    ERECTION,OPERATION

    AND MAINTENANCE OF

    DISTRIBUTION AND

    POWER TRANSFORMERS

  • 8/14/2019 Erection and Maintenance of Transformers

    2/82

    RECEIPT OF TRANSFORMER AT SITE

    (1)Dispatched with Core & Windings fitted in the

    Tank and filled with Nitrogen upto 0.15kgc!.s" or

    filled with #nsulating $il a%oe Windings.

    (') #f filled with Nitrogen check Nitrogen ressure and

    if less than 0.' kgc!.s" replenish it upto

    0.15kgc!.s".

    (*) +ll other parts such as Conserator Tank,ushings

    (-&/)adiators+ccessoriesrotectie deises

    are dispatched in separate packages.

  • 8/14/2019 Erection and Maintenance of Transformers

    3/82

    () 2eep the following Tools & 3aterials read4

    6teel 6lings of arious capacities-4draulic

    /ifting 7acks Wooden 6leepers Wooden

    acking ieces + 3o%ile Crane etc.

    (5) ,efore Co!!encing 8rection Nitrogen !ust %e

    slowl4 released and the tank flushed with Dr4

    $94gen or filled with #nsulating $il slowl4 to

    aoid contact of winding with +t!ospheric +ir.

  • 8/14/2019 Erection and Maintenance of Transformers

    4/82

    Precautions to be taken Long Storage of the Transformer is not

    recommended.

    Store Oil Drums properly

    Assembly should commence from Bottom

    Core !indings should be filled "ith Oil as soon

    as #itrogen is e$pelled.

    Choose a Dry Day "hen "eather is clear

    Care to be taken so as to not to allo" any foreign

    ob%ect falling into the Transformer

    Blanking Plates should be remo&ed "hen "e are

    ready for assembly.

  • 8/14/2019 Erection and Maintenance of Transformers

    5/82

    Blanking Plates should also be stored safely after

    "ork is completed.

    The Person "orking "ith Tools used inside

    Transformer must tie it by cotton tape

    #o coins'pens'"atches etc should be used by the

    persons "orking on the Transformer

    (askets must be tightened properly ie #ot too much

    or too less

    #e" (askets must be used for Bushings )adiators'etc

    *nsure tightness of all the connections inside and

    proper Locking

  • 8/14/2019 Erection and Maintenance of Transformers

    6/82

    Transformer Oil must be pumped from the Drums to

    the Storage Tank through Purifier

    Lea&e about +,mm oil at the bottom of each drum.-tmay be impure.

    Pumping in Oil must be through the Drain &al&e. Also

    Draining. Lea&e one Opening at the Top Open to

    release *ntry Air.

    Before Commencing Oil filling and purification'Clean

    the top of oil drums'flush hoses'Oil Tank'and the

    ilter also. /se (asket Paste "hen fi$ing them

    Once the 0oint is detached' use fresh (askets

  • 8/14/2019 Erection and Maintenance of Transformers

    7/82

    (asket Paste shall be applied uniformly before

    pressing onto a metal surface.

    All the Bushings must be thoroughly cleanedespecially the Bottom Portion before assembly.

    Bushing Shields must be fitted to the Bushing before

    assembly. Storage of (asket is &ery important.#o rolling'folding

    Oil Pockets for OT- !T- must be filled "ith Oil

    before fitting the Sensing Bulbs

    or Transformers rated belo" 11k& 2acuuming to be

    done at belo" 34,mm5g

  • 8/14/2019 Erection and Maintenance of Transformers

    8/82

    or Transformers abo&e 11k& 2acuuming to be

    done at 678mm of 5g

    *9uali:er pipe connections must be connected

    bet"een the ;ain Tank and OLTC to a&oid

    Buckling of OLTC

    The Bursting 5ead of *$plosion 2ent to be

    remo&ed and a Blanking Plate fi$ed before

    &acuuming the Transformer.

    The )e9uired &acuuming shall be for t"o

    hours. )eplace 2ent *$plosion 5ead

    Oil may be in%ected through the Bottom Drain

    2al&e into the Transformer.#o )ubber 5oses

  • 8/14/2019 Erection and Maintenance of Transformers

    9/82

    5ot Oil Circulation to be done to e$pel moisture

    from the insulation at 1,

  • 8/14/2019 Erection and Maintenance of Transformers

    10/82

    i$ the Arcing 5orns for the Bushings ?for 11k& and

    abo&e@and ad%ust

    Connect the Transformer Body earth

    )elease any Trapped Air from the Bushings' TopCo&er etc

    Connect the 5eating Coils of the !T- to BCT

    Terminals.

  • 8/14/2019 Erection and Maintenance of Transformers

    11/82

    Precautions to be taken !en orkin"

    in a #i$e Substation %

    Do not "ork too close to another Li&e e9uipment Before "orking Take a Permit. All sources of po"er

    must be disconnected

    A safety earth to be pro&ided "here&er necessary

    The Area of "ork should be surrounded "ith a

    Safety )ibbon and all the staff clearly educated

    Trained and 9ualified persons must carry out

    inspection and enforce safety

  • 8/14/2019 Erection and Maintenance of Transformers

    12/82

    All the Testing de&ices must be handled by ualified

    persons A Safety Sargent should be posted at the "ork site

    "ho should deenergi:e if needed

    -f it is necessary to "ork inside the Tank' Dry Air

    must be allo"ed as the Oil is pumped out .

    Dry Air supply must be slo"ly allo"ed inside from

    the Bottom and allo"ed to go out from the top by

    keeping one Blanking Plate Open should a person

    "ork inside

  • 8/14/2019 Erection and Maintenance of Transformers

    13/82

    Another Person should al"ays stay outside

    "atching the person inside

    *lectrical Tools should be used "ith plug pins only

    !arning Boards should be *$hibited

    Before energi:ing the *9uipment ensure that all the

    "orking personnel ha&e come out and all the *arths

    pro&ided for safe "orking are remo&ed.

  • 8/14/2019 Erection and Maintenance of Transformers

    14/82

    ERECTION,O&M OF ' P!ase (()*+''*

    DISTRIBUTION TRANSFORMERS

    )ead the ;anufacturers -nstructions carefully.

    The Transformer should be commissioned only after

    completing all the assembly and Pre

  • 8/14/2019 Erection and Maintenance of Transformers

    15/82

    ;obile Crane or other appro&ed de&ices should be

    used.

    or Loading and /nloading the Transformer the T"oLifting Lugs pro&ided on the sides of the Transformer

    should only be used.

    Ade9uate care must be taken "hen shifting the Tr

    to site from Storage ard

    The Transformer is dispatched in complete shape "ith

    the Tank' core !indings' Conser&ator' 2ent' 52

    L2 Bushings' assembled. 2isual -nspection must be

    done before erection to detect any damages' leakage

    of oil'cracks.

  • 8/14/2019 Erection and Maintenance of Transformers

    16/82

    Pre commissioning Site Tests such as ;egger

    Test' )atio Test' *$citation Current' !inding

    Continuity'Oil sample Testing for Dielectric and

    Acidity to be done.

    Oil is inflammable.Take care not to bring naked

    flame or light such as during "elding near the

    Transformer

    ibrous cleaning material should not be used./se cloth

  • 8/14/2019 Erection and Maintenance of Transformers

    17/82

    Equipment for Erection, Testing andEquipment for Erection, Testing and

    CommissioningCommissioning

    AC 2oltmeters ?,,,, &olts or +,,,&olts@

    *lectric Oil Pump = 5and Pump

    Spanners Single=Double *dged' )ing' complete Set

    Scre" Dri&ers' assorted si:es' Tester

    Enife' TailorFs scissors

    ;S Bolts #uts' !ashers ?plain and spring@

  • 8/14/2019 Erection and Maintenance of Transformers

    18/82

    Cotton cloth for cleaning

    Paint Brush "ith Paint as re9uired

    Oil Sampling Bottle and Testing Eit Transformer should be erected on a Le&el

    oundation

    The oundation must be properly designed. Sufficient clearances bet"een phases and (round

    shooed be maintained

    or -ndoor -nstallation' good &entilation muste$ist

    *$amine Standard ittings like )ating Plate' Oil

    (auge'Lifting Lugs' Conser&ator'2ent' etc

  • 8/14/2019 Erection and Maintenance of Transformers

    19/82

    Bi ;etallic Connectors to be used in 52 L2

    connections Transformer *arthing Terminals must be earthed.

    ?#ote C)(O core is connected to clamping frame

    "hich is connected to the Transformer Tank@

    Lifting Lugs pro&ided on the Tank Co&er is meant

    for Lifting Core !indings. #or for Lifting Tank

    Check for Drain &al&e' Sampling 2al&e' Oil Le&el

    (auge' Breather' 2ent' Bottom Channel ?;ounting@'

    Corrugated ins for )adiator.

  • 8/14/2019 Erection and Maintenance of Transformers

    20/82

    Pre Co--issionin" TestsPre Co--issionin" Tests atio Testatio Test

    This can be done by using a Turns )atio Tester or byusing T"o 2olt meters.

    Applying a 3 phase >7 &olts supply on 52 side'

    measure the 2oltages on the L2 side bet"een phases and also

    bet"een phase and (round on e&ery Tap.

    Check Continuity of "inding at e&ery tap.

    *nsure that the &oltages as measured is as per the

    )ating plate and "ithin the Tolerance permitted.

    Alternati&ely ' the Turns )atio can be directly

    checked at &arious Taps by )atio Tester

  • 8/14/2019 Erection and Maintenance of Transformers

    21/82

    -nsulation )esistance-nsulation )esistance

    The -) &alues should be checked "ith a 7,,

    2olts megger for L2 "inding and a >,,,=+,,,&olts megger for 52 "inding

    -) &alues bet"een Phase to (round on all 52

    and L& "indings must be taken . Also bet"een52 L2 . The Temperature at the time of test

    must be noted

    The ;egger Leads must be continuous

  • 8/14/2019 Erection and Maintenance of Transformers

    22/82

    The 52 L2 Bushings must be thoroughly

    cleaned.

    The Safe -) 2alues as per CB-P >>k& and 33k&

    are 2oltage.. ;inimum safe -) in ;ega Ohms at a

    Temperature of

    G C 3, , 7, 1,

    >>k& ,, +,, >,, 7,

    33k& 7,, +7, >+7 17

    Temp >.84 3.87 6.47 >7.47Correction

  • 8/14/2019 Erection and Maintenance of Transformers

    23/82

    Precautions Precautions

    Any -) 2alue taken must be )educed to +, deg C.

    All the &alues must be taken "ith the same

    instrument'temperature recorded "ith the same meter.

    NoteNotethat for e&ery >, GC rise in Temperature the -)

    &alue gets 5al&ed.

    T+N D8/T+T+N D8/T+(Dielectric Dissipation :actor) on(Dielectric Dissipation :actor) onthe Windingsthe Windings

    This Test indicates the Dielectric Loss actor.

    The Po"er actor of the -nsulation is directly related

    to the moisture absorbed by the "inding.

    The higher the Po"er actor'the greater is the moisture

    absorption. The ideal "ould be ,.,>H >, to the po"er

    of

  • 8/14/2019 Erection and Maintenance of Transformers

    24/82

    3agneti;ing Current 3agneti;ing Current

    A 3 phase >7 2olts supply is applied to the

    Primary and the ;agneti:ing current measured in

    all the phases.

    These &alues must be e9ual and confirm to the

    ;anufacturers Test Certificates.

  • 8/14/2019 Erection and Maintenance of Transformers

    25/82

    $il Tests$il Tests

    The BD2 of -nsulating Oil must "ithstand 3, k& perminute "hen Tested "ith a Eit ha&ing >+mm spheres

    and a +.7 mm (ap

    The same "ill hold good in respect of OLTC oil forPo"er Transformers.

    Oil samples from Top and Bottom ha&e to be collected

    for this Test.

  • 8/14/2019 Erection and Maintenance of Transformers

    26/82

  • 8/14/2019 Erection and Maintenance of Transformers

    27/82

    After all the Tests as abo&e are satisfactory

    Allo" a settling time of *ight hours

    )elease Air from all the pockets

    *nergi:e the Transformer "ith L2 uses in the

    Distribution Bo$ remo&ed

    Obser&e for any abnormal 5um or Sound

    -f OE' measure 2oltage bet"een phases and

    bet"een phase to (round

    After a fe" hours' take out the Transformer' check

    and rectify any abnormality and put it back into

    operation

  • 8/14/2019 Erection and Maintenance of Transformers

    28/82

    MAINTENANCE OF TRANSFORMERS

    3aintain a register indicating all the reco!!issioning

    Test esults.

    +n4 !aintenance should %e done after de=energisation

    of Transfor!er and 8arthing

    h4sical inspection !ust %e done periodicall4 for an4$il /eakages /oose - & / & 8arth Connections

    Clean the ,od4 ,ushings etc

    During $er hauls the core and winding !ust %e

    lifted windings inspected for displace!ent core foran4 looseness Tie ods cla!ps %olts and nuts for

    tightness Ducts for an4 %lockage due to sludge and

    re!ed4.

  • 8/14/2019 Erection and Maintenance of Transformers

    29/82

    Check the /oad in +!peres on / side egularl4

    Check /T oltages in all the phases

    Check $il leel./eakages.

    Check for tightness of -/Connections once in

    si9 !onths.

    Test the $il for Dielectric 6trength and +cidit4 once

    in a 4ear.

    $erhaul the Transfor!er atleast once in :ie>ears.

    ERECTION O&M OF 'P ''+(()*ERECTION O&M OF 'P ''+(()*

  • 8/14/2019 Erection and Maintenance of Transformers

    30/82

    ERECTION,O&M OF 'P,''+(()*ERECTION,O&M OF 'P,''+(()*

    '.(/-$a,/.0-$a TRANSFORMERs'.(/-$a,/.0-$a TRANSFORMERs

    )ead the -nstruction ;anual Carefully.

    )ead the complete set of Dra"ings .

    *nergi:e only after completing all the assembly

    "ork'conducting all the Pre Commissioning Checks

    and satisfactory pre commissioning Tests.

    The )ele&ant -ndian standards are

    -S +,+1 ?P>@' ?P+@' ?P3@' ?P@' ?P7@ onPo"er Transformer (eneral'Temp )ise'Dielectric

    Tests' Terminal marking Tapings' Bushings

    Clearances

  • 8/14/2019 Erection and Maintenance of Transformers

    31/82

    Small capacity Transformers' after tests are

    dispatched filled "ith Oil.!here the Conser&ator

    and )adiators are of detachable type' Oil is filled

    upto >,mm belo" Top Co&er.

    /se Lifting Lugs pro&ided on the Top of the

    Transformer on either side. Do not use the Lugs

    pro&ided on t he Top Co&er. These are meant for

    Lifting Core and !indings

    /se Suitable ;obile Crane or appro&ed Lifting

    De&ices for unloading=Loading

    Packages containing Bushings Accessories

    must be carefully handled

  • 8/14/2019 Erection and Maintenance of Transformers

    32/82

    -n Lifting the Complete Transformers use such Lugs

    to maintain balance and a&oid Tilting

    Before /nloading the Transformers recei&ed fromthe actory' *$amine the parts for any missing'

    damaged itemsI

    Before commissioning' conduct 2isual Checks'

    ;egger the !indings'Do the )atio Test' Check

    !inding Continuity'*$cite "ith Lo" 2oltage'

    Conduct BD2 of Oil

    Do not store for Longer periods.All Blanking plates

    etc must be preser&ed

  • 8/14/2019 Erection and Maintenance of Transformers

    33/82

    A properly designed oundation must be ready.

    Oil Soak Pits are recommended.

    *asy access around the Transformer.

    *nsure Proper Clearance to Li&e Parts.

    Cardon the !ork place "ith Safety )ibbon and

    Danger Boards.

    -ndoor -nstallations must be "ell &entillated.

    Oil is inflammable.Take care "hen "elding nearby.

    A&oid assembly' as far as possible on a moist day.

    Those ha&ing access to the interior of the Transformer

  • 8/14/2019 Erection and Maintenance of Transformers

    34/82

    Those ha&ing access to the interior of the Transformer

    must empty their pockets.

    !orkmen should tie the spanners they use' to their

    hands' "ith Strings?Cotton@ Clean e&ery part "ith Oil or "ith #on fluffy cloth

    for "iping

    The Transformer oil can be circulated to get aTemperature abo&e ambient before accessing

    interiors.

    Transformer should be erected on a Le&el

    oundation Oil ilteration to be Stopped !hen BD2 is

    ,E&=mt' !C

  • 8/14/2019 Erection and Maintenance of Transformers

    35/82

    Tools Testing *9uipment )e9uired

    Oil Test Eit

    )atio ;eter ? T"o AC 2olt ;eters@

    ;obile Crane

    2acuum (auge

    ;egger';otor Operated'>.,k&=+.7E&

    5ydraulic 0acks'!ooden Sleepers= Packing "ood'spanners'tools.

    Stream Line ilter

    Slings' Shackles Chain Pulley Blocks=Tirfor

    Tarpaline')opes'Cleaning rags etc

  • 8/14/2019 Erection and Maintenance of Transformers

    36/82

    Pre Commissioning Tests

    )atio Test

    Polarity Test )esistance of "indings "ith Eel"in Bridge

    -nsulation )esistance

    ;agneti:ing Current Oil Tests BD2=Acidity

    *rection' assembly must bear the safety clearances

    "hen "orking in Li&e Stations

    Settings of all Current and 2oltage Operated )elays

    and Testing

    Operation of Alarms Tripping

    All 5 d L2 ti t b ti ht

  • 8/14/2019 Erection and Maintenance of Transformers

    37/82

    All 5& and L2 connections must be tight

    *nsure Proper #eutral and Body *arthing

    )elease Air from all Air )elease Pockets *nsure all )adiator 2al&es are Open

    *nsure Drain 2al&es'Sample 2al&es'Top &al&es in

    closed condition

    Thermometer Pockets are filled "ith Oil

    Oil Le&el is as re9uired

    Arcing 5orns and (aps set.

    !T- CT connected to Compensating 5eater.

    Allo" a settling Time of + hours

    ) l th Ai f ll th P k t i

  • 8/14/2019 Erection and Maintenance of Transformers

    38/82

    )elease the Air from all the Pockets again

    *nergi:e the Transformer from 52.

    #ote for any abnormal 5um= sound Check the L2 2oltages

    Build up the 2oltage in Steps and )ecord

    Transformer should be s"itched off again after + hrs

    #ote any abnormal Temperature=&ibration= hum=

    beha&iour.)ectify.

    *nergise and Load the Transformer.

    All the details to be recorded and informed to the

    ;anufacturer.

    Check points for Large Transformers

  • 8/14/2019 Erection and Maintenance of Transformers

    39/82

    Check points for Large Transformers

    Eeep a fire fighting e9uipment )eady

    !elding "orks must bear ire Safety

    #o smoking near the Transformer=ilter

    *arth all Control Cabinets'and;Bs

    *nsure that the Tank has no pressure "hen BlankingPlate is being opened

    )emo&e all loose parts on the Top co&er

    asten tools to "rist. *mpty Pockets. /tmost care at "ork site

    All components to be "ell cleaned.

    ;inimum *$posure of Core !inding

    Any ob%ect dropped inside despite all precautions

  • 8/14/2019 Erection and Maintenance of Transformers

    40/82

    Any ob%ect dropped inside despite all precautions

    must be brought out.

    Assemble Turrets in )ight places

    Calibrate OT- !T-

    Check Oil Le&els in Bushings

    Settings of OT- !T-' Alarm=Trip

    *arth )esistance of Transformer *arth

    5and operation of OLTC in all Taps

    Limit S"itches Operation of OLTC Step By Step Operation of OLTC

    Local=)emote Operation of OLTC

    Tap Position -ndicator

    f l f h

  • 8/14/2019 Erection and Maintenance of Transformers

    41/82

    Out of Step )elay of Tap cahnger

    Off Circuit Tap Changer -nter Lock

    Analyse any (as Collected in Buch )elay

    Check -nter Trip operation

    Trip ree Operation of 52 L2 CBs.

    Check Alarms =Trips as belo"

    Bucholt:' !T- 'OT-' Oil lo"'!ater lo"'

    Differential Pressure ?Lo" Cooling@'an fail'P)

    2al&e 'Diffl )elay'O=C )elay'*= )elay')* )elay.

    Color of (as Due to Decomposition of

  • 8/14/2019 Erection and Maintenance of Transformers

    42/82

    Color of (as Due to Decomposition of

    !hite Paper Cloth

    ello" !ood

    (rey -ron

    Black *lectric arc in Oil

    Clear Air

    !hen (as Passed throF 7J Ag #o3 sol

    !hite Precipitate turning Bro"n. Oil Decomposition

    !hen (as passed thro "eak Ammonia solution' if the

    curdled precipitate turns to Dark Bro"n' indicates

    Paper'"ood'cotton decomposition.

    2acuum iltration of Oil should be done separately

  • 8/14/2019 Erection and Maintenance of Transformers

    43/82

    2acuum iltration of Oil should be done separately

    at 7,7ppm !C

    2AC//; T)*AT;*#T

    k& *&acuate5old Standing Time

    ?>7 >+5rs >+5rs

    upto+, +5rs 45rs@ +, 315rs >+,5rs

    No 8lectrical Test er!itted in acuu!

    Don1ts 2or Poer Trans2or-ersDon1ts 2or Poer Trans2or-ers

  • 8/14/2019 Erection and Maintenance of Transformers

    44/82

    Don ts 2or Poer Trans2or-ers.Don ts 2or Poer Trans2or-ers.

    >.DonFt *nergise "ithout -n&estigation if it Trips

    +.DonFt )e *nergise "ithout analysis of (as ifBucholt: )elay Acts

    3.DonFt )e *nergise "ithout conducting all Pre

    Commissioning Tests.DonFt 5andle Off Ckt Tap changer "hen the

    Transformer is in ser&ice

    7.DonFt *nergise the Transformer unless the Off CktTC is Locked

    1.DonFt Lea&e Tertiary Terminals un

  • 8/14/2019 Erection and Maintenance of Transformers

    45/82

    6.DonFt allo" OT-=!T- to e$ceed 17 deg C.ilter Temp

    beyond 6,deg C.

    4.DonFt Parallel Transformers unless conditions are

    satisfied

    8.DonFt /se Lo" Capacity Lifting 0acks

    >,. DonFt ;o&e the Transformers "ith Bushings fitted

    >>.O&er Load Transformer ?limits as per -S 11,,@

    >+.Change !T-=OT- settings fe9uently

    >3.Lea&e the )ed Pointer?;a$@ behind the Black

    Pointer?-nstant@

  • 8/14/2019 Erection and Maintenance of Transformers

    46/82

    >.Allo" Loose Connections

    >7.;eddle "ith Protection Circuits

    >1.Allo" Conser&ator Oil Le&el fall belo" >= le&el

    >6.Allo" Oil Le&el in Bushings fall .Top up

    immediately

    >4.Allo" shalling Bo$ and Control Cabinetsunlocked.

    >8.S"itch off 5eater in ;B off.

    +,.Allo" Dirt Deposits on Bushings

    +>.Allo" any /n

  • 8/14/2019 Erection and Maintenance of Transformers

    47/82

    ++.Lea&e Ladders /n

  • 8/14/2019 Erection and Maintenance of Transformers

    48/82

    D$A6 :$ $W8 T+N6:$386 D$A6 :$ $W8 T+N6:$386

    >.Check thouroughly "hen an Alarm =Trip occurs

    +.Check Air Cell in Conser&ator3.Attend Lakages of Oil in Bushings -mmediately

    .Clean Petty Coats of Bushings occassionally

    7.Check BD2 !C of Oil in ;ain tank and BD2 for

    OLTC

    1.Check Oil Seal in Breather'top up if re9d

    6.Check Oil for Acdity

    4.Tighten -nspection co&er Bolts #uts /niformly"hen re9d

    8.Clean )elay Alarm Contacts'their operation'accuracy

    etc

  • 8/14/2019 Erection and Maintenance of Transformers

    49/82

    >,.Periodically check Protection Circuits

    >>.Pointers of all the gauges for free mo&ement

    >+.Clean the Oil Conser&ator thoroughly before *rection

    >3.Check Bucholt: )elay Operation

    >.Check Painting and touch up if necessary

    >7.Check !T-=OT- Oil Pockets and replenish Oil if need

    be

    >1.)elease Air through 2ent of Di&ertor before *nergising

    >6.Check Oil Le&el in Di&ertor

    >4.Check (ear Bo$ Oil Le&el'Top up

    >8.)eplace "orn out OLTC contacts as re9uired

  • 8/14/2019 Erection and Maintenance of Transformers

    50/82

    +,.Check all Bearings and Lubricate

    +>.Eeep the *9ualising Pipe 2al&e bet"een the Tank

    OLTC if pro&ided' open during 2acuuming and Oilfilling.

    ++.Connect a #+ Cylinder and keep the &al&e open'

    maintain a positi&e pressre through the Automatic ?or

    ;anual@ regulator+3.ill the Transformer "ith Oil at the *arliest.

    + .Check Door Seals of ;arshalling Bo$ and )eplace

    +7. Check "hether the ;ain Tank can "ithstand 2acuum

    and if so the Safe Limit.?or *52 class >.,, Torr@

    NoteNote adiators and Conserator Tanks cannotadiators and Conserator Tanks cannot

    withstand acuu!withstand acuu!

    MAINTENANCE SCEDU#ES

  • 8/14/2019 Erection and Maintenance of Transformers

    51/82

    MAINTENANCE SCEDU#ES(For Power Transformers)

    Hourly :

    !inding Temperature' Oil Temperature' AmbientTemperature

    Load in Amps ?;in=;a$@'2oltages?;in=;a$@

    Daily :

    Oil Le&el in Conser&ator'OLTC'Bushings'Oil Leakages

    Mon!ly :

    Breather functioning'Silica gel'Oil seal'Cleanliness of

    Bushings'Loose Connections?5ot Spots@

    "uarerly :

  • 8/14/2019 Erection and Maintenance of Transformers

    52/82

    Cleanliness of Bushings'Oil Leakages'BD2 and !C of Oil

    unctioning of Cooler ans ' Oil Pumps

    Check OLTC Operation

  • 8/14/2019 Erection and Maintenance of Transformers

    53/82

    Bushing Connectors for Tightness

    Test Bucholt: )elay by Air -n%ection

    Test Pressure )elief Trip Tan Delta for Bushings and !inding

    Ma3or O$er au4Ma3or O$er au4

    ($nce in B to 10 >ears)($nce in B to 10 >ears)

    Detailed e9a!ination of the windingCore $il,ushingsrotectie Deices6elector& Diertor

    6witches etc.

    Permissible BD2 !C

  • 8/14/2019 Erection and Maintenance of Transformers

    54/82

    Belo" 6+.7k& K ,k&=mt' +7ppm

    6+.7 to >7k& K 7,k&=mt' +,ppm

    >7 abo&e K 1,k&=mt'>7ppm

    ?The (ap in Testing Eit to be +'7mm@

    -) &alues at 3,deg C for Po"er DistributionTransformers

    33=>>k& >>k& =,2

    52 to *arth +7,; +,,;L2 to *arth +,,; >,,;

    52 to L2 +7,; +,,;

    Sin"4e P!ase A-or5!ous Meta4

  • 8/14/2019 Erection and Maintenance of Transformers

    55/82

    Sin"4e P!ase A-or5!ous Meta4

    Trans2or-er

    Suitable for Direct Pole ;ounting

    Plinth ;ounting

    Temperature )ise ?Abo&e Ambient@

    7 deg C by !inding

    , deg C by Oil

    )ating

    >>k&=+,2'.7J M'67k&?Peak@ B-L'copper

    Core

    Shell Type' made of Amorphous ;etal ?-ronah Grain has to + oh# #

    Grain Boundary has + to the %ower of + The Resistane of the Inter Granular 8ayer

    dereases at a threshold (alue

    Disharge ta"es %lae and nor#ali5ed The Resistane is :on68inear.

    There are thre ty%es of Regions/

  • 8/14/2019 Erection and Maintenance of Transformers

    74/82

    9) Brea" Down stage

    9') A% Return; E +++& %er $# $ube

    So#e I#%ortant 7ara#eters;

    9) $O3 ; :or#al 3oltage/s? rt of '

    9)M$O3 ; Ma= sys C3/s?.rt.of ' Rated C3 F Ma= sys "( G44

    G44 9Ground 4ault 4ator)F

    +.1 for Solidly earthed syste# .+ for In effeti(ely >arthed syste#

    8& Disharges; 2"& to +"&.

    7ressure Relief Dia%hrag# is %ro(ided as

  • 8/14/2019 Erection and Maintenance of Transformers

    75/82

    an >=haust 3ent to safe guard e?ui%#ents

    8as designed on 7ollution 8e(els ;

    8ight.,##

    Mediu#+##

    !ea(y..2## 3.!ea(y..'##

    Other $onditions;

    bient ; H2+$ to 6+$&ltitude ; &bo(e +++#ts

    8oation ; $orrosi(e / 7olluted /S#o"e

    $he#ial / $onta#ination

    &bnor#al 4re?ueny ;

  • 8/14/2019 Erection and Maintenance of Transformers

    76/82

    -1!< or E ,!arth Jua"e

    3ibrations

    !igh @ind Iing

    !ealth Monitoring ;

    9) $he" Surge $ounter Rading regularly 9) $he" 8ea"age $urrents

    9') $he" >=haust 3ents

    Curren Transformers:

    The 7ri#ary winding is generally a Bar

  • 8/14/2019 Erection and Maintenance of Transformers

    77/82

    The 7ri#ary winding is generally a Bar.

    It ould onsist of two or #ore turns to sa(e o%%er of the

    seondary winding

    There is no a%%reiable (oltage dro% in the 7ri#ary.

    & !ea(y urrent ould flow through the 7ri#ary at a !igh

    3oltage.

    The urrent in the 7ri#ary is not de%endant on the 8oad

    on the seondary.

    & nu#ber of seondary windings 9alled oresRing

    Ty%e) are %laed around the 7ri#ary.

    The $lassifiation ould be for #etering%rotetion et The Iron $ore #ust be of 8ow 8oss 8ow Relutane

    ty%e #ust ha(e 8ow 4lu= Density 9about +++ lines /s?

    #). MAM>T&8 9:i64e &lloy) is used as $ore.

    The Ratio hanging ould be on 7ri#ary or Seondary.

  • 8/14/2019 Erection and Maintenance of Transformers

    78/82

    Generally a $urrent Transfor#er in the

    >!3 l i h ti ll l d d i

  • 8/14/2019 Erection and Maintenance of Transformers

    79/82

    >!3 lass is her#etially sealedand is

    Maintenane 4ree 9Internal)

    I#%ortant ; The Seondary @inding shouldnot be left o%en or loose.Dangerously !igh

    3oltages will a%%ear.

    $8>&R&:$>S ; 9##) (oltge 4or e?ui%#ent %h6%h s%aing in

    rating %h6%h %h6> Isol Sw 9&!)

    "( -,+ '+ ,+ *+

    ''"( *+ ,+ 0,+ +

    '"( 0++ ++ -+ '+2+

    $learanes in Strung Bus 9##)

  • 8/14/2019 Erection and Maintenance of Transformers

    80/82

    C3 Rating S%ae between ondutors

    + -2++

    ' ',++

    '' ++

    '++ Ground $learanes ; 9##)

    + "( 22++

    '"( -,++ ''"( '0++

    "( '0++

    Setional $learanes 9##);

  • 8/14/2019 Erection and Maintenance of Transformers

    81/82

    C3 Rating $learane

    + -'++

    ' '2++

    '' 1++

    ,++ $learane for Indoor >?ui%#ent 9##);

    C3 Rating 7h6 7h 7h 6 >arth

    '' '2, 0 0,

    9when ondutors bus are not insulated)

    Ga% Settings;9##)

  • 8/14/2019 Erection and Maintenance of Transformers

    82/82

    Sys C3 Tr Bushg ga% TT Ga% Ga%&T