  • 8/19/2019 FDN Checklist

    1/12

     (A Government of India Enterprise)

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    PIT MARIN!

    Location No.:…………….. Tower Type :…………………

    i) Approved Drg. Nos """""""""""##

    ii) Reference Level """""""""""##

    iii) Alignment of Loc. w.r.t. previous and next Loc. O.K NOT O.K 

    iv) O.K NOT O.K  

    v) !E" NO

    vi) Span on both sides of Loc. As per pro#$e Act%a$trs trs

    a) Preceding span Loc. No.)

     b) Succeeding span Loc. No.)

    vii) Angle of deviation and bisection in case of angle tower loc. As per pro#$e Act%a$

    a) Angle of deviation

     b) !isection found O.K NOT O.K 

    viii) Position of cross pegs in transverse direction O.K NOT O.K 

    i') Position of all four pits are on leveled ground and safe  !E" NO

    ') Dimensions of pit mar"ing are as per drawings O.K NOT O.K 

    'i)  !E" NO

     !E" NO

    ……………………..%.m.

    Certificate : Cleared for Excavation

    $%R C%NTRACT%R $%R P%&ER!RI'

    "inat%re : ******************* "inat%re : *******************  

    Name : ******************* Name : *******************  

    +esination : ******************* +esination : (E, E- E)

    +ate : ******************* +ate : *******************  

    /O0E1 G1I+ O1/O1ATION O2IN+IA LI&ITE+

     345

    Loc. of centre peg#position of various land mar"s are matchingas per profile.

    An$ new features on ground w.r.t profile necessitatingrealignment#shifting of Loc. or due to an$ other reasons.

     

  • 8/19/2019 FDN Checklist

    2/12

     (A Government of India Enterprise)

    Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    E6CAATI%N

    Location No.:…………….. Tower Type :………………… Type of 2o%ndation :……………..

    0l# No# DESCRIPTION ACCEPTABILIT7 

    , Pit Dimensional (onformit$

    A

    !

    (

    D

    - erticalit$ * S&uareness of Pit

    A

    !

    (

    D

    +ndercutting erification if an$)

    A

    !

    (

    D

    Certificate : Cleared for Lean Concrete

    $%R C%NTRACT%R $%R P%&ER!RI'

    "inat%re : ******************* "inat%re : *******************  

    Name : ******************* Name : *******************  

    +esination : ******************* +esination : (E, E- E)

    +ate : ******************* +ate : *******************  

    /O0E1 G1I+ O1/O1ATION O2IN+IA LI&ITE+

  • 8/19/2019 FDN Checklist

    3/12Pa e 3 of 12

     (A Government of India Enterprise)

    Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    $%8N'ATI%N CLA00I$ICATI%N

    Location No.:…………….. Tower Type :…………………

    i) Stratawise pit details (Orai)R,(,''N- ,ND

    SRAA D,P/ SRAA D,P/

    P' ( P' !

    SRAA D,P/ SRAA D,P/

    P' D S,ND'N- ,ND P' A

    0abalpur)

    Note : Classification may also e !iven on trial "it or one "it excavation asis#

    a) Predominant soil

    ii) Sub soil water table details as on date 1

    PIT $ PIT % PIT C PIT D

    iii) %ater table in nearb$ well as on date 2222.mtrs

    iv) 3ax. Subsoil water table in monsoon season after thorough local en&uir$ 2222.mtrs

    v) Surface water table on ground in monsoon season * its duration 222.mtrs for 22.da$s

    vi) $pe of cultivation Padd$ fields # (ultivated land # !arren land

    %hether encasement of stubs re&uired due to surface water 4,S # N5

    'f 4es6 height of encasement above ground level 2222..mtrs

    vii) %hether soil investigation carried out at this location or nearb$ location Loc. No2222.

    /O0E1 G1I+ O1/O1ATION O2IN+IA LI&ITE+

    rial Pit details #!ore leg details

  • 8/19/2019 FDN Checklist

    4/12Pa e 4 of 12

    viii)Loc. No2222.

    i') Details of Soil 'nvestigation Report 1

    a) SRAA D,P/

     b) Subsoil water table 2222mtrs

    c) +ltimate bearing capacit$

    2222degrees

    ') 7oundation (lassification proposed b$ contractor 2222222.

    'i) 7oundation (lassification recommended

    $ct&al

    Remar"s # Reasons 1

    $%R C%NTRACT%R $%R P%&ER!RI'

    "inat%re : ******************* "inat%re : *******************  

    Name : ******************* Name : *******************  

    +esination : ******************* +esination : (E, E- E)

    +ate : ******************* +ate : *******************  

    $""roval

    Site visited on 22222222222222222222..and details verified.

    he classification of foundation is approved as 222222222222222..

    $%R P%&ER!RI'

    "inat%re : ******************* 

    Name : ******************* 

    (Line Inc3are Gro%p 4ead)

    'f this location strata details are comparable with above soilinvestigation reports or an$ other location of this line

    2222."g#m8

    d) Angle of Repose 5)

    $s "er SoilInv#

  • 8/19/2019 FDN Checklist

    5/12Pa e 5 of 12

    +ate : ******************* 

  • 8/19/2019 FDN Checklist

    6/12

     (A Government of India Enterprise)

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    0T8B 0ETTIN!Location No.:…………….. Tower Type :…………………

    i) Approved Drg. Nos """"""""""

    ii) Pit Dimensions """"""""""

    a) Depth of Pits 7rom Ref. Level -round Level

    P' A

    P' !

    P' (

    P' D

     b) Pit dimensions are as per approved foundation classification 4,S # N5c) ,xcavated soil is "ept 8 m awa$ from pit edge 4,S # N5

    d) +nder cutting done in case of fissured roc"s 4,S # N5

    iii) Alignment of emplate

    a) angent ower 

    a.a) 'n the direction of line 4,S # N5

     b) Angle ower 

     b.a) Angle of Deviation

     b.b) Alignment of emplate on bisection 4,S # N5

    iv) Diagonals of emplate

    A( 22222.m

    !D 22222.mP9 : Line of !isection Lines AD and !( are Perpendicular to P9)

    ST'% SETTIN ON %ISECTION

    v) Level of emplate chec"ed b$ dump$ level # water tube level 4,S # N5vi) /eight of emplate above ground level 5; # N5 5;  

    vii)Leg A 22222cm

    Leg ! 22222cm

    Leg ( 22222cm

    Leg D 22222cm

    viii) 4,S # N5

    i') All members of emplate are fixed as per drawing and full$ tightened 4,S # N5

    ') (hec"ing of Stubs

    a) Stub dimensions are as per t$pe of ower 4,S # N5

    4,S # N5

    Certificate : St& Settin! $""roved

    $%R C%NTRACT%R $%R P%&ER!RI'

    "inat%re : ******************* "inat%re : *******************  

    N N

    /O0E1 G1I+ O1/O1ATION O2IN+IA LI&ITE+

      1

    #degrees

    5 : Angle of Deviation

    (learance between lowest part of stub and base of pit Notless than

  • 8/19/2019 FDN Checklist

    7/12

     (A Government of India Enterprise)

    Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    C%N0TR8CTI%N MATERIAL0

    Location No.:………… Tower Type :…………… Type of 2o%ndation :…………

    Sl# No# Descri"tion Acce.tabilit9< 9ualit$ # 9uantit$ of sand as per approved drawings and specifications 5; # N5 5; 

    9uantit$ Re&uired 9uantit$ Available Approved Source 9ualit$

    8 9ualit$ # 9uantit$ of metal as per approved drawings and specificationsSi>e 9uantit$ Re&uired 9uantit$ Available Approved Source 9ualit$

    8? mm

    @? mm

    Dimensions of 3easuring box ? cm x ? cm x B cm /eight) 5; # N5 5;  

    @ Proportions of nominal mix

    9uantit$ of (oarse Aggregate 9uantit$ of 7ine Aggregate 9uantit$ of (ement 9uantit$ of %ater 

    3C

  • 8/19/2019 FDN Checklist

    8/12

     (A Government of India Enterprise)Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    LEAN C%NCRETIN!

    Location No.:………… Tower Type :…………… Type of 2o%ndation :…………

    Sl# No# Descri"tion Acce.tabilit9

    < Pits are free from all foreign materials 4,S # N5

    8

    4,S # N5 3ix ratio

  • 8/19/2019 FDN Checklist

    9/12

     (A Government of India Enterprise)

    Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    IN0TALLATI%N %$ REIN$%RCEMENT 0TEEL $%RM B%6

    Location No.:………… Tower Type :…………… Type of 2o%ndation :…………

    Sl# No# DESCRIPTION ACCEPTABILIT7 

    - $""roved Dra.in!s Nos#

    / Reinforcement Steel

    a) 9ualit$ # 9uantit$ as per Specifications 4,S # N5

     b) !ending # Placing as per approved drawing 4,S # N5

    c) 4,S # N5

    d) !inding done as per specifications 4,S # N5

    e) An$ undue stress or bending of steel bars 4,S # N5

    f) Steel is clean * free from loose rust or an$ other foreign materials 4,S # N5

    g) Position of bars with respect to stub as per drawing 5; # N5 5;  

    0 ,orm %oxes

    a) Dimensions as per approved drawing 5; # N5 5;  

     b) Placing with respect to stub as per approved drawing 5; # N5 5; 

    c) !olts * Nuts are watertight 4,S # N5

    @ (lear cover of =? mm or as per specification available) 4,S # N5

    = ,arth Strips fixed as per approved drawing 4,S # N5

    Certificate : Cleared for ,o&ndation Castin!

    $%R C%NTRACT%R $%R P%&ER!RI'

    "inat%re : ******************* "inat%re : *******************  

    Name : ******************* Name : *******************  

    +esination : ******************* +esination : (E, E- E)

    +ate : ******************* +ate : *******************  

    /O0E1 G1I+ O1/O1ATION O2IN+IA LI&ITE+

    Re&uired number of chairs approved 3in. Dia. C

  • 8/19/2019 FDN Checklist

    10/12

  • 8/19/2019 FDN Checklist

    11/12 

    (A Government of India Enterprise)Project : ()* + '/C -abal.ur Poolin 0tation 1 %rai Transmission Line 2P! : TE 345

    Name of Contractor : M/s Bajaj Electricals Limited, Mumbai

    MI6IN!, PLACIN! AN' C%MPACTI%N %$ C%NCRETE

    Location No.:………… Tower Type :…………… Type of 2o%ndation :…………

    Sl# No# Descri"tion Acce.tabilit9

    < Approved Drawings Nos.

    8 3ix Ratio

    a) 7or p$ramid # base with @? mm metal with ratio

  • 8/19/2019 FDN Checklist

    12/12

    Sl# No# Descri"tion Acce.tabilit9