feasibility study schemes: · scheme 1—renovating and expanding the meetinghouse. this scheme...

25

Upload: barrie-strickland

Post on 23-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Feasibility Study Schemes:

· Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to a social space and central circulation space, and constructs a new sanctuary behind it.

· Scheme 2—Building a new meetinghouse on a different (hypothetical) site. This scheme proposes a new, single-story building on an open site as near as possible to Amherst Center.

· Scheme 3—Building a new meetinghouse on the current site. This scheme removes the original meetinghouse and builds new, with the sanctuary facing North Pleasant Street, and the social space to the rear.  

COST COMPARISONS

ACTUAL TOTAL – 12,900 SQ.FT.

PREFERRED DESIGN – FLOOR PLANS

UPPER LEVEL – 6700 SQ.FT.

LOWER LEVEL – 6200 SQ.FT.

PREFERRED DESIGN – PERSPECTIVE VIEWS

View from North Pleasant Street View from Kellogg Street

Interior of sanctuary

PREFERRED DESIGN - COST

PROJECT COST SUMMARY

Building Construction Cost $2.8 to $3.1 MillionSite Development Cost $200,000Soft Cost $750,000 to $825,000 Total Project Cost $3.8 to $4.1 Million  Taken together, the Building Construction Cost and the Site Development Cost represent the portion of the overall project that a future builder would be contracted to complete.  Soft Costs are the third component in the Total Project Costs. Soft Costs include those portions of a project outside of the builder’s scope of work, and include items such as architectural and engineering fees and reimbursable expenses, furnishings, environmental and soils engineering, legal services, testing during construction and a construction contingency allowance. Based on our experience Soft Costs are generally about 25% of Construction Cost.

SCHEME - A

SCHEME A – PHASE ONE - NEW ADDITION AND NEW PARKING

NEW 13-CAR PARKING LOT

NEW ADDITION

SANCTUARY PORTION OF EXISTING STRUCTURE TO REMAIN IN PHASE ONE

PROPOSED PHASE ONE

EXISTING

PORTION OF EXISTING STRUCTURE TO BE REMOVED AS PART OF PHASE ONE

SCHEME A - PHASE ONE - NEW ADDITION AND NEW PARKING

LOWER LEVEL – 3,350 SQ.FT.

UPPER LEVEL – 3,490 SQ.FT.

TOTAL NEW AREA PHASE ONE 6,840 SQ.FT.

SCHEME A - PHASE TWO – NEW SANCTUARY ADDTION

PHASE ONE

PHASE TWO ADDITION (NEW SANCTUARY)

PROPOSED PHASE TWO

PHASE ONE

REMAINDER OF EXISTING STRUCTURE TO BE REMOVED AS PART OF PHASE TWO

PHASE TWO – NEW SANCTUARY ADDITION

LOWER LEVEL – 3,410 SQ.FT.

UPPER LEVEL – 3,490 SQ.FT.

TOTAL PHASE ONE AREA 6,840 SQ.FT.TOTAL PHASE TWO AREA 6,900 SQ.FT.TOTAL 13,740 SQ.FT.

SCHEME B

SCHEME B - PHASE ONE – NEW ADDITION AND NEW PARKING

NEW 6 CAR PARKING LOT

NEW ADDITION

ENTIRE EXISTING STRUCTURE TO REMAIN IN PHASE ONE

PROPOSED PHASE ONE

EXISTING

PHASE ONE – NEW ADDITION AND NEW PARKING

LOWER LEVEL – 3,000 SQ.FT.

UPPER LEVEL – 3,400 SQ.FT.

TOTAL NEW AREA PHASE ONE 6,400 SQ.FT.

PHASE TWO – NEW SANCTUARY ADDTION

PHASE ONE

PHASE TWO ADDITION (NEW SANCTUARY)

PROPOSED PHASE TWO

PHASE ONE

ENTIRE EXISTING STRUCTURE TO BE REMOVED AS PART OF PHASE TWO

PHASE TWO – NEW SANCTUARY ADDITION

LOWER LEVEL – 3,200 SQ.FT.

UPPER LEVEL – 3,300 SQ.FT.

TOTAL PHASE ONE AREA 6,400 SQ.FT.TOTAL PHASE TWO AREA 6,500 SQ.FT.TOTAL 12,900 SQ.FT.

PHASED CONSTRUCTION - COST

PROJECT COST SUMMARY – PHASED CONSTRUCTION

PHASE ONEBuilding Construction Cost $1.5 to $1.7 MillionSite Development Cost $100,000Soft Cost $375,000 to $425,000Phase One Subtotal $2.0 to $2.2 Million

PHASE TWO*Building Construction Cost $1.3 to $1.4Site Development Cost $100,000Soft Cost $325,000 to $350,0000Phase Two Subtotal $1.7 to $1.9 Million

Total Both Phase* $3.7 to $4.1 Million

*Note Phase Two costs and Total cost for both phases are in today’s dollars with no attempt to adjust for inflation. 

UNITARIAN UNIVERSALIST SOCIETY OF AMHERST

CAPITAL CAMPAIGN SCHEMATIC DESIGN – SITE PLAN

existing 15 car parking lot

Nort

h Ple

asa

nt

Str

eet

Kellogg Street

CAPITAL CAMPAIGN SCHEMATIC DESIGN – SITE PLAN

New 13 car parking lot

Nort

h Ple

asa

nt

Str

eet

Kellogg Street

CAPITAL CAMPAIGN SCHEMATIC DESIGN – VIEWED FROM SOUTH WEST

North Pleasant Street

Kellogg Street

New 13 car parking lot

North Pleasant Street

Kellogg Stre

et

New 13 car parking lot

CAPITAL CAMPAIGN SCHEMATIC DESIGN – VIEWED FROM NORTH WEST

ACTUAL TOTAL – 12,900 SQ.FT.

CAPITAL CAMPAIGN SCHEMATIC DESIGN – FLOOR PLANS

UPPER LEVEL – 6700 SQ.FT.

LOWER LEVEL – 6200 SQ.FT.

CAPITAL CAMPAIGN SCHEMATIC DESIGN – PERSPECTIVE VIEWS

View from North Pleasant Street View from Kellogg Street

Interior of sanctuary

CAPITAL CAMPAIGN SCHEMATIC DESIGN - COST

PROJECT COST SUMMARY

Building Construction Cost $2.8 to $3.1 MillionSite Development Cost $200,000Soft Cost $750,000 to $825,000 Total Project Cost $3.8 to $4.1 Million  Taken together, the Building Construction Cost and the Site Development Cost represent the portion of the overall project that a future builder would be contracted to complete.  Soft Costs are the third component in the Total Project Costs. Soft Costs include those portions of a project outside of the builder’s scope of work, and include items such as architectural and engineering fees and reimbursable expenses, furnishings, environmental and soils engineering, legal services, testing during construction and a construction contingency allowance. Based on our experience Soft Costs are generally about 25% of Construction Cost.