eod technical team book

83
EOD TECHNICAL TEAMBOOK

Upload: jarod437

Post on 18-Apr-2015

720 views

Category:

Documents


106 download

TRANSCRIPT

Page 1: EOD Technical Team Book

EODTECHNICALTEAMBOOK

Page 2: EOD Technical Team Book

SFC DANIEL B. HOPE

Date of last Revision: Jan 2000

Page 3: EOD Technical Team Book

TABLE OF CONTENTS

EOD REFERENCES………………………………………….5

CONVENTIONAL INCIDENTS 6

CHECKLIST 6LOAD OUT 7GUIDELINES 8

DEMOLITION PROCEDURES 10

NONELECTRIC DUAL FIRING SYSTEM 10ELECTRIC DUAL FIRING SYSTEM 11MISFIRE PROCEDURES - GENERAL 12NONELECTRIC MISFIRES 12

ELECTRIC MISFIRES 12

FRAGMENTATION TABLE 13

BOMBS

BOMB FUZE COMBINATION CHART 14EXPLOSIVE CONTENTS OF GP BOMBS 15UNIDENTIFIED INTERNAL FUZING 16UNIDENTIFIED INTERNAL FUZING CONTINUED... 17

MINEFIELD OPERATIONS 18

GENERAL NOTES 18MINEFIELD SAFETY PRECAUTIONS 18MINEFIELD LOADOUT 18

CHEMICAL OPERATIONS 19

SURPRISE, IT'S CHEMICAL 19LOADOUT 20ON SITE CHEMICAL INCIDENT CHECKLIST 21BEAUFORT SCALE 23DOSEAGE DATA FOR COMPUTING DOWNWIND 23VERTICAL TEMPERATURE GRADIENT 24DOSEAGE DATA FOR COMPUTING DOWNWINDHAZARD 24RUSSIAN "P" CHART 25DECONS (PERSONNEL) 25DECON (EQUIPMENT/ORDNANCE) 26DECON (MIXING PROCEDURES) 27OPEN/CLOSED PIT BURN PROCEDURES 29

Page 4: EOD Technical Team Book

.50 CAL DEARMER 30

WARNINGS AND CAUTIONS 30.50 CAL TOOL LIST 31NON-ELEC INITIATION OF NON-ELEC CARTS 32ELECTRIC INITIATION OF NON-ELEC CARTS 33ELECTRIC INITIATION OF ELECTRIC CARTS(STEEL SHOT) 34ELECTRIC INITIATION OF ELECTRIC CARTRIDGES (SLUG)

35

ROCKET WRENCH 36

WARNINGS AND CAUTIONS 36TOOL LIST 37ELECTRIC INITIATION OF ELECTRIC CARTS 38NON-ELEC INITIATION OF NON-ELEC CARTS 39ELECTRIC INITIATION OF NON-ELEC CARTS 40

MECHANICAL IMPACT WRENCH (MIW) 41

WARNINGS AND CAUTIONS 41MIW TOOL LIST 41GENERAL PROCEDURES 42

TAPE AND LINE 43

WARNINGS AND CAUTIONS 43TAPE AND LINE LOADOUT 43MODIFIED FRA (FUZE REMOVAL) 44LARGE DIAMETER FUZES (GREATER THAN 2" 45SMALL DIAMETER FUZES (2" OR LESS) 46MODIFIED FRA -HEX BASE PLUG REMOVAL 47MODIFIED TECHNIQUE 48

GAGGING / IMMOBILIZATION 49

WARNINGS AND CAUTIONS 49LOADOUT 50PREPARATION OF PLASTER OF PARIS (POP) 50EXTERNAL GAGGING PROCEDURES 51

Selection of Technique 51Materials And Uses 51

INCENDIARYGRENADES 52

REMOTE INITIATION 52Modified Preparation 52Standard Preparation 52

Figure 1- Incendiary Grenade Preparation 53

Page 5: EOD Technical Team Book

EMR AND SHIELDING 54

GENERAL NOTES 54WRAP IN FOIL (WIF) PROCEDURES 55

M122 FIRING DEVICE 56

WARNINGS AND CAUTIONS 56GENERAL PROCEDURES 56PROCEDURES FOR .50 CAL DEARMER 58MISFIRE PROCEDURES 59

MK 32 X-RAY 60

WARNINGS AND CAUTIONS 60GENERAL PROCEDURES 61X-RAY HINTS 62X-RAY EXPOSURE EXAMPLES 63

TECHNICAL INTELLIGENCE 64

UXO SPOT REPORT 71

MEDEVAC REQUEST 71

PACKING LIST "A" & "B" BAGS 72

COLD WEATHER DEPLOYMENT 72HOT WEATHER DEPLOYMENT 73

IEP 74

TOOL BOX 74IEP FOOT LOCKER 74

Page 6: EOD Technical Team Book

EOD REFERENCES

60A-1-1-4 Protective Works60A-1-1-5 Access & Recovery of UXO's60A-1-1-7 Technical Intelligence Reporting60A-1-1-9 Description & Disposal Procedures for

Explosives & Hazardous Materials60A-1-1-10 Disposal of Liquid Propellants & Oxidizers60A-1-1-11 Chemical Agent Characteristics &

Leak/Seal/Disposal60A-1-1-12 EMR Hazards, Precautions & Procedures60A-1-1-17 ASP Clean-up Guidance60A-1-1-22 General EOD Safety Precautions60A-1-1-27 Demolition Procedures (Ice)60A-1-1-31 General EOD Procedures60A-1-1-36 Range Clearance Information60A-1-1-38 Dynamite Disposal Procedures60A-2-1-1 Tape & Line Techniques60A-2-1-3 .50 cal Procedures60A-2-1-38 Removal of Stuck Rounds60A-2-1-45 Base Plate Removal60A-2-1-46 Remote Wrench Procedures60A-2-1-51 Shape Charges60A-2-1-59 Surface Disruption by Gunfire60A-2-1-60 Gagging Procedures60A-2-1-63-1 Removal of 61mm Projectiles60A-2-1-63-2 Removal of 81mm Projectiles60A-2-1-63-3 Removal of 4.2" Projectiles60A-2-1-65 Water Charges60B-2-2-3 Thermite Procedures(MK 81, 82, 83, 84)60L-1-1-1 IED's60L-1-1-1-1 IED's60L-1-1-1-2 IND's

Page 7: EOD Technical Team Book

INCIDENT CHECKLIST

Conventional Incidents

1. Requesting Unit2. Telephone Number3. Call-sign and Frequency4. Description of Item

a. Colorb. Lengthc. Widthd. Markingse. Distinctive Parts (Fins, Bands, etc.)

5. Drawing of Item6. Ask for Guide1. When and how discovered? How close did you get? Any protective works done?8. How did it get there?9. Location of item?10.What is the urgency of the situation?1. What is in the area? (Buildings, ASP, etc.)2. Closest approach?13.Was the item moved?14.Casualties?15.Are there random detonations in area?16.Evacuation - Essential personnel in protective gear &

undercover17.Support Available

a. Fire, Medical, Engineer, Worker Bodies

Improvised Explosive Devices

1. Have there been any threats?2. Is there any intelligence on the item?3. Is there any noise or wires coming from the device?

Nuclear Devices

1. Time of accident2. Was there a fire?3. Weapon Serial Number/PAL Combination4. Condition of Weapon5. Has there been any monitoring?6. Is Alpha Team available?7. Has DOE been notified? Are they on site?

Page 8: EOD Technical Team Book

Nuclear Devices

8. What is the alert code name?9. What is the name and location of the security POC?

Page 9: EOD Technical Team Book

CONVENTIONAL INCIDENTS

LOAD OUT1. IEP Foot Locker2. IEP Tool Box3. Rope Boxes (2ea)4. Wire Reels (2ea)5. Water Can, 5 gallon (filled)6. Decon Apparatus (M11 or M13)7. Fire Extinguisher8. Shovel9. Pick Ax10. Ax11. Sledge Hammer12. Tie Down Stakes (6ea)13. Tie Down Rope (pre-cut)14. Binoculars15. Sand Filled Ammo Can (20mm)16. Slave Cables / POL17. M18 Kit / M256 kit18. Sand Bags (10 Filled, 20 Empty)19. Radio(s) (Vehicle / Team)20. CMC Sealed (.50cal Ammo Can)21. Water Bucket (for WP Munitions)22. Rocket Wrench / MIW (Mk 1 Mod 3)23. Lap Top Computer (60 series TM's)24. Face Shield25. X-Ray Kit (Mk 32)26. .50 cal Dearmer Kit (Mk 2 Mod 1))27. MOPP Gear28. TAP Aprons29. M40 Masks30. Call Signs and Frequencies31. Personal Gear/ Food and Water32. IED or Jensen Kit

Page 10: EOD Technical Team Book

CONVENTIONAL INCIDENTS

Basic GuidelinesTeam Leader:

1. Brief team members on:a. Location and type of ordnanceb. Mode of Travelc. Route of Marchd. Equipment and Publications to be takene. Communicationsf. Support Availableg. Safety Precautions to be Observedh. Evacuation/Protective Works in Effect

2. Brief Guide (Release when finished with)3. Notify CP upon arrival at incident site.4. Initiate an on-site log.5. Ensure that on-site personnel have taken proper

evacuation / protective measures. Get a complete description / briefing from the person(s) who discovered item - terrain, path to, and attitude of the item (surly or provocative).

Approach:

NOTE: Team Leader will make initial approach

a. Have guide remain in safe area with team. b. Cautiously approach item using terrain features

for protection.c. Attempt to ID item, fuze, and condition.d. Second approach for recon by team members is

encouraged unless the team leader determines the item too hazardous.

a. If second approach is made, the team member will be briefed on the route, exact location, and position of the item, and what particular hazards are present.

Planning / Execution Phase: (Think BIP)

7. At this time make any necessary adjustments to evacuation / protective measures prior to:a. Returning to CP for publications or tools.b. Attempt of RSP or BIP.

Page 11: EOD Technical Team Book

Planning / Execution Phase: (Think BIP) Continued:

1 8. The team leader will determine any required deviations to 2 the RSP and supervise or perform the RSP.

9. The team leader will approach the item and check results of the RSP prior to approach by any other personnel.

1. Proceed to disposal (Ask for on site, if not transport to designated area)

1. Team leader will supervise loading and blocking and

bracing of the item. 12. Transportation

a. Ensure vehicle engine is off.b. Set brake. Chalk wheel if on a grade.c. Sandbag item to prevent movement.d. Ensure equipment will not slide and hit item.e. Ensure caps or initiators are in the front, and

explosives are in the rear of the vehicle.f. Ensure all explosives are in containers.g. Ensure tailgate is closed.

Page 12: EOD Technical Team Book

DEMOLITION PROCEDURESTM 60A-1-1-31

NONELECTRIC DUAL FIRING SYSTEM

1. Perform test burn:a. Tie slip knot on end of time fuse roll, cut and discard 6"from

the other end. b. Cut a 3' length of time fuse and move 25'

downwind from explosives, and attach fuse igniter. Function igniter and time the burn.

c. Compute burn rate: Burn time (in seconds) /3 feet = time (in seconds) per foot.

2. Squarely cut required lengths of time fuse consistent with time needed to reach safe area, but not less than 6'.

3. Attach fuse igniter to one end of each length of time fuse, and, if necessary, install priming adapters.

4. Ensuring that you are 25' downwind from all explosive materials, remove a blasting cap and inspect the open end for foreign matter.

5. If the cap is good, insert and carefully seat it firmly until the flash charge is in contact with the end of the fuse.

6. Crimp cap 1/8" to ¼" from the open end of the cap.7. Repeat steps 4-6 above for second cap. Barricade /

sandbag firing systems until ready to prime into explosives.

TRANSPORT ITEMS TO DISPOSAL AREA:Note: 25' Separation between Caps and HE while transportingdownrange

1. Make cap holes, place charges.2. Ensuring that all nonessential personnel are a safe

distance away, prime into the explosives.3. Lay out time fuse in straight lines; secure as necessary

to prevent movement.4. If necessary, advise area commander to prepare for a

high order detonation, and ensure that all personnel are properly protected.

5. Yell "FIRE IN THE HOLE" three times in different directions.

6. Initiate igniters (ID Smoke) and return to the safe area.

Page 13: EOD Technical Team Book

DEMOLITION PROCEDURESTM 60A-1-1-31

ELECTRIC DUAL FIRING SYSTEM1. Conduct continuity checks on the following:

a. Test Setb. Firing Wirec. Blasting Caps (as follows):

(1) Ensuring you are 25' from all explosives, place caps under sandbag or other suitable barricade.

(2) Ground yourself and remove shunt. Connect to test set and check.

(3) Re-shunt(1) Repeat steps 1-3 for second cap.

2. Wire caps together by splicing one lead wire of each together, and repeat for the remaining set of lead wires.

TRANSPORT ITEMS TO DISPOSAL AREA

1. Lay firing wire back to safe area.2. Place charges and make cap holes.3. Test firing wire back to safe area.4. Prime in to explosives.5. Return to safe area.6. Check firing circuit.7. If necessary, advise area commander to prepare for

high order detonation, and ensure all personnel are properly protected.

8. Yell FIRE IN THE HOLE.9. Attach blasting machine to the firing wire and function.

Page 14: EOD Technical Team Book

DEMOLITION PROCEDURESTM 60A-1-1-31

MISFIRE PROCEDURES - GENERALAs a general rule, all misfires will incur a minimum 30 minute wait time.

NONELECTRIC MISFIRES1. Observe 60 minute wait time (from latest possible

elapsed time of expected detonation).2. When practical, insert a new non-electric dual firing

system into the charge without disturbing the other caps. Otherwise, place a secondary charge as close as possible to the original charge to ensure both detonate.

ELECTRIC MISFIRES

1. Make several successive attempts to fire.2. Check connection of firing wire to blasting machine

and try again.3. Try different blasting machine, or alternate power

source, if available.4. If misfire still exists, disconnect and shunt the firing

wire and begin the 30 minute wait time unless it can be ascertained that the blasting cap failure is strictly electrical.

5. Remove and disconnect old blasting caps and shunt wires.

6. Test, make a parallel circuit, and attach new blasting caps. Re-prime the charge and proceed with normal firing procedures.

Page 15: EOD Technical Team Book

FRAGMENTATION TABLE

LBS METERS LBS METERS LBS METERS1 100 23 284 45 3562 126 24 288 46 3583 144 25 292 47 3614 159 26 296 48 3635 171 27 300 49 3666 182 28 304 50 3687 191 29 307 60 3918 200 30 311 70 4139 208 31 314 80 43110 215 32 317 90 44911 222 33 320 100 46512 229 34 324 125 50013 235 35 327 150 53414 241 36 330 175 56015 247 37 333 200 58516 251 38 336 250 63017 257 39 339 500 79418 262 40 342 750 90919 267 41 345 1,0001,00020 271 42 348 2,0001,26021 276 43 350 5,0007,940

22 280 44 353 10,000 10,000

Page 16: EOD Technical Team Book

BOMB FUZE COMBINATION CHART

Fuze Nose/Tail Fins Lanyard Function PlugsActions

M904 Nose Any Plug Impact N/A Gag On ReconM905 Tail Conical - Side Arming Plug Impact Inertia N/A

Square cut outs side arming vaneM906 Tail Conical - Side Arming Plug Impact Inertia N/A

No cut outs side arming Cocked StrikerMK346 Tail Conical - Side Arming or Snake-eye Plug Clockwork Long

Delay N/A Black (4) Rivets - may have thermal shieldMK 36/40 M117 Nose/Tail Conical/ Snake eye Gold Plug

Anti-Mag MK 82-4, M117 Gold Base PlateMK 844 Tail GBU or Unretarded Blue bullseye w/ bungee & coax

cable Proximity N/A Wait Time!! TDDs - MK 48 Grn

M20 Rd or tanExt arm wire

MK 376 Tail Retarded or Unretarded Blue Bullseye Proximity

FMU 26BNose/Tail Unretarded LL/LA Impact/Short DelayAny Type Use Pin to Insert

FMU 72/B Nose/Tail Unretarded LL/LA Elec Long Delay Anti- Disturbance Any Type Wait Time!!

FMU 54A/B Tail Retarded Bungee Cord & Coax CableProximity - Impact Closure Ring Large Smiling Face MK 48

TDDFMU 54BTail Retarded LL Only Impact Hex PlugRemotely

Remove PlugFMU 81BNose/Tail Retarded or Unretarded LA Only Impact - Short

Delay N/A Wait Time!! Can't use snakeye if in tail

FMU 124/B Nose/Tail Usually GBU or Retarded or UnretardedWind Generator or thermal battery Impact N/A Wait Time!!

elec jack face off center (gold)

FMU 112Nose/Tail GBU or Retarded or Unretarded Wind Generator or thermal battery Impact - Short Delay elec jack in

center of face (black)FMU 110B Used mainly in GBUs-Proximity & TDD Combined - Wait Time!!FMU 56/B Big OD Green TitFMU 56 A/B

Page 17: EOD Technical Team Book

BOMBS

EXPLOSIVE CONTENTS OF GP BOMBSBOMB TotalWeight lbs ExplosiveWeight lbsOld Series100 LB GP, AN-30A1 120 57250 LB GP, AN-M57A1 261 125500 LB GP, AN-M64A1 549 2661000 LB GP, AN-M65A1 1064 5552000 LB GP, AN-M66A2 2113 1098New Series750 LB GP, M117 823 3863000 LB GP, M118 3049 1975Low Drag250 LB GP, MK81 MOD 1 260 100500 LB GP, MK 82 MOD 1 531 1921000 LB GP, MK 83 MOD 3 985 4452000 LB GP, MK 84 MOD 1 1970 945Low Drag w/ Snakeye Fins250 LB GP, MK 81 MOD 1 300 100500 LB GP, MK 82 MOD 1 560 192

Page 18: EOD Technical Team Book

BOMBS

UNIDENTIFIED INTERNAL FUZINGIf a US bomb with unidentified internal fuzing is found, the most hazardous fuze(s) must be assumed to be installed. In all cases, nose and / or tail, retarded or unretarded, the most hazardous fuze is the fuze, bomb, nose or tail, electronic, long delay, anti-disturbance, FMU 72/B. If evidence leads one to believe the fuze(s) are armed, you must choose between disposing of the bomb in place, or waiting a specified period and then performing an RSP.

If you choose either of the disposal procedures, proceed to 60B-2-2-3, para 5.b., regardless of the type of bomb.

If you choose to wait the specified waiting period, the hazard must be re-evaluated after the specified waiting period. If the bomb utilized a retardation device, and there is evidence that there is a tail fuze, then the most hazardous fuze at this time would be the fuze, bomb, tail, FMU 54/B. The reason for this is that the hazard posed by the possible FMU 72/B has passed after the wait time has elapsed, but the hazard still exists for the possible FMU 54/B. Therefore, the procedure in 60B-2-3-22 must be performed to remove the tail closure plug.

If, after this procedure, it is determined that the tail fuze is NOT the FMU 54/B, then this procedure must be discontinued, and the remainder of the correct procedure for the particular fuze encountered must be started.

If it is determined that the tail fuze is the FMU 54/B, then the remainder of the procedure for the FMU 54/B must be performed prior to attempting the removal of the nose closure plug if there is evidence of a nose fuze. The removal of the nose closure plug should be accomplished IAW 60B-2-3-41, for the FMU 72/B.

If after this procedure, it is determined that the fuze is NOT the FMU 72/B, then this procedure must be discontinued, and the remainder of the correct procedure for the particular fuze encountered must be started.

If it is determined that the fuze is the FMU 72/B, then the remainder of the procedure for the FMU 72/B must be performed IAW 60B-2-3-41.

If the fuze closure plug(s) can not be removed, or the fuze(s) can not be identified after the removal of the fuze closure plug(s), then the bomb must be disposed of IAW

Page 19: EOD Technical Team Book

60B-2-2-3, para 5.b.

BOMBS

UNIDENTIFIED INTERNAL FUZING (Continued)

If the fuze closure plug(s) can be removed and the fuze(s) identified, but the RSP cannot be performed for any reason, such as the fuze well being deformed, the bomb should be disposed of IAW 60B-2-2-3, or the specific bomb publication, or the specific fuze publication, depending on the circumstances that prevail at the time.

Page 20: EOD Technical Team Book

MINEFIELD OPERATIONS

GENERAL NOTES1. Check with highest applicable headquarters to see if

the area is a known minefield.2. Study photos of the area, and check PW interrogation

reports, if available.3. Check area of previous detonations for identifiable

fragments or components.4. Conduct a ground reconnaissance.5. Establish and mark minefield boundaries.

MINEFIELD SAFETY PRECAUTIONS1. Exercise complete and positive control of the

operation.2. Stay 25 meters away from probers.3. Wait at least 30 seconds before approach after

blowing any mine in place.4. Never work with helmet on.5. Use nonmetallic probes only.6. Roll up sleeves and remove all jewelry before probing.7. Remote mines from ground by remote means only.8. Check all surfaces of mine for secondary fuzing.

MINEFIELD LOADOUTMine MarkersEngineer Tape / Survey TapeMarking Flags Cotter PinsNonmetallic ProbesPaper ClipsMine Detector

Page 21: EOD Technical Team Book

CHEMICAL OPERATIONS

SURPRISE, IT'S CHEMICAL1. Immediately Mask and pull back to vehicle.2. Have all other personnel in the area mask.3. If you touched the item or the ground around the item,

decon your hands.4. Don MOPP gear (MOPP IV)5. Notify CP that you have an item of interest to (use

CAIRA call-sign), and that necessary information will follow.

6. If necessary, use the guide as your safety observer. Brief him well as to what is expected of him.

7. Use M8 paper, M256 detection kit, and/or the M18 kit to determine whether or not the item is leaking.

8. ID the item, fuzing, and condition.9. Pass information to the CP.10.If leaking, ask where the DISCOM PDS is located, or

where the unit will establish the EPDS.

Page 22: EOD Technical Team Book

CHEMICAL OPERATIONS

LOADOUT1 ea Clipboard1 box Plastic Bags2 roll Monofilament Tape1 ea NBC Marking Set1 ea M18 Kit10 ea POP Bandages1 ea Craftsman Knife1 ea Bandage Scissors1 ea Pen Light2 ea Grease Pencils3 ea Tongue Depressors12 ea MK 1 Nerve Agent Antidote Kits1 roll Strip Putty1 ea Smoke Grenade1 ea Mirror1 ea Rake1 ea M8 Paper Holder/Mixing Stick30 gal Decon30 gal Waterbunch Rags3 ea Buckets1 ea Shuffle Pit1 ea Vapor Collecting Can7 ea Rubber Drop Clothsbunch Twist Ties / Clothes Pins2 ea Thermometers1 ea Scrub Brush5 ea Sand Bags1 ea Stopwatch1 ea Shovel

Page 23: EOD Technical Team Book

CHEMICAL OPERATIONS

ON SITE CHEMICAL INCIDENT CHECKLIST1. On site determinations (for "a" & "b" use smoke

grenade):a. wind direction (adjust exclusion area - report to CP)b. temperature gradientc. safe approachd. distance to munition (10-20 meters)

2. Establish shuffle pit and place rake & fire extinguisher on a drop cloth.

3. Team leader & worker(s) walk to munition with:a. drop clothsb. gagging and sealing material (rags and POP)c. M18 Kitd. 5 gallons decon & 5 gallons rinse watere. 3 buckets (2 for hands/1 for munition)f. rope for initial movement

4. Recon Ordnancea. number of munitionsb. number of leakers & non-leakers (vapor check if

necessary)c. condition of fuzesd. determine RSP if requireda. type of agent

5. Re-adjust down wind hazard and exclusion area.6. RSP ordnance or initially move if no RSP required.7. Plug and upright leaks.8. Gross decon ordnance and rinse; move to drop cloth9. Seal the munition with POP10.Perform 4 Step Decon:

a. STEP 1 - decon munitionb. STEP 2 - wait contact time (keep munition wet with

decon)c. STEP 3 - rinse munitiond. STEP 4 - vapor test - place in plastic bag, collect

vapors (5-10 minutes), and check with M18.11.Decision Tree:

a. If vapors are detected - remove from bag and repeat the 4 step decon on the munition.

b. If vapors are detected a second time, wrap the munition in the bag it is in and repeat the 4 step decon on the outside of the bag (the bag is now considered to be the skin of themunition).

c. If no vapors are detected, wrap the munition in the bag it is in.

Page 24: EOD Technical Team Book
Page 25: EOD Technical Team Book

CHEMICAL OPERATIONS

ON SITE CHEMICAL INCIDENT CHECKLIST Continued...12. Vapor Test: Place the munition in another plastic bag,

collect vapors (5-10 min), and check with M18 Kit.13.If vapors are not detected, remove the wrapped

munition from the bag it is in and go to step 13. If vapors are detected, remove from bag and repeat the 4 step decon on the outside of the bagged munition and return to this step.

NOTE: If you are unable to get the outside of this bag clean, then you might be doing something wrong (i.e... decon hands? clean drop cloth? wrong decon?)

14.Place the munition in a clean container with the leaking end up, and place cushioning material around the munition to hold it.

15.Mark the container with the following information:a. position of leak (^)b. type of agentc. decon usedd. type munitione. HE present or notf. sealing procedure usedg. dateh. unit name and phone number

16.Bag all equipment that will be needed, keeping clean and dirty separate. Pour all decons and rinse water in the areas of heavy contamination.

17.Place all equipment on truck. Ensure that the weapon is at the very back for easy removal at the hot-line, and secure it in place.

18.Mark the area with chemical warning signs:a. on the front of the sign put agent, date and time

(the time agent is detected)b. place at least 3 signs around the exclusion area (50

meters radius if no HE is present). Try to place them near heavy traffic areas such as roads and foot paths.

19.Ask CAIRA for disposition of item.20.Return to the hot-line.

Page 26: EOD Technical Team Book

CHEMICAL OPERATIONS

BEAUFORT SCALEBeaufort Number

NameMPHDescription0 Calm <1 Calm; smoke rises vertically1 Light Air 1-3 Direction of wind shown by smoke but not by wind vanes2 Light Breeze 4-7 Wind felt on face; leaves rustle; ordinary vanes move by wind3 Gentle Breeze 8-12 Leaves and small twigs in constant motion; wind extends light flag4 Moderate Breeze 13-18 Raises dust and loose paper; small branches are moved5 Fresh Breeze 19-24 Small trees in leaf begin to sway; wavelets form on inland waters6 Strong Breeze 25-31 Large branches in motion; telegraph wires whistle; umbrellas used with difficulty7 Moderate Gale 32-38 Whole trees in motion; inconvenience in walking against the wind8 Fresh Gale 39-46 Breaks twigs off trees; generally

impedes progress9 Strong Gale 47-54 Slight structural damage

occurs; chimney pots and slates removed10 Whole Gale 55-63 Trees uprooted; considerable

structural damage occurs11 Storm 64-72 Very rarely experienced; accompanied

by widespread damage12-17 Hurricane 73-136 Devastation occurs

DOSEAGE DATA FOR COMPUTING DOWNWIND HAZARD

Chemical Agent Symbol DosageNerve GA 30

GB 2GD 2VX 25

BlisterHD, HN 25L 30

Blood AC 100CK 700

Choking CG, DP 150

Page 27: EOD Technical Team Book

Riot Control CS 1CN 10DM 10

Incapacitating BZ 10

Page 28: EOD Technical Team Book

CHEMICAL OPERATIONS

VERTICAL TEMPERATURE GRADIENT

ADJUSING EXCLUSION AREA & DOWNWIND HAZARD

1. Wind Direction2. Wind Speed3. VTG4. Dosage5. Chemical Weight6. Chemical Type

Page 29: EOD Technical Team Book

CHEMICAL OPERATIONS

RUSSIAN "P" CHARTMarking Filler

P-2 AC (Hydrocyanic Gas)P-4 White and Yellow Phosphorus

P-5 Mustard GasP-15 AdamsiteGasP-35 GB (Sarin Gas)

P-43 Lewisite GasP-55 GD (Soman Gas)

P-74 Mustard GasPK-7 Mustard/Lewisite Mixture

P10 Phosgene GasPC Lewisite Gas

DECONS (PERSONNEL)Decontaminate Agent Mixing Procedures RemarksBleach Blister, V, Bio, CN 50/50 Bleach and Water

Flush with clear Water after use.Washing Soda Vomiting, G, CN 10LB Soda / 12

Gals Water (10% Solution Possible sources: Commercial laundry

Hot Soapy Water G, V on skin; liquid mustard, blood, arsenicals, blister, tear, and vomiting Mix thoroughly

Keep hotM258A1 or M291 Kit G, V, mustard, arsenicals,

blisterNone Only decontaminate available for paper.

NOTE: No contact time for personnel.

Page 30: EOD Technical Team Book

CHEMICAL OPERATIONS

DECON (EQUIPMENT/ORDNANCE)Agent DecontaminateBlister:MustardsArsenicalsCX 1. HTH-HTB Solution2. DS-23. STB Slurry4. BleachNerve:G series 1. Caustic Soda Solution2. DS-23. Washing Soda Solution4. STB Slurry5. Bleach6. Hot Soapy WaterNerve:V series 1. HTH-HTB Solution2. DS-23. STB Slurry4. Bleach5. Washing Soda SolutionBlood:AC-CK 1. DS-22. Caustic Soda SolutionChoking:CG 1. DS-22. Caustic Soda SolutionRiot Control:DM-DA 1. DS-22. Caustic Soda SolutionRiot Control:CS 1. DS-22. Alcoholic Caustic Soda Solution3. Hot Soapy WaterRiot Control:CN 1. Washing Soda2. Alcoholic Caustic Soda Solution3. Hot Soapy WaterIncapacitating Agent:BZ 1. Alcoholic Caustic Soda Solution2. Hot Soapy Water

NOTE: Decon depends on material and its intended

Page 31: EOD Technical Team Book

use. Use hot soapy water only if others are NOT available.

Page 32: EOD Technical Team Book

CHEMICAL OPERATIONS

DECON (MIXING PROCEDURES)Decontaminate Mixing Procedures Contact Time

RemarksSuper-tropical Bleach (STB) Dry mix - 2 shovels bleach to 3 shovels earth. Slurry mix - 50 lbs bleach to 5 gal. water Leave slurry on munition 30 minutes, then rinse. 1. Rechecks: GB, HD - vapor check; VX - M8 paper.2. Wear minimum protective clothing when preparing.3. Gives off toxic vapor from G agents.4. DS-2 put on STB will ignite5. Pure bleach burns on contact with liquid blister agents.Decontaminating Solution #2 (DS-2) No mixing required

G and mustard - 10 minAll other agents - 30 min 1. Rechecks: Applicable agent vapor check.2. Turns M8 paper black3. DS-2 put on STB or HTH will spontaneously ignite4. Wear minimum protective clothing when using.5. Can be used from -25 to 125 degrees F.Calcium Hypochlorite (HTH-HTB)Mix 10 lbs HTH with 12 gal. water (10% solution) Chemical Agents: 5 minBiological Agents: 15 min

1. Rechecks: V agents - vapor check or M8 paper; blister - vapor check2. Wear minimum protective clothing3. Pure, undiluted HTH-HTB will burn on contact with liquid blister agent and VX.4. Possible sources: Chemical companies and laundry facilities.5. DS-2 and HTH will spontaneously igniteSodium Hypochlorite (Commercial or household Bleach)

No mixing required 5 min 1. Rechecks: Use vapor check2. Wear minimum protective clothing3. Possible sources: Commercial laundries and food stores.4. Use full strength solution

Page 33: EOD Technical Team Book

CHEMICAL OPERATIONS

DECON (MIXING PROCEDURES) Continued...Decontaminate Mixing Procedures Contact Time

RemarksSodium Hydroxide (Caustic Soda) Mix a solution of 10 lbs caustic soda with 12 gal of water (10% solution)

G agents - 5 minMustard - 5 min

Arsenical Blisters - 15 minBlood and Choking - 15 min

CN - 15 minBiological agents - 30 min1. Rechecks: use vapor check2. Wear minimum protective clothing when preparing.3. When mixing, add caustic soda to water while stirring to prevent boiling and splattering due to excessive heat formed when dissolving caustic.4. Caustic soda turns M8 paper red.5. Possible sources: Chemical companies, large manufacturers of metal products, laundries, and drug stores.6. Mix caustic soda in an iron, steel, or plastic container, NOT aluminum.Sodium Hydroxide in an alcohol/water solution (Alcoholic Caustic Soda) Mix 10 lbs caustic soda with 12 gal water. Once the solution cools, add 12 gal of alcohol (methyl, ethyl, or isopropyl) Dissolve agent in solution and allow to stand for 24 hours 1. See remarks on sodium hydroxide.2. Wear minimum protective clothing when preparing.3. After it stands for 24 hours, burn the solution.Sodium Carbonate (Washing Soda) Mix 10 lbs washing soda with 12 gal water (10% solution) Reacts rather rapidly for G agents (normally within 5 min) 1. Rechecks: G agent - vapor check.2. Possible sources: Chemical companies and laundries

Page 34: EOD Technical Team Book

CHEMICAL OPERATIONS

OPEN PIT BURN PROCEDURES

CLOSED PIT BURN PROCEDURES

Page 35: EOD Technical Team Book

.50 CAL DEARMERRef: TM 60A-2-1-3 w/cg 10 23 Sep 94

WARNINGS AND CAUTIONSDo not tip or tilt the cartridge case after extracting the bullet from the cartridge. The powder is a potential fire and explosive hazard, and, if spilled between the cartridge case and the cartridge holder of the extractor, it may make removal of the cartridge case difficult and dangerous.

CAUTIONSUse service (Ball) .50 cal cartridges only.

Do not use steel shot with a non-electric cartridge.

Do not use monofilament tape to hold the slug in position.

Review EMR hazards and precautions and electrical grounding procedures prior to using cal .50 impulse cartridges and electric blasting caps.

Ensure that the lead wires of all electrically initiated accessories are shunted until ready to be tested or fired.

Keep all personnel and hands from in front or back of the dearmer after the cartridge is installed.

Use only authorized galvanometer or M51 test set.

Do NOT use S70 steel shot with non-electric cartridges.

Page 36: EOD Technical Team Book

.50 CAL DEARMERRef: TM 60A-2-1-3 w/cg 10 23 Sep 94

.50 CAL TOOL LISTAll equipment on Conventional Incident Load out Plus:

1. Dearmer Barrel2. Breech Plug3. Standard Slugs4. Wedge Slugs5. Forked Slugs6. Chisel Slug7. Plastic Vial w/Rubber Bands8. Steel Shot9. Set of Angles10.6' Lead Wires11.Firing Wire (2 reels)12.Blasting Machine and Test Set13..50 Cal Cartridges (3ea)14.Standoff Dowels15.M122 Firing Device

For Non-electric Procedures:

1. .50 Cal Cartridge Extractor2. Toilet Tissue3. 4' Length of Det Cord

Page 37: EOD Technical Team Book

.50 CAL DEARMER

NONELECTRIC INITIATION OF NONELECTRIC CARTRIDGES

IN SAFE AREA1. Ensure all necessary equipment is available.2. Prepare cal .50 ball cartridge (remove bullet and insert

toilet paper).3. Place cartridge in breech plug.4. Apply silicone grease around neck of cartridge.5. Screw assembled cartridge and breech plug hand tight

into barrel.6. Squarely cut both ends of a suitable length of det cord.7. Assemble 2ea non-electric firing systems.8. Prime firing systems into det cord.9. Insert end of det cord firmly into breech plug flash

hole, and secure with tape.TRANSPORT COMPONENTS TO INCIDENT SITE

10.Seat slug.11.If chisel slug is required:

a. seat standard slugb. fully seat chisel slug over the protruding portion of

the standard slug12.Secure slug with tape, if necessary.13.Position dearmer for attack IAW applicable TM14.Advise area commander of possible high order

detonation and ensure all personnel are properly protected.

15.Yell FIRE IN THE HOLE.16.Initiate fuse igniters and return to safe area.17.After dearmer has functioned, return to incident site

and proceed as per TM.

Page 38: EOD Technical Team Book

.50 CAL DEARMER

ELECTRIC INITIATION OF NONELECTRIC CARTRIDGES

1. Ensure that all necessary equipment is available.2. Prepare .50 cal cartridge (remove bullet and insert

toilet paper).3. Place cartridge in breech plug.4. Apply silicone grease around neck of cartridge.5. Screw assembled cartridge and breech plug hand

tight into barrel.6. Squarely cut both ends of a suitable length of det

cord.7. Sandbag and check continuity of 2ea elec caps.8. Test firing wire, then connect caps to firing wire and

det cord (tape splices).9. Insert end of det cord firmly into breech plug flash

hole, and secure with tape. Transport components to incident site.

10. Seat slug.11. If chisel slug is required: a. seat standard slug b.

fully seat chisel slug over the protruding portion of the standard slug.

12. Secure slug with tape, if necessary.13. Position dearmer for attack IAW applicable TM.14. Return to safe area, laying out firing wire.15. Check firing circuit.16. Advise area commander of possible high order

detonation and ensure all personnel are properly protected.

17. Yell FIRE IN THE HOLE!18. Attach blasting machine to firing wire and function.19. After dearmer has functioned, return to incident site

and proceed as per TM.

Page 39: EOD Technical Team Book

.50 CAL DEARMER

ELECTRIC INITIATION OF ELECTRIC CARTRIDGES

(Steel Shot)

1. Ensure all necessary equipment is available.2. If the cartridge has short white leads (SWL), use step

a.; if cartridge has other than SWL, use step b.a. Discard top to plastic vial. Insert vial (closed end

first) to its maximum depth in the barrel. Fill vial and chamber with steel shot and cover muzzle with tape, plastic wrap secured with rubber bands or equivalent.

b. Discard top to plastic vial. Wrap a rubber band around bottom of vial and insert vial (closed end first) until the front of the vial is flush with the muzzle. Fill vial with steel shot and seal.

1. Position cartridge in breech plug. Attach 6' lead wires, if necessary.

2. Place cartridge under sandbag and check continuity.3. Screw assembled cartridge and breech plug hand

tight into barrel.4. Test firing wire, then connect cartridge lead wires to

firing wire, and tape splices.

Transport Components to Incident Site

1. Position dearmer for attack.2. Return to safe area, laying out firing wire.3. Check firing circuit.4. Advise area commander of possible high order

detonation and ensure all personnel are properly protected.

5. Yell FIRE IN THE HOLE6. Attach firing machine to firing wire and function.7. After the dearmer has functioned, return to incident

site and proceed as per TM.

Page 40: EOD Technical Team Book

.50 CAL DEARMER

ELECTRIC INITIATION OF ELECTRIC CARTRIDGES (SLUG)

1. Ensure all necessary equipment is available.2. Position cartridge in breech plug, and attach 6' lead

wires, if necessary.3. Place cartridge under sandbag and check continuity.4. Screw assembled cartridge and breech plug hand

tight into barrel.5. Test firing wire, and connect cartridge lead wires to

firing wires (tape splices).

Transport Components to Incident Site

1. Seat Slug.2. If chisel slug is required, seat standard slug, then fully

seat the chisel slug over the protruding portion of the standard slug.

3. Secure slug with tape, if necessary - NO monofilament Tape.

4. Position dearmer for attack IAW applicable TM.5. Return to safe area, laying out firing wire.6. Check firing circuit.7. Advise area commander of possible high order

detonation and ensure all personnel are properly protected.

8. Yell FIRE IN THE HOLE.9. Attach blasting machine to firing wire and function.10. After dearmer has functioned, return to incident site,

and proceed as per TM.

Page 41: EOD Technical Team Book

ROCKET WRENCH

WARNINGS AND CAUTIONS

PRECAUTIONSDo not spill any powder from the cartridge case after extracting the bullet. The powder is a potential fire and explosive hazard. Powder spilled between the cartridge case and cartridge holder of the extractor may make removal of the cartridge case difficult as well as dangerous.

Observe the safety summary and EOD procedures in the specific fuze manual concerning deviations from these procedures.

Ensure that the lead wires of the cartridge are shunted, unless testing or connecting to other leads or firing wire.

Ensure that the wrench can be properly fitted to the component to be removed before attempting its installation. This may include removal of parts, earth, or debris as a preliminary step.

Review EMR hazards and precautions and electrical grounding procedures prior to utilizing impulse cartridges or electric blasting caps.

WARNINGDo not jar, jolt, or otherwise mishandle a fuze after its removal by the impact or rocket wrench. The fuze may have become more sensitive as a result of wrench removal.

CAUTIONSBefore installing the jaw slide assembly, when using the conical jaws, ensure that the teeth of the jaws and the small concave side of the conical jaw assembly faces outward (toward the smaller end of the component to be removed).

Tighten the bolts of the jaw assembly until the jaw teeth sink slightly but firmly into the fuze body. Ensure that the jaws are attached to the fuze only and not to any part of the ordnance (bomb or projectile).

Only cartridges with the same color lead wires should be used.

Page 42: EOD Technical Team Book

ROCKET WRENCHTM 60A-2-1-46

TOOL LISTAll equipment on Conventional Incident Load out plus:

Rocket Wrench Assembly w/venturis installedJaw Frame w/appropriate jaws installed.50 cal Cartridges (2ea)Breech plugs (2ea)Firing Wire (2 reels)Blasting Machine and Test Set6' Lead Wires (2ea)13/16 Combination Wrench7/16 WrenchBungee Cord (4')Bomb StakesBomb Tie Down RopeParachute Cord (2')Electrical TapeKnifeSand Filled Container

For Non-electric Procedures:

2ea Electric or non-electric firing systems.50 cal Cartridge ExtractorToilet Tissue6' Length of Det Cord

SAFETY PRECAUTIONSPrepare, test, and assemble as much of the wrench as possible at a safe distance from the ordnance under

attack.

Use service .50 cal service (ball) cartridges only.

Keep all personnel from in front and back of the motor tubes after the cartridges are installed.

Page 43: EOD Technical Team Book

ROCKET WRENCH

ELECTRIC INITIATION OF ELECTRIC CARTRIDGES

In Safe Area

1. Ensure all necessary equipment is available.2. Install venturis: Right hand threads -

counterclockwise; Left hand threads - clockwise.3. Place appropriate jaws in jaw frame.4. Remove breech plugs.5. Position cartridges in breech plugs.6. Attach 6' lead wires to cartridges.7. Place cartridges under sandbags and check.8. Insert cartridges into tool and screw breech plugs

hand tight into motor tubes.9. Connect lead wires into a series circuit and check

continuity (tape splices).

Transport Components to Incident Site

1. Lay firing wire back to safe area.2. Test firing wire, then connect to circuit.3. Install jaw extender, if necessary.4. Install jaw slide assembly (ensure it is centered).5. Place rocket wrench subassembly on jaw slide

assembly.6. Tighten R/W subassembly to jaw slide assembly by

using a 7/16" wrench or screwdriver.7. Attach parachute cord/bungee cord to tightening

bolts and stake.8. Return to safe area and test firing circuit.9. Advise area commander of the possibility of a high

order detonation and ensure all personnel are properly protected.

10. Yell FIRE IN THE HOLE.11. Attach blasting machine to firing wire and function.12. After wrench has functioned, return to incident site

and carefully remove fuze from wrench.

Page 44: EOD Technical Team Book

ROCKET WRENCH

NONELECTRIC INITIATION OF NONELECTRIC CARTRIDGES

In Safe Area

1. Ensure all necessary equipment is available.2. Install venturis: Right hand threads -

counterclockwise; Left hand threads - clockwise.3. Place appropriate jaws in jaw frame.4. Prepare 2ea .50 cal ball cartridges (remove bullet,

insert toilet paper.)5. Place cartridges in breech plugs.6. Apply silicone grease around neck of cartridges.7. Insert cartridges into tool and screw breech plugs

hand tight into motor tubes.8. Squarely cut both ends of a suitable length of det

cord.9. Assemble 2ea non-electric firing systems.10. Prime firing systems into det cord.

Transport Components to Incident Site

1. If necessary, place jaw extender on fuze.2. Install jaw slide assembly (ensure it is centered).3. Place rocket wrench subassembly on jaw slide

assembly.4. Tighten R/W subassembly to jaw slide assembly by

using a 7/16" wrench or screwdriver.5. Insert ends of det cord firmly into breech plug flash

holes, and secure with tape.6. Advise area commander of the possibility of a high

order detonation and ensure all personnel are properly protected.

7. Yell FIRE IN THE HOLE.8. Initiate fuse igniters and return to safe area.9. After wrench has functioned, return to incident site

and carefully remove fuze from wrench.

Page 45: EOD Technical Team Book

ROCKET WRENCH

ELECTRIC INITIATION OF NONELECTRIC CARTRIDGES

In Safe Area

1. Ensure all necessary equipment is available.2. Install venturis: Right hand threads -

counterclockwise; Left hand threads - clockwise.3. Place appropriate jaws in jaw frame.4. Prepare 2ea .50 cal ball cartridges (remove bullet,

insert toilet paper.)5. Place cartridges in breech plugs.6. Apply silicone grease around neck of cartridges.7. Insert cartridges into tool and screw breech plugs

hand tight into motor tubes.8. Squarely cut both ends of a suitable length of det

cord.9. Sandbag and check continuity of 2ea electric caps.

Transport Components to Incident Site

1. Lay firing wire back to safe area.2. Test firing wire, then connect caps to firing wire and

det cord (tape splices).3. Install jaw extender, if necessary.4. Install jaw slide assembly (ensure it is centered).5. Place R/W subassembly on jaw slide assembly.6. Tighten R/W subassembly to jaw slide assembly by

using a 7/16" wrench or screwdriver.7. Firmly insert ends of det cord into breech plug flash

holes and secure with tape.8. Return to safe area and check firing circuit.9. Advise area commander of the possibility of a high

order detonation and ensure all personnel are properly protected.

10. Yell FIRE IN THE HOLE.11. Attach blasting machine to firing wire and function.12. After wrench has functioned, return to the incident

site and carefully remove fuze from wrench.

Page 46: EOD Technical Team Book

MECHANICAL IMPACT WRENCH (MIW)

TM 60A-2-1-46

WARNINGS AND CAUTIONS

SAFETY PRECAUTIONSPrepare, test, and assemble as much of the wrench as possible at a safe distance from the ordnance under attack.

Observe the safety summary and EOD procedures in the specific fuze manual concerning deviations from these procedures.

Ensure that the wrench can be properly fitted to the component to be removed before attempting its installation. This may involve removal of parts, earth, or debris as a preliminary step.

WARNINGDo not jar, jolt, or otherwise mishandle a fuze after its removal by the impact or rocket wrench. The fuze may have become more sensitive as a result of wrench removal.

CAUTIONSBefore installing the jaw slide assembly, when using the conical jaws, ensure that the teeth of the jaws and the small concave side of the conical jaw assembly faces outward (toward the smaller end of the component being removed).

Tighten the bolts of the jaw assembly until the jaw teeth sink slightly but firmly into the fuze body. Ensure that the jaws are attached to the fuze only and not to any part of the ordnance (bomb or projectile).

MIW TOOL LISTAll equipment on Conventional Incident Load out plus:

MIW (Properly assembled) Extra Spring ClipFRA w/Allen Wrench (if needed) Extra Cotter Pin (small)Jaw Extender (if needed) Short Length of Parachute Cord

Adjustable Wrenches (2ea) Bungee CordJaw Slide Assembly w/Jaws Installed PulleysExtra Rope Box (if needed) Bomb StakesBomb Tie Down Rope Sand Filled Container

Page 47: EOD Technical Team Book

MECHANICAL IMPACT WRENCH (MIW)

GENERAL PROCEDURES

In Safe Area

1. Ensure that all necessary equipment is available.2. Place appropriate jaws in jaw slide assembly.3. Make sure wrench is assembled properly to remove

the fuze threads encountered:a. Spring and cord on reel going in a counterclockwise

direction for right hand threads.b. Spring and cord on reel going in a clockwise

direction for left hand threads.1. Ensure there are at least 15 wraps of cord on the reel.2. If jaw extender is needed, make sure appropriate

jaws are installed and extender is properly assembled.3. If FRA is used, make sure it is serviceable and that

you have the correct allen wrench.

Transport Components to Incident Site

1. Lay out rope from item to safe area. If pulleys are used, install them as you lay out rope to ensure that knots are far enough away from the pulleys so the rope can be pulled.

2. Install extender or FRA to fuze, if required.3. If using bungee cord, attach nylon bridle to tightening

bolts.4. Attach jaw slide assembly to fuze, FRA, or jaw

extender (ensure it is centered). If using nylon bridle, ensure it goes behind the jaws, is centered in the slots of the jaws, and comes out the front.

5. Attach driving mechanism to jaw slide assembly.6. If using bungee cord, attach it to nylon bridle and

stretch it to stake.7. Return to safe area.8. Advise area commander of the possibility of a high

order detonation, and ensure all personnel are properly protected.

9. Operate Wrench (tie the rope back together, operate the wrench, tie the rope back together, etc.)

Return to the incident site and, optimistically assuming it actually came out, carefully remove fuze from wrench.

Page 48: EOD Technical Team Book

TAPE AND LINETM 60A-2-1-1, 18 NOV 92, w/cg 1

WARNINGS AND CAUTIONS

SAFETY PRECAUTIONSStake, sandbag, or otherwise secure the ordnance to keep it from moving when fuze or hexagonal base plug removal is attempted. The force exerted by pulling on the line, plus the leverage produced by the wrench handle, may cause small and medium size ordnance to roll or pivot on their axis.

Keep the line leading away from the fuze perpendicular to the fuze body or the handle of the modified FRA unless called for in the procedure. Tightening the jaws may prevent the wrench from disengaging after the fuze is broken loose.

Do not pull on the line after it is attached to the pipe wrench until all personnel are in a safe area. The initial pull to break the fuze loose may function the fuze. However, slight tension on the line may be required to prevent the wrench from falling off the fuze before personnel return to the safe area.

WARNINGObserve EOD procedures in the specific fuze manual concerning deviations from the procedures herein. Failure to comply with any deviations may function the fuze.

TAPE AND LINE LOADOUTAll equipment on Conventional Incident Checklist plus:18" Pipe Wrench w/Tape AttachedMonofilament TapePSA TapePulleysBungee CordFRA w/Allen Wrench/Flat DiskBomb StakesBomb Tie-down RopeExtra Rope Box (if needed)Short Length of Parachute CordSand Filled Container

Page 49: EOD Technical Team Book

TAPE AND LINE

MODIFIED FRA TECHNIQUE (FUZE REMOVAL)In Safe Area

1. Ensure all necessary equipment is available. (FRA with 3/8" allen screws)

Transport Components to Incident Site1. Position FRA using 3/8" allen screws on retaining nut

flange and orient it to fit fuze restraining clip into recess of the FRA.

2. Tighten set screws adjacent to each leg of frame support to center and secure FRA.

3. Tighten remaining set screws.4. Install flat disk.5. Lay out rope to safe area. Fairlead if necessary,

ensuring that the line is perpendicular to the fuze axis.6. Place 12 wraps of PSA tape around the frame of the

FRA in the direction the fuze will turn when unscrewed. Leave 24" free to attach rope.

7. Spiral tape around rope.8. Wrap 1 turn of rope around FRA.9. If needed, attach bungee cord to the hole in the FRA

handle and secure it to the fairlead.10. Attach pipe wrench, or suitable tool, against flat disk.11. Attach 1 turn of rope to the pipe wrench, taking up

any slack between FRA and wrench.12. Maintain a slight tension on the rope while moving to

the safe area.13. Advise the area commander of the possibility of a

high order detonation, and ensure all personnel are properly protected.

14. Pull rope.

Page 50: EOD Technical Team Book

TAPE AND LINE

LARGE DIAMETER FUZES (GREATER THAN 2 INCHES)In Safe Area

1. Ensure all necessary equipment is available.Transport Components to Incident Site

1. Clean exposed fuze body, if necessary.2. Attach tape bridle to fuze body, if necessary.3. Lay out rope to safe area. Fairlead, if necessary, to

ensure that the line is perpendicular to fuze axis.4. Wrap 4 turns of tape around fuze body, at the base of

the fuze, in the direction the fuze will turn when unscrewed. Leave 24" free to attach to the rope. Allow space to attach pipe wrench to the fuze body.

5. Spiral tape around the rope.6. Wrap line 12 times (5-4-3, with sticks, etc. between

wraps) around fuze over tape (PSA tape may be used if there is not enough space for rope).

7. If needed, attach bungee cord to bridle and secure to fairlead.

8. Attach pipe wrench to fuze.9. Attach 1 turn of rope to the pipe wrench, taking up

any slack between fuze and wrench.10. Maintain a slight tension on rope while moving to safe

area.11. Advise area commander of the possibility of a high

order detonation and ensure all personnel are properly protected.

12. Pull rope.

Page 51: EOD Technical Team Book

TAPE AND LINE

SMALL DIAMETER FUZES (2 INCHES OR LESS)In Safe Area

1. Ensure all necessary equipment is available.Transport Components to Incident Site

1. Clean exposed fuze body, if necessary.2. Attach tape bridle to fuze body, if necessary.3. Lay out rope to safe area. Fairlead, if necessary,

ensuring that rope is perpendicular to fuze axis.4. Wrap PSA tape 12 times around fuze body, at the

base of the fuze, in the direction the fuze will turn when unscrewed. Leave 24" free to attach to the rope. Allow space to attach pipe wrench to the fuze.

5. Spiral tape around rope.6. Wrap 1 turn of rope around fuze and lightly secure in

place with a small piece of tape.7. If needed, attach bungee cord to the bridle and

secure to the fairlead.8. Attach pipe wrench to the fuze.9. Leave approximately 8" of slack between fuze and

pipe wrench and secure rope to wrench with a girth hitch.

10. Maintain a slight tension on rope while moving to the safe area.

11. Advise area commander of the possibility of a high order detonation, and ensure all personnel are properly protected.

12. Pull rope.

Page 52: EOD Technical Team Book

TAPE AND LINE

MODIFIED FRA TECHNIQUE - HEX BASE PLUG REMOVAL

In Safe Area1. Ensure all necessary equipment is available. (FRA

with ¾" allen screws)Transport Components to Incident Site

1. Position FRA using ¾" allen screws on hexagonal plug.

2. Tighten all set screws possible to secure FRA to hexagonal plug.

3. Install flat disk, if necessary.4. Lay out first rope (remote operating line) to safe area.

Fairlead if necessary, ensuring that rope is perpendicular to plug axis.

5. Lay out second rope (base plug extraction line) to safe area. Fairlead if necessary, ensuring that first 6 to 10' of line is parallel to plug axis.

6. Place 12 wraps of PSA tape around the frame of the FRA in direction the hexagonal plug will turn when unscrewed. Leave 24" free to attach to rope.

7. Spiral tape around rope.8. Wrap 1 turn of rope around FRA.9. Tie second line to first hole in FRA handle, if a wrench

is to be used, or to the unused hole, if a lever is to be used, and fairlead line through pulley.

10. Attach pipe wrench to handle (against flat disk) or place lever into the FRA handle hole that will provide the desired lever angle.

NOTE: Do NOT pull on the first line after it is attached to the pipe wrench.

1. Attach 1 turn of rope to the pipe wrench, taking up any slack between wrench and FRA.

2. Maintain a slight tension on ropes while moving to the safe area.

3. Advise the area commander of the possibility of a high order detonation, and ensure all personnel are properly protected.

4. Pull rope.5. When base plug is unscrewed, pull second rope.

Page 53: EOD Technical Team Book

TAPE AND LINE

MODIFIED TECHNIQUEIn Safe Area

1. Ensure all necessary equipment is available.Transport Components to Incident Site

1. Clean exposed fuze body, if necessary.2. Attach tape bridle to fuze body, if necessary.3. Lay out line to safe area. Fairlead, if necessary,

ensuring that rope is perpendicular to the fuze axis.4. Attach pipe wrench to fuze as close to the munition

case as possible.5. Wrap 4 turns of PSA tape around fuze as close to pipe

wrench as possible in direction fuze will turn when unscrewed. Leave 24" free to attach to rope.

6. Spiral tape around rope.7. Wrap 12 turns of rope around fuze and lightly secure

in place with a small piece of tape (PSA tape may be used if there is not enough space for rope).

8. Attach bungee cord to bridle and secure to fairlead.9. Leave approximately 8" of slack between fuze and

wrench and secure rope to wrench with a girth hitch.10. Maintain a slight tension on the rope while moving to

the safe area.11. Advise the area commander of the possibility of a

high order detonation and ensure that all personnel are properly protected.

12. Pull rope.

Page 54: EOD Technical Team Book

GAGGING/IMMOBILIZATIONTM 60A-2-1-60

WARNINGS AND CAUTIONSCAUTION

Follow manufacturer's directions for preparing epoxy mixtures and make all required preparations for application before mixing the epoxy. Epoxy mixtures will normally begin to set up and become difficult to work within a few minutes after mixing.

WARNINGSWear goggles and rubber gloves, and avoid breathing epoxy fumes during all mixing and application operations.

Do not remain in the area while POP or epoxy is curing. POP and epoxy release heat when curing.

Do not strike or jar ordnance during the external gagging procedure.

Do not permit unnecessary movement of the item being gagged.

Perform initial movement of all gagged items remotely.

Be aware that heat producing gagging materials such as foams, epoxies, POP, etc., used on chemical delay action fuzing systems can accelerate the delay times causing the fuze to function before their predetermined delay times.

NOTEKeep gagging techniques as simple as possible. For the most part it is left to the ingenuity of the person performing the gagging procedure. The material used for gagging is usually chosen from that on hand. Gagging is at best a temporary measure providing an additional degree of safety for the transport of hazardous ordnance.

Page 55: EOD Technical Team Book

GAGGING / IMMOBILIZATION

LOADOUTAll equipment on Conventional Incident Load out plus:

Can of Plaster of ParisPaper or Styrofoam cups5 Gallon Water Can (filled)Water PailShovelStirring Stick/SpoonPOP BandagesEpoxyCotter PinsNailsPaper ClipsTapeRope

PREPARATION OF PLASTER OF PARIS (POP)NOTE

Reference the specific TM for POP/water ratio. For general use, a 60/40 mix will work.

1. Carefully construct a cofferdam around the fuze or item.

2. Prepare POP solution by adding three parts to two parts water (by volume), and stir until a completely smooth consistency is obtained. In COLD weather, add a 1:60 ration of salt to the water prior to mixing with the plaster.

3. Pour POP solution as specified in specific TM. Save some of the solution for a test batch.

4. Return to the safe area and pour the remaining solution in the same type of material as used for the cofferdam (if the material used was earth, pour the solution on the ground. This will give an accurate indication as to whether or not the solution has set on the item(s) in question.

Page 56: EOD Technical Team Book

GAGGING / IMMOBILIZATION

EXTERNAL GAGGING PROCEDURES

SELECTION OF TECHNIQUE

Item Gagging ProcedureArming Vanes Wire, Rope, or Tape

Tilt Rods POP or EpoxyClose-Fitting Items Glue, Epoxy, or Deformation

Loose Fitting Items Spacer (block)Exposed Firing PinsPOP or Epoxy

Openings Tape, Plugs, Liquid Rubber, or PlasticStriker Plates POP, Epoxy, or Wedges

Jump-out Pins and Plungers Tape or EpoxyMilitary Firing Devices Cotter Pins, Nails, or Epoxy

MATERIALS AND USES

Material RemarksWire, Rope, Tape, POP Bandage Wrap to prevent

rotation/movementGlue, Liquid Rubber, Plastic Follow manufacturer's

instructions; clean surface prior to applicationSpacers and Wedges Secure arming vanes, etc.

POP Use when high strength is not requiredTwo-Part Epoxy Use when high strength is requiredCotter Pins, Nails, Paper Clips Use as a physical block;

secure in place

Page 57: EOD Technical Team Book

INCENDIARY GRENADESTM 60A-1-1-31, DTD 19 JAN 82 W/CG 10

REMOTE INITIATION

MODIFIED PREPARATION

1. Remove Fuze.2. Puncture vent hole tape (4ea).3. Rough up surface of first fire mixture.4. Fill ½ full of smokeless powder.5. Insert squib or split end of time fuse.6. Tape in place.7. Place grenades in position IAW TM for item.8. Return to safe area and initiate (electric), or initiate

fuse igniter, and return to safe area (non-electric).

STANDARD PREPARATION

1. Place cap 1" from the top of the grenade body.2. Tape cap in place.3. Place grenade(s) in position IAW TM for specific item.4. Return to safe area and initiate (electric), or initiate

fuse igniters and return to safe area (non-electric).

NOTE: See Also:

Incendiary Grenade Setup (Figure)General Bomb Publication60B-2-2-3 (Covers specific procedures for MK 81, 82,

83, 84)

Page 58: EOD Technical Team Book

INCENDIARY GRENADES

Page 59: EOD Technical Team Book
Page 60: EOD Technical Team Book

FIGURE 1

INCENDIARY GRENADE PREPARATION

Page 61: EOD Technical Team Book

EMR AND SHIELDINGTM 60A-1-1-12, DTD 10 MAY 89, W/CG 1

GENERAL NOTES

h Proximity fuzes are most susceptible to EMR.

h The most sensitive portion of a bomb is the fuzing mechanism or device.

h Two areas on rockets are considered EMR (RF) hazardous. The fuze and the rocket motor.

h Cartridges, without firing leads, but with electrical primers, are also sensitive to EMR.

h Electrical blasting caps, shunted or not, are also susceptible to EMR. Stretched out lead wires act as a dipole antenna. When coiled they can act as a closed loop antenna. Keep blasting caps in a sealed metal container until ready for use.

h Always shield munitions and loose wires, from the effects of EMR, do NOT short.

h Metal foil tape, not less than 1" wide, used to seal a seam between two sheets of metal foil is as effective as folding the edges together to form a watertight seam.

h All metal containers do not provide total shielding of the contents from the RF environment, but such comprehensive protection is not required. Placing aluminum foil around the top of metal ammo cans (so it will engage the lid when closed) will provide sufficient protection.

h All exposed firing bands, buttons, rings, electrical contacts, and plug prongs should be covered with electrical insulating tape.

Page 62: EOD Technical Team Book

EMR AND SHIELDINGTM

WRAP IN FOIL (WIF) PROCEDURESIn Safe Area

1? Improvise a standoff with non-static producing material, such as cardboard or a paper cup (do NOT use plastics, styrofoam, or other static producing material).

2? Construct single layer of foil, with edges overlapping and mating edges folded together to form a watertight weal. RTV can be used within the fold to ensure fold stays in place. An aluminum can, with the top cut off, can be used, provided that it will fit over the fuze and standoff. Multiple layers of foil increase the strength of the wrap and reduce the possibility of the shield being compromised by tear or punctures.

Transport Items to Incident SiteThe orientation of the ordnance should NOT be changed until the shielding application is completed.

1? Tape all jagged edges, as required.2? Do not touch any exposed wiring.3? Emplace standoff, and secure with tape, if necessary.4? If necessary and possible (or practical), remove any

paint, oil, corrosion, or any other non-conductive material from the ordnance surface to ensure good metal to metal contact between foil and ordnance. A file can be used to remove paint.

5? Emplace shielding material, ensuring a tight wrap around the ordnance skin, as flat as possible. Seal with metallic tape, if available. If not available, use electrical tape. The width of the tape should be wide (several tape widths), and the wrap as smooth as possible.

6? Cover ordnance holes, if present, in the same manner.7? Essentially must be waterproof.

Page 63: EOD Technical Team Book

M122 FIRING DEVICETM 9-1375-213-12-3&P DTD NOV81, W/CG6

WARNINGS AND CAUTIONSWARNINGS

Never operate the M122 within 100 feet of any electric blasting caps or other EEDs.

Avoid contact with antenna when pressing firing button.Always keep transmitter set to 000000 until ready to fire.

GENERAL PROCEDURESIn Safe Area1. Cut a 10' length of insulated wire for receiver antenna.2. Install batteries in transmitter and receiver(s).3. Attach antenna to antenna terminal.4. Test:

a. Set receiver(s) to ARM.b. Wait 8 minutes.c. Extend antenna, and set code on transmitter.d. Lift FIRE button cover and depress FIRE button for 5

seconds.e. Observe FIRE lamp on transmitter and yellow light

on receiver.Transport Components to Demolition Site5. Prepare electric caps to accept lead wires IAW FM 5-

250 and sandbag. Lay out lead wire between receiver and cap, connect leads to receiver and check continuity. Remove leads from receiver, shunt, and connect leads to cap. Check continuity and shunt other end of leads.

6. If practical, select a transmitter location that provides a clear line of sight to the receiver.

7. Place receiver(s) in desired location (sandbag if necessary). Raise antenna or lay on the ground pointing directly towards or away from expected transmitter location.

8. Write down the code and location of the receiver(s).

WARNINGDo NOT connect cap circuit to a receiver that does not

have

continuity between the blasting cap binding posts.

Page 64: EOD Technical Team Book

M122 FIRING DEVICETM 9-1375-213-12-3&P DTD NOV81, W/CG6

GENERAL PROCEDURES Continued...9. Clear the area of unnecessary personnel and keep

blasting caps away from explosive charge.10.Connect lead wires to blasting cap binding posts on

receiver, face opposite direction, hold the receiver in your hand and place in the M122 ARM position. Wait 15 seconds, then prime caps into explosive charge.

11.Return to safe area.12.Advise the area commander of high order detonation,

and ensure all personnel are properly protected.13.Wait 8 minutes (from time receiver was armed) and

yell FIRE IN THE HOLE.14.Set the code on the transmitter, lift the FIRE button

cover, and press the FIRE button for 5 seconds. Observe FIRE signal lamp, and listen.

15.After detonation, return to site and set lever to SAFE position.

Page 65: EOD Technical Team Book

M122 FIRING DEVICE

PROCEDURES FOR .50 CAL DEARMER

OBSERVE WARNINGS FOR M1221. Complete steps 1-4 in M122 Firing Device procedures

to prepare the M122 for use.2. Position cartridge in breech plug, and attach 6' lead

wires.3. Place cartridge under sandbag. Lay out lead wires

between receiver and cartridge, and connect leads to receiver. Check for continuity. Remove leads from receiver and connect them to the cartridge. Check for continuity and shunt.

WARNING

4. Do NOT connect cartridge to a receiver that does not have continuity between the blasting cap binding posts.

5. Connect lead wires to blasting cap binding posts on receiver, face opposite direction, hold the receiver in your hand and place in the ARM position. Wait 15 seconds, then screw assembled cartridge into barrel.

6. If practical, select a transmitter location that provides a clear line of sight to the receiver.

Transport Components to Incident Site

1. Place receiver in desired location and sandbag, if necessary. Raise antenna or lay on the ground pointing directly towards or away from the expected transmitter location.

2. Write down receiver code.3. Return to safe area.4. Advise area commander of the possibility of a high

order detonation, and ensure all personnel are properly protected.

5. Wait 8 minutes (from time receiver was armed) and yell FIRE IN THE HOLE.

6. Set code on transmitter, lift the FIRE button cover, and press FIRE button for 5 seconds. Observe FIRE signal lamp and listen.

7. After actuation, return to the incident site and set

Page 66: EOD Technical Team Book

lever to SAFE position.

Page 67: EOD Technical Team Book

M122 FIRING DEVICE

MISFIRE PROCEDURES

1. Ensure 8 minutes have elapsed since arming the receiver.

2. Recheck code setting. Rotate area code switch back and forth through all positions five times. Reset area code.

3. Attempt to fire again.4. If charge still fails to fire, set the code to 000000,

attempt to fire.5. If FIRE signal lamp lights, reset to the proper code

and move closer to the receiver or relocate, if safely possible.

6. Attempt to fire again from new position.7. If above procedure still fails to fire charge, secure

another transmitter, if possible.8. If another transmitter cannot be secured, or if it fails

as well, reset transmitter to 000000.

WARNING

Wait 30 minutes before approaching a misfired charge.

1. While waiting, check out another receiver.2. Approach receiver, cut lead wires from binding posts

one at a time without disturbing receiver, caps, or connections.

3. Strip 1" of insulation from cut lead wires and shunt.4. Remove caps from explosive and sandbag them.

Check continuity of cap leads, and look for any damage.

5. Use new receiver and repeat procedural steps.6. If another receiver is not available, retrieve and hold

receiver steady, move lever to SAFE position.7. Ensure battery cap is tightened.8. Ensure antenna is properly connected and is NOT

being grounded.9. Ensure firing circuit has been properly connected.10. If problem is related to the above, fix it.11. If problem is not related to above, set up shot using

firing wire and blasting machine (you may want to consider leaving the M122 components on the shot - it would be worth the case.)

Page 68: EOD Technical Team Book

MK 32 X-RAYTM 60A-2-1-42, DTD 14 JUL 89

WARNINGS AND CAUTIONS

Safety Precautions

Film badges will be worn by all personnel present during x-ray operations.

Safety is one of the most important considerations when using x-ray equipment. Unnecessary exposure to radiation, no matter how small, is too much.

All personnel will stay at least 15' from the apparatus (or at the fullest extension of the remote control cable) when it is in operation.

Be aware that the x-ray apparatus incorporates printed circuits, capacitors, and other electronic components which generate high voltage and x-rays. Misuse or carelessness during operation could cause death or injury.

Warnings

When handling and processing film, keep developer pod chemicals away from the eyes and mouth and off the skin. Immediately wipe off any chemicals that get on the skin and wash the affected area with plenty of water.

Remove all electrical power to the x-ray apparatus before removing the x-ray tube.

Cautions

When operating the x-ray apparatus under normal operating conditions, wait 4 minutes after each series of 99 pulses.

Before operating the x-ray in the AC mode, ensure that the voltage selector switch inside the battery compartment is set to the appropriate voltage setting (before connecting the AC power cable to electrical power source). Protect film packets from direct sunlight. Do NOT press or squeeze the developer chemical pods in 10x12 film packets. When checking a battery in the battery charger, do not press the battery test button for more than 2 seconds. This will result in battery discharge.Do not charge a battery for more than 12 hours in the x-

Page 69: EOD Technical Team Book

ray apparatus.Wear surgical gloves when handling an x-ray tube.

Page 70: EOD Technical Team Book

MK 32 X-RAYTM 60A-2-1-42, DTD 14 JUL 89

GENERAL PROCEDURES1. Ensure all necessary equipment is available.2. Conduct survey of IED location and note size, shape,

placement, and density of IED.3. Determine the following:

a. Placement of the film in relation to the IED, and film packet preparation method.

b. Placement of the x-ray apparatus and its mode of operation.

c. Placement of shielding if scatter is likely to occur.d. Number of exposure pulses.

4. Return to safe area and prepare equipment.5. Return to IED location and place cassette or film

packet behind and as close as possible to the IED and position shielding material.

6. Position x-ray and connect to external power source, if necessary.

7. Actuate x-ray apparatus.8. Move at least 15' away from the x-ray.9. After x-ray has functioned, return turn off x-ray and

move cassettes and other equipment to the safe area.10.Process film and interpret radiograph.

Page 71: EOD Technical Team Book

MK 32 X-RAYTM 60A-2-1-42, DTD 14 JUL 89

X-RAY HINTSShielding: Construction materials, such as plasterboard, wood, and concrete, can all cause scatter. Polyvinyl-lead shielding should be placed near the film and target to absorb scatter and protect the film.

(Source to Film Distance SFD): When x-raying a high density object, such as a pipe bomb or projectile fuze, a standard SFD of 24" has been established as a baseline.

Clarity: If a print has poor definition or appears fuzzy, the film was too far away from the IED, or the x-ray is too close to the IED. Decrease the film-to-IED distance, or move the x-ray farther away form the IED. If a print has poor definition and the image appears enlarged, the film was too far away from the IED. Decrease the film-to-IED distance.

Exposure: Taking several x-rays of a target object initially and varying the exposure may increase the probability of obtaining a readable radiograph. Exposure may vary when x-raying items which appear alike. This depends entirely upon the density and composition of the materials of which they are made. Two galvanized pipes of the same diameter and thickness may require different exposures. One manufacturer may use slightly different materials in the pipe than another manufacturer. If an exposure estimation is based on x-raying an object when an intensifying screen is used with the film, exposure without the screen must be increased. The lowest possible exposure with the x-ray is 1 pulse of radiation. The methods of reducing this exposure are to increase the SFD, to expose the film without an intensifying screen, or to use a radiographic filter. A polyvinyl-lead sheet can be placed over the forward end of the x-ray when exposure of less than 1 pulse is desired.

Exposure Correction: If the print is too light, it is over-exposed. Increase the number of pulses, or reduce the SFD. If the print is too dark, it is under-exposed. Reduce the number of pulses or increase the SFD.

Page 72: EOD Technical Team Book

MK 32 X-RAYTM 60A-2-1-42, DTD 14 JUL 89

X-RAY EXPOSURE EXAMPLESP U L S E S

Item SFD TPX Film TLX Film 3000 FilmW/S W/O W/S W/O W/S W/O

18" 99 25 10 10 10 10Pipe 24" 99 25 18 18 18 18Bomb 36" 150 175 41 41 41 41

48" 250 175 99 72 72 7272" 600 450 198 198 162 16218" 6 6 3* 3 2* 2

Book 24" 11* 11 5* 5 4* 4Bomb 36" 25* 25 11* 11 9* 9

48" 45* 45 20* 20 16* 1672" 99* 99 45* 45 36* 3618" 2* 2 1* 1 1* 1

Wood 24" 4* 4 2* 2 1* 1Box 36" 9* 9 4* 4 1* 1

48" 16* 16 9* 9 2* 272" 36* 36 20* 20 4* 418" 2 2 1 1 1 1

Brief- 24" 2 2 1 1 1 1case 36" 4 4 2 2 2 2

48" 7 7 4 4 4 472" 16 16 9 9 9 918" 1 1 1 1 1 1

Card- 24" 3 3 1 1 1 1board 36" 3* 3 2* 2 2* 2Box 48" 5* 5 2* 2 2* 2

72" 11* 11 4* 4 4* 4

W/S - with polyvinyl-lead shielding.W/O - without polyvinyl-lead shielding.

·- Test exposures showed that shielding did not significantly affect the quality of radiograph.

Page 73: EOD Technical Team Book

·TECHNICAL INTELLIGENCE

GENERAL REPORTING PROCEDURES

M Mark all paperwork top and bottom with:

M Submit SALUTE Report (New Format)

M Submit COMTECREP (Must include photographs, drawings, and x-rays)

M Enclose all materials in a CONFIDENTIAL cover sheet

M If you cannot get the materials to control, send

Page 74: EOD Technical Team Book

SALUTE REPORT

M Size:

M Activity:

M Location:

M Unit:

M Time:

M Equipment:

M Remarks / Other Information:

EXAMPLE SPOT REPORT

SALUTE REPORT

TO: 191st ORD BN DTG:

FROM: 702D ORD CO (EOD) REPORT NO:

1. SIZE:________________________________________2. ACTIVITY:___________________________________3. LOCATION:__________________________________4. UNIT:________________________________________5. TIME:_______________________________________6. EQUIPMENT:_________________________________7. REMARKS/OTHER INFORMATION:_________________________________________________________________________________

Page 75: EOD Technical Team Book

PRETECHREP

M LINE A: Type of equipment and quantity.

M LINE B: Date and time of capture.

M LINE C:Location (map reference)

M LINE D:Capturing unit and circumstances of capture.

M LINE E:Enemy formation from which captured and origin

M LINE F: Brief description with distinguishing marks and, if possible, manufacturer.

M LINE G:Technical characteristics with an immediate value, including information or any photographs available.

M LINE H:Time and origin of message.

M LINE I: Present location of disposal of captured enemy equipment.

M LINE J: Tentative RSP

Page 76: EOD Technical Team Book

SECRET RESTRICTED DATA(FOR TRAINING USE ONLY)

PRETECHREP

PRIORITY:

FROM: 702D ORD CO (EOD)TO: 191st ORD BN (EOD)INFO: CDR USA TECH DET INDIAN HEAD MDNAV EOD TECH CEN INDIAN HEAD MDCDR FSTC CHARLOTTESVILLE VADIA WASHINGTON DC

BTSECRET RESTRICTED DATA/NOFORN/WINTELWARNING NOTICE- SENSITIVE INTELLIGENCE SOURCES OR METHODS INVOLVED

SUBJECT: PRETECHREP

REFERENCE: MSG SUBJECT: UNKNOWN ORDNANCE SPOT REPORT

LINE A:________________________________________LINE B:________________________________________LINE C:________________________________________LINE D:________________________________________LINE E:________________________________________LINE F:________________________________________LINE G:________________________________________LINE H:________________________________________LINE I:_________________________________________LINE J:_________________________________________

DECL: OADR

SECRET RESTRICTED DATA(FOR TRAINING USE ONLY)

Page 77: EOD Technical Team Book

COMTECHREP

M LINE A:Date and location of acquisition; acquired by and of for whom.

M LINE B:Nationality, designation, and identification marks.

M LINE C:Description.

M LINE D:Overall length, including fuze, tail, vanes or control surfaces and fitting, and measurement of various states (if there are several).

M LINE E:Maximum diameter of each state (if there are several).

M LINE F: Shape, design, and internal configuration (streamlining shells).

M LINE G:Span of vanes and control surfaces.

M LINE H:Number, relative positions, and dimensions (width, length, size, and or configuration of control surfaces.)

M LINE I: Thickness of casing at:(1) Nose.(2) Sides.(3) Base.

M LINE J: Type and materials of body and control surface.

M LINE K:Color and markings of:(1) Nose.(2) Body.(3) Tail and vanes.

Page 78: EOD Technical Team Book

COMTECHREP (CONTINUED)

M LINE L: Weights:(1) Total weight, including propellant.(2) Weight of filling.

M LINE M: Nature of main filling. If of a CW / BW nature, give method of filling, for example, bomblets or massive fill; specify method of delivery, such as spray, ground burst, or air burst. For antitank missiles with HEAT warheads, give full details of cone liner materials, cone angle, and diameter. For antitank missiles with non-heat warheads, give full description of the warhead.

M LINE N:Type of missile guidance system and method of stabilization environment (control and guidance radar (s), acquisition radar); frequencies used for reception response (in case of a transponder); and proximity fuse (if there is one). ECM and ECCM equipment and or chaff-dispensing equipment.

M LINE O: Sensors.

M LINE P: Diameter or radome and size of homing dish, if fitted.

M LINE Q: Dimensions (internal and external) of wave guides in the homing head, and wave guides and or aerials in the wings or body, and the technology used.

M LINE R:Homing head, transducer design, and shape and size (torpedoes).

M LINE S:Method of propulsion and propeller data (torpedoes).

M LINE T: Detonating system, fuzing system (nose, tail, or transverse) and firing mechanism details.

M LINE U:Type of suspension, giving details of devices used, such as electrically operated hoods or release gear.

Page 79: EOD Technical Team Book

COMTECHREP (CONTINUED)

M LINE V:Anti-handling or booby-trap devices.

M LINE W: Other information (to include estimate of time required to prepare item for shipment to TECHINT center or designated industrial firm for detailed analysis).

M LINE X:Name of officer in command of technical team making examination.

M LINE Y: Time and origin of message.

M LINE Z:Energy used for mobile systems other then propulsion.

M LINE AA: Estimate of time required for completion.

NOTE: If feasible, a preliminary set of photographs should be sent with the report.

Page 80: EOD Technical Team Book

UXO SPOT REPORT

LINE 1: Date/time DiscoveredLINE 2: Reporting Unit/Grid Location of OrdnanceLINE 3: Method of Contact/Call Sign (Phone #, Frequency)LINE 4: Type of Munition (Dropped, Projected, Placed, Thrown)LINE 5: NBC ContaminationLINE 6: Resources ThreatenedLINE 7: Impact on MissionLINE 8: Protective Measures Taken/Method of MarkingLINE 9: Recommended Priority(Immediate, Indirect, Minor or No Threat)

MEDEVAC REQUEST

LINE 1: Location of pick-up siteLINE 2: Frequency, call signLINE 3: # of patients by precedence(urgent, priority, routine, tactical immediate)LINE 4: Special equipment (penetrator, litter)LINE 5: # of patients by type (litter, ambulatory)LINE 6: Security at PZ (1. no enemy, 2. Possible enemy, 3. Enemy present (caution), 4. Enemy present (armed escort)LINE 7: Method of marking PZLINE 8: Patients nationality & status(US military/civilian, Foreign military/civilian, POW)LINE 9: NBC contamination

Page 81: EOD Technical Team Book

PACKING LIST "A" & "B" BAGS

COLD WEATHER DEPLOYMENTEquipment QTY Equipment QTY

BDUs 3pr Boots, Combat Leather 1prCap, BDU 2ea Drawers, Cotton 2ea

Gloves, Leather w/Inserts 1pr Socks, Wool 3prTowel 2ea Undershirt, Cotton Brown 3ea

Coat, Field Jacket, BDU 1ea Bag, Barracks 2eaBag, Waterproof 2ea Belt, Individual Equip. 1eaCanteen, Water (1qt) 1ea Cap, Cold Weather 1eaCarrier, Entrenching Tool 1ea Case, First Aid 1eaCase, Small Arms 2ea Cover, Helmet Camo. 1eaCover, Canteen (1qt) 1ea Cup, Canteen 1eaDrawers & Shirt, C.W. 4ea Fieldpack, LC1 w/Straps

1eaFork & Spoon, Field Mess 1ea Helmet, Kevlar w/Band

1eaEntrenching Tool 1ea Liner, Coat, C.W. 1ea

Mat, Sleeping 1ea Overshoes 1prParka, Wet Weather 1ea Poncho 1ea

Scarf, Wool 1ea Shirt & Pants, C.W. 2prShelter Half w/pins&poles 1ea Suspenders, Indiv. Equip.

1prSleeping Bag 1ea Sweater, Men's Wool 1ea

Suspenders, Trousers 1pr Trousers, CW, OG1082pr

Trousers, XCW, OG107 2pr Body Armor, (Flak Vest)1ea

Trousers, Wet Weather 1pr MOPP Kit 1seBag, Kit, Flyers 1ea Booties, TAP 1pr

Apron, TAP 1ea Bayonet w/Scabbard 1eaProtective Mask, M17 1ea Weapon (M16 or 9mm)

1eaFlashlight w/Blue Lens 1ea Toilet Articles - As

Required

The B Bag will consist of a duffel bag or other suitable substitute containing all authorized Class A and B uniforms, out of season clothing and other authorized equipment not required in the A bag. The B Bag will be inventoried, locked, and consolidated. These will be placed in storage by the backstop personnel to be shipped when directed by the unit commander.

Page 82: EOD Technical Team Book

PACKING LIST - "A" & "B" BAGS

HOT WEATHER DEPLOYMENTEquipment QTY Equipment QTY

BDUs 3pr Boots, Combat Leather 1prCap, BDU 2ea Drawers, Cotton 2ea

Gloves, Leather w/Inserts 1pr Socks, Wool 3prTowel 2ea Undershirt, Cotton Brown 3ea

Bag, Waterproof 2ea Bag, Barracks 2eaCanteen, Water (1qt) 1ea Belt, Individual Equip.

1eaCarrier, Entrenching Tool 1ea Cap, Cold Weather 1ea

Case, Small Arms 2ea Case, First Aid 1eaCover, Canteen (1qt) 1ea Cover, Helmet Camo.

1eaFork & Spoon, Field Mess 1ea Cup, Canteen 1eaEntrenching Tool 1ea Fieldpack, LC1 w/Straps 1eaMat, Sleeping 1ea Helmet, Kevlar w/Band 1eaParka, Wet Weather 1ea Liner, Coat, C.W. 1ea

Mosquito Net w/Poles 1ea Overshoes 1prShelter Half w/pins&poles 1ea Poncho 1eaSleeping Bag 1ea Shirt & Pants, C.W. 2pr

Trousers, Wet Weather 1pr Suspenders, Indiv. Equip.1pr

Bag, Kit, Flyers 1ea Body Armor, (Flak Vest) 1eaApron, TAP 1ea MOPP Kit 1se

Protective Mask, M17 1ea Booties, TAP 1prFlashlight w/Blue Lens 1ea Bayonet w/Scabbard

1eaWeapon (M16 or 9mm) 1ea Toilet Articles - As

Required

The B Bag will consist of a duffel bag or other suitable substitute containing all authorized Class A and B uniforms, out of season clothing and other authorized equipment not required in the A bag. The B Bag will be inventoried, locked, and consolidated. These will be placed in storage by the backstop personnel to be shipped when directed by the unit commander.

IEP

TOOL BOX1. 12" Pipe Wrench 24. Pens and Pencils2. 18" Pipe Wrench 25. Ear Protectors3. Inside Calipers 26. 6' Lead Wires4. Outside Calipers 27. Tape, Monofilament

Page 83: EOD Technical Team Book

5. 18" Ruler 28. Tape, Electrician's6. Chalk 29. Tape, Friction7. Mirrors 30. Tape, Masking8. Flashlight 31. Small Trowel9. Brush 32. Adjustable Wrench10. Diagonal Cutters 33. Needle-nose Pliers11. Forceps 34. Channel Lock Pliers12. Chemical Lights 35. 1/4" Flat Tip Screwdriver13. Aluminum Foil 36. #2 Phillips Screwdriver14. Pulleys (4ea)37. 10' Tape Measure15. Safety Glasses 38. Tongue Depressors16. Gloves for WP 39. Stethoscope17. Craftsman's Knife 40. Surgeon's Gloves18. Steel Wool 41. 3 Snap Links19. Safing Pins 42. Scalpels20. Probes 43. Length of Solder21. Allen Wrenches 44. 2 Dimes22. Forked Slug and Pipe 45. Liquid Solder23. Steno Notebook

IEP FOOT LOCKER1. POP Kit 9. Large Flashlight2. NBC Marking Kit 10. Wood Stakes (6ea)3. Ammo Can w/rags tape and elec. gloves 11.

30, 45, 60, 90 degree angles4. Ammo Can- plastic bags 12. Parachute Cord5. .50 cal Kit 13. Bungee Cord6. First Aid Kit 14. Camera7. Engineer Tape 15. Standoff Dowels8. Colored Marking Flags