erection and maintenance of transformers
TRANSCRIPT
-
8/14/2019 Erection and Maintenance of Transformers
1/82
ERECTION,OPERATION
AND MAINTENANCE OF
DISTRIBUTION AND
POWER TRANSFORMERS
-
8/14/2019 Erection and Maintenance of Transformers
2/82
RECEIPT OF TRANSFORMER AT SITE
(1)Dispatched with Core & Windings fitted in the
Tank and filled with Nitrogen upto 0.15kgc!.s" or
filled with #nsulating $il a%oe Windings.
(') #f filled with Nitrogen check Nitrogen ressure and
if less than 0.' kgc!.s" replenish it upto
0.15kgc!.s".
(*) +ll other parts such as Conserator Tank,ushings
(-&/)adiators+ccessoriesrotectie deises
are dispatched in separate packages.
-
8/14/2019 Erection and Maintenance of Transformers
3/82
() 2eep the following Tools & 3aterials read4
6teel 6lings of arious capacities-4draulic
/ifting 7acks Wooden 6leepers Wooden
acking ieces + 3o%ile Crane etc.
(5) ,efore Co!!encing 8rection Nitrogen !ust %e
slowl4 released and the tank flushed with Dr4
$94gen or filled with #nsulating $il slowl4 to
aoid contact of winding with +t!ospheric +ir.
-
8/14/2019 Erection and Maintenance of Transformers
4/82
Precautions to be taken Long Storage of the Transformer is not
recommended.
Store Oil Drums properly
Assembly should commence from Bottom
Core !indings should be filled "ith Oil as soon
as #itrogen is e$pelled.
Choose a Dry Day "hen "eather is clear
Care to be taken so as to not to allo" any foreign
ob%ect falling into the Transformer
Blanking Plates should be remo&ed "hen "e are
ready for assembly.
-
8/14/2019 Erection and Maintenance of Transformers
5/82
Blanking Plates should also be stored safely after
"ork is completed.
The Person "orking "ith Tools used inside
Transformer must tie it by cotton tape
#o coins'pens'"atches etc should be used by the
persons "orking on the Transformer
(askets must be tightened properly ie #ot too much
or too less
#e" (askets must be used for Bushings )adiators'etc
*nsure tightness of all the connections inside and
proper Locking
-
8/14/2019 Erection and Maintenance of Transformers
6/82
Transformer Oil must be pumped from the Drums to
the Storage Tank through Purifier
Lea&e about +,mm oil at the bottom of each drum.-tmay be impure.
Pumping in Oil must be through the Drain &al&e. Also
Draining. Lea&e one Opening at the Top Open to
release *ntry Air.
Before Commencing Oil filling and purification'Clean
the top of oil drums'flush hoses'Oil Tank'and the
ilter also. /se (asket Paste "hen fi$ing them
Once the 0oint is detached' use fresh (askets
-
8/14/2019 Erection and Maintenance of Transformers
7/82
(asket Paste shall be applied uniformly before
pressing onto a metal surface.
All the Bushings must be thoroughly cleanedespecially the Bottom Portion before assembly.
Bushing Shields must be fitted to the Bushing before
assembly. Storage of (asket is &ery important.#o rolling'folding
Oil Pockets for OT- !T- must be filled "ith Oil
before fitting the Sensing Bulbs
or Transformers rated belo" 11k& 2acuuming to be
done at belo" 34,mm5g
-
8/14/2019 Erection and Maintenance of Transformers
8/82
or Transformers abo&e 11k& 2acuuming to be
done at 678mm of 5g
*9uali:er pipe connections must be connected
bet"een the ;ain Tank and OLTC to a&oid
Buckling of OLTC
The Bursting 5ead of *$plosion 2ent to be
remo&ed and a Blanking Plate fi$ed before
&acuuming the Transformer.
The )e9uired &acuuming shall be for t"o
hours. )eplace 2ent *$plosion 5ead
Oil may be in%ected through the Bottom Drain
2al&e into the Transformer.#o )ubber 5oses
-
8/14/2019 Erection and Maintenance of Transformers
9/82
5ot Oil Circulation to be done to e$pel moisture
from the insulation at 1,
-
8/14/2019 Erection and Maintenance of Transformers
10/82
i$ the Arcing 5orns for the Bushings ?for 11k& and
abo&e@and ad%ust
Connect the Transformer Body earth
)elease any Trapped Air from the Bushings' TopCo&er etc
Connect the 5eating Coils of the !T- to BCT
Terminals.
-
8/14/2019 Erection and Maintenance of Transformers
11/82
Precautions to be taken !en orkin"
in a #i$e Substation %
Do not "ork too close to another Li&e e9uipment Before "orking Take a Permit. All sources of po"er
must be disconnected
A safety earth to be pro&ided "here&er necessary
The Area of "ork should be surrounded "ith a
Safety )ibbon and all the staff clearly educated
Trained and 9ualified persons must carry out
inspection and enforce safety
-
8/14/2019 Erection and Maintenance of Transformers
12/82
All the Testing de&ices must be handled by ualified
persons A Safety Sargent should be posted at the "ork site
"ho should deenergi:e if needed
-f it is necessary to "ork inside the Tank' Dry Air
must be allo"ed as the Oil is pumped out .
Dry Air supply must be slo"ly allo"ed inside from
the Bottom and allo"ed to go out from the top by
keeping one Blanking Plate Open should a person
"ork inside
-
8/14/2019 Erection and Maintenance of Transformers
13/82
Another Person should al"ays stay outside
"atching the person inside
*lectrical Tools should be used "ith plug pins only
!arning Boards should be *$hibited
Before energi:ing the *9uipment ensure that all the
"orking personnel ha&e come out and all the *arths
pro&ided for safe "orking are remo&ed.
-
8/14/2019 Erection and Maintenance of Transformers
14/82
ERECTION,O&M OF ' P!ase (()*+''*
DISTRIBUTION TRANSFORMERS
)ead the ;anufacturers -nstructions carefully.
The Transformer should be commissioned only after
completing all the assembly and Pre
-
8/14/2019 Erection and Maintenance of Transformers
15/82
;obile Crane or other appro&ed de&ices should be
used.
or Loading and /nloading the Transformer the T"oLifting Lugs pro&ided on the sides of the Transformer
should only be used.
Ade9uate care must be taken "hen shifting the Tr
to site from Storage ard
The Transformer is dispatched in complete shape "ith
the Tank' core !indings' Conser&ator' 2ent' 52
L2 Bushings' assembled. 2isual -nspection must be
done before erection to detect any damages' leakage
of oil'cracks.
-
8/14/2019 Erection and Maintenance of Transformers
16/82
Pre commissioning Site Tests such as ;egger
Test' )atio Test' *$citation Current' !inding
Continuity'Oil sample Testing for Dielectric and
Acidity to be done.
Oil is inflammable.Take care not to bring naked
flame or light such as during "elding near the
Transformer
ibrous cleaning material should not be used./se cloth
-
8/14/2019 Erection and Maintenance of Transformers
17/82
Equipment for Erection, Testing andEquipment for Erection, Testing and
CommissioningCommissioning
AC 2oltmeters ?,,,, &olts or +,,,&olts@
*lectric Oil Pump = 5and Pump
Spanners Single=Double *dged' )ing' complete Set
Scre" Dri&ers' assorted si:es' Tester
Enife' TailorFs scissors
;S Bolts #uts' !ashers ?plain and spring@
-
8/14/2019 Erection and Maintenance of Transformers
18/82
Cotton cloth for cleaning
Paint Brush "ith Paint as re9uired
Oil Sampling Bottle and Testing Eit Transformer should be erected on a Le&el
oundation
The oundation must be properly designed. Sufficient clearances bet"een phases and (round
shooed be maintained
or -ndoor -nstallation' good &entilation muste$ist
*$amine Standard ittings like )ating Plate' Oil
(auge'Lifting Lugs' Conser&ator'2ent' etc
-
8/14/2019 Erection and Maintenance of Transformers
19/82
Bi ;etallic Connectors to be used in 52 L2
connections Transformer *arthing Terminals must be earthed.
?#ote C)(O core is connected to clamping frame
"hich is connected to the Transformer Tank@
Lifting Lugs pro&ided on the Tank Co&er is meant
for Lifting Core !indings. #or for Lifting Tank
Check for Drain &al&e' Sampling 2al&e' Oil Le&el
(auge' Breather' 2ent' Bottom Channel ?;ounting@'
Corrugated ins for )adiator.
-
8/14/2019 Erection and Maintenance of Transformers
20/82
Pre Co--issionin" TestsPre Co--issionin" Tests atio Testatio Test
This can be done by using a Turns )atio Tester or byusing T"o 2olt meters.
Applying a 3 phase >7 &olts supply on 52 side'
measure the 2oltages on the L2 side bet"een phases and also
bet"een phase and (round on e&ery Tap.
Check Continuity of "inding at e&ery tap.
*nsure that the &oltages as measured is as per the
)ating plate and "ithin the Tolerance permitted.
Alternati&ely ' the Turns )atio can be directly
checked at &arious Taps by )atio Tester
-
8/14/2019 Erection and Maintenance of Transformers
21/82
-nsulation )esistance-nsulation )esistance
The -) &alues should be checked "ith a 7,,
2olts megger for L2 "inding and a >,,,=+,,,&olts megger for 52 "inding
-) &alues bet"een Phase to (round on all 52
and L& "indings must be taken . Also bet"een52 L2 . The Temperature at the time of test
must be noted
The ;egger Leads must be continuous
-
8/14/2019 Erection and Maintenance of Transformers
22/82
The 52 L2 Bushings must be thoroughly
cleaned.
The Safe -) 2alues as per CB-P >>k& and 33k&
are 2oltage.. ;inimum safe -) in ;ega Ohms at a
Temperature of
G C 3, , 7, 1,
>>k& ,, +,, >,, 7,
33k& 7,, +7, >+7 17
Temp >.84 3.87 6.47 >7.47Correction
-
8/14/2019 Erection and Maintenance of Transformers
23/82
Precautions Precautions
Any -) 2alue taken must be )educed to +, deg C.
All the &alues must be taken "ith the same
instrument'temperature recorded "ith the same meter.
NoteNotethat for e&ery >, GC rise in Temperature the -)
&alue gets 5al&ed.
T+N D8/T+T+N D8/T+(Dielectric Dissipation :actor) on(Dielectric Dissipation :actor) onthe Windingsthe Windings
This Test indicates the Dielectric Loss actor.
The Po"er actor of the -nsulation is directly related
to the moisture absorbed by the "inding.
The higher the Po"er actor'the greater is the moisture
absorption. The ideal "ould be ,.,>H >, to the po"er
of
-
8/14/2019 Erection and Maintenance of Transformers
24/82
3agneti;ing Current 3agneti;ing Current
A 3 phase >7 2olts supply is applied to the
Primary and the ;agneti:ing current measured in
all the phases.
These &alues must be e9ual and confirm to the
;anufacturers Test Certificates.
-
8/14/2019 Erection and Maintenance of Transformers
25/82
$il Tests$il Tests
The BD2 of -nsulating Oil must "ithstand 3, k& perminute "hen Tested "ith a Eit ha&ing >+mm spheres
and a +.7 mm (ap
The same "ill hold good in respect of OLTC oil forPo"er Transformers.
Oil samples from Top and Bottom ha&e to be collected
for this Test.
-
8/14/2019 Erection and Maintenance of Transformers
26/82
-
8/14/2019 Erection and Maintenance of Transformers
27/82
After all the Tests as abo&e are satisfactory
Allo" a settling time of *ight hours
)elease Air from all the pockets
*nergi:e the Transformer "ith L2 uses in the
Distribution Bo$ remo&ed
Obser&e for any abnormal 5um or Sound
-f OE' measure 2oltage bet"een phases and
bet"een phase to (round
After a fe" hours' take out the Transformer' check
and rectify any abnormality and put it back into
operation
-
8/14/2019 Erection and Maintenance of Transformers
28/82
MAINTENANCE OF TRANSFORMERS
3aintain a register indicating all the reco!!issioning
Test esults.
+n4 !aintenance should %e done after de=energisation
of Transfor!er and 8arthing
h4sical inspection !ust %e done periodicall4 for an4$il /eakages /oose - & / & 8arth Connections
Clean the ,od4 ,ushings etc
During $er hauls the core and winding !ust %e
lifted windings inspected for displace!ent core foran4 looseness Tie ods cla!ps %olts and nuts for
tightness Ducts for an4 %lockage due to sludge and
re!ed4.
-
8/14/2019 Erection and Maintenance of Transformers
29/82
Check the /oad in +!peres on / side egularl4
Check /T oltages in all the phases
Check $il leel./eakages.
Check for tightness of -/Connections once in
si9 !onths.
Test the $il for Dielectric 6trength and +cidit4 once
in a 4ear.
$erhaul the Transfor!er atleast once in :ie>ears.
ERECTION O&M OF 'P ''+(()*ERECTION O&M OF 'P ''+(()*
-
8/14/2019 Erection and Maintenance of Transformers
30/82
ERECTION,O&M OF 'P,''+(()*ERECTION,O&M OF 'P,''+(()*
'.(/-$a,/.0-$a TRANSFORMERs'.(/-$a,/.0-$a TRANSFORMERs
)ead the -nstruction ;anual Carefully.
)ead the complete set of Dra"ings .
*nergi:e only after completing all the assembly
"ork'conducting all the Pre Commissioning Checks
and satisfactory pre commissioning Tests.
The )ele&ant -ndian standards are
-S +,+1 ?P>@' ?P+@' ?P3@' ?P@' ?P7@ onPo"er Transformer (eneral'Temp )ise'Dielectric
Tests' Terminal marking Tapings' Bushings
Clearances
-
8/14/2019 Erection and Maintenance of Transformers
31/82
Small capacity Transformers' after tests are
dispatched filled "ith Oil.!here the Conser&ator
and )adiators are of detachable type' Oil is filled
upto >,mm belo" Top Co&er.
/se Lifting Lugs pro&ided on the Top of the
Transformer on either side. Do not use the Lugs
pro&ided on t he Top Co&er. These are meant for
Lifting Core and !indings
/se Suitable ;obile Crane or appro&ed Lifting
De&ices for unloading=Loading
Packages containing Bushings Accessories
must be carefully handled
-
8/14/2019 Erection and Maintenance of Transformers
32/82
-n Lifting the Complete Transformers use such Lugs
to maintain balance and a&oid Tilting
Before /nloading the Transformers recei&ed fromthe actory' *$amine the parts for any missing'
damaged itemsI
Before commissioning' conduct 2isual Checks'
;egger the !indings'Do the )atio Test' Check
!inding Continuity'*$cite "ith Lo" 2oltage'
Conduct BD2 of Oil
Do not store for Longer periods.All Blanking plates
etc must be preser&ed
-
8/14/2019 Erection and Maintenance of Transformers
33/82
A properly designed oundation must be ready.
Oil Soak Pits are recommended.
*asy access around the Transformer.
*nsure Proper Clearance to Li&e Parts.
Cardon the !ork place "ith Safety )ibbon and
Danger Boards.
-ndoor -nstallations must be "ell &entillated.
Oil is inflammable.Take care "hen "elding nearby.
A&oid assembly' as far as possible on a moist day.
Those ha&ing access to the interior of the Transformer
-
8/14/2019 Erection and Maintenance of Transformers
34/82
Those ha&ing access to the interior of the Transformer
must empty their pockets.
!orkmen should tie the spanners they use' to their
hands' "ith Strings?Cotton@ Clean e&ery part "ith Oil or "ith #on fluffy cloth
for "iping
The Transformer oil can be circulated to get aTemperature abo&e ambient before accessing
interiors.
Transformer should be erected on a Le&el
oundation Oil ilteration to be Stopped !hen BD2 is
,E&=mt' !C
-
8/14/2019 Erection and Maintenance of Transformers
35/82
Tools Testing *9uipment )e9uired
Oil Test Eit
)atio ;eter ? T"o AC 2olt ;eters@
;obile Crane
2acuum (auge
;egger';otor Operated'>.,k&=+.7E&
5ydraulic 0acks'!ooden Sleepers= Packing "ood'spanners'tools.
Stream Line ilter
Slings' Shackles Chain Pulley Blocks=Tirfor
Tarpaline')opes'Cleaning rags etc
-
8/14/2019 Erection and Maintenance of Transformers
36/82
Pre Commissioning Tests
)atio Test
Polarity Test )esistance of "indings "ith Eel"in Bridge
-nsulation )esistance
;agneti:ing Current Oil Tests BD2=Acidity
*rection' assembly must bear the safety clearances
"hen "orking in Li&e Stations
Settings of all Current and 2oltage Operated )elays
and Testing
Operation of Alarms Tripping
All 5 d L2 ti t b ti ht
-
8/14/2019 Erection and Maintenance of Transformers
37/82
All 5& and L2 connections must be tight
*nsure Proper #eutral and Body *arthing
)elease Air from all Air )elease Pockets *nsure all )adiator 2al&es are Open
*nsure Drain 2al&es'Sample 2al&es'Top &al&es in
closed condition
Thermometer Pockets are filled "ith Oil
Oil Le&el is as re9uired
Arcing 5orns and (aps set.
!T- CT connected to Compensating 5eater.
Allo" a settling Time of + hours
) l th Ai f ll th P k t i
-
8/14/2019 Erection and Maintenance of Transformers
38/82
)elease the Air from all the Pockets again
*nergi:e the Transformer from 52.
#ote for any abnormal 5um= sound Check the L2 2oltages
Build up the 2oltage in Steps and )ecord
Transformer should be s"itched off again after + hrs
#ote any abnormal Temperature=&ibration= hum=
beha&iour.)ectify.
*nergise and Load the Transformer.
All the details to be recorded and informed to the
;anufacturer.
Check points for Large Transformers
-
8/14/2019 Erection and Maintenance of Transformers
39/82
Check points for Large Transformers
Eeep a fire fighting e9uipment )eady
!elding "orks must bear ire Safety
#o smoking near the Transformer=ilter
*arth all Control Cabinets'and;Bs
*nsure that the Tank has no pressure "hen BlankingPlate is being opened
)emo&e all loose parts on the Top co&er
asten tools to "rist. *mpty Pockets. /tmost care at "ork site
All components to be "ell cleaned.
;inimum *$posure of Core !inding
Any ob%ect dropped inside despite all precautions
-
8/14/2019 Erection and Maintenance of Transformers
40/82
Any ob%ect dropped inside despite all precautions
must be brought out.
Assemble Turrets in )ight places
Calibrate OT- !T-
Check Oil Le&els in Bushings
Settings of OT- !T-' Alarm=Trip
*arth )esistance of Transformer *arth
5and operation of OLTC in all Taps
Limit S"itches Operation of OLTC Step By Step Operation of OLTC
Local=)emote Operation of OLTC
Tap Position -ndicator
f l f h
-
8/14/2019 Erection and Maintenance of Transformers
41/82
Out of Step )elay of Tap cahnger
Off Circuit Tap Changer -nter Lock
Analyse any (as Collected in Buch )elay
Check -nter Trip operation
Trip ree Operation of 52 L2 CBs.
Check Alarms =Trips as belo"
Bucholt:' !T- 'OT-' Oil lo"'!ater lo"'
Differential Pressure ?Lo" Cooling@'an fail'P)
2al&e 'Diffl )elay'O=C )elay'*= )elay')* )elay.
Color of (as Due to Decomposition of
-
8/14/2019 Erection and Maintenance of Transformers
42/82
Color of (as Due to Decomposition of
!hite Paper Cloth
ello" !ood
(rey -ron
Black *lectric arc in Oil
Clear Air
!hen (as Passed throF 7J Ag #o3 sol
!hite Precipitate turning Bro"n. Oil Decomposition
!hen (as passed thro "eak Ammonia solution' if the
curdled precipitate turns to Dark Bro"n' indicates
Paper'"ood'cotton decomposition.
2acuum iltration of Oil should be done separately
-
8/14/2019 Erection and Maintenance of Transformers
43/82
2acuum iltration of Oil should be done separately
at 7,7ppm !C
2AC//; T)*AT;*#T
k& *&acuate5old Standing Time
?>7 >+5rs >+5rs
upto+, +5rs 45rs@ +, 315rs >+,5rs
No 8lectrical Test er!itted in acuu!
Don1ts 2or Poer Trans2or-ersDon1ts 2or Poer Trans2or-ers
-
8/14/2019 Erection and Maintenance of Transformers
44/82
Don ts 2or Poer Trans2or-ers.Don ts 2or Poer Trans2or-ers.
>.DonFt *nergise "ithout -n&estigation if it Trips
+.DonFt )e *nergise "ithout analysis of (as ifBucholt: )elay Acts
3.DonFt )e *nergise "ithout conducting all Pre
Commissioning Tests.DonFt 5andle Off Ckt Tap changer "hen the
Transformer is in ser&ice
7.DonFt *nergise the Transformer unless the Off CktTC is Locked
1.DonFt Lea&e Tertiary Terminals un
-
8/14/2019 Erection and Maintenance of Transformers
45/82
6.DonFt allo" OT-=!T- to e$ceed 17 deg C.ilter Temp
beyond 6,deg C.
4.DonFt Parallel Transformers unless conditions are
satisfied
8.DonFt /se Lo" Capacity Lifting 0acks
>,. DonFt ;o&e the Transformers "ith Bushings fitted
>>.O&er Load Transformer ?limits as per -S 11,,@
>+.Change !T-=OT- settings fe9uently
>3.Lea&e the )ed Pointer?;a$@ behind the Black
Pointer?-nstant@
-
8/14/2019 Erection and Maintenance of Transformers
46/82
>.Allo" Loose Connections
>7.;eddle "ith Protection Circuits
>1.Allo" Conser&ator Oil Le&el fall belo" >= le&el
>6.Allo" Oil Le&el in Bushings fall .Top up
immediately
>4.Allo" shalling Bo$ and Control Cabinetsunlocked.
>8.S"itch off 5eater in ;B off.
+,.Allo" Dirt Deposits on Bushings
+>.Allo" any /n
-
8/14/2019 Erection and Maintenance of Transformers
47/82
++.Lea&e Ladders /n
-
8/14/2019 Erection and Maintenance of Transformers
48/82
D$A6 :$ $W8 T+N6:$386 D$A6 :$ $W8 T+N6:$386
>.Check thouroughly "hen an Alarm =Trip occurs
+.Check Air Cell in Conser&ator3.Attend Lakages of Oil in Bushings -mmediately
.Clean Petty Coats of Bushings occassionally
7.Check BD2 !C of Oil in ;ain tank and BD2 for
OLTC
1.Check Oil Seal in Breather'top up if re9d
6.Check Oil for Acdity
4.Tighten -nspection co&er Bolts #uts /niformly"hen re9d
8.Clean )elay Alarm Contacts'their operation'accuracy
etc
-
8/14/2019 Erection and Maintenance of Transformers
49/82
>,.Periodically check Protection Circuits
>>.Pointers of all the gauges for free mo&ement
>+.Clean the Oil Conser&ator thoroughly before *rection
>3.Check Bucholt: )elay Operation
>.Check Painting and touch up if necessary
>7.Check !T-=OT- Oil Pockets and replenish Oil if need
be
>1.)elease Air through 2ent of Di&ertor before *nergising
>6.Check Oil Le&el in Di&ertor
>4.Check (ear Bo$ Oil Le&el'Top up
>8.)eplace "orn out OLTC contacts as re9uired
-
8/14/2019 Erection and Maintenance of Transformers
50/82
+,.Check all Bearings and Lubricate
+>.Eeep the *9ualising Pipe 2al&e bet"een the Tank
OLTC if pro&ided' open during 2acuuming and Oilfilling.
++.Connect a #+ Cylinder and keep the &al&e open'
maintain a positi&e pressre through the Automatic ?or
;anual@ regulator+3.ill the Transformer "ith Oil at the *arliest.
+ .Check Door Seals of ;arshalling Bo$ and )eplace
+7. Check "hether the ;ain Tank can "ithstand 2acuum
and if so the Safe Limit.?or *52 class >.,, Torr@
NoteNote adiators and Conserator Tanks cannotadiators and Conserator Tanks cannot
withstand acuu!withstand acuu!
MAINTENANCE SCEDU#ES
-
8/14/2019 Erection and Maintenance of Transformers
51/82
MAINTENANCE SCEDU#ES(For Power Transformers)
Hourly :
!inding Temperature' Oil Temperature' AmbientTemperature
Load in Amps ?;in=;a$@'2oltages?;in=;a$@
Daily :
Oil Le&el in Conser&ator'OLTC'Bushings'Oil Leakages
Mon!ly :
Breather functioning'Silica gel'Oil seal'Cleanliness of
Bushings'Loose Connections?5ot Spots@
"uarerly :
-
8/14/2019 Erection and Maintenance of Transformers
52/82
Cleanliness of Bushings'Oil Leakages'BD2 and !C of Oil
unctioning of Cooler ans ' Oil Pumps
Check OLTC Operation
-
8/14/2019 Erection and Maintenance of Transformers
53/82
Bushing Connectors for Tightness
Test Bucholt: )elay by Air -n%ection
Test Pressure )elief Trip Tan Delta for Bushings and !inding
Ma3or O$er au4Ma3or O$er au4
($nce in B to 10 >ears)($nce in B to 10 >ears)
Detailed e9a!ination of the windingCore $il,ushingsrotectie Deices6elector& Diertor
6witches etc.
Permissible BD2 !C
-
8/14/2019 Erection and Maintenance of Transformers
54/82
Belo" 6+.7k& K ,k&=mt' +7ppm
6+.7 to >7k& K 7,k&=mt' +,ppm
>7 abo&e K 1,k&=mt'>7ppm
?The (ap in Testing Eit to be +'7mm@
-) &alues at 3,deg C for Po"er DistributionTransformers
33=>>k& >>k& =,2
52 to *arth +7,; +,,;L2 to *arth +,,; >,,;
52 to L2 +7,; +,,;
Sin"4e P!ase A-or5!ous Meta4
-
8/14/2019 Erection and Maintenance of Transformers
55/82
Sin"4e P!ase A-or5!ous Meta4
Trans2or-er
Suitable for Direct Pole ;ounting
Plinth ;ounting
Temperature )ise ?Abo&e Ambient@
7 deg C by !inding
, deg C by Oil
)ating
>>k&=+,2'.7J M'67k&?Peak@ B-L'copper
Core
Shell Type' made of Amorphous ;etal ?-ronah Grain has to + oh# #
Grain Boundary has + to the %ower of + The Resistane of the Inter Granular 8ayer
dereases at a threshold (alue
Disharge ta"es %lae and nor#ali5ed The Resistane is :on68inear.
There are thre ty%es of Regions/
-
8/14/2019 Erection and Maintenance of Transformers
74/82
9) Brea" Down stage
9') A% Return; E +++& %er $# $ube
So#e I#%ortant 7ara#eters;
9) $O3 ; :or#al 3oltage/s? rt of '
9)M$O3 ; Ma= sys C3/s?.rt.of ' Rated C3 F Ma= sys "( G44
G44 9Ground 4ault 4ator)F
+.1 for Solidly earthed syste# .+ for In effeti(ely >arthed syste#
8& Disharges; 2"& to +"&.
7ressure Relief Dia%hrag# is %ro(ided as
-
8/14/2019 Erection and Maintenance of Transformers
75/82
an >=haust 3ent to safe guard e?ui%#ents
8as designed on 7ollution 8e(els ;
8ight.,##
Mediu#+##
!ea(y..2## 3.!ea(y..'##
Other $onditions;
bient ; H2+$ to 6+$<itude ; &bo(e +++#ts
8oation ; $orrosi(e / 7olluted /S#o"e
$he#ial / $onta#ination
&bnor#al 4re?ueny ;
-
8/14/2019 Erection and Maintenance of Transformers
76/82
-1!< or E ,!arth Jua"e
3ibrations
!igh @ind Iing
!ealth Monitoring ;
9) $he" Surge $ounter Rading regularly 9) $he" 8ea"age $urrents
9') $he" >=haust 3ents
Curren Transformers:
The 7ri#ary winding is generally a Bar
-
8/14/2019 Erection and Maintenance of Transformers
77/82
The 7ri#ary winding is generally a Bar.
It ould onsist of two or #ore turns to sa(e o%%er of the
seondary winding
There is no a%%reiable (oltage dro% in the 7ri#ary.
& !ea(y urrent ould flow through the 7ri#ary at a !igh
3oltage.
The urrent in the 7ri#ary is not de%endant on the 8oad
on the seondary.
& nu#ber of seondary windings 9alled oresRing
Ty%e) are %laed around the 7ri#ary.
The $lassifiation ould be for #etering%rotetion et The Iron $ore #ust be of 8ow 8oss 8ow Relutane
ty%e #ust ha(e 8ow 4lu= Density 9about +++ lines /s?
#). MAM>T&8 9:i64e &lloy) is used as $ore.
The Ratio hanging ould be on 7ri#ary or Seondary.
-
8/14/2019 Erection and Maintenance of Transformers
78/82
Generally a $urrent Transfor#er in the
>!3 l i h ti ll l d d i
-
8/14/2019 Erection and Maintenance of Transformers
79/82
>!3 lass is her#etially sealedand is
Maintenane 4ree 9Internal)
I#%ortant ; The Seondary @inding shouldnot be left o%en or loose.Dangerously !igh
3oltages will a%%ear.
$8>&R&:$>S ; 9##) (oltge 4or e?ui%#ent %h6%h s%aing in
rating %h6%h %h6> Isol Sw 9&!)
"( -,+ '+ ,+ *+
''"( *+ ,+ 0,+ +
'"( 0++ ++ -+ '+2+
$learanes in Strung Bus 9##)
-
8/14/2019 Erection and Maintenance of Transformers
80/82
C3 Rating S%ae between ondutors
+ -2++
' ',++
'' ++
'++ Ground $learanes ; 9##)
+ "( 22++
'"( -,++ ''"( '0++
"( '0++
Setional $learanes 9##);
-
8/14/2019 Erection and Maintenance of Transformers
81/82
C3 Rating $learane
+ -'++
' '2++
'' 1++
,++ $learane for Indoor >?ui%#ent 9##);
C3 Rating 7h6 7h 7h 6 >arth
'' '2, 0 0,
9when ondutors bus are not insulated)
Ga% Settings;9##)
-
8/14/2019 Erection and Maintenance of Transformers
82/82
Sys C3 Tr Bushg ga% TT Ga% Ga%&T
'' none none none
' 1++ 0'2 0,+
+ -+ + +