSIONFAILURE TO GIVE POSSESSION
If employer fails to give possession of site to the contractor the Engineer shall, after due consultationIf employer fails to give possession of site to the contractor the Engineer shall, after due consultation
with the employer and the contractor, determine:with the employer and the contractor, determine:
-- Extension of timeExtension of time
-- Additional cost to be added to contract priceAdditional cost to be added to contract price
42.342.3 RIGHTS OF WAY AND FACILITIESRIGHTS OF WAY AND FACILITIES
The contractor should bear the cost for any right of way required by him for access to the site.The contractor should bear the cost for any right of way required by him for access to the site.
43.143.1 TIME FOR COMPLETIONTIME FOR COMPLETION
The complete project or any part of the project should be completed within the time specified in theThe complete project or any part of the project should be completed within the time specified in the
Appendix to tender in accordance to clause 48. If extension is given then the works are to eAppendix to tender in accordance to clause 48. If extension is given then the works are to e
completed as per clause 44.completed as per clause 44.
44.144.1 EXTENSION OF TIME FOR COMPLETIONEXTENSION OF TIME FOR COMPLETION
The contractor is entitled for extension of time, ifThe contractor is entitled for extension of time, if
-- Amount of extra work is to be doneAmount of extra work is to be done
-- Adverse climatic conditions,Adverse climatic conditions,
-- Delay due to hurdles created by employerDelay due to hurdles created by employer
-- Any special circumstance other than breach by the contractor.Any special circumstance other than breach by the contractor.
-
8/6/2019 Fidic Redfull 87&92 Correct
26/49
44.244.2 CONTRACTOR TO PROVIDE NOTIFICATION AND DETAILED PARTICULARS.CONTRACTOR TO PROVIDE NOTIFICATION AND DETAILED PARTICULARS.
The engineer is not bound to make decision regarding the extension if the contractor has not notifiedThe engineer is not bound to make decision regarding the extension if the contractor has not notified
the engineer within 28 days after such situation has aroused.the engineer within 28 days after such situation has aroused.
44.344.3 INTERIM DETERMINATION OF EXTENSIONINTERIM DETERMINATION OF EXTENSION
If it is impracticable for contractor to provide details of delay within 28 days, the extension shall still beIf it is impracticable for contractor to provide details of delay within 28 days, the extension shall still be
granted, if contractor can provide interim details. But the full details of event need to be providedgranted, if contractor can provide interim details. But the full details of event need to be provided
within 28 days of the end of the effects resulting from events.within 28 days of the end of the effects resulting from events.
45.145.1 RESTRICTION ON WORKING HOURSRESTRICTION ON WORKING HOURS
IfIf notnot specificallyspecifically mentionedmentioned inin thethe contractcontract thenthen nono workwork shouldshould bebe carriedcarried outout inin thethe nightnight oror onon locallocal
daysdays ofof restrest.. IfIf absolutelyabsolutely necessarynecessary andand unavoidableunavoidable thethe workwork atat nightnight cancan bebe allowedallowed ifif thethe
contractorcontractor takestakes priorprior permissionpermission fromfrom thethe engineerengineer..
4646..11 RATERATE OFOF PROGRESSPROGRESS
IfIf forfor anyany reasonreason thethe raterate ofof progressprogress isis delayeddelayed andand thethe contractorcontractor isis notnot entitledentitled forfor anan extensionextension thethe
engineerengineer shouldshould adviseadvise thethe contractorcontractor toto expediteexpedite hishis workwork soso asas toto completecomplete thethe projectproject inin timetime.. TheThecontractorcontractor shallshall taketake stepssteps toto expediteexpedite hishis workwork afterafter consultingconsulting thethe engineerengineer.. TheThe contractorcontractor isis notnot
entitledentitled forfor paymentpayment ofof anyany extraextra costcost incurredincurred.. IfIf anyany overtimeovertime workwork isis carriedcarried outout toto catchcatch withwith thethe
progressprogress ofof workwork.. TheThe extraextra supervisionsupervision costcost ofof employer/engineeremployer/engineer shallshall bebe deductibledeductible fromfrom thethe
contractorscontractors moniesmonies..
-
8/6/2019 Fidic Redfull 87&92 Correct
27/49
47.147.1 LIQUIDATED DAMAGES FOR DELAYLIQUIDATED DAMAGES FOR DELAY
If the contractor fails to complete the project within stipulated time then he shall pay the employerIf the contractor fails to complete the project within stipulated time then he shall pay the employer
relevant sum as mentioned in the appendix to tender as liquidated damages and not as penalty. Therelevant sum as mentioned in the appendix to tender as liquidated damages and not as penalty. The
employer is free to deduct this amount from the payment of the contractor. Still this does not relieveemployer is free to deduct this amount from the payment of the contractor. Still this does not relievethe contractor from his obligations as mentioned in the contract to complete the works.the contractor from his obligations as mentioned in the contract to complete the works.
47.247.2 REDUCTION OF LIQUIDATED DAMAGESREDUCTION OF LIQUIDATED DAMAGES
if the taking over certificate is issued for any part of work before the completion of the work then theif the taking over certificate is issued for any part of work before the completion of the work then the
amount payable as liquidated damages shall be reduced to that extent.amount payable as liquidated damages shall be reduced to that extent.
48.148.1 TAKING OVER CERTIFICATETAKING OVER CERTIFICATEWhen major part of the project has been substantially completed and passed the test of completionWhen major part of the project has been substantially completed and passed the test of completion
then the contractor can send a notice to the engineer, stating that all outstanding works will bethen the contractor can send a notice to the engineer, stating that all outstanding works will be
completed in the defect liability period with due expedition.completed in the defect liability period with due expedition.
48.248.2 TAKING OVER OF PARTSTAKING OVER OF PARTS
In accordance with the procedure of clause 48.1 the engineer shall issue on request of the contractorIn accordance with the procedure of clause 48.1 the engineer shall issue on request of the contractora taking over certificate in respect ofa taking over certificate in respect of
-- Any section for which a separate time of completion is mentioned in the original contract.Any section for which a separate time of completion is mentioned in the original contract.
-
8/6/2019 Fidic Redfull 87&92 Correct
28/49
48.348.3 SUBSTANTIAL COMPLETION OF PARTSSUBSTANTIAL COMPLETION OF PARTS
If any part of the project has been substantially completed than the engineer has the authority to issueIf any part of the project has been substantially completed than the engineer has the authority to issue
taking over certificate on receipt of such notice the contractor is liable to complete any outstandingtaking over certificate on receipt of such notice the contractor is liable to complete any outstanding
work within the defect liability period.work within the defect liability period.
48.448.4 SURFACES REQUIRING REINSTATEMENTSURFACES REQUIRING REINSTATEMENT
Unless specially mentioned any taking over certificate should not be considered as certification forUnless specially mentioned any taking over certificate should not be considered as certification for
completion of any ground or surfaces requiring reinstatement.completion of any ground or surfaces requiring reinstatement.
DEFECT LIABILITYDEFECT LIABILITY49.149.1 DEFECT LIABILITY PERIODDEFECT LIABILITY PERIOD
Defect liability period means period so named in he Appendix calculated from.Defect liability period means period so named in he Appendix calculated from.
-- The date of substantial completion of work as certified by the engineer as per clause 48 or fromThe date of substantial completion of work as certified by the engineer as per clause 48 or from
respective part completion dates.respective part completion dates.
49.249.2 COMPLETION OF OUTSTANDING WORKS AND REMEDYING DEFECTSCOMPLETION OF OUTSTANDING WORKS AND REMEDYING DEFECTS
Contractor shall complete the work if any outstanding on the date stated in the taking over certificateContractor shall complete the work if any outstanding on the date stated in the taking over certificate
as soon as practicable after such date.as soon as practicable after such date.
-- Execute all such work of amendment reconstruction and remedying defects as the engineer mayExecute all such work of amendment reconstruction and remedying defects as the engineer may
during the defect liability period or within 14 days after expiration of such period.during the defect liability period or within 14 days after expiration of such period.
-
8/6/2019 Fidic Redfull 87&92 Correct
29/49
49.349.3 COST OF REMEDYING DEFECTSCOST OF REMEDYING DEFECTS
All work referred to in clause 49.2 (b) shall be executed by the contractor at his own cost unlessAll work referred to in clause 49.2 (b) shall be executed by the contractor at his own cost unless
remedy work is due to any other cause, for which Engineer will determine addition to Contract price.remedy work is due to any other cause, for which Engineer will determine addition to Contract price.
49.449.4 CONTRACTORS FAILURE TO CARRY OUR INSTRUCTIONSCONTRACTORS FAILURE TO CARRY OUR INSTRUCTIONS
If there is any default on the part of the contractor in carrying out the work of remedy withinIf there is any default on the part of the contractor in carrying out the work of remedy within
reasonable time the employer shall be entitled to employ and pay other person whom he thinksreasonable time the employer shall be entitled to employ and pay other person whom he thinks
suitable to carry out the same work. All the cost incurred for doing the work by the other person willsuitable to carry out the same work. All the cost incurred for doing the work by the other person will
deducted from the contractors bills.deducted from the contractors bills.
50.150.1 CONTRACTOR TO SEARCHCONTRACTOR TO SEARCH
If any defects or fault appears in the work done by the contractor before the completion of the defectIf any defects or fault appears in the work done by the contractor before the completion of the defect
liability period the engineer may instruct the contractor to find out the cause of such a defect. Theliability period the engineer may instruct the contractor to find out the cause of such a defect. The
cost of such a search be added to the contract price only if the contractor is not liable for the defectcost of such a search be added to the contract price only if the contractor is not liable for the defect
caused.caused.
-
8/6/2019 Fidic Redfull 87&92 Correct
30/49
51.151.1 VARIATIONS:VARIATIONS:
If the Engineer feels the necessity to make any variations of the form, quality or quantity of theIf the Engineer feels the necessity to make any variations of the form, quality or quantity of the
Works he has the authority to instruct the Contractor to do so and the Contractor shall do any of theWorks he has the authority to instruct the Contractor to do so and the Contractor shall do any of the
following:following:a)a) Increase or decrease the quantity of any work included in the contract.Increase or decrease the quantity of any work included in the contract.
b)b) Omit any such work (but not if the omitted work is to be carried out by the Employer or byOmit any such work (but not if the omitted work is to be carried out by the Employer or by
another contractor).another contractor).
c)c) Change the character or quality or kind of any such work.Change the character or quality or kind of any such work.
d)d) Change the levels, lines, position and dimensions of any part of the works.Change the levels, lines, position and dimensions of any part of the works.
e)e) Execute additional work of any kind necessary for the completion of the works.Execute additional work of any kind necessary for the completion of the works.
f)f) Change sequence or timing of construction.Change sequence or timing of construction.
51.251.2 INSTRUCTIONS FOR VARIATIONS:INSTRUCTIONS FOR VARIATIONS:
The Contractor is not supposed to make any variation without an instruction of the Engineer. NoThe Contractor is not supposed to make any variation without an instruction of the Engineer. No
instructions are required if work execution results into increase/decrease of quantities than thoseinstructions are required if work execution results into increase/decrease of quantities than those
stated in the Bill of quantities.stated in the Bill of quantities.
52.152.1 VALUATION OF VARIATIONSVALUATION OF VARIATIONSAllAll variationsvariations andand anyany additionsadditions toto thethe ContractContract PricePrice shallshall bebe asas perper thethe ratesrates andand priceprice ofof variationsvariations
presentpresent inin thethe ContractContract.. IfIf thethe ContractContract doesdoes notnot containcontain anyany ratesrates oror pricesprices applicableapplicable toto variedvaried work,work,
thethe ratesrates andand pricesprices ofof thethe ContractContract shallshall bebe usedused asas thethe basisbasis forfor valuationvaluation.. InIn thethe eventevent ofof
disagreementdisagreement thethe EngineerEngineer shallshall notifynotify thethe ContractorContractor withwith aa copycopy toto thethe EmployerEmployer.. TillTill thethe timetime thethe
ratesrates areare agreedagreed oror fixed,fixed, thethe EngineerEngineer shallshall determinedetermine provisional provisional ratesrates oror pricesprices toto enableenable onon--
accountaccount paymentspayments toto bebe includedincluded inin certificatescertificates issuedissued inin accordanceaccordance withwith ClauseClause 6060..
-
8/6/2019 Fidic Redfull 87&92 Correct
31/49
52.252.2 POWER OF ENGINEER TO FIX RATESPOWER OF ENGINEER TO FIX RATES
TheThe EngineerEngineer shallshall determinedetermine thethe raterate forfor variedvaried workwork ifif existingexisting ratesrates inin thethe contractcontract areare
inappropriate,inappropriate, inin consultationconsultation withwith EmployerEmployer andand ContractorContractor.. IfIf agreementagreement isis notnot reachedreached onon thethe
rates,rates, thethe engineerengineer shallshall fixfix provisional provisional ratesrates whichwhich areare appropriateappropriate inin hishis opinion,opinion, toto enableenable ononaccountaccount paymentpayment forfor paymentpayment certificatescertificates issuedissued underunder clauseclause 6060,, untilluntill suchsuch timetime asas ratesrates oror pricesprices
areare agreed,agreed, providedprovided ContractorContractor oror engineerengineer hashas givengiven noticenotice ofof 1414 daysdays toto eacheach otherother aboutabout theirtheir
intentionintention toto seekseek variedvaried ratesrates..
5252..33 VARIATIONSVARIATIONS EXCEEDINGEXCEEDING 1515 PERCENTPERCENT
If,If, onon thethe issueissue ofof thethe TakingTaking--OverOver CertificateCertificate forfor thethe WholeWhole ofof thethe Works,Works, itit isis foundfound thatthat asas aa resultresult ofof::
a)a) all all variedvaried workwork valuedvalued underunder SubSub--ClauseClause 5252..11 andand 5252..22 andand
b)b) all all adjustmentsadjustments uponupon measurementmeasurement ofof thethe estimatedestimated quantitiesquantities setset outout inin thethe BillBill OfOf Quantities,Quantities,
excludingexcluding ProvisionalProvisional Sums,Sums, dayday worksworks andand adjustmentsadjustments ofof priceprice mademade underunder ClauseClause 7070 thatthat thethe
contractcontract priceprice hashas variedvaried inin excessexcess ofof 1515%% thenthen EngineerEngineer willwill decidedecide increase/decreaseincrease/decrease toto
contractcontract priceprice havinghaving regardsregards toto ContractorsContractors sitesite andand generalgeneral overheadoverhead costcost.. ThisThis changechange ifif anyany
shallshall bebe relatedrelated toto 1515%% excessexcess levellevel overover contractcontract priceprice..
5252..44 DAYDAY WORKWORK
TheThe EngineerEngineer ifif hehe feelsfeels thatthat itit isis necessary,necessary, cancan issueissue aa instructioninstruction thatthat anyany variedvaried workwork shallshall bebe
executedexecuted onon aa dayday workwork basisbasis accordingaccording toto thethe termsterms andand conditionsconditions providedprovided inin thethe dayday workwork
scheduleschedule..
-
8/6/2019 Fidic Redfull 87&92 Correct
32/49
53.153.1 NOTICE OF CLAIMSNOTICE OF CLAIMS
IfIf thethe ContractorContractor wantwant toto raiseraise anyany additionaladditional claimclaim forfor paymentpayment pursuantpursuant toto anyany provisionprovision ofof Contract,Contract,
hehe shallshall givegive aa noticenotice ofof hishis intentionsintentions toto thethe EngineersEngineers withwith aa copycopy ofof thethe EmployerEmployer withinwithin 2828 daysdays
afterafter thethe eventevent givinggiving riserise toto thethe claimclaim..
5353..22 CONTEMPORARYCONTEMPORARY RECORDSRECORDS
IfIf anyany eventevent happenshappens andand thethe ContractorContractor wantswants toto claimclaim forfor additionaladditional paymentspayments forfor suchsuch eventsevents hehe
shallshall keepkeep contemporarycontemporary recordsrecords withoutwithout necessarilynecessarily admittingadmitting thethe EmployersEmployers liabilityliability..
5353..33 SUBSTANTIATIONSUBSTANTIATION OFOF CLAIMSCLAIMS
WithinWithin 2828 daysdays oror suchsuch otherother reasonablereasonable timetime underunder SubSub--ClauseClause 5353..11,, thethe ContractorContractor shallshall sendsend toto
thethe EngineerEngineer anan accountaccount givinggiving detailsdetails ofof thethe amountamount claimedclaimed andand thethe groundsgrounds uponupon whichwhich thethe claimclaim
isis basedbased.. InIn casecase thethe eventevent givinggiving riserise toto thethe claimsclaims hashas aa continuingcontinuing effect,effect, withinwithin 2828 daysdays ofof thethe endend
ofof thethe effecteffect ofof thethe event,event, thethe ContractorContractor shallshall sendsend aa finalfinal accountaccount toto thethe EngineerEngineer..
5353..44 FAILUREFAILURE TOTO COMPLYCOMPLY
IfIf thethe ContractorContractor cannotcannot fulfillfulfill anyany ofof thethe provisionsprovisions ofof thisthis ClauseClause inin respectrespect toto anyany claimsclaims whichwhich hehedesiresdesires toto make,make, hishis entitlemententitlement toto paymentpayment shallshall notnot exceedexceed suchsuch amountamount asas thethe EngineerEngineer oror anyany
arbitratorsarbitrators appointedappointed underunder subsub--ClauseClause 6767..33 andand assessingassessing thethe claimsclaims considersconsiders toto bebe verifiedverified byby
contemporarycontemporary recordsrecords..
-
8/6/2019 Fidic Redfull 87&92 Correct
33/49
53.553.5 PAYMENT OF CLAIMSPAYMENT OF CLAIMS
TheThe ContractorContractor shallshall bebe entitledentitled toto havehave includedincluded inin anyany interiminterim paymentpayment certifiedcertified byby thethe EngineerEngineer
pursuantpursuant toto ClauseClause 6060 suchsuch amountamount inin respectrespect ofof anyany claimclaim asas thethe Engineer,Engineer, maymay considerconsider duedue toto thethe
ContractorContractor providedprovided thatthat thethe ContractorContractor hashas suppliedsupplied sufficientsufficient particularsparticulars toto enableenable thethe EngineerEngineer totodeterminedetermine thethe amountamount duedue.. IfIf thethe particularsparticulars areare insufficientinsufficient toto substantiatesubstantiate thethe wholewhole ofof thethe claimclaim
thenthen thethe ContractorContractor shallshall bebe paidpaid onlyonly forfor thatthat partpart ofof thethe claimclaim forfor whichwhich thethe particularsparticulars maymay
substantiatesubstantiate toto thethe satisfactionsatisfaction ofof thethe EngineerEngineer..
5454..11 CONTRACTORSCONTRACTORS EQUIPMENT,EQUIPMENT, TEMPORARYTEMPORARY WORKSWORKS ANDAND MATERIALSMATERIALS
AllAll thethe ContractorsContractors Equipment,Equipment, TemporaryTemporary worksworks andand MaterialsMaterials providedprovided byby thethe ContractorContractor whenwhen
onceonce broughtbrought onon toto thethe Site,Site, shouldshould bebe usedused exclusivelyexclusively forfor thethe executionexecution ofof worksworks andand thethe ContractorContractor
shallshall notnot removeremove thethe samesame withoutwithout thethe consentconsent ofof thethe EngineerEngineer..
5454..22 EMPLOYEREMPLOYER NOTNOT LIABLELIABLE FORFOR DAMAGEDAMAGE
TheThe EmployerEmployer shallshall notnot atat anyany timetime bebe liable,liable, savesave asas mentionedmentioned inin ClausesClauses 2020 andand 6565,, forfor thethe lossloss ofof
oror damagedamage toto anyany ofof thethe saidsaid ContractorsContractors Equipment,Equipment, TemporaryTemporary WorksWorks oror MaterialsMaterials..
5454..33 CUSTOMSCUSTOMS CLEARANCECLEARANCE
TheThe EmployerEmployer willwill trytry hishis levellevel bestbest inin helpinghelping thethe ContractorContractor inin obtainingobtaining clearanceclearance throughthrough thethe
CustomsCustoms ofof ContractorsContractors Equipment,Equipment, materialsmaterials andand otherother thingsthings requiredrequired forfor thethe WorksWorks..
-
8/6/2019 Fidic Redfull 87&92 Correct
34/49
54.454.4 RERE--EXPORT OF CONTRACTORS EQUIPMENTEXPORT OF CONTRACTORS EQUIPMENT
IfIf thethe ContractorContractor hashas importedimported anyany EquipmentEquipment forfor thethe purposespurposes ofof thethe Works,Works, thethe EmployerEmployer willwill useuse
hishis bestbest endeavorsendeavors toto assistassist thethe ContractorContractor inin seekingseeking GovernmentGovernment consentconsent toto rere--exportexport..
5454..55 CONDITIONSCONDITIONS OFOF HIREHIRE OFOF CONTRACTORSCONTRACTORS EQUIPMENTEQUIPMENT
InIn casecase ofof terminationtermination ofof contract,contract, thethe employeremployer isis freefree toto useuse ContractorsContractors equipmentequipment atat sitesite byby payingpaying
hirehire--chargescharges andand requestingrequesting forfor thisthis withinwithin sevenseven daysdays ofof terminationtermination..
5454..66 COSTSCOSTS FORFOR THETHE PURPOSEPURPOSE OFOF CLAUSECLAUSE 6363
InIn thethe eventevent ofof thethe EmployerEmployer enteringentering intointo anyany agreementagreement forfor thethe hirehire ofof ContractorsContractors EquipmentEquipment
pursuantpursuant toto SubSub--ClauseClause 5454..55,, allall sumssums properlyproperly paidpaid byby thethe EmployerEmployer andand allall costscosts incurredincurred byby himhim
shallshall bebe deemed,deemed, forfor thethe purposepurpose ofof ClauseClause 6363,, toto bebe partpart ofof thethe costcost ofof executingexecuting andand completingcompleting thethe
WorksWorks andand thethe remedyingremedying ofof anyany defectsdefects thereintherein..
5454..77 INCORPORATIONINCORPORATION OFOF CLAUSECLAUSE ININ SUBSUB--CONTRACTSCONTRACTS
TheThe ContractorContractor whilewhile enteringentering thethe executionexecution ofof anyany partpart ofof thethe worksworks shallshall keepkeep thethe provisionsprovisions ofof thisthis
clauseclause inin relationrelation toto ContractorsContractors Equipment,Equipment, TemporaryTemporary WorksWorks oror MaterialsMaterials broughtbrought onon toto thethe SiteSite bybythethe SubSub--ContractorContractor alsoalso..
5454..88 APPROVALAPPROVAL OFOF MATERIALSMATERIALS NOTNOT IMPLIEDIMPLIED
TheThe operationoperation ofof thisthis ClauseClause shallshall notnot bebe deemeddeemed toto implyimply anyany approvalapproval byby thethe engineerengineer ofof thethe
materialmaterial oror otherother mattersmatters referredreferred.. EngineerEngineer isis alsoalso freefree toto rejectreject atat anyany timetime..
-
8/6/2019 Fidic Redfull 87&92 Correct
35/49
55.155.1 QUANTITIESQUANTITIES
TheThe quantitiesquantities providedprovided inin thethe BillBill ofof QuantitiesQuantities areare thethe estimatedestimated quantitiesquantities ofof workwork andand areare notnot thethe
actualactual oror correctcorrect quantitiesquantities whichwhich aa ContractorContractor isis supposedsupposed toto dodo underunder aa contractcontract..
5656..11 WORKSWORKS TOTO BEBE MEASUREDMEASURED
TheThe EngineerEngineer shallshall measuremeasure thethe valuevalue ofof thethe worksworks donedone inin accordanceaccordance withwith thethe contractcontract andand thethe
ContractorContractor shallshall bebe paidpaid inin accordanceaccordance toto ClauseClause 6060..
ForFor PermanentPermanent WorksWorks whichwhich areare measuredmeasured byby recordsrecords andand drawings,drawings, thethe EngineerEngineer shallshall prepareprepare thethe
measurementmeasurement andand thethe ContractorContractor whenwhen calledcalled uponupon inin writingwriting toto examineexamine andand agreeagree themthem shallshall dodo soso
withinwithin 1414 daysdays andand signsign themthem.. IfIf thethe ContractorContractor doesdoes notnot signsign themthem theythey areare deemeddeemed correctcorrect.. IfIf thethecontractorcontractor afterafter examinationexamination findsfinds themthem incorrectincorrect hehe shallshall withinwithin 1414 daysdays ofof suchsuch examinationexamination sentsent aa
noticenotice ofof hishis disdis--agreementagreement withwith thethe EngineerEngineer whowho shallshall reviewreview thethe recordsrecords andand drawingsdrawings andand eithereither
confirmconfirm oror varyvary themthem..
5757..11 METHODMETHOD OFOF MEASUREMENTMEASUREMENT
TheThe worksworks shallshall bebe measuredmeasured net,net, notnot withstandingwithstanding anyany generalgeneral oror locallocal custom,custom, exceptexcept wherewhere
otherwiseotherwise providedprovided forfor inin thethe contractcontract..
5757..22 BREAKDOWNBREAKDOWN OFOF LUMPLUMP SUMSUM ITEMSITEMS
WihtinWihtin 2828 daysdays afterafter thethe receiptreceipt ofof thethe LetterLetter OfOf Acceptance,Acceptance, thethe ContractorContractor shallshall submitsubmit inin
accordanceaccordance withwith clauseclause 6060..11 aa breakdownbreakdown forfor eacheach ofof thethe lumplump sumsum itemsitems whichwhich areare containedcontained inin thethe
tendertender.. SuchSuch breakdownsbreakdowns shallshall bebe subjectsubject toto approvalapproval ofof EngineerEngineer..
-
8/6/2019 Fidic Redfull 87&92 Correct
36/49
58.158.1 DEFINITION OF PROVISIONAL SUMDEFINITION OF PROVISIONAL SUM
ProvisionalProvisional SumSum meansmeans aa sumsum (if(if any)any) whichwhich isis specifiedspecified inin thethe contractcontract asas aa provisionalprovisional sumsum..
ProvisionalProvisional SumSum shallshall onlyonly bebe usedused inin wholewhole oror inin part,part, inin accordanceaccordance withwith thethe EngineersEngineers instructionsinstructions
andand thethe ContractContract PricePrice shallshall bebe adjustedadjusted accordinglyaccordingly..
5858..22 USEUSE OFOF PROVISIONALPROVISIONAL SUMSSUMS
TheThe engineerengineer shallshall havehave authorityauthority toto issueissue instructioninstruction forfor thethe executionexecution ofof workwork oror forfor supplysupply ofof goodsgoods
oror servicesservices underunder provisionalprovisional sumsum..
5858..33 PRODUCTIONPRODUCTION OFOF VOCHERSVOCHERS
TheThe ContractorContractor shall,shall, whenwhen requiredrequired byby thethe Engineer,Engineer, produceproduce quotations,quotations, invoices,invoices, vouchersvouchers andand
accountsaccounts oror receiptsreceipts inin connectionconnection withwith thethe expenditureexpenditure mademade underunder thethe ProvisionalProvisional Sums,Sums, exceptexcept
wherewhere workwork isis valuedvalued inin accordanceaccordance withwith thethe ratesrates oror pricesprices setset outout inin thethe TenderTender..
5959..11 DEFINITIONDEFINITION OFOF NOMINATEDNOMINATED SUBCONTRACTORSUBCONTRACTOR
AllAll specialist,specialist, merchants,merchants, tradesmenstradesmens supplyingsupplying anyany goods,goods, material,material, plantplant oror servicesservices forfor whichwhich
provisionalprovisional sumssums areare includedincluded inin thethe contract,contract, andand allall personspersons toto whomwhom byby valuevalue ofof thethe provisionsprovisions ofofthethe contractcontract thethe contractorcontractor isis requiredrequired toto subcontractsubcontract shall,shall, inin thethe executionexecution ofof suchsuch workwork bebe deemeddeemed
toto bebe subcontractorssubcontractors toto thethe contractorcontractor andand areare referredreferred toto inin thethe contractcontract asas NominatedNominated
SubcontractorsSubcontractors..
5959..22 NOMINATEDNOMINATED SUBCONTRACTORSSUBCONTRACTORS;; OBJECTIONOBJECTION TOTO NOMINATIONNOMINATION
TheThe ContractorContractor shallshall notnot bebe requiredrequired byby EmployerEmployer oror EngineerEngineer toto bebe underunder anyany obligationobligation toto employemploy
anyany nominatednominated subcontractorsubcontractor againstagainst whomwhom contractorcontractor maymay raiseraise reasonablereasonable objectionobjection oror whowho
-
8/6/2019 Fidic Redfull 87&92 Correct
37/49
declinesdeclines toto enterenter intointo subsub contractcontract withwith contractorcontractor containingcontaining provisionprovision..
a)a) TheThe nominatednominated subsub contractorcontractor willwill undertakeundertake towardstowards thethe contractorcontractor obligationobligation andand liabilitiesliabilities
towardstowards thethe EmployerEmployer arisingarising outout ofof anyany failurefailure toto performperform suchsuch obligationsobligations..
b)b) TheThe nominatednominated subcontractorsubcontractor willwill savesave harmlessharmless andand indemnityindemnity thethe contractorcontractor fromfrom andand againstagainstanyany negligencenegligence byby nominatednominated subcontractor,subcontractor, hishis menmen andand fromfrom anyany mistakemistake byby himhim..
5959..33 DESIGNDESIGN REQUIREMENTSREQUIREMENTS TOTO BEBE EXPRESSLYEXPRESSLY STATEDSTATED
IfIf inin thethe connectionconnection withwith anyany provisionalprovisional sumsum thethe serviceservice toto bebe providedprovided inin toto anyany matermater ofof designdesign oror
specification,specification, s