ASSESSMENT ON CREDIBILITY OF COMPLIANCE LEVEL DECLARATION
EXPLANATIONS
ANNEX 1 TO THE COMPLIANE OVERSIGHT REPORT 2012 17 APRIL 2013
ENTSO-E REGIONAL GROUP CONTINENTAL EUROPE
COMPLIANCE MONITORING PROGRAM 2012
Page 2 of 65
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
TABLE OF CONTENTS
1 ANALYSING PRINCIPLES ......................................................................................................4
1.1 INTRODUCTION ................................................................................................................................................ 4 1.2 CRITERIA FOR SAQ 2012 ANSWER ASSESSMENT ..................................................................................................... 4 1.3 STRUCTURE OF THE TABLES ................................................................................................................................. 4
2 OH STANDARD P4-A-S1 ....................................................................................................6
3 OH STANDARD P4-A-S2 ....................................................................................................8
4 OH STANDARD P4-A-S2.1 ............................................................................................... 10
5 OH STANDARD P4-A-S3 .................................................................................................. 12
6 OH STANDARD P4-A-S4.1 ............................................................................................... 14
7 OH STANDARD P4-A-S4.2 ............................................................................................... 16
8 OH STANDARD P4-A-S4.3 ............................................................................................... 18
9 OH STANDARD P4-A-S5 .................................................................................................. 20
10 OH STANDARD P4-A-S6 .................................................................................................. 22
11 OH STANDARD P4-B-S1 .................................................................................................. 24
12 OH STANDARD P4-B-S2 .................................................................................................. 26
13 OH STANDARD P4-B-S3 .................................................................................................. 28
14 OH STANDARD P4-B-S4 .................................................................................................. 30
15 OH STANDARD P4-B-S4.1 ............................................................................................... 32
16 OH STANDARD P4-B-S6 .................................................................................................. 34
17 OH STANDARD P4-B-S7 .................................................................................................. 36
18 OH STANDARD P4-B-S8 .................................................................................................. 38
19 OH STANDARD P4-C-S1 .................................................................................................. 40
20 OH STANDARD P4-C-S2.1 ............................................................................................... 42
21 OH STANDARD P4-C-S2.2 ............................................................................................... 44
22 OH STANDARD P4-C-S2.3 ............................................................................................... 46
23 OH STANDARD P4-C-S2.4 ............................................................................................... 48
Page 3 of 65
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
24 OH STANDARD P4-C-S3 .................................................................................................. 50
25 OH STANDARD P4-C-S4.1 ............................................................................................... 52
26 OH STANDARD P4-C-S5 .................................................................................................. 54
27 OH STANDARD P4-C-S6 .................................................................................................. 56
28 OH STANDARD P4-C-S7 .................................................................................................. 58
29 OH STANDARD P4-C-S8 .................................................................................................. 60
30 OH STANDARD P4-C-S9 .................................................................................................. 62
31 OH STANDARD P4-C-S11 ................................................................................................ 64
Page 4 of 65
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
1 ANALYSING PRINCIPLES
1.1 INTRODUCTION
This Annex 1 of the Compliance Oversight Report 2012 contains detailed results of the analysis of the
explanations for the declared compliance level. All standards from the RGCE OH policy 4 which were
assessable had a mandatory explanation request for the declared compliance level. The framework
of the self-assessment process is described in chapters 2 and 3 of the COR 2012 main document.
Each standard has a credibility analysis table which presents the evaluation of the explanation given
by all TSOs related to the standard. The data used for this analysis was provided by the RGCE TSOs
before 8 June 2012 via the RGCE compliance self assessment web questionnaire 2012 system.
1.2 CRITERIA FOR SAQ 2012 ANSWER ASSESSMENT
Assessment teams will follow same principles as 2011 (Chapter 1.3.) with following additions:
o Mismatches between neighbouring TSOs will be analysed and may be an additional input to evaluate credibility of the compliance declaration explanation. The weight of mismatches depends on the standard and TSOs explanations and rely assessment team’s experience and expertise.
o In case two TSOs declare two different compliance levels on a multilateral standard the lower declaration is assumed more credible as rule of thumb if no additional information is in the compliance level explanation
1.3 STRUCTURE OF THE TABLES
The declared compliance level:
o FC = fully compliant (this implies that no improvement/mitigation plan is needed)
o SC = sufficiently compliant (an improvement plan with a deadline to reach full compliance is necessary)
o NC = non-compliant (a mitigation plan with a deadline to remove non-compliance is obligatory)
o N/A = not applicable
The credibility grade for the explanation for the compliance level declaration:
o Credible (CR, Green), good and precise answer
o Some doubts (SD, Yellow), answer is a little bit off topic, inadequate, not precise (or
contains mismatches with neighbours without proper explanation, refer to chapter
1.2. bullet points)
o Not Plausible (NP, Red), missing answer or completely off topic
Comments, if appropriate
Page 5 of 65
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
Under a table the CME may place overall remarks regarding their analysis for the particular standard.
Page 6 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
2 OH STANDARD P4-A-S1
Operation security
The TSOs have to jointly ensure that despite the planned outages of POWER SYSTEM elements, the interconnected network always meets the N-1 SECURITY PRINCIPLE in the concerned networks (>P3-A).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC SD There is no concrete reference to the (n-1) security principle. Coordination with neighbouring TSOs is not mentioned.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
Page 7 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
NL – TenneT FC CR
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except two declared FC level (PSE-Operator SA and SEPS declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 8 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
3 OH STANDARD P4-A-S2
Relevant elements
The set of network elements (e.g. TIE-LINES, internal lines, bus-bars, phase shifters, transformers, major generating units), automatic and protection devices which influence two or more TSOs while being out of operation has to be agreed among involved TSOs on a regional basis.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD
There is a mismatch on border with RTE. Swissgrid declared FC and answered YES to an additional question and RTE declared SC answered NO to an additional question on the common border. According to CRITERIA FOR SAQ 2012 ANSWER ASSESSMENT and the explanations, the lower declaration is assumed to be more credible.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD There is a mismatch on border with Energinet.dk. TenneT TSO GMbH answered YES and Energinet.dk answered NO to an additional question on the common border. It is not clear if the list is exchanged between TenneT TSO GMbH and Energinet.dk.
DE - TransnetBW FC CR
DK_W - Energinet.dk FC SD
There is a mismatch on border with TenneT TSO GMbH. Energinet.dk answered NO and TenneT TSO GMbH answered YES to an additional question on the common border. It seems that Energinet.dk doesn't exchange a list with the relevant elements with TenneT TSO GMbH.
Page 9 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ES – REE FC CR
FR – RTE SC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except three declared FC level (RTE, PSE-Operator SA and SEPS declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 10 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
4 OH STANDARD P4-A-S2.1
Critical elements
A subset of relevant elements which are considered to have a major influence on the operational management of the neighbouring systems has to be agreed among involved TSOs. The scheduling of the outages of these elements must be agreed among the TSOs involved on a regional basis This set must include at least the elements considered in the EXTERNAL CONTINGENCY LIST ((>P3-A) determined by each of the TSOs involved in the region.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD
There is a mismatch on border with RTE. Swissgrid declared FC and answered YES to an additional question and RTE declared SC answered NO to an additional question on the common border. According to CRITERIA FOR SAQ 2012 ANSWER ASSESSMENT and the explanations, the lower declaration is assumed to be more credible.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD
There is a mismatch on border with Energinet.dk. TenneT TSO GMbH declared FC and answered YES to an additional question and Energinet.dk declared NC and answered NO to an additional question on the common border. According to CRITERIA FOR SAQ 2012 ANSWER ASSESSMENT and the explanations, the lower declaration is assumed to be more credible.
DE - TransnetBW FC CR
DK_W - Energinet.dk NC CR
ES – REE FC CR
Page 11 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
FR – RTE SC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except four declared FC level (RTE, PSE-Operator SA and SEPS declared SC and Energinet.dk declared NC level).
Overall the quality of TSOs’ answers is very good.
Page 12 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
5 OH STANDARD P4-A-S3
Exchange of information
TSOs collect and share information about planned outages of the relevant elements within regional groups. The scheduled outages of critical elements are reviewed at the Weekly Operational Teleconference (>B- S7: WOPT).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk SC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 13 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comments
All TSOs except one declared FC level (Energinet.dk declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 14 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
6 OH STANDARD P4-A-S4.1
Long-term planning
In the second half of the preceding year, TSOs start outages scheduling in regional groups for the forthcoming year. At the end of the preceding year, TSOs agree on a joint schedule of outages of all network elements impacting two or more TSOs for the next year.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 15 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except two declared FC level (PSE-Operator SA and SEPS declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 16 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
7 OH STANDARD P4-A-S4.2
Medium-term planning
The outage scheduling agreed for the whole year must be revised on a monthly basis, considering the possible changes known at that time, and providing a reviewed version for the rest of the year agreed among involved TSOs.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 17 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except two declared FC level (PSE-Operator SA and SEPS declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 18 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
8 OH STANDARD P4-A-S4.3
Short-term planning
In case of any changes, the agreed schedule has to be reviewed in the course of the year and any amendments will be notified to and agreed with each TSO in the group concerned as soon as possible, but at the latest on Friday before the week concerned.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 19 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS SC CR
General remarks:
Comments
All TSOs except two declared FC level (PSE-Operator SA and SEPS declared SC level).
Overall the quality of TSOs’ answers is very good.
Page 20 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
9 OH STANDARD P4-A-S5
Confirmation of planned outages
Each TSO reviews and confirms the outages of relevant elements to involved neighbouring TSOs in the course of the week (but latest on Thursday because of the D-2CF process) before the week concerned during the WOPT (>B- S7).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 21 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comments
All TSOs declared FC level.
Overall the quality of TSOs’ answers is very good.
Page 22 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
10 OH STANDARD P4-A-S6
Confidentiality of data
The use and communication of the data exchanged and of the associated results are restricted to needs linked with the improvement of the security of supply. They have to be treated in compliance with Policy 7.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 23 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comments
All TSOs declared FC level.
Overall the quality of TSOs’ answers is very good.
Page 24 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
11 OH STANDARD P4-B-S1
Operation security
During the capacity assessment process the TSOs have to jointly ensure that the interconnected network always meets the N-1 SECURITY PRINCIPLE (>P3-A).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC SD Incomplete explanation. It is unclear how (n-1) security principle is handled, and whether there’s coordination with neighbouring TSOs.
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD Explanation is not complete (e.g. no reference to the border with CZ and Energinet.dk); It is unclear how (n-1) security principle is handled).
DE - TransnetBW FC CR
DK_W - Energinet.dk FC SD Explanation is incomplete. It is unclear how (n-1) security principle is handled, and whether there’s coordination with neighbouring TSOs.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD Not to be permanently interconnected to any other TSO besides Amprion is not a
Page 25 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
reason for N/A. Answers provided for P4-B-S1, P4-B-S2, P4-B-S3, P4-B-S4, P4-B-S4.1, P4-B-S7 and P4-B-S8 are the same.
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2
Capacity assessment is regularly performed on a Regional basis based on common grid model providing the most probable
topology (e.g. planned outages) and flow pattern (e.g. exchanges, load and generation injections).
Existing procedures are in line with Policy 3: during all capacity assessment processes (Y, M, D-2, D-1, D) the n-1 security
principles are respected and verified by calculations; the list of critical branches and remedial actions are shared at Regional
level with neighboring TSOs.
High level of regional coordination is sometimes achieved by the support Central Allocation Offices (e.g. CAO, SG SEE CMMI,
CWE ATC based Market Coupling, etc.)
Page 26 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
12 OH STANDARD P4-B-S2
Capacity assessment
TSOs perform capacity assessments for different time frames and in advance of corresponding capacity allocation procedures. Those binding values are assessed on the basis of the TSOs’ best forecast.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD
Explanation is not clear. Which timeframes are considered in the capacity assessment process? The capacity assessment and harmonisation shall suit (and not be identical) for timeframes. It is unclear how the coordination among the concerned TSOs is handled. Answers provided for P4-B-S2, P4-B-S3 and P4-B-S4 are the same.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC SD Explanation is quite off topic. Which timeframes are considered in the Capacity assessment process? It is unclear how the coordination among the concerned TSOs is handled.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC SD Explanation is quite off topic. It is unclear how many timeframes are considered in the capacity assessment process.
Page 27 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2
Capacity assessments are done systematically for different time frames on yearly, monthly, weekly, daily and intraday basis and
in advance for the corresponding capacity allocation timeframes. Calculations are regularly performed on the basis of merged
common grid models which include the latest TSO's best forecast
Page 28 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
13 OH STANDARD P4-B-S3
Harmonisation of capacity values
Neighbouring TSOs have to harmonize the calculated capacity values on their common borders and region. In case there is no agreement on a common value, the lower value has to be used, as this ensures secure operation in both systems.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD Explanation is not clear. It is unclear what security criterion is used (e.g. lower value). Answers provided for P4-B-S2, P4-B-S3 and P4-B-S4 are the same.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO FC CR
Page 29 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2
Neighbouring TSOs harmonize the calculated capacity values on their common borders and region in the year allocation
process, month allocation process and day allocation process. In case there is no agreement on a common value, the lower
value is used
Page 30 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
14 OH STANDARD P4-B-S4
Procedure for the capacity assessment
Each TSO uses a coordinated and harmonized methodology with the neighbouring TSOs or in the region. The methodology must guarantee system security in the affected grids. It has to deliver available capacities satisfactory and reliable for the market.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD
Explanation is quite off topic. It is unclear how (n-1) security principle is handled, and whether there’s harmonization among the concerned TSOs. How do you check that the assessed capacities are satisfactory and reliable for the market? Answers provided for P4-B-S2, P4-B-S3 and P4-B-S4 are the same.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
Page 31 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2:
TSOs use coordinated and harmonized methodologies for capacity assessment based on bilateral agreements, centralized
service provider (e.g. CEE Central Allocation Office, CWE region ATC market coupling) or ad hoc Technical Task Force in the
Pentalateral region
Page 32 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
15 OH STANDARD P4-B-S4.1
NTC values
TSOs use the procedure for the calculation of NTC values which is described in appendix 4 section B.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
Page 33 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2
Methodology based on the calculation of Net Transfer Capacity well consolidated among all TSOs. The NTC are assessed
according to the generation shift method and are modelled by generation shift keys. The Flow Based methodology is currently
under test for CWE region
Page 34 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
16 OH STANDARD P4-B-S6
Weekly Operational Teleconference (WOPT)
TSOs within regional groups organise a weekly teleconference call to share operational information regarding:
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC SD There are mismatching answers with EMS and NOS BIH. Moreover, according to HEP-OPS Improvement plan, ISO BiH does not report properly
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk SC NP No actions are envisaged in the improvement plan (ENDK does not plan to join the teleconference in the future). The only influence on TenneT Germany is not a reason to avoid the WOPT. Deadline for Improvement plan is missing.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS SC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC SD If Creos does not participate on a regular basis in WOPT, answer can't be FC.
ME – CGES FC CR
Page 35 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
MK – MEPSO FC NP Explanation is off topic: It is unclear if MEPSO participates to the WOPT. How often does the SEE Maintenance Group held a meeting? If not weekly, answer should be NC.
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC SD There are mismatching answers with EMS and NOS BIH. Moreover, according to HEP-OPS Improvement plan, JP EMS does not report properly.
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but two declared FC level (Energinet.dk and HEP-OPS declared SC)
Comment 2
During the WOPT TSOs report all relevant information including planned outages, special events, NTC values and market
evolutions, expected climatic conditions/special loads/bank holidays, etc.
Page 36 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
17 OH STANDARD P4-B-S7
Calculation of ATC values
In case there is a joint capacity allocation procedure, TSOs calculate and harmonize the ATC values.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC SD Explanation is not complete. Only the harmonization with the IT border is mentioned.
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC SD Explanation is not complete. Do you have an agreement to commit TenneT Germany to assess the ATC? It is unclear which rule is in use to assess the ATC.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC SD Explanation is not complete. It is unclear whether there’s ATC harmonization among the concerned TSOs. Which specific ENTSO-E rules exactly do you refer?
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
Page 37 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ME – CGES N/A CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC SD Explanation is incomplete. Which Annex do you refer exactly? It is unclear which rule is used to assess the ATC.
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but two declared FC level (Creos Luxembourg S.A. and Crnogorski Elektroprenosni system AD declared N/A)
Comment 2
Coordinated and harmonized methodology to calculate ATC in place among all Neighbouring TSOs. The harmonisation is done
under bi/multilateral agreements or by Central Allocation Office (e.g. Market Coupling in the CEE and CWE region)
Page 38 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
18 OH STANDARD P4-B-S8
Confidentiality of data
The use and communication of the data exchanged and of the associated results are restricted to needs linked with the improvement of the security of supply. They have to be treated in compliance with Policy 7.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC NP Missing explanation despite they answered "YES" to the COSAQ for all Neighbours.
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A NP Explanation is off topic. Not to be permanently interconnected to any other TSO besides Amprion is not a reason for N/A. Answers provided for P4-B-S1, P4-B-S2, P4-B-S3, P4-B-S4, P4-B-S4.1, P4-B-S7 and P4-B-S8 are the same.
ME – CGES FC CR
Page 39 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
MK – MEPSO FC NP Explanation is off topic. It’s unclear which confidentiality procedures are in place and how they are handled.
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
Comment 1
All TSOs but one declared FC level (Creos Luxembourg S.A. declared N/A)
Comment 2
Existing procedures in line with Policy 7. Confidentiality is regulated by the national grid code or bilateral agreements referring
to OH rules. From legal point of view, several policies for data protection are in place. Data exchanged and associated results
are kept exclusively restricted to security matter
Page 40 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
19 OH STANDARD P4-C-S1
Infrastructure
For exchanging the DACF load flow data sets and the results of the network security analysis, TSOs use the Electronic Highway (EH) infrastructure described in Policy 6.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC CR
ME – CGES SC NP The chosen compliance level does not reflect the fact there is no EH node established. Level NC should have been declared.
MK – MEPSO FC CR
Page 41 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
NL – TenneT FC CR
PL - PSE-Operator SA SC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC level (ME-CGES and PL-PSE-Operator S.A. declared SC).
In the case of ME-CGES, level NC should have been declared: the chosen compliance level does not reflect the fact there is no
EH node established.
Existing procedures in line with Operation Handbook: TSOs use the Electronic Highway for exchange of DACF load flow data
sets and results according to Policy 6.
Page 42 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
20 OH STANDARD P4-C-S2.1
Network model
Each TSO provides to the EH-ftp server a forecasted load flow data set of its grid, with the whole, detailed network model related to the transmission grid, i.e. a real model (no equivalents) of at least all elements at ≥ 220kV level like bus bar couplers, nodes, lines, transformers, nodes’ load and injections. Equivalent or real lines and transformers can be used to represent networks of lower voltages, in case they influence the 750kV, 380 kV or 220 kV level significantly.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk SC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
Page 43 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC level (DK_W Energinet.dk declared SC and LU-CREOS declared N/A).
Some of provided TSO explanations to this standard is a little bit out of topic, especially missing references to network model
and elements. Nevertheless, all explanations were evaluated as credible.
Page 44 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
21 OH STANDARD P4-C-S2.2
Data format
TSOs shall use the current UCTE format published on the ENTSO-E website for the exchange of the DACF load flow sets.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC NP Missing explanation.
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD The delegation of functions of Creos to Amprion should be described in terms of e.g. bilateral agreements, but the justification stating that a capacity allocation between the border LU-DE does not take exist does not seem adequate.
ME – CGES FC CR
MK – MEPSO FC CR
Page 45 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but one declared FC level (LU-CREOS declared N/A).
BE – Elia received “NP” mark due to missing explanation.
Explanation provided by LU-CREOS gives no evidence to the standard in a direct way.
Existing procedures in line with Operation Handbook: Data are delivered by the TSOs in the currently used UCTE-format.
Page 46 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
22 OH STANDARD P4-C-S2.3
Data processing
Each TSO has to provide its complete DACF load flow data set with exchange program on the EH ftp-server before 6 p.m. (C.E.T.), where it is accessible to all other participating TSOs.
TSO Compliance
level Grade for the explanation
CME comments
AT – APG FC CR
BA - ISO-BiH FC CR
BE – Elia FC NP Missing explanation.
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk SC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD The delegation of functions of Creos to Amprion should be described in terms of e.g. bilateral agreements, but the justification stating that a capacity allocation between the border LU-DE does not take exist does not seem adequate.
ME – CGES FC CR
Page 47 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC to the standard (Creos Luxembourg S.A.- LU – CREOS declared N/A, while DK_W - Energinet.dk declared SC).
BE – Elia received “NP” mark due to missing explanation
TSOs provide their DACF load flows data sets with exchange program on the EH ftp-server before 6 p.m. (C.E.T.). Those data are
accessible to all other participating TSOs for creating an own model for analysis.
Page 48 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
23 OH STANDARD P4-C-S2.4
Backup procedure
In case of EH-ftp server malfunction, TSO exchange the data sets by sending an e-mail to an agreed list of addressees.
TSO Compliance
level Grade for the explanation
CME comments
AT – APG FC CR
BA - ISO-BiH FC CR
BE – Elia FC NP Missing explanation.
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk SC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD
The delegation of functions of Creos to Amprion should be described in terms of e.g. bilateral agreements, but the justification stating that a capacity allocation between the border LU-DE does not take exist does not seem adequate.
ME – CGES FC SD Provided explanation does not directly answer the question if emails are used only as a backup or general procedure.
Page 49 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC to the standard (Creos Luxembourg S.A.- LU – CREOS declared N/A, while DK_W - Energinet.dk declared SC).
BE – Elia received “NP” mark due to missing explanation
Explanation provided by Montenegro – CGES and Creos Luxembourg S.A.- LU – CREOS give no evidence to the standard in a direct way.
TSOs declare that, in case of EH-ftp server malfunction, as a back-up, they will exchanging the data sets via email. E-mails are
sending to an agreed list of addressees of the persons involved in the planning process.
Page 50 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
24 OH STANDARD P4-C-S3
Data collection
Each TSO collects DACF files from the EH-ftp server and constructs a network model (i.e. the DACF merging process) that represents the most probable state of the forecast time. That model can include all ENTSO-E networks, but a TSO can also disregard the data sets of TSOs whose influence on its network is deemed negligible. This process can be done in a centralized way (organized by any TSO that volunteered). Alternatively this process can be done in a centralized way by a TSO, a regional group or a TSO initiative.
TSO Compliance
level Grade for the explanation
CME comments
AT – APG FC CR
BA - ISO-BiH FC CR
BE – Elia FC CR
BG - ESO EAD FC CR
CH – swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE – TransnetBW FC CR
DK_W - Energinet.dk NC NP NC declaration without valid mitigation plan.
ES – REE N/A SD Inconsistency with explanation of REN.
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
Page 51 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
LU – CREOS N/A SD The delegation of functions of Creos to Amprion should be described in terms of e.g. bilateral agreements, but the justification stating that a capacity allocation between the border LU-DE does not take exist does not seem adequate.
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN SC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
23 TSOs declared FC to the standard. LU – CREOS and ES - REE declared N/A, DK_W - Energinet.dk declared NC and PT-REN declared SC.
DK_W – Energinet.dk received “NP” mark due to missing valid mitigation plan.
ES-REE provided inconsistent explanation with REN.
Explanations provided by LU – CREOS give no evidence to the standard in a direct way.
Existing procedures are in line with Operation Handbook. Additionally some TSOs from Central Western Europe are member of CORESO and some TSOs from Central Europe are member of TSC to share and validate DACF files.
Page 52 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
OH Standard P4-C-S3
25 OH STANDARD P4-C-S4.1
Quality of data set and merging process:
TSOs follow the rules included into the document “Quality of datasets and calculations”.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk NC NP Missing explanation.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD The delegation of functions of Creos to Amprion should be described in terms of e.g. bilateral agreements, but the justification stating that a capacity allocation between the border LU-DE does not take exist does not seem adequate.
ME – CGES FC CR
Page 53 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC to the standard. LU – CREOS declared N/A, while DK_W - Energinet.dk declared NC.
DK_W - Energinet.dk received “NP” mark due to missing explanation.
Existing procedures are in line with Operation Handbook: TSOs follow the rules of quality of DACF.
Page 54 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
26 OH Standard P4-C-S5
Confidentiality of data
The use and communication of the data exchanged and of the associated results are restricted to needs linked with the improvement of the security of supply. They have to be treated in compliance with Policy 7.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC NP Missing explanation.
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD Provided explanation give no evidence to the standard within the context of compliance with Policy 7.
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A SD Creos has to treats data in compliance with Policy 7. N/A declaration is cant be chosen.
ME – CGES FC SD According the explanation data sets are exchanging via emails - then there can be
Page 55 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
some doubts about confidentiality.
MK – MEPSO FC SD Explanation is off topic. Provided explanation give no evidence to the standard in
a direct way.
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC SD Unclear explanation Provided explanation give no evidence to the standard in a direct way.
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but one declared FC level (LU-CREOS declared N/A).
BE – Elia received “NP” mark due to missing explanation.
Creos Luxembourg S.A. insufficiently explained N/A level. If Creos receives any data, has to treat it in compliance with Policy 7.
Whereas CGES declared FC-level to this standard, the data sets are only exchanged via emails. This procedure is not
compliance with Policy 7.
In the case of TenneT Germany, MEPSO and RE, an unclear, off topic explanation was provided, which gives no evidence to the
standard.
TSOs keep the confidentiality of data in compliance with Policy 7.
Page 56 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
27 OH STANDARD P4-C-S6
Participation of TSOs
All TSOs of the synchronous area participate in the DACF method.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC NP Explanation missing.
BG - ESO EAD FC CR
CH - swissgrid
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD Given answer is a bit off topic: Being a member of TSC, taking into account that the TSC initiative works according to the rules described in the standards, does not guarantee the following of the OH standards by a certain TSO.
DE - TransnetBW FC CR
DK_W - Energinet.dk N/A SD Because Energinet.dk declared that they submit their DACF data to Amprion, the answer N/A does not make any sense.
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
Page 57 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC level (LU-CREOS and Energinet.dk declared N/A).
BE – Elia received “NP” mark due to missing explanation.
N/A level declared by Energinet.dk does not make any sense because of their notice that they submit DACF data to Amprion.
TenneT Germany gave evidence to this standard by referring to its membership in the TSC initiative. This explanation is insufficient for providing evidence to this standard. All TSOs are participating in the DACF process.
Page 58 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
28 OH STANDARD P4-C-S7
Datasets for DACF
Daily data sets will be supplied for at least the reference times 3:30, 07:30, 10:30,12:30, 17:30 and 19:30 (C.E.T.).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC SD From answer does not result whether HEP-OPS submits snapshots for at least 6 mandatory times.
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
Page 59 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS NC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs but two declared FC level (LU-CREOS declared N/A, JP EMS declared NC).
Only in case of HEP-OPS there are some doubts about if they submit snapshot for at least 6 times.
TSOs confirmed the practice of data sets creating at least 6 mandatory times.
Page 60 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
29 OH STANDARD P4-C-S8
Vulcanus data
For the purpose of managing the DACF process, all CONTROL BLOCKS of the synchronous area provide the Vulcanus system with the Day Ahead exchange programs before 6 p.m. (C.E.T.).
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH N/A CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz N/A CR
DE – Amprion FC CR
DE – TenneT N/A CR
DE - TransnetBW N/A CR
DK_W - Energinet.dk N/A CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS N/A CR
ME – CGES FC CR
MK – MEPSO N/A CR
NL – TenneT FC CR
Page 61 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
PL - PSE-Operator SA FC CR
PT – REN N/A CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
TSOs declared FC or N/A level depending on their position (Control Area/ Control Block) within synchronous area.
Standard refers to the control blocks task about providing DACF data to the Vulcanus system. All the explanations provided by
TSOs were evaluated as fully credible.
Page 62 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
30 OH STANDARD P4-C-S9
Security check
All TSO of the ENTSO-E RG CE shall carry out DACF N-1 security calculations according to Policy 3 A1-S3.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC SD
Given answer is a bit off topic: being a member of TSC, taking into account that the TSC initiative works according to the rules described in the standards, does not guarantee the following of the standard according to P3-A1-S3 a certain TSO.
DE - TransnetBW FC CR
DK_W - Energinet.dk SC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS NC SD Remedial actions are missing in the mitigation plan.
ME – CGES FC CR
MK – MEPSO FC CR
Page 63 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC NP There is inconsistency between declared level and COSAQ answer.
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs (except Energinet.dk- SC and CREOS - NC) declared FC.
TenneT Germany insufficiently explained their implementation of DACF process by making reference to its membership in the
TSC initiative. Creos Luxembourg S.A. introduced a mitigation plan without any relevant remedial actions. In case of REN
Portugal , an inconsistency was noted between the declared level and the COSAQ answer.
TSOs confirmed the ability to carry out N-1 calculation according to Policy 3 A1-S3.
Page 64 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
31 OH STANDARD P4-C-S11
Additional data
For examining DACF data quality or for purposes of examinations of events in the interconnected network TSOs should provide on request of other TSOs snapshots (SN) of the real operation. In case of disturbances or other unusual operation of interconnected system each TSO can require SN. All TSOs who are requested to do so should prepare and send SN to other TSOs through the EH-ftp server as soon as possible and at latest two working days after the request was made.
TSO Compliance
level Grade for the explanation
CME comments
AT - APG FC CR
BA - ISO-BiH FC CR
BE - Elia FC CR
BG - ESO EAD FC CR
CH - swissgrid FC CR
CZ – CEPS FC CR
DE - 50Hertz FC CR
DE – Amprion FC CR
DE – TenneT FC CR
DE - TransnetBW FC CR
DK_W - Energinet.dk FC CR
ES – REE FC CR
FR – RTE FC CR
GR - HTSO/DESMIE FC CR
HR - HEP-OPS FC CR
HU - MAVIR ZRt. FC CR
IT - Terna S.p.A. FC CR
LU – CREOS FC SD Comparing the explanation to standard P4-C-S11 with the answers given to related standards in part C of the SAQ, the coherency of the answers given by Creos should
Page 65 of 65
European Network of Transmission System Operators
for Electricity
ANALYSIS OF THE SAQ 2012 EXPLANATIONS FOR THE DECLARED
COMPLIANCE LEVELS
ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu
be proved. At the end, it does not seem clear which tasks are delegated to Amprion and which tasks are performed by Creos.
ME – CGES FC CR
MK – MEPSO FC CR
NL – TenneT FC CR
PL - PSE-Operator SA FC CR
PT – REN FC CR
RO - Transelectrica FC CR
RS - JP EMS FC CR
SI – ELES FC CR
SK – SEPS FC CR
General remarks:
All TSOs declared FC.
Creos Luxembourg S.A. insufficiently explained their implementation of the DACF process. There are some doubts about the
declared compliance level.
TSOs confirmed the ability on request of any TSO to prepare and send snapshots through EH-server. Most of them are regularly
archiving snapshots of the grid, including all relevant nodes, branches, generation and loads.