EXECUTIVE SUMMARY
The Community-Based Forest Management Program (CBFMP)
revolutionized forest development and rehabilitation efforts of the government
when it was institutionalized in 1995 by virtue of Executive Order No. 263.
Before the adoption of the CBFM approach, the sole motivating factor of
contract reforestation awardees was primarily financial gains. With the
implementation of the Forestry Sector Project (FSP) using CBFM as its main
strategy to rehabilitate the upland ecosystem, it empowered beneficiary
communities economically, socially, technically and politically while transforming
them into environmentally responsible managers. The tenurial right to develop
subproject sites alongside the various inputs from the Subproject deepened
their commitment to collaborate with other stakeholders in the implementation
of these subprojects.
The Mananga-Kotkot-Lusaran Watershed Subproject is in Cebu Province
and covers the cities of Cebu, Talisay and Danao and the municipalities of
Minglanilla, Lilo-an, Consolacion, Compostela and Balamban. The rehabilitation of
the MKL Watershed is significant considering the declining underground water
supply aggravated by salt-water intrusion on the one hand and the continuing
and pressing demand for water for Metro Cebu’s industries and residents on
the other.
The implementation of Comprehensive Site Development ( CSD )
activities for the MKL Subproject involved the participation of 13 People’s
Organizations to cover the entire expanse of the three watersheds. With an
original target of 5,688 hectares, accomplishment reached only a total of
4,920.75 hectares due to the heavy damage caused by the El Nino phenomenon
in 1998 to some 1.0 million seedlings. Realignment of targets focused
development and maintenance activities on the improvement of these 4,920.75
hectares.
The CSD activities as well as Infrastructure Development nevertheless
provided employment to the local community as well as some technical persons in
need of work. A total of 498,685 man days were generated that resulted to an
estimated increase of 59% in the average annual household income from PHP
15,976 before the project to PHP 25,330 during the project.
The Subproject has succeeded in diverting concentration on forest-
based source of income to non-forest based income sources as PO members
invested part of the PHP 1,868,709.56 Community Forest Development Fund on
various livelihood projects.
-
ii
In terms of infrastructure, beneficiaries find the farm-to-market roads,
the hanging bridges and footbridges very helpful in facilitating mobility and
ease in transporting their farm products to places of commerce. The irrigation
system and water supply structures on the other hand supplement water supply
requirements of the communities.
The MKL Subproject suffered several setbacks in its implementation but
the same problems had taught valuable insights to both implementers and
beneficiaries.
-
LIST OF ACRONYMS
ANR Assisted Natural RegenerationAP Assisting ProfessionalBAKANTI Banikanhong Kapunongan Alang sa Nasudnong TingusbwanCBFM Community Based Forest ManagementCBFMP Community Based Forest Management Program
CCCICSM Central Cebu Center for Integrated Catchment System ManagementCCIC CENRO Composite Inspection CommitteeCCNP Central Cebu National ParkCO Community OrganizingCOMMITTA Camp 4 - Manipis - Minglanilla - ToongCOSU Community Organizing and Strengthening UnitSCD Comprehensive Site Development COSW Cebu Uniting for Sustainable WaterDA Department of AgricultureFORI Forest Reseach DevelopmentGIS Geographical Information SystemIEC Information, Education and CommunicationIGP Income Generating ProjectIPBA Institutional Project Benefits AssessmentJBIC Japan Bank International CooperationKLRWFR Kot-kot Lusaran River Watershed Forest ReserveLFA Licos Farmers AssociationLGU Local Government UnitM & E Monitoring and InformationMALTAJ Maghaway-Lagtang-Tapul-JaclupanMCFA Mulao Compostela Farmers AssociationMFMFC Mulao Compostela Farmers Multipurpose CooperativeMWFR Mananga Watershed Forest ReserveNAGMATA Nagkahiusang Grupo sa mga Mag-uuma sa Tag-ubiNGO None-Government OrganizationOECF Overseas Economic Cooperation FundOIDCI Orient Integrated DevelopmentPCEEM Philippine Canadian Environmental and Economic Management ProjectPO Peoples OrganizationPSBA Pamutan Sang Daku Buot - Taop Assn.PSMPC Pung-ol Sibugay Multipurpose CooperativeRAFI Ramon Aboitiz FoundationSDMU Site Development and Management UnitSEC Security Exchange CommisionSMP Survey, Mapping and PlanningSNP Sudlon National ParkSSSFAI Sinsin-Sudlon I Sudlon II Farmers Assn.SUSIMO Subproject Site Management officeTMPC Tabla Multipurpose CooperativeUFMPC United Farmers Multipirpose CooperativeVBU Validation and Billing UnitWFP Work and Financial Plan
-
TABLE OF CONTENTS
Executive Summary ------------------------------------------------------------------ i
I. Subproject Description ----------------------------------------------------------- 1
1. Purpose/ Objectives
2. Subproject Scope and Dimension
A. Comparison of Original and
Actual Scope and Dimensions
B. Reasons for Revision/ Modification
Of Scope and Dimensions
C. Contribution of Subproject to
Relevant (Sub) Sectors
II. Subproject Implementation --------------------------------------------------- 19
1. Organizations for Implementing
Subproject
2. Implementation Period
3. Subproject Cost
4. Comments on Performance of
AO, AP, PO, M&E, and Infra Contractors
5. Other Matters Relating to
Subproject Implementation
III. Action taken by the AO, AP, and PO ---------------------------------------- 39
Relating to Recommendation(s)
IV. Initial Operation and Maintenance
Of the Subproject Facilities -------------------------------------------------- 41
1. Present Condition of Facilities
2. Organization for Operation and Maintenance
3. Annual Budget or Actual Expenditure
For Operation and Maintenance (by year)
4. Maintenance Method
V. Benefits Derived from the Project -------------------------------------------- 48
1. Indirect Effects
VI. Conclusions and Recommendations -------------------------------------------- 51
-
LIST OF TABLES:
Table 1 : Trainings Attended by the People’s Organization ---------------------52
Table 2 : Subproject Performance ------------------------------------------------54
Table 3 : Subproject Site Management Office Equipment --------------------- 55
Table 4 : Trainings Attended by SUSIMO --------------------------------------- 56
Table 5a : Swine Production Livelihood Project ----------------------------------57
Table 5b : Rice and Corn Retail Livelihood Project ------------------------------ 58
Table 5c : Micro-Lending Livelihood Project ------------------------------------- 59
Table 5d : Rice and Corn Retail Livelihood Project ------------------------------- 60
Table 5e : Swine Production Livelihood Project -----------------------------------61
Table 5f : Cattle Dispersal Livelihood Project ------------------------------------62
Table 5g : Poultry Raising Livelihood Project -------------------------------------63
Table 5h : Swine Production Livelihood Project ----------------------------------64
Table 5i : Consumer Store Livelihood Project ------------------------------------65
Table 5j : Micro-Lending Livelihood Project ------------------------------------- 66
Table 5k : Consumer Store Livelihood Project ----------------------------------- 67
Table 5l : Micro-Lending Livelihood Project --------------------------------------68
Table 5m : Livestock Dispersal Livelihood Project ------------------------------ 69
Table 5n : Consumer Store Livelihood Project ------------------------------------70
Table 5o : Micro-Lending Livelihood Project --------------------------------------71
Table 5p : Livestock Dispersal Livelihood Project -------------------------------72
-
Table 5q : Consumer Store Livelihood Project ----------------------------------- 73
Table 5r : Rice and Corn Retail Livelihood Project ------------------------------- 74
Table 5s : Consumer Store Livelihood Project ----------------------------------- 75
Table 5t : Consumer Store Livelihood Project ----------------------------------- 76
Table 5u : Micro-Lending Livelihood Project ------------------------------------- 77
Table 5v : Livestock Dispersal Livelihood Project -------------------------------- 78
Table 5w : Trucking Livelihood Project ------------------------------------------- 79
Table 5x : Rice and Corn Livelihood Project -------------------------------------- 80
Table 6 : Subproject Status Report ---------------------------------------------- 81
Table 7 : Community Organizing Cost Estimate per Activity --------------------82
Table 8a : Cost Estimate for Agroforestry Per Activity ------------------------ 83
Table 8b : Cost Estimate for Enrichment Planting Per Activity----------------- 84
Table 8c : Cost Estimate for Bamboo Plantation Per Activity--------------------85
Table 8d : Cost Estimate for Rattan Plantation Per Activity--------------------86
Table 8e : Cost Estimate for Tree Plantation Per Activity ----------------------87
Table 9 : Monitoring and Evaluation Cost Estimate Per Activity --------------- 88
Table 10 : Infrastructure Project ------------------------------------------------ 89
Table 11 : Annual Work and Financial Plan ---------------------------------------- 98
-
ANNEXES:
1. Organizational Structure ------------------------------------------------------ 102
1a. PO
1b. M&E
1c. SUSIMO
1d. Infrastructure Contractor
2. Pictures ------------------------------------------------------------------------- 120
3. CSD Accomplishment Map ----------------------------------------------------- 123
-
1
SUBPROJECT COMPLETION REPORT
of
MANANGA-KOTKOT-LUSARAN WATERSHED SUBPROJECT
Forestry Sector Project
Loan Agreement No. PH-P 135
I. Subproject Description
The Mananga-Kotkot-Lusaran Watershed Subproject is located within the
cities of Cebu , Talisay, and Danao, and the municipalities of Minglanilla, Lilo-
an, Consolacion, Compostela and Balamban, all in the province of Cebu. It lies in
10º 19' 47.49" to 10º 23' 42.77" latitude and 123º 47' 25.15" to 123º 00'
50.17" longitude.
The rehabilitation of the critical Mananga-Kotkot-Lusaran Watershed was
considered by the then Overseas Economic Cooperation Fund (OECF) of Japan
now the Japan Bank for International Cooperation (JBIC) as one of the
subprojects of the Forestry Sector Project – Loan II in Central Visayas in
view of the increasing demand of Metro Cebu’s industries and populace for
potable water.
1. Purpose/Objectives
A) Original (at the time of appraisal)
1. To establish, manage, and safeguard protection zones for
sustenance of water yield and for natural as well as permanent
habitat of endemic wildlife;
2. To rehabilitate and re-vegetate degraded lands in the restoration
zone with indigenous species and to establish soil and water
conservation measures especially along water channels;
-
2
3. To establish, manage and develop multiple-use zone for the
production of land-based goods and services applying appropriate
land-use technologies;
4. To develop and manage sustainable use zone by improving existing
land uses and by introducing alternative non-forest based
livelihood activities;
5. To establish and develop riparian zones through stream bank
stabilization, planting of bamboo, fruit trees and endemic forest
tree species for erosion control;
6. To educate watershed residents and increase their awareness on
watershed protection, biodiversity conservation, wildlife
conservation and appropriate upland farming technologies.
7. To enforce forest protection laws, rules and regulations through
community-based and multi-sectoral approaches; and,
8. To institutionalize community-based and multi-sectoral capability
in watershed planning and management.
B) Modification
a. Modified purpose/objectives (No Modification was made)
b. Reasons for modification (Not applicable)
(with detailed explanation of the discrepancy between the original
and modified basic plans, where applicable)
2. Subproject Scope and Dimension
A. Comparison of Original and Actual Scope & Dimensions
A.1. Please check: There has been ( revision and/or modification or
no revision and/or modification) of the Subproject scope and
dimensions.
-
3
A.2. If “revision and/or modification”, please complete the Table.
ITEM Original Scope and
Dimensions (At the
time of
appraisal/Planned)
Revised/Modified
(Actual)
1. REFORESTATION/
WATERSHED/CBFM
A. SMA
B. CO1
RAFI
CRMOI
VALUES
Blessed
Philippines
Total
Year 1
Year 2
5,688 hectares
February 1997 to
February 1999
782.33 hectares
February 1997 to
February 1999;
999.75 hectares
February 1997 to
February 1999;
1,034.74 hectares
February 1997 to
February 1999;
1,210.18 hectares
4,027 hectares
IEC activities
Assistance to
CSD activities
Assistance on
Networking
and Linkaging
Organizational
Development
and Capacity
Building
Livelihood
Project
implementation
Monitoring and
Evaluation
5,688 hectares
February 1997 to
July 2001
230.08 hectares
February 1997 to
July 1999
1,288.08 hectares
February 1997 to
July 2000
1,088.88 hectares
February 1997 to
July 2000
1,601.42 hectares
4,208.46 hectares
IEC activities
Assistance to
CSD activities
Assistance on
Networking and
Linkaging
Organizational
Development and
Capacity Building
Livelihood Project
implementation
Monitoring and
Evaluation
-
4
C. CSD
1. SOIL EROSION CONTROL
a. Infrastructure
gabion
b. Trail and footpath
c. Tree Plantation
c.1 Riparian Zone
(Bamboo)
2. VEGETATIVE MEASURES2
a. Agroforestry
b. Assisted Natural
regeneration
c. Enrichment Planting
d. Tree Plantation
d.1 Bamboo
d.2Rattan (Protection
Forest)
d.3 Mangrove
d.4 Plantation Spp.
(Production Forest)
e. Timber Stand
Improvement
TOTAL:
3. INVENTORY RESIDUAL
FOREST
4. INCOME ENHANCEMENT
SUBPROJECT
5. INFRASTRUCTURE
Look-out tower
Bunkhouse
Graded trail
Footpath
D. INFRASTRUCTURE
COMPONENT
Hanging bridge
o Brgy. Buot-Taup
(proper), Cebu City
1 unit
1,146 hectares
1,129 hectares
396 hectares
899 hectares
2008 hectares
5,578 ha.
9 units
6 units
1,000 km
30,000 sq.m
1 unit
1,149.20 hectares
1,945.51 hectares
68 hectares
750.11 hectares
1,007.93 hectares
4,920.75 ha.
9 units
5 units
1,300 km
30,000 sq.m
A 62-meter
hanging bridge;
made up of two
(2) 7.90-meter
concrete towers,
-
5
o Brgy. Lagtang and
Lwaan II, Talisay City,
Cebu.
o Brgy. Mulao,
Compostela Cebu
Concrete Footbridge
o Brgy. Pamutan, Cebu
City
high tensile
strength (HTS)
cables with
lightweight steel
channels for floor
joists, welded
wire mesh
flooring and
cyclone wire
sidings.
An 80-m hanging
bridge connecting
Brgy. Lagtang and
Lawaan II,
Talisay City. It is
made up of two
11.30-meter
concrete towers,
High Tensile
Strengths (HTS)
cables with
lightweight steel
channels for floor
joists, welded
wire mesh
flooring and
cyclone wire
sidings.
A 50-m hanging
bridge made up of
HTS with
lightweight steel
channels for floor
joists, wielded
wire mesh
flooring and
cyclone wire.
A 21-meter
Concrete
Footbridge; made
up of concrete
slab resting on a
-
6
Water Supply Structures
o Brgy. Pamutan, Cebu
City
o Brgy. Jaclupan,
Talisay City, Cebu
A Pump Irrigation System
o Brgy. Sinsin, Sudlon I,
Sudlon II, Cebu City
single concrete
beam supported
by concrete
columns. It has
G.I pipe railings
and compacted
fill with grouted
riprap
approaches.
A small scale
Water Irrigation
System composed
of a concrete
intake box, one
distribution tank
(capacity 17.248
cu.m.) and
interconnected by
a 227.34 meters
polyethylene
pipeline.
A water system
at Brgy. Jaclupan,
Talisay City,
Cebu. The water
system is
composed of s
concrete intake
box, one concrete
distribution tank
(capacity=17.248
cu.m.) and
interconnected by
a 1.04921-km.
Polyethelyne
pipeline.
Five (5)
distribution tanks
(capacity 17.28
cu.m), a concrete
relief box, and
interconnected by
-
7
Farm to Market Road
Rehabilitation Project
o Brgy. Tagba-o, Cebu
City
o Brgy. Magsaysay,
Talamban, Cebu City
E. MONITORING AND
EVALUATION
Physical Validation
Year 1
Year 2
Year 3
Inspection Chart
Mapping
9,420 km
polyethylene
pipeline.
A 1.91120-km
rehabilitated
farm to market
road.
A 2.532- km Farm
to Market Road
Sitio Sunog-Sitio
Manunggal
Crossing to Sitio
Sandayong at
Brgy. Magsaysay,
Balamban, Cebu.
Portion of the
road (1.809 km) is
concreted.
Conducted in three
(3) passes;
December 1999 to
May 31, 2003;
4,920.75 hectares
Verification of
boundaries,
monuments, and
block corner
posts
Seedling
production
inventory analysis
Survival Counting
with 20%
sampling
intensity,
including mapping
of developed
areas
-
8
Institutional and Project Benefit
Assessment
Height and
diameter
measurement,
assessment of
overall health/
appearance
Inspection of
physical
infrastructure
Conducted in two (2)
passes:
June 2002 to June
2003; 4,920.75
hectares
Assessment of
the overall
development of
the PO
Assessment of
the capability of
the PO to pursue
sustainable
resource
management and
sustain its
livelihood
initiatives
Identification of
various
issues/problems/
constraints
related to the
development and
strengthening of
the PO and the
relevant support
systems
Identification of
immediate
benefits of the
project and
-
9
2. SUSIMO
Equipment provided to
the Office3
evidences that
would indicate the
intermediate and
long-term socio-
economic and
environmental
impacts.
1 unit truck
1 unit Power
Generator
1 set Computer w/
software
1 unit UPS 500VA
1 unit GIS
Software
2 units GPS
1 set Base Radio
Transceiver
4 sets Handheld
Radio Transceiver
2 units Forester’s
Transit
1 unit Typewriter
Manual
4 units Brunton
Compass
6 units Steel
cabinet
1 unit Water
pump
2 units
Steel/Nylon
1 unit Tape/Chain
2 units Diameter
I unit Tape
1 unit Cassette
Recorder
1 unit Planimeter;
1 unit
4 units Abney
Hand Level
1 unit Rain Gauge
. Binoculars
-
10
Researches conducted
Trainings4
Others
o SUSIMO
Building
4 units Calculator
1 set lettering
1 unit Drafting
Table
12 units Desks &
Chair
2 pcs Camera
1 unit Scanner
2 units Printer
50 pcs Plastic
Chairs
7 pcs VHF-FM
radio
None
Simple
Bookkeeping.
Simple
Worksheet &
Simple
Financial
Statement
Preparation.
Forest
Protection &
Fire Mgt and
Control.
Workshop on
Organizational
Mgt. & CO
Milestones.
Simple Process
Documentation
& record
Keeping.
Basic Auditing
for Non-
Auditors.
Financial Mgt.
Integration.
Renovated the
old Forest
-
11
o Turned-over
facilities of
Infrastructure
Research
Institute
(FORI) building
at Camp7,
Minglanilla,
Cebu having an
approximate
area of 400
square meters,
worth P200T.
Two four wheel
drive vehicles
(Nissan path
finder & Izuzu
fuego),
Two Cameras,
(Kodak
Advantix)
Two desktop
computers ,
(Compaq)
1 Please refer to Table 1 for the details on training attended by the POs 2 Table 2 details the subproject performance in terms of area planted
3 Table 3 shows the details of the equipment provided to the SUSIMO
4 Please refer to Table 4 for the training attended by the SUSIMO staff
B. Reasons for Revision/Modification of scope and Dimensions
B.1. Where there has been “revision/modification” of the Subproject
scope and dimensions.
Please choose the reason(s) from the following list and check.
Revision of the superior plan (e.g. sector development plan, etc.)
Revision of the supply-and-demand estimate
Large fluctuation in the Subproject cost
Substantial revision of design due to the unforeseeable physical
condition at the time of the original design (e.g. poor soil
condition, etc.)
Natural disaster/unseasonable weather
Unusual circumstances beyond the control of the Executing
Agency
-
12
Structural and organizational problems of the agencies concerned
(e.g. lack of staff, inadequate coordination with other agencies,
etc.)
Availability of funds (e.g. lack of funds, use of contingency,
fluctuation of the exchange rate, etc.)
Unrealistic initial plan/Technical problems
Procurement problems
Performance of contractor/supplier
Performance of consultant
Change in construction period
Others
B.2. Detailed statement of reasons (with background).
Natural Disaster/Bad Weather.
The occurrence of the El Nino phenomenon in 1998 brought damage to
the seedling production of the People’s Organizations (POs) of
Mananga-Kotkot-Lusaran. Approximately 1.0 million seedlings of
different species for agro forestry and reforestation components
worth millions of pesos were affected by the El Nino phenomenon.
Taking into account the number of seedlings to be produced again and
the cost it may incur, the PO will not be able to generate the required
number of seedlings for reforestation component. This prompted the
DENR and POs to realign the target of different components of CSD.
Performance of contractor/supplier
After five years of project implementation, the PO established only a
total of 4,920.75 hectares out of 5,688 hectares. Result of
assessment conducted in year 2000 however, dictated the revision of
the targets of all subprojects under the Forestry Sector Project
funded by JBIC. Development and other maintenance activities were
focused on the improvement of the 4,920.75 hectares established
plantation.
Others
o On Monitoring & Evaluation (Policy Change)
Before the adoption of MC 2001-04 entitled “Revised Guidelines in
the conduct of Monitoring and Evaluation in the Forestry Sector
Project”, monitoring and evaluation (M&E) of FSP subprojects’
accomplishments employed the Inspection Chart Mapping (ICM)
system, whereby, there was a 100% counting of seedlings planted and
-
13
dealt only on the physical aspect. Review of policy, however, resulted
to the adoption of MC 2001-04 that specified the conduct of an
independent review and assessment of not only the physical
components of the subproject but also came up with the Institutional
and Project Benefit Assessment (IPBA).
o On Infrastructure Component (added component of the
FSP)
An intensive review and assessment of the status of each subproject
was conducted by the NFDO through the Technical Assistance team
in CY 2000. Results of the assessment justified the inclusion of the
Infrastructure Support Project in the FSP II. The Infrastructure
Support Project aimed to promote the livelihood development of the
PO through the rehabilitation of the poor road condition that
hindered livelihood development and /or other infrastructure support
that the PO deemed necessary for the promotion of their livelihood
projects.
o On SUSIMO Creation (Project Management Office
Initiative)
Results of the assessment likewise, compelled NFDO to institute a
system that would provide effective and efficient management of the
Subproject on the ground level. Creation of the Subproject Site
Management Office (SUSIMO) manned by the DENR permanent
personnel was found to be the proper approach, hence, the issuance
of the Department Administrative Order (DAO) No 2000-65 that,
mandated the Regional Office and the field Offices to install the
SUSIMO for each subproject site. Simultaneous with SUSIMO
creation was the capability building of its staff through the provision
of the technical, financial and management trainings. Facilities such as
buildings and other equipment were likewise provided to the SUSIMO
for sound subproject administration.
C. Contribution of Subproject to Relevant (Sub) Sector(s)
c.1. (Sub) Sector(s) to which the Subproject belongs
Electric power and Gas Telecommunication Social
services
(Multipurpose) Dams Telecommunications Water
supply
Power Plants Broadcasting Sewerage
Transmission lines Education
-
14
Distribution Systems Irrigation and Flood control Health
Gas Irrigation Tourism
Others Flood control Others
Transportation Agriculture, Forestry and Fisheries
Roads Agriculture and Forestry
Bridges Fisheries
Railways
Airport Mining and Manufacturing
Ports Mining
Marine Transportation Manufacturing
Others
C.2. Original (At the time of appraisal/Planned)
Item Description
1.Site development and rehabilitation
2. Livelihood Development Projects
3. Management of the Community
Based Forest Management Agreement
The Subproject at full development
is expected to increase the extent
of forested area in the watershed,
which in turn will increase volume
of wood and minor forest products
at a substantial level, bringing
about stumpage and other
plantation products build-up.
The water yield of watersheds is
expected to increase substantially
and will generate sufficient and
sustained amount of water in Cebu
City and nearby municipalities.
It will provide positive economic
spillover downstream.
Additional livelihood projects will
be identified and implemented by
the communities to augment
household income of the watershed
communities while waiting for major
harvests from the agro forestry
component of the Subproject.
CBFMA management will generate
employment opportunities
-
15
(CBFMA) Area.
equivalent to 11.81 million person-
days for a period of 26 years or an
annual average of 454,295 person-
days. This is equivalent to a total
labor of 47,247 workers in 26
years or an average of 1,817
workers annually.
There will be an increase in annual
household income estimated at
P6,025 for the first year up to
P26,268 for the fifth year or a
total of P112,155 for five years.
This will give an average increase of
P22,432 per household annually.
C.3. Present situation and outlook for the future
Item Description
1.Issuance of land tenure
2. Established plantation
Instead of CBFMA, PACBRMA will be issued to
the POs since MKL is within the proclaimed
protected area. The 13 POs of MKL through
the SUSIMO already submitted their
application for PACBRMA to the respective
Protected Area Management Boards (PAMBs)
of MKL Watershed Subproject. To date,
issuance of PACBRMA is still being processed.
Delay in the formulation of the implementing
guidelines for the issuance of PACBRMA
greatly affects the trust & confidence of the
upland communities. Once the PACBRMA is
issued to the POs, they will be motivated to
manage the area sustainably.
Efficiency and effectiveness of the POs in
protected area management will depend on the
assistance to be provided by the DENR-PAMB
and SUSIMO.
The CSD area of BUKID MPC and UFMPC
includes the remaining natural growth of Mount
Manunggal and the Tabunan Forest
respectively. The vegetation on the slopes
towards Mt. Manunggal still contains species
-
16
3. Livelihood Development5
commonly found only in natural forest, although
there is great reduction in big trees. Several
dipterocarp species are still present in big part
of such slopes.
Based on the CUSW’s Final Pass Report, Eight
(8) out of thirteen PO’s are above the standard
Weighted Average Survival Rate (WASR), with
WASR ranging from 82% to 93%, while the
other five (5) PO’s are below standard WASR,
ranging from 30% to 79%. Eventually, four (4)
POs passed and claimed their respective
retention fees.
A total of 4,920. 75 hectares was established
by the POs with a weighted average survival
rate (WASR) of 85.46%. With the above
accomplishment the extent of forested area in
the watershed increased. At full development,
there will be an increase in wood volume and
quantity of minor forest products at a
substantial level. Thus, stumpage and other
plantation products build-up in the long run.
The water yield of watershed will also increase
substantially and will generate sufficient and
sustained amount of water in Cebu City and
nearby municipalities, thus, there will be
positive economic spill-over downstream.
The Subproject implementation has diverted
the attention of the community from forest-
based source of income to non-forest based
income sources. Presently, the POs of MKL are
investing much of their CFDF into individual
livelihood projects. Some POs are engaged in
vegetable production and have tied up with
MACRO supermarket for the marketing of
their products. Other POs are into consumer
stores, grocery stores, micro-financing and
others. A cumulative CFDF is P1,868,709.56,
with P11,550.00 as the smallest and
P1,258,000.00 as biggest CFDF among the 12
POs.
-
17
4.Comprehensive Site
Development Activities
5.Agroforestry
development
Given the necessary support through
continuous trainings on technical aspects of
livelihood projects, marketing, linkaging and
financial management systems, competency
level of these thirteen POs will increase, thus,
will enable them to expand their livelihood
projects and do away with the forest-based
means of livelihood,
The Subproject generated employment
opportunities equivalent to 1,050 workers
(employment ranging from 90 to 700 days) for
a period of seven (7) years from different CSD
activities and infrastructure development.
The Subproject activities increased the annual
household income at an estimate of 59% or
an annual additional household income of
P9,354.00 for seven (7) years.
Planted fruit trees, particularly cacao are
growing well and becoming visible vegetative
component of developed areas, although these
are in relatively small parcels. There are some
indigenous tree species that exhibit promising
growth performance, such as pangantoon,
bagalunga, himbabalud and molave. Mangiums
planted in 1998 showed highest average
diameter of seven centimeters (7 cm.) and
eight meters (8 m.) in height for SSSFAI and
MCFA plantations.
The agro forestry component of BUKID MPC is
associated to intensive human intervention and
if applied to areas with natural growth, the
project is expected to do more damage than
development to the natural resources and soil
conservation. It was also noted that BUKID
MPC’s activities did not include schemes for
protection and production forests (ViFARD 2nd
Pass Report). This observation is also true with
UFMPC CSD areas near the Tabunan Forest.
BUKID MPC’s CSD area has a wide coverage.
Similar rehabilitation works should be
-
18
6. Conduct of Maintenance
and Protection activities
expanded to adjoining area that needs similar
land development. The PO has the advantage of
having big areas needing development, since
the area can be used to request for additional
funds or to secure new project. However, the
organization should continue concentrating on
degraded areas that are more or less
dominated by grass. While much of the planted
sites are indeed in denuded sites, isolated
parcels of this kind within the covered areas
remain unplanted.
A total of 1,945.51 hectares was planted to
agroforestry crops and has a weighted average
survival rate of 84.78%. Harvest will be
abundant in just few years to augment annual
household income of the community. Once
harvests of agro forestry products boom,
processing of such is deemed necessary to
optimize gain from the products. Trainings and
capability development as well as funds support
are encouraged to sustain the agro forestry
development as an alternative source of
income.
Further development is likewise encouraged
for the optimum use of the land.
There is no more funds for maintenance and
protection activities, but through the CFDF,
allocation for such has been provided.
Presently, the PO has been able to meet the
standard survival percentage.
Maintenance of established plantations must
be continued especially that the plantations
are in their critical stage. Funding must either
be allocated from the regular DENR budget or
solicited from other funding agencies including
the private sector. NGOs working in the area
must be encouraged to participate in
supporting the maintenance activities, such as
adopting a particular plantation area and
working with POs concerned.
-
19
7.Infrastructure
Development/Rehabilitation
Through the effort of the SUSIMO, the
Philippine Canadian Environmental and Economic
Management Project (PCEEM) installed the
water system benefited by almost 380 families
in barangay Mulao, Lupa, Compostela Cebu.
Different infrastructure projects have been
constructed/rehabilitated in the site to
support the livelihood development activities of
the POs, such as:
o The rehabilitated farm-to-market
roads, hanging bridges and footbridges
provide accessibility to the community as
well as ease of transport of the farm
products thus, increasing profitability.
o Irrigation system and water supply
structures that provide irrigation and
domestic water supply to Brgys. Pamutan,
Jaclupan, Sinsin, Sudlon I and Sudlon II.
5 Please refer to Table 5 for the livelihood projects being implemented by the POs
II. Subproject Implementation
1. Organizations for Implementing Subproject
Function in the Name of Organization Reasons for
Subproject
Implementation
(1) Original (2) Changed Change
1. SMA
2. AO for CO
3. AP
By Administration
o BLESSED Phils.
Inc.
o VALUES Inc.
o CRMOI
o RAFI
JUDAH ALIPOSA
JUSTINO
BRIONES
JUSTINO
BRIONES
ISIDRO
DINEROS
BRIGITTE
YANOC
JUDAH
ALIPOSA
resigned from
OIDCI as an AP
after receiving
a better job
-
20
4. PO
5.M&E Contractor
Physical
Component
and Socio-
institutional
Institutional
and Project
Benefit
Assessment
(IPBA)
6. Infrastructure
Contractor
1. MALTAJ
2. CAMMITA
3. SSSFAI
4. PSBA
5. PSMPC
6. UFMPC
7. TMPC
8. MFMPC
9. MCFA
10. NAGMATA
11. BAKANTI
12. LFA
Cebu Uniting for
Sustainable Water
(CUSW) Inc.
1. PMC
Construction
2. WERR Corp.
(International)
o BUKID MPC
ViSCA Foundation
for Agric’l. and
Rural Dev’t.
(VIFARD)
offer from FPE
in terms of
salary & scope
of work.
Additional PO
was tapped by
DENR to be
contracted for
the
establishment
of backlog in
CSD
Both Physical
and
Institutional
components
were awarded to
CUSW, but
CUSW did not
complete the
IPBA. Hence, a
new contract
for Institutional
& Project
Benefit
Assessment was
awarded to
VIFARD.
-
21
Please state:
1.1 Reasons for the change
On Assisting Professional (AP)
After a year of being an AP of the MKL Watershed Subproject, Mr.
Judah S. Aliposa, resigned to pursue a career development path.
Considering the number of POs in MKL that need assistance,
replacement of Mr. Aliposa was deemed necessary, hence, SUSIMO
requested the Project Management Office (NFDO) and the OIDCI to
hire not just one but two AP’s in the persons of Mr. Isidro Dineros
and Ms. Brigitte Yanoc.
On Comprehensive Site Development
The willingness of the BUKID MPC to implement and complete the
backlogs in CSD area and with the strong support of LGUs of
Balamban, Cebu City encouraged the SUSIMO to award a 600-hectare
CSD contract to BUKID MPC. BUKID MPC was organized by the LGU
of Balamban, Cebu City in 2000 while, strengthening and capability
building trainings were conducted and facilitated by the SUSIMO and
AP.
On Monitoring & Evaluation
The original contract of CUSW was designed to conduct both the
physical evaluation and Institutional & Project Benefit Assessment of
the POs of MKL Watershed Subproject. Considering the area
coverage and the scattered location of the area of the thirteen POs,
it seemed that CUSW could not cope with conducting both activities
at once. Consequently and in compliance with MC 2001-04, the DENR
decided to split the M&E activities and awarded the Institutional and
Project Benefit Assessment to ViFARD, Inc. to ensure completion of
M&E activities on time.
1.2 Problems arising, counter measures adopted and results
Problems Measures Adopted Results
A.. On Community
Organizing
1. The AO (VALUES)
abandoned its CO
contract in 1999 and
The Regional DENR
management provided
project officer, aside
The PO was able to
recover the backlog of
SSSFAI.
-
22
left some financial
obligation to SSSFAI.
2. Weak Organizational
and Financial
Management of POs.
3. Lack of appreciation
and awareness about the
project by some PO
members brought about
cultivations in portions
of developed areas by
claimants (tenants or
absentee claimants) for
their basic needs.
from the site
coordinator, to supervise
the implementation of
the CO and SSSFAI CSD
contract in 1999.
The SUSIMO and PO
conducted Training
Needs Assessment TNA),
thus, prioritized the
conduct of trainings and
seminars on record
keeping, bookkeeping,
auditing, and
documentation of
minutes of meeting.
SUSIMO and AP
intensified the IEC
and conducted house
to house
meetings/discussions
during regular,
emergency and BOD
meetings.
The SUSIMO and AP
adopted a Joint
monthly meeting
among the 13 POs,
SUSIMO and APs to
discuss all issues,
problems, and
concerns in the
project
implementation.
Some PO association/
organization
capacitated on
organizational and
financial aspect
Systems on
organizational and
financial aspects were
installed
functional/operational
.
Clarified roles,
responsibilities and
functions of PO
Officers, members
and BODs.
Increased awareness
of PO in project
implementation, thus,
encouraged other
interested claimants
and tenants to
participate in the
plantation
establishment
Increased degree of
coordination between
and among the DENR,
POs and LGUs.
Shared lessons
learned.
POs’ monthly action
plan prepared.
-
23
B. On Comprehensive
Site Development
1. Unsatisfactory per-
formance of AO and
some POs at the early
stage of project
implementation.
Only one site
coordinator was assigned
at first to monitor the
project implementation
covering 12 POs of 39
Barangays with an area
of more than 5,000 ha.
The site coordinator,
being alone, could not
monitor the
performance of the AO
and PO properly. This
resulted to poor
performance (average
survival of 65%) of the
project.
2. Regional directive to
conduct 100% inventory
of the CSD
accomplishments.
3. Unavailability of area
to be developed under
the CSD.
Most of the members of
the organized PO have
SUSIMO installation:
SUSIMO staffs were
deployed to monitor and
supervise the CSD
activities of two-three
POs.
Provision of three
AP’s to assist the 13
POs as part of the
SUSIMO installation
and capacitation.
Close monitoring and
supervision by the
SUSIMO and AP was
employed.
POs were assisted in
the preparation of
the monthly CSD
work plan as their
basis in the regular
assessment of CSD
performance.
No action
Canvassers
(approximately 65
There was sufficient
staff to monitor and
supervise the
performance of the
AP and PO. Validation
and billing process
was shortened and
facilitated from an
average of 3 months
to 1 month.
Improved quality of
plantation
Out of 13 PO’s, 12
have claimed their
retention fees. Only
one PO (PSMPC) did
not receive the
retention fee because
of low survival rate
(35% survival rate),
but was able to
manage the livelihood
project.
Incurred delays in the
processing of billings due
to extensive validation
procedure, which caused
loss of interest of some
POs to perform the CSD
activities.
The POs of MKL were
able to meet the revised
-
24
no area to be developed.
Sometimes the tenant
wanted the area be
planted but the
absentee claimant did
not allow planting, or
vice versa.
4. Poor Quality of
plantations due to
absence of maintenance
activities.
5. Lack of support from
Local Government Units,
except for BUKID MPC
(Barangay level), most
members of the PO was
influenced by the LGUs.
6. Rodents attacking
jackfruit plantations at
an alarming (90%
damaged) rate,
particularly SSSFAI’s
plantations. These pests
ate the succulent part
of the stem and barks of
the jackfruit seedlings
once out planted in the
field.
persons) were employed
by the PO to identify the
area for development
charged to CSD fund, it
incurred approximately
an amount of P572,000
for the canvasser only.
The SUSIMO conducted
intensive IEC on the
project to win the
support of most LGUs in
the subproject site.
The POs applied chemical
(COALTAR) to minimize
infestation.
The PO changed the
species used for planting
from jackfruit to
starapple.
target but of different
area per component. Most
of the target area under
reforestation was
converted into
agroforestry.
The very low survival
rate of PSMPC is
attributed to stray
animals, and apathy or
loss of interest and
dissatisfaction of
stakeholders
concerned who
allegedly did not allow
the conduct of
maintenance activities
in the plantation
within their claimed
area.
After series of dialogue,
coordination and IEC, the
SUSIMO and the PO
gained support of the
LGUs concerned.
No significant effect
because the smell would
fade after several days
of exposure.
Rodents no longer attack
starapple seedlings,
apparently because of its
hardness.
1.3 The latest organization chart (or equivalent) for the implementation
of the Subproject is ( attached or not available).
-
25
Organizational Charts of the thirteen (13) POs, M&E Contractors, and
Infrastructure Contractors are attached and marked as Annexes
1a1-1a13, 1b1-1b2 and 1d1-1d2, respectively.
1.4 If the organizational chart (or equivalent) is not available, please
state the reason.
Organizational Charts of the CO contractors (RAFI, CRMOI,
VALUES, Blessed Philippines) are not on file. Securing of such was
explored by the region, but still neither Organizational Structure nor
its equivalent was secured.
2. Implementation Period
A. Comparison of Original Schedule and Actual Period
Please fill in the following blanks with actual period for each item.
ITEM
ORIGINAL SCHEDULE
ACTUAL PERIOD
1. SMA
1. Contract of AO for CO
2.1 RAFI
2.2 VALUES
2.3 CRMOI
2.4 BPI
3. Contract of PO for
CSD
3.1 MALTAJ
3.2 CAMMITA
3.3 SSSFAI
3.4 PSBA
3.5 PSMPC
3.6 UFMPC
3.7 MFMPC
3.8 MCFA
3.9 LFA
3.10 TMPC
3.11 NAGMATA
3.12 BAKANTI
3.13 BUKID-MPC
4. Contract of NGO for
M&E
February 1996 – July 1996
Feb. 12, 1997 – Feb. 12. 1999
Feb. 12, 1997 – Feb. 12. 1999
Feb. 12, 1997 – Feb. 12. 1999
Feb. 12, 1997 – Feb. 12. 1999
Oct. 15, 1997 – Oct. 15, 2000
Oct. 15, 1997 – Oct. 15, 2000
Oct. 15, 1997 – Oct. 15, 2000
Oct. 15, 1997 – Oct. 15, 2000
Nov. 14, 1997 – Nov. 14, 2000
Nov. 14, 1997 – Nov. 14, 2000
Nov. 27, 1997 – Nov. 27, 2000
Nov. 26, 1997 – Nov. 26, 2000
Nov. 26, 1997 – Nov. 26, 2000
Nov. 27, 1997 – Nov. 27, 2000
Nov. 27, 1997 – Nov. 27, 2000
Nov. 27, 1997 – Nov. 27, 2000
Dec. 28, 2000 – Jun. 30, 2003
February 1996 – July 1996
Feb. 1997 – July 2001
Feb. 1997 – Jan. 2000
Feb. 1997 – June 1999
Feb. 1997 – July 2000
Oct. 1997 – June, 2003
Oct. 1997 – June, 2003
Oct. 1997 – June, 2003
Oct. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Nov. 1997 – June, 2003
Dec. 200 – June, 2003
-
26
4.1 CUSW
4.2 ViFARD
5. Contract of
Infrastructure
Component
5.1 PMC
5.2 WERR Corp.
Completion
(completion of
Subproject)
Dec. 1999 – June 2001
June 2002 – June 2003
Dec. 12, 2002 – June 30, 2003
Dec. 12, 2002 – June 30, 2003
June 30, 2000
Dec. 1999 – May 20‘03
June 2002 – June 2003
Dec. 12, 2002 – July 31,
2003
Dec. 12, 2002 – July 31,
2003
October 24, 2003
Please refer to Table 6 for the subproject status report
Notes: Completion of the Subproject was defined as ( completion ceremony or
final disbursement or other than the above.
The completion date was scheduled for June 30, 2000 (at the time of
appraisal) and is indicated (thus ) in the above Table.
B. Reasons for Delay or Early Completion
B.1. In case of delay or early completion, please choose the reason(s)
from the following list and check.
Change in scope/dimensions
Natural disaster/bad weather (e.g. earthquake, typhoon, etc.)
Shortage of funds/Fluctuation of the exchange rate
Problems in procurement
Inflation
Unusual circumstances beyond the control of the Executing
Agency
Structural and organizational problems of the agencies concerned
(e.g. lack of staff, inadequate coordination with other agencies,
etc.)
Legislative matters
Unrealistic initial plan/Technical problems
Performance of contractor/supplier
Performance of consultant
Others
-
27
B.2. Reasons and background for delay or early completion
Change in scope and dimension
o On Comprehensive Site Development
Intensification of maintenance activities such as: ringweeding,
cultivation and application of fertilizers (RCF) and patrolling to
improve the quality of plantation brought the change in schedule of
the implementation period of the CSD activities pursuant to MC
2000-19 entitled “Guidelines Governing the updating of Cost and
Intensification of Maintenance activities in the FSP Subprojects
funded by JBIC.”
o On Infrastructure
Duration of the infrastructure activity was affected by different
variation orders made by the contractors for effective and efficient
use of different infrastructure projects, such as:
a. Pump Irrigation System : A need to install the 3- Phase electrical
power supply to Sinsin-Sudlon Pump Station. Originally, installation
of power lines is not incorporated in the technical plan of the
water system in Barangay Sinsin, Sudlon I, Sudlon II, but, during
its initial operation it was found out that there is no power supply
to operate the pump irrigation system, thus, this variation order;
b. Hanging bridge: Transfer or relocation of the original contract for
a 72-meter hanging bridge at Brgy. Jaclupan to an 80 meters
hanging bridge at Brgy.
Lagtang, Talisay Cebu.
Jaclupan is accordingly
the site of another
proposed bridge to be
constructed from the
Countrywide Development
Fund (CDF) of the
Congressman of Talisay
City.
-
28
Natural Disaster/Bad Weather.
o On Comprehensive Site Development
The occurrence of the El Niño Phenomenon in 1998 hampered the PO’s
production of planting materials and also caused high mortality (50%)
of out planted seedlings. It was aggravated by Typhoon Nanang that
hit Cebu in November 2001 causing landslides, gully erosion and
floods. This brought considerable damage (30% of the area) to the
established plantations of MALTAJ, PSMPC,PSBA,SSSFAI, UFMPC
and BUKID MPC. Re-planting and other maintenance activities to
recover the damage were conducted during the extension period.
o On Infrastructure
Typhoon in 2002 damaged a portion of the rehabilitated farm-to-
market road in Barangay Magsaysay, Balamban, Cebu City. The
contractor again conducted the repair job which delayed the
completion of infrastructure project.
Problems in procurement
Difficulty in procuring the services of the Community Organizing
contractor had been the experience of the MKL, attributed to the
cost allocation over the location and size of the target communities.
The DENR Region 7 had posted notice of bidding for the conduct of
the community organizing for Mananga-Kotkot-Lusaran, only one (1)
NGO had shown interest. So, it was declared failure of bidding due to
insufficient number of bidders. Other NGOs had backed-out before
the bidding process, apparently, due to low CO cost.
Structural and Organizational Problems of the Agencies
Concerned
At the start of implementation, only one site coordinator (which later
became three) was assigned to facilitate and supervise the
Subproject implementation. Being alone, supervision and monitoring
the performance of the four (4) AOs and twelve (12) POs of thirty-
nine (39) barangays covering an area of 5,578 hectares became
ineffective that resulted to poor quality of the plantation with just
an average survival of 65%.
Poor performance of the POs is also attributed to the procedure and
composition of team that conducted inspection and validation of
accomplishments of AOs and POs. Composite Inspection Team (CIT)
-
29
or Composite Inspection Committee (CIC) members were not on full
time basis in the FSP as evaluators. Delay in the conduct of validation
also delayed the processing and release of payments to the POs, with
the domino effect in the implementation of the CSD activities of the
POs.
Installation of SUSIMO by virtue of DAO 2000-65 seemed to be the
appropriate strategy for effective and efficient management of the
Subproject but in the case of MKL, it did not easily materialize.
Considering the need for 19 SUSIMO staff for MKL alone, the DENR
R-7 could only deploy even just eight (8) personnel, which is still
insufficient to carry out the tasks mandated by DAO 2000-65.
Delays in the provision of assistance, facilitation, supervision and
validation of POs accomplishments were still encountered, although
minimized.
Legislative Matters.
Since MKL Watershed Subproject is within the four (4) proclaimed
protected areas of Cebu namely; Mananga Watershed Forest Reserve
(MWFR), Kotkot-Lusaran River Watershed Forest Reserve (KLRWFR),
Sudlon National Park (SNP) and Central Cebu National Park (CCNP),
CBFMA could not be issued to the 13 POs, hence, occupants were
hesitant to participate in the project. In 2002 through DAO No. 02
the establishment and management of the Community Based Program
within the protected area has been allowed through the issuance of
the PACBRMA as its tenurial instrument. Henceforth, requirements
for the processing and issuance of PACBRMA had been worked out
and complied with by the POs, SUSIMOs and Protected Area
Management Boards (PAMBs). However, issuance of the tenurial
instrument is still pending due to the long delay in the approval of the
management zones of MKL. Thus, loss of trust and confidence to the
DENR by the occupants further contributed to the non-participation
of the residents in the project implementation.
Unrealistic initial plan/Technical Problem/Performance of the
Contractor/Supplier
During the preparatory stage, appraisal of the site had been
conducted by the DENR personnel to evaluate the feasibility, viability
(economic and financial aspects), and social acceptability of the
project. Local communities had been consulted; however, there was no
direct participation of local communities in the planning process even
in the preparation of the Work and Financial Plans (WFPs) of the POs.
This resulted to rejection of some recommended species by the local
-
30
communities, primarily, due to its poor performance in that area as
observed by the POs during implementation; over-estimation of areas
for plantation over the actual available area due to the resistance of
the absentee claimants to plant their claimed lots and low acceptance
of the project by the communities.
Convincing the target participants to implement the project took long,
since the Community Organizing activity was awarded in 1996, but the
PO started nursery operations only in 1998. Another contributing
factor to the delay was the need to revise the WFPs to incorporate
the preferred species of the communities in order to gain their active
participation and willingness to plant their claimed area for the
project.
Deployment of inexperienced and not well-trained CO staff resulted
to resistance of the community to accept the project. There was
weak information, education and communication campaign by the CO-
workers. Furthermore, the CO activities were conducted as what the
guidelines provided and not based on the needs of the community.
Performance of the Contractor/Supplier
Since, the contractor awarded with the infrastructure component is
based in Luzon, heavy equipment necessary for the farm-to-market
road construction such as bulldozer, dump truck and the like, need to
be transported from Luzon, and thus incurred significant delay in the
completion of the infrastructure project. Further, a portion of the
rehabilitated farm-to-market road in Brgy. Magsaysay was of
substandard quality and was easily damaged by the typhoon.
Others (Insufficient fund for M&E activity and Policy Change)
Considering the size and location of approximately 3,000 patches
plantations (with an average of 1.3 ha per patch) of thirteen (13) POs
in MKL, the cost provided for the conduct of monitoring and
evaluation was not sufficient enough prohibiting the CUSW to hire
required number of workers to do the M&E activity. There was
therefore a delay in its completion.
Another factor that affected the schedule of the M&E activity was
the adoption of the MC 2001-04 or the “Revised guidelines in the
Conduct of the Monitoring and Evaluation” wherein contracts for the
Institutional and Project Benefit Assessment (IPBA) and Physical
components must be awarded separately.
-
31
C. Remedial Action Taken in Each Case of Delay
Change in scope and dimension
o On Comprehensive Site Development
Pursuant to MC 2000-19, corresponding revision of the WFPs and
amendment of the CSD contracts were undertaken by the PO and the
site coordinator, to effect the increase in frequency of the ring
weeding passes, application of fertilizer and the conduct of patrolling
in the area for further improvement in the quality of the established
plantations.
o On Infrastructure
As regards the infrastructure project, different variation orders
made by the infrastructure contractors had been approved by the
PMO.
Natural Disaster/ Unseasonable weather
To minimize damage of El Nino phenomenon, the POs were instructed
to apply leaf pruning and practice mulching (in the plantation) to
lessen the transpiration rate of seedlings; provide additional shade in
the nurseries; purchase additional watering equipment/ tools/
facilities like drums, hose and water pump; construct water-
impounding dams for nursery and encourage backyard nursery.
Moreover, the POs conducted intensive replanting in the damaged
area. Likewise, they implemented the maintenance and protection
activities specified in MC 2000-19 during the extension period.
Problems in procurement
Since, there was a failure of bidding for Community Organizing, a
negotiated bidding took place. Hence, CRMOI, VALUES, RAFI and
BLESSED Philippines were awarded with the Community Organizing
contract for Mananga-Kotkot-Lusaran in 1996.
Structural and Organizational Problems
Implementing the DAO 2000-65 or the SUSIMO creation was
deemed appropriate for effective and efficient management of the
Subproject in the field level. In the case of MKL however, this was
not the outright solution as called for by the need to deploy 19
SUSIMO staff. The SUSIMO instead adopted the following
-
32
strategies to address the need of the POs on technical, financial and
management aspects:
a. Site Coordinator scheme in the supervision and provision of
technical assistance to the PO in the plantation establishment,
maintenance and protection activities;
b. Tapping the technical assistance of the personnel from the
DENR-RO, Central Cebu Center for the Integrated Catchment
System Management (CCCICSM), PENRO and CENROs for the
conduct of technical, financial and management trainings for
POs’ strengthening and conduct of field validation.
c. Hired foresters on a contractual basis (charged to the
project) in the last quarter of CY-2001 as approved by the
PMO Central Office and fielded to the different POs of MKL
Watershed Subproject to provide technical assistance/advice
and to oversee the actual CSD implementation of the POs.
Legislative Matters.
The MKL SUSIMO encouraged PO presidents/chairpersons to apply
for membership in the PAMB (some are already PAMB members) so
that they
could participate in the planning and development of the protected
area. For the PACBRMA issuance, the SUSIMO also sent tracer-
letters to the offices concerned on the status of the POs application
for PACBRMA and for the PAMB to make follow-ups in the DENR
Central Office with regard the submitted management zones.
Unrealistic Initial Plan/Technical Problems/Performance of the
Contractor.
The SUSIMO instructed the POs to prepare resolutions for
changing/adding of species to be planted in their respective areas and
assisted in the preparation of their plans and resolutions. For the POs
who had difficulty in accomplishing their target areas as per CSD
contract, the SUSIMO successfully convinced these POs to reduce
their areas based on their capabilities and award the same to POs of
good standing. Likewise, corresponding revision and extension of
contracts have been undertaken.
Extension of the contract duration was granted for infrastructure.
-
33
Others (Insufficient cost for M&E activity and policy change)
The Regional Office encouraged the M&E contractor to undertake
the activity by allowing them to just identify and indicate the relative
location of the patches plantation while the SUSIMO would
determine the area planted per stakeholder.
In compliance with MC 2001-04, issuance of separate contracts for
socio-institutional and physical components had been made.
3. Subproject Cost
A. Comparison of Original Estimated Cost and Actual Expenditure (by
Component)
Item
Original Cost
(based on appraisal)
(in M pesos)
Actual Expenditures
(in M pesos)
SMA
Community
Organization
Comprehensive
Site Development
Monitoring
and Evaluation
Infrastructure
Dev’t
Subproject
Coordinating
Office
(SUSIMO)
7.248600
100.835388
5.938672
31.940664
3.019450
6.388486
94.753681
5.921526
33.655122
3.019450
Total 148.982774 143.738265
Please refer to Tables 7, 8a-e and 9 for the details on cost of CO, CSD and M&E,
respectively. List of Infrastructure projects with its corresponding cost is also attached as
Table 11.
B. Reasons for Difference between Original Estimated Cost and
Actual Expenditure
B.1. If there is any difference between Table a.1 and Table a.2 in
Paragraph a, please choose the reason(s) from the following list
and check.
-
34
Increase in reconstruction cost arising from natural
disaster/unreasonable weather (e.g. earthquake, typhoon, etc.)
Increase or decrease arising from a change in construction period
Increase or decrease arising from inflation
Increase or decrease arising from fluctuation in the exchange
rate
Increase or decrease arising from a change in the scope/work
volume of the Subproject
Decrease arising from keen competition in tender
Unusual circumstances beyond the control of the Executing
Agency
Unrealistic cost estimates/Technical problems
Others
B.2. Description of the detailed reason(s) and background
Increase or decrease arising from a change in the scope/work
volume of the Subproject
o On Comprehensive Site Development
Despite updating of cost and intensification of the maintenance
activities of the POs per MC 2000-19, as well as the granting of
contingency funds to some POs, still the CSD cost decreased because
of the series of revision, reduction and re-alignment of targets from
one PO to another.
o On Monitoring and Evaluation
Although, implementation of MC 2001-04 brings an increase in cost
of the M&E because of the increase in cost per hectare on physical
aspect and additional fund provided for IPBA, this was not the case
for MKL. Adoption of the revised guidelines brought a decrease in
the number of passes and the area covered by the M&E and thus
reduced the M&E cost.
o On Infrastructure
Different variation orders brought decrease in cost of some specific
infrastructure projects, however, installation of the electrical power
supply in pump irrigation system in Brgys Sinsin, Sudlon I and Sudlon
II caused increase in total cost of infrastructure project.
-
35
Unusual circumstances beyond the control of the Executing
Agency
Decrease in cost of the Community Organizing was caused by the loss
of interest by the CRMOI to claim the retention fee due to the billing
requirements of the DENR.
Others (performance of the contractors)
o On Community Organizing
Decrease in cost was mainly due to the unaccomplished CO activities
of some AOs, whereby only two (2) of the four AOs successfully
received their respective retention fees.
o On Comprehensive Site Development
Reduction in CSD cost is an indication of the poor performance of the
contractors. Failure of the POs to establish the target up to CY2000
forced the DENR to reduce the 5,688 hectares to 4,920.75 hectares.
C. Action taken in Case of Cost Overrun and Results
Additional obligation and corresponding revision of the WFP on
infrastructure component was undertaken. The financial obligation
was paid for corresponding physical accomplishments.
D. Comparison of Original Estimated Expenditure and Actual
Expenditure (by Year)
Calendar
Year
Original Cost
(based on Original
Contracts)
(in M pesos)
Actual Expenditures
(in M pesos)
1997
1998
1999
2000
2001
2002
2003
19.447047
56.544947
16.576002
15.515992
1.539750
0.599000
32.821364
1.817131
25.925880
17.579311
15.379566
22.383793
14.574059
40.156999
Total 148.982774 143.738265
Please refer to Table 12 for the details of the Annual Work and Financial Plan
-
36
4. Comments on Performance of Assisting Organizations (AOs),
Assisting Professionals (APs), Peoples Organizations (POs), M&E and
Infrastructure contractors.
Please describe the performance of each organization after checking the
item(s) in the relevant lists on which you have any comment.
A. Performance of Assisting Organizations & Assisting Professionals (if
any) Peoples Organizations, M&E and Infrastructure contractors
A.1. Overall performance Design
Contract administration Construction supervision
Expertise Staff qualifications
Coordinating ability Compliance with Contracts
Performance related to any other than the Subproject scope,
if any.
Others
A.2 Description (in detail)
o Over-all Performance
Assisting Organizations
In general, the Assisting Organizations (AOs) in MKL can be rated
fair, since, only two have successfully accomplished their CO
activities namely: BLESSED Phils. Inc. (BPI) and Ramon Aboitiz
Foundation, Inc. (RAFI), while the personnel of VALUES, Inc.
abandoned their site during the later part of their contract
duration after one of its personnel borrowed a considerable
amount of money from their PO and never paid it back. Cebu
Resource Management Organization, Inc. (CRMOI) on the other
hand, submitted a terminal report to the DENR but it had lost
interest in complying with other billing requirements until its
contract expired.
Assisting Professionals
The Assisting Professionals (APs) performance in the delivery of
their duties and obligations to the PO’s of MKL Watershed
Subproject was satisfactory. They had successfully instituted
reforms in the project management particularly in financial aspect.
The APs helped the PO to improve the systems and procedures in
project management and conducted all other activities left by the
AOs some of which were installation of systems and procedures on
financial management, proper bookkeeping, preparation of
-
37
feasibility studies, and record keeping. Presently, most POs are
practicing the systems instituted by the AP’s.
People’s Organization
In the midst of the contract duration, only one (1) out of thirteen
(13) POs was able to deliver satisfactory performance in terms of
physical accomplishment (standards and compliance to
instructions). Majority (12 POs) did not internalize the trainings
and coaching provided by the AOs during the CO works. As a
result, most PO’s encountered financial losses, huge debts and
failures in livelihood development activities. Continued assistance
however, was provided by the DENR and APs until the POs were
able to plant a total of 4,920.75 hectares and was able to receive
their retention fees.
The M & E Contractors
Initially, only the CUSW was contracted to do the monitoring and
evaluation of the MKL both for the physical and institutional
aspect. However, it was observed by the DENR that CUSW had
difficulty in completing the task considering that almost 3,000
patches of plantations were covered by the M&E contract, thus,
Vifard was tapped to perform other activities. This was to ensure
the completion of the activity particularly the institutional and
project benefit assessment. Performance of both contractors can
be considered satisfactory since they delivered the expected
outputs.
The Infrastructure Contractors
There were two contractors for the MKL-WSP Infrastructure
Projects, however, none of them delivered good performance.
Without extension and revision of the contract, none of the
structures would be finished. This could be attributed to the fact
that the contractors were not based locally and that they lacked
logistical and financial support from their respective head offices.
Expertise and Staff Qualifications
Assisting Organization
Expertise and staff qualifications greatly affected the
administration of CO contracts. Some AOs employed experienced
personnel while others utilized fresh graduates, apparently new in
-
38
community organizing works. In terms of staff qualifications, high-
ranking officials of the AOs were highly trained and experienced,
however, the time spent by these officials was not as often as
expected particularly during community immersion.
Assisting Professional
The expertise and qualifications of the APs are beyond question.
The time frame however, was not enough considering the number of
POs in the Subproject. The activities undertaken by the APs were
very important to ensure the sustainability of the organization.
5. Other matters relating to Subproject Implementation
Please choose the item(s) from the following list on which you have
any comment, check it (them), and describe it (them) with measure
and results in (B) below.
A. Technical Financial Institutional Economic
Social/Distributional Others
B. Description (in detail)
Lack of technical knowledge and skills in the project implementation.
There were undertakings within the Subproject that differ from one
PO to another that could not be explained by different site
coordinator; e.g. planting of fruit trees in almost all management
zones. This would have been clear had enough technical training were
provided to the site coordinators. On the other hand, only selected
personnel could handle other aspects of the project implementation.
Measures undertaken and Results:
Training and coaching in skills development and capacity building of
the SUSIMO Staff were facilitated by the SMO to make them
effective and efficient in carrying out the tasks, such as:
(1) Training on bookkeeping attended by the Validation and Billing
Unit,
(2) Survey and Mapping attended by the Administrative and Support
Unit staff, and;
(3) Different technical trainings attended by the Site Development
and Management Unit (SDMU) staff.
-
39
Through this initiative, the SUSIMO was able to assist, monitor,
supervise and manage the thirteen (13) POs of MKL.
III. Action Taken by the AOs, APs and POs relating to Recommendation(s)
1. Recommendation(s) made by SUSIMO
Recommendations Action Taken by APs and
PO’s
Results
1. Conduct of Joint
monthly
meetings
between
SUSIMO, POs
and APs as a
venue for
resolving issues
and problems
and sharing of
experiences in
the project
implementation.
2. Hiring of
technical
support staff
for the
SUSIMO
Since the creation of
SUSIMO MKL, monthly
meetings were regularly
undertaken, to create a forum
in discussing issues affecting
each organization’s
performances and problems.
During these meetings, POs
were given time to present
their monthly accomplishments
and problems and their views
on issues that they may have
encountered. This also served
as a venue whereby the
SUSIMO and APs would know
the training needs of the POs
and for the SUSIMO and APs
to formulate strategies and
come up with appropriate
training designs for each POs
specific need.
After a few months since the
creation of SUSIMO, the
SMO requested for additional
allotment for hiring of
additional technical personnel
on contractual basis. When the
request was granted, these
technical personnel were
assigned to the different POs
of MKL Watershed
Subproject whose functions
were similar to those of the
“Site Coordinators”.
Close coordination
between SUSIMO
and POs. Issues and
problems were
addressed on time,
thus, facilitated the
implementation of
the CSD activities.
Immediate response
to the need of the PO
was provided. It also
facilitated the billing
process of the POs
accomplishments.
-
40
3. Development of
skills and
knowledge of
the SUSIMO
staff and the
PO members
through training
on technical,
financial and
management
aspects.
4. Proposed the
creation of
Composite team
from region,
PENRO and
CENROs to
validate the
accomplishment
s of 13 POs in
MKL. Also,
requested the
other CENRO
staff to cross
validate the
accomplishment
s of other POs
outside the
jurisdiction of
Upon hiring, the SUSIMO
staffs were assigned to
respective POs to act as
SDMU and at the same time as
project site coordinators.
Validation and Billing
Unit attended the
Bookkeeping and
Financial Management
training.
SDMU attended
different Technical
training.
Admin staff attended
Survey and mapping
(basic) training.
PO were trained on the
different aspects
conducted by the
SUSIMO
SUSIMO staff and
the PO members were
capacitated on
different aspects of
project management.
Facilitated the
conduct of validation
and billing of
accomplishment.
-
41
their respective
CENROs
5. Initiated the
conduct of
Financial Audit
per POs.
The AP assisted the SUSIMO
and POs in the conduct of
Financial Audit.
Transparency on
financial transaction
was established.
IV. Initial Operation and Maintenance of Subproject Facilities
1. Present Condition of Facilities
A. Please check: This article is ( applicable due to problem(s) or not
applicable. No particular problem has occurred since the initial operation
started). If there have been any problems, please check the relevant
space in the Table.
For the PO:
Item Status Initial
Operation
Maintenance Manage
ment
Others
1.Bunkhouse
2.Computer
3.Canter
vehicle
4.Motorcycle
5.Water pump
6.Multicab
Serviceable
serviceable
serviceable
Serviceable
Serviceable
Serviceable
For the SUSIMO
Item Status Initial
Operation
Maintena
nce
Manage
ment
Other
s
1. KIA cross truck,
4x4
2. Power Generator
3. Computer
4. Printer (HP840C)
5. AVR
6. UPS
Serviceable
Needs repair
Serviceable
Needs Repair
Serviceable
Serviceable
Serviceable
Serviceable
-
42
7. GIS Maptitude
8. GPS
9. Handheld Radios
10. Foresters Transit
11. Base Radio
12. Manual
Typewriter
13. Brunton Compass
14. Steel Tape
15. Diameter Tape
16. Planimeter
17. Abney Hand Level
18. Rain Gauge
19. Lettering Set
20. Binocular
21. Clerical Tables &
Chairs
22. Drafting Table
23. Camera
24. Cassette
Recorder
25. Scanner
26. Printer (LQ300)
27. Steel Cabinet
28. Water Pump
29. Printer (HP5550)
30. SUSIMO Office
Unserviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
B. Please check: The Problem(s) has arisen owing to the following
reason(s).
Technical Financial Institutional Economic
Social/Distributional Others
C. Description (in detail)
The Uninterrupted Power Supply (UPS) has lost the compression, but
no available spare parts could be found locally. Other equipment that
encountered problems need replacement of defective parts but no
spare parts available locally.
D. Aspect of utilizing the Subproject facilities.
For the PO:
-
43
For the SUSIMO
2. Organization for Operation and Maintenance.
A. Name of PO.
A.1. Please give the name of PO and/or Body in charge of O/M.
PO : 1. MALTAJ
2. CAMMITA
3. SSSFAI
4. PSBA
5. PSMPC
6. UFMPC
7. MFMPC
8. MCFA
9. LFA
10 TMPC
11. NAGMATA
12. BAKANTI
13. BUKID-MPC
Item Original Plan Actual Operation
1.Bunkhouses
2.Computers
3.Canter vehicle
4.Motorcycles
5.Water pumps
6.Multicabs
For the use of PO’s of
MKL
-do-
-do-
-do-
-do-
For the use of PO’s of MKL
-do-
-do-
-do-
-do-
-do-
Item Original Plan Actual Operation
1. KIA cross truck, 4x4
2.Power Generator
3. Computer
4.Printer (HP840C)
5.AVR
6. UPS
7. GIS Maptitude
8. GPS
9. Handheld Radios
10. Foresters Transit
11. Base Radio
12. Water Pump
13. Printer (HP5550)
14. SUSIMO Office
For the use of
SUSIMO MKL
Watershed
Rehabilitation
Subproject
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
For the use of
SUSIMO MKL Watershed
Rehabilitation Subproject
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-
44
SUSIMO : SUSIMO MKL Watershed Subproject
A.2. Please check:
The latest organizational charts (or equivalent) for the O/M of
the subproject facilities are attached or not availabl