i EXECUTIVE SUMMARY The Community-Based Forest Management Program (CBFMP) revolutionized forest development and rehabilitation efforts of the government when it was institutionalized in 1995 by virtue of Executive Order No. 263. Before the adoption of the CBFM approach, the sole motivating factor of contract reforestation awardees was primarily financial gains. With the implementation of the Forestry Sector Project (FSP) using CBFM as its main strategy to rehabilitate the upland ecosystem, it empowered beneficiary communities economically, socially, technically and politically while transforming them into environmentally responsible managers. The tenurial right to develop subproject sites alongside the various inputs from the Subproject deepened their commitment to collaborate with other stakeholders in the implementation of these subprojects. The Mananga-Kotkot-Lusaran Watershed Subproject is in Cebu Province and covers the cities of Cebu, Talisay and Danao and the municipalities of Minglanilla, Lilo-an, Consolacion, Compostela and Balamban. The rehabilitation of the MKL Watershed is significant considering the declining underground water supply aggravated by salt-water intrusion on the one hand and the continuing and pressing demand for water for Metro Cebu’s industries and residents on the other. The implementation of Comprehensive Site Development ( CSD ) activities for the MKL Subproject involved the participation of 13 People’s Organizations to cover the entire expanse of the three watersheds. With an original target of 5,688 hectares, accomplishment reached only a total of 4,920.75 hectares due to the heavy damage caused by the El Nino phenomenon in 1998 to some 1.0 million seedlings. Realignment of targets focused development and maintenance activities on the improvement of these 4,920.75 hectares. The CSD activities as well as Infrastructure Development nevertheless provided employment to the local community as well as some technical persons in need of work. A total of 498,685 man days were generated that resulted to an estimated increase of 59% in the average annual household income from PHP 15,976 before the project to PHP 25,330 during the project. The Subproject has succeeded in diverting concentration on forest- based source of income to non-forest based income sources as PO members invested part of the PHP 1,868,709.56 Community Forest Development Fund on various livelihood projects.

Upload: others

Post on 31-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • i

    EXECUTIVE SUMMARY

    The Community-Based Forest Management Program (CBFMP)

    revolutionized forest development and rehabilitation efforts of the government

    when it was institutionalized in 1995 by virtue of Executive Order No. 263.

    Before the adoption of the CBFM approach, the sole motivating factor of

    contract reforestation awardees was primarily financial gains. With the

    implementation of the Forestry Sector Project (FSP) using CBFM as its main

    strategy to rehabilitate the upland ecosystem, it empowered beneficiary

    communities economically, socially, technically and politically while transforming

    them into environmentally responsible managers. The tenurial right to develop

    subproject sites alongside the various inputs from the Subproject deepened

    their commitment to collaborate with other stakeholders in the implementation

    of these subprojects.

    The Mananga-Kotkot-Lusaran Watershed Subproject is in Cebu Province

    and covers the cities of Cebu, Talisay and Danao and the municipalities of

    Minglanilla, Lilo-an, Consolacion, Compostela and Balamban. The rehabilitation of

    the MKL Watershed is significant considering the declining underground water

    supply aggravated by salt-water intrusion on the one hand and the continuing

    and pressing demand for water for Metro Cebu’s industries and residents on

    the other.

    The implementation of Comprehensive Site Development ( CSD )

    activities for the MKL Subproject involved the participation of 13 People’s

    Organizations to cover the entire expanse of the three watersheds. With an

    original target of 5,688 hectares, accomplishment reached only a total of

    4,920.75 hectares due to the heavy damage caused by the El Nino phenomenon

    in 1998 to some 1.0 million seedlings. Realignment of targets focused

    development and maintenance activities on the improvement of these 4,920.75

    hectares.

    The CSD activities as well as Infrastructure Development nevertheless

    provided employment to the local community as well as some technical persons in

    need of work. A total of 498,685 man days were generated that resulted to an

    estimated increase of 59% in the average annual household income from PHP

    15,976 before the project to PHP 25,330 during the project.

    The Subproject has succeeded in diverting concentration on forest-

    based source of income to non-forest based income sources as PO members

    invested part of the PHP 1,868,709.56 Community Forest Development Fund on

    various livelihood projects.

  • ii

    In terms of infrastructure, beneficiaries find the farm-to-market roads,

    the hanging bridges and footbridges very helpful in facilitating mobility and

    ease in transporting their farm products to places of commerce. The irrigation

    system and water supply structures on the other hand supplement water supply

    requirements of the communities.

    The MKL Subproject suffered several setbacks in its implementation but

    the same problems had taught valuable insights to both implementers and

    beneficiaries.

  • LIST OF ACRONYMS

    ANR Assisted Natural RegenerationAP Assisting ProfessionalBAKANTI Banikanhong Kapunongan Alang sa Nasudnong TingusbwanCBFM Community Based Forest ManagementCBFMP Community Based Forest Management Program

    CCCICSM Central Cebu Center for Integrated Catchment System ManagementCCIC CENRO Composite Inspection CommitteeCCNP Central Cebu National ParkCO Community OrganizingCOMMITTA Camp 4 - Manipis - Minglanilla - ToongCOSU Community Organizing and Strengthening UnitSCD Comprehensive Site Development COSW Cebu Uniting for Sustainable WaterDA Department of AgricultureFORI Forest Reseach DevelopmentGIS Geographical Information SystemIEC Information, Education and CommunicationIGP Income Generating ProjectIPBA Institutional Project Benefits AssessmentJBIC Japan Bank International CooperationKLRWFR Kot-kot Lusaran River Watershed Forest ReserveLFA Licos Farmers AssociationLGU Local Government UnitM & E Monitoring and InformationMALTAJ Maghaway-Lagtang-Tapul-JaclupanMCFA Mulao Compostela Farmers AssociationMFMFC Mulao Compostela Farmers Multipurpose CooperativeMWFR Mananga Watershed Forest ReserveNAGMATA Nagkahiusang Grupo sa mga Mag-uuma sa Tag-ubiNGO None-Government OrganizationOECF Overseas Economic Cooperation FundOIDCI Orient Integrated DevelopmentPCEEM Philippine Canadian Environmental and Economic Management ProjectPO Peoples OrganizationPSBA Pamutan Sang Daku Buot - Taop Assn.PSMPC Pung-ol Sibugay Multipurpose CooperativeRAFI Ramon Aboitiz FoundationSDMU Site Development and Management UnitSEC Security Exchange CommisionSMP Survey, Mapping and PlanningSNP Sudlon National ParkSSSFAI Sinsin-Sudlon I Sudlon II Farmers Assn.SUSIMO Subproject Site Management officeTMPC Tabla Multipurpose CooperativeUFMPC United Farmers Multipirpose CooperativeVBU Validation and Billing UnitWFP Work and Financial Plan

  • TABLE OF CONTENTS

    Executive Summary ------------------------------------------------------------------ i

    I. Subproject Description ----------------------------------------------------------- 1

    1. Purpose/ Objectives

    2. Subproject Scope and Dimension

    A. Comparison of Original and

    Actual Scope and Dimensions

    B. Reasons for Revision/ Modification

    Of Scope and Dimensions

    C. Contribution of Subproject to

    Relevant (Sub) Sectors

    II. Subproject Implementation --------------------------------------------------- 19

    1. Organizations for Implementing

    Subproject

    2. Implementation Period

    3. Subproject Cost

    4. Comments on Performance of

    AO, AP, PO, M&E, and Infra Contractors

    5. Other Matters Relating to

    Subproject Implementation

    III. Action taken by the AO, AP, and PO ---------------------------------------- 39

    Relating to Recommendation(s)

    IV. Initial Operation and Maintenance

    Of the Subproject Facilities -------------------------------------------------- 41

    1. Present Condition of Facilities

    2. Organization for Operation and Maintenance

    3. Annual Budget or Actual Expenditure

    For Operation and Maintenance (by year)

    4. Maintenance Method

    V. Benefits Derived from the Project -------------------------------------------- 48

    1. Indirect Effects

    VI. Conclusions and Recommendations -------------------------------------------- 51

  • LIST OF TABLES:

    Table 1 : Trainings Attended by the People’s Organization ---------------------52

    Table 2 : Subproject Performance ------------------------------------------------54

    Table 3 : Subproject Site Management Office Equipment --------------------- 55

    Table 4 : Trainings Attended by SUSIMO --------------------------------------- 56

    Table 5a : Swine Production Livelihood Project ----------------------------------57

    Table 5b : Rice and Corn Retail Livelihood Project ------------------------------ 58

    Table 5c : Micro-Lending Livelihood Project ------------------------------------- 59

    Table 5d : Rice and Corn Retail Livelihood Project ------------------------------- 60

    Table 5e : Swine Production Livelihood Project -----------------------------------61

    Table 5f : Cattle Dispersal Livelihood Project ------------------------------------62

    Table 5g : Poultry Raising Livelihood Project -------------------------------------63

    Table 5h : Swine Production Livelihood Project ----------------------------------64

    Table 5i : Consumer Store Livelihood Project ------------------------------------65

    Table 5j : Micro-Lending Livelihood Project ------------------------------------- 66

    Table 5k : Consumer Store Livelihood Project ----------------------------------- 67

    Table 5l : Micro-Lending Livelihood Project --------------------------------------68

    Table 5m : Livestock Dispersal Livelihood Project ------------------------------ 69

    Table 5n : Consumer Store Livelihood Project ------------------------------------70

    Table 5o : Micro-Lending Livelihood Project --------------------------------------71

    Table 5p : Livestock Dispersal Livelihood Project -------------------------------72

  • Table 5q : Consumer Store Livelihood Project ----------------------------------- 73

    Table 5r : Rice and Corn Retail Livelihood Project ------------------------------- 74

    Table 5s : Consumer Store Livelihood Project ----------------------------------- 75

    Table 5t : Consumer Store Livelihood Project ----------------------------------- 76

    Table 5u : Micro-Lending Livelihood Project ------------------------------------- 77

    Table 5v : Livestock Dispersal Livelihood Project -------------------------------- 78

    Table 5w : Trucking Livelihood Project ------------------------------------------- 79

    Table 5x : Rice and Corn Livelihood Project -------------------------------------- 80

    Table 6 : Subproject Status Report ---------------------------------------------- 81

    Table 7 : Community Organizing Cost Estimate per Activity --------------------82

    Table 8a : Cost Estimate for Agroforestry Per Activity ------------------------ 83

    Table 8b : Cost Estimate for Enrichment Planting Per Activity----------------- 84

    Table 8c : Cost Estimate for Bamboo Plantation Per Activity--------------------85

    Table 8d : Cost Estimate for Rattan Plantation Per Activity--------------------86

    Table 8e : Cost Estimate for Tree Plantation Per Activity ----------------------87

    Table 9 : Monitoring and Evaluation Cost Estimate Per Activity --------------- 88

    Table 10 : Infrastructure Project ------------------------------------------------ 89

    Table 11 : Annual Work and Financial Plan ---------------------------------------- 98

  • ANNEXES:

    1. Organizational Structure ------------------------------------------------------ 102

    1a. PO

    1b. M&E

    1c. SUSIMO

    1d. Infrastructure Contractor

    2. Pictures ------------------------------------------------------------------------- 120

    3. CSD Accomplishment Map ----------------------------------------------------- 123

  • 1

    SUBPROJECT COMPLETION REPORT

    of

    MANANGA-KOTKOT-LUSARAN WATERSHED SUBPROJECT

    Forestry Sector Project

    Loan Agreement No. PH-P 135

    I. Subproject Description

    The Mananga-Kotkot-Lusaran Watershed Subproject is located within the

    cities of Cebu , Talisay, and Danao, and the municipalities of Minglanilla, Lilo-

    an, Consolacion, Compostela and Balamban, all in the province of Cebu. It lies in

    10º 19' 47.49" to 10º 23' 42.77" latitude and 123º 47' 25.15" to 123º 00'

    50.17" longitude.

    The rehabilitation of the critical Mananga-Kotkot-Lusaran Watershed was

    considered by the then Overseas Economic Cooperation Fund (OECF) of Japan

    now the Japan Bank for International Cooperation (JBIC) as one of the

    subprojects of the Forestry Sector Project – Loan II in Central Visayas in

    view of the increasing demand of Metro Cebu’s industries and populace for

    potable water.

    1. Purpose/Objectives

    A) Original (at the time of appraisal)

    1. To establish, manage, and safeguard protection zones for

    sustenance of water yield and for natural as well as permanent

    habitat of endemic wildlife;

    2. To rehabilitate and re-vegetate degraded lands in the restoration

    zone with indigenous species and to establish soil and water

    conservation measures especially along water channels;

  • 2

    3. To establish, manage and develop multiple-use zone for the

    production of land-based goods and services applying appropriate

    land-use technologies;

    4. To develop and manage sustainable use zone by improving existing

    land uses and by introducing alternative non-forest based

    livelihood activities;

    5. To establish and develop riparian zones through stream bank

    stabilization, planting of bamboo, fruit trees and endemic forest

    tree species for erosion control;

    6. To educate watershed residents and increase their awareness on

    watershed protection, biodiversity conservation, wildlife

    conservation and appropriate upland farming technologies.

    7. To enforce forest protection laws, rules and regulations through

    community-based and multi-sectoral approaches; and,

    8. To institutionalize community-based and multi-sectoral capability

    in watershed planning and management.

    B) Modification

    a. Modified purpose/objectives (No Modification was made)

    b. Reasons for modification (Not applicable)

    (with detailed explanation of the discrepancy between the original

    and modified basic plans, where applicable)

    2. Subproject Scope and Dimension

    A. Comparison of Original and Actual Scope & Dimensions

    A.1. Please check: There has been ( revision and/or modification or

    no revision and/or modification) of the Subproject scope and

    dimensions.

  • 3

    A.2. If “revision and/or modification”, please complete the Table.

    ITEM Original Scope and

    Dimensions (At the

    time of

    appraisal/Planned)

    Revised/Modified

    (Actual)

    1. REFORESTATION/

    WATERSHED/CBFM

    A. SMA

    B. CO1

    RAFI

    CRMOI

    VALUES

    Blessed

    Philippines

    Total

    Year 1

    Year 2

    5,688 hectares

    February 1997 to

    February 1999

    782.33 hectares

    February 1997 to

    February 1999;

    999.75 hectares

    February 1997 to

    February 1999;

    1,034.74 hectares

    February 1997 to

    February 1999;

    1,210.18 hectares

    4,027 hectares

    IEC activities

    Assistance to

    CSD activities

    Assistance on

    Networking

    and Linkaging

    Organizational

    Development

    and Capacity

    Building

    Livelihood

    Project

    implementation

    Monitoring and

    Evaluation

    5,688 hectares

    February 1997 to

    July 2001

    230.08 hectares

    February 1997 to

    July 1999

    1,288.08 hectares

    February 1997 to

    July 2000

    1,088.88 hectares

    February 1997 to

    July 2000

    1,601.42 hectares

    4,208.46 hectares

    IEC activities

    Assistance to

    CSD activities

    Assistance on

    Networking and

    Linkaging

    Organizational

    Development and

    Capacity Building

    Livelihood Project

    implementation

    Monitoring and

    Evaluation

  • 4

    C. CSD

    1. SOIL EROSION CONTROL

    a. Infrastructure

    gabion

    b. Trail and footpath

    c. Tree Plantation

    c.1 Riparian Zone

    (Bamboo)

    2. VEGETATIVE MEASURES2

    a. Agroforestry

    b. Assisted Natural

    regeneration

    c. Enrichment Planting

    d. Tree Plantation

    d.1 Bamboo

    d.2Rattan (Protection

    Forest)

    d.3 Mangrove

    d.4 Plantation Spp.

    (Production Forest)

    e. Timber Stand

    Improvement

    TOTAL:

    3. INVENTORY RESIDUAL

    FOREST

    4. INCOME ENHANCEMENT

    SUBPROJECT

    5. INFRASTRUCTURE

    Look-out tower

    Bunkhouse

    Graded trail

    Footpath

    D. INFRASTRUCTURE

    COMPONENT

    Hanging bridge

    o Brgy. Buot-Taup

    (proper), Cebu City

    1 unit

    1,146 hectares

    1,129 hectares

    396 hectares

    899 hectares

    2008 hectares

    5,578 ha.

    9 units

    6 units

    1,000 km

    30,000 sq.m

    1 unit

    1,149.20 hectares

    1,945.51 hectares

    68 hectares

    750.11 hectares

    1,007.93 hectares

    4,920.75 ha.

    9 units

    5 units

    1,300 km

    30,000 sq.m

    A 62-meter

    hanging bridge;

    made up of two

    (2) 7.90-meter

    concrete towers,

  • 5

    o Brgy. Lagtang and

    Lwaan II, Talisay City,

    Cebu.

    o Brgy. Mulao,

    Compostela Cebu

    Concrete Footbridge

    o Brgy. Pamutan, Cebu

    City

    high tensile

    strength (HTS)

    cables with

    lightweight steel

    channels for floor

    joists, welded

    wire mesh

    flooring and

    cyclone wire

    sidings.

    An 80-m hanging

    bridge connecting

    Brgy. Lagtang and

    Lawaan II,

    Talisay City. It is

    made up of two

    11.30-meter

    concrete towers,

    High Tensile

    Strengths (HTS)

    cables with

    lightweight steel

    channels for floor

    joists, welded

    wire mesh

    flooring and

    cyclone wire

    sidings.

    A 50-m hanging

    bridge made up of

    HTS with

    lightweight steel

    channels for floor

    joists, wielded

    wire mesh

    flooring and

    cyclone wire.

    A 21-meter

    Concrete

    Footbridge; made

    up of concrete

    slab resting on a

  • 6

    Water Supply Structures

    o Brgy. Pamutan, Cebu

    City

    o Brgy. Jaclupan,

    Talisay City, Cebu

    A Pump Irrigation System

    o Brgy. Sinsin, Sudlon I,

    Sudlon II, Cebu City

    single concrete

    beam supported

    by concrete

    columns. It has

    G.I pipe railings

    and compacted

    fill with grouted

    riprap

    approaches.

    A small scale

    Water Irrigation

    System composed

    of a concrete

    intake box, one

    distribution tank

    (capacity 17.248

    cu.m.) and

    interconnected by

    a 227.34 meters

    polyethylene

    pipeline.

    A water system

    at Brgy. Jaclupan,

    Talisay City,

    Cebu. The water

    system is

    composed of s

    concrete intake

    box, one concrete

    distribution tank

    (capacity=17.248

    cu.m.) and

    interconnected by

    a 1.04921-km.

    Polyethelyne

    pipeline.

    Five (5)

    distribution tanks

    (capacity 17.28

    cu.m), a concrete

    relief box, and

    interconnected by

  • 7

    Farm to Market Road

    Rehabilitation Project

    o Brgy. Tagba-o, Cebu

    City

    o Brgy. Magsaysay,

    Talamban, Cebu City

    E. MONITORING AND

    EVALUATION

    Physical Validation

    Year 1

    Year 2

    Year 3

    Inspection Chart

    Mapping

    9,420 km

    polyethylene

    pipeline.

    A 1.91120-km

    rehabilitated

    farm to market

    road.

    A 2.532- km Farm

    to Market Road

    Sitio Sunog-Sitio

    Manunggal

    Crossing to Sitio

    Sandayong at

    Brgy. Magsaysay,

    Balamban, Cebu.

    Portion of the

    road (1.809 km) is

    concreted.

    Conducted in three

    (3) passes;

    December 1999 to

    May 31, 2003;

    4,920.75 hectares

    Verification of

    boundaries,

    monuments, and

    block corner

    posts

    Seedling

    production

    inventory analysis

    Survival Counting

    with 20%

    sampling

    intensity,

    including mapping

    of developed

    areas

  • 8

    Institutional and Project Benefit

    Assessment

    Height and

    diameter

    measurement,

    assessment of

    overall health/

    appearance

    Inspection of

    physical

    infrastructure

    Conducted in two (2)

    passes:

    June 2002 to June

    2003; 4,920.75

    hectares

    Assessment of

    the overall

    development of

    the PO

    Assessment of

    the capability of

    the PO to pursue

    sustainable

    resource

    management and

    sustain its

    livelihood

    initiatives

    Identification of

    various

    issues/problems/

    constraints

    related to the

    development and

    strengthening of

    the PO and the

    relevant support

    systems

    Identification of

    immediate

    benefits of the

    project and

  • 9

    2. SUSIMO

    Equipment provided to

    the Office3

    evidences that

    would indicate the

    intermediate and

    long-term socio-

    economic and

    environmental

    impacts.

    1 unit truck

    1 unit Power

    Generator

    1 set Computer w/

    software

    1 unit UPS 500VA

    1 unit GIS

    Software

    2 units GPS

    1 set Base Radio

    Transceiver

    4 sets Handheld

    Radio Transceiver

    2 units Forester’s

    Transit

    1 unit Typewriter

    Manual

    4 units Brunton

    Compass

    6 units Steel

    cabinet

    1 unit Water

    pump

    2 units

    Steel/Nylon

    1 unit Tape/Chain

    2 units Diameter

    I unit Tape

    1 unit Cassette

    Recorder

    1 unit Planimeter;

    1 unit

    4 units Abney

    Hand Level

    1 unit Rain Gauge

    . Binoculars

  • 10

    Researches conducted

    Trainings4

    Others

    o SUSIMO

    Building

    4 units Calculator

    1 set lettering

    1 unit Drafting

    Table

    12 units Desks &

    Chair

    2 pcs Camera

    1 unit Scanner

    2 units Printer

    50 pcs Plastic

    Chairs

    7 pcs VHF-FM

    radio

    None

    Simple

    Bookkeeping.

    Simple

    Worksheet &

    Simple

    Financial

    Statement

    Preparation.

    Forest

    Protection &

    Fire Mgt and

    Control.

    Workshop on

    Organizational

    Mgt. & CO

    Milestones.

    Simple Process

    Documentation

    & record

    Keeping.

    Basic Auditing

    for Non-

    Auditors.

    Financial Mgt.

    Integration.

    Renovated the

    old Forest

  • 11

    o Turned-over

    facilities of

    Infrastructure

    Research

    Institute

    (FORI) building

    at Camp7,

    Minglanilla,

    Cebu having an

    approximate

    area of 400

    square meters,

    worth P200T.

    Two four wheel

    drive vehicles

    (Nissan path

    finder & Izuzu

    fuego),

    Two Cameras,

    (Kodak

    Advantix)

    Two desktop

    computers ,

    (Compaq)

    1 Please refer to Table 1 for the details on training attended by the POs 2 Table 2 details the subproject performance in terms of area planted

    3 Table 3 shows the details of the equipment provided to the SUSIMO

    4 Please refer to Table 4 for the training attended by the SUSIMO staff

    B. Reasons for Revision/Modification of scope and Dimensions

    B.1. Where there has been “revision/modification” of the Subproject

    scope and dimensions.

    Please choose the reason(s) from the following list and check.

    Revision of the superior plan (e.g. sector development plan, etc.)

    Revision of the supply-and-demand estimate

    Large fluctuation in the Subproject cost

    Substantial revision of design due to the unforeseeable physical

    condition at the time of the original design (e.g. poor soil

    condition, etc.)

    Natural disaster/unseasonable weather

    Unusual circumstances beyond the control of the Executing

    Agency

  • 12

    Structural and organizational problems of the agencies concerned

    (e.g. lack of staff, inadequate coordination with other agencies,

    etc.)

    Availability of funds (e.g. lack of funds, use of contingency,

    fluctuation of the exchange rate, etc.)

    Unrealistic initial plan/Technical problems

    Procurement problems

    Performance of contractor/supplier

    Performance of consultant

    Change in construction period

    Others

    B.2. Detailed statement of reasons (with background).

    Natural Disaster/Bad Weather.

    The occurrence of the El Nino phenomenon in 1998 brought damage to

    the seedling production of the People’s Organizations (POs) of

    Mananga-Kotkot-Lusaran. Approximately 1.0 million seedlings of

    different species for agro forestry and reforestation components

    worth millions of pesos were affected by the El Nino phenomenon.

    Taking into account the number of seedlings to be produced again and

    the cost it may incur, the PO will not be able to generate the required

    number of seedlings for reforestation component. This prompted the

    DENR and POs to realign the target of different components of CSD.

    Performance of contractor/supplier

    After five years of project implementation, the PO established only a

    total of 4,920.75 hectares out of 5,688 hectares. Result of

    assessment conducted in year 2000 however, dictated the revision of

    the targets of all subprojects under the Forestry Sector Project

    funded by JBIC. Development and other maintenance activities were

    focused on the improvement of the 4,920.75 hectares established

    plantation.

    Others

    o On Monitoring & Evaluation (Policy Change)

    Before the adoption of MC 2001-04 entitled “Revised Guidelines in

    the conduct of Monitoring and Evaluation in the Forestry Sector

    Project”, monitoring and evaluation (M&E) of FSP subprojects’

    accomplishments employed the Inspection Chart Mapping (ICM)

    system, whereby, there was a 100% counting of seedlings planted and

  • 13

    dealt only on the physical aspect. Review of policy, however, resulted

    to the adoption of MC 2001-04 that specified the conduct of an

    independent review and assessment of not only the physical

    components of the subproject but also came up with the Institutional

    and Project Benefit Assessment (IPBA).

    o On Infrastructure Component (added component of the

    FSP)

    An intensive review and assessment of the status of each subproject

    was conducted by the NFDO through the Technical Assistance team

    in CY 2000. Results of the assessment justified the inclusion of the

    Infrastructure Support Project in the FSP II. The Infrastructure

    Support Project aimed to promote the livelihood development of the

    PO through the rehabilitation of the poor road condition that

    hindered livelihood development and /or other infrastructure support

    that the PO deemed necessary for the promotion of their livelihood

    projects.

    o On SUSIMO Creation (Project Management Office

    Initiative)

    Results of the assessment likewise, compelled NFDO to institute a

    system that would provide effective and efficient management of the

    Subproject on the ground level. Creation of the Subproject Site

    Management Office (SUSIMO) manned by the DENR permanent

    personnel was found to be the proper approach, hence, the issuance

    of the Department Administrative Order (DAO) No 2000-65 that,

    mandated the Regional Office and the field Offices to install the

    SUSIMO for each subproject site. Simultaneous with SUSIMO

    creation was the capability building of its staff through the provision

    of the technical, financial and management trainings. Facilities such as

    buildings and other equipment were likewise provided to the SUSIMO

    for sound subproject administration.

    C. Contribution of Subproject to Relevant (Sub) Sector(s)

    c.1. (Sub) Sector(s) to which the Subproject belongs

    Electric power and Gas Telecommunication Social

    services

    (Multipurpose) Dams Telecommunications Water

    supply

    Power Plants Broadcasting Sewerage

    Transmission lines Education

  • 14

    Distribution Systems Irrigation and Flood control Health

    Gas Irrigation Tourism

    Others Flood control Others

    Transportation Agriculture, Forestry and Fisheries

    Roads Agriculture and Forestry

    Bridges Fisheries

    Railways

    Airport Mining and Manufacturing

    Ports Mining

    Marine Transportation Manufacturing

    Others

    C.2. Original (At the time of appraisal/Planned)

    Item Description

    1.Site development and rehabilitation

    2. Livelihood Development Projects

    3. Management of the Community

    Based Forest Management Agreement

    The Subproject at full development

    is expected to increase the extent

    of forested area in the watershed,

    which in turn will increase volume

    of wood and minor forest products

    at a substantial level, bringing

    about stumpage and other

    plantation products build-up.

    The water yield of watersheds is

    expected to increase substantially

    and will generate sufficient and

    sustained amount of water in Cebu

    City and nearby municipalities.

    It will provide positive economic

    spillover downstream.

    Additional livelihood projects will

    be identified and implemented by

    the communities to augment

    household income of the watershed

    communities while waiting for major

    harvests from the agro forestry

    component of the Subproject.

    CBFMA management will generate

    employment opportunities

  • 15

    (CBFMA) Area.

    equivalent to 11.81 million person-

    days for a period of 26 years or an

    annual average of 454,295 person-

    days. This is equivalent to a total

    labor of 47,247 workers in 26

    years or an average of 1,817

    workers annually.

    There will be an increase in annual

    household income estimated at

    P6,025 for the first year up to

    P26,268 for the fifth year or a

    total of P112,155 for five years.

    This will give an average increase of

    P22,432 per household annually.

    C.3. Present situation and outlook for the future

    Item Description

    1.Issuance of land tenure

    2. Established plantation

    Instead of CBFMA, PACBRMA will be issued to

    the POs since MKL is within the proclaimed

    protected area. The 13 POs of MKL through

    the SUSIMO already submitted their

    application for PACBRMA to the respective

    Protected Area Management Boards (PAMBs)

    of MKL Watershed Subproject. To date,

    issuance of PACBRMA is still being processed.

    Delay in the formulation of the implementing

    guidelines for the issuance of PACBRMA

    greatly affects the trust & confidence of the

    upland communities. Once the PACBRMA is

    issued to the POs, they will be motivated to

    manage the area sustainably.

    Efficiency and effectiveness of the POs in

    protected area management will depend on the

    assistance to be provided by the DENR-PAMB

    and SUSIMO.

    The CSD area of BUKID MPC and UFMPC

    includes the remaining natural growth of Mount

    Manunggal and the Tabunan Forest

    respectively. The vegetation on the slopes

    towards Mt. Manunggal still contains species

  • 16

    3. Livelihood Development5

    commonly found only in natural forest, although

    there is great reduction in big trees. Several

    dipterocarp species are still present in big part

    of such slopes.

    Based on the CUSW’s Final Pass Report, Eight

    (8) out of thirteen PO’s are above the standard

    Weighted Average Survival Rate (WASR), with

    WASR ranging from 82% to 93%, while the

    other five (5) PO’s are below standard WASR,

    ranging from 30% to 79%. Eventually, four (4)

    POs passed and claimed their respective

    retention fees.

    A total of 4,920. 75 hectares was established

    by the POs with a weighted average survival

    rate (WASR) of 85.46%. With the above

    accomplishment the extent of forested area in

    the watershed increased. At full development,

    there will be an increase in wood volume and

    quantity of minor forest products at a

    substantial level. Thus, stumpage and other

    plantation products build-up in the long run.

    The water yield of watershed will also increase

    substantially and will generate sufficient and

    sustained amount of water in Cebu City and

    nearby municipalities, thus, there will be

    positive economic spill-over downstream.

    The Subproject implementation has diverted

    the attention of the community from forest-

    based source of income to non-forest based

    income sources. Presently, the POs of MKL are

    investing much of their CFDF into individual

    livelihood projects. Some POs are engaged in

    vegetable production and have tied up with

    MACRO supermarket for the marketing of

    their products. Other POs are into consumer

    stores, grocery stores, micro-financing and

    others. A cumulative CFDF is P1,868,709.56,

    with P11,550.00 as the smallest and

    P1,258,000.00 as biggest CFDF among the 12

    POs.

  • 17

    4.Comprehensive Site

    Development Activities

    5.Agroforestry

    development

    Given the necessary support through

    continuous trainings on technical aspects of

    livelihood projects, marketing, linkaging and

    financial management systems, competency

    level of these thirteen POs will increase, thus,

    will enable them to expand their livelihood

    projects and do away with the forest-based

    means of livelihood,

    The Subproject generated employment

    opportunities equivalent to 1,050 workers

    (employment ranging from 90 to 700 days) for

    a period of seven (7) years from different CSD

    activities and infrastructure development.

    The Subproject activities increased the annual

    household income at an estimate of 59% or

    an annual additional household income of

    P9,354.00 for seven (7) years.

    Planted fruit trees, particularly cacao are

    growing well and becoming visible vegetative

    component of developed areas, although these

    are in relatively small parcels. There are some

    indigenous tree species that exhibit promising

    growth performance, such as pangantoon,

    bagalunga, himbabalud and molave. Mangiums

    planted in 1998 showed highest average

    diameter of seven centimeters (7 cm.) and

    eight meters (8 m.) in height for SSSFAI and

    MCFA plantations.

    The agro forestry component of BUKID MPC is

    associated to intensive human intervention and

    if applied to areas with natural growth, the

    project is expected to do more damage than

    development to the natural resources and soil

    conservation. It was also noted that BUKID

    MPC’s activities did not include schemes for

    protection and production forests (ViFARD 2nd

    Pass Report). This observation is also true with

    UFMPC CSD areas near the Tabunan Forest.

    BUKID MPC’s CSD area has a wide coverage.

    Similar rehabilitation works should be

  • 18

    6. Conduct of Maintenance

    and Protection activities

    expanded to adjoining area that needs similar

    land development. The PO has the advantage of

    having big areas needing development, since

    the area can be used to request for additional

    funds or to secure new project. However, the

    organization should continue concentrating on

    degraded areas that are more or less

    dominated by grass. While much of the planted

    sites are indeed in denuded sites, isolated

    parcels of this kind within the covered areas

    remain unplanted.

    A total of 1,945.51 hectares was planted to

    agroforestry crops and has a weighted average

    survival rate of 84.78%. Harvest will be

    abundant in just few years to augment annual

    household income of the community. Once

    harvests of agro forestry products boom,

    processing of such is deemed necessary to

    optimize gain from the products. Trainings and

    capability development as well as funds support

    are encouraged to sustain the agro forestry

    development as an alternative source of

    income.

    Further development is likewise encouraged

    for the optimum use of the land.

    There is no more funds for maintenance and

    protection activities, but through the CFDF,

    allocation for such has been provided.

    Presently, the PO has been able to meet the

    standard survival percentage.

    Maintenance of established plantations must

    be continued especially that the plantations

    are in their critical stage. Funding must either

    be allocated from the regular DENR budget or

    solicited from other funding agencies including

    the private sector. NGOs working in the area

    must be encouraged to participate in

    supporting the maintenance activities, such as

    adopting a particular plantation area and

    working with POs concerned.

  • 19

    7.Infrastructure

    Development/Rehabilitation

    Through the effort of the SUSIMO, the

    Philippine Canadian Environmental and Economic

    Management Project (PCEEM) installed the

    water system benefited by almost 380 families

    in barangay Mulao, Lupa, Compostela Cebu.

    Different infrastructure projects have been

    constructed/rehabilitated in the site to

    support the livelihood development activities of

    the POs, such as:

    o The rehabilitated farm-to-market

    roads, hanging bridges and footbridges

    provide accessibility to the community as

    well as ease of transport of the farm

    products thus, increasing profitability.

    o Irrigation system and water supply

    structures that provide irrigation and

    domestic water supply to Brgys. Pamutan,

    Jaclupan, Sinsin, Sudlon I and Sudlon II.

    5 Please refer to Table 5 for the livelihood projects being implemented by the POs

    II. Subproject Implementation

    1. Organizations for Implementing Subproject

    Function in the Name of Organization Reasons for

    Subproject

    Implementation

    (1) Original (2) Changed Change

    1. SMA

    2. AO for CO

    3. AP

    By Administration

    o BLESSED Phils.

    Inc.

    o VALUES Inc.

    o CRMOI

    o RAFI

    JUDAH ALIPOSA

    JUSTINO

    BRIONES

    JUSTINO

    BRIONES

    ISIDRO

    DINEROS

    BRIGITTE

    YANOC

    JUDAH

    ALIPOSA

    resigned from

    OIDCI as an AP

    after receiving

    a better job

  • 20

    4. PO

    5.M&E Contractor

    Physical

    Component

    and Socio-

    institutional

    Institutional

    and Project

    Benefit

    Assessment

    (IPBA)

    6. Infrastructure

    Contractor

    1. MALTAJ

    2. CAMMITA

    3. SSSFAI

    4. PSBA

    5. PSMPC

    6. UFMPC

    7. TMPC

    8. MFMPC

    9. MCFA

    10. NAGMATA

    11. BAKANTI

    12. LFA

    Cebu Uniting for

    Sustainable Water

    (CUSW) Inc.

    1. PMC

    Construction

    2. WERR Corp.

    (International)

    o BUKID MPC

    ViSCA Foundation

    for Agric’l. and

    Rural Dev’t.

    (VIFARD)

    offer from FPE

    in terms of

    salary & scope

    of work.

    Additional PO

    was tapped by

    DENR to be

    contracted for

    the

    establishment

    of backlog in

    CSD

    Both Physical

    and

    Institutional

    components

    were awarded to

    CUSW, but

    CUSW did not

    complete the

    IPBA. Hence, a

    new contract

    for Institutional

    & Project

    Benefit

    Assessment was

    awarded to

    VIFARD.

  • 21

    Please state:

    1.1 Reasons for the change

    On Assisting Professional (AP)

    After a year of being an AP of the MKL Watershed Subproject, Mr.

    Judah S. Aliposa, resigned to pursue a career development path.

    Considering the number of POs in MKL that need assistance,

    replacement of Mr. Aliposa was deemed necessary, hence, SUSIMO

    requested the Project Management Office (NFDO) and the OIDCI to

    hire not just one but two AP’s in the persons of Mr. Isidro Dineros

    and Ms. Brigitte Yanoc.

    On Comprehensive Site Development

    The willingness of the BUKID MPC to implement and complete the

    backlogs in CSD area and with the strong support of LGUs of

    Balamban, Cebu City encouraged the SUSIMO to award a 600-hectare

    CSD contract to BUKID MPC. BUKID MPC was organized by the LGU

    of Balamban, Cebu City in 2000 while, strengthening and capability

    building trainings were conducted and facilitated by the SUSIMO and

    AP.

    On Monitoring & Evaluation

    The original contract of CUSW was designed to conduct both the

    physical evaluation and Institutional & Project Benefit Assessment of

    the POs of MKL Watershed Subproject. Considering the area

    coverage and the scattered location of the area of the thirteen POs,

    it seemed that CUSW could not cope with conducting both activities

    at once. Consequently and in compliance with MC 2001-04, the DENR

    decided to split the M&E activities and awarded the Institutional and

    Project Benefit Assessment to ViFARD, Inc. to ensure completion of

    M&E activities on time.

    1.2 Problems arising, counter measures adopted and results

    Problems Measures Adopted Results

    A.. On Community

    Organizing

    1. The AO (VALUES)

    abandoned its CO

    contract in 1999 and

    The Regional DENR

    management provided

    project officer, aside

    The PO was able to

    recover the backlog of

    SSSFAI.

  • 22

    left some financial

    obligation to SSSFAI.

    2. Weak Organizational

    and Financial

    Management of POs.

    3. Lack of appreciation

    and awareness about the

    project by some PO

    members brought about

    cultivations in portions

    of developed areas by

    claimants (tenants or

    absentee claimants) for

    their basic needs.

    from the site

    coordinator, to supervise

    the implementation of

    the CO and SSSFAI CSD

    contract in 1999.

    The SUSIMO and PO

    conducted Training

    Needs Assessment TNA),

    thus, prioritized the

    conduct of trainings and

    seminars on record

    keeping, bookkeeping,

    auditing, and

    documentation of

    minutes of meeting.

    SUSIMO and AP

    intensified the IEC

    and conducted house

    to house

    meetings/discussions

    during regular,

    emergency and BOD

    meetings.

    The SUSIMO and AP

    adopted a Joint

    monthly meeting

    among the 13 POs,

    SUSIMO and APs to

    discuss all issues,

    problems, and

    concerns in the

    project

    implementation.

    Some PO association/

    organization

    capacitated on

    organizational and

    financial aspect

    Systems on

    organizational and

    financial aspects were

    installed

    functional/operational

    .

    Clarified roles,

    responsibilities and

    functions of PO

    Officers, members

    and BODs.

    Increased awareness

    of PO in project

    implementation, thus,

    encouraged other

    interested claimants

    and tenants to

    participate in the

    plantation

    establishment

    Increased degree of

    coordination between

    and among the DENR,

    POs and LGUs.

    Shared lessons

    learned.

    POs’ monthly action

    plan prepared.

  • 23

    B. On Comprehensive

    Site Development

    1. Unsatisfactory per-

    formance of AO and

    some POs at the early

    stage of project

    implementation.

    Only one site

    coordinator was assigned

    at first to monitor the

    project implementation

    covering 12 POs of 39

    Barangays with an area

    of more than 5,000 ha.

    The site coordinator,

    being alone, could not

    monitor the

    performance of the AO

    and PO properly. This

    resulted to poor

    performance (average

    survival of 65%) of the

    project.

    2. Regional directive to

    conduct 100% inventory

    of the CSD

    accomplishments.

    3. Unavailability of area

    to be developed under

    the CSD.

    Most of the members of

    the organized PO have

    SUSIMO installation:

    SUSIMO staffs were

    deployed to monitor and

    supervise the CSD

    activities of two-three

    POs.

    Provision of three

    AP’s to assist the 13

    POs as part of the

    SUSIMO installation

    and capacitation.

    Close monitoring and

    supervision by the

    SUSIMO and AP was

    employed.

    POs were assisted in

    the preparation of

    the monthly CSD

    work plan as their

    basis in the regular

    assessment of CSD

    performance.

    No action

    Canvassers

    (approximately 65

    There was sufficient

    staff to monitor and

    supervise the

    performance of the

    AP and PO. Validation

    and billing process

    was shortened and

    facilitated from an

    average of 3 months

    to 1 month.

    Improved quality of

    plantation

    Out of 13 PO’s, 12

    have claimed their

    retention fees. Only

    one PO (PSMPC) did

    not receive the

    retention fee because

    of low survival rate

    (35% survival rate),

    but was able to

    manage the livelihood

    project.

    Incurred delays in the

    processing of billings due

    to extensive validation

    procedure, which caused

    loss of interest of some

    POs to perform the CSD

    activities.

    The POs of MKL were

    able to meet the revised

  • 24

    no area to be developed.

    Sometimes the tenant

    wanted the area be

    planted but the

    absentee claimant did

    not allow planting, or

    vice versa.

    4. Poor Quality of

    plantations due to

    absence of maintenance

    activities.

    5. Lack of support from

    Local Government Units,

    except for BUKID MPC

    (Barangay level), most

    members of the PO was

    influenced by the LGUs.

    6. Rodents attacking

    jackfruit plantations at

    an alarming (90%

    damaged) rate,

    particularly SSSFAI’s

    plantations. These pests

    ate the succulent part

    of the stem and barks of

    the jackfruit seedlings

    once out planted in the

    field.

    persons) were employed

    by the PO to identify the

    area for development

    charged to CSD fund, it

    incurred approximately

    an amount of P572,000

    for the canvasser only.

    The SUSIMO conducted

    intensive IEC on the

    project to win the

    support of most LGUs in

    the subproject site.

    The POs applied chemical

    (COALTAR) to minimize

    infestation.

    The PO changed the

    species used for planting

    from jackfruit to

    starapple.

    target but of different

    area per component. Most

    of the target area under

    reforestation was

    converted into

    agroforestry.

    The very low survival

    rate of PSMPC is

    attributed to stray

    animals, and apathy or

    loss of interest and

    dissatisfaction of

    stakeholders

    concerned who

    allegedly did not allow

    the conduct of

    maintenance activities

    in the plantation

    within their claimed

    area.

    After series of dialogue,

    coordination and IEC, the

    SUSIMO and the PO

    gained support of the

    LGUs concerned.

    No significant effect

    because the smell would

    fade after several days

    of exposure.

    Rodents no longer attack

    starapple seedlings,

    apparently because of its

    hardness.

    1.3 The latest organization chart (or equivalent) for the implementation

    of the Subproject is ( attached or not available).

  • 25

    Organizational Charts of the thirteen (13) POs, M&E Contractors, and

    Infrastructure Contractors are attached and marked as Annexes

    1a1-1a13, 1b1-1b2 and 1d1-1d2, respectively.

    1.4 If the organizational chart (or equivalent) is not available, please

    state the reason.

    Organizational Charts of the CO contractors (RAFI, CRMOI,

    VALUES, Blessed Philippines) are not on file. Securing of such was

    explored by the region, but still neither Organizational Structure nor

    its equivalent was secured.

    2. Implementation Period

    A. Comparison of Original Schedule and Actual Period

    Please fill in the following blanks with actual period for each item.

    ITEM

    ORIGINAL SCHEDULE

    ACTUAL PERIOD

    1. SMA

    1. Contract of AO for CO

    2.1 RAFI

    2.2 VALUES

    2.3 CRMOI

    2.4 BPI

    3. Contract of PO for

    CSD

    3.1 MALTAJ

    3.2 CAMMITA

    3.3 SSSFAI

    3.4 PSBA

    3.5 PSMPC

    3.6 UFMPC

    3.7 MFMPC

    3.8 MCFA

    3.9 LFA

    3.10 TMPC

    3.11 NAGMATA

    3.12 BAKANTI

    3.13 BUKID-MPC

    4. Contract of NGO for

    M&E

    February 1996 – July 1996

    Feb. 12, 1997 – Feb. 12. 1999

    Feb. 12, 1997 – Feb. 12. 1999

    Feb. 12, 1997 – Feb. 12. 1999

    Feb. 12, 1997 – Feb. 12. 1999

    Oct. 15, 1997 – Oct. 15, 2000

    Oct. 15, 1997 – Oct. 15, 2000

    Oct. 15, 1997 – Oct. 15, 2000

    Oct. 15, 1997 – Oct. 15, 2000

    Nov. 14, 1997 – Nov. 14, 2000

    Nov. 14, 1997 – Nov. 14, 2000

    Nov. 27, 1997 – Nov. 27, 2000

    Nov. 26, 1997 – Nov. 26, 2000

    Nov. 26, 1997 – Nov. 26, 2000

    Nov. 27, 1997 – Nov. 27, 2000

    Nov. 27, 1997 – Nov. 27, 2000

    Nov. 27, 1997 – Nov. 27, 2000

    Dec. 28, 2000 – Jun. 30, 2003

    February 1996 – July 1996

    Feb. 1997 – July 2001

    Feb. 1997 – Jan. 2000

    Feb. 1997 – June 1999

    Feb. 1997 – July 2000

    Oct. 1997 – June, 2003

    Oct. 1997 – June, 2003

    Oct. 1997 – June, 2003

    Oct. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Nov. 1997 – June, 2003

    Dec. 200 – June, 2003

  • 26

    4.1 CUSW

    4.2 ViFARD

    5. Contract of

    Infrastructure

    Component

    5.1 PMC

    5.2 WERR Corp.

    Completion

    (completion of

    Subproject)

    Dec. 1999 – June 2001

    June 2002 – June 2003

    Dec. 12, 2002 – June 30, 2003

    Dec. 12, 2002 – June 30, 2003

    June 30, 2000

    Dec. 1999 – May 20‘03

    June 2002 – June 2003

    Dec. 12, 2002 – July 31,

    2003

    Dec. 12, 2002 – July 31,

    2003

    October 24, 2003

    Please refer to Table 6 for the subproject status report

    Notes: Completion of the Subproject was defined as ( completion ceremony or

    final disbursement or other than the above.

    The completion date was scheduled for June 30, 2000 (at the time of

    appraisal) and is indicated (thus ) in the above Table.

    B. Reasons for Delay or Early Completion

    B.1. In case of delay or early completion, please choose the reason(s)

    from the following list and check.

    Change in scope/dimensions

    Natural disaster/bad weather (e.g. earthquake, typhoon, etc.)

    Shortage of funds/Fluctuation of the exchange rate

    Problems in procurement

    Inflation

    Unusual circumstances beyond the control of the Executing

    Agency

    Structural and organizational problems of the agencies concerned

    (e.g. lack of staff, inadequate coordination with other agencies,

    etc.)

    Legislative matters

    Unrealistic initial plan/Technical problems

    Performance of contractor/supplier

    Performance of consultant

    Others

  • 27

    B.2. Reasons and background for delay or early completion

    Change in scope and dimension

    o On Comprehensive Site Development

    Intensification of maintenance activities such as: ringweeding,

    cultivation and application of fertilizers (RCF) and patrolling to

    improve the quality of plantation brought the change in schedule of

    the implementation period of the CSD activities pursuant to MC

    2000-19 entitled “Guidelines Governing the updating of Cost and

    Intensification of Maintenance activities in the FSP Subprojects

    funded by JBIC.”

    o On Infrastructure

    Duration of the infrastructure activity was affected by different

    variation orders made by the contractors for effective and efficient

    use of different infrastructure projects, such as:

    a. Pump Irrigation System : A need to install the 3- Phase electrical

    power supply to Sinsin-Sudlon Pump Station. Originally, installation

    of power lines is not incorporated in the technical plan of the

    water system in Barangay Sinsin, Sudlon I, Sudlon II, but, during

    its initial operation it was found out that there is no power supply

    to operate the pump irrigation system, thus, this variation order;

    b. Hanging bridge: Transfer or relocation of the original contract for

    a 72-meter hanging bridge at Brgy. Jaclupan to an 80 meters

    hanging bridge at Brgy.

    Lagtang, Talisay Cebu.

    Jaclupan is accordingly

    the site of another

    proposed bridge to be

    constructed from the

    Countrywide Development

    Fund (CDF) of the

    Congressman of Talisay

    City.

  • 28

    Natural Disaster/Bad Weather.

    o On Comprehensive Site Development

    The occurrence of the El Niño Phenomenon in 1998 hampered the PO’s

    production of planting materials and also caused high mortality (50%)

    of out planted seedlings. It was aggravated by Typhoon Nanang that

    hit Cebu in November 2001 causing landslides, gully erosion and

    floods. This brought considerable damage (30% of the area) to the

    established plantations of MALTAJ, PSMPC,PSBA,SSSFAI, UFMPC

    and BUKID MPC. Re-planting and other maintenance activities to

    recover the damage were conducted during the extension period.

    o On Infrastructure

    Typhoon in 2002 damaged a portion of the rehabilitated farm-to-

    market road in Barangay Magsaysay, Balamban, Cebu City. The

    contractor again conducted the repair job which delayed the

    completion of infrastructure project.

    Problems in procurement

    Difficulty in procuring the services of the Community Organizing

    contractor had been the experience of the MKL, attributed to the

    cost allocation over the location and size of the target communities.

    The DENR Region 7 had posted notice of bidding for the conduct of

    the community organizing for Mananga-Kotkot-Lusaran, only one (1)

    NGO had shown interest. So, it was declared failure of bidding due to

    insufficient number of bidders. Other NGOs had backed-out before

    the bidding process, apparently, due to low CO cost.

    Structural and Organizational Problems of the Agencies

    Concerned

    At the start of implementation, only one site coordinator (which later

    became three) was assigned to facilitate and supervise the

    Subproject implementation. Being alone, supervision and monitoring

    the performance of the four (4) AOs and twelve (12) POs of thirty-

    nine (39) barangays covering an area of 5,578 hectares became

    ineffective that resulted to poor quality of the plantation with just

    an average survival of 65%.

    Poor performance of the POs is also attributed to the procedure and

    composition of team that conducted inspection and validation of

    accomplishments of AOs and POs. Composite Inspection Team (CIT)

  • 29

    or Composite Inspection Committee (CIC) members were not on full

    time basis in the FSP as evaluators. Delay in the conduct of validation

    also delayed the processing and release of payments to the POs, with

    the domino effect in the implementation of the CSD activities of the

    POs.

    Installation of SUSIMO by virtue of DAO 2000-65 seemed to be the

    appropriate strategy for effective and efficient management of the

    Subproject but in the case of MKL, it did not easily materialize.

    Considering the need for 19 SUSIMO staff for MKL alone, the DENR

    R-7 could only deploy even just eight (8) personnel, which is still

    insufficient to carry out the tasks mandated by DAO 2000-65.

    Delays in the provision of assistance, facilitation, supervision and

    validation of POs accomplishments were still encountered, although

    minimized.

    Legislative Matters.

    Since MKL Watershed Subproject is within the four (4) proclaimed

    protected areas of Cebu namely; Mananga Watershed Forest Reserve

    (MWFR), Kotkot-Lusaran River Watershed Forest Reserve (KLRWFR),

    Sudlon National Park (SNP) and Central Cebu National Park (CCNP),

    CBFMA could not be issued to the 13 POs, hence, occupants were

    hesitant to participate in the project. In 2002 through DAO No. 02

    the establishment and management of the Community Based Program

    within the protected area has been allowed through the issuance of

    the PACBRMA as its tenurial instrument. Henceforth, requirements

    for the processing and issuance of PACBRMA had been worked out

    and complied with by the POs, SUSIMOs and Protected Area

    Management Boards (PAMBs). However, issuance of the tenurial

    instrument is still pending due to the long delay in the approval of the

    management zones of MKL. Thus, loss of trust and confidence to the

    DENR by the occupants further contributed to the non-participation

    of the residents in the project implementation.

    Unrealistic initial plan/Technical Problem/Performance of the

    Contractor/Supplier

    During the preparatory stage, appraisal of the site had been

    conducted by the DENR personnel to evaluate the feasibility, viability

    (economic and financial aspects), and social acceptability of the

    project. Local communities had been consulted; however, there was no

    direct participation of local communities in the planning process even

    in the preparation of the Work and Financial Plans (WFPs) of the POs.

    This resulted to rejection of some recommended species by the local

  • 30

    communities, primarily, due to its poor performance in that area as

    observed by the POs during implementation; over-estimation of areas

    for plantation over the actual available area due to the resistance of

    the absentee claimants to plant their claimed lots and low acceptance

    of the project by the communities.

    Convincing the target participants to implement the project took long,

    since the Community Organizing activity was awarded in 1996, but the

    PO started nursery operations only in 1998. Another contributing

    factor to the delay was the need to revise the WFPs to incorporate

    the preferred species of the communities in order to gain their active

    participation and willingness to plant their claimed area for the

    project.

    Deployment of inexperienced and not well-trained CO staff resulted

    to resistance of the community to accept the project. There was

    weak information, education and communication campaign by the CO-

    workers. Furthermore, the CO activities were conducted as what the

    guidelines provided and not based on the needs of the community.

    Performance of the Contractor/Supplier

    Since, the contractor awarded with the infrastructure component is

    based in Luzon, heavy equipment necessary for the farm-to-market

    road construction such as bulldozer, dump truck and the like, need to

    be transported from Luzon, and thus incurred significant delay in the

    completion of the infrastructure project. Further, a portion of the

    rehabilitated farm-to-market road in Brgy. Magsaysay was of

    substandard quality and was easily damaged by the typhoon.

    Others (Insufficient fund for M&E activity and Policy Change)

    Considering the size and location of approximately 3,000 patches

    plantations (with an average of 1.3 ha per patch) of thirteen (13) POs

    in MKL, the cost provided for the conduct of monitoring and

    evaluation was not sufficient enough prohibiting the CUSW to hire

    required number of workers to do the M&E activity. There was

    therefore a delay in its completion.

    Another factor that affected the schedule of the M&E activity was

    the adoption of the MC 2001-04 or the “Revised guidelines in the

    Conduct of the Monitoring and Evaluation” wherein contracts for the

    Institutional and Project Benefit Assessment (IPBA) and Physical

    components must be awarded separately.

  • 31

    C. Remedial Action Taken in Each Case of Delay

    Change in scope and dimension

    o On Comprehensive Site Development

    Pursuant to MC 2000-19, corresponding revision of the WFPs and

    amendment of the CSD contracts were undertaken by the PO and the

    site coordinator, to effect the increase in frequency of the ring

    weeding passes, application of fertilizer and the conduct of patrolling

    in the area for further improvement in the quality of the established

    plantations.

    o On Infrastructure

    As regards the infrastructure project, different variation orders

    made by the infrastructure contractors had been approved by the

    PMO.

    Natural Disaster/ Unseasonable weather

    To minimize damage of El Nino phenomenon, the POs were instructed

    to apply leaf pruning and practice mulching (in the plantation) to

    lessen the transpiration rate of seedlings; provide additional shade in

    the nurseries; purchase additional watering equipment/ tools/

    facilities like drums, hose and water pump; construct water-

    impounding dams for nursery and encourage backyard nursery.

    Moreover, the POs conducted intensive replanting in the damaged

    area. Likewise, they implemented the maintenance and protection

    activities specified in MC 2000-19 during the extension period.

    Problems in procurement

    Since, there was a failure of bidding for Community Organizing, a

    negotiated bidding took place. Hence, CRMOI, VALUES, RAFI and

    BLESSED Philippines were awarded with the Community Organizing

    contract for Mananga-Kotkot-Lusaran in 1996.

    Structural and Organizational Problems

    Implementing the DAO 2000-65 or the SUSIMO creation was

    deemed appropriate for effective and efficient management of the

    Subproject in the field level. In the case of MKL however, this was

    not the outright solution as called for by the need to deploy 19

    SUSIMO staff. The SUSIMO instead adopted the following

  • 32

    strategies to address the need of the POs on technical, financial and

    management aspects:

    a. Site Coordinator scheme in the supervision and provision of

    technical assistance to the PO in the plantation establishment,

    maintenance and protection activities;

    b. Tapping the technical assistance of the personnel from the

    DENR-RO, Central Cebu Center for the Integrated Catchment

    System Management (CCCICSM), PENRO and CENROs for the

    conduct of technical, financial and management trainings for

    POs’ strengthening and conduct of field validation.

    c. Hired foresters on a contractual basis (charged to the

    project) in the last quarter of CY-2001 as approved by the

    PMO Central Office and fielded to the different POs of MKL

    Watershed Subproject to provide technical assistance/advice

    and to oversee the actual CSD implementation of the POs.

    Legislative Matters.

    The MKL SUSIMO encouraged PO presidents/chairpersons to apply

    for membership in the PAMB (some are already PAMB members) so

    that they

    could participate in the planning and development of the protected

    area. For the PACBRMA issuance, the SUSIMO also sent tracer-

    letters to the offices concerned on the status of the POs application

    for PACBRMA and for the PAMB to make follow-ups in the DENR

    Central Office with regard the submitted management zones.

    Unrealistic Initial Plan/Technical Problems/Performance of the

    Contractor.

    The SUSIMO instructed the POs to prepare resolutions for

    changing/adding of species to be planted in their respective areas and

    assisted in the preparation of their plans and resolutions. For the POs

    who had difficulty in accomplishing their target areas as per CSD

    contract, the SUSIMO successfully convinced these POs to reduce

    their areas based on their capabilities and award the same to POs of

    good standing. Likewise, corresponding revision and extension of

    contracts have been undertaken.

    Extension of the contract duration was granted for infrastructure.

  • 33

    Others (Insufficient cost for M&E activity and policy change)

    The Regional Office encouraged the M&E contractor to undertake

    the activity by allowing them to just identify and indicate the relative

    location of the patches plantation while the SUSIMO would

    determine the area planted per stakeholder.

    In compliance with MC 2001-04, issuance of separate contracts for

    socio-institutional and physical components had been made.

    3. Subproject Cost

    A. Comparison of Original Estimated Cost and Actual Expenditure (by

    Component)

    Item

    Original Cost

    (based on appraisal)

    (in M pesos)

    Actual Expenditures

    (in M pesos)

    SMA

    Community

    Organization

    Comprehensive

    Site Development

    Monitoring

    and Evaluation

    Infrastructure

    Dev’t

    Subproject

    Coordinating

    Office

    (SUSIMO)

    7.248600

    100.835388

    5.938672

    31.940664

    3.019450

    6.388486

    94.753681

    5.921526

    33.655122

    3.019450

    Total 148.982774 143.738265

    Please refer to Tables 7, 8a-e and 9 for the details on cost of CO, CSD and M&E,

    respectively. List of Infrastructure projects with its corresponding cost is also attached as

    Table 11.

    B. Reasons for Difference between Original Estimated Cost and

    Actual Expenditure

    B.1. If there is any difference between Table a.1 and Table a.2 in

    Paragraph a, please choose the reason(s) from the following list

    and check.

  • 34

    Increase in reconstruction cost arising from natural

    disaster/unreasonable weather (e.g. earthquake, typhoon, etc.)

    Increase or decrease arising from a change in construction period

    Increase or decrease arising from inflation

    Increase or decrease arising from fluctuation in the exchange

    rate

    Increase or decrease arising from a change in the scope/work

    volume of the Subproject

    Decrease arising from keen competition in tender

    Unusual circumstances beyond the control of the Executing

    Agency

    Unrealistic cost estimates/Technical problems

    Others

    B.2. Description of the detailed reason(s) and background

    Increase or decrease arising from a change in the scope/work

    volume of the Subproject

    o On Comprehensive Site Development

    Despite updating of cost and intensification of the maintenance

    activities of the POs per MC 2000-19, as well as the granting of

    contingency funds to some POs, still the CSD cost decreased because

    of the series of revision, reduction and re-alignment of targets from

    one PO to another.

    o On Monitoring and Evaluation

    Although, implementation of MC 2001-04 brings an increase in cost

    of the M&E because of the increase in cost per hectare on physical

    aspect and additional fund provided for IPBA, this was not the case

    for MKL. Adoption of the revised guidelines brought a decrease in

    the number of passes and the area covered by the M&E and thus

    reduced the M&E cost.

    o On Infrastructure

    Different variation orders brought decrease in cost of some specific

    infrastructure projects, however, installation of the electrical power

    supply in pump irrigation system in Brgys Sinsin, Sudlon I and Sudlon

    II caused increase in total cost of infrastructure project.

  • 35

    Unusual circumstances beyond the control of the Executing

    Agency

    Decrease in cost of the Community Organizing was caused by the loss

    of interest by the CRMOI to claim the retention fee due to the billing

    requirements of the DENR.

    Others (performance of the contractors)

    o On Community Organizing

    Decrease in cost was mainly due to the unaccomplished CO activities

    of some AOs, whereby only two (2) of the four AOs successfully

    received their respective retention fees.

    o On Comprehensive Site Development

    Reduction in CSD cost is an indication of the poor performance of the

    contractors. Failure of the POs to establish the target up to CY2000

    forced the DENR to reduce the 5,688 hectares to 4,920.75 hectares.

    C. Action taken in Case of Cost Overrun and Results

    Additional obligation and corresponding revision of the WFP on

    infrastructure component was undertaken. The financial obligation

    was paid for corresponding physical accomplishments.

    D. Comparison of Original Estimated Expenditure and Actual

    Expenditure (by Year)

    Calendar

    Year

    Original Cost

    (based on Original

    Contracts)

    (in M pesos)

    Actual Expenditures

    (in M pesos)

    1997

    1998

    1999

    2000

    2001

    2002

    2003

    19.447047

    56.544947

    16.576002

    15.515992

    1.539750

    0.599000

    32.821364

    1.817131

    25.925880

    17.579311

    15.379566

    22.383793

    14.574059

    40.156999

    Total 148.982774 143.738265

    Please refer to Table 12 for the details of the Annual Work and Financial Plan

  • 36

    4. Comments on Performance of Assisting Organizations (AOs),

    Assisting Professionals (APs), Peoples Organizations (POs), M&E and

    Infrastructure contractors.

    Please describe the performance of each organization after checking the

    item(s) in the relevant lists on which you have any comment.

    A. Performance of Assisting Organizations & Assisting Professionals (if

    any) Peoples Organizations, M&E and Infrastructure contractors

    A.1. Overall performance Design

    Contract administration Construction supervision

    Expertise Staff qualifications

    Coordinating ability Compliance with Contracts

    Performance related to any other than the Subproject scope,

    if any.

    Others

    A.2 Description (in detail)

    o Over-all Performance

    Assisting Organizations

    In general, the Assisting Organizations (AOs) in MKL can be rated

    fair, since, only two have successfully accomplished their CO

    activities namely: BLESSED Phils. Inc. (BPI) and Ramon Aboitiz

    Foundation, Inc. (RAFI), while the personnel of VALUES, Inc.

    abandoned their site during the later part of their contract

    duration after one of its personnel borrowed a considerable

    amount of money from their PO and never paid it back. Cebu

    Resource Management Organization, Inc. (CRMOI) on the other

    hand, submitted a terminal report to the DENR but it had lost

    interest in complying with other billing requirements until its

    contract expired.

    Assisting Professionals

    The Assisting Professionals (APs) performance in the delivery of

    their duties and obligations to the PO’s of MKL Watershed

    Subproject was satisfactory. They had successfully instituted

    reforms in the project management particularly in financial aspect.

    The APs helped the PO to improve the systems and procedures in

    project management and conducted all other activities left by the

    AOs some of which were installation of systems and procedures on

    financial management, proper bookkeeping, preparation of

  • 37

    feasibility studies, and record keeping. Presently, most POs are

    practicing the systems instituted by the AP’s.

    People’s Organization

    In the midst of the contract duration, only one (1) out of thirteen

    (13) POs was able to deliver satisfactory performance in terms of

    physical accomplishment (standards and compliance to

    instructions). Majority (12 POs) did not internalize the trainings

    and coaching provided by the AOs during the CO works. As a

    result, most PO’s encountered financial losses, huge debts and

    failures in livelihood development activities. Continued assistance

    however, was provided by the DENR and APs until the POs were

    able to plant a total of 4,920.75 hectares and was able to receive

    their retention fees.

    The M & E Contractors

    Initially, only the CUSW was contracted to do the monitoring and

    evaluation of the MKL both for the physical and institutional

    aspect. However, it was observed by the DENR that CUSW had

    difficulty in completing the task considering that almost 3,000

    patches of plantations were covered by the M&E contract, thus,

    Vifard was tapped to perform other activities. This was to ensure

    the completion of the activity particularly the institutional and

    project benefit assessment. Performance of both contractors can

    be considered satisfactory since they delivered the expected

    outputs.

    The Infrastructure Contractors

    There were two contractors for the MKL-WSP Infrastructure

    Projects, however, none of them delivered good performance.

    Without extension and revision of the contract, none of the

    structures would be finished. This could be attributed to the fact

    that the contractors were not based locally and that they lacked

    logistical and financial support from their respective head offices.

    Expertise and Staff Qualifications

    Assisting Organization

    Expertise and staff qualifications greatly affected the

    administration of CO contracts. Some AOs employed experienced

    personnel while others utilized fresh graduates, apparently new in

  • 38

    community organizing works. In terms of staff qualifications, high-

    ranking officials of the AOs were highly trained and experienced,

    however, the time spent by these officials was not as often as

    expected particularly during community immersion.

    Assisting Professional

    The expertise and qualifications of the APs are beyond question.

    The time frame however, was not enough considering the number of

    POs in the Subproject. The activities undertaken by the APs were

    very important to ensure the sustainability of the organization.

    5. Other matters relating to Subproject Implementation

    Please choose the item(s) from the following list on which you have

    any comment, check it (them), and describe it (them) with measure

    and results in (B) below.

    A. Technical Financial Institutional Economic

    Social/Distributional Others

    B. Description (in detail)

    Lack of technical knowledge and skills in the project implementation.

    There were undertakings within the Subproject that differ from one

    PO to another that could not be explained by different site

    coordinator; e.g. planting of fruit trees in almost all management

    zones. This would have been clear had enough technical training were

    provided to the site coordinators. On the other hand, only selected

    personnel could handle other aspects of the project implementation.

    Measures undertaken and Results:

    Training and coaching in skills development and capacity building of

    the SUSIMO Staff were facilitated by the SMO to make them

    effective and efficient in carrying out the tasks, such as:

    (1) Training on bookkeeping attended by the Validation and Billing

    Unit,

    (2) Survey and Mapping attended by the Administrative and Support

    Unit staff, and;

    (3) Different technical trainings attended by the Site Development

    and Management Unit (SDMU) staff.

  • 39

    Through this initiative, the SUSIMO was able to assist, monitor,

    supervise and manage the thirteen (13) POs of MKL.

    III. Action Taken by the AOs, APs and POs relating to Recommendation(s)

    1. Recommendation(s) made by SUSIMO

    Recommendations Action Taken by APs and

    PO’s

    Results

    1. Conduct of Joint

    monthly

    meetings

    between

    SUSIMO, POs

    and APs as a

    venue for

    resolving issues

    and problems

    and sharing of

    experiences in

    the project

    implementation.

    2. Hiring of

    technical

    support staff

    for the

    SUSIMO

    Since the creation of

    SUSIMO MKL, monthly

    meetings were regularly

    undertaken, to create a forum

    in discussing issues affecting

    each organization’s

    performances and problems.

    During these meetings, POs

    were given time to present

    their monthly accomplishments

    and problems and their views

    on issues that they may have

    encountered. This also served

    as a venue whereby the

    SUSIMO and APs would know

    the training needs of the POs

    and for the SUSIMO and APs

    to formulate strategies and

    come up with appropriate

    training designs for each POs

    specific need.

    After a few months since the

    creation of SUSIMO, the

    SMO requested for additional

    allotment for hiring of

    additional technical personnel

    on contractual basis. When the

    request was granted, these

    technical personnel were

    assigned to the different POs

    of MKL Watershed

    Subproject whose functions

    were similar to those of the

    “Site Coordinators”.

    Close coordination

    between SUSIMO

    and POs. Issues and

    problems were

    addressed on time,

    thus, facilitated the

    implementation of

    the CSD activities.

    Immediate response

    to the need of the PO

    was provided. It also

    facilitated the billing

    process of the POs

    accomplishments.

  • 40

    3. Development of

    skills and

    knowledge of

    the SUSIMO

    staff and the

    PO members

    through training

    on technical,

    financial and

    management

    aspects.

    4. Proposed the

    creation of

    Composite team

    from region,

    PENRO and

    CENROs to

    validate the

    accomplishment

    s of 13 POs in

    MKL. Also,

    requested the

    other CENRO

    staff to cross

    validate the

    accomplishment

    s of other POs

    outside the

    jurisdiction of

    Upon hiring, the SUSIMO

    staffs were assigned to

    respective POs to act as

    SDMU and at the same time as

    project site coordinators.

    Validation and Billing

    Unit attended the

    Bookkeeping and

    Financial Management

    training.

    SDMU attended

    different Technical

    training.

    Admin staff attended

    Survey and mapping

    (basic) training.

    PO were trained on the

    different aspects

    conducted by the

    SUSIMO

    SUSIMO staff and

    the PO members were

    capacitated on

    different aspects of

    project management.

    Facilitated the

    conduct of validation

    and billing of

    accomplishment.

  • 41

    their respective

    CENROs

    5. Initiated the

    conduct of

    Financial Audit

    per POs.

    The AP assisted the SUSIMO

    and POs in the conduct of

    Financial Audit.

    Transparency on

    financial transaction

    was established.

    IV. Initial Operation and Maintenance of Subproject Facilities

    1. Present Condition of Facilities

    A. Please check: This article is ( applicable due to problem(s) or not

    applicable. No particular problem has occurred since the initial operation

    started). If there have been any problems, please check the relevant

    space in the Table.

    For the PO:

    Item Status Initial

    Operation

    Maintenance Manage

    ment

    Others

    1.Bunkhouse

    2.Computer

    3.Canter

    vehicle

    4.Motorcycle

    5.Water pump

    6.Multicab

    Serviceable

    serviceable

    serviceable

    Serviceable

    Serviceable

    Serviceable

    For the SUSIMO

    Item Status Initial

    Operation

    Maintena

    nce

    Manage

    ment

    Other

    s

    1. KIA cross truck,

    4x4

    2. Power Generator

    3. Computer

    4. Printer (HP840C)

    5. AVR

    6. UPS

    Serviceable

    Needs repair

    Serviceable

    Needs Repair

    Serviceable

    Serviceable

    Serviceable

    Serviceable

  • 42

    7. GIS Maptitude

    8. GPS

    9. Handheld Radios

    10. Foresters Transit

    11. Base Radio

    12. Manual

    Typewriter

    13. Brunton Compass

    14. Steel Tape

    15. Diameter Tape

    16. Planimeter

    17. Abney Hand Level

    18. Rain Gauge

    19. Lettering Set

    20. Binocular

    21. Clerical Tables &

    Chairs

    22. Drafting Table

    23. Camera

    24. Cassette

    Recorder

    25. Scanner

    26. Printer (LQ300)

    27. Steel Cabinet

    28. Water Pump

    29. Printer (HP5550)

    30. SUSIMO Office

    Unserviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    Serviceable

    B. Please check: The Problem(s) has arisen owing to the following

    reason(s).

    Technical Financial Institutional Economic

    Social/Distributional Others

    C. Description (in detail)

    The Uninterrupted Power Supply (UPS) has lost the compression, but

    no available spare parts could be found locally. Other equipment that

    encountered problems need replacement of defective parts but no

    spare parts available locally.

    D. Aspect of utilizing the Subproject facilities.

    For the PO:

  • 43

    For the SUSIMO

    2. Organization for Operation and Maintenance.

    A. Name of PO.

    A.1. Please give the name of PO and/or Body in charge of O/M.

    PO : 1. MALTAJ

    2. CAMMITA

    3. SSSFAI

    4. PSBA

    5. PSMPC

    6. UFMPC

    7. MFMPC

    8. MCFA

    9. LFA

    10 TMPC

    11. NAGMATA

    12. BAKANTI

    13. BUKID-MPC

    Item Original Plan Actual Operation

    1.Bunkhouses

    2.Computers

    3.Canter vehicle

    4.Motorcycles

    5.Water pumps

    6.Multicabs

    For the use of PO’s of

    MKL

    -do-

    -do-

    -do-

    -do-

    For the use of PO’s of MKL

    -do-

    -do-

    -do-

    -do-

    -do-

    Item Original Plan Actual Operation

    1. KIA cross truck, 4x4

    2.Power Generator

    3. Computer

    4.Printer (HP840C)

    5.AVR

    6. UPS

    7. GIS Maptitude

    8. GPS

    9. Handheld Radios

    10. Foresters Transit

    11. Base Radio

    12. Water Pump

    13. Printer (HP5550)

    14. SUSIMO Office

    For the use of

    SUSIMO MKL

    Watershed

    Rehabilitation

    Subproject

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    For the use of

    SUSIMO MKL Watershed

    Rehabilitation Subproject

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

    -do-

  • 44

    SUSIMO : SUSIMO MKL Watershed Subproject

    A.2. Please check:

    The latest organizational charts (or equivalent) for the O/M of

    the subproject facilities are attached or not availabl