suite 1, 216 carp st (po box 470) bega nsw 2550 australia t 61 2 6492 8333 www.nghenvironmental.com.au e [email protected] unit 17, 27 yallourn st (po box 1037) fyshwick act 2609 australia t 61 2 6280 5053 f 61 2 6280 9387 unit 18, level 3, 21 mary st surry hills nsw 2010 australia t 61 2 8202 8333 suite 1, 39 fitzmaurice st (po box 5464) wagga wagga nsw 2650 australia t 61 2 6971 9696 f 61 2 6971 9693 suite 7, 5/18 griffin dr (po box 1037) dunsborough wa 6281 australia t 61 8 9759 1985 Environmental Impact Statement WHITE ROCK SOLAR FARM SSD 16_7487 MARCH 2016

Upload: others

Post on 04-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

 suite 1, 216 carp st  (po box 470)  bega  nsw  2550  australia  t 61 2 6492 8333   

www.nghenvironmental.com.au   e [email protected] 

unit 17, 27 yallourn st  (po box 1037) fyshwick  act  2609  australia 

t 61 2 6280 5053  f 61 2 6280 9387 

unit 18, level 3, 21 mary stsurry hills  nsw  2010  australia 

t 61 2 8202 8333  

suite 1, 39 fitzmaurice st  (po box 5464)wagga wagga  nsw  2650  australia t 61 2 6971 9696  f 61 2 6971 9693 

  suite 7, 5/18 griffin dr  (po box 1037)dunsborough wa  6281  australia 

t 61 8 9759 1985 

 

 

 

Environmental Impact Statement WHITE ROCK SOLAR FARM 

SSD 16_7487 

 

 

 

 

 

 

 

 

 

 

 

 

 

MARCH 2016 

 

Page 2: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

 suite 1, 216 carp st  (po box 470)  bega  nsw  2550  australia  t 61 2 6492 8333   

www.nghenvironmental.com.au   e [email protected] 

unit 17, 27 yallourn st  (po box 1037)fyshwick  act  2609  australia 

t 61 2 6280 5053  f 61 2 6280 9387 

unit 18, level 3, 21 mary stsurry hills  nsw  2010  australia 

t 61 2 8202 8333  

suite 1, 39 fitzmaurice st  (po box 5464)wagga wagga  nsw  2650  australia t 61 2 6971 9696  f 61 2 6971 9693 

suite 7, 5/18 griffin dr  (po box 1037)dunsborough wa  6281  australia 

t 61 8 9759 1985 

 

 

 

Document Verification

 

Project Title:  White Rock Solar Farm Environmental Impact 

Statement 

Project Number:  6589 

Project File Name:  White Rock Solar Farm EIS final v1 3 100316.docxRevision  Date  Prepared by (name)  Reviewed by (name)  Approved by (name) 

Draft v1  19/02/16  Jane Mills  Jenny Walsh  Nick Graham‐Higgs Brooke Marshall 

Final v1.3  10/03/16  Jane Mills Brooke Marshall (minor changes) 

Brooke Marshall  Nick Graham‐Higgs 

NGH Environmental prints all documents on environmentally sustainable paper including paper made from bagasse (a by‐

product of sugar production) or recycled paper. 

NGH Environmental Pty Ltd (ACN: 124 444 622. ABN: 31 124 444 622) and NGH Environmental (Heritage) 

Pty Ltd (ACN: 603 938 549. ABN: 62 603 938 549) are part of the NGH Environmental Group of Companies.

 

 

 

 

 

Page 3: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  i   

 

 

Certification 

I certify  that  I have prepared  the contents of  this Environmental  Impact Statement  in accordance with 

Schedule 2 of the Environmental Planning and Assessment Regulations 2000. To the best of my knowledge, 

this assessment contains all available information that is relevant to the environmental assessment of the 

project and that information is neither false nor misleading. 

 

Name:  Jane Mills   

Qualifications:  B Applied Science  

M Env. Mgmt. and Rest. 

 

 

Signature:  

 

Date:   03032016   

     

     

     

     

     

 

   

Page 4: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  ii   

CONTENTS TERMS AND DEFINITIONS ............................................................................................................................. X 

EXECUTIVE SUMMARY ................................................................................................................................... I 

ES 1 ‐ PROJECT LOCATION ................................................................................................................................ I 

ES 2 – WRSF PROJECT DESCRIPTION ................................................................................................................ I 

ES 3 ‐ NEED FOR THE WRSF PROJECT .............................................................................................................. II 

ES 4 ‐ ENVIRONMENTAL ASSESSMENT AND CONSULTATION ........................................................................ II 

Summary of results for key issues.................................................................................................................... iii 

ES 5 ‐ OVERALL MANAGEMENT FRAMEWORK ............................................................................................. IV 

ES 6 ‐ CONCLUSIONS ...................................................................................................................................... V 

1  INTRODUCTION ...................................................................................................................................1 

1.1  PURPOSE AND SCOPE OF THIS DOCUMENT .........................................................................................1 

1.2  PROJECT OVERVIEW .............................................................................................................................1 

1.3  PROJECT OBJECTIVE .............................................................................................................................2 

1.4  BACKGROUND TO THE WRSF PROJECT ................................................................................................2 

1.5  THE WRSF PROPONENT .......................................................................................................................5 

1.6  ARENA ADVANCING RENEWABLES PROGRAM ....................................................................................5 

2  NEED AND JUSTIFICATION OF THE PROJECT .......................................................................................6 

2.1  CLIMATE CHANGE AND RENEWABLE ENERGY .....................................................................................6 

2.1.1  Greenhouse gas emission benefits – electricity generation .................................................................. 7 

2.1.2  Greenhouse gas emission benefits ‐ life cycle analysis.......................................................................... 7 

2.2  ENERGY CONTEXT IN AUSTRALIA AND NSW ........................................................................................8 

2.2.1  Electricity generation in NSW ................................................................................................................ 8 

2.2.2  National Electricity Market .................................................................................................................... 8 

2.3  STRATEGIC DIRECTION OF THE REGION AND STATE ............................................................................9 

2.3.1  Australia’s Renewable Energy Target .................................................................................................... 9 

2.3.2  NSW 2021: A Plan to Make NSW Number One ................................................................................... 10 

2.3.3  NSW Renewable Energy Action Plan ................................................................................................... 10 

2.4  WHITE ROCK SOLAR FARM BENEFITS.................................................................................................11 

2.5  NEED AND JUSTIFICATION .................................................................................................................13 

3  ALTERNATIVES CONSIDERED .............................................................................................................14 

3.1  CAPACITY OF THE WRSF PROJECT ......................................................................................................14 

3.1.1  Option 1: Do nothing ........................................................................................................................... 14 

3.1.2  Option 2: Construct a 20 MW hybrid wind/solar farm ........................................................................ 14 

3.1.3  Option 3: Construct a larger MW hybrid wind/solar farm (maximum capacity) ................................. 14 

3.1.4  Analysis of WRSF Project capacity options .......................................................................................... 14 

3.1.5  Preferred capacity option .................................................................................................................... 15 

Page 5: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  iii   

3.2  ALTERNATIVE LOCATIONS ..................................................................................................................15 

3.2.1  Option 1: Development Site 1 ............................................................................................................. 16 

3.2.2  Option 2: Development Site 2 ............................................................................................................. 16 

3.2.3  Option 3: Development Site 3 ............................................................................................................. 16 

3.2.4  Option 4: Development Site 4 ............................................................................................................. 16 

3.2.5  Option 5: Development Site 5 ............................................................................................................. 17 

3.2.6  Analysis of solar farm location options ................................................................................................ 17 

3.2.7  Preferred location option .................................................................................................................... 20 

3.3  ALTERNATIVE INFRASTRUCTURE DESIGN AND LAYOUTS ..................................................................20 

3.3.1  Option 1 ............................................................................................................................................... 20 

3.3.2  Option 2 ............................................................................................................................................... 20 

3.3.3  Analysis of Infrastructure and Layout Options .................................................................................... 21 

3.3.4  Preferred infrastructure layout option ................................................................................................ 21 

3.4  SUMMARY OF ANALYSIS OF PROJECT OPTIONS ................................................................................21 

4  DESCRIPTION OF THE PROJECT .........................................................................................................22 

4.1  TERMINOLOGY ...................................................................................................................................22 

4.2  PROJECT OVERVIEW ...........................................................................................................................23 

4.3  RELATIONSHIP TO THE WHITE ROCK WIND FARM ............................................................................25 

4.4  GENERAL SITE DESCRIPTION ..............................................................................................................25 

4.5  LOCATION OF THE ACTIVITY AND PROPERTY DESCRIPTION ..............................................................26 

4.6  DESCRIPTION OF PROPOSED WRSF INFRASTRUCTURE ......................................................................26 

4.6.1  Solar panels and framework ................................................................................................................ 27 

4.6.2  Power Conversion Blocks (PCBs) including inverters, step up transformers and switchgear ............. 27 

4.7  DESCRIPTION OF ASSOCIATED CIVIL WORKS .....................................................................................27 

4.7.1  Connection to WRWF substation ......................................................................................................... 27 

4.7.2  Internal access tracks ........................................................................................................................... 28 

4.7.3  Fencing ................................................................................................................................................. 28 

4.8  CONSTRUCTION ACTIVITIES ...............................................................................................................30 

4.8.1  Pre‐construction activities ................................................................................................................... 30 

4.8.2  Construction program .......................................................................................................................... 30 

4.8.4  Proposed construction equipment ...................................................................................................... 32 

4.8.5  Source and quantity of materials ........................................................................................................ 32 

4.8.6  Timing of work ..................................................................................................................................... 32 

4.8.7  Staffing requirements .......................................................................................................................... 33 

4.9  OPERATION ........................................................................................................................................33 

4.10  DECOMMISSIONING ...........................................................................................................................33 

4.11  ACCESS AND TRAFFIC MANAGEMENT ...............................................................................................34 

4.12  INDICATIVE TIMELINE .........................................................................................................................34 

Page 6: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  iv   

5  STAKEHOLDER CONSULTATION ........................................................................................................36 

5.1  AGENCY CONSULTATION ...................................................................................................................36 

5.1.1  Department of Planning and Environment .......................................................................................... 36 

5.1.2  Office of Environment and Heritage .................................................................................................... 36 

5.1.3  Glen Innes Severn Council ................................................................................................................... 37 

5.1.4  Inverell Shire Council ........................................................................................................................... 37 

5.1.5  Department of Primary Industries (DPI) – Agriculture ........................................................................ 38 

5.1.6  Department of Primary Industries (DPI) ‐ Water ................................................................................. 38 

5.1.7  Environment Protection Authority ...................................................................................................... 39 

5.1.8  Rural Fire Service ................................................................................................................................. 39 

5.1.9  Roads and Maritime Services. ............................................................................................................. 39 

5.2  COMMUNITY CONSULTATION ...........................................................................................................39 

5.3  ABORIGINAL CONSULTATION .............................................................................................................40 

6  PLANNING CONTEXT .........................................................................................................................42 

6.1  ASSESSMENT CONTEXT ......................................................................................................................42 

6.1.1  Permissibility ........................................................................................................................................ 42 

6.1.2  State Significant Development (SDD) .................................................................................................. 42 

6.2  EVALUATION OF THE DEVELOPMENT ................................................................................................44 

6.2.1  The provisions of any environmental planning instrument ................................................................. 45 

6.2.2  The provisions of any development control plan ................................................................................ 49 

6.2.3  The provisions of any relevant planning agreement ........................................................................... 49 

6.2.4  The provisions of the EP&A Regulation ............................................................................................... 49 

6.2.5  The  likely  impacts of  the development,  including environmental  impacts on both  the natural built 

environments, and the social and economic impact in the locality ............................................... 49 

6.2.6  Suitability of the site for the development .......................................................................................... 50 

6.2.7  Any submissions made on the development ....................................................................................... 50 

6.2.8  The public interest ............................................................................................................................... 50 

6.3  NSW LEGISLATION ..............................................................................................................................51 

6.3.1  Environmental Planning and Assessment Act 1979 ............................................................................. 51 

6.3.2  Protection of the Environment Operations Act 1997 .......................................................................... 51 

6.3.3  Threatened Species Conservation Act 1995 ........................................................................................ 52 

6.3.4  Fisheries Management Act 1994 (FM Act) .......................................................................................... 53 

6.3.5  Native Vegetation Act 2003 ................................................................................................................. 53 

6.3.6  National Parks and Wildlife Act 1974 .................................................................................................. 53 

6.3.7  Noxious Weeds Act 1993 (NW Act) ..................................................................................................... 54 

6.3.8  Roads Act 1993 .................................................................................................................................... 54 

6.3.9  Crown Lands Act 1989 ......................................................................................................................... 54 

6.3.10 Heritage Act 1977 ................................................................................................................................ 54 

Page 7: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  v   

6.3.11 Mining Act 1992 ................................................................................................................................... 55 

6.4  COMMONWEALTH LEGISLATION .......................................................................................................55 

6.4.1  Environment Protection and Biodiversity Conservation Act 1999 ...................................................... 55 

6.4.2  Native Title Act 1993............................................................................................................................ 56 

6.4.3  Renewable Energy (Electricity) Act 2000 ............................................................................................. 57 

6.5  OTHER RELEVANT POLICIES AND PLANS ............................................................................................57 

6.5.1  Ecologically Sustainable Development (ESD) ....................................................................................... 57 

6.5.2  Strategic Regional Land Use Plan – New England North West ............................................................ 59 

6.6  SUMMARY OF LICENSES AND APPROVALS ........................................................................................60 

7  SCOPING ............................................................................................................................................61 

7.1  RISK ASSESSMENT ..............................................................................................................................61 

7.2  CONSTRAINTS MAPPING ....................................................................................................................63 

8  ENVIRONMENTAL IMPACT ASSESSMENT – KEY ISSUES ...................................................................65 

8.1  BIODIVERSITY (FLORA AND FAUNA) ...................................................................................................65 

8.1.1  Approach ............................................................................................................................................. 65 

8.1.2  Existing environment ........................................................................................................................... 66 

8.1.3  Site surveys .......................................................................................................................................... 71 

8.1.4  Potential impacts ................................................................................................................................. 72 

8.1.5  Environmental safeguards ................................................................................................................... 74 

8.2  ABORIGINAL HERITAGE ......................................................................................................................75 

8.2.1  Approach ............................................................................................................................................. 75 

8.2.2  Existing environment ........................................................................................................................... 75 

8.2.3  Site survey ............................................................................................................................................ 76 

8.2.4  Potential impacts ................................................................................................................................. 77 

8.2.5  Environmental safeguards ................................................................................................................... 77 

8.3  VISUAL IMPACTS ................................................................................................................................78 

8.3.1  Approach ............................................................................................................................................. 78 

8.3.2  Existing environment ........................................................................................................................... 79 

8.3.3  Potential impacts ................................................................................................................................. 80 

8.3.4  Environmental safeguards ................................................................................................................... 82 

8.4  NOISE IMPACT ....................................................................................................................................83 

8.4.1  Approach ............................................................................................................................................. 83 

8.4.2  Existing environment ........................................................................................................................... 84 

8.4.3  Policy setting and criteria .................................................................................................................... 84 

8.4.4  Potential impacts ................................................................................................................................. 85 

8.4.5  Environmental safeguards ................................................................................................................... 87 

8.5  LAND USE ...........................................................................................................................................88 

8.5.1  Existing environment ........................................................................................................................... 88 

Page 8: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  vi   

8.5.2  Potential Impacts ................................................................................................................................. 92 

8.5.3  Environmental safeguards ................................................................................................................... 94 

9  ASSESSMENT OF ADDITIONAL ISSUES ..............................................................................................95 

9.1  SOILS AND LANDFORMS .....................................................................................................................95 

9.1.1  Existing environment ........................................................................................................................... 95 

9.1.2  Potential impacts ................................................................................................................................. 96 

9.1.3  Environmental safeguards ................................................................................................................... 97 

9.2  WATER ................................................................................................................................................97 

9.2.1  Existing environment ........................................................................................................................... 97 

9.2.2  Potential impacts ............................................................................................................................... 100 

9.2.3  Environmental safeguards ................................................................................................................. 102 

9.3  TRAFFIC, TRANSPORT AND ROAD SAFETY....................................................................................... 102 

9.3.1  Existing Environment ......................................................................................................................... 102 

9.3.2  Traffic and the WRWF Project ........................................................................................................... 102 

9.3.3  Potential impacts ............................................................................................................................... 103 

9.3.4  Environmental safeguards ................................................................................................................. 106 

9.4  HEALTH AND SAFETY ....................................................................................................................... 106 

9.4.1  Electromagnetic interference ............................................................................................................ 106 

9.4.2  Aviation .............................................................................................................................................. 109 

9.4.3  Bushfire .............................................................................................................................................. 110 

9.4.4  Environmental safeguards ................................................................................................................. 112 

9.5  RESOURCE USE AND WASTE GENERATION ..................................................................................... 113 

9.5.1  Existing environment ......................................................................................................................... 113 

9.5.2  Potential impacts ............................................................................................................................... 115 

9.5.3  Environmental safeguards ................................................................................................................. 116 

9.6  HISTORIC HERITAGE ........................................................................................................................ 116 

9.6.1  Approach ........................................................................................................................................... 116 

9.6.2  Existing environment ......................................................................................................................... 116 

9.6.3  Potential impacts ............................................................................................................................... 117 

9.6.4  Environmental safeguards ................................................................................................................. 118 

9.7  CLIMATE AND AIR QUALITY ............................................................................................................. 118 

9.7.1  Existing environment ......................................................................................................................... 118 

9.7.2  Potential impacts ............................................................................................................................... 120 

9.7.3  Environmental safeguards ................................................................................................................. 121 

9.8  SOCIOECONOMIC AND COMMUNITY ............................................................................................. 121 

9.8.1  Existing environment ......................................................................................................................... 121 

9.8.2  Potential impacts ............................................................................................................................... 122 

9.8.3  Environmental safeguards ................................................................................................................. 124 

Page 9: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  vii   

9.9  CUMULATIVE IMPACTS ................................................................................................................... 124 

9.9.1  Existing environment ......................................................................................................................... 124 

9.9.2  Potential impacts ............................................................................................................................... 124 

10  ENVIRONMENTAL MANAGEMENT ................................................................................................. 127 

10.1  ENVIRONMENTAL FRAMEWORK ..................................................................................................... 127 

10.2  ENVIRONMENTAL SAFEGUARDS ..................................................................................................... 127 

11  CONCLUSION .......................................................................................................................... 133 

12  REFERENCES ............................................................................................................................ 134 

APPENDIX A  SEARS ........................................................................................................................A‐I 

APPENDIX B  BIODIVERSITY ASSESSMENT ....................................................................................... B‐I 

APPENDIX C  ARCHAEOLOGICAL ASSESSMENT ................................................................................ C‐I 

APPENDIX D  VISUAL IMPACT ASSESSMENT ................................................................................... D‐I 

APPENDIX E  NOISE IMPACT ASSESSMENT ...................................................................................... E‐I 

APPENDIX F  DRAFT NOISE MANAGEMENT PLAN ........................................................................... F‐I 

APPENDIX G  DRAFT EROSION AND SEDIMENT CONTROL PLAN ...................................................... G‐I 

APPENDIX H  DRAFT TRAFFIC MANAGEMENT PLAN ....................................................................... H‐I 

 

   

Page 10: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  viii   

TABLES 

Table 2‐1  Existing major power station capacity by technology in NSW. ......................................................8 

Table 2‐2  Operational consumption over the short, medium and long term in NSW ...................................9 

Table 4‐1 Property details and project infrastructure of the WRSF Development Envelope. ......................26 

Table 4‐2 Key WRSF infrastructure components and associated construction activities .............................31 

Table 4‐3  Phases of WRSF implementation relative to WRWF ....................................................................35 

Table 6‐1 Secretary’s Environmental Assessment Requirements for WRSF ................................................43 

Table 6‐2  Summary of Matters of National Environmental Significance (50km search radius). .................56 

Table 6‐3  Summary of other matters protected by the EPBC Act (50km search radius). ............................56 

Table 6‐4  Summary extra information (50km search radius). .....................................................................56 

Table 6‐5  Summary of licenses and approvals required for WRSF. .............................................................60 

Table 7‐1  Risk assessment rating matrix. .....................................................................................................61 

Table 7‐2  Risk analysis of adverse environmental issues. ...........................................................................62 

Table 7‐3 Threatened species returned from the BCC as requiring survey ..................................................69 

Table 7‐4  Additional species potentially present at the site .......................................................................69 

Table 7‐5 Potential biodiversity impacts as a result of the proposal. ...........................................................72 

Table 7‐6 RBL at background monitoring location R1 ..................................................................................84 

Table 7‐7  The ICN management levels ........................................................................................................85 

Table 7‐8 Predicted construction noise levels ..............................................................................................85 

Table 7‐9  Assumed sound power spectrum for inverter/transformer units ...............................................87 

Table 9‐1 Predicted traffic management volumes during construction .................................................... 103 

Table 9‐2 ICNIRP reference levels (ICNIRP 2010) ....................................................................................... 107 

Table 9‐3 Summary of total heritage listings. ............................................................................................ 116 

Table 9‐4  Comparison of CO2 equivalent emissions produced per kilowatt hour .................................... 119 

Table 9‐5  Forecast changes to various climate characteristics within New England Region ................... 123 

   

Page 11: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  ix   

 

FIGURES 

Figure 1‐1  WRSF Development Envelope in relation to WRWF project boundary ........................................4 

Figure 2‐1– Indicative profile for average daily wind and solar generation profiles ....................................11 

Figure 3‐1 Locations of five alternative development sites in relation to the WRWF ..................................18 

Figure 4‐1 Images representative of proposed WRSF infrastructure components ......................................29 

Figure 7‐1 Constraints map for the WRSF Development Envelope ..............................................................64 

Figure 7‐2 Endangered ecological community map for the WRSF Development Envelope. ........................68 

Figure 7‐3. SAL  land within and surrounding the WRSF Development Envelope  (NSW Crown Copyright  ‐ 

Planning and Environment) ..........................................................................................................................90 

Figure 9‐1  Drainage depression looking towards the north of the WRSF Development Envelope. ............98 

Figure 9‐2  View to the south showing general path of drainage depression ..............................................98 

Figure 9‐3  Waterbodies, drainage depressions and groundwater bores within and surrounding the WRSF 

Development Envelope.................................................................................................................................99 

Figure 9‐4  Comparative reflection analysis (Spaven 2011) ....................................................................... 110 

Figure 9‐5  Renewable energy projects in proximity to the WRSF Development Envelope (base map: Epuron 

2011) .......................................................................................................................................................... 122 

 

Page 12: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  x   

TERMS AND DEFINITIONS AC  Alternating current 

ACHA  Aboriginal Cultural Heritage Assessment 

AEMO  Australian Energy Market Operator 

Applicant 

AR5 

Entity applying for development consent under the EP&A Act (refer also proponent)  

Assessment Report 5 (IPCC) 

ARPANSA  Australian Radiation Protection and Nuclear Safety Agency 

BAR  Biodiversity Assessment Report 

BCC  Biobanking Credit Calculator 

BOM  Australian Bureau of Meteorology 

BRMP  Bush Fire Risk Management Plan 

CEMP  Construction Environmental Management Plan 

CHMP  Cultural Heritage Management Plan 

Cwth  Commonwealth 

DA  Development Application 

dB  Decibel 

dB(A)  A measure of A‐weighted (c.f.) sound levels. 

DC 

DCCEE 

Direct Current 

Department of Climate Change and Energy Efficiency (Commonwealth) 

DECCW  Refers to OEH 

DEMP  Decommissioning Environmental Management Plan 

DP&E  Department of Planning and Environment (NSW) 

DPI  Department of Primary Industries (NSW) 

DoE  (Cwth) Department of Environment.  

EEC  Endangered Ecological Community –  as defined under  relevant  law  applying  to  the proposal 

EIA  Environmental Impact Assessment 

EIS  Environmental Impact Statement 

ELF  Extremely low frequency, in relation to Hz (c.f.) 

EMFs  Electric and Magnetic Fields 

EPBC Act  Environment Protection and Biodiversity Conservation Act 1999 (Cwth) 

EPA  (NSW) Environment Protection Authority 

EPL  Environment Protection Licence, issued under the POEO Act (c.f.) 

EP&A Act  Environmental Planning and Assessment Act 1979 (NSW)  

EP&A Regulation  Environmental Planning and Assessment Regulation 2000 (NSW) 

ESD  Ecologically Sustainable Development 

GHG  Greenhouse gas 

GISC  Glen Innes Severn Council 

Page 13: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  xi   

GWCA 

GWI 

Goldwind Capital Australia

Goldwind International Holdings (HK) Limited 

GWh  Gigawatt hours 

ha  hectare 

Heritage Act  Heritage Act 1977 (NSW) 

Hz  Hertz 

IPCC  Intergovernmental Panel on Climate Change 

ISC   Inverell Shire Council 

km  kilometre 

LALC  Local Aboriginal Land Council 

LCA  Life Cycle Analysis, an assessment and quantification of the energy and material flows associated with a given process or product  to  identify  the  resource  impacts of  that process. 

LEP  Local Environment Plan 

LGA 

LGCs 

LRET 

Local Government Area 

Large‐Scale Generation Certificates 

Large‐Scale Renewable Energy Target 

m  metres 

NEFR  National Electricity Forecasting Report 

NEM  National Electricity Market 

NWBFMC  North West Bush Fire Management Committee 

OEMP  Operational Environmental Management Plan 

MNES  Matters of National Environmental Significance, under the EPBC Act (c.f.) 

MRET  Mandatory Renewable Energy Target 

MW  Megawatt 

MWh  Megawatt hours 

NNTT  National Native Title Tribunal 

NW Act  Noxious Weeds Act 1993 (NSW) 

NSW  New South Wales 

OEH  (NSW)  Office  of  Environment  and  Heritage,  formerly  Department  of  Environment, Climate Change and Water (DECCW) 

OEMP   Operational Environmental Management Plan  

POEO Act  Protection of the Environment Operations Act 1997 (NSW) 

Proponent  The entity proposing this development, in this instance, WRSFPL. 

PV  Photovoltaic 

RBL  Rating Background Level ‐ the level of background noise 

RE Act  Renewable Energy (Electricity) Act 2000 (Commonwealth) 

REC  Renewable Energy Certificate 

RET  Renewable Energy Target 

Page 14: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  xii   

RFS  NSW Rural Fire Service 

Roads and Maritime 

(NSW) Roads and Maritime Services, formerly Roads and Traffic Authority (RTA)  

Roads Act 

SAT 

Roads Act 1993 (NSW) 

Spot Assessment Technique 

SEARs  Secretary’s Environmental Assessment Requirements 

SEPP  State Environmental Planning Policy (NSW) 

SEPP (Infrastructure) 

State Environmental Planning Policy (Infrastructure) 2007 (NSW) 

Sound pressure level 

The noise at a given distance from plant or equipment 

SRD SEPP  State Environmental Planning Policy (State and Regional Development) 2011 (NSW) 

SIS 

SPM 

Species Impact Statement 

Summary for Policy Makers 

SSD  State Significant Development, as defined by Section 89C of the EP&A Act (c.f.) 

   

TSC Act  Threatened Species Conservation Act 1995 (NSW) 

µT  Microtesla , multiples of a unit of magnetic field 

V  Volts 

VIA 

WG1 

Visual Impact Assessment 

Working Group 1 (IPCC) 

WHO  World Health Organisation 

WMP  Waste Management Plan 

WRSF 

WRSF Project 

WRSFPL 

White Rock Solar Farm as defined in Section 4.1 ‐ Terminology 

White Rock Solar Farm Project as defined in Section 4.1 ‐ Terminology 

White Rock Solar Farm Pty Ltd (the Proponent) 

WRWF  White Rock Wind Farm 

WRWFPL 

 

White Rock Wind Farm Pty Ltd (WRWF Proponent) 

Page 15: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  i   

EXECUTIVE SUMMARY 

This Environmental  Impact Statement  (EIS)  identifies and assesses  the environmental  issues associated 

with  the construction, operation and decommissioning of  the proposed White Rock Solar Farm Project 

(WRSF Project). NGH Environmental has prepared the EIS on behalf of the proponent, White Rock Solar 

Farm Pty Ltd (WRSFPL). 

The EIS has been prepared in accordance with Part 4 of the NSW Environmental Planning and Assessment 

Act 1979 (EP&A Act) and Schedule 2 of the Environmental Planning and Assessment Regulation 2000 (EP&A 

Regulations).  The  structure  and  content of  the  EIS  address  the  Secretary’s  Environmental Assessment 

Requirements (SEARs), provided by NSW Department of Planning and Environment (DP&E) on 3 February 

2016.  

ES 1 ‐ PROJECT LOCATION 

The WRSF Project would be  located  in the New England Tablelands, approximately 20 km west of Glen 

Innes, NSW. It  is  located about 500 km north of Sydney and 400 km south‐west of Brisbane.  The WRSF 

would have a nominal capacity of up to approximately 20 megawatts (MW) (Alternating Current) and would 

be built to enhance renewable energy generation at the White Rock Wind Farm (WRWF). The location of 

the proposed WRSF Development Envelope is shown relative to the approved WRWF, Figure ES 1, below. 

The WRSF  Development  Envelope  (approximately  150  hectares  (ha))  is  located  predominantly  in  the 

western part of  the Glen  Innes Severn  Local Government Area  (LGA), within  the Border Rivers‐Gwydir 

catchment.  A small part of the WRSF Development Envelope at the western extent is within the Inverell 

LGA and only a short section (about 200 m) of WRSF access track would be within Inverell LGA. The WRSF 

Development Envelope is zoned RU1, Primary Production under the Glen Innes Severn and Inverell Local 

Environmental Plans (LEPs).  The WRSF Development Envelope comprises rural land currently utilised for 

grazing and cropping and  is  largely cleared of overstorey vegetation. The WRSF Development Footprint 

would comprise only about 50 ha of the WRSF Development Envelope (as described in Section 4.1). 

ES 2 – WRSF PROJECT DESCRIPTION 

Infrastructure components proposed for the WRSF are listed below (and further outlined in Section 4.1). 

An indicative WRSF layout is shown in Figure ES 2, below. 

Solar panel arrays:  

o Approximately 75,000 polycrystalline panels. 

Mounting framework: 

o The solar panels would be secured on a galvanised steel structure that consists of a frame secured to posts that have been pile driven into the ground. 

o In  the unlikely event  that  the posts cannot be pile driven, a ballasted solution may be investigated. 

o A fixed panel arrangement to enable panels, at a tilt of between 15 and 30 degrees to the horizontal, to optimise solar incidence and achieve optimum efficiency.   

Internal Direct Current (DC) wiring between panels and inverter systems within groups of panels. 

Connection of groups of panels to Power Conversion Blocks  (PCBs) within the area of the solar arrays. 

Typically eight PCBs with a total output up to approximately 20 MW (AC) including: 

o Inverter modules (container based modules) of the order of 1 to 2.75 MW. 

Page 16: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  ii   

o Typically eight step‐up transformers to 33 kV (one transformer per PCB). 

o 33 kV switchgear at each PCB. 

33 kV cabling to link the WRSF output to the WRWF collections circuits. 

Access tracks for access to the site during construction and to the PCBs during operation. 

Fencing around the solar farm for security and safety. 

Monitoring equipment. 

Small permanent site building, approximately 12 m by 12 m in area. 

Co‐use of the WRWF Operations and Maintenance Building for the operational phase. 

WRSFPL  is  seeking  development  consent  for  the WRSF  by mid‐2016 with  the  objective  to  commence 

construction  in  first half of 2017 and be operating  towards  the end of 2017. The WRSF Project would 

require approximately 6 months for construction with peak construction activity occurring over only about 

3 months. The WRSF Project would operate for approximately 25 years. 

ES 3 ‐ NEED FOR THE WRSF PROJECT 

There  is substantial scientific evidence that the Earth’s climate  is changing.   The 5th Assessment Report 

(AR5) of the  Intergovernmental Panel on Climate Change (IPCC), Working Group 1 (WG1), Summary for 

Policy Makers (SPM), concluded that:  

 “Continued emissions of greenhouse gases will cause further warming and changes in all components of 

the climate system. Limiting climate change will require substantial and sustained reductions of greenhouse 

gas emissions”… 

The Quarterly update of the National Greenhouse Gas Inventory (Department of Environment 2014) states 

that energy generation is the largest individual contributor of Greenhouse Gas (GHG) emissions in Australia, 

accounting for 32% of emissions in the year to March 2014.  Australia has committed to reducing its GHG 

emissions to 26‐28% below 2005 levels, by 2030.  Thus, there is an important role for the development of 

renewable energy generation projects in lowering national emissions to combat climate change.    

The central objective of the WRSF Project is to generate renewable electricity using solar PV technology.  

The WRSF Project would form part of a hybrid wind/solar facility and export electricity generated onsite to 

the national grid using the substation infrastructure to be constructed for the WRWF.  While the Australian 

Energy Market Operator (AEMO) does not predict that NSW will experience a shortfall of electricity over 

the next couple of years, the WRSF Project would assist in meeting the Australian Government’s Renewable 

Energy Target (RET) and would be important in the implementation of the NSW Renewable Energy Plan, 

particularly due  to  the hybrid nature of  the WRSF  Project  that provides  cost  effective delivery of  the 

required renewable energy to the grid. 

ES 4 ‐ ENVIRONMENTAL ASSESSMENT AND CONSULTATION 

The  detailed  investigation  of  risks  and  impacts  was  undertaken  for  the  construction,  operation  and 

decommissioning  phases  of  the  WRSF.  Additional  to  addressing  the  project‐specific  SEARs,  a  risk 

assessment was  carried out  to  identify key environmental  risks of  the proposal,  to guide  the depth of 

investigation  that would  be  undertaken  in  this  EIS.  The  risk  assessment  identified  five  environmental 

aspects as key risks, and detailed investigations were subsequently undertaken in these areas:  

Biodiversity impacts and, if relevant offsetting requirements 

Aboriginal heritage impacts 

Visual impacts 

Page 17: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  iii   

Noise impacts 

Land use impacts 

Biodiversity, Aboriginal heritage, visual and noise impacts were investigated by specialists. Summaries of 

these reports are included in Section 8 and the full reports are attached as Appendices B‐E.  Land use has 

been assessed in Section 8.5 with guidance provided in Primefact 1063 (DPI 2013). Additional issues that 

did not constitute ‘Key Issues’ are considered in Section 9 of this EIS.  

Where relevant to the assessment of the various issues and potential impacts, consultation was undertaken 

with government agencies and community stakeholders as described  in Section 5. Mitigation measures 

identified in Sections 8 and 9 are compiled in Section 10. 

Summary of results for key issues 

Biodiversity  impacts were assessed against  the Framework  for Biodiversity Assessment  (FBA), the NSW 

biodiversity offsets policy developed for Major Projects (OEH 2014) and the requirements of the SEARs.  

The  specialist  report  found  no  requirement  to  offset  the  biodiversity  impacts  of  the  development.  

Mitigation measures are provided to  further minimise  impacts to vegetation and habitat. Based on the 

specialist assessment, a  referral under  the EPBC Act  is not considered  to be  required. Preparation of a 

Species Impact Statement, under the TSC Act is not considered to be required. 

Aboriginal  cultural  heritage  impacts  were  assessed  in  accordance  with  the  Guide  to  Investigating, 

Assessing and Reporting on Aboriginal Cultural Heritage in NSW (OEH 2011); the Code of Practice for the 

Archaeological Investigation of Aboriginal Objects in New South Wales (OEH 2010a), and Aboriginal Cultural 

Heritage  Consultation  Requirements  for  Proponents  2010  (OEH  2010b).  A  search  of  the  NSW  OEH 

Aboriginal Heritage  Information Management  System  (AHIMS)  found  that  there  are no  recorded  sites 

within  or  adjacent  to  the  proposed  WRSF  Development  Envelope.  Consultation  with  Aboriginal 

stakeholders identified no places with cultural or spiritual significance and the field survey conducted with 

registered Aboriginal stakeholders found no heritage sites throughout the WRSF Development Envelope. 

The specialist report concluded that the WRSF Development Envelope holds low potential for unrecorded 

heritage sites. Mitigation measures are provided to further minimise  impacts  in the design phase and a 

Cultural  Heritage Management  Plan  (CHMP) would  be  prepared  to  address  the  potential  for  finding 

Aboriginal artefacts during the construction phase. 

Visual  Impacts were assessed by a Registered Landscape Architect with extensive experience of visual 

impact  assessments  of  infrastructure  projects.  The  Visual  Impact  Assessment  identified  a  total  of  12 

residential dwellings  located within an approximate 4km viewshed surrounding  the WRSF site.   Sinclair 

Lookout, Matheson Church and a small number of local roads were also identified as visual receivers for 

the site.  The specialist report found that majority of pre‐construction, construction and decommissioning 

activities would be unlikely to result  in an unacceptable  level of visual  impact due to their duration and 

temporary nature.  It also determined an overall very low level of visual impact during the operation phase 

in relation to landscape character, impacts of residential dwellings, impacts on roads and other sensitive 

receivers.   Mitigation measures are provided to further minimise  impacts  in the design and operational 

phases of the solar farm. 

Noise  Impacts  for  construction  and  operation were  assessed  by  an  acoustic  specialist.  The  specialist 

Environmental Noise Assessment (ENA) was undertaken with reference to the NSW Industrial Noise Policy 

2000  (INP) and the Department of Environment & Climate Change  Interim Construction Noise Guideline 

2009 (ICN Guideline).  The Noise Assessment modelled noise levels at 550 metres from the WRSF Project; 

this is the distance of the closest dwelling to the proposed WRSF.  At this distance, no receivers would be 

Page 18: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  iv   

considered  to  be  highly  noise  affected  as  defined  by  the  ICN  Guideline  during  construction.    During 

operation, the predicted noise levels comply with the criteria conservatively established in accordance with 

INP, without any acoustic treatment. To further reduce impacts due to noise, a draft Noise Management 

Plan has been developed for the solar farm and would be completed prior to Project implementation, to 

ensure the noise impacts are managed appropriately. 

Land Use impacts. The proposal would be located on land identified as Strategic Agricultural Land by the 

Department  of  Primary  Industries  (DPI).  Potential  agricultural  impacts  considered  in  the  EIS  include 

resource loss and fragmentation, disturbance to farming operations and livestock, and potential increased 

in biosecurity, pest, weed and bushfire risks.  Consultation with the landowner has resulted in avoidance 

of an area considered to be of high agricultural value.  Solar farm developments are considered to be highly 

reversible and would not result in the permanent loss of agricultural land, after the decommissioning phase 

of the WRSF Project. During decommissioning, all above ground infrastructure would be removed from the 

site and the land returned to existing or alternative land uses. 

Additional issues considered within Section 9 of this EIS included: 

Soil and landforms. 

Water Supply, hydrology and quality. 

Traffic, transport and road safety. 

Health and safety including electromagnetic interference, risks to aviation and bushfire risk. 

Resource use and waste generation. 

Historic heritage. 

Climate and air quality. 

Socioeconomic and community.  

Cumulative impacts. 

Where relevant, management measures to avoid or mitigate environmental  impacts are outlined  in the 

relevant sections and compiled for all issues in Section 10.2. 

ES 5 ‐ OVERALL MANAGEMENT FRAMEWORK 

A preliminary constraints analysis was used to inform the location of infrastructure in the early planning 

phase of the WRSF Project, to avoid environmental impacts as far as reasonably and practically possible. 

Impacts of the proposed WRSF relate primarily to the construction phase of the WRSF Project. Primary 

impacts include clearing of vegetation (mostly for the access tracks, 33 kV cable trench and construction 

laydown  area),  construction  noise,  construction  traffic  and  dust.  The  main  impacts  associated  with 

operation relate to visual impact and reduction in agricultural production at the site for the duration of the 

WRSF  Project. Decommissioning  impacts  are  generally  of  a  similar nature  but  to  a  lesser  extent  than 

construction impacts.  

Mitigation  measures  and  safeguards  have  been  developed  and  are  compiled  in  Chapter  10.    The 

management measures aim  to minimise  impacts of  the proposal. They  include prescriptions  to  further 

reduce impacts where possible as well as standard protocols to manage activities that carry a pollution risk 

(such as management of fuels and excavation activities). They are precautionary in that, where uncertainty 

was present regarding risk, a mitigation measure has been  included. There  is a high degree of certainty 

regarding the ability of the measures to manage the risks identified.   

   

Page 19: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  v   

This EIS also includes the following draft management plans: 

Draft Noise Management Plan (Appendix F) 

Draft Erosion and Sediment Control Plan (Appendix G) 

Draft Traffic Management Plan (Appendix H) 

Development  of  a  draft  Landscaping Management  Plan  (requested  by  the  SEARs)  to minimise  visual 

impacts on affected landowners has been assessed by the Landscape specialist as not necessary for WRSF  

based on, consultation with affected  landowners, review of view field, existing screening by terrain and 

vegetation and considering the low levels of visual impact predicted by the assessment. 

Based  on  the  assessments  undertaken  and  with  the  implementation  of  the management measures 

identified in this EIS, it has been reliably demonstrated that: 

Potential impacts are manageable and would not result in a significant impact to the environment, 

including any Matters of National Environmental Significance. 

ES 6 ‐ CONCLUSIONS 

The WRSF Project  involves  the  construction and operation of a 20 MW Solar Farm  that will provide a 

beneficial  contribution  to  Australia’s  transition  to  a  low  emission  energy  generation  economy.  

Development of the solar farm would make use of existing WRWF grid connection and access infrastructure 

through a hybrid wind / solar project that optimises use of the  infrastructure and enables cost effective 

delivery of additional supply of renewable energy. 

This  EIS  has  assessed  the  potential  environmental  impacts  of  the WRSF  and,  as  applicable,  identified 

management measures to minimise the impacts. Overall, the WRSF Project has been assessed as able to 

comply with relevant Acts and Regulations, is compatible with existing land uses and highly reversible and, 

upon decommissioning, the site can be returned to  its previous agricultural capacity or alternative  land 

use.  

The  WRSF  Project  is  considered  to  be  consistent  with  the  principles  of  Ecologically  Sustainable 

Development. Specifically, it would address the need to mitigate the risk of climate change to current and 

future generations by reducing the carbon emissions intensity of electricity generation.  

In light of the benefits of the WRSF Project, the assessed low level of environmental impact, the high level 

of manageability related to these impacts and their reversibility after the decommissioning phase of the 

WRSF Project, the WRSF Project is considered to be justified. 

Page 20: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")")")

")

")

")

98

65

432

8382

81

80

79

78

7675

73

7271

6968

65

6463

62

61

60

59

55

5453

5251

48

47

44

4140

3938

3736

34

3130

292827

2522

212019

14

13

1110

113112111110

109

7

1

77

58

5756

35

26

15

Jenkins Rd

Kelley

sR

d

I lparran Rd

Kelleys Rd

SpringMountain Rd

GWYDIRHIGHWAY

Maybole Rd

I180 J180

H40

L80L82

L83

I40

F131

N180

N190

F132

M80

N191

M60

E50

K30

E140

N90

O191

P190

Q170

P70

R190

Q81

Q80

Q110

Q70

Q82

J181

L170

L180K170

H140

L100

L90

L70

L71

L101

F120

K51

K50

O190

N100

P170

R121

R130

R120

357500 360000 362500 365000 36750066

9250

066

9500

066

9750

067

0000

067

0250

067

0500

067

0750

0

PROJECT

TITLE

DRAWING No. REV

White Rock Wind Farm and Solar FarmProject LocationsWRWF and WRSF

LEGEND

Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.

Projection: GDA94 MGA56

±0 1,000 2,000500 Metres

Approved

16/02/2016

1:50,000 @ A3

STATUS

DATE

SCALE

WRSOL_OVR_017_6A

J.Gardner

I.Mackey

J.Bembrick

APPROVED

PRODUCED

CHECKED

06A

Wind Farm Project Boundary

Cadastral Boundary

!. Turbine Layout 66

#0 Permanent Met Mast

") WRWF Involved Residence

") WRWF Uninvolved Residence

") WRWF Neighbour Agreement

Existing 132kV Transmission Line

33kV Overhead Line (Proposed)

132kV Overhead Line (Proposed)

Access Tracks (Proposed)

Substation / Switchyard

Wind Farm Facilities (Modified Layout)Operation & Maintenance Facility

Temporary Construction Compound

Laydown Area

Concrete Batching Plant

WR Solar Farm Development AreaSolar Farm - Development Area

Note: All WRWF infrastructure subject to a 100m micrositing allowance under the WRWF Project Approval

Lot 32DP 753319

Lot 27DP 753319

Lot 30DP 753319

Lot 78DP 753260

Lot 31DP 753319

Lot 29DP 753319

Figure ES 1 WRSF Project Area in relation to WRWF Project boundary

Page 21: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  vii   

 

Figure ES 2   Indicative WRSF layout (subject to detailed design and site constraints). 

")

")

")

")

")

")

")

")

!(

!(

78

132

30

3132

27

29

119

7001

26

DP753260

DP753319

DP753319

DP753319DP753319

DP753319

DP753260

DP753319

DP93978

DP665915

2

1

°0 200 400100 Meters

www.nghenvironmen tal.com.au

Ref: 6589 4.1 v7Author: JB

Notes:- Infrastructure data and aer ial courtesyof Goldwind, received 2016

10m contours

Farm dam

Cadastre

Existing 132kV overhead powerline

Proposed solar farm

Development envelope

Solar array

Construction office and laydown area") Power Conversion Blocks

Indicative 33kV cable route

Alternative 33kV cable route

Fence

WRSF access tracks

Wind farm infrastructure!( Wind turbine

Wind farm access track

WRWF 33kV cabling and communications

Proposed 132kV overhead powerline

WRWF facilities

Gwydir Highway

Page 22: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  1   

1 INTRODUCTION 

1.1 PURPOSE AND SCOPE OF THIS DOCUMENT 

This Environmental  Impact Statement  (EIS)  identifies and assesses  the environmental  issues associated 

with the construction, operation and decommissioning of the proposed White Rock Solar Farm (WRSF). 

NGH Environmental has prepared  the EIS on behalf of  the proponent, White Rock  Solar  Farm Pty  Ltd 

(WRSFPL), a subsidiary of Goldwind International Holdings (HK) Limited (GWI). 

This EIS has been prepared in accordance with Part 4 of the NSW Environmental Planning and Assessment 

Act 1979 (EP&A Act) and Schedule 2 of the Environmental Planning and Assessment Regulation 2000 (EP&A 

Regulation). The structure and content of  the EIS addresses  the Secretary’s Environmental Assessment 

Requirements (SEARs), provided by NSW Department of Planning and Environment (DP&E) on 3 February 

2016 in respect of WRSF Project SSD 16_7487.  

By virtue of the EP&A Act and State Environmental Planning Policy (State and Regional Development) 2011 

(SRD SEPP), the WRSF is State Significant Development (SSD). Accordingly, the application for development 

consent will be assessed and determined by the Minister for Planning (or delegate) under Part 4.1 of the 

EP&A Act.  

1.2 PROJECT OVERVIEW 

The WRSF would be located in the New England Tablelands, approximately 20 km west of Glen Innes, about 

500 km north of Sydney and 400 km south‐west of Brisbane.  The WRSF would have a nominal capacity of 

up  to  approximately  20  megawatts  (MW)  Alternating  Current  (AC)  and  would  be  built  to  enhance 

renewable energy generation at the White Rock Wind Farm (WRWF).  

WRWF  received project  approval  in  July 2012  allowing  for  the  installation  and operation of 119 wind 

turbines.  WRWF Stage 1 involves 70 turbines and is scheduled to start construction in late March 2016. 

The WRSF would be located within and adjacent to the WRWF project area. Figure 1‐1 shows the WRSF 

Development Envelope of approximately 150 hectare (ha) in relation to the WRWF. Only a portion of the 

Development  Envelope would  be  used  for  infrastructure  and  form  the WRSF  Development  Footprint 

(approximately 50 ha).   The hybrid wind/solar  renewable energy  facility  comprising  the WRSF and  the 

WRWF would share significant infrastructure, including the WRWF grid connection, WRWF access tracks 

and a WRWF cable corridor. These aspects, herein referred to as WRSF Shared Infrastructure, have been 

assessed for the WRWF project and are not addressed in this EIS. 

The WRSF Development Envelope is located predominantly in the western part of the Glen Innes Severn 

Local Government Area (LGA) within the Border Rivers‐Gwydir catchment.  A small part of the Development 

Envelope at the western extent is within the Inverell LGA and only a short section (about 200m) of WRSF 

access  track would  be within  Inverell  LGA.  The WRSF  Development  Envelope  is  zoned  RU1,  Primary 

Production under both  the Glen  Innes Severn  Local Environmental Plan 2012  (Glen  Innes  LEP) and  the 

Inverell Local Environmental Plan 2012 (Inverell LEP).  The WRSF Development Envelope comprises rural 

land currently utilised for grazing and cropping and is largely cleared. 

The  capital  cost of  the WRSF  Project  is  estimated  at  approximately  $45 million.    Subject  to  approval, 

construction is proposed to commence in 2017 and the WRSF Project would be expected to take up to six 

months to reach operational status. 

Page 23: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  2   

The WRSF Project is expected to have a 25 year operating life and would employ additional operations and 

maintenance personnel in conjunction with the WRWF operation.  At the end of its operating life, the WRSF 

could  be  either  decommissioned  or,  subject  to  planning  approvals  and  landowner  agreements,  be 

retrofitted with new equipment.  If decommissioned, all above ground infrastructure would be removed 

and the site would be rehabilitated to allow for a return to agricultural or other land use.  

This EIS has assessed the WRSF Development Envelope of approximately 150  (ha) where  infrastructure 

may be  located, to allow  for some  flexibility  in the solar  farm design. When quantifying  impacts  in this 

assessment,  the  indicative  WRSF  Development  Footprint  of  approximately  50  ha  has  been  used. 

Infrastructure  within  the  WRSF  Development  Footprint  includes  the  solar  panel  arrays,  associated 

inverters, step‐up transformers, monitoring equipment, 33 kV cabling and access tracks.   

An indicative WRSF Project design is included in Section 4.  The final design would be informed by the final 

environmental  constraints,  mitigation  measures  determined  in  this  EIS,  any  additional  development 

consent conditions and technical aspects from the detailed design phase. 

1.3 PROJECT OBJECTIVE 

The primary objective of the WRSF Project is to generate renewable electricity using solar PV technology.   

In addition, the WRSF Project  involves development of a hybrid wind/solar  facility, exporting electricity 

generated  to  the grid  through  the  infrastructure  to be constructed  for  the WRWF.   The objective  is  to 

maximise  the  amount of  renewable  electricity  that  can be produced  at  the  site without  the need  for 

additional connecting infrastructure.   

This  reduces  the  potential  environmental  impact  of  the  solar  farm  development  by  minimising  the 

disturbance  footprint  (no  standalone  substation  is  required  for  the WRSF),  reducing  visual  and  noise 

impacts as a result of less infrastructure and the efficient use of resources. The sharing of infrastructure 

between the wind and solar farms also enables a more cost effective delivery of electricity that contributes 

to lower electricity pricing. 

1.4 BACKGROUND TO THE WRSF PROJECT 

The WRWF will include up to 119 wind turbines and associated infrastructure including access tracks, a 33 

kV/132 kV substation and approximately 8 km of 132 kV transmission line to connect to TransGrid’s existing 

132 kV Glen  Innes  to  Inverell  transmission  line. The proponent  for WRWF  is WRWFPL. The WRWF was 

acquired  from  Epuron,  in  2013,  by  Goldwind  Capital  Australia  (GWCA)  and  is  owned  by  Goldwind 

International  (GWI). WRWFPL has  scheduled  construction of WRWF  to  commence  from approximately 

March 2016 with operation of the wind farm due to begin from approximately mid‐2017. 

Associated with  the  construction of  the WRWF, GWI has  identified an opportunity  to  supplement  the 

renewable energy generation from the wind farm with energy produced from a solar farm.  It is indicated 

that wind/solar hybrid renewable energy plants are a relatively new trend internationally and, in Australia 

several  such projects  are  in  the planning/approval  stages. Gullen  Solar  Farm Pty  Ltd, has  submitted  a 

Development Application (DA) for the Gullen Solar Farm that once approved will enable development of a 

wind‐solar hybrid plant at Gullen Range Wind Farm.  The advantage of combining wind and solar generation 

profiles at  the  same  location  is  that  the  combined electricity generation profile  can be maximised. As 

WRWF generates a greater percentage of energy at night and the wind farm substation will have spare 

capacity during day time periods when solar generation capacity is available (refer to Figure 2‐1) the two 

Page 24: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  3   

forms of renewable energy generation are compatible.  This assists in providing the community with a more 

consistent and reliable supply of electricity and a clean alternative to coal‐fired power. 

The WRSF together with the WRWF, would comprise an area referred to as the White Rock Renewable 

Energy Precinct and the Precinct would have a total wind and solar generation capacity of 195 MW.  Whilst 

this would exceed the total capacity for the grid connection (nominally 170MW), modelling demonstrates 

that there is only a small percentage of the time (<2%) that part of the output of the solar farm would be 

constrained by total generation capacity exceeding the connection capacity. 

 

 

Page 25: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")")")

")

")

")

98

65

432

8382

81

80

79

78

7675

73

7271

6968

65

6463

62

61

60

59

55

5453

5251

48

47

44

4140

3938

3736

34

3130

292827

2522

212019

14

13

1110

113112111110

109

7

1

77

58

5756

35

26

15

Jenkins Rd

Kelley

sR

d

I lparran Rd

Kelleys Rd

SpringMountain Rd

GWYDIRHIGHWAY

Maybole Rd

I180 J180

H40

L80L82

L83

I40

F131

N180

N190

F132

M80

N191

M60

E50

K30

E140

N90

O191

P190

Q170

P70

R190

Q81

Q80

Q110

Q70

Q82

J181

L170

L180K170

H140

L100

L90

L70

L71

L101

F120

K51

K50

O190

N100

P170

R121

R130

R120

357500 360000 362500 365000 36750066

9250

066

9500

066

9750

067

0000

067

0250

067

0500

067

0750

0

PROJECT

TITLE

DRAWING No. REV

White Rock Wind Farm and Solar FarmProject LocationsWRWF and WRSF

LEGEND

Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.

Projection: GDA94 MGA56

±0 1,000 2,000500 Metres

Approved

16/02/2016

1:50,000 @ A3

STATUS

DATE

SCALE

WRSOL_OVR_017_6A

J.Gardner

I.Mackey

J.Bembrick

APPROVED

PRODUCED

CHECKED

06A

Wind Farm Project Boundary

Cadastral Boundary

!. Turbine Layout 66

#0 Permanent Met Mast

") WRWF Involved Residence

") WRWF Uninvolved Residence

") WRWF Neighbour Agreement

Existing 132kV Transmission Line

33kV Overhead Line (Proposed)

132kV Overhead Line (Proposed)

Access Tracks (Proposed)

Substation / Switchyard

Wind Farm Facilities (Modified Layout)Operation & Maintenance Facility

Temporary Construction Compound

Laydown Area

Concrete Batching Plant

WR Solar Farm Development AreaSolar Farm - Development Area

Note: All WRWF infrastructure subject to a 100m micrositing allowance under the WRWF Project Approval

Lot 32DP 753319

Lot 27DP 753319

Lot 30DP 753319

Lot 78DP 753260

Lot 31DP 753319

Lot 29DP 753319

Figure 1.1 WRSF Project Area in relation to WRWF Project boundary

Page 26: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  5   

 

1.5 THE WRSF PROPONENT 

The proponent for the WRSF Project  is WRSFPL. WRSFPL  is ultimately owned by Goldwind  International 

(GWI); an  international, multi‐faceted wind power company.   Based  in China, GWI  is a global  leader  in 

manufacturing wind  turbine generators and  in providing  comprehensive wind power  solutions. Within 

Australia, Goldwind is involved with the sales of Goldwind turbines and the development of wind and solar 

projects. 

Since establishment in Australia in 2009, Goldwind has developed and now operates: 

Mortons Lane Wind Farm (VIC), 13 turbines, generating capacity up to 19.5 MW of electricity. 

Gullen Range Wind Farm (NSW), 73 turbines, generating capacity up to 165.5MW of electricity.  

WRWF  is  Goldwind’s  third  Australian  wind  farm  development  and,  it’s  second  in  NSW.  In  addition, 

Goldwind has now progressed planning of two solar projects, Gullen Solar Farm (11MW) and White Rock 

Solar Farm (20 MW). 

1.6 ARENA ADVANCING RENEWABLES PROGRAM 

ARENA is the Australian Renewable Energy Agency, a commercially oriented government agency.  It was 

established on 1 July 2012 by the Australian Renewable Energy Agency Act 2011. 

ARENA has two objectives: 

To improve the competitiveness of renewable energy technologies. 

To increase the supply of renewable energy in Australia. 

ARENA’s  timeframe  for delivering  its objectives  is 2022, with  an  intent  to provide  competitive energy 

solutions up to 2030‐40.   

ARENA has approximately $2.5 billion in funding, which is legislated and extends until 2022.  ARENA funds 

activities  that are expected  to advance  renewable energy  technologies  towards  commercial  readiness, 

improve business models or reduce overall industry costs.   

Goldwind  Australia  has  been  invited  to  submit  an  application  for  the WRSF  Project  to  ARENA  in  the 

competitive round of the Large Scale Photovoltaics (PV).  ARENA has allocated $100 million in funding to 

support large‐scale solar PV projects selected through the round.  Twenty two high merit projects including 

WRSF have been short‐listed to submit full applications for this funding by 15 June 2016.  Individual projects 

cannot seek more than $30 million in funding.  

   

Page 27: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  6   

2 NEED AND JUSTIFICATION OF THE PROJECT 

2.1 CLIMATE CHANGE AND RENEWABLE ENERGY 

There is substantial scientific evidence that the Earth’s climate is changing. Some impacts of this are already 

being observed (increases in air and ocean temperatures, widespread melting of snow and ice and rising 

sea levels) with other indicators including altered rainfall patterns and more frequent or intense weather 

patterns such as heatwaves, drought, and storms (DCCEE 2010).  Climate change impacts in Australia are 

anticipated  to  affect water  supply  and quality,  ecosystems  and  conservation,  agriculture  and  forestry, 

fisheries,  settlements and  industry and human health, while  trade and  commodity prices may also be 

impacted by the global impacts of climate change (DCCEE 2010). 

Natural and anthropogenic substances and processes that alter the Earth’s energy budget are drivers of 

climate change.  These drivers have been studied in detail for many years.  Radiative forcing quantifies the 

change in energy fluxes caused by changes in these drivers for 2011 relative to 1750.  The significance of 

1750 is that it represents the commencement of the Industrial Age and utilisation of hydrocarbon fuels to 

support development and modern lifestyles.  

The 5th Assessment Report (AR5) of the Intergovernmental Panel on Climate Change (IPCC), Working Group 

1 (WG1), Summary for Policy Makers (SPM), concluded that:  

“The largest contribution to total radiative forcing is caused by the increase in atmospheric concentration 

of carbon dioxide since 1750” (IPCC 2013).  

The AR5 WG1 SPM 2013 further concluded that:  

“Continued emissions of greenhouse gases will cause further warming and changes  in all components of 

the climate system. Limiting climate change will require substantial and sustained reductions of greenhouse 

gas emissions”; and 

“Cumulative emissions of CO2 largely determine global mean surface warming by the late 21st century and 

beyond. Most aspects of climate change will persist for many centuries even if emissions of CO2 are stopped. 

This represents a substantial multi‐century climate change commitment created by past, present and future 

emissions of CO2.” 

Most people that take the time to review the material presented  in AR5, WG1 SPM will appreciate the 

need for a response to anthropogenic climate changes.  There is a range of responses to Climate Change 

that are complementary and are  likely to be needed together to achieve effective mitigation of climate 

change trends and effects.  One important measure is the transition to less carbon intensive generation 

technologies  that  will  reduce  emissions  intensity  and  growth  in  CO2  emissions.    Renewable  energy 

technologies such as wind, solar, hydro that have very low CO2 emissions are crucial to efforts to redress 

the current adverse changes.  The significant global increase in take‐up of renewable energy technologies 

is testimony to the importance of these forms of energy generation. 

 

 

 

Page 28: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  7   

2.1.1 Greenhouse gas emission benefits – electricity generation 

The quarterly update of the National Greenhouse Gas Inventory (Department of Environment 2014), states 

that energy generation is the largest individual contributor of GHG emissions in Australia, accounting for 

32% of emissions  in  the year  to March 2014.   Thus,  there  is an  important  role  for  the development of 

renewable  energy  generation  projects  in  lowering  electricity  generation’s  contribution  to  national 

emissions intensity, and as a result, combating climate change.  

Reducing GHG emissions globally is likely to be able to reduce the rate and magnitude of climate change.  

The WRSF Project would produce an estimated 20 MW per year of renewable electricity that would assist 

in meeting the LRET and providing a GHG emission‐free source of electricity to the Australian electricity 

grid.   Where  renewable energy  supplies displace  carbon based electricity generation  then  it  results  in 

greenhouse gas emissions savings, providing added benefit of renewable energy technology. 

2.1.2 Greenhouse gas emission benefits ‐ life cycle analysis 

Life cycle emissions take into account emissions produced during the manufacture, construction, operation 

and decommissioning of,  in this case, electricity generation technologies. When compared with existing 

conventional fossil‐fuel based electricity generation, solar PV technology generates far less life‐cycle GHG 

emissions per GWh than conventional fossil‐fuel‐based electricity generation technologies (Fthenakis et al 

2008).   

Unlike fossil fuel systems, most of the GHG emissions for solar technology occur upstream of the lifecycle, 

with the majority of the emissions  (50‐80%) arising during the production of the module  (Weisser n.d).  

Other lifecycle emissions relate to construction and decommissioning activities.  During plant operation, 

the production of electricity with photovoltaic modules emits no pollution, produces no GHGs, and uses no 

finite  fossil‐fuel  resources.    Support  activities,  such  as  maintenance  works,  may  however  generate 

emissions but  the amount would be  regarded as being very  low.   End of  life and associated  transport 

activities do not result in meaningful cumulative GHG emissions (Weisser n.d).    

Emissions  from conventional  fossil  fuel based energy generation can therefore be avoided by replacing 

conventional methods of fossil fuel energy generation with solar PV energy generation.  The WRSF Project 

is expected to supply on average approximately 41,000 MWh of electricity per year over a 25 year operating 

period with an energy payback period of 2 years1.   Approximately 36,900 tonnes of CO2 equivalent per 

annum would be avoided while the WRSF Project is operational, when compared to fossil‐fuel based energy 

generation.2  

 

                                                              

1 Data sourced from U.S. Department of Energy, Energy Efficiency and Renewable Energy, PV Faqs datasheet, dated January 2004. This correlates with a more recent research paper produced by M.J. de Wild‐Scholten titled ‘Energy payback time and carbon footprint of commercial photovoltaic systems’, dated December 2013, and found in Volume 119 of Solar Energy Materials and Solar Cells. 

2 Based on a CO2 equivalent intensity factor of 0.9 (AEMO 2016). 

Page 29: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  8   

2.2 ENERGY CONTEXT IN AUSTRALIA AND NSW 

2.2.1 Electricity generation in NSW 

Electricity in NSW is generated from a range of fuel sources, including black coal, natural gas, coal seam 

methane gas and to a lesser extent from renewable energy sources such as hydro, wind, biomass and solar 

(NSW T&I 2015). 

NSW  has  over  18,000 MW  of  installed  electricity  generation  capacity.    Table  2‐1  shows  the  installed 

capacity of power stations with greater than 30MW capacity, relative to the fuel used by the power station. 

Interconnectors with Queensland and Victoria provide additional capacity of about 1,100 MW and 1,500 

MW respectively.  

Table 2‐1  Existing major power station capacity by technology in NSW. 

Technology and energy source  Capacity (MW) 

Fossil fuel technologies 

Steam/Coal  10,760   

 

 

12,860 

Open Cycle Gas Turbine  1,388 

Combined Cycle Gas Turbine  460 

Diesel  156 

Coal Seam Methane  96 

Renewable energy sources 

Hydro  4510   

 

5,390 Wind  657 

Solar  155 

Bagasse  68 

Total  18,250 

Note: Table only includes major power stations with capacities over 30 MW. 

Source: Modified from NSW T&I 2015 

In addition to the installed capacity described above, there are over 17,500 MW of power plant proposals 

in NSW  (including  over  8,500 MW  from  renewable  sources)  at  various  phases  of  development,  from 

concept to construction.  

2.2.2 National Electricity Market 

The National Electricity Market (NEM), Australia’s wholesale electricity market for the supply of electricity 

to retailers and end‐users, has operations in five interconnected regions – Queensland, New South Wales 

and the Australian Capital Territory, Victoria, South Australia and Tasmania.  The independent Australian 

Energy Market Operator  (AEMO) manages operation of  the NEM. AEMO published  the 2015 National 

Electricity Forecasting Report (NEFR) in June 2015.  

The NEFR provides AEMO’s independent electricity consumption and maximum demand forecasts for the 

NEM and each of  the  five  regions over a 20 year outlook period.   For NSW, AEMO  (2015)  forecasts a 

recovery  in operational consumption  in the short term driven by the residential and commercial sector, 

Page 30: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  9   

which represents the largest proportion of the total state load.  Medium and long term forecasts indicate 

a stronger  recovery  in operational consumption, again driven by  the  residential and commercial sector 

(refer Table 2‐2).  For 2015 reporting period, NSW is the only NEM region to have a slight increase in the 

per capita consumption, thought to be driven by a relative fall in electricity prices and increase in average 

income.   

Table 2‐2  Operational consumption over the short, medium and long term in NSW  

Timeframe  Forecast (GWh)  Average annual change 

Short term 

(2014‐15 to 2017‐18) 

66,935 to 68,151  0.6% 

Medium term 

(2017‐18 to 2024‐25) 

68,151 to 73,878  1.2% 

Long term 

(2024‐25 to 2034‐35) 

73,878 to 84,030  1.3% 

Source: AEMO 2015  

While operational consumption in NSW is predicted to rise, the AEMO medium term outlook for NSW (as 

of 19/01/2016) indicates that the state will not experience a shortfall of electricity over the next couple of 

years.   Growth  in generation  from  renewable energy  sources  is, however, essential  to meet State and 

Australian Government renewable energy targets (discussed below in Section 2.3.1). 

2.3 STRATEGIC DIRECTION OF THE REGION AND STATE 

Australia is a signatory to various international agreements, conventions and protocols.  Most recently, at 

the Paris climate change conference, Australia committed to reducing its emissions to 26‐28% below 2005 

levels by 2030.  

The  Australian  and NSW Governments  have  each  developed  strategies  and  set  targets  in  relation  to 

renewable energy generation that will assist in meeting energy demand while at the same time reducing 

GHG emissions. Key plans, strategies and  targets, and how  the proposal  relates  to  them, are discussed 

below. 

2.3.1 Australia’s Renewable Energy Target 

In 2001,  the Commonwealth Government  introduced  the Mandatory Renewable Energy Target  (MRET) 

Scheme to increase the amount of renewable energy being used in Australia’s electricity supply.  The initial 

aim was to source two per cent of the nation’s electricity generation from renewable sources.  Compliance 

is demonstrated by surrendering renewable energy certificates (RECs), where one REC is equivalent to one 

additional megawatt‐hour (MWh) of electricity generated from renewable energy sources.   In 2009, the 

MRET was expanded from a target of 9,500 GWh of Australia’s electricity supply produced from renewable 

energy sources in 2010, to a target of 20 per cent of Australia’s electricity supply by 2020, or 45,000 GWh.  

The large increase in the target was expected to accelerate the development and deployment of a broad 

range of renewable energy technologies including solar, biomass and geothermal energy. 

From January 2011, the existing target was divided into two components, separating large and small‐scale 

projects, which combined were expected to exceed the 45,000 GWh target.  At this time, RECs were also 

reclassified  as  either  large‐scale  generation  certificates  (LGCs)  and  small‐scale  technology  certificates 

(STCs).  The  Large‐scale  Renewable  Energy  Target  (LRET)  aims  to  create  a  financial  incentive  for  the 

Page 31: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  10   

establishment and growth of megawatt scale renewable energy power stations, such as wind and solar 

farms, or hydro‐electric power stations through the creation of large‐scale generation certificates. 

In June 2015, the Australian parliament passed the Renewable Energy (Electricity) Amendment Bill 2015.  

As part of the amendment bill, the Large Scale Renewable Energy Target was reduced from 41,000 GWh to 

33,000 GWh  in 2020 with  interim and post 2020 targets adjusted accordingly.   The current projection  is 

that about 23.5% of Australia’s electricity generation in 2020 will be from renewable sources.  

At the commencement of operation, the WRSF Project would produce an estimated 46,000 MWh/year of 

renewable electricity and supply over 1 million MWh over its life.  This would assist Australia to meet the 

LRET and WRSF would constitute approximately 0.18 per cent of the annual LRET target for 2018 (26,031 

GWH) (Clean Energy Regulator 2015), the year it is proposed to become operational, and approximately 

0.14 per cent of the overall LRET target.  This is additional to the renewable energy that would be generated 

by the WRWF. 

2.3.2 NSW 2021: A Plan to Make NSW Number One 

This plan was released in 2011, replacing the State Plan as the NSW Government’s strategic business plan, 

setting priorities for action and guiding resource allocation.  Goal 22 of this plan seeks to protect our natural 

environment, and includes a specific target to increase renewable energy. A commitment is made to: 

Contribute to the national renewable energy target [i.e. 20% renewable energy supply] by promoting 

energy  security  through  a more  diverse  energy mix,  reducing  coal  dependence,  increasing  energy 

efficiency and moving to lower emission energy sources (NSW Government 2011). 

Specific  initiatives under this target that directly support building solar power plants  included the Solar 

Flagships Program, in partnership with the Commonwealth Government, established in 2009 (now closed).  

Additionally,  a  strategic  move  towards  renewable  energy  generation  is  supported  through  the 

establishment of a Joint Industry Government Taskforce to develop a Renewable Energy Action Plan for 

NSW, which would  identify opportunities  for  investment  in  renewable energy sources  (refer  to Section 

2.3.3). 

2.3.3 NSW Renewable Energy Action Plan 

In 2013, the NSW Government released the NSW Renewable Energy Action Plan to guide NSW’s renewable 

energy development (NSW Government 2013).   The Government’s vision  is for a secure, affordable and 

clean energy future for NSW.  

The  Plan  positions  the  state  to  increase  energy  from  renewable  sources,  at  least  cost  to  the  energy 

customer and with maximum benefits to NSW.  The strategy is to work closely with NSW communities and 

the renewable energy industry to increase renewable energy generation in NSW. 

The Plan details three goals and 24 actions to efficiently grow renewable energy generation in NSW: 

1. Attract renewable energy investment and projects. 

2. Build community support for renewable energy. 

3. Attract and grow expertise in renewable energy. 

The plan recognises hybrid systems as being a cost effective way to extend the life of existing infrastructure 

and create a reliable energy supply from a variable energy source.  The NSW Government understands the 

opportunities  available  from  hybrid  systems  and  will  examine  proposals  that  maximise  the  use  of 

renewable resources through integrated energy technologies (NSW Government 2013).  

Page 32: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  11   

2.4 WHITE ROCK SOLAR FARM BENEFITS 

The central objective of the WRSF Project is to generate electricity using solar PV technology.  The WRSF 

Project would form part of a hybrid wind/solar facility and export electricity generated to the grid, using 

infrastructure  to be  constructed  for  the WRWF.   The  solar  infrastructure would be  located within and 

adjacent to the WRWF project area.   The WRSF Project would complement the energy generation from 

WRWF and reduce the variability of output.  This is shown in the indicative average daily generation profile 

in Figure 2‐1.  

 

Figure 2‐1– Indicative profile for average daily wind and solar generation profiles 

This proposed hybrid wind/solar facility would be an important demonstration project.  It would be at the 

forefront of  renewable energy systems  technology  in Australia and demonstrate  the advantages of co‐

locating energy  infrastructure, resulting  in costs savings and reduced environmental  impacts associated 

with the development of a solar farm site.  The WRSF would utilise other infrastructure already in place 

that would be maintained as part of  the WRWF,  including electrical  infrastructure  (substation), access 

tracks,  operation  and  maintenance  building  and  transport  routes.    Subject  to  suitable  contract 

arrangements, the same construction site facilities may be shared with WRWF. However, as this has not 

been confirmed, this EIS identifies separate construction facilities at the WRSF site.  

The WRSF Project would include a Knowledge Sharing Plan (KSP) to capitalise on key lessons learned from 

the WRSF Project. The KSP would be available to industry, education facilities and the general public.  It 

would  include  a website  showing  live  performance  data,  providing  valuable  knowledge  to  the wider 

renewable energy industry.   

During  its operational  life,  the WRSF Project would provide additional work  for a  larger WRWF onsite 

maintenance and operations staff.  The onsite staff would acquire new transferrable skills and experience, 

and there is some potential for further employment for local skilled workers.  

The WRSF also presents an opportunity for a WRWF host landowner to further diversify the income streams 

of  their  property.  Renewable  energy  generation  is  a  ‘drought  proof’  income  stream,  compatible with 

agricultural enterprises. 

Page 33: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  12   

Overall, the expanded renewable energy facility will deliver further economic benefits to the local economy 

during construction and operations. 

The WRSF Project would provide power to supply an estimated 7,200 average NSW homes3 and would 

assist to:  

Reduce GHG emissions and move towards cleaner electricity generation. The WRSF Project would 

avoid the release of approximately 36,900 tonnes of CO2 equivalent per annum, by replacing fossil 

fuel based energy with solar generated energy. 

Utilise  existing  infrastructure  and  thereby  reduce  potential  environmental  impacts  from  new 

infrastructure. 

Maximise renewable electricity generation and supply into the Australian grid. 

Develop the solar power industry and supply chain in Australia.  

Develop Australian  intellectual  property  and  know‐how  in  solar  power  and  hybrid wind/solar 

technology.  

Assist in meeting NSW and Australian Government targets for renewable energy generation and 

reductions in GHG emissions.  

Specific to community benefits, the WRSF Project would: 

Generate approximately 50 Full Time Equivalent (FTE) jobs during construction and a small number 

of additional jobs during operation.  

Provide flow‐on economic benefits to the local area and encourage regional development.  

Diversify the skills and experience of WRWF operations and maintenance staff.  

Maximise the use of local contractors, manufacturing facilities and materials during construction, 

through liaison with local industry representatives. 

   

                                                              

3 Household Energy Consumption Survey, Australia, 2012, found that the average Australian home without solar power used 122.3 kWh of energy per week, totalling 6359.6 kWh annually. The study ‘Electricity Bill Benchmarks’ by ACIL Allen Consulting for the Australian Energy Regulator in 2014 found that the average Australian home used 5915 kWh annually, while the average NSW home used 6,220 kWh.  

Page 34: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  13   

 

2.5 NEED AND JUSTIFICATION 

The WRSF would generate approximately 46 gigawatt hours (AC) or 46,000 megawatt hours of electricity 

in the first year of operation. This  is enough electricity to supply the equivalent of approximately 7,200 

average NSW homes4.  The generation of non‐polluting renewable energy assists with the transition from 

fossil  fuel generated electricity to a cleaner more sustainable alternative  in  line with the Government’s 

Renewable Energy Target. This is in keeping with national and international agreements to which Australia 

is a party. 

The WRSF Project is justified due to its ability to:  

Utilise existing energy  infrastructure to supply additional renewable electricity through a hybrid 

wind/solar facility.  

Generate additional renewable energy at the WRWF location. 

Provide for further reduction in GHG emissions intensity for generation in the NEM. 

Provide  further  investment  in  a  local  community  which  has  previously  shown  support  for 

renewable energy. 

Improves the cost effectiveness of the renewable energy by utilising the wind‐solar hybrid project. 

   

                                                              

4 Refer footnote 3 above. 

Page 35: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  14   

3 ALTERNATIVES CONSIDERED 

During the development of the WRSF, a number of alternative options and infrastructure layouts were 

considered in respect of project objectives and an overview of the considerations are described below.  

Alternatives considered relate to: 

The capacity of the WRSF. 

The selection of the WRSF Development Envelope. 

Alternative infrastructure designs and layout configurations. 

3.1 CAPACITY OF THE WRSF PROJECT 

3.1.1 Option 1: Do nothing 

Under this option, no solar farm development would take place and the opportunity to generate additional 

renewable energy from a hybrid wind/solar system would be lost. 

3.1.2 Option 2: Construct a 20 MW hybrid wind/solar farm 

Under this option, a solar farm capable of generating up to 20 MW of electricity would be constructed.  The 

solar farm would complement the operations of the WRWF (a hybrid wind/solar farm) and would increase 

the amount of renewable energy that could be generated from the WRWF infrastructure.  

3.1.3 Option 3: Construct a larger MW hybrid wind/solar farm (maximum capacity) 

The maximum output of the WRWF grid connection supports about 170 MW of generation capacity.  The 

WRSF  and  the WRWF  together  constitute  about  195 MW  of  generating  capacity, which  exceeds  the 

maximum possible output.  However, due to different generation profiles, the combined generation only 

exceeds the maximum for less than 2% of the time.  Installation of additional solar farm generating capacity 

would  result  in  increased  time when  the maximum  output  is  exceeded  and where  output  cannot  be 

exported.  As a result, the value in increasing the scale of the solar farm development is reduced.  

3.1.4 Analysis of WRSF Project capacity options 

Option 1, not constructing a solar farm, would be the cheapest option for WRSFPL and would not cause 

any of the potential environmental  impacts that would generally result from a solar farm development.  

The option would not however, capitalise on the opportunity to produce additional renewable energy from 

infrastructure that will be constructed for the WRWF.  The consequences of not proceeding with the WRSF 

would not meet the objectives of the WRSF Project, resulting in:   

Loss  of  opportunity  to  reduce GHG  emissions  intensity  and move  towards  cleaner  electricity 

generation. 

Loss of additional renewable energy sourced electricity generation and supply into the Australian 

grid. 

Loss of opportunity to increase the utilisation of the existing wind farm grid connection. 

Loss of  social and economic benefits  through  the provision of direct and  indirect employment 

opportunities locally and regionally during construction and operation of the solar farm. 

Page 36: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  15   

Doing  nothing  would  avoid  potential  environmental  impacts  associated  with  the  development  and 

operation of the proposed solar farm, which include temporary construction noise, traffic and dust, visual 

impacts and a reduction in agricultural production at the site.  However, there is likely to be an increased 

adoption  of megawatt  scale  renewable  energy  at  other  locations,  perhaps without  the  benefit  of  co‐

locating with wind energy facilities and sharing infrastructure.  Potential environmental impacts have been 

assessed in this EIS, are considered to be manageable and would not result in a significant impact to the 

environment.  As such, and given the benefits of the WRSF Project, the do nothing option is not considered 

to be a preferred option.  Doing nothing does not assist in meeting the WRSF Project’s primary objective 

which is to generate renewable energy using solar PV technology. 

Option 2 would generate up to approximately 20 MW of renewable energy that can be exported to the 

grid  using  the WRWF  infrastructure.    The  sizing  of  the WRSF  Project  is  slightly more  than  could  be 

accommodated by the shared grid connection  facilities but  is seen as appropriate based on the energy 

generation profiles for the wind and solar components and considering the available sites and potential 

impacts. This option would meet the WRSF Project’s objectives.   

Option 3.  Development of a larger solar farm was considered during the early planning stages and would 

also meet the WRSF Project’s objectives.  A larger system would maximise the total amount of electricity 

that would be produced at the site.  However, a larger system would increase the percentage of time that 

the combined wind/solar facility would exceed grid connection capacity and would waste the additional 

power created by the solar farm.  As such, the larger system would not be as efficient financially or in its 

use of land during the development and operation of the solar farm, in comparison to the smaller 20 MW 

site at this time.   The construction of a solar farm with a  larger generating capacity does not match the 

energy generation profiles for wind and solar components at the site. 

3.1.5 Preferred capacity option 

Option 2  is  the preferred  capacity option  as  it  is  the only option  that  fully meets  the WRSF Project’s 

objectives.  The proposed size is considered optimal for the co‐location with WRWF and in respect of its 

ability to be integrated at the locality.  Environmental impacts resulting from the WRSF Project would be 

addressed  by  the  appropriate  use  of  environmental  safeguards.    Both  environmental  impacts  and 

safeguards are identified in this EIS.  

3.2 ALTERNATIVE LOCATIONS 

Five locations within and adjacent to the WRWF were considered for the development of a solar facility in 

conjunction with the WRWF. Figure 3‐1 shows the geographic relationships of the potential Development 

Envelopes to WRWF and the WRWF Stage 1 infrastructure.  

Site  suitability  for  the  WRSF  has  been  considered  based  on  the  following  technical  aspects  and 

environmental objectives: 

Technical / Commercial aspects 

Ability to connect to the proposed WRWF substation. 

The project area is available for the solar farm purpose (can be leased or acquired). 

Land has a suitable slope, aspect and ground conditions for construction and operation. 

Access to transport network will enable delivery of components and materials. 

The project area has sufficient space to enable up to approximately 20 MW of solar capacity.  

Page 37: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  16   

Environmental aspect objectives 

Achieve a low visual impact. 

Minimise and as necessary offset any significant adverse impact to biodiversity. 

Minimise and manage any significant adverse impact on known heritage items and sites. 

Minimise land use conflicts (e.g. minimise loss of agricultural land or impact on neighbours). 

Minimise any significant adverse impact on rural residence locations. 

3.2.1 Option 1: Development Site 1 

Development Site 1 is 53.9 ha and is located at the western end of Kelleys Road within Inverell LGA.  The 

site is located on a neighbouring property to the WRWF site and is 7 km from the WRWF substation.  

Site 1 would be accessed via the public road network and the internal tracks of the WRWF site, specifically 

the track to be constructed between wind turbine 48 and wind turbine 109.  The site is currently used for 

sheep and  cattle grazing and  is mapped as Strategic Agricultural  Land; highly productive  land  that has 

unique natural resource characteristics or socio‐economic values (DP&E 2016, refer to Section 6.5.2).  A 

large portion of the area has been cleared and was previously cropped, predominately for carrots and peas.  

Parts of Site 1 have conservation significant vegetation that would either form a constraint or, if cleared, 

would be likely to require biodiversity offsets.  

3.2.2 Option 2: Development Site 2 

Development Site 2 is 42.8 ha and is located on the same property as Development Site 1.  The site would 

be accessed via the same transport routes as Development Site 1.  The site is currently used for sheep and 

cattle grazing and has been previously cleared for cropping.  It is also mapped as Strategic Agricultural Land 

and is approximately 6 km from the WRWF substation. 

3.2.3 Option 3: Development Site 3 

This area is 34.4 ha and is located to the east of Development Sites 1 and 2, on a different property.  The 

property  is a host  landowner of  the WRWF supporting Stage 1 wind  turbines 109, 110, 111, 112, 113, 

associated access tracks and the 33 kV collection circuit.  The property is 7 km from the WRWF substation.  

The development site would be accessed at the western end of Kelley’s Road using the  internal WRWF 

access tracks.  The site is currently used for sheep and cattle grazing and has a history of cropping, including 

peas, carrots, canola and lucerne.  It is located within land that is mapped as Strategic Agricultural Land. 

Subsequent discussion with  the  landowner has  resulted  in  the  location being withdrawn  from  further 

consideration. 

3.2.4 Option 4: Development Site 4 

Development Site 4  is 199.9 ha and  is owned by WRWFPL.   The  site  is  located 2 km  from  the WRWF 

substation.  Access to the site would be via Spring Mountain Road, a public road within the Inverell Shire 

Council.  The land is currently grazed but has a high proportion of woodland vegetation and large areas of 

Endangered Ecological Communities.   

Page 38: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  17   

3.2.5 Option 5: Development Site 5 

Development Site 5  is 149.7 ha and  is  located within a single property predominantly  in the Glen  Innes 

Severn LGA but with a small part of the potential Development Envelope within Inverell LGA.  The property 

is a host  landowner of  the WRWF, supporting wind  turbines 1 and 2,  the operations and maintenance 

facility, temporary construction site compound and the concrete batching plant, associated access tracks 

and the 33 kV connection route.  The site is 8 km from the WRWF substation. 

Development site 5 would be accessed by the Gwydir Highway and internal access tracks of the WRWF.  

The site is currently used for cattle grazing and has been previously cultivated.  Crops include soybeans, 

corn and triticale.  A large portion of the site is mapped as Strategic Agricultural Land. 

3.2.6 Analysis of solar farm location options 

A preliminary assessment of the five potential solar farm development sites was undertaken as part of a 

scoping report prepared in January 2016.  The assessment was based on a desktop assessment, information 

known through the WRWF planning studies and preliminary site visits.  A summary of the relative merits 

and anticipated environmental and social impacts of each site is provided in Table 3.1. 

During  the early planning stages, Development Site 4 was  the  favoured  location  for  the WRSF Project.  

Benefits  of  Development  Site  4  include  ownership  by  WRWFPL  and  close  proximity  to  the  WRWF 

substation, potentially reducing costs associated with cabling and connection.  However, the site contains 

a  substantive  area  of  vegetation  of  conservation  significance,  some  of which may  require  clearing  to 

accommodate the WRSF development.   It  is also  likely that significant upgrades would be required on a 

public  road  (Spring Mountain  Road  in  Inverell  Shire)  to  access  the  site  during  the  construction  and 

operation  phases  of  the  WRSF.    Given  these  biodiversity  and  access  constraints,  the  suitability  of 

Development Site 4 is reduced.  The site has at this stage been discounted as a potential solar farm site and 

is not currently proposed for development of the WRSF or considered further in this EIS. 

Development Site 3 comprises mostly exotic pasture and planted windbreaks comprising pines and some 

eucalypts.   The preliminary assessment  identified the area as having a  low biodiversity value.   Potential 

visual impacts are considered to be low and there are few sensitive receivers in proximity to the site.  The 

site is generally flat and would be suitable for a solar farm development.  Development Site 3 was however, 

discounted  as  a  potential  solar  farm  site  following  the  site  inspection  and  subsequent  landowner 

negotiations.  The site is not considered further in this EIS. 

Development Sites 1 and 2 are owned by the same landowner.  Both areas have an agricultural history of 

grazing and cultivation.   Potential visual  impacts are considered  to be  low and  there are  few sensitive 

receivers in close proximity to the site.  Topography within Development Site 1 is undulating but would not 

constrain the development of a solar farm.  The preliminary assessment identified the areas as having a 

moderate to  low biodiversity value however, parts do  include conservation significant vegetation. Both 

sites were included in all environmental assessments that were undertaken for the WRSF Project.  Sites 1 

and 2 were discounted  later  in the planning stages due to a combination of biodiversity constraints and 

landowner negotiations. The sites are not considered further in this EIS.   

 

   

Page 39: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")")")

")

")

98

65

432

8382

81

80

79

78

7675

73

7271

6968

65

6463

62

61

60

59

5554

5352

51

48

47

44

4140

3938

3736

34

3130

292827

2522

212019

14

13

1110

113112111110

109

7

1

77

58

5756

35

26

15

Jenkins Rd

Kelley

sR

d

I lparran Rd

Kelleys Rd

SpringMountain Rd

GWYDIRHIGHWAY

Maybole Rd

I180 J180

H40

L80L82

L83

I40

F131

L200

N180

N190

F132

M80

N191

M60

E50

E140

N90

D121

O191

P190

Q170

P70

R190

Q81

Q80

Q110

Q70

Q82

J181

L170

L180K170

H140

L100

L90

L70

L71

L101

F120

K51

K50

O190

N100

P170

R121

R120

357500 360000 362500 365000 36750066

9250

066

9500

066

9750

067

0000

067

0250

067

0500

067

0750

0

PROJECT

TITLE

DRAWING No. REV

White Rock Wind Farm and Solar Farm SitesProject Locations

WRWF and WRSF Site Options

LEGEND

Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.

Projection: GDA94 MGA56

±0 1,000 2,000500 Metres

Approved

5/01/2016

1:50,000 @ A3

STATUS

DATE

SCALE

WRSOL_OVR_017_5A

J.Gardner

I.Mackey

J.Bembrick

APPROVED

PRODUCED

CHECKED

05A

Wind Farm Project Boundary

Lot 99/DP753292

Lot 154/DP753260

Cadastral Boundary

!. Turbine Layout 66

#0 Permanent Met Mast

") WRWF Involved Residence

") WRWF Uninvolved Residence

") WRWF Neighbour Agreement

Existing 132kV Transmission Line

33kV Overhead Line (Proposed)

132kV Overhead Line (Proposed)

Access Tracks (Proposed)

Substation / Switchyard

Wind Farm Facilities (Modified Layout)Operation & Maintenance Facility

Temporary Construction Compound

Laydown Area

Concrete Batching Plant

WR Solar Farm Development Area OptionsSolar Farm - Development Area 1

Solar Farm - Development Area 2

Solar Farm - Development Area 3

Potential Cabling and Access Tracks

Solar Farm - Development Area 4

Solar Farm - Development Area 5

Note: All WRWF infrastructure subject to a 100m micrositing allowance under the WRWF Project Approval

Lot 99DP 753292

Lot 154DP 753260

T1

T2

T3

T4

T5

Lot 77DP 753292

Lot 32DP 753319

Lot 27DP 753319

Lot 30DP 753319

Lot 78DP 753260

Lot 31DP 753319

Lot 29DP 753319

Figure 3-1 Five alternative development sites in relation to WRWF

Page 40: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  19   

Table 3‐1 Review of indicative siting factors for the five potential WRSF sites 

Site  Distance of site to WRWF Substation 

Landowner association status 

Key environmental issues and potential WRSF impacts   

Biodiversity  Agriculture  Heritage  Visual  Noise  Access/Traffic Summary  of site suitability 

1  7 km  WRWF Neighbour, associated 

Moderate to Low 

Good grazing 

Strategic Agricultural Land (SAL) 

Low to moderate 

Low   

 

 

Need to 

assess 

cumulative 

impact at up 

to 4 

residences 

 

Direct access from Kelleys Rd 

Suitable but insufficient area alone and moderate biodiversity values 

2  6km  WRWF Neighbour, associated 

Low to Moderate 

Good grazing 

SAL 

Low   Low  Direct access from Kelleys Rd 

Suitable but insufficient area alone 

3  7km  WRWF  

Host landowner 

Low  Cultivated and 

grazed 

SAL 

Low  Low  Direct access from Kelleys Rd 

Not available as landowner has withdrawn 

4  2km  

Closest to the substation 

Acquired by WRWFPL 

Moderate to High 

Grazing  Moderate potential 

Low  Low  Spring Mtn Road access, possible upgrade required. 

Least suitable due to biodiversity impacts 

5  8 km  

Furthest from the substation 

Host for WRWF 

Low  Cultivated and 

grazed 

SAL 

Low  Low, 

Partly visible from Gwydir Hwy 

Need to assess cumulative impact at up to 2 residences 

Direct access from WRWF track network 

Preferred site with low impact and least cost option 

Page 41: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  20   

Development Site 5 is the most distant site from the substation at 8 km however, is located close to the 

Gwydir Highway, WRWF Operations  and Maintenance building  and wind  turbine 1.   The property has 

pastoral uses  including cultivation and grazing and the WRSF Project would  likely have a  low  impact on 

biodiversity.    Initial  review  concluded  the development  site would be visible  from parts of  the Gwydir 

Highway (filtered by roadside vegetation and terrain) affording short term glimpses of the WRSF Project.  

There are sensitive receivers (residences) within approximately 2 km of the area however, the residences 

were anticipated not to have direct views to Development Site 5.  The site is gently sloping and open and 

would be suitable for a solar farm development. 

3.2.7 Preferred location option 

The construction of a 20 MW  (AC)  solar  farm within Development Site 5  is  identified as  the preferred 

location option for the WRSF Project.   The preferred  location has been selected based on the following 

factors:  

Outcomes of negotiated landowner agreements. 

Development feasibility. 

Site development costs. 

Environmental assessment ‐ environmental constraints, impacts and mitigation measures as 

described in this EIS. 

Development  Site  5  is  the  only  site  assessed  further  in  this  EIS.  Subsequently  referred  to  as WRSF 

Development Envelope. 

3.3 ALTERNATIVE INFRASTRUCTURE DESIGN AND LAYOUTS  

The design has considered various placement of blocks of solar panels within the site constraints, use of 

fixed and tracking systems for solar panels, various sizes of inverters, solar farm footprint and landowner 

preferences. 

3.3.1 Option 1 

A conceptual 20 MW (AC)  layout design provides a simple cost effective technology.   This design option 

indicatively involves typically eight Power Conversion Blocks (PCBs) and eight groups of solar arrays utilising 

a  fixed  solar  panel  array.  The  total  area  for  the  solar  farm  for  this  option  is  approximately  50  ha.  A 

construction site office and laydown area is located at the solar farm site. Operations and Maintenance is 

based at the WRWF O&M facility. 

3.3.2 Option 2 

A conceptual 20 MW (AC) layout incorporating tracking systems for mounting of the solar panels. Similar 

to Option 1, the design could involve eight groups of solar panels and typically eight PCBs.  The total area 

of the solar farm with tracking systems may increase to 70 to 80 ha.  The design would increase the power 

output  from  the  solar  farm but  involves  increased  complexity  and  increased  costs  for  installation  and 

operations and maintenance. 

Page 42: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  21   

3.3.3 Analysis of Infrastructure and Layout Options 

The benefits of Option 1 are that it is a compact installation that is relatively straightforward to install and 

maintain and has been assessed as cost effective for a solar farm of this capacity. The design is consistent 

with  the WRSF  Project  description  that was  included  in  the ARENA  funding  submission  and  that was 

provided to the noise and environmental consultants.   

The compact design for Option 1 has been determined as the optimal arrangement for a cost competitive 

solar array that can integrate with WRWF to provide a hybrid wind/solar facility.   The design for Option 1 

can be accommodated within site constraints and meets the landowner’s request for a corridor to be left 

for stock to cross from east to west and avoids an area to the east that is considered by the landowner to 

be of higher agricultural value.   

Option  2  offers  a  benefit  of  increased  renewable  energy  output  over  the  day, marginally  increasing 

generation earlier and later in the day. However, the additional complexity for design and for operational 

maintenance  increases the cost. Compared to returns  from the additional power produced, the cost of 

power  is  increased  under  this  option  and  renders  Option  2  less  competitive  for  the  ARENA  funding 

submission. 

3.3.4 Preferred infrastructure layout option 

Option 1 is the preferred option.  The indicative design is consistent with the ARENA funding submission, 

has a smaller environmental and agricultural footprint, while retaining some flexibility, and minimises the 

impact on higher value agricultural land.   

Subject to gaining development consent, the final layout and solar farm design would be outlined in the 

WRSF Construction Environmental Management Plan which would be prepared prior to construction. 

3.4 SUMMARY OF ANALYSIS OF PROJECT OPTIONS  

The proposed WRSF  involves a fixed panel PV solar farm, of up to approximately 20 MW (AC) capacity, 

located to the northeast of turbine 1 of WRWF. The WRSF indicative design comprises eight groups of solar 

panels with each group having a PCB comprising inverters, step‐up transformer and switchgear.  

The solar farm output would utilise an underground 33 kV cable between the solar farm and the WRWF 

substation.  The  cable  route would  run  generally  from  the  southern part of  the WRSF  to  a point near 

Turbines 1 and 2 and  then  follow  the WRWF 33 kV  cable  corridor  to  the WRWF  Substation.  Separate 

communications cabling from WRSF would follow the 33 kV cable route to a point where  it would align 

with  the WRWF  communications  cables  from Wind  Turbine  1  to  the  nearby WRWF  Operations  and 

Maintenance Building that will be used for both the WRWF and WRSF Projects.    

Page 43: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  22   

4 DESCRIPTION OF THE PROJECT 

4.1 TERMINOLOGY 

WRSF Project  

 

 

                          WRSF 

 

 

 

 

WRSF Shared 

Infrastructure 

The WRSF Project comprises: 

The infrastructure for the White Rock Solar Farm located within 

the WRSF  Development  Envelope  (refer  “WRSF  Development 

Envelope”  below)  but  excludes  any  “Approved  WRWF 

Infrastructure”  being  White  Rock  Wind  Farm  infrastructure 

approved under  the Part 3A Project Approval  (MP10_0160, as 

modified) (“WRSF ”).  The WRSF is the subject of this EIS and the 

Development Application SSD 16_7487; and 

Approved WRWF Infrastructure that is proposed to be shared by 

the White Rock Wind Farm and White Rock Solar Farm (“WRSF 

Shared Infrastructure”) for the purposes of enabling the export 

of the electricity generated by the White Rock Solar Farm. The 

WRWF  Infrastructure  is  approved  under  the  Part  3A  Project 

Approval (MP10_0160, as modified). A modification application 

currently being assessed by the DP&E seeks further approval for 

the WRSF Shared Infrastructure. 

WRSF Development 

Envelope 

The WRSF Development Envelope is approximately 150 ha and includes 

the solar array, power conversion blocks, fencing, temporary construction 

facilities,  permanent  storage  shed,  solar monitoring  equipment, WRSF 

access tracks and WRSF 33kV underground cabling to connect WRSF to 

the WRWF collection circuits.  

The WRSF Development Envelope  is  the area assessed  in  this EIS and, 

within which WRSF Infrastructure would be located. It is a larger area than 

the  WRSF  Development  Footprint  to  allow  some  design  flexibility 

regarding the final infrastructure placement. 

WRSF Development 

Footprint 

 

               Solar infrastructure 

 

 

                     Solar ancillaries 

The  WRSF  Development  Footprint  is  a  sub‐area  of  the  WRSF 

Development Envelope which  is proposed  to be approximately 50ha  in 

size and includes:   

indicative  groups  of  solar  panels  and  power  conversion 

equipment as shown  in Figure 4‐1 within the area bounded by 

the “Development Footprint fence” (shown in yellow); and 

 

the  “WRSF access  track” and  the  “Indicative WRSF 33kV  cable 

route”    or  “Alternative WRSF  33kV  cable  route”  as  shown  in 

Figure 4‐1. 

 

Page 44: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  23   

4.2 PROJECT OVERVIEW 

The WRSF would be a PV solar farm facility generating up to approximately 20 MW (AC) from solar panels 

collectively rated at up to approximately 25 MW (DC).  The WRSF would generally comprise the following 

components: 

Solar panel arrays:  

o Approximately 75,000 polycrystalline panels. 

Mounting framework: 

o The solar panels would be secured on a galvanised steel structure that consists of a frame 

secured to posts that have been piled into the ground. 

o In the unlikely event that the posts cannot be piled into the ground, a ballasted solution 

may be investigated. 

o A fixed panel arrangement to enable panels at a tilt of between 15 and 30 degrees to the 

horizontal to optimise solar incidence and achieve optimum efficiency.   

Internal DC wiring between panels and inverter systems within groups of panels. 

Connection of groups of panels to Power Conversion Blocks  (PCBs) within the area of the solar 

arrays. 

Typically eight PCBs with a total output up to approximately 20 MW (AC) including: 

o Inverter modules (container based modules) of the order of 1 to 2.75 MW. 

o Typically eight step‐up transformers to 33 kV (one transformer per PCB). 

o 33 kV Switchgear at each PCB. 

33 kV cabling to link the solar farm output to the WRWF collections circuits near Turbine 1 or 2.  

Access tracks for access to the site during construction and to the PCBs during operation. 

Fencing around the solar farm for security and safety. 

Monitoring equipment. 

Small permanent site building (12 m by 12 m in area). 

Potential WRSF site screening for WRSF Development Footprint, dependent on final design and 

need for screening. 

Temporary construction facilities and laydown area. 

An indicative layout (WRSF Development Footprint) within the WRSF Development Envelope is shown in 

Figure 4.1.   The  indicative  layout (which  is subject to detailed design)  is based on 2.5 MW (AC)  inverter 

units and eight modules of solar panels and typically eight PCBs. The layout also shows the approximate 

location of key project elements and  infrastructure approved by the WRWF project approval within the 

Development Envelope, including WRSF Shared Infrastructure. 

The  indicative WRSF   design  (based on a  fixed  frame arrangement of panels) has an annual generation 

capacity of up to approximately 46,000 MWh at start of operation.  Over a 25 year operating life this would 

be reduced to approximately 80%.  On average over 25 years, the average output would be approximately 

41,000 MWh/year.  The cumulative generation over the lifetime of the WRSF will be in excess of 1 million 

MWh. 

 

Page 45: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  24   

 

Figure 4.1   Indicative WRSF layout (subject to detailed design and site constraints).

")

")

")

")

")

")

")

")

!(

!(

78

132

30

3132

27

29

119

7001

26

DP753260

DP753319

DP753319

DP753319DP753319

DP753319

DP753260

DP753319

DP93978

DP665915

2

1

°0 200 400100 Meters

www.nghenvironmen tal.com.au

Ref: 6589 4.1 v7Author: JB

Notes:- Infrastructure data and aer ial courtesyof Goldwind, received 2016

10m contours

Farm dam

Cadastre

Existing 132kV overhead powerline

Proposed solar farm

Development envelope

Solar array

Construction office and laydown area") Power Conversion Blocks

Indicative 33kV cable route

Alternative 33kV cable route

Fence

WRSF access tracks

Wind farm infrastructure!( Wind turbine

Wind farm access track

WRWF 33kV cabling and communications

Proposed 132kV overhead powerline

WRWF facilities

Gwydir Highway

Page 46: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  25   

   

4.3 RELATIONSHIP TO THE WHITE ROCK WIND FARM 

The WRSF is located on land within and adjacent to the WRWF site.  The potential for the WRSF and the 

WRWF  to  share  facilities maximises  the  use  of  available  facilities without  generating  further  impacts 

through the development of similar facilities elsewhere.  It also increases the value of the WRSF Project.  

The WRSF’s output via 33 kV underground  cable aligned with  the WRWF  collections  circuits would be 

exported  through  the WRWF  substation,  located  approximately  eight  kilometres  to  the  south  of  the 

Development Envelope.  The WRWF collector circuits between turbine 1 and the WRWF Substation would 

include an additional 33 kV cable to handle the output of the WRSF generation. The additional cable would 

be within 2m of the WRWF 33 kV cable corridor and within the disturbance corridor that was assessed as 

part of the WRWF Project Approval. There would be no additional increase in environmental impact from 

the installation of this cable.  Existing facilities proposed to be shared between the WRSF Project and the 

WRWF include: 

Connection of WRSF using a 33 kV cable installed within WRWF cable route to WRWF substation. 

33 kV Switchgear for WRSF at WRWF substation within the WRWF switchroom.  

Control and monitoring functions within WRWF Operations and Maintenance facility. 

Access from Gwydir Highway using the upgrade undertaken for WRWF. 

Access  via  internal  access  tracks  constructed  for WRWF  and only 800m of WRSF  access  track 

between WRSF and WRWF access track.  

The  construction  and  operation  of  the WRWF  components  has  been  assessed  for  the WRWF  Project 

Application and approved under Part 3A of  the EP&A Act.   Environmental  impacts associated with  the 

previously assessed and approved WRWF components that would be shared by the WRSF (WRWF Shared 

Infrastructure) are not  included  in this WRSF EIS. Goldwind has requested that DP&E modify the WRWF 

Project Approval MP10_160 to allow for WRWF infrastructure  to be used for the Solar Farm purpose as 

well for WRWF. That request is under review by DP&E. 

In addition to sharing facilities, it is anticipated that some personnel, including operation and maintenance 

technicians, may  carry  out maintenance  for  both  the wind  and  solar  farm.    Control  and monitoring 

equipment at the WRWF Operations and Maintenance building would also be shared. 

4.4 GENERAL SITE DESCRIPTION 

The WRSF is located in the south‐eastern part of the Border Rivers‐Gwydir catchment, an area of 5,000 ha 

that is part of the Murray Darling Basin Area.  The WRSF Development Envelope slopes to the northeast 

towards  Wellingrove  Creek  that  is  within  the  Severn  River  sub‐catchment.  The  Severn  River  is 

approximately 30 kilometres north. There are no major rivers or creeks within the Development Envelope.  

Surface elevations within the WRSF Development Envelope range between 970 m and 1030 m above sea 

level (ASL).  The terrain comprises a ridge line along the western boundary of the Development Envelope 

which slopes into a relatively flat area within the valley floor.  

The  land has been substantially cleared but retains areas of remnant woodland. Settlement  is scattered 

through the locality. 

Page 47: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  26   

4.5 LOCATION OF THE ACTIVITY AND PROPERTY DESCRIPTION 

The WRSF Development  Envelope  is  located  predominantly within  the Glen  Innes  Severn  LGA,  in  the 

Matheson  locality.      It  comprises 149.7 ha,  is on  a  single property,  and  is  located on  land within  and 

adjoining the WRWF project boundary.   

Turbine 1 and 2 of the WRWF and part of the WRWF 33 kV collections circuit are  located  in the south‐

western  corner of  the WRSF Development  Envelope.   Other WRWF  infrastructure  such  as  the WRWF 

Operations and Maintenance Facility, wind turbine 2 and the WRWF access track from Gwydir Highway are 

located within or adjacent to the western boundary of the Development Envelope and within Inverell LGA. 

The Development Envelope  is  from 650m to 1300m south of the Gwydir Highway and at the  indicative 

location, infrastructure would be intermittently visible from part of the Highway due to existing vegetation 

and terrain screening.  

The WRSF can be accessed from the Gwydir Highway using the WRWF access tracks and an additional track 

to be constructed between the WRWF track and the WRSF Development Footprint.  Approximately 200 m 

of the proposed WRSF access track is within the Inverell LGA.  The land within WRSF Development Envelope 

is zoned RU1 under both the Glen Innes Severn and Inverell  LEPs.   

The property details and WRSF Project components  in relation to the WRSF Development Envelope are 

shown in Table 4‐1 and in Figure 4.1.  The land within the WRWF boundary is currently leased from the 

landowner  for  the WRWF purpose.    Similar  leasing arrangements, would be established  for  the WRSF 

Project, be they inside or outside the WRWF boundary.  

Table 4‐1 Property details and project infrastructure of the Development Envelope. 

Infrastructure / works / associated facilities  Lots  DP 

Solar  arrays,  power  conversion  blocks,  internal  access  tracks, underground  cabling,  fencing,  site  buildings.      Direct  access  from WRWF access track network.  

33 kV underground cable to link to WRWF 33 kV collections circuit. 

 

27, 29, 30, 31  753319 

78  753260 

No  above  ground  infrastructure,  possible  33  kV  underground  cabling crossing the crown land and access track consistent with the Crown Land permitted usage. A licence would be sought for any works within Crown Land. 

Crown land – paper road 

The Development Envelope is located on agricultural land that is used for grazing and cropping purposes.  

The  land  is  considered  to be  Strategic Agricultural  Land,  that  is,  land with high quality  soil  and water 

resources  capable  of  sustaining  high  levels  of  productivity  (DP&E  2015,  refer  Section  6.5.2  for more 

information on Strategic Agricultural Land). 

4.6 DESCRIPTION OF PROPOSED WRSF INFRASTRUCTURE  

The key infrastructure components of the WRSF are described below.  Images considered representative 

of the key infrastructure components are provided in Figure 4‐1. 

The  design  intent  is  to  create  a  simple  layout  that  aids  in  construction  and  operation,  particularly  in 

consideration of access through the site to the key electrical equipment.  

Page 48: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  27   

4.6.1 Solar panels and framework  

Solar panels would be installed in arrays with the panels mounted on a metal framework above the ground.  

The metal framework would be hot dip galvanised (or equivalent) to increase the durability and design life 

of the structure.  The front clearance of the framework would be a minimum of 600 mm, while the height 

of the rear of the framework may be up to 3.5 m above ground level.  The panels would be tilted to the 

order of 15 to 30 degrees.  Typically, the dimensions of such panels are approximately 1 m by 2 m and they 

have a 25 year design life. 

The  posts  that  form  part  of  the  framework  will  be  rammed  into  the  ground  to  a  depth  of  up  to 

approximately 2 m.  

The  final  number  and  dimension  of  the  panels  would  be  dependent  on  availability  and  commercial 

considerations at the time of construction.  

4.6.2 Power Conversion Blocks (PCBs) including inverters, step up transformers and 

switchgear 

The  arrays  of  solar  panels would  be  connected  to  inverters  that  convert  the  electricity  from  (DC)  to 

Alternating Current (AC) and step up transformers would increase the WRSF output voltage to 33 kV.  These 

components may have various ratings and design arrangements.  The inverter units are to be in the order 

of  1‐2.75MW  rating.   One  or  two  inverters may  be  co‐located with  a  single  step  up  transformer  and 

switchgear  to  form a Power Conversion Block  (PCB) module  that  inverts DC  to AC and  transforms  the 

electricity to 33 kV for transmission to the substation.  Cooling fans are associated with the inverter units.  

Typically,  the  PCB modules  can  be  delivered  in  container  like  structures  that  allow  efficient modular 

construction of the solar farm.  The output from each of the PCBs would be connected by 33 kV cabling to 

a hub near the southern extent of the solar farm from which a single 33 kV underground cable would carry 

the power  to  the WRWF substation. The 33 kV cable  route would be  toward  the southwest  to a point 

between Turbine 1 and 2.  At that point the WRSF cable will align with the WRWF cable corridor.   

The WRSF Shared Infrastructure that is not assessed in this EIS includes, single 33kV cable to the south of 

the Development Envelope through to the Substation and additional 33 kV switchgear to be installed inside 

the WRWF switchroom. The WRWF substation transformer would step up the voltage from 33 kV to 132 

kV, for connection into the grid.   

4.7 DESCRIPTION OF ASSOCIATED CIVIL WORKS 

4.7.1 Connection to WRWF substation 

The WRSF would be connected to the WRWF substation using a single 33 kV underground cable. The route 

of the additional 33 kV cable would be from the southern part of WRSF generally in a southwest direction 

to a point near Turbine 1 or 2. An indicative route is shown in Figure 4.1 but may be varied to a more direct 

route while still avoiding environmentally sensitive  features such as hollow bearing  trees. As  the cable 

route approaches the WRWF cable corridor between Wind Turbine 1 and the WRWF substation (at a point 

near Turbine 1 or 2) it would align with the WRWF 33 kV cable corridor route.  Only the area where the 

WRSF cable is outside the WRWF cable corridor has been assessed in this EIS. 

No additional cabling routes within the WRWF collection system are required to integrate the WRSF with 

WRWF.  Use of WRWF cabling routes would not require a significant variation to the WRWF infrastructure 

and would not increase impacts of the WRWF.  These works are not assessed in this EIS. 

Page 49: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  28   

Cabling  works  between WRSF  and  the WRWF  Shared  Infrastructure  would  require  trenching  works, 

approximately 1 m deep and 0.75 m wide.  The 33kV cable would be laid on bedding sand and back filled 

with fine materials followed by the subsoil material that would be excavated from the trench and stockpiled 

separately  from  the  topsoil.    At  the  completion  of  the  cable  installation,  the  cable  trench would  be 

backfilled and stabilised using a grass mix appropriate to the area. 

4.7.2 Internal access tracks 

The WRSF Project would require the construction of a new access track from the proposed WRWF main 

access track from the Gwydir Highway to the solar farm site (refer Figure 4.1 for location of WRSF access 

track).  The proposed WRSF access track would be located generally along the northern boundary of the 

Development Envelope.   Approximately 800 m of access  track would be  required.    It would be up  to 5 

metres wide and unsealed.   

Additional access tracks (internal to WRSF) would be constructed to provide access to the solar arrays and 

PCB equipment located within the Development Enevelope.  An indicative location of the tracks is shown 

in Figure 4.1 but would be subject to detailed design considerations.  Access tracks would be unsealed and 

would typically comprise 200‐300mm mm thick crushed rock road base with a 50 mm thick durable layer 

on  top.   Minor  excavation works would  be  required  to  level  tracks  and  undertake  drainage works  as 

necessary. 

4.7.3 Fencing 

The WRSF Development Footprint would be entirely fenced by an approximately 1.8m ‐2.4m high chain 

mesh fence.  The fencing is primarily for the purpose   security and public safety but would also allow for a 

managed grazing regime within the WRSF Development Footprint.  

 

 

Page 50: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  29   

a) Typical Solar array panels.  

b) SMA (example) Inverters.    

c) Example pile driving rig in operation. 

Figure 4‐1 Images representative of proposed WRSF infrastructure components 

   

Page 51: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  30   

4.8 CONSTRUCTION ACTIVITIES 

4.8.1 Pre‐construction activities 

Prior to the site establishment and commencement of the construction activities, there would be a range 

of  site  investigation  activities  undertaken  to  inform  the  design  and  the  planning  of  the  construction 

program. These activities include:  

Site survey to confirm infrastructure positions in relation to site features and environmental 

investigations.  

Geotechnical Investigation for PCB footings and insertion of posts.  

Earthing study. 

Prior to these tasks being undertaken, the consultant or contractor would undertake a risk assessment and 

develop  a  task  specific  environmental management  plan  for  review  and  approval  of WRSFPL.  These 

investigation activities would only commence after the required management plan has been approved by 

WRSFPL  as  suitable  for  the  tasks  to be undertaken,  risks  identified  and  ability  to deliver  the  required 

environmental performance objectives.   

4.8.2 Construction program 

The sequence of the construction program would likely be as follows: 

Detailed design and procurement of materials. 

Site establishment and preparation for construction;  

o Construction of access tracks.  

o Establishment of construction site compound  

Site office. 

Containers for storage of tools and equipment. 

Designated areas for parking of machinery and site vehicles. 

Portable pump out toilet. 

Fencing as necessary. 

o Location and marking of any underground services. 

o Delineation of any stockpile sites. 

o Fencing of any ‘no go’ zones (if applicable). 

Delivery of materials and equipment. 

Ramming of piles into the ground to provide supports for the panel mounting framework. 

Installation of the foundations (excavation and footings) for the PCB. 

Installation of 33 kV underground cabling between the solar arrays and WRWF collection 

circuit. 

Assembly of the panel frames and mounts on top of the piles. 

Installation of the PV panels. 

Installation of the PCBs (inverter, transformer and switchgear units) on concrete pads or 

footings. 

Installation of monitoring equipment. 

Installation of underground 33 kV cabling between the PCBs and WRWF collection circuit.  

Page 52: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  31   

Electrical works to connect the solar farm to the WRWF Substation (these occur within the 

switch room of the substation with no additional visible external substation infrastructure 

required). This item is part of the WRSF Shared Infrastructure. 

Testing and commissioning of the solar farm. 

Removal of temporary construction facilities, tidying of site and completion of restoration 

works. 

Table 4‐2 describes the indicative WRSF construction works that would take place for each infrastructure 

component and civil works.    

Table 4‐2 Key WRSF infrastructure components and associated construction activities 

Component  Construction activities 

Install access tracks   Clear  tracks  up  to  approximately  five metres  wide  including 

drainage. 

Site compound and laydown area  Earthworks  for  office  and  laydown  areas  and  drainage 

structures.   

Solar panel supporting structures  Install posts (pile driven)  

Attach support structures to footings or posts. 

Attach low voltage DC wiring ready for attachment to panels. 

Install solar panels  Mount panels on support structure, attach wiring. 

Power Conversion Blocks 

(Inverters, step up transformers 

and switchgear) 

Earthworks/formwork for footings or pads. 

Footings  installed  for  inverters  and  transformers,  mount 

inverters and transformers on footings. 

Connect DC electrical wiring from solar panels. 

  Install/connect 33 kV cables. 

Connection to WRWF collection 

circuit  

Trenching (disturbance corridor up to approximately ten metres 

wide),  laying  of  33  kV  cable  and  communications  lines  and 

backfill trench.  

Internal access tracks (final form)  Rehabilitation of disturbed areas adjacent to completed tracks 

and complete drainage works. 

Small permanent site building  Concrete footings for 12 m x 12m site building.  

Construct building, for storage of components. 

Rehabilitation of site  Provide stable ground cover across site and flow controls. 

Fencing of WRSF Development 

Footprint 

Excavate and form footings (concrete). 

Install posts and attach mesh. 

   

Page 53: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  32   

4.8.4 Proposed construction equipment 

Proposed construction equipment would include: 

Cable trenching equipment. 

Cable laying equipment. 

Post driving equipment to install posts in ground to depths of about 2m 

Earthmoving equipment such as excavators, bulldozers, pile drivers, backhoes, compactors, 

rollers and graders. 

Trucks for delivery of solar farm components. 

Materials handling equipment such as small cranes and forklifts. 

Water truck. 

4.8.5 Source and quantity of materials 

Sourcing of materials such as gravel and services such as earthworks and fencing would be  local where 

feasible, maximising the local economic benefits of the WRSF Project.  The WRSF Project would promote 

opportunities for local business involvement through the WRSF web site.  

Materials would include: 

Gravel and road base for forming the gravel roads, imported from local quarries.  

Concrete will be sourced locally, most likely from Glen Innes (anticipated to require a low 

number of delivery trucks over the construction period). 

Solar panels,  steelwork  for  supporting  structures, power  conversion block modules  and 

cabling will come from metropolitan areas via the New England Highway. 

Water  for dust suppression and cleaning of panels would be sourced  locally as required. 

Water sources would  likely be the farm dams within the WRSF site or on a neighbouring 

property,  subject  to  landowner  approval. Non potable water would be  sourced  for  this 

activity.  

4.8.6 Timing of work 

Construction would mostly be undertaken during standard construction hours: 

Monday to Friday:       7am to 6pm. 

Saturday:         8am to 1pm. 

Sunday and Public Holidays:    No work. 

No night works are proposed.  It is unlikely that any works or deliveries would be required outside standard 

construction hours. Works carried out outside of these hours will only entail works that do not cause noise 

emissions to be audible at any nearby residences not located on the site. It is expected that the construction 

program for the WRSF Project would be up to six months, with a peak construction period of three months. 

Any  variations  to  the  above  listed  work  hours  will  be  discussed  and  agreed with  the  relevant  local 

authorities and impacted residents.  

Page 54: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  33   

4.8.7 Staffing requirements  

During construction, it is expected an average of 40 workers would be required onsite with a construction 

peak  of  approximately  100 workers.    Peak  construction  periods would  have  the  greatest  potential  to 

employ local contractors and labourers. 

4.9 OPERATION 

WRSF’s operational life is anticipated to be 25 years. After this time, components may be decommissioned 

and removed from the site, or the solar farm replaced/upgraded for continued operation. 

Operational  activities would  include monitoring  and  facility maintenance,  such  as  panel  cleaning  and 

landscaping works, and the management of faults and repairs. These requirements are likely to be largely 

met by a marginally increased operational staff at the wind farm. It is currently intended for maintenance 

activities to be undertaken during the day, however some electrical switch out and maintenance works 

may take place at night when the site is not generating due to operational and safety requirements. The 

Operational Environmental Management Plan would  include protocols for any maintenance work to be 

undertaken outside daytime hours. 

Grazing by sheep may be used as a ground cover management strategy under and around the array. This 

would be to assist management of the fuel load but may provide the additional benefit of grazing income. 

This will be dependent on the suitability of the site for grazing by sheep. The lease agreements with the 

landowner have been negotiated taking into account the lost revenue from agricultural activities due to 

the WRSF Project utilising pastoral lands. However, the co‐use has mutual benefits for the proponent and 

landowner. 

4.10 DECOMMISSIONING 

All  aboveground  infrastructure  would  be  removed  from  the  site  at  the  decommissioning  phase. 

Infrastructure and materials removed from the site would be recycled or otherwise disposed of at approved 

facilities. All areas of soil disturbed during decommissioning would be  rehabilitated, appropriate to  the 

existing species composition in consultation with and in consideration of landowner requirements.  

Recycling  and  re‐use  of  the  materials  are  key  to  the  decommissioning  strategy  of  the  site.  Key 

decommissioning elements relevant to the WRSF include the following: 

The PV power plant would be disconnected from the electrical grid. 

PV modules and all equipment would be disconnected. 

PV modules would be collected and recycled at a dedicated recycling facility. 

Ancillary equipment would be removed and materials recycled, wherever possible. 

Posts, frames and above ground cabling would be removed and recycled where possible.  

Site rehabilitation to former grazing condition. 

The WRSF is highly reversible. After operation, the land could be returned to its former agricultural landuse 

or an alternative land use with negligible impact on production capacity.  

There is also potential for the WRSF to continue to operate as a solar farm after the 25 year WRSF design 

life although it is not possible to confirm whether this outcome will apply at the time. Continued operation 

of the WRSF would require: 

Page 55: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  34   

Retention of some WRSF Shared Infrastructure while WRWF continues to operate (currently 

required to be removed during the WRWF decommissioning phase).  

Further agreement between proponent and landowner. 

Planning approval for the future use as a solar farm.   

4.11 ACCESS AND TRAFFIC MANAGEMENT 

Access to the WRSF is via the Gwydir Highway, the WRWF internal access tracks and the new track to be 

constructed between the WRWF northern access track and the solar farm site. 

Traffic and access would be managed in accordance with the Draft Traffic Management Plan that is included 

as Appendix H and would be  incorporated  into a WRSF Construction Environmental Management Plan.  

Management of relevant issues is generally consistent with the existing WRWF Stage 1 Traffic and Access 

Management  Plan  that  forms  Annex  D  of  the  approved WRWF  Stage  1  Construction  Environmental 

Management Plan (ERM, 2015).  

4.12 INDICATIVE TIMELINE 

WRWF Stage 1 is scheduled to commence construction towards the end of the first quarter in 2016 and to 

be commissioned and operational during 2017. Civil works for access tracks, the substation, 33 kV cabling 

and turbine sites at WRWF are expected to be mostly complete during 2016. 

Subject to gaining approval for WRSF in mid‐2016, it is proposed to commence construction of the solar 

farm  in  the  first quarter of 2017. Commencement of  construction on WRSF would  likely occur  as  the 

construction of WRWF is nearing completion and wind farm construction activities are scaling down.  

The proposed planning, construction and operations timeframe for WRSF is shown in Table 4‐3.  WRSFPL 

wishes to be in a position to commence construction of the WRSF in first half of 2017. 

   

Page 56: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  35   

 

Table 4‐3  Phases of WRSF implementation relative to WRWF 

Timing 2016  2017 

Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4 

WRSF Project Phases Timeframe 

WRWS DA                 

DA Review                   

Approval                     

Contracts                   

Pre‐construct preparation                   

Construction                   

Operation                 

WRWF Project Phases Timeframe 

Construction                   

Commissioning                 

Operation                 

 

   

Page 57: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  36   

5 STAKEHOLDER CONSULTATION 

5.1 AGENCY CONSULTATION 

5.1.1 Department of Planning and Environment 

WRSFPL  has  consulted  with  the  Department  of  Planning  and  Environment  (DP&E)  at  various  stages 

throughout the planning of the WRSF Project. 

As the WRSF is State Significant Development, WRSFPL was required to request the SEARs under Clause 

78A (8A) of the EP&A Act.  The SEARs are intended to guide the structure and content of the EIS and reflect 

the  responsibilities  and  concerns  of  NSW  government  agencies  in  relation  to  the  environmental 

assessment of WRSF. 

An initial meeting was held between DP&E and WRSFPL on 16 December 2015 to discuss the WRSF. The 

aim of  the meeting was  to discuss  the preparation of the scoping  report which would be submitted to 

inform  the  development  of  the  SEARs.   Based  on  the  information  provided  during  that meeting,  and 

WRSFPL’s subsequent project review and preliminary planning  investigations, the WRSF Scoping Report 

was submitted to DP&E on 11 January 2016 as part of WRSFPL’s request for the SEARs. 

Following submission of the Scoping Report, a DP&E representative from the Armidale office attended a 

meeting on 2 February 2016 with the proponent and other representatives from government agencies (see 

below) to discuss the WRSF Project.  The meeting included a meeting in Glen Innes followed by a site visit 

to the WRSF Development Envelope (Site 5) as well as potential Development Sites 1 and 2 (prior to these 

sites being discounted). 

The SEARs for WRSF were issued on 3 February 2016.  They are included as Appendix A and in Table 6‐1.  

Specific to consultation, the SEARs require the following: 

Consultation  with  relevant  local,  state  or  commonwealth  government  authorities, 

infrastructure and service providers, community groups and affected landowners. 

Detailed consultation with affected landowners surrounding the development, and relevant 

local Council(s) 

The EIS must describe the consultation that was carried out, identify the issues raised during 

this consultation, and explain how these issues have been addressed in the EIS. 

A further meeting with DP&E was held on 8 February 2016 to specifically discuss the WRSF’s timeline to 

ensure the development application was  lodged with sufficient time to allow the DP&E DA assessment 

phase to occur within the timeframe specified in the ARENA funding.  The meeting included representatives 

from DP&E, WRSFPL and NGH Environmental. 

The  consultation with  specific Government agencies  that has occurred during  the development of  the 

SEARs and the preparation of this EIS is summarised below. 

5.1.2  Office of Environment and Heritage 

Consultation with the Office of Environment and Heritage (OEH) has included the following: 

A site meeting with two representatives from the OEH north‐east offices on 2 February 2016 

to  introduce  and discuss  the WRSF. A meeting  at Glen  Innes  Severn Council office was 

Page 58: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  37   

followed  by  a  site  visit  to  the  WRSF  Development  Envelope  (Site  5)  and  potential 

Development Sites 1 and 2 (prior to them being discounted). 

Teleconference between OEH, NGH Environmental and WRWFPL on 5 February 2016 that 

discussed Sites 1, 2 and 5  in  relation  to biodiversity assessment methodology and  initial 

mapping,  basis  for  vegetation  categories,  reference  to  NSW  Scientific  Committee 

determinations and basis for offset calculations. 

Teleconference between OEH, NGH Environmental and WRWFPL on 10 February 2016 that 

followed  previous  teleconference  on  5  February  2016.  This  reviewed  classifications  for 

vegetation, whether cleared grassland areas constitute derived grassland and how many 

biometric plots are required.  

Provision of stratified vegetation mapping to OEH prior to NGH Environmental revisiting the 

WRSF Development Envelope and two potential southern Development Sites 1 and 2 on 15 

and  16  February  2016  to  confirm  details  of  vegetation mapping  and  obtain  additional 

biometric plot data. 

The Biodiversity assessment summary (Section 8.1 of this EIS) outlines the assessment methodology 

used for the WRSF Development Envelope and addresses the matters raised by OEH. 

5.1.3 Glen Innes Severn Council 

Consultation with the Glen Innes Severn Council (GISC) has included the following: 

A site meeting with two GISC representatives on 2 February 2016 to introduce and discuss 

the WRSF Project. 

Information requests regarding mapping for flood prone land and bushfire prone land.  

A GISC representative attended WRWF Community Consultative Committee on 4 February 

2016 that discussed the proposed WRSF. 

NGH Environmental was provided with bushfire prone land mapping on 11 February 2016.  There are no 

areas  of  bushfire  prone  land  within  the  Development  Envelope,  however  a  bushfire  assessment  is 

contained within Section 9.4.3 of this EIS.  No mapping of flood prone land was provided by GISC. 

5.1.4 Inverell Shire Council  

Consultation with the  Inverell Shire Council  (ISC) was undertaken  in relation to the WRSF Development 

Envelope and Development Sites 1 and 2 (now discounted and that are  located within  Inverell LGA).   A 

short section of the WRSF access track within the WRSF Development Envelope is also located within the 

ISC LGA. Consultation included the following: 

A site meeting with one ISC representative on 2 February 2016 to introduce and discuss the 

WRSF Project. 

An Inverell Council representative attended the WRWF Community Consultative Committee 

on 4 February 2016 that discussed the proposed WRSF Project. 

Inverell Council had greater interest in the Development Sites 1 and 2 due to their location 

within the Inverell LGA but noted that the bulk of roads used to access these sites are within 

GISC LGA. Inverell Council appeared supportive of the solar farm development at any of the 

proposed sites due to the WRSF Project’s additional contribution to the regional economy.  

It is understood that there are no specific issues outstanding with ISC in relation to the proposed WRSF 

Project. 

Page 59: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  38   

5.1.5 Department of Primary Industries (DPI) – Agriculture 

Consultation with Department of Primary Industries (DPI) was undertaken by way of a teleconference on 

4  February  2016.    Representatives  from  DPI,  WRSFPL  and  NGH  Environmental  participated  in  the 

teleconference.   The purpose of the consultation was to  introduce the WRSF Project and WRSF Project 

team, and to discuss the SEARs in relation to land use impacts.  Of particular importance, was a discussion 

about  the  siting  of  the WRSF  Project  on  land  that  is mapped  as  Strategic  Agricultural  Land  and  the 

implications  of  this  from  an  agricultural  impact  perspective  and  in  relation  to  an  application  for 

development consent. 

During the consultation, DPI highlighted the following issues: 

Basalt soils (on which the WRSF Project would be constructed) have a high natural fertility 

and are not common. 

SAL maps provided by DP&E are general and have not been fine‐tuned or ground truthed.  

Discussions  with  the  landowner  on  the  agricultural  productivity  value  is  highly 

recommended. 

The  importance of  consultation with adjacent  farmers  in  relation  to whether  the WRSF 

Project would impact on agricultural activities in surrounding areas. 

The importance of using the guideline Primefact 1063: Infrastructure proposals on rural land 

(DPI) to guide the assessment of land use impacts in the EIS. 

DPI advised that,  in general, solar  farms tend to be considered to be  low  impact projects  in relation to 

agriculture  due  to  their  reversibility  post‐decommissioning.    However,  each  site  must  be  assessed 

individually based on the location of the WRSF and the value of the agricultural land.  

Impacts to agricultural land use have been discussed in Section 8.5 of the EIS. 

5.1.6 Department of Primary Industries (DPI) ‐ Water 

NGH  Environmental  consulted with DPI  on  11  February  2011  (Section  9.2.2)  regarding  the  north‐east 

trending drainage depressions  located  in the WRSF Development Envelope and the WRSF Development 

Footprint.  Based on the indicative WRSF layout, the solar arrays would be constructed above this drainage 

depression. 

The drainage depression  is mapped as a watercourse on topographical maps  (Six Maps, NSW Land and 

Property Information 2016) and is visible on aerial photography of the site.  It was not however, obvious 

on the ground, during the environmental assessment site inspections other than as shallow depressions in 

the land surface. There was no evidence of substantive flow along these depressions. 

Advice was sought in relation to whether the drainage depressions would be considered a ‘river’ under the 

Water Management  Act  2000  and  would  therefore  require  a  Controlled  Activity  Approval  (CAA)  to 

undertake any works within 40 metres of the watercourse.  Photos of the drainage depression and a brief 

email were  sent  followed  by  a  phone  call.   DPI    advised  that, while  the  drainage  depression may  be 

identified as a minor watercourse (1st or 2nd order Strahler classification) on the 1:25000 topographical 

map, there are no definable channel banks and or a channel bed, nor are there any fluvial bedforms evident 

(pools  riffles  sediment  bars  etc.).    The  drainage  depression  is  not  a  river  for  the  purpose  of  defining 

waterfront land and would not require a CAA. 

It is understood that there are no specific issues outstanding with DPI in relation to the proposed WRSF, 

however an assessment of potential impacts on water are included in Section 9.2 of this EIS. 

Page 60: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  39   

5.1.7 Environment Protection Authority 

While an Environment Protection Licence (EPL) is required for WRWF, the solar farm does not constitute 

scheduled premises and an EPL is not required.  Works for connection to the substation that are within the 

WRWF footprint will be subject to requirements of the EPL as they are in the designated area for the EPL. 

5.1.8 Rural Fire Service 

A Bushfire Risk Management has been developed for WRWF in consultation with Rural Fire Service (RFS).  

The Plan forms part of the approved WRWF Stage 1 CEMP.  Further consultation would be undertaken with 

the RFS as part of pre‐construction planning. Subject to the outcomes of the consultation there may be a 

need to either update the Bushfire Risk Management Plan for the WRWF in respect of WRWF and WRSF or 

to prepare a plan focussed on WRSF only. 

5.1.9 Roads and Maritime Services. 

The WRSF would be accessed by the main entry point for WRWF, direct from Gwydir Highway. WRWFPL 

and its Stage 1 contractor for Balance of Plant have been consulting with Roads and Maritime Service (RMS) 

to agree on the design for the upgrade of the WRWF entry point from the Gwydir Highway. The approved 

upgrade works are required to be implemented prior to WRWF construction commencing, well before the 

WRSF construction phase and no further roadworks are anticipated for WRSF. Roads and Maritime will be 

notified of the proposed WRSF development and expected timeframes with WRSFPL seeking Roads and 

Maritime Service’s advice on any additional requirements for access in respect of the WRSF Project. 

An  assessment  of  access  and  traffic  is  included  in  Section  9.3  of  this  EIS.  Additionally,  a  draft  Traffic 

Management Plan is provided in Appendix H. 

5.2 COMMUNITY CONSULTATION 

WRSFPL  is  committed  to  engaging  the  local  community  and  ensuring  information  is  available  for  the 

proposed development. A Community Engagement Plan (CEP) has been developed for WRSF to guide all 

engagement  activities.  The  CEP  identifies  objectives  and  aims,  the  WRSF  stakeholders,  proposed 

consultation strategies, challenges and opportunities, and specific engagement tools. 

The objectives of the CEP include: 

To establish and maintain a  level of acceptance or approval of the WRSF within the  local 

community.  

To have a culture of openness, inclusiveness, responsiveness and accountability.  

To enable better community integration of the WRSF. 

For WRSF  to  be  considered  as  an  integrated  and  valued  component  of  the  social  and 

economic fabric of the community. 

For a low or infrequent level of complaints and conflicts and no regulatory issues.  

In line with the CEP, a range of engagement tools have been used with regards to the WRSF.  These include: 

Establishment of dedicated telephone line, email address and postal address. 

Development of a WRSF factsheet for distribution as required to the community. 

Development of a WRSF website  (www.whiterocksolarfarm.com)  to provide  information 

and updates. 

Direct engagement with all potentially involved landowners. 

Page 61: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  40   

Direct engagement with neighbours to 3 km through phone calls, email and  face to  face 

meetings. 

Media release to the local Glen Innes newspaper, resulting in an article on the 21 January 

2016. 

Information  provided  to  Federal  and  State  politicians  (through  distribution  of  media 

release) on proposed WRSF Project. 

Presentation to the WRWF Community Consultative Committee (CCC) on 4 February 2016, 

providing an overview of  the proposed WRSF.  It  is anticipated  that a single CCC may be 

suitable for WRWF and WRSF to provide efficiency in community engagement and ensure 

consistent consultation.  

A community information session for WRSF is scheduled to be held in Glen Innes on 21 March 2016.  The 

timing has been arranged to coincide with the anticipated public exhibition period for the WRSF EIS that 

would be separately arranged by DP&E. The session will provide all stakeholders the opportunity to find 

out  more  about  the  WRSF,  talk  one‐on‐one  with  the  project  planning  staff  and  provide  feedback. 

Information  on  the WRSF  and  Development  Application  process  will  also  be  circulated  to  the  local 

community via newsletter.  

Engagement activities will continue throughout the WRSF determination period, as set out in the CEP. 

The CEP will be reviewed regularly, as well as at key transition phases between different stages of WRSF 

development  (e.g.  prior  to  construction  or  operation).  The  Plan  will  continue  to  guide  engagement 

activities at all phases of the WRSF, ensuring that engagement is appropriate and in line with good practice. 

To date, consultation activities appear to have been well received by the local community. No objections 

or concerns have been received but questions have been received on: 

Timescales for the WRSF progression. 

Involvement of ARENA. 

The hybrid nature of  the wind/solar  farm  arrangement  and  sharing of  facilities  for  grid 

connection.  

These questions are being addressed during the consultation activities and are also covered within this EIS. 

5.3 ABORIGINAL CONSULTATION 

The  consultation with  Aboriginal  stakeholders was  undertaken  in  accordance with  clause  80C  of  the 

National Parks and Wildlife Amendment  (Aboriginal Objects and Aboriginal Places) Regulation 2010.  It 

followed the consultation steps outlined in the Aboriginal Cultural Heritage Consultation Requirements for 

Proponents 2010 (ACHCRP) guide provided by OEH.  The guide outlines a four stage process of consultation 

as follows: 

Stage 1 – Notification of WRSF proposal and registration of interest.  

Stage 2 – Presentation of information about the proposed WRSF. 

Stage 3 – Gathering information about cultural significance. 

Stage 4 – Review of WRSF draft cultural heritage assessment report. 

The  full  list  of  consultation  steps,  including  those  groups  and  individuals  that were  contacted  and  a 

consultation log is provided in Appendix C.  A summary of actions carried out in following these stages are 

as follows.  

Page 62: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  41   

Stage 1. Letters outlining the WRSF development proposal and the need to carry out an ACHA were sent 

to  the Anaiwan and Glen  Innes  Local Aboriginal  Land Council  (LALC), and various  statutory authorities 

including OEH.  An advertisement was placed in three local newspapers; the Northern Daily Leader on 4 

January 2016, the Glen Innes Examiner on 7 January 2016 and the Inverell Times on 8 January 2016, seeking 

registrations of interest from Aboriginal people and organisations. A further series of letters was sent to 

other organisations  identified by OEH  in correspondence  to NGH Environmental.    In each  instance,  the 

closing date for submission was 14 days from receipt of the letter.  

As a  result of  this process,  four groups contacted  the consultant  to  register  their  interest  in  the WRSF 

proposal.  The Registered Aboriginal Groups (RAPs) who registered interest were: 

Anaiwan Local Aboriginal Land Council. 

Glen Innes Local Aboriginal Land Council. 

Anaiwan Traditional Owners. 

Jukambal. 

No other party registered their  interest,  including the entities and  individuals recommended by OEH or who were part of the previous consultation for WRWF Project.  

Stage 2. An Assessment Methodology document for the WRSF was sent to the RAPs and other Aboriginal 

stakeholders  named  by OEH.    This  document  provided  details  of  the  background  to  the  proposal,  a 

summary of previous archaeological surveys and the proposed heritage assessment methodology for the 

proposal.  The document invited comments on proposed methodology and sought information regarding 

known  Aboriginal  cultural  significance  values  associated with  the  Development  Envelope  and/or  any 

Aboriginal objects contained therein.  No written responses were received.  The Anaiwan LALC and Glen 

Innes LALC indicated by phone that they were satisfied with the methodology and were happy to proceed 

to conducting fieldwork. 

Stage  3.  The Assessment Methodology  outlined  in  Stage  2  included  a written  request  to  provide  any 

information that may be relevant to the cultural heritage assessment of the WRSF Development Envelope.  

It was noted that sensitive information would be treated as confidential. No response regarding cultural 

information was received.  

The  fieldwork was organised  and  the Anaiwan  and Glen  Innes  LALCs were  asked  to participate  in  the 

fieldwork as the Development Envelope crossed both Land Council boundaries.  Senior site officers from 

both LALCs attended the survey with the archaeologist and assisted  in conducting the survey, providing 

input into transect placement and cultural significance.  

Stage 4  In February 2016, a draft Aboriginal Cultural Heritage Assessment Report was forwarded to the 

RAPs and a timeframe of 28 days allowed for responses to the document. Section 8.2 of this EIS summarised 

the final report, which is provided in full in Appendix C. 

    

Page 63: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  42   

6 PLANNING CONTEXT 

6.1 ASSESSMENT CONTEXT 

6.1.1 Permissibility 

SEPP  (Infrastructure) applies to the whole of the State. Clauses 34(7) and 34(8) of SEPP  (Infrastructure) 

provide that development for the purpose of a solar energy system may be carried out by any person with 

consent on any land (other than on land in a prescribed residential zone).  

Relevantly,  a  ‘solar  energy  system’  includes  a  photovoltaic  electricity  generating  system.  The WRSF 

Development Envelope is not located within a prescribed residential zone. Accordingly, the construction, 

operation and decommissioning of the WRSF may be carried out with development consent. 

6.1.2 State Significant Development (SDD) 

Section 89C of the EP&A Act provides that development will be SSD if it is declared to be SSD by a State 

Environmental Planning Policy (SEPP).  

The SRD SEPP declares the WRSF to be SSD as it is development for the purpose of electricity generating 

works with a capital investment value of greater than $30 million (clause 20, Schedule 1). This is considered 

further in Section 6.2.1 below. 

Section 78A (8A) of the EP&A Act requires a development application for SSD to be accompanied by an EIS 

prepared in accordance with the EP&A Regulation.  

On 11 January 2016, the proponent made a written application to the Secretary requesting SEARS for the 

proposed WRSF as required by clause 3 of Schedule 2 of the EP&A Regulations. The proponent’s application 

was accompanied by a Scoping Report, which provided detailed  information about the proposed WRSF 

Project including key environmental issues. The request for SEARs was registered as SSD 16_7487. 

In formulating the environmental assessment requirements, the Secretary consulted with relevant public 

authorities and agencies and considered key issues raised by those authorities. The preparation of SEARs 

was assisted by a meeting between WRSFPL and agencies on 2 February 2016 that included an office based 

meeting to discuss the WRSF Project and its potential impacts and site visits to the two potential solar farm 

Development Envelopes. 

On 3 February 2016, the Secretary  issued the SEARs for the WRSF (Appendix A).   Table 6‐1 outlines the 

SEARs and provides a cross reference to where each  item  is addressed within this EIS. This EIS complies 

with  the  SEARs  and  the  environment  assessment  requirements  contained  in  Schedule  2  of  the  EP&A 

Regulation. 

Page 64: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  43   

Table 6‐1 Secretary’s Environmental Assessment Requirements for WRSF 

Issue summary  Addressed in EIS 

General requirements   

The (EIS) for the development must comply with the requirements in Schedule 2 of the 

EP&A Regulation 2000 and include the following: 

a full description of the development, including: 

 

 

Details of construction, operation and decommissioning; Sections 4.6  to 4.11 

A site plan showing all infrastructure and facilities (including any infrastructure that would be required for the development, but the subject of a separate approvals process) 

Figure 1.1 and Figure 4.1   

Indicative WRSF layout. Not 

Final, subject to final design 

and constraints 

A detailed constraints map identifying the key environmental and other land use constraints that have informed the final design of the development; 

Figure 7‐1 

a strategic justification of the development focusing on site selection and the suitability of the proposed site; 

Section 3 

an assessment of the likely impacts of the development on the environment, focusing on the specific issues identified below, including: 

a description of the existing environment likely to be affected by the development; 

an assessment of the likely impacts of all stages of the development (which is commensurate with the level of impact), taking into consideration any relevant legislation, environmental planning instruments, guidelines, policies, plans and industry codes of practice; 

a description of the measures that would be implemented to avoid, mitigate and/or offset the impacts of the development (including draft management plans for specific issues as identified below); 

Sections 8 and Section 9 

 

a description of the measures that would be implemented to monitor and report on the environmental performance of the development; 

Section 10.2 and Draft 

Management Plans 

a consolidated summary of all the proposed environmental management and monitoring measures, identifying all the commitments in the EIS; and 

Section 10.2 

the reasons why the development should be approved having regard to the biophysical, economic and social costs and benefits of the development. 

Section 2 

the development application must be accompanied by a signed report from a suitably qualified person that includes an accurate estimate of the capital investment value of the development (as defined in Clause 3 of the Environmental Planning and Assessment Regulation 2000 

Separate report to be 

submitted to DP&E with 

Development Application 

Specific issues   

 The Eis must address the following specific issues: 

Biodiversity – including an assessment of the likely biodiversity impacts of the development, having regard to the NSW Biodiversity Offsets Policy for Major Projects, and  in accordance with the Framework for Biodiversity Assessment, unless otherwise agreed by the Department 

 

Section 8.1 and Appendix B 

 

Page 65: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  44   

Issue summary  Addressed in EIS 

Heritage – including an assessment of the likely Aboriginal and historic heritage (cultural and archaeological) impacts of the development, including adequate consultation with the local Aboriginal community; 

Sections 8.2 and 9.6, 

Appendix C 

Land  –  including  an  assessment  of  the  impact  of  the  development  on agricultural  land  and  flood  prone  land,  paying  particular  attention  to compatibility of the development with the existing  land uses on the site and consistency with the zoning provisions applying to the land; 

Section 8.5 

Visual  –  including  an  assessment  of  the  likely  visual  impacts  of  the development (including any night lighting) on surrounding landowners and key vantage points in the public domain, and a draft landscaping plan developed in consultation with affected landowners; 

Section 8.3, Appendix D 

Noise  ‐    including  an  assessment  of  the  construction  noise  impacts  of  the development in accordance with the Interim Construction Noise Guideline and sub‐station noise impacts in accordance with the NSW Industrial Noise Policy, and a draft noise management plan if the assessment shows construction noise is likely to exceed applicable criteria; 

Section 8.4 and Appendix E 

and F 

Transport  –  including  an  assessment  of  the  likely  transport  impacts  of  the development on the capacity, condition, safety and efficiency of the local and State road networks, and a draft traffic management plan for the construction phase of the development; 

Section 9.3 and Appendix H 

 

Water – including an assessment of the likely impacts of the development on surface water resources (including any nearby watercourses), details of water supply arrangements, and a draft erosion and sediment control plan prepared in  accordance  with  Managing  Urban  Stormwater:  Soils  and  Construction (Landcom 2004); and  

Section 9.2 and Appendix G 

 

Electromagnetic  interference – an assessment of the proposed transmission line and  substation against  the  International Commission on Non –  Ionizing Radiation Protection (ICNIRP) Guidelines for limiting exposure to Time‐varying Electric, Magnetic and Electromagnetic Fields. 

Section 9.4.1 

Consultation   

Consultation with relevant local, state or commonwealth government authorities, infrastructure and service providers, community groups and affected landowners. 

Detailed consultation with affected landowners surrounding the development, and relevant local Council (s) 

The EIS must describe the consultation that was carried out, identify the issues raised during this consultation, and explain how these issues have been addressed in the EIS. 

Section 5 

6.2 EVALUATION OF THE DEVELOPMENT 

Section 89H of  the  EP&A Act provides  that  Section 79C  applies  to  the determination of development 

applications for SSD. 

Under Section 79C of the EP&A Act, the consent authority  is required to consider a number of matters 

when determining a development application under Part 4. These matters include: 

The provisions of: 

o any environmental planning instrument; 

o any proposed  instrument  that  is or has been  the  subject of public  consultation 

under the EP&A Act and that has been notified to the consent authority. 

Page 66: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  45   

Any development control plan. 

Any planning agreement that has been entered into under Section 93F, or any draft planning 

agreement that a developer has offered to enter into under Section 93F. 

The regulations (to the extent that they prescribe matters for consideration). 

Any coastal zone management plan (within the meaning of the Coastal Protection Act 1979). 

That apply to the land to which the development application relates. 

The  likely  impacts  of  that  development,  including  environmental  impacts  on  both  the 

natural and built environments, and social and economic impacts in the locality. 

The suitability of the site for the development. 

Any submissions made in accordance with this Act or the regulations. 

The public interest. 

Each of these matters are considered further below. 

6.2.1 The provisions of any environmental planning instrument 

The following environmental planning instruments include provisions relevant to the WRSF Project: 

SEPP (State and Regional Development) 2011. 

State Environmental Planning Policy(Infrastructure) 2007 (SEPP (Infrastructure) ). 

State Environmental Planning Policy No. 55 – Remediation of Land. 

State Environmental Planning Policy (Rural Lands 2008). 

State Environmental Planning Policy 44 – Koala Habitat Protection. 

Glen Innes Severn Local Environmental Plan 2012 (Glen Innes LEP).  

SEPP (State and Regional Development) 2011 

The aims of the State and Regional Development (SRD) SEPP are to identify development that is SSD, State 

Significant  Infrastructure  and  Critical  State  Significant  Infrastructure  and  to  confer  functions  on  joint 

regional planning panels to determine development applications. 

State Significant Development 

Clause 8 of the SRD SEPP provides that development is declared to be SSD for the purposes of the EP&A 

Act if: 

a) the development is not permissible without consent under Part 4 of the EP&A Act; and 

b) the development is specified in Schedule 1 or 2 of the SRD SEPP. 

Clause 20 of Schedule 1 of the SRD SEPP provides:  

“Development  for  the  purpose  of  electricity  generating works  or  heat  or  their  co‐generation 

(using any energy source, including gas, coal, bio‐fuel, distillate and waste and hydro, wave, solar 

or wind power), being development that: 

(a)   has a capital investment value of more than $30 million, or 

(b)   has  a  capital  investment  value  of  more  than  $10  million  and  is  located  in  an 

environmentally sensitive area of State significance.” 

The WRSF is a development for the purpose of electricity generation and would have a capital investment 

value in excess of $30 million. Accordingly, the WRSF is declared to be SSD for the purposes of the EP&A 

Act.    

Page 67: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  46   

State Environmental Planning Policy (Infrastructure) 2007 

The SEPP  (Infrastructure) was  introduced  to  facilitate  the effective delivery of  infrastructure across  the 

State  by  improving  regulatory  efficiency  through  a  consistent  planning  regime  for  infrastructure  and 

services across NSW.  

Clause 34(7) of SEPP (Infrastructure) provides that development for the purpose of ‘solar energy systems’ 

may be carried out with consent on any land, except as prescribed by subclause 34(8). Clause 34(8) provides 

that development for the purpose of a photovoltaic electricity generating system may be carried out by a 

person with consent on land in a prescribed residential zone only if the system has the capacity to generate 

no more than 100kW. Clause 34(8) does not apply to the WRSF Project as the WRSF Development Envelope 

is not within a prescribed residential zone. 

Accordingly,  the  WRSF  is  permissible  with  development  consent.  Further  information  regarding 

permissibility is considered below in the context of applicable local environmental plans.  

Traffic generating development 

Clause 104 of the SEPP (Infrastructure) requires certain developments (identified in Column 1 of the Table 

in Schedule 3) to be referred to Roads and Maritime (known as traffic generating development). In the case 

of traffic generating development, the consent authority is required to take into account any submission 

made by Roads and Maritime in relation to the development.  

Electricity generation  is not  included  in column 1  in the Table. Clause 104 of the SEPP applies to other 

development where there are 200 or more motor vehicles. Since the WRSF Project would result  in the 

generation of fewer than 200 vehicles per day during construction or operation, the requirements under 

clause 104 of the SEPP do not apply. 

State Environmental Planning Policy No. 55 ‐ Remediation of Land 

SEPP No. 55 aims to promote the remediation of contaminated land for the purpose of reducing the risk of 

harm to human health or any other aspect of the environment. The SEPP applies to the whole of the State. 

Under  Clause  7  of  the  SEPP  No.  55,  a  consent  authority  must  not  consent  to  the  carrying  out  of 

development on land unless: 

It has considered whether the land is contaminated; 

If the  land  is contaminated,  it  is satisfied that the  land  is suitable for the purposes of the 

proposed development in its contaminated state; or  

If  the  land  requires  remediation  to be made  suitable  for  the purposes of  the proposed 

development, whether it is satisfied that the land will be remediated before the land is used 

for that purpose.   

A search of the OEH contaminated land public record (OEH 2016) was undertaken for contaminated sites 

within the Glen Innes Severn LGA on 22 January 2016.  There were no records returned.   

The online List of NSW contaminated sites notified to EPA (OEH 2015) was also searched on 22 January 

2016. Eight sites were found in the Glen Innes area however, all were service stations or former commercial 

industry sites located within the Glen Innes township.  

There  is a minor risk that contamination associated with agricultural activities (e.g., pesticides) could be 

present however, given no contaminated sites are recorded on or adjacent to the proposed development 

and  that  no  evidence  of  contamination  was  observed  during  the  site  visit  or  mentioned  during 

conversations with the land owner, it is considered highly unlikely that significant contamination exists in 

Page 68: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  47   

areas that would be affected by the WRSF. Furthermore, the construction activities would not significantly 

disturb soil or groundwater at the site.  

Given  the  historical  use  of  the  Development  Envelope  and  the  nature  of  the  WRSF  (both  during 

construction and operation), there is no reason to believe that the land is not suitable for the proposed 

WRSF. 

State Environmental Planning Policy (Rural Lands 2008) 

One of the primary aims of this SEPP  is   ‘to  identify State significant agricultural  land for the purpose of 

ensuring  the  ongoing  viability  of  agriculture  on  that  land,  having  regard  to  social,  economic  and 

environmental considerations’. 

The objects of Part 4 (State significant agricultural land) are:  

a)  to  identify  State  significant  agricultural  land  and  to  provide  for  the  carrying  out  of 

development on that land, 

b)  to provide for the protection of agricultural land: 

(i) that is of State or regional agricultural significance, and 

(ii) that may be subject to demand for uses that are not compatible with agriculture,  

(iii) if the protection will result in a public benefit. 

Clause 13 of the SEPP identifies land as being State significant agricultural land if it is listed in Schedule 2.  

Schedule 2 does not identify any land. However, the WRSF is located on land that is identified as Strategic 

Agricultural Land (refer Section 6.5.2).  The EIS assesses the impact the WRSF may have on this land (refer 

Section 8.5.2) 

State Environmental Planning Policy 44 ‐ Koala Habitat Protection 

The aim of the State Environmental Planning Policy 44 – Koala Habitat Protection is to encourage the proper 

conservation and management of areas of natural vegetation that provide habitat for koalas to ensure a 

permanent  free‐living  population  over  their  present  range  and  reverse  the  current  trend  of  koala 

population decline.  

The SEPP applies to each local government area listed in Schedule 1. The Glen Innes Severn and Inverell 

LGAs   are not  listed  in Schedule 1 of SEPP 44.   As  such,  this SEPP does not apply  to  the Development 

Envelope. 

Regardless, the biodiversity field surveys included an assessment of the potential for the species to occur 

within the Development Envelope.  No koalas or suitable habitat were recorded during targeted surveys 

and targeted Spot Assessment Technique (SAT) surveys.  The biodiversity assessment concluded that the 

species is more likely to be inhabiting the more contiguous habitat in larger patches, such as on the slopes 

and valleys surrounding the Development Envelope and in National Parks, such as the Guy Fawkes River 

National Park to the east.  

Local Environmental Plan Provisions 

Glen Innes Severn Local Environmental Plan 2012 

The majority of the WRSF Development Envelope is located within the Glen Innes Severn Local Government 

Area and is subject to the Glen Innes Severn Local Environmental Plan 2012 (LEP). The LEP aims: 

1) to  encourage  the  proper management,  development  and  conservation  of  natural  and 

human  resources  in  Glen  Innes  Severn  by  protecting,  enhancing  and  conserving  the 

following: 

Page 69: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  48   

a. land of significance to agricultural production 

b. timber, minerals, soil, water and other natural resources 

c. areas of significance for nature conservation 

d. areas of high scenic or recreational value 

e. landscapes, places and buildings of archaeological or heritage significance including 

aboriginal relics and places 

f. communities and settlements 

2) to facilitate growth and development that: 

a. minimises  the cost  to  the community of  fragments and  isolated development of 

rural land, and 

b. facilitates the efficient and effective delivery of amenities and services, and  

c. facilitates  stimulation  of  demand  for  a  range  of  residential,  enterprise  and 

employment opportunities and promotes agricultural diversity, and 

d. maximises the efficient use of existing infrastructure 

Inverell Local Environmental Environment Plan 2012 

Approximately 200 metres of the access road is located within the Inverell Local Government Area and is 

subject to the Inverell Local Environmental Plan 2012 (LEP). The LEP aims: 

1) to encourage sustainable economic growth and development 

2) to protect and retain productive agricultural land 

3) to protect, conserve and enhance natural assets 

4) to protect built and cultural heritage assets 

5) to provide opportunities for growth  

Permissibility 

Both LEP’s state that the consent authority must have regard to the development objectives of planning 

zones identified in the LEP when determining development applications. The Development Envelope lies 

within land zoned RU1 ‐ Primary Production in both LGA’s. 

The objectives of the RU1 zone are the same for both LGA: 

a) to encourage sustainable primary industry production by maintaining and enhancing the natural 

resource base 

b) to encourage diversity in primary industry enterprises and systems appropriate for the area 

c) to minimise the fragmentation and alienation of resource lands 

d) to minimise conflict between land uses within this zone and land uses within adjoining zones. 

The WRSF is consistent with the above objectives and, for the operational life of the WRSF, would harness 

a  natural  resource  (solar  energy).  While  the  activity  would  impact  on  land  availability  for  primary 

production, the land would meet objects b) and c) as identified above; it would allow for diversity in land 

use, appropriate to the area and it would not fragment resource lands. Being fully reversible and involving 

limited ground disturbance, it would not remove the potential to use the land for primary production in 

the long term. 

Under the LEPs, electricity generation is not a permissible use in the RU1 Zone.  However, clause 34(7) of 

SEPP Infrastructure prevails over the LEPs and provides that development for the purpose of ‘solar energy 

systems’ may be carried out with consent on any land, except as prescribed by subclause 34(8).  

Page 70: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  49   

Clause 34(8) of the SEPP states that development for the purpose of a photovoltaic electricity generating 

system may be carried out by a person with consent on  land  in a prescribed residential zone only  if the 

system has the capacity to generate no more than 100 kW.  A solar energy systems include a photovoltaic 

electricity  generating  system  however,  as  the  proposed Development  Envelope  is  not  in  a prescribed 

residential zone, clause 34(8) does not apply.  

Section 36 of the EP&A Act provides that where there is an inconsistency between environmental planning 

instruments, there is a general presumption that a State environmental planning policy prevails over a local 

environmental plan or other  instrument made before or after that State environmental planning policy. 

Clause  8  of  SEPP  Infrastructure  relevantly  provides  that  if  there  is  an  inconsistency  between  SEPP 

Infrastructure  and  any  other  environmental  planning  instrument, whether made  before  or  after  the 

commencement of SEPP  Infrastructure, SEPP  Infrastructure prevails  to  the extent of  the  inconsistency. 

WRSF is permissible with consent under SEPP (Infrastructure. 

6.2.2 The provisions of any development control plan 

Clause  11  of  the  SRD  SEPP  provides  that  development  control  plans  do  not  apply  to  state  significant 

development.  

6.2.3 The provisions of any relevant planning agreement  

There  are  no  planning  agreements  that  have  been  entered  into,  nor  are  any  planning  agreements 

proposed, that relate to the WRSF.  

6.2.4 The provisions of the EP&A Regulation 

Clause 92 of  the EP&A Regulations outlines  the additional matters  that  requires  consideration.   These 

include: 

the Government Coastal Policy for development applications in certain local government areas; 

the provisions of AS 2601 for development applications involving the demolition of structures; and 

the provisions of a subdivision order and any development plan for development of land that is subject to a subdivision order. 

The WRSF does not involve either types of development and the LGA is not listed in the table under this 

clause.  The additional provisions provided by the EP&A Regulation are not relevant to the WRSF.   

6.2.5 The likely impacts of the development, including environmental impacts on both 

the natural built environments, and the social and economic impact in the locality 

The  likely  impacts  of  the  WRSF,  including  environmental  impacts  on  both  the  natural  and  built 

environments, and the social and economic impacts in the locality, are detailed in Sections 8 and 9 of this 

EIS. This EIS demonstrates that the environmental impacts of the WRSF have to the extent, reasonably and 

feasibly possible, been avoided or minimised through careful project design.  

Page 71: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  50   

6.2.6 Suitability of the site for the development 

The  WRSF  Development  Envelope  has  a  number  of  characteristics  that  make  it  suitable  for  the 

development of a solar farm.   Most notably,  is  its  location within and adjacent to the WRWF site which 

facilitates the development of the proposed hybrid wind/solar facility by sharing the existing (to be) WRWF 

infrastructure such as the substation and grid connection.   Utilising existing  facilities reduces the WRSF 

Development Footprint of the WRSF Project and establishes a compact renewable energy precinct.  

Other characteristics include: 

Distance from sensitive residential receivers resulting in minimal visual and noise impacts 

Gently sloping topography over the Development Envelope. 

Accessibility, the site would be accessed via the same transport routes as the WRWF.   

Utilisation  of  the WRWF  substation  and  grid  connection  (WRSF  Shared  Infrastructure), 

which would minimise impacts on the community and environment. 

Further, the WRSF is largely reversible; at the end of the WRSF life, all above ground infrastructure would 

be removed and current agricultural land use activities could resume. 

6.2.7 Any submissions made on the development 

WRSFPL would consider and, as necessary, respond constructively to any submission made in relation to 

the WRSF. 

6.2.8 The public interest 

The WRSF is in the public interest for a number of reasons. On an annual basis the plant would produce 

approximately 46,000 MWh in the first year of operation and over 1 million MWh over the 25 year project 

life. This would provide energy for approximately 7,200 average Australian homes. The solar farm would 

also assist to:   

Generate local jobs and encourage regional development.  

Boost the local economy by use of local supplies and services, where suitable 

Avoid approximately 36,900 tonnes of CO2 equivalent per annum by replacing  fossil  fuel based 

energy with solar generated energy, reducing emissions that contribute to climate change. 

Assist in meeting State and Australian Government policies to increase renewable energy supply 

in Australia. 

Develop the solar power  industry and supply chain  in Australia,  increasing the potential for  job 

creation and environmental benefits that are associated with renewable energy supply across a 

broader area.  

The  community  has  been  notified  of  the  proposed  development  and  to  date  no  adverse  comments 

concerning  the  development  have  been  received  by WRSFPL.    Development  of  the WRWF  has  been 

positively  received  in  the  region  and  it  is  expected  that  the WRSF may  experience  a  similar  level  of 

community support. 

Page 72: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  51   

6.3 NSW LEGISLATION 

6.3.1 Environmental Planning and Assessment Act 1979 

Development  in NSW  is  subject  to  the  requirements  of  the  EP&A  Act  and  its  associated  regulations. 

Environmental planning  instruments prepared under the EP&A Act set the  framework  for development 

approval in NSW. 

The relevant objects of the EP&A Act are: 

a) to encourage: 

i. The proper management, development and conservation of natural and artificial resources, 

including agricultural land, natural areas, forests, minerals, water, cities, towns and villages 

for  the purpose of promoting  the  social and economic welfare of  the community and a 

better environment. 

ii. The promotion and coordination of the orderly and economic use and development of land. 

iii. The protection, provision and coordination of communication and utility services. 

vi. The protection of  the environment,  including  the protection and  conservation of native 

animals and plants, including threatened species, populations and ecological communities, 

and their habitats.  

vii. Ecologically sustainable development. 

c) To provide increased opportunity for public involvement and participation in environmental planning 

and assessment. 

The objects of the EP&A Act have been considered throughout this environmental assessment. The WRSF 

aims to promote the orderly and economic use of the land through the provision of utility services (power 

generation).  The WRSF  has  been  located  and  designed  such  that  it would  avoid  protected  areas  and 

generally minimise the use of natural and artificial resources while still promoting the social and economic 

welfare of the local community.  

Given the WRSF would support a number of the objects of the EP&A Act, and is not inconsistent with the 

remaining objects of the Act, the WRSF is considered appropriate in the context of the EP&A Act. 

The WRSF would be assessed under Part 4 of the EP&A Act. 

Environmental Planning and Assessment Regulations 2000 

Clause 82 to Clause 85B of the EP&A Regulation addresses public participation in SSD.  

The WRSF Development Application and accompanying information (including this EIS) will be placed on 

public exhibition by DP&E for a period not less than 30 days. 

6.3.2 Protection of the Environment Operations Act 1997 

The  Protection  of  the  Environment Operations Act  1997  (POEO Act)  provides  an  integrated  system  of licensing for certain polluting activities within the objective of protecting the environment. 

Section 148 of this Act requires notification of pollution incidents.  

Section 120 of this Act provides that it an offence to pollute waters. 

Schedule 1 of the POEO Act describes activities for which an Environment Protection Licence  is required. 

Page 73: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  52   

WRSFPL must ensure that all phases of the WRSF are managed to prevent pollution, including pollution of waters.  

WRSFPL  is  obliged  to  notify  the  relevant  authorities  (e.g.  Environment  Protection  Authority) when  a ‘pollution incident’ occurs that causes or threatens ‘material harm’ to the environment. 

Under Section 48 of the POEO Act, premises‐based scheduled activities (as defined  in Schedule 1 of the 

POEO Act)  require an Environment Protection  Licence  (EPL). Clause 17 of Schedule 1 of  the POEO Act 

concerns electricity generation works. General electricity works is a scheduled activity and requires an EPL 

where the activity has the capacity to generate more than 30 MW of electrical power. General electricity 

generation works is defined as “the generation of electricity by means of electricity plant that, wherever 

situated, is based on, or uses, any energy source other than wind power or solar power”. The WRSF is not 

general electricity works as it generates electricity through solar power, and in any event, would not have 

the capacity to generate more than 30 MW of electrical power.  

The WRSF is not otherwise a scheduled activity under this Act. Accordingly, an EPL is not required under 

the POEO Act for the proposed WRSF. 

Legal  requirements  for  the management  of waste  are  also  established  under  the  POEO  Act  and  the 

Protection  of  the  Environment  Operations  (Waste)  Regulation  2005.  Unlawful  transportation  and 

deposition of waste  is  an offence under  Section 143 of  the POEO Act. Waste management  should be 

undertaken  in accordance with the Waste Avoidance and Resource Recovery Act 2001 (WARR Act). The 

objectives of this Act are: 

a) to  encourage  the most  efficient  use  of  resources  and  to  reduce  environmental  harm  in 

accordance with the principles of ecologically sustainable development, 

b) to  ensure  that  resource management options are  considered against a hierarchy of  the 

following order: 

i. avoidance of unnecessary resource consumption, 

ii. resource recovery (including reuse, reprocessing, recycling and energy recovery),  

iii. disposal, 

c) to provide for the continual reduction in waste generation, 

d) to minimise  the  consumption  of  natural  resources  and  the  final  disposal  of  waste  by 

encouraging the avoidance of waste and the reuse and recycling of waste, 

e) to  ensure  that  industry  shares with  the  community  the  responsibility  for  reducing  and 

dealing with waste, 

f) to ensure the efficient funding of waste and resource management planning, programs and 

service delivery, 

g) to achieve  integrated waste and  resource management planning, programs and  service 

delivery on a State‐wide basis, 

h) to  assist  in  the  achievement  of  the  objectives  of  the  Protection  of  the  Environment 

Operations Act 1997. 

Waste minimisation and management is assessed in Section 9.5 of the EIS. 

6.3.3 Threatened Species Conservation Act 1995 

The  Threatened  Species  Conservation Act  1995  (TSC Act)  deals with  the  listing  of  threatened  species, 

populations and communities, the declaration of critical habitat, recovery plans, threat abatement plans, 

licensing, Species Impact Statements, biodiversity certification and biobanking.  

Page 74: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  53   

The EP&A Act specifies seven factors which must be considered by decision‐makers regarding the effect of 

a proposed development or activity on threatened species, populations or ecological communities (or their 

habitats) that are  listed under the TSC Act. These  factors are collectively referred to as the  ‘Seven‐part 

Test’. If the seven‐part test determines that there is likely to be a significant effect, then the WRSF Project 

must be modified to remove the potential for this  impact, or a Species  Impact Statement (SIS) must be 

prepared and the concurrence of the Chief Executive of OEH obtained by the determining authority prior 

to determination. 

An assessment of the potential impacts of the proposed activities on threatened species, populations and 

ecological communities was undertaken, as documented in Section 8.1 of this EIS and in full in Appendix B.  

A significant  impact on any  listed threatened species, population or ecological community  is considered 

unlikely  due  to  the  low  condition  of  the  vegetation  and  lack  of  habitat  features.    A  Species  Impact 

Statement for WRSF is not considered to be required. 

6.3.4 Fisheries Management Act 1994 (FM Act) 

The FM Act sets out  to conserve  fish stocks and key  fish habitats, threatened species, populations and 

ecological communities of fish and marine vegetation and biological diversity. Further, it aims to promote 

viable  commercial  fishing,  aquaculture  industries  and  recreational  fishing  opportunities.  Threatened 

species, populations and ecological communities and key threatening process are  listed  in the FM Act’s 

Schedules.  

The WRSF  Development  Envelope  is  on  western  side  of Wellingrove  Creek  catchment.  There  is  an 

ephemeral  drainage  depression  within  the  solar  farm  site.    There  are  no  watercourses  within  the 

Development Envelope considered to be Key Fish Habitat under the Act.  Key Fish Habitat are those aquatic 

habitats that are important to the sustainability of the recreational and commercial fishing industries, the 

maintenance of fish populations generally and the survival and recovery of threatened aquatic species (DPI 

2016). Key Fish Habitat has been mapped on a local government basis.   

A permit under Section 201, 205 or 219 of the Act is not required by virtue of Section 89J of the EP&A Act. 

6.3.5 Native Vegetation Act 2003 

The Native Vegetation Act 2003 regulates the clearing of native vegetation. Clearing is defined as cutting 

down, felling, thinning, logging, removing, killing, destroying, poisoning, ringbarking, uprooting or burning 

native vegetation including native grasses and herbage.  

An authorisation to clear native vegetation is not required for SSD (Section 89J EP&A Act). Native vegetation 

clearing is addressed in Section 8.1. 

6.3.6 National Parks and Wildlife Act 1974 

Under the National Parks and Wildlife Act 1974 (NPW Act), the Director General of OEH is responsible for 

the care, control and management of all national parks, historic sites, nature reserves, reserves, Aboriginal 

areas and state game reserves. The Director General of OEH is also responsible under this legislation for 

the protection and care of native fauna and flora, and Aboriginal places and objects throughout NSW.  

The provisions of the NPW Act have been considered for the WRSF. The WRSF Development Envelope is 

not in or in the vicinity of any protected areas as defined in the Act. 

Page 75: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  54   

An assessment of impacts to Aboriginal Heritage is provided in Section 8.2 of the EIS (and in full, Appendix 

C). An Aboriginal Heritage Impact Permit (AHIP) under Section 90 of the NPW Act is not required for SSD 

(Section 89J EP&A Act). 

6.3.7 Noxious Weeds Act 1993 (NW Act) 

This Act aims  to control noxious weeds  in NSW.   Part 3 of  this Act outlined  the obligations of a public 

authority to control noxious weeds.   

Noxious weeds and their management are discussed in Section 8.1 and 8.5 of this EIS and Appendix B. 

6.3.8 Roads Act 1993 

The Roads Act provides for the classification of roads and for the declaration of the Roads and Maritime 

and other public authorities as roads authorities for both classified and unclassified roads. It also regulates 

the carrying out of various activities in, on and over public roads. This includes the erection or removal of 

structures, the excavation or disturbance to a public road surface, the pumping of water into a public road 

from any land adjoining the road or the connection of a road to a classified road. 

The WRSF would not  involve any works  in, on or over a public road.   Access to the WRSF would be via 

Gwydir Highway and the main access track for the construction and operation of the WRWF.  Upgrading of 

the site entry from Gwydir Highway (widening and safety works) would take place prior to the windfarm 

construction  and  have  been  assessed  as  part  of Works  Authorisation  Deed  (WAD)  that will  need  to 

approved by Roads and Maritime prior to the WRWF pre‐construction works being undertaken.   

A Section 138 approval would not be required for the WRSF.  

6.3.9 Crown Lands Act 1989 

The objective of the Crown Lands Act is to ensure that Crown land is managed for the benefit of the people 

of New  South Wales.  The  Catchments  and  Lands Division,  DPI  is  responsible  for  the  sustainable  and 

commercial management of Crown land. This involves the management of state‐owned land, linking with 

other agencies,  local government,  the private  sector and  communities  to provide  social and economic 

outcomes for NSW.  

The northern entry to the WRWF project area from the Gwydir Highway utilises an existing farm entry point 

across a Crown Reserve Lot 7001/93978. The access is the same as that which will be used for the WRWF 

site and WRWFPL has obtained Licence R1 523495 for construction of an access track across the Crown 

Land. The Licence has been issued under Section 34A of the Crown Lands Act, 1989. 

Additionally, a paper road runs through the Development Envelope in a north‐south alignment between 

Lots 29 and 30 of DP 753319. The indicative array (Figure 4.1) ensures that no above ground infrastructure 

is located within the paper road but may require 33 kV underground cabling crossing this land for which 

approval of Crown Lands will need to be obtained. WRSFPL will  initially consult Crown Lands seeking to 

licence the paper road temporarily and subsequently seek closure of the road. If closed by Crown Lands, 

then fencing either side of the paper road would not be required.  

6.3.10 Heritage Act 1977 

This act aims to conserve heritage values. The Heritage Act 1977 defines ‘environmental heritage’ as those 

places, buildings, works, relics, moveable objects and precincts of State or  local heritage significance. A 

Page 76: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  55   

property is a heritage item if it is listed in the heritage schedule of the local Council's LEP or listed on the 

State Heritage Register, a register of places and items of particular importance to the people of NSW. 

Section 9.6 of this EIS addresses potential impacts on heritage items or places. No heritage items or places 

have been identified for the solar farm site. 

6.3.11 Mining Act 1992 

The main objective of the Mining Act 1992 is to encourage and facilitate the discovery and development of 

mineral resources  in New South Wales, having regard to the need to encourage ecologically sustainable 

development.  

A search of Department of Industry’s MinView database (Department of Industry 2016) found there are no 

existing Mining Exploration Licences or other authorisations within the Development Envelope. A historical 

exploration licence (EL7302) exists which covers the southern portion of the Development Envelope.  This 

was for the exploration of metallic mineral between 2009 and 2013. 

6.4 COMMONWEALTH LEGISLATION 

6.4.1 Environment Protection and Biodiversity Conservation Act 1999 

The  Environment Protection and Biodiversity Conservation Act 1999  (EPBC Act)  is  administered by  the 

Commonwealth Department of Environment (DoE). Under the EPBC Act, if the Minister determines that an 

action  is a  ‘controlled action’ which would have or  is  likely  to have a significant  impact on a Matter of 

National  Environmental  Significance  (MNES)  or  Commonwealth  land,  then  the  action  may  not  be 

undertaken without prior approval of the Minster. 

The EPBC Act identifies nine MNES: 

World Heritage properties. 

National heritage places. 

Ramsar wetlands of international significance. 

Threatened species and ecological communities. 

Migratory species. 

Commonwealth marine areas. 

The Great Barrier Reef Marine Park. 

Nuclear actions (including uranium mining). 

A  water  resource,  in  relation  to  coal  seam  gas  development  and  large  coal  mining 

development 

When a person proposes to take an action that they believe may be a ‘controlled action’ under the EPBC 

Act, they must refer the WRSF Project to the Department for a decision about whether the proposed action 

is a ‘controlled action’. 

A search for MNES and other matters protected by the EPBC Act was carried out within a 50km radius of 

the WRSF Development Envelope using the Commonwealth online Environmental Reporting Tool (report 

created 7 January 2016). A summary of the findings is provided in the tables below.   

Page 77: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  56   

Table 6‐2  Summary of Matters of National Environmental Significance (50km search radius). 

Matters of National Environmental Significance  No. 

World Heritage Properties  0 

National Heritage Places  0 

Wetlands of International Significance  5 

Great Barrier Reef Marine Park  0 

Commonwealth Marine Areas  0 

Threatened Ecological Communities  5 

Threatened Species  61 

Migratory Species  13 

 

Table 6‐3  Summary of other matters protected by the EPBC Act (50km search radius). 

Other Matters Protected by the EPBC Act  No.  

Commonwealth Lands  5 

Commonwealth Heritage Places  1 

Listed Marine Species  16 

Whales and Other Cetaceans   0 

Critical Habitats  0 

Commonwealth Reserves  0 

 

Table 6‐4  Summary extra information (50km search radius). 

Extra Information  No. 

State and Territory Reserves  21 

Regional Forest Agreements  1 

Invasive Species  39 

Nationally Important Wetlands  2 

Key Ecological Features (Marine)  0 

Relevant matters are discussed within Section 8.1 (Biodiversity) and 9.6 (Heritage items). No MNES would 

be affected by the proposed activity and a referral under the EPBC Act is not considered to be required. 

6.4.2 Native Title Act 1993 

The Native Title Act 1993 provides a legislative framework for the recognition and protection of common 

law native title rights. Native title is the recognition by Australian law that Indigenous people had a system 

of law and ownership of their lands before European settlement. Where that traditional connection to land 

and waters has been maintained and where government acts have not removed it, the law recognises the 

persistence of native title. 

Page 78: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  57   

People who hold native title have a right to continue to practise their  law and customs over traditional 

lands and waters while respecting other Australian laws. This could include visiting to protect important 

places, making decisions about the future use of the land or waters, hunting, gathering and collecting bush 

medicines.  Further, when  a  native  title  claimant  application  is  registered  by  the National Native  Title 

Tribunal, the people seeking native title recognition gain a right to consult or negotiate with anyone who 

wants to undertake a project on the area claimed. 

Native title may exist in areas such as: 

Vacant Crown land. 

Some national parks, forests and public reserves. 

Some types of pastoral lease. 

Some land held for Aboriginal communities. 

Beaches, oceans, seas, reefs, lakes, rivers, creeks, swamps and other waters that are not privately 

owned. 

A search of the National Native Title Register (NNTR) for the Glen Innes Severn Council returned no results. 

6.4.3 Renewable Energy (Electricity) Act 2000 

The Renewable Energy (Electricity) Act 2000 (RE Act) aims: 

To encourage the additional generation of electricity from renewable sources. 

To reduce emissions of greenhouse gases in the electricity sector. 

To ensure that renewable energy sources are ecologically sustainable. 

Section 17 of the RE Act defines renewable energy sources eligible under the Commonwealth government’s 

Renewable Energy Target (RET); this includes solar energy. 

Certificates  for  the  generation  of  electricity  are  issued  using  eligible  renewable  energy  sources.  This 

requires purchasers (called liable entities) to surrender a specified number of certificates for the electricity 

that they acquire.  In January 2011, renewable energy certificates were reclassified as either  large‐scale 

generation certificates or a small‐scale technology certificates following changes to the RET scheme. 

WRWFPL  and WRSFPL will  both  need  to  be  accredited  as  a  Renewable  Energy  Generators  to  create 

Renewable Energy Certificates. 

6.5 OTHER RELEVANT POLICIES AND PLANS 

6.5.1 Ecologically Sustainable Development (ESD) 

Ecologically  Sustainable Development  (ESD)  involves  the  effective  integration  of  social,  economic  and 

environmental considerations in decision‐making processes. In 1992, the Commonwealth and all state and 

territory governments endorsed the National Strategy for Ecologically Sustainable Development. 

In NSW, the concept has been  incorporated  in  legislation such as the EP&A Act and Regulation. For the 

purposes  of  the  EP&A  Act  and  other  NSW  legislation,  the  Intergovernmental  Agreement  on  the 

Environment  (1992)  and  the Protection of  the  Environment Administration Act 1991 outline principles 

which can be used to achieve ESD. These principles are presented below along with a description of how 

the WRSF and this EIS have considered each principle. 

Page 79: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  58   

a) The precautionary principle, namely, that  if there are threats of serious or  irreversible 

environmental damage, lack of full scientific certainty should not be used as a reason for 

postponing measures  to prevent environmental degradation.  In  the application of  the 

precautionary principle, public and private decisions should be guided by: 

i. careful evaluation to avoid, wherever practicable, serious or irreversible damage to 

the environment, and 

ii. an assessment of the risk‐weighted consequences of various options. 

The precautionary principle has been adopted in the assessment of impact; all potential impacts have 

been considered and mitigated where a risk is present. Where uncertainty exists, measures have been 

included to address the uncertainty. 

b) Inter‐generational equity, namely, that the present generation should ensure that the 

health, diversity and productivity of the environment are maintained or enhanced for the 

benefit of future generations. 

Potential impacts of the WRSF are likely to be localised and would not diminish the options regarding 

land and resource uses and nature conservation available to future generations. Importantly, the WRSF 

provides  additional  renewable  energy  that  contributes  to minimising  the  risk  of  climate  change  to 

current and future generations by reducing carbon emissions intensity of electricity generation. 

c) Conservation of biological diversity and ecological integrity, namely, that conservation of 

biological diversity and ecological integrity should be a fundamental consideration. 

The impacts of the WRSF Project on biodiversity, including EPBC listed species, have been assessed in 

detail in the Biodiversity Assessment in Appendix B and are summarised in Section 8.1. This has included 

avoidance of areas of higher conservation value and management prescriptions to minimise and manage 

residual impacts. 

d) Improved  valuation,  pricing  and  incentive mechanisms,  namely,  that  environmental 

factors should be included in the valuation of assets and services, such as: 

i. polluter pays, that is, those who generate pollution and waste should bear the cost 

of containment, avoidance or abatement, 

ii. the users of goods and services should pay prices based on the full life cycle of costs 

of providing goods and services,  including the use of natural resources and assets 

and the ultimate disposal of any waste, 

iii. environmental goals, having been established, should be pursued in the most cost 

effective way, by establishing  incentive structures,  including market mechanisms, 

that enable those best placed  to maximise benefits or minimise costs  to develop 

their own solutions and responses to environmental problems. 

Attributes of the Development Envelope such as the existing native vegetation, soil and hydrology have 

been valued in terms of their broader contribution to the catchment and catchment processes. 

   

Page 80: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  59   

The aims, structure and content of this EIS have incorporated these ESD principles. The mitigation measures 

in Section 10 provide an auditable environmental management commitment to these parameters. Based 

on the social and environmental benefits accruing  from the WRSF at a  local and broader  level, and the 

assessed  impacts  on  the  environment  and  their  ability  to  be  managed,  it  is  considered  that  the 

development would be ecologically sustainable within the context of ESD. 

6.5.2 Strategic Regional Land Use Plan – New England North West 

The  New  England  North  West  Strategic  Regional  Land  Use  Plan  represents  one  component  of  the 

Government’s broader Strategic Regional Land Use Policy which comprises multiple initiatives being staged 

over time to address land use conflict in regional areas. The primary aim of the plan is to provide greater 

protection for valuable agricultural land and better balance competing land uses.   

The plan is particularly focused on managing coal and coal seam gas issues (DP&I 2012), however is relevant 

to all developments within the New England North West region as it identifies land that is considered to 

be Strategic Agricultural Land.  Strategic agricultural land is defined as highly productive land that has both 

unique natural resource characteristics (such as soil and water resources) as well as socio‐economic value 

(such as high productivity,  infrastructure availability and access to markets). Two categories of strategic 

agricultural land have been identified:  

1. Biophysical strategic agricultural land. 

2. Critical industry clusters. 

Biophysical strategic agricultural land is land with a rare combination of natural resources highly suitable 

for agriculture. These  lands  intrinsically have the best quality  landforms, soil and water resources which 

are naturally capable of sustaining high levels of productivity and require minimal management practices 

to maintain this high quality. 

Critical industry clusters are related to the lands importance to highly significant agricultural industries (eg, 

wine making, horse breeding etc).  There are no critical industry clusters in the New England North West. 

The WRSF is located on land that is mapped as Strategic Agricultural Land (NSW Planning Portal).  Potential 

impacts to this high value land are considered in this EIS along with management measures to minimise 

the impact.  DPI has been consulted in relation to assessment required for WRSF and the SEARs require 

assessment of development on agricultural land. Attachment 1 of the SEARs in respect of Land, references 

‘Primefact 1063:  Infrastructure proposals on  rural  land  (DPI)’. Section 7.5 addresses potential Land Use 

issues including agricultural issues in accordance with this guideline. 

   

Page 81: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  60   

6.6 SUMMARY OF LICENSES AND APPROVALS 

Table 6‐5  Summary of licenses and approvals required for WRSF. 

Legal Instrument  License or Approval 

EP&A Act, Part 4  Development consent required 

Crown Lands Act  Licence for access across Crown Land or works for cabling below paper road 

POEO Act 1997  EPL  not  required  as  solar  electricity  generation  is  not  a  scheduled activity. WRWF Development Envelope is subject to an EPL. WRWFPL may need to seek exclusion of the Solar Farm site from the EPL. 

EPBC Act, 1999  Based  on  specialist  advice,  a  referral  under  the  EPBC  Act  is  not considered to be required 

Note, if it is determined that additional licenses or approvals are required, WRWFPL would obtain these 

prior to commencement of relevant activities.   

Page 82: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  61   

7  SCOPING  

7.1 RISK ASSESSMENT 

A Scoping Report was completed, as part of the request for SEARs, to identify the key environmental issues 

likely to be associated with the WRSF. The Scoping Report was prepared by WRSFPL with input and review 

from NGH Environmental.  It was based on desktop review of available information, site inspections and a 

general familiarity with the area as a result of the environmental assessments undertaken for the adjoining 

WRWF development. 

An environmental consultant (from NGH Environmental) and WRSFPL Development Compliance Manager 

undertook  a  site  inspection  of  each  potential  development  site  on  6  January  2016.    After  the  site 

assessment,  a  risk  assessment was  undertaken  to  characterise  the  likely  adverse  environmental  risks 

associated with  the  construction,  operation  and  decommissioning  of  the WRSF.  The  aim  of  the  risk 

assessment was to ensure that all relevant risks were identified, investigated and mitigated as part of the 

WRSFPL’s submission, relative to the degree of environmental risk they represented.  

The  risk  rating  is a  factor of  the consequence of an  impact occurring and  the  likelihood of  the  impact 

occurring. Depending on the combination of consequence and likelihood, the overall risk rating could be 

low to extreme (refer Table 7‐1). Very High to extreme risks (termed ‘key risks’) have warranted a higher 

level of investigation. Risks identified as low or highly manageable are discussed in less detail.  

Table 7‐1  Risk assessment rating matrix. 

Likelihood  Consequence 

  Negligible  Minor  Moderate  Major  Catastrophic 

Remote  Low  Low  Low  Medium  Medium 

Unlikely  Low  Low  Medium  High  High 

Possible  Low  Medium  High  Very High  Very High 

Likely  Medium  High  Very High  Very High  Extreme 

 Almost certain/ inevitable  Medium  High  Very High  Extreme  Extreme 

 

Page 83: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  62   

Table 7‐2 summarises the results of the risk assessment. Fourteen environmental risks were investigated. 

The unmitigated risk rating is the risk rating prior to assessment and is therefore precautionary. It considers 

a  ‘worst  case’  in  the  absence of  specific  information.  The mitigated  risk  rating  is developed  following 

detailed assessment. It reflects the actual risks identified in consideration of the receiving environment and 

the mitigation strategy proposed to manage them. 

Table 7‐2  Risk analysis of adverse environmental issues. 

Relevant 

EIS Section Environmental risk  Consequence  Likelihood 

Risk rating 

(unmitigated) 

Risk rating 

(mitigated) 

7.1  Biodiversity  Moderate  Possible  High  Low 

7.2  Archaeology  Moderate  Possible  High  Low 

7.3  Visual  Moderate  Possible  High  Low 

7.4  Noise  Moderate  Possible  High  Low 

7.5  Land use  Moderate  Likely  Very High  Low 

8.1  Soils and 

Landforms 

Minor  Possible  Medium  Low 

8.2  Water  Minor  Possible  Medium  Low 

8.3  Traffic  Moderate  Unlikely  Medium  Low 

8.4  Health and Safety  Moderate  Unlikely  Medium  Low 

8.5  Resource Use and 

Waste Generation 

Minor  Possible  Medium  Low 

8.6  Historic Heritage  Minor  Unlikely  Low  Low 

8.7  Climate  Minor  Unlikely  Low  Low 

8.8  Socioeconomic  Minor  Unlikely  Low  Low 

In summary, the following environmental risks were considered to be key issues for the EIS: 

Biodiversity 

Archaeology 

Visual impacts 

Noise impacts 

Land use 

Biodiversity, archaeology, visual and noise  impacts were  investigated by specialists. Summaries of these 

reports are included in Section 8.  The full reports are attached as Appendices.  Land use has been assessed 

in  Section  8.5  and  addresses  guidance  provided  in  Primefact  1063  (DPI  2013).  Lower  risk  issues  are 

addressed in Section 9. 

Page 84: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  63   

7.2 CONSTRAINTS MAPPING 

Early in the assessment process, following the site inspections by environmental consultants, constraints 

mapping was compiled  to  inform  the project planning and assist  in  the development of  the solar  farm 

design.   The map  is  included as Figure 7‐1.   WRSF Project  constraints  identified at  this  stage primarily 

involved site  topography and minimising  impacts  to biodiversity.   A drainage depression was  identified 

onsite and reviewed  for  its  impact on the surrounding area. The Department of Primary  Industries was 

consulted with regards to the significance of this drainage depression and following this consultation,  it 

was determined that the drainage depression is a minor feature in the landscape and not a constraint to 

the WRSF Project.  No other constraints were identified during the environmental site inspections. Strategic 

Agricultural  land was  not  included  on  the  constraints mapping  as  all  suitable  land  for  the  solar  farm 

development within the Development Envelope is mapped as Strategic Agricultural Land. 

Page 85: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  64   

 

Figure 7‐1 Constraints map for the WRSF Development Envelope 

Page 86: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  65   

8 ENVIRONMENTAL IMPACT ASSESSMENT – KEY 

ISSUES 

8.1 BIODIVERSITY (FLORA AND FAUNA) 

8.1.1 Approach 

A specialist Biodiversity Assessment Report (BAR) was prepared by NGH Environmental to investigate and 

assess  the  potential  impacts  of  the WRSF  on  biodiversity.  The  aim  of  the  report was  to  address  the 

requirements of  the  Framework  for Biodiversity Assessment  (FBA),  the NSW biodiversity offsets policy 

developed for Major Projects (OEH 2014) and the requirements of the SEARs in relation to biodiversity.  

The full report is included in Appendix B and the report is summarised below. 

The assessment approach followed the FBA and involved literature reviews, database searches, and field 

surveys conducted in accordance with relevant survey guidelines.   

Site assessment and field surveys were undertaken on two occasions; January and February 2016. The field 

survey work included; 

1. Random Meander and targeted searches for threatened flora species.  2. Five biometric vegetation plots surveys, these included; 3. Fauna habitat assessment. 

4. Opportunistic surveys that included recording of fauna species observed during the fauna 

assessment. 

5. Targeted surveys of threatened species.  

A review of previous surveys completed in the local area was undertaken. This included those prepared as 

part of the WRWF that occurs on land adjacent to the solar farm site. 

The approach to undertaking the BAR included giving consideration to avoiding and minimising impacts to 

biodiversity throughout each phase of the WRSF Project. For example, early site selection options where 

assessed against key environmental, social and economic criteria, with several alignment and interchange 

options  being  eliminated  due  to  their  impact  on  environmental  values;  notably  on  CEECs  EECs,  and 

threatened species habitat. The option proposed and assessed in this EIS ensures the greatest avoidance 

and minimisation of impacts on biodiversity possible. 

As  part  of  the  BAR,  a  BioBanking  development  credit  assessment was  completed  for  the WRSF.  The 

proposal ID for the assessment is 205/2016/2392MP Version 1 and the assessment type was selected as 

‘Major Project’.  Section 2.10 of Appendix B of this EIS summarises the values entered into the Landscape 

values section of the Biobanking Credit Calculator (BCC). 

Page 87: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  66   

8.1.2 Existing environment 

Landscape features 

The WRSF Project  is  located within The New England Tablelands Bioregion and  the Glenn  Innes‐Guyra 

Basalts Subregion (IBRA v.7 2012). The dominant IBRA subregion affected by the WRSF Project is the Glenn 

Innes‐Guyra Basalts Subregion.  The geology of the region is Silurian to Triassic (443 million years) in age, 

with  landforms  described  as  mountain  ranges,  dissected  plateaus,  hills,  and  undulating  plains.  The 

dominant  pre‐European  vegetation  type  is  considered  likely  to  be  Eucalypt Woodlands  dominated  by 

Eucalyptus albens and E. melliodora (ASRIS accessed 21/1/16). 

The following Mitchell Landscapes occur within the study area; 

Glenn Innes – Guyra Basalts occurs throughout the majority of the study area. The per cent 

cleared estimate for this landscape is currently 82% (OEH 2007).  

Inverell Plateau Granites occurs to the east and west of the study area and crosses a small 

section of the study area in the northeast. The per cent cleared estimate for this landscape 

is currently 40% (OEH 2007).  

The  total  area  of  native  vegetation  mapped  within  the  outer  assessment  circle  is  1470.42  ha.  

Approximately 76.27ha (47%) within the WRSF Development Footprint is cleared (non‐native vegetation) 

land which provide very little in terms of fauna habitat. These areas provide suitable foraging habitat for 

raptors and macropods, and introduced species such as cats, foxes and rabbits.  

There are no rivers or steams present at the site.  A drainage depression lies within Development Envelope 

which was dry during the  field surveys and does not contain permanently wet areas.   Waterbodies are 

limited to two man made dams with a sparse covering of aquatic vegetation.  The dams provide low quality 

habitat for wetland birds and amphibians. The closest Nationally Important Wetland and Ramsar Wetland 

to  the  Development  Envelope  is  the  Little  Lliangothlin  Lake  and  Nature  Reserve  approximately  30 

kilometres to the southeast. 

No  state  or  regionally  significant  biodiversity  links,  as  defined  in  the  FBA  (OEH)  occur  within  the 

Development Envelope and within the inner and outer assessment circles. 

Using the Biobanking Credit Calculator, the study area returned a landscape value score of 12. 

Native vegetation 

Two distinct Plant Community Types  (PCTs) were observed  in  the Development Envelope  (mapped on 

Figure 7‐2): 

1. Blakely’s Red Gum – Yellow Box grassy woodland of the New England Tableland Bioregion. 

2. Cleared areas (cultivated exotic vegetation). 

Blakely’s Red Gum – Yellow Box grassy woodland of the New England Tableland Bioregion (PCT 510) 

Within the Development Envelope, the Plant Community Type (PCT) 510 occurs as highly disturbed, and 

therefore low condition within the site, as several small patches on the east and one larger patch in the 

western extent of the site.  This vegetation community is listed as an Endangered Ecological Community 

(EEC) under the TSC White Box Yellow Box Blakely’s Red Gum Woodland.    It  is also  listed as a Critically 

Endangered Ecological Community (CEEC) under the EPBC Act ‐ White Box Yellow Box Blakely’s Red Gum 

Woodland, but given the highly modified state, it is classed as low condition, and no vegetation proposed 

for clearing to construct the WRSF development qualifies for EPBC listing. 

Page 88: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  67   

The  dominant  tree  species  in  the  community  consisted  of  Yellow  Box  (E. melliodora).  The midstorey 

consisted  of  shrubs  including  Blackberry  (Rubus  fruticosus).  The  understorey  was  nearly  completely 

dominated  by  St  Barnaby’s  Thistle  (Centaurea  solstitialis).  The  understorey  also  included  a  diverse 

assemblage of exotic species with limited examples of native species including Phalaris (Phalaris aquatic), 

Prarie  grass  (Bromus  catharticus),  Perennial  Rye  grass  (Lolium  perene),  Chickweed  (Stellaria  media), 

stinging  nettle  (Urtica  urens),  Red  Clover  (Trifolium  pratense),  Tussock  grass  (Poa  sieberiana  var. 

sieberiana), Bracken Fern (Pteridium esculentum) and Wallaby grass (Rytidosperma tenuius). 

The vegetation community provides for some fauna. Canopy trees provide foraging and nesting/resting for 

birds and arboreal  fauna. Ground  cover plants,  logs and  fallen  leaves provide  shelter and  foraging  for 

terrestrial fauna as well. Where hollow‐bearing trees are present, it may provide daytime resting habitat 

for bats and mammals, and roosting habitat for birds. 

Cleared areas 

This highly disturbed or modified vegetation community occupies  the majority of  the site and  is  found 

where there is a prevalence of exotic or planted non‐local flora species that make up groundcover layers 

and  is  confined  to  grazing  areas. Non‐indigenous  vegetation  covers  the majority  of  the Development 

Envelope, making  it  the most abundant  community  in  the Development Envelope. The groundcover  is 

mainly exotic with common grazing species including Phalaris (Phalaris aquatica), Yorkshire Fog (Holocus 

lanatus), Prarie grass (Bromus catharticus), Paspalum (Paspalum diltatum) and Perennial Rye Grass (Lolium 

perenne).

Page 89: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  68   

 

Figure 7‐2 Endangered ecological community map for the Development Envelope. 

Page 90: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  69   

Threatened species 

The following threatened species were identified from the BCC as potentially being present and requiring 

targeted  survey.    The  table  below  states  whether  each  species  was  detected  during  onsite  surveys 

(methodology and results provided below) and furthermore, if they are now expected to be impacted by 

the proposal. 

Table 7‐3 Threatened species returned from the BCC as requiring survey 

Common name  Scientific name Surveys  Present/presumed 

present 

Affected by the proposal 

Bluegrass  Dichanthium 

setosum 

Not detected.  Presumed to occur on 

occasion. 

Unlikely – not recorded 

within the Development 

Envelope. 

Regent Honeyeater Anthorchaera 

phrygia 

Not detected.  No.  Unlikely – not recorded 

within the Development 

Envelope, only one 

recording within 20km, 

and minimal clearance of 

marginal habitat. 

Silky Swainson‐pea  Swainsona sericea Not detected.  Presumed to occur on 

occasion. 

Unlikely – not recorded 

within the Development 

Envelope. 

Small Snake Orchid Diuris 

pedunculata 

Not detected, 

although not 

targeted due to non‐

favourable survey 

time. 

Presumed to occur on 

occasion. 

Unlikely – elevation above 

species range, marginal 

and poor quality habitat 

present closest record 

more than 50km south, 

not recorded in surveys at 

adjacent and equivalent 

habitat of the WRSF. 

 

Other threatened species of note that were  identified  in background searches with previous recordings 

within a 10km radius are included in Table 7‐4. 

Table 7‐4  Additional species potentially present at the site 

Common name  / Status (TSC Act,  EPBC Act) 

Scientific name 

Number of records (OEH/AoLA/WRWF) 

Suitable habitat within  the Development Envelope 

Surveys  Present/presumed present 

Affected by the proposal 

Austral Toadflax  / V, V 

Thesium australe 

0/4/0  Marginal  Not detected 

Unlikely to occur  Unlikely 

Blackbutt Candlegum / V 

Eucalyptus rubida  subsp. barbigerorum 

0/1/0  No  Not detected 

Unlikely to occur  Unlikely 

Page 91: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  70   

Common name  / Status (TSC Act,  EPBC Act) 

Scientific name 

Number of records (OEH/AoLA/WRWF) 

Suitable habitat within  the Development Envelope 

Surveys  Present/presumed present 

Affected by the proposal 

Speckled Warbler  / V 

Chthonicola sagittata 

1/4/0  No  Not detected 

Unlikely  to  occur due  to  habitat condition 

Unlikely 

Spotted Harrier / V 

Circus assimilis 

0/2/0  Marginal  Not detected 

Presumed  to occur  on occasion.  Habitat elements  that occur  onsite  are common  in  the local area. 

Unlikely 

Varied Sittella / V 

Daphoenositta chrysoptera 

0/1/2  No  Not detected 

May  occur  on occasion.  Habitat elements  that occur  onsite  are poor  quality  and common  in  the local area. 

Unlikely 

Hooded Robin V 

Melanodryas cucullata 

1/1/0  No  Not detected 

Unlikely  to occur, habitat  elements that  occur  onsite are poor quality 

Unlikely 

Flame Robin / V 

Petroica phoenicea 

0/7/0  No  Not detected 

Unlikely  to occur, habitat  elements that  occur  onsite are poor quality 

Unlikely 

Scarlet Robin / V 

Petroica boodang 

0/5/0  No  Not detected 

Unlikely  to occur, habitat  elements that  occur  onsite are poor quality 

Unlikely 

Black‐throated Finch (southern sub‐species)  / E, E 

Poephila cincta cincta 

0/1/0  Marginal  Not detected 

Unlikely to occur  Unlikely 

Diamond Firetail / V 

Stagonopleura guttata 

0/9/0  Marginal  Not detected 

Unlikely  to occur, habitat  elements that  occur  onsite are poor quality 

Unlikely 

Little Lorikeet  / V 

Glossopsitta pusilla 

0/3/0  No  Not detected 

Unlikely  to occur, habitat  elements that  occur  onsite are poor quality 

Unlikely 

Page 92: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  71   

Common name  / Status (TSC Act,  EPBC Act) 

Scientific name 

Number of records (OEH/AoLA/WRWF) 

Suitable habitat within  the Development Envelope 

Surveys  Present/presumed present 

Affected by the proposal 

Spotted‐tailed Quoll  /  V, E 

Dasyrurus maculatus 

1/1/0  No  Not detected 

Unlikely to occur  Unlikely 

Koala  /  V, V  

Phascolarctos cinereus 

0/0/0  Marginal  Not detected 

Unlikely to occur  Unlikely 

Eastern Bentwing‐bat V 

Miniopterus schreibersii oceanensis 

0/0/12  Marginal  Not detected 

May forage at site on  occasion, habitat  elements that  occur  onsite are poor quality 

Unlikely 

8.1.3 Site surveys 

Methodology 

Site surveys were undertaken by a botanist and an ecologist between the 11 and 15 January 2016.  A follow 

up survey occurred on 15th February 2016.  

The aims of the site surveys were as follows: 

1. Determine vegetation communities present within the Development Envelope, their condition and 

extent. 

2. Identify  potential  EECs within  the  Development  Envelope  and  determine  their  condition  and 

extent. 

3. Conduct  targeted  searches  for  threatened  flora  and  fauna  species  predicted  to  occur  in  the 

Development Envelope. 

Assess the availability and extent of flora and fauna habitat, particularly threatened species habitat, such 

as hollow‐bearing trees. 

The following survey methods were utilised during the survey: 

Random meander and targeted searches for threatened flora species 

Biometric vegetation plots 

Fauna habitat assessment 

Opportunistic fauna surveys 

Targeted fauna surveys for the Regent Honeyeater (Anthochaera phrygia).  

A full description of the survey methodology is outlined in Section 4.2.2 of Appendix B. 

Results 

Thirty‐two flora species and 16 fauna species were detected during the surveys.  

Of all the species recorded, none are listed as threatened under the NSW TSC Act or EPBC Act. 

Page 93: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  72   

Four threatened species returned by the BCC assessment as requiring survey (and therefore with potential 

to  generate  species  credits  requiring offsets) were  considered  to have  some potential  to occur  in  the 

Development Envelope.  These include the following: 

Small Snake Orchid (Diurus pedunculata), listed as endangered under the TSC Act and the 

EPBC Act. 

Bluegrass (Dicanthium setosum), listed as vulnerable under the TSC Act and EPBC Act. 

Silky Swainson‐pea (Swainsona sericea), listed as vulnerable under the TSC Act. 

Regent Honeyeater (Anthocheara phrygia), listed as critically endangered under the TSC Act 

and EPBC Act. 

Based on the extensive survey effort undertaken at the subject site and within the neighbouring WRWF, 

combined with the modified nature of the areas that would be removed by the WRSF Project, none of 

these threatened species were considered likely to be adversely impacted by the WRSF Project. It is noted 

that the Small Snake Orchid (Diuris pedunculata) was not in flower during surveys and would not have been 

detected due to its cryptic habit. However based on an assessment of habitat present at the site, the sites 

elevation, combined with a review of surveys undertaken by RPS  (2011) of the WRWF site,  it has been 

identified that the site is very unlikely to provide habitat of the Small Snake Orchid. 

8.1.4 Potential impacts 

Construction  

The BAR identified the following potential direct and indirect impacts to biodiversity values of the site that 

would result during the construction phase. 

Table 7‐5 Potential biodiversity impacts as a result of the proposal. 

Impact  Frequency  Intensity  Consequence 

Direct       

Habitat  clearance  for permanent  and  temporary construction facilities (e.g. solar infrastructure,  compound  sites, stockpile sites, access tracks) 

Regular  High  Direct  loss  of  native  flora  and fauna habitat. 

Potential  clearing  of  habitat outside  of  the  WRSF Development Footprint. 

Injury  and  mortality  to  fauna during clearing of fauna habitat and habitat trees. 

Disturbance  to  fallen  timber, dead wood and bush rock 

Indirect 

Accidental  spills  and contamination  from construction activities (including compound sites) 

Rare  Moderate  Pollution of waterways. 

Earthworks  Regular  Moderate  Erosion  and  sedimentation  of waterways. 

Noise  Regular  Low  Construction  machinery  and activities  may  disturb  local fauna. 

Page 94: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  73   

Impact  Frequency  Intensity  Consequence 

Direct       

Dust generation  Regular  Low  Inhibit  the  function  of  plant species  and  communities, waterways. 

General construction activities  Regular  Moderate  Feral  pest,  weed  and/or pathogen encroachment. 

A range of mitigation measures would be implemented to ensure that impacts on biodiversity during the 

construction  phase  are  avoided  where  possible,  and minimised  where  they  cannot  be  avoided.  The 

mitigation measures that would be employed during the construction phase are provided in Section 8.1.5 

below.  Mitigation  measures  have  considered  methods  of  clearing,  clearing  operations,  timing  of 

construction and other measures that would minimise impacts of the WRSF Project on biodiversity values. 

Operation 

The BAR  identified  the  following potential direct and  indirect  impacts  to biodiversity values of  the site 

during the operational phase. 

Impact  Frequency  Intensity  Consequence 

Direct 

Existence  of  permanent  solar infrastructure 

Constant  Moderate  Permanent  removal  of  flora  and fauna habitat. 

Collision risk to birds and microbats to exterior barbed‐wire fencing. 

Inappropriate landscaping   Constant  Moderate  Reduction  in  the quality of habitat for native flora and fauna species. 

Indirect 

Light spill  Occasional  Low  Alter movements of  fauna through the landscape. 

Weed encroachment  Regular  Moderate  Ingress  of  weeds  along  the boundary of the development. 

Pest animals  Irregular  Low  Increase in pest species specialising in edge habitats. 

Measures  to  avoid  and  minimise  impacts  that  may  occur  during  the  operational  phase  would  be 

implemented as part of  the WRSF Project. Where practical, measures  to avoid  impacts on biodiversity 

during operation have been  identified. Where  impacts are unavoidable measures  to minimise  impacts 

would be implemented. 

Requirement for biodiversity offsets 

Use of the BCC for the WRSF Project concluded that there is no requirement to offset potential impacts to:  

Native vegetation 

Species and populations 

Hollow bearing trees   

Page 95: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  74   

8.1.5 Environmental safeguards 

The following mitigation measures would be implemented to reduce the impacts to biodiversity during the 

construction, operation and decommissioning phases of the WRSF Project: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

BIO 1  Preparation of  Flora and  Fauna Management Plan  (FFMP) that would  incorporate mitigation  strategies  below.    The FFMP  would  form  part  of  the  White  Rock  Solar  Farm Construction Environmental Management Plan.    

C     

BIO 2  Native vegetation to be retained (EEC and trees) would be delineated  (fencing  or  other  method),  and  construction activities would be excluded from these areas. Clearing and construction  contractors  would  be  given  inductions  that make clear the importance of these features. 

C     

BIO 3  A  ‘Clearing  and Grubbing  Plan’ would  be  developed.  This would include; 

o best  practice methods  for  the  removal  of woody vegetation and non‐woody vegetation  

o Where trees are to be retained, an adequate tree protection zone  

o A provision  for mulch reuse onsite, particularly  to stabilise disturbed areas 

o An unexpected threatened species finds procedure 

C     

BIO 4  Stockpile and  compound  sites would be  located using  the following criteria: 

o Within the Development Envelope. o At  least  40  metres  away  from  the  nearest 

waterway. o In areas of low ecological conservation significance 

(i.e. pasture  land, and avoiding drip  line of native trees). 

C     

BIO 5  The location of the underground power cable from the solar farm to WRWF would be micro‐sited to avoid hollow bearing trees. 

C     

BIO 6  Use non barbed‐wire on exterior fencing, unless required for public safety.  

C     

BIO 7  Rehabilitation would be undertaken  in  all  areas disturbed during  construction.   Where  plantings  are  be  carried  out they will utilise local native species to increase the diversity of  the  existing  vegetation,  as  well  as  to  improve  the connectivity between patches in the landscape. 

C     

BIO 8  Prepare a weed management plan that; o Is  consistent  with  DPI’s  Prime  Fact  1063 

Infrastructure proposals on rural land (DPI 2013)  o Allows for management of declared noxious weeds 

in accordance to the requirements stipulated by the Noxious Weeds Act 1993  

o Develops a protocol for weed hygiene in relation to plant,  machinery  and  importation  and management of fill 

C  O   

BIO 9  Vegetation groundcover, particularly beneath the low edge of  the panels, would be monitored and any bare areas or 

  O   

Page 96: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  75   

No.  Environmental Safeguard  Solar farm 

C  O  D 

erosion addressed (ie. planting, jute mesh armouring etc.) to resist erosion and weed infestation. 

BIO 10  Carry  out  refuelling  of  plant  and  equipment,  chemical storage  and  decanting  at  least  50 m  away  from  aquatic habitats in impervious bunds. Ensure that dry and wet spill kits are readily available 

C     

BIO 11  Dust  control  measures  (ie.  water  cart)  would  be implemented  in  response  to  visual  cues  to  prevent  dust spreading to nearby habitats. 

C     

BIO 12  If night work is unavoidable, ensure lights are directed away from wildlife or habitat corridor (biodiversity links). 

C     

BIO 13  Develop  a  pest management  plan  drawing  on  the White Rock  Wind  Farm  Stage  1  Construction  Flora  and  Fauna Management Plan, to cover all pest management  issues at the WRSF site. 

C  O   

8.2 ABORIGINAL HERITAGE 

8.2.1 Approach 

A  specialist  Aboriginal  Cultural  Heritage  Assessment  Report  (ACHAR)  was  undertaken  to  provide  an 

assessment of the Aboriginal cultural values associated with the Development Envelope and to assess the 

cultural and scientific significance of any Aboriginal heritage sites.  

The full report is provided in Appendix C and is summarised below. 

The ACHAR was prepared in line with the following:  

Guide  to  Investigating, Assessing and Reporting on Aboriginal Cultural Heritage  in NSW (OEH 2011); 

Code of Practice  for  the Archaeological  Investigation of Aboriginal Objects  in New South Wales (OEH 2010a), and 

Aboriginal cultural heritage consultation  requirements  for proponents 2010  (OEH 2010b) produced by the NSW Office of Environment and Heritage (OEH). 

8.2.2 Existing environment 

The Development  Envelope  is  located between  the  towns of  Inverell  and Glen  Innes.   At  the  time of 

European settlement in the region, the area in the vicinity of Inverell was believed to have been inhabited 

by Anaiwan (Nganyaywana) speaking Aboriginal people (Tindale 1974).  The area closer to Glen Innes was 

(probably) inhabited by a related group known as the Ngarrabul (Ngarabal, Ngarrbul) (Tindale 1974).   

The Anaiwan and Ngarrabal people are  thought  to have utilised  the majority of  the area north of  the 

Macintyre River, making use of  a broad  range of natural  resources.   Occupation  seems  to have been 

focused on the riverine margins, the Macintyre River and perennial creeks, but also traversed a variety of 

landform units away from the major water sources for the gathering of resources and hunting (McIntyre 

1998). 

Most archaeological assessment that has occurred within the Glen Innes area has been for the purpose of 

assessing potential impacts from proposed developments.  Results of these surveys show that Aboriginal 

Page 97: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  76   

sites are present  in a  range of  landforms.    In general, small artefact scatters  tend  to be present  in  the 

proximity of small drainage or creek lines.  Scarred trees tend to be located along ridge crests.   

Database searches and consultation 

An extensive search of the NSW OEH Aboriginal Heritage Information Management System (AHIMS) was 

undertaken on 4 January 2016 (AHIMS reference 205497) in an area 24 km (north‐south) by 20 km (east‐

west) surrounding the WRSF Development Envelope.  The search found that there are no recorded sites 

within or adjacent  to  the proposed WRSF Development Envelope.    Sixteen  sites were  recorded  in  the 

broader  search  area,  comprising  four modified  (scarred)  trees,  five  artefact  scatters,  six  locations  of 

potential archaeological deposit (PAD) and one art (engraving) site.   

The most relevant previous study relative to the WRSF Development Envelope assessments for the WRWF 

Project adjacent to the WRSF Development Envelope undertaken by RPS in 2010 and ERM in 2015.  RPS 

recorded three modified trees and two artefact scatters during their surveys (RPS 2010).  All are outside of 

the current Development Envelope.  ERM identified an additional Aboriginal site consisting of an isolated 

artefacts  located at Easting 362631, Northing 6704 300  (MGA Zone 56), also outside  the Development 

Envelope. 

Consultation with the Aboriginal parties concerning the significance of the WRSF site has been undertaken 

(refer Section 5.3).  To date, no places with cultural or spiritual significance have been identified during this 

consultation.   

8.2.3 Site survey 

Methodology 

Field survey was undertaken over two days (10 ‐ 11 February 2016).   The survey was led by archaeologist 

Lyn O’Brien.  Assistance was provided by a representative from both the Anaiwan and Glenn Innes Local 

Aboriginal Land Councils.   

The  survey  strategy  followed  the  standard  practice  of  delineating  different  survey  units  within  the 

Development Envelope, based on topography, soils or other landscape features. Three survey units were 

delineated for this survey (refer Figure 3, Appendix C for location of survey units).  

Survey methodology involved carrying out a series of pedestrian survey transects across the Development 

Envelope, ensuring enough coverage to be able to assess and characterise the archaeology. Team members 

walked in parallel lines across each paddock looking for the evidence of Aboriginal occupation.  Just under 

3.3 km of transects were walked across the Development Envelope.    The field survey was impeded by very 

poor visibility. 

Overall,  it  is considered that the surface survey of the Development Envelope had  low effective survey 

coverage due to the dense grass coverage over all areas.  However, the main infrastructure site area was 

subject to intensive survey with numerous pedestrian transects crossing the area.  Survey coverage was 

sparser on the ridgeline and middle slopes units, located away from the main site area.  Not all remnant 

mature trees were inspected in the wider Development Envelope.  

Results and conclusions 

No  heritage  sites,  including  isolated  artefacts  or  scarred  trees were  located  during  the 

survey.   

Due to the high level of European land use activities within the Development Envelope, and 

its location away from a water sources, it is considered: 

Page 98: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  77   

o Unlikely that any archaeological sites would remain within this area. 

o The potential for the site area to contain unidentified Aboriginal sites is extremely low. 

Based on the land use history of the Development Envelope and an appraisal of the area 

from  the  field  survey,  there  is negligible potential  for  the presence of  intact  subsurface 

deposits.     

Whilst not intensively surveyed, the Development Envelope is considered to hold an overall 

low potential for unrecorded sites. 

As the WRSF is State Significant Development, an Aboriginal Heritage Impact Permit would not be required 

for the WRSF Project, regardless of whether Aboriginal sites were recorded. 

8.2.4 Potential impacts 

Construction 

The proposed works would  involve excavation activities which can potentially  impact Aboriginal objects 

which may be present within the Development Envelope.  Impacts associated with excavation works at this 

site are considered to be low for the following reasons: 

The field survey did not identify any heritage sites within the Development Envelope and 

there are no recorded Aboriginal archaeological sites present.  

The ACHAR concluded that there are unlikely to be other unrecorded sites or sub‐surface 

deposits within the Development Envelope, and if any of these deposits was to be present, 

it would be severely compromised due to past ploughing activity.   

As not all mature remnant trees were surveyed in the Development Envelope (outside the Development 

Envelope),  there  is  a  low  potential  for  unrecorded  scarred  trees  to  remain  and  be  impacted  during 

construction of the access track and the underground cable  linking the solar  farm with wind turbine 1.  

Impacts associated with these works are considered to be low as the location of this infrastructure can be 

microsited during construction to avoid any potential impacts to trees.   

Operation 

During operation, it is unlikely the WRSF Project would impact on Aboriginal archaeology.  

8.2.5 Environmental safeguards 

In summary, the ACHAR concludes the:  

 ‘development proposal should be able  to proceed with no additional archaeological  investigations.   No 

areas of potential archaeological deposits or scarred trees have been  identified within the Development 

Envelope and  the potential  for Aboriginal heritage objects within  the Development  Envelope has been 

assessed as low’. 

No.  Environmental Safeguard  Solar farm 

C  O  D 

AH1  If removal of mature trees in relation to installation of the 33 kV cable is required, these would be checked for scars prior to removal, and if present  the  scar  should  then be examined by a qualified heritage practitioner and RAPs to assess if the scar is cultural.   

If any culturally  scarred  trees are  identified by  the above process, avoidance by redesign of the cable alignment should be undertaken.  

C     

Page 99: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  78   

No.  Environmental Safeguard  Solar farm 

C  O  D 

AH2  WRSFPL  would  prepare  a  Cultural  Heritage  Management  Plan (CHMP)  to  address  the  potential  for  finding  Aboriginal  artefacts during the construction of the WRSF.   The CHMP would outline an unexpected  finds  protocol  to  deal  with  construction  activity.  Preparation of the CHMP should be undertaken in consultation with the RAPs.  

C     

AH3  In the unlikely event that human remains are discovered during the construction,  all work must  cease.   OEH,  the  local police  and  the appropriate LALC should be notified.  Further assessment would be undertaken  to  determine  if  the  remains  are  Aboriginal  or  non‐Aboriginal. 

C     

AH4  Continued consultation with the RAPs for the WRSF Project should be undertaken.   RAPs should be  informed of any major changes  in project design or scope, further investigations or finds. 

C     

8.3 VISUAL IMPACTS 

8.3.1 Approach 

A specialist Visual Impact Assessment (VIA) was undertaken to investigate the potential visual impacts of 

the proposed WRSF. The assessment was undertaken by Green Bean Design Pty Ltd (GBD). The full GBD 

VIA report is provided in Appendix D and is summarised below. 

The methodology employed for the VIA has been prepared with regard to industry standard VIA guidelines 

including the: 

Guidelines for Landscape and Visual  Impact Assessment 3rd Ed. (Landscape  Institute and 

Institute of Environmental Management and Assessment, 2013). 

The Environmental Impact Assessment Practice Note – Guideline for Landscape Character 

and Visual Impact Assessment EIA–N04 (practice note EIA‐N04). 

The VIA has been undertaken to: 

Assess  the  existing  visual  character within  the  proposed  solar  farm  site  as well  as  the 

surrounding landscape. 

Determine the extent and nature of the potential visual impact of the proposed solar farm 

on surrounding areas. 

Identify measures to mitigate and minimise any potential visual impacts. 

The VIA was based on the following solar farm layout design: 

The solar farm would consist of groups of arrays of photovoltaic panels which are attached 

to a fixed steel framework that is mounted on posts that are rammed into the ground.  

The  arrays of photovoltaic modules would be  electrically  connected  into  approximately 

eight power conversion blocks, followed by export via an underground 33 kV cable route to 

the substation at the White Rock Wind Farm.  

The maximum height of the framework would be approximately three metres, maximum 

height of the power conversion blocks approximately  four metres, while there may be a 

number of monitoring poles onsite that reach five metres in height from the ground. 

Page 100: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  79   

The solar farm site would be surrounded by a chain link fence approximately two metres in 

height. 

The VIA included the following tasks: 

Desktop study addressing visual character and  identification of view  locations within the 

surrounding area  ‐ Topographic maps and aerial photographs were used  to  identify  the 

locations and categories of potential  receiver  locations  that could be verified during  the 

fieldwork  component  of  the  assessment.  The  desktop  study  also  outlined  the  visual 

character  of  the  surrounding  landscape  including  features  such  as  landform,  elevation, 

landcover and the distribution of residential dwellings. 

Fieldwork  and  photography  ‐ A  site  inspection  to  determine  and  confirm  the  potential 

extent of visibility of the proposed solar farm and ancillary structures. Determination and 

confirmation of the various view location categories and locations from which the proposed 

solar farm structures could potentially be visible. 

Assessment and determination of visual  impact  ‐ The overall determination of potential 

visual  impacts resulting  from the construction and operation of the proposed solar  farm 

would result from a combination of receiver sensitivity and the magnitude of visual effect. 

The  sensitivity  of  visual  receptors  has  been  determined  and  described  in  the  VIA  by 

reference to: 

o The location and context of the view point. 

o The occupation or activity of the receptor. 

Judging the magnitude of visual effect has considered: 

o The scale of the change in the view with respect to the loss or addition of features 

in the view and changes  in  its composition,  including the proportion of the view 

occupied by the proposed solar farm. 

o The  degree  of  contrast  or  integration  of  any  new  features  or  changes  in  the 

landscape  with the existing or remaining landscape elements and characteristics 

in terms of form, scale and mass, line height, colour and texture. 

o The nature of the view of the proposed solar farm, in terms of the relative amount 

of time over which it will be experienced and whether views will be full, partial or 

glimpses. 

Determination of potential mitigation measures. 

8.3.2 Existing environment 

Landscape character and visual absorption capability 

The  landscape  character  surrounding  the  Development  Envelope  has  been  determined  as  a  singular 

landscape unit which  generally occurs within  a 4  km  viewshed of  the Development Envelope.  For  the 

purpose of this VIA, the viewshed is defined as the area of land surrounding and beyond the solar farm site 

which may be potentially affected by the solar farm. In essence, the viewshed defines this VIA study area.  

The  landscape unit  represents an area  that  is  relatively consistent and  recognisable  in  terms of  its key 

landscape  elements  and  physical  attributes;  which  include  a  relatively  limited  combination  of 

topography/landform, vegetation/landcover, land use and built structures (including settlements and local 

road corridors). The predominant landscape unit within and surrounding the proposed solar farm site has 

been identified as ‘sloping and undulating modified agricultural land’. 

Page 101: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  80   

The Visual Absorption Capability (VAC) of the landscape surrounding the proposed solar farm is generally 

high as a result of locally undulating landforms and significant areas of tree cover surrounding the proposed 

solar farm site. 

The  overall  sensitivity  rating  of  the  landscape  (taking  into  account  landform  and  scale,  landcover, 

settlement and human influence, movement patterns, rarity and intervisibility) was assessed a quantitative 

scale  as  14/30;  low  landscape  sensitivity  (refer  to  detailed  evaluation,  Table  4,  in  the  appended  VIA, 

Appendix D).  

Visual receivers  

The  VIA  identified  a  total  of  12  residential  dwellings  located within  an  approximate  4  km  viewshed 

surrounding the WRSF Development Envelope.  

A small number of local roads connect localities and residential dwellings within the surrounding landscape. 

The roads from which views may extend toward the proposed solar farm site include: 

Gwydir Highway 

Ilparran Road 

Waterloo Road. 

The Sinclair Lookout is located on Waterloo Range approximately 6.3 km to the east of the proposed solar 

farm. The lookout is accessible by a single lane and partially washed out unsealed access track from the 

Gwydir Highway. The lookout has a westerly aspect looking over and beyond the valley where the proposed 

solar farm would be located. The lookout is a very basic facility with no seating or shelter structures and 

appears to have low levels of visitation.  

The Matheson Church is located approximately 3.15 km to the north east of the proposed solar farm, and 

160 m north‐west of the Gwydir Highway on the Waterloo Road. 

8.3.3 Potential impacts 

Potential impacts investigated by the VIA included: 

Impacts during construction. 

Impacts during decommissioning.  

Operational impacts: 

o On landscape character 

o On residential dwellings 

o On roads 

o On other sensitive locations. 

Potential impact for glare or glint, from proposed infrastructure on nearby receivers. 

Cumulative impacts. 

Construction / decommissioning activities and potential impacts 

The  key  pre‐construction  and  construction  activities  that may  be  visible  from  areas  surrounding  the 

Development Envelope include: 

Ongoing detailed site assessment including technical investigations. 

Various minor civil works at access points. 

Construction facilities, including portable structures and laydown areas. 

Various construction and directional signage. 

Page 102: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  81   

Vegetation clearing, excavations and earthworks. 

Various construction activities including erection of solar panels with associated electrical 

infrastructure works, including power conversion blocks. 

The majority of pre‐construction and construction activities would be unlikely to result in an unacceptable 

level of visual impact due to their duration and temporary nature.   

Decommissioning  activities  are  anticipated  to  be  similar  to  those  during  construction.  The 

decommissioning phase of  the proposed solar  farm would not  result  in an unacceptable  level of visual 

impact. 

Operation 

Impacts on landscape character 

The VIA determined  that  the characteristics of  the  landscape surrounding  the proposed solar  farm are 

generally robust, and the degree to which the  landscape would accommodate the solar farm would not 

significantly alter existing the landscape character.  

In  consideration  of  the  existing  landscape  characteristics,  the  landscape  within  and  surrounding  the 

Development Envelope is determined to have a low sensitivity to the solar farm development. 

Impacts on residential dwellings  

Of the 12 residential dwellings located within an approximate 4 km viewshed of the White Rock Solar Farm 

site, the VIA determined that: 

1 residential dwelling (I40) would experience a potential low visual impact. 

11 of the residential dwellings would experience a potential negligible visual impact. 

The determination of negligible visual  impact  for  the majority of  residential dwellings  surrounding  the 

proposed solar farm site reflects the high degree of localised screening provided by the undulating semi‐

cleared landform extending across this section of the Great Dividing Range, as well as the occurrence of 

tree screening alongside local road corridors, around homesteads and within surrounding agricultural land. 

Impacts on roads 

Available views toward the proposed solar farm site from surrounding local roads will be tend to be indirect 

and of a very short duration from moving vehicles. The majority of road corridors also support a significant 

amount of tree planting, including tree planting along proximate road locations such as the Gwydir Highway 

and Ilparran Road which will generally block and/or filter views toward the WRSF Development Envelope.  

A  representative  visualisation  of  the  proposed  infrastructure  from  the  Ilparran  Road  corridor  (photo 

location WS12  looking west)  is  included as Figures 13 and 14  in Appendix D.    It  illustrates the potential 

view toward the proposed solar farm from the Ilparran road corridor and the potential influence of both 

distance and existing tree cover on solar farm visibility.   The visualisation demonstrates that the overall 

visual bulk and scale of  the proposed solar  farm would not be significant  from  Ilparran Road  following 

completion of the construction works. 

Impacts on other sensitive locations 

The proposed solar  farm would be visible  from  the Sinclair Lookout; however,  the proposed structures 

associated with the solar farm would not form prominent features within the available view. The visual 

magnitude of the proposed solar farm would also be diminished and contained within the context and scale 

of view available from the lookout. 

Page 103: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  82   

A representative visualisation of the proposed  infrastructure  from Sinclair  lookout  (photo  location WS1 

looking west)  is  included as Figures 11 and 12  in Appendix D. The visualisation demonstrates  that  the 

overall visual bulk and scale of the proposed solar  farm would not be significant  in the  landscape  from 

Sinclair Lookout following completion of the construction works. 

The  proposed  solar  farm would  not  be  visible  from  the Matheson  Church,  or  from  land  immediately 

surrounding the Church. Views toward the proposed solar farm will be screened by existing tree planting 

alongside and beyond the Gwydir Highway corridor. 

The WRSF Project has the potential to impact people engaged in predominantly farming activities, where 

views  toward  the  proposed  solar  farm  occur  from  surrounding  and  non‐associated  agricultural  areas. 

Ultimately the level of impact would depend on the type of activities engaged in as well as the location of 

the  activities  together  with  the  degree  of  screening  provided  by  local  vegetation  within  individual 

properties. Whilst views toward the proposed solar farm could occur from surrounding rural agricultural 

land, the VIA has determined that the sensitivity of visual impacts is less for those employed or carrying 

out work in rural areas compared to potential views from residential dwellings. The low height of the solar 

panel arrays means that even  low terrain and vegetation screening can restrict views to proposed solar 

farm. 

The proposed solar farm does not propose to incorporate external lighting, other than manually operated 

safety lighting at main component locations, therefore night time lighting is not expected to give rise to 

substantive visual impacts.  There may be occasional requirements for night time maintenance works which 

may require temporary lighting.  Visual impacts resulting from these activities would also be low. 

Reflectivity: sunglint and glare 

The VIA determined that opportunities for sunglint and glare would be limited due to the properties and 

characteristics of the solar panels, which are designed to absorb light rather than reflect it. Sunglint and 

glare would also be limited due to the lack of direct visibility and line of sight from surrounding sensitive 

receiver locations to the proposed solar farm site. The potential for sunglint impacting motorists travelling 

along local roads would largely be mitigated by existing tree planting alongside road corridors, and where 

visible, sunglint would tend to be indirect relative to the direction of travel and very short term in duration.   

Cumulative impacts 

The cumulative assessment determined that the overall very low level of visibility will limit potential for 

cumulative visual impacts and specifically those that could result from views toward the approved White 

Rock and Sapphire wind  farm developments. Constructed elements associated with the proposed solar 

farm would be dissimilar  in scale,  line and form to existing  infrastructure associated with the wind farm 

development.  

8.3.4 Environmental safeguards 

Whilst  the VIA has determined an overall very  low  level of visual  impact, mitigation measures may be 

considered  appropriate  to  minimise  any  residual  or  localised  visual  impacts.  Additional  mitigation 

measures would largely address the selection of appropriate materials, finishes and colours for proposed 

infrastructure and some  limited  landscape  treatments  to address any specific and  localised views  from 

private property  following construction. The  following measures are specific  to  the phase of  the WRSF 

Project: 

Page 104: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  83   

No.  Environmental Safeguard  Solar farm 

C  O  D 

VIA1  In the final design and  layout of the proposal, the following should be considered; 

o minimise bulk and height of proposed structures, where possible. 

o selection  and  location  for  replacement  tree  planting which may provide partial screening or backdrop setting for constructed elements  

o review  of  materials  and  colour  finishes  for  selected components including the use of non‐reflective finishes to structures where possible 

C     

VIA2  Retention of grass cover wherever possible.  C     

VIA3  During operation the facility would be maintained in a manner that  ensures  the  constructed  elements,  and  on‐site vegetation are maintained to an appropriate visual standard.  

  O   

 

Draft Landscaping Management Plan 

The  SEAR’s  set  out  a  requirement  to  prepare  a  draft  Landscaping  Management  Plan  developed  in 

consultation with affected landowners.  

The VIA has determined that the vast majority of landowners surrounding the proposed solar farm will not 

be visually affected by the WRSF Project as it will be significantly screened by combinations of landform 

and/or tree cover extending beyond the proposed solar farm site. Residential dwellings will also tend to be 

less affected by the proposed solar farm as the distance between the proposed solar farm site and dwelling 

begins to exceed a 2 kilometre distance. 

The Proponent has  consulted with  the neighbouring property owner  (at dwelling  I40).   Results of  this 

consultation have confirmed that the neighbouring landowner is not concerned about the WRSF Project 

given it will be a low level structure and that the dwelling is orientated away from the solar farm. 

Given  the  assessment  has  determined  negligible  or  low  potential  visual  impact  for  the  majority  of  

residences,  and  the  results  of  consultation  undertaken,  the  landscape  specialist  advised  that  it  not 

considered necessary to prepare a draft Landscaping Management Plan for any properties surrounding the 

proposed solar farm site. 

8.4 NOISE IMPACT 

8.4.1 Approach 

A specialist Environmental Noise Assessment (ENA) was undertaken by Sonus Pty Ltd to  investigate the 

potential noise impacts of the WRSF Project. The assessment compares the predicted noise levels at the 

closest noise sensitive receivers from the operation of the solar farm with the NSW Industrial Noise Policy 

2000 (INP), and noise from construction activity with the Department of Environment & Climate Change 

Interim Construction Noise Guideline 2009 (ICN Guideline).  The full report is provided in Appendix E and 

is summarised below.   

The assessment has been based on: 

Page 105: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  84   

UGL ‘White Rock Solar PV Site Fixed PV Layout Plan’ drawing, numbered TC‐10411‐DP1‐100, and 

dated 9 February (an earlier version of the solar farm layout, refer Appendix E). 

SMA “White Paper BU‐U‐019: Sunny Central” sound power measurements on SC 2200 (‐US), SC 

2500‐EV central inverters. 

It  includes  consideration  of  construction,  operational  and  cumulative  noise  impacts  (considering  the 

possible interaction with the existing White Rock Wind Farm).   

8.4.2 Existing environment 

Noise monitoring 

Long term background noise monitoring has previously been conducted for the WRWF and has been used 

to calculate the Rating Background Level (RBL). The results presented in the Sonus Report entitled “White 

Rock Solar Farm Environmental Noise Assessment: Report No. S4834C1 dated 3rd February 2016, have 

been used for the determination of applicable noise limits in the assessment of the solar farm. The noise 

monitoring was carried out at seven residences in the vicinity of the wind farm, with R1 being the closest 

and most relevant location to the proposed solar farm. The RBL for each of the day, evening and night time 

periods is provided in Table 7‐6 below 

Table 7‐6 RBL at background monitoring location R1 

Day  33 

Evening  31 

Night  25 

Based on the solar farm only operating during daylight hours, the lowest relevant RBL is during the evening, 

31 dB(A).  

8.4.3 Policy setting and criteria 

The  NSW  Industrial  Noise  Policy  2000  (The  INP)  establishes  criteria  based  on  existing  ambient  noise 

environment and the envisaged amenity of the area. The INP enables the RBL to be set at 30 dB (A) in quiet 

environments and a goal noise criterion of 40 dB (A) for a rural environment. Based on an RBL of 31 dB (A) 

the relevant assessment criteria in accordance with INP is 36 dB (A).  

Construction noise 

To  assess  construction noise  in  accordance with  the  SEARs,  the  (then) Department of  Environment & 

Climate Change  Interim Construction Noise Guideline 2009 (ICN)  is used (Table 7‐7). Management  levels 

are defined based on the RBL of the environment. For this case an RBL at 33 dB (A) for daytime construction 

activity is used.  

Page 106: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  85   

Table 7‐7  The ICN management levels  

Time of day  Management Level 

Recommended standard hours: 

Monday to Friday 

7 am to 6 pm 

Saturday 8 am to 1 pm 

No work on Sundays or public holidays 

Noise affected 

RBL + 10dB(A) 

Highly noise affected 

75dB(A) 

Outside recommended standard hours  Noise affected 

RBL + 5dB(A) 

 

Restrictions to the hours of construction may apply to activities that generate noise at residences above 

the ‘highly noise affected’ noise management goal.  

Operational noise 

The Industrial Noise Policy (INP) provides a framework and process from deriving noise criteria for consents 

and  licences  that will enable  the EPA  to  regulate premises  that  scheduled under  the Protection of  the 

Environment  Operations  Act  1997.  The  prediction  of  environmental  noise  has  been made  using  the 

Conversation of Clean Air and Water in Europe (CONCAWE) noise propagation model and SoundPLAN noise 

modelling software. Weather category 5 has been used for the assessment in accordance with the INP. 

8.4.4 Potential impacts 

Construction 

The equipment and activities on site will vary throughout the WRSF Project depending on various stages of 

construction. The predicted noise from construction activity  is presented as a worst case (highest noise 

level)  scenario,  where  weather  conditions  used  for  the  predictions  are  the most  conducive  for  the 

propagation of noise. 

The separation distance of the closest dwelling (R1) to any proposed construction activity is approximately 

550 m. The results of noise predictions from construction activity at 550 m are presented in Table 7‐8. The 

required separation distance in order to achieve the ICN Guidelines 43 dB(A) criterion, 10 dB(A) above the 

RBL, is also provided in Table 7‐8. 

Table 7‐8 Predicted construction noise levels 

Phase  Main Plant and Equipment  Predicted  Noise Level at 550m 

Separation  to Achieve  43  dB(A) Criterion 

Site Preparation, Clearing & Demolition 

ExcavatorBulldozer Chainsaw 

Tree Mulcher Light Vehicle 

Dump Truck 

53 dB(A)  1800m 

Page 107: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  86   

Phase  Main Plant and Equipment  Predicted  Noise Level at 550m 

Separation  to Achieve  43  dB(A) Criterion 

Establishment Site Compound, Access Roads & Delivery of Materials 

Hand ToolsExcavator 

Light Vehicles Delivery Truck Bulldozer 

Plate Compactor Grader Roller 

Asphalt Paver Bobcat 

Bored Piling Rig 

Mobile Crane 

54 dB(A)  2000m 

Installation of Foundations 

Piling RigMobile Crane 

Bobcat Excavator 

Concrete Vibrating Needle 

Concrete Truck 

57 dB(A)  2500m 

Installation of Underground Cabling 

Bobcat / TrencherTractor & Cable Trailer 

Loader 

44 dB(A)  600m 

Assembly of Panel Frames, Mounts & Transformer Units 

TruckCompressor Hand Tools Generator Ratchet Gun 

Mobile Crane 

51 dB(A)  1400m 

Site Rehabilitation / Removal of Temporary Construction Facilities 

Light VehiclesExcavator Bulldozer Loader 

Dump Truck 

Truck 

51 dB(A)  1400m 

 

Based on the predicted noise  levels,  it  is expected that at some times, the construction noise would be 

greater than 43 dB(A) at a distance of 550 m.  The predicted noise levels are, however, significantly less 

than the 75 dB(A) upper limit provided in the ICN Guideline.  

The ENA concluded that, during construction, it is possible that a dwelling located between 500 m and 2500 

m from the site may be defined as “noise affected” but not “highly noise affected” by the ICN Guideline.  

WRSFPL is therefore required to mitigate noise impacts that would result during the construction period.  

Strategies may include engineering measures such as the construction of temporary acoustic barriers, the 

use  of  proprietary  enclosures  around machines,  the  use  of  silencers,  the  substitution  of  alternative 

construction processes and the fitting of broadband reversing signals. It may also include administrative 

measures such as inspections, scheduling and providing training to establish a noise minimisation culture 

for  the works.  These measures  are  included  in  the Draft Noise Management  Plan  that  is  included  as 

Appendix F. 

Page 108: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  87   

An  assessment  of  the  noise  generated  from  construction  traffic  against  the  NSW  Road  Noise  Policy 

concluded that the day‐time criterion (55 dB(A)) can be achieved a distance 10 m from the highway with 

the movement of 10 passenger vehicles and 3 heavy vehicle movements  in one hour.   The number of 

vehicle movements can double for every doubling of distance from the roadside.  THE ENA recommends a 

series of mitigation measures that should be employed  if the criterion outlined  in the NSW Road Noise 

Policy is exceeded during construction and these are included in the Draft Noise Management Plan.  The 

direct access from the Gwydir state highway is considered to mitigate the potential impacts of construction 

traffic compared with access being required via local roads. 

Operation 

In order to determine the noise impacts of the operating solar farm, a computer model incorporating all 

significant noise sources, the closest potentially affected residential properties, and the intervening terrain 

was prepared.  

The  sound power  level used  in  the  assessment  is based off  the 2.5 MW  SMA  Sunny Central 2500‐EV 

inverter/transformer  unit.  The  sound  power  level  for  each  2.5  MW  inverter/transformer  unit  is 

summarised in the below table. 

Table 7‐9  Assumed sound power spectrum for inverter/transformer units  

Inverter/Transformer Rating 

SWL (dB) for each Octave Band Centre Frequency  Total  SWL (dB(A)) 

63 Hz  125 Hz  250 Hz  500 Hz  1000 Hz  2000 Hz  4000 Hz 

2.5 MW  86  90  96  89  85  81  73  92 

 

From the above sound power level data it shows that the current proposal can achieve compliance with 

the WRSF Project criteria. Furthermore the predicted noise levels comply with the criteria conservatively 

established  in  accordance  with  the  NSW  Industrial  Noise  Policy  2000,  without  any  specific  acoustic 

treatment.   

Variations to the indicative layout are unlikely to increase operational noise at the nearest residence as it 

is understood that movement would most likely be away from the closest residence.  

Cumulative noise from wind farm and solar farm 

The noise assessment considered the cumulative effect of noise from both the solar farm and the WRWF. 

The most onerous criterion  for  the wind  farm  is 35 dB(A), and  the wind  farm Stage 1  layout has been 

assessed  to be  compliant.  The predicted noise  from  the  solar  farm  is more  than  10 dB(A) below  and 

therefore would not result in the total noise level exceeding 35 dB(A).  

The ENA concluded that for dwellings which achieve the wind farm criteria, the solar farm noise would not 

increase or significantly contribute  to  the predicted  level and  for dwellings which have predicted noise 

levels which are similar solar and wind farm components the combined level will be approximately 3 dB(A) 

higher.  

8.4.5 Environmental safeguards 

The  following mitigation measures would be  implemented to reduce the noise  impacts associated with 

construction: 

Page 109: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  88   

No.  Environmental Safeguard  Solar farm 

C  O  D 

NO1  Preparation of a final noise management plan based on the Draft  Plan  provided with  this  EIS  and  the  final  design  and arrangements for construction and operation.  

C     

NO2  Adherence  to  standard  construction  hours,  unless  they  do not  cause  noise  emissions  to  be  audible  at  any  nearby residences  not  located  on  the  site  or  are  otherwise approved. 

C     

8.5 LAND USE 

8.5.1 Existing environment 

Land use 

The Development Envelope  is  located within  the broader New England North West Region.   Land uses 

within this region include the following industries: 

Agriculture 

Mining  

Renewable Energy Generation. 

The Development Envelope, and all  land  immediately surrounding  it,  is zoned RU1 Primary Production.    

The objectives of the RU1 zone are: 

to encourage sustainable primary industry production by maintaining and enhancing the natural 

resource base 

to encourage diversity in primary industry enterprises and systems appropriate for the area 

to minimise the fragmentation and alienation of resource lands 

to minimise conflict between land uses within this zone and land uses within adjoining zones. 

The primary land use within the Development Envelope is agriculture. The land is part of a larger 1018 ha 

agricultural based property.5 

Agriculture 

The New England North West Region  is one of the State’s most fertile and productive agricultural areas 

(DP&I 2012a). Agricultural activities within the region include sheep and cattle grazing, broad acre cereal 

crops, irrigated cotton, intensive livestock and plant agriculture and poultry production.  

Over 1.5 million ha or 15.3% of  the New England North West Region has been mapped as Biophysical 

Strategic Agricultural  Land  (SAL), which  is  land,  recognised by  the NSW Government,  as having  a  rare 

combination of natural resources highly suitable for agriculture (DP&I 2012a). Lands mapped as SAL are 

considered to have the best quality  landforms, soil and water resources which are naturally capable of 

sustaining high  levels of productivity and  require minimal management practices  to maintain  this high 

                                                              

5 Approximations only.  Total land areas calculated from cadastre mapping on Six Viewer (DL&PI 2016). 

Page 110: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  89   

quality. The SAL maps are at a regional scale and are partially derived from land and soil capability data 

sets compiled by the OEH.  Criteria for SAL land includes the following: 

land that falls under soil fertility classes ‘high’ or ‘moderately high’ under the Draft Inherent 

General Fertility of NSW (OEH), 

land capability classes I, II or III under the Land and Soil Capability Mapping of NSW (OEH) 

reliable water of suitable quality, characterised by having: 

o reliable rainfall of 350 mm or more per annum (9 out of 10 years); 

o properties within 150 m of a regulated river, or unregulated rivers where there are 

flows for at least 95% of the time (ie the 95th percentile flow of each month of the 

year is greater than zero) or 5th order and higher rivers. 

o groundwater  aquifers  (excluding miscellaneous  alluvial  aquifers,  also  known  as 

small storage aquifers) which have a yield rate greater than 5 L/s and total dissolved 

solids of less than 1,500 mg/L. 

OR 

land  that  falls  under  soil  fertility  classes  ‘moderate’  under  the  Draft  Inherent  General 

Fertility of NSW (OEH), and 

land capability classes I or II under the Land and Soil Capability Mapping of NSW (OEH), and 

reliable water of suitable quality as described above. 

Some of the Development Envelope is located on land that is identified as SAL (refer Figure 7‐3).  These 

areas contain highly valued pockets of red basalt and experience a reliable annual rainfall of over 700 mm 

per annum.  Ground‐truthing has not verified that the land meets the criteria for SAL but consultation with 

the land owners confirm the land is of high agricultural value.  

SAL extends beyond the Development Envelope to the north and east.  At the time of the site inspection 

the site was being grazed by cattle.  A corn crop, with an area of approximately 10 ha, was planted in the 

north‐eastern part of the Development Envelope.  Following discussion with the landowner that area has 

been excluded from the area of the indicative layout. The site is also grazed by sheep. Other crops grown 

at the property include soybeans and triticale.   

Page 111: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  90   

 

Figure 7‐3. SAL land within and surrounding the Development Envelope (NSW Crown Copyright ‐ Planning and 

Environment) 

0 1 20.5 Kilometers

°

www.nghenvironmental.com.au

Ref: 6589 8.4 v3Author: JB

Notes:- Infrastructure data courtesy of Goldwind,received 2016- BSAL data - NSW Crown Copyright –Planning and Environment

Biophysical Strategic Agricultural Land

Proposed solar farmDevelopment envelope

Solar array

Page 112: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  91   

Mining 

In addition to agriculture, the New England North West region has experienced strong growth in the mining 

and coal seam gas industries. The region is rich in a variety of mineral resources including the following: 

Coal  covers  an  area of  approximately 39.7% of  the  region. This  comprises existing  and 

approved mines,  areas  subject  to  an  existing  exploration  licence,  and  known  areas  of 

resource potential. No coal deposits are known for the Development Envelope. 

Coal  seam gas  resources  cover an area of approximately 3,434,124 ha or 34.4% of  the 

region.  This comprises areas of high, medium and low potential. The area is not expected 

to be prospective for Coal Seam Gas. 

Other known mineral resources cover an area of approximately 468,335 ha or 4.7% of the 

region.  This includes resources such as gold, silver, industrial minerals and gemstones. The 

Glen Innes Inverell locality has a history of mining for gemstones and heavy metals. 

The location of these resources are mapped within the New England North West Region Strategic Land Use 

Plan (DP&I 2012a).  Coal and coal seam gas resources are generally located in the western part of the region 

in  the  Liverpool  Plains,  Gunnedah,  Boggabri  and  Narrabri  Shire  Council  areas.   Mineral  deposits  are 

scattered across the eastern part of the region.  Mapping indicates mineral resources (type unknown) are 

located north of the Gwydir Highway approximately 9 km north‐east of the Development Envelope. 

A search of Department of Industry’s MinView database (Department of Industry 2016) found there are no 

existing Mining Exploration Licences within  the Development Envelope. A historical exploration  licence 

(EL7302)  exists  which  covers  the  southern  portion  of  the  Development  Envelope.    This  was  for  the 

exploration of metallic minerals between 2009 and 2013. 

Renewable Energy 

The New England North West region has been identified as one of the key renewable energy precincts in 

NSW due to suitable weather and high wind speeds.  Several wind farms (Figure 9‐5), including the WRWF, 

have been approved for construction or are in the planning process.  Solar farms are also being considered 

as a viable option for renewable energy developers in NSW. Construction of the Nyngan Solar Farm (155 

MW capacity) and Broken Hill Solar Farm (53 MW capacity) was completed at the end of 2015. Construction 

of the Moree Solar farm, a 56 MW capacity farm, is also nearing completion. 

This EIS  is for the development of a solar farm which would form a hybrid system with the WRSF.   This 

would be the first hybrid wind/solar system for the region. 

Flood prone land 

An ephemeral drainage depression, elevation 970 m ASL, drains  in  a north‐east direction  through  the 

Development Envelope into Wellingrove Creek.  A second drainage depression bounds the eastern side of 

the Development Envelope (refer Section 9.2.1 and Figure 9‐3).   

There  is no mapping of  flood prone areas within  the GlSC area  (pers. comm Greg Doman, Manager of 

Regulatory and Planning Services, Glen Innes Severn Council, 16 February 2016).   

The Development Envelope is not located on a floodplain, and freely drains to the northeast.  It is not within 

an area that is the subject of a floodplain management plan developed by OEH under Part 8 of the Water 

Act 2000.  At the time of the site inspection, there is no indication of elevated flows levels such as debris 

on fences across the drainage depression. 

At  the  time of  the site  inspection, a corn crop was planted on both sides of a section of  this drainage 

depression. 

Page 113: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  92   

8.5.2  Potential Impacts 

Construction, operation and decommissioning 

Agricultural impacts 

The development of a solar farm within the Development Envelope would potentially result in the following 

agricultural impacts: 

Resource loss and fragmentation 

Disturbance to farming operations and livestock 

A potential increase in biosecurity, pest and weed risks  

Potential bushfire risks (DPI 2013) 

Upon decommissioning of the WRSF, the site would require rehabilitation to restore it to its pre‐existing 

agricultural condition.  Bushfire risks are discussed in Section 9.4, rehabilitation in Section 8.1. 

RESOURCE LOSS AND FRAGMENTATION 

The WRSF Project would take place on land that is identified by the NSW Government as SAL.  The WRSF 

Project would result in the development of a solar farm with an operational life of 25 years. Construction 

works involve only minor excavation works with minimal disturbance to soils and soil profiles, and minimal 

risk of soil loss.  At the end of the operational period, solar farm infrastructure would be removed, the land 

would be rehabilitated to  its pre‐existing condition and available for agricultural use. The WRSF Project 

would not result in the permanent removal of land that is considered to be of high value agricultural land.   

The WRSF Project has been designed to minimise the WRSF Development Footprint, and therefore, impact 

on agricultural land by utilising the WRWF infrastructure thus avoiding the need to construct infrastructure 

that would normally be  required  for  a  solar  farm,  for  example  substations  and  transmission  lines.    In 

addition, the 33 kV electric cable required to connect the solar farm with the WRWF substation would be 

located within the WRWF cabling corridors.  

DISTURBANCE TO FARMING OPERATIONS AND LIVESTOCK 

During construction, agricultural activities within the WRSF Development Envelope would be restricted and 

up to 50 ha of Strategic Agricultural Land that would otherwise be used for either grazing and cropping 

purposes would  be  removed  from  use.   Within  the  broader New  England North West  region,  this  is 

equivalent to 0.00003% of the land that is currently mapped as SAL.  Within the landowner’s property, 50 

ha  accounts  for  approximately  4.9%  of  the  entire  property.   Development  in  the WRSF Development 

Envelope would impact all of the SAL that is identified on the property during the construction, operation 

and decommissioning phases.   

During operation, the solar farm would be fenced for security and stock exclusion purposes.  Cattle grazing 

would be restricted from the site.  It is possible, however, that a managed regime of sheep grazing would 

occur within the solar farm site to assist the management of vegetation biomass and weeds underneath 

and surrounding the panels.  

The land within the Development Envelope is currently grazed by cattle and in part cropped for corn.  Farm 

infrastructure includes a farm dam, and a water tank and water troughs that are located on a small rise 

within the area.  The indicative site layout for the solar farm indicates no disturbance to this infrastructure.   

The WRSF Project would not adversely impact the land owner’s access to external road networks or internal 

access  tracks.    There  would  be  no  impact  on  infrastructure  such  as  irrigation  systems,  power, 

communication cables and water.  The layout of the solar farm (as shown in Figure 4.1) has been designed 

Page 114: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  93   

following  consultation with  the  landowner.   A  corridor has been  retained  in  the  southern part of  the 

Development Envelope to allow for the movement of stock in an east‐west direction.  Impact to the land 

that currently supports the corn crop has been avoided based on the  landowner’s advice that the area 

includes some high value land within the property.  

INCREASE IN BIOSECURITY RISKS – PEST, DISEASES AND WEED RISKS 

The  WRSF  Project  would  result  in  the  increased  movement  of  vehicles  and  people  to  the  WRSF 

Development  Envelope with  higher  numbers  occurring  during  the  construction  and  decommissioning 

phases.    The  primary  risk  to  biosecurity  is  the  spread  of weeds  that may  result  from  the  increased 

movement of vehicles in and out of the site.  Weed seeds can be transported through and from the site on 

the tyres and undercarriages of vehicles and on the clothing of staff personnel.  The risk of spread would 

primarily be mitigated by confining vehicle and machinery movements to formed access tracks during all 

phases of  the WRSF Project  and  implementing  a wash down procedure  for  vehicles entering  the  site.  

Noxious weed species within the site  include Class 4 weeds Weeping Willow (Salix babylonica) Bathurst 

Burr (Xanthium spinosum) and Class 2 weed Chinese celtis (Celtis sinensis). 

To assist  in the  identification and management of weeds at the site, a Weed Management Plan will be 

prepared for the construction and decommissioning phases WRSF,based on the plan developed for WRWF 

(RPS 2015) and mapping undertaken by NGH Environmental (2016). Management measures would focus 

on  early  identification  of  invasive weeds  and  effective management  controls.    An Operational Weed 

Management Plan would also be prepared to manage impacts associated with weeds such as the risk of 

weed ingress along the boundary of the Development Envelope and the importation and spread of weeds 

through vehicle movements. 

Establishment of a temporary construction site compound, specifically rubbish bins containing food, can 

potentially increase the risk of pest animals at the site (mostly fox).  Fencing of the solar farm site during 

construction and operation would minimise this risk by preventing animals (non flying and climbing) from 

entering the site.  Appropriate management of waste would also minimise the pest animal impacts. 

SUMMARY 

The removal of high value  land  from agricultural practices during construction, and the restrictions the 

operation of a solar  farm would present to the property during operation, has been considered by the 

landowners and deemed acceptable.   The location of the solar farm has been chosen in consultation with 

the landowner and has been designed to avoid the agricultural constraints identified by the land owner. 

The landowner would continue to be consulted in the WRSF Project’s planning phase and during all phases 

of the WRSF Project’s life.  

Any obstruction to farming operations and to the wellbeing of livestock is considered to be manageable 

with the implementation of controls. The WRSF Project is reversible and would not result in the permanent 

loss of agricultural land.   

Mining Impacts 

The WRSF Project  is not  located within an area  that has been  identified as having any  type of mining 

resource and there  is no current mining exploration  licence over the site.    Impacts on mining would be 

negligible.  In the long term (after decommissioning), the solar farm infrastructure would be removed and 

the site would be available for alternative land uses, including for mining purposes, if this was desirable. 

Page 115: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  94   

Renewable Energy impacts 

The WRSF Project is for the construction of a wind/solar hybrid solar farm.  Only beneficial impacts, such 

as increased renewable energy generation, would result from the WRSF Project. 

Storm water impact 

Surface  runoff at  the  site during  construction  could  result  in downstream water pollution  through  the 

generation of sediment, by scouring around the base of equipment and through picking up site equipment 

that may be laying within the depression area and transporting it downstream.  

The potential for flooding to occur is assessed as being low.  This is due to the following: 

The drainage depression has a small catchment area 

The Development Envelope is located on a gently sloping hill vegetated by grass.  The grassy 

cover would slow the speed of the water flow down the slope and assist in dissipating the 

flow direction. The land to the east is at a lower level and is unlikely to result in backing up 

surface water flows. 

A farm dam located upslope of the Development Envelope would assist in capturing water 

prior to it entering the drainage depressions. 

During operation, the likelihood that the site would be impacted by surface flow of water would be low. 

The anticipated  low flow volumes and the height of the solar panels reduces the risk of damage to the 

infrastructure located within or near to the depression where surface flow would be greatest. There may 

be some potential for scouring to occur around the base of the support posts during a significant rain event 

but the small diameter of the posts would reduce the level of impact. 

Despite it being considered a low risk, measures at the site to mitigate against impacts from stormwater 

during  construction and operation are  included below and  in Appendix G, draft Erosion and Sediment 

Control  (E&SC)  Plan.   With  the  implementation  of  these measures,  the  impacts  are  considered  to  be 

manageable. Further information is in Section 9.1. 

8.5.3 Environmental safeguards 

The following additional mitigation measures would be implemented to reduce the impacts to land use: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

LU 1  Continued  consultation  with  the  landowner  regarding  the WRSF Project including potential impacts to farm operations and risks to livestock. 

C  O   

LU 2  Construction and operations personnel would drive carefully and  below  the  designated  speed  limit,  to  minimise disturbance  to  livestock,  crops  and  pasture,  and  dust generation. 

C  O  D 

LU 3  Rehabilitation of  the  site  following decommissioning of  the WRSF Project. 

    D 

 

   

Page 116: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  95   

9 ASSESSMENT OF ADDITIONAL ISSUES 

9.1 SOILS AND LANDFORMS 

9.1.1 Existing environment 

The WRSF Project would be  located within a valley within  the New England Tablelands,  that  includes, 

stepped  plateaus,  hills  and  plains  with  elevations  ranging  between  700  and  1400  m  on  Permian 

sedimentary rocks, intrusive granites and extensive Tertiary basalts (OEH 2011).   

The western portion of the WRSF Development Envelope is a ridge line which forms a catchment divide 

between the McIntyre and Severn River catchments. The ridge line rises from less than 1,000 m to over 

1,300 m in the vicinity of white Rock Mountain. The northern wind turbines of WRWF will be installed along 

the ridge with turbines 1 and 2 at the northern end of the ridge being within the southwestern part of the 

WRSF Development Envelope. The bulk of the WRSF Development Envelope is gently sloping with slopes 

decreasing  from  the west to more gently sloping  land  in the east.   The surface elevation  for  the WRSF 

Development Envelope  ranges between 970 m ASL  and 1,030 m ASL.   The highest point  in  the WRSF 

Development Envelope is located in the south‐ west of the site on the crest of the ridgeline at the site of 

wind turbine 1.  The solar farm would be located east of the ridge on the gently sloping valley land. 

The WRSF Development Envelope lies within the New England fold belt which is composed of sedimentary 

rocks of Carboniferous and Permian age that were extensively folded and faulted during a period of rapid 

continental plate movement associated with granite  intrusions  in  the  late Carboniferous  (OEH 2011b).  

More recent volcanic activity has produced widespread areas of basalt overlying older folded and faulted 

strata. The WRSF Development Envelope is located within the Glen Innes‐Guyra Basalts soils landscape in 

the New England Tablelands Bioregion (Mitchell 2002).  The landscape includes undulating to stepped hilly 

plateau with broad ridges, wide shallow valleys and high rounded peaks on Tertiary basalt.  The extensive 

basalt flows have capped the more complex underlying geology and are associated with flatter tablelands. 

Where rivers have eroded through the Basalt layers they often expose more variable geology comprising 

granites and  folded metasediments and metavolcanics  that present a  range of  topographic  forms and 

varying soil types.   

Basalt soils are usually red, black or chocolate coloured with a high clay content that increases with depth.  

They consist of brown structured stony loam and clay loam on the slopes, occasional red structured  loam  

in  gradational  profiles  and  deep dark  self‐mulching  sticky  clay  on  the valley   floors.  Soils are sometimes 

waterlogged in valley floors (OEH 2011c).  Basalt derived soils generally have good natural fertility and are 

suitable for most agricultural production, although some may be rocky, limiting or preventing cultivation 

(NSW Agriculture 2003). Cultivation of such area has generally required that landowners remove the larger 

basalt rocks, generally stockpiling them within paddocks.  

A geotechnical  investigation  to determine  the  specific  soil  characteristics at  the  site  is proposed  to be 

undertaken in March 2016.   The results would assist the preparation of the final design layout for the solar 

farm. To the west of the indicative layout, there are areas of basalt outcrop on the slightly steeper slopes 

and in the east where corn is grown, the soil is described as ‘black soil’ country. 

Generally, soils that are high in clay have low soil erodibility.  This soil property, combined with the WRSF 

Project’s location in the gently sloping valley floor in areas of moister, stickier soils, can suggest erosion risk 

at the site is low.  There was little evidence of soil erosion occurring at the site during the site inspection. 

The site is predominately flat with a uniform vegetation cover.  The fertile soils assist vegetation growth 

Page 117: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  96   

that tends to stabilise soils and its retention as far as possible will reduce erosion risk. There are no incised 

waterways within the WRSF Development Envelope. The site is, however, subject to sheet flow which may 

lead to erosion where groundcover is removed and extent of clearing should be minimised.  

The site is situated a considerable distance from the coastline (c. 175 kilometres) and as such the potential 

for acid sulphate soils to occur is negligible.  A search of the EPA contaminated lands register (OEH 2016) 

returned one record within the Glen Innes Severn Council area located within the township of Glen Innes.   

9.1.2 Potential impacts 

Construction and decommissioning 

Risks to soil  include soil  loss through erosion, soil compaction or contamination. Topsoils are critical for 

agriculture and cannot be easily replaced within a human time scale. Adverse soil impacts can also have 

ecological  impacts, affecting habitat condition, water quality and riparian ecosystems. Risks to soils are 

influenced by landscape position, slope, soil type, hydrology and land use. 

General construction activities, such as excavation and trenching, have the greatest potential to cause soil 

erosion and subsequent sedimentation at the site.  Soil erosion could potentially occur when trenches for 

underground cables are excavated and during construction and deconstruction of the access road into the 

WRSF Development Envelope and the internal access tracks.   

Large scale bulk earth works would not be required as part of the works. There may be some land shaping 

works, including localised cut and fill areas, to construct the concrete foundations for the PCB’s, achieve 

more consistent gradients beneath the array and clear and level the site compound and laydown area.  

The localised excavation activities would remove vegetation cover and disturb soils, potentially decreasing 

their stability and increasing susceptibility to erosion.  Soil disturbance areas would be relatively small and 

isolated and site rehabilitation following installation would aim to stabilise these areas. Support posts for 

the solar panels would be pile driven into the ground with much of the surrounding groundcover retained 

across  the site.   Most of  the works would  take place on ground  that  is  relatively  flat  to gently sloping, 

reducing  the  potential  for  downslope  sedimentation.    A  short  section  of  trenching works  for  33  kV 

underground cable to link to the WRWF collection circuit route would be undertaken on marginally steeper 

land.  Impacts are considered manageable with the implementation of works in accordance with provisions 

of the Managing Urban Stormwater: Soils and Construction series, in particular: 

Managing  Urban  Stormwater:  Soils  and  Construction,  Volume  1,  4th  edition  (Landcom 

2004), known as ‘the Blue Book’. 

Volume 2A Installation of Services (DECC 2008a). 

Volume 2C Unsealed Roads (DECC 2008b). 

A draft Construction Erosion and Sediment Control Plan has been prepared for the WRSF Project and  is 

included  in Appendix G of  this  EIS.    The plan would be  incorporated  into  the White Rock  Solar  Farm 

Construction Environmental Management Plan.  

Soil compaction would occur as tracks are constructed and when driving the steel posts supporting the PV 

modules  into  the  ground.  Compaction  reduces  soil  permeability  thereby  increasing  run  off  and  the 

potential for concentrated flows and reduced vegetative cover.   

The use of  fuels  and other  chemicals on  site pose  a  risk of  soil  contamination  in  the event of  a  spill. 

Chemicals used onsite would include fuels, lubricants and herbicides. 

Page 118: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  97   

It  is  possible  that  contamination  associated with  past  agricultural  activities  (e.g.,  pesticides)  could  be 

present on the site, however, given no contaminated sites are recorded on or adjacent to the proposed 

development,  it  is  unlikely  that  significant  contamination  exists  at  the  proposed  site.  Furthermore, 

construction activities would not significantly disturb soil or groundwater at the site. If contamination  is 

identified during site construction, it would be managed in accordance with a Construction Environmental 

Management Plan (CEMP).  

Operation  

Minimal operational  impacts to soils would occur. Maintenance activities and vehicles would be  largely 

confined  to  the  formalised access  tracks. There would  remain a minor  risk of soil contamination  in the 

event of a chemical spill (fuels, lubricants, herbicides). 

Concentrated runoff from the PV modules could lead to increased soil erosion below the modules during 

significant  rain  events.  The  runoff would  generally be directed  to  the drainage depression.   Retaining 

vegetation cover would assist in reducing potential for erosion from rainfall run‐off.  Monitoring the solar 

farm for scouring following significant rain events and undertaking works to stabilise any bare soil would 

also minimise the impact.   

9.1.3 Environmental safeguards 

The following mitigation measures would be implemented to reduce the impacts to soils and landforms: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

SL 1  Preparation of an erosion and sediment control plan for the site  (based on  the draft plan  in Appendix G) which  includes measures for flood management at the site. 

C     

SL 2  Preparation of a Spill Response Plan consistent with the Spill Response Plan for the WRWF to: 

o Manage  the storage of any potential contaminant onsite 

o Mitigate the effects of soil contamination by fuels or other chemicals (including emergency response and EPA notification procedures). 

o Prevent  contaminants  affecting  adjacent  pasture and dams. 

C  O   

9.2 WATER 

9.2.1 Existing environment 

The WRSF  Development  Envelope  is  located  in  the  south‐eastern  part  of  the  Border  Rivers‐Gwydir 

Catchment  Area,  an  area  of  5,000  ha  that  is  part  of  the Murray  Darling  Basin  Area.    Closest major 

watercourses  in proximity  to  the WRSF Project are  the Macintyre River,  located approximately 20  km 

south‐west of the area and the Severn River which is approximately 30 kilometres north. The WRSF Project 

is located outside the town water catchment for the Glen Innes.  

There are no major rivers or creeks  in the WRSF Development Envelope.   Waterbodies are  limited to a 

single farm dam and a shallow, ephemeral drainage depression which drains in a north‐easterly direction 

into Wellingrove Creek, a tributary of the Severn River.   At the time of the site  inspection, the drainage 

Page 119: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  98   

depression was dry.  The banks are vegetated and stable with no signs of erosion.  There are no definable 

channel banks or a channel bed and no signs of any fluvial bedforms such as pools, riffles or sediment bars. 

The drainage depression varies in width and is up to 45 metres wide in some sections.  It runs for a distance 

of 800 metres through the WRSF Development Envelope (refer Figure 9‐1, Figure 9‐2 and Figure 9‐3). 

  

Figure 9‐1  Drainage depression looking towards the north of the WRSF Development Envelope. 

 

Figure 9‐2  View to the south showing general path of drainage depression

Page 120: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  99   

 

Figure 9‐3  Waterbodies, drainage depressions and groundwater bores within and surrounding the WRSF Development Envelope. 

Gwydir Highway

GW050147

GW031259

°0 0.5 10.25 Kilometers

www.nghenvironmental.com.au

Ref: 6589 9.3 v3Author: JB

Notes:- Bore data Copyright NSW DPI 2016- Infrastructure data and aer ial courtesyof Goldwind, received 2016

Groundwater bores

Drainage depression

Farm dam

Proposed solar farm

Development envelope

Solar array

Wellingrove Creek

Page 121: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  100   

 

The WRSF Project is located within the Border Rivers water management area.  It is located in an area that 

is not subject to any water sharing plans. The drainage depression drains  into Wellingrove Creek which 

flows  into the Severn River and then  into the Pindari Dam.   The water sharing plan for the NSW Border 

Rivers Regulated River Water Source begins below Pindari Dam. 

The WRSF Development Envelope includes one small farm dam, total capacity approximately 1.5‐2.0 ML.  

There are  three more  farm dams  just outside  the  south‐western and  southern boundary of  the WRSF 

Development  Envelope  located  on  land  belonging  to  the  same  landowner.    Subject  to  landowner 

agreement, the dams may be used as a water source for the WRSF Project.  An alternate water source may 

be a dam located on a neighbouring property which is likely to be one of the water supply dams used during 

construction of the WRWF. 

The closest groundwater bores to the WRSF Development Envelope, as  indicated by the Department of 

Primary Industries groundwater data website are: GW031259 – located approximately 590 metres north‐

west of the site.  The bore was drilled to 12.20 metres. No water bearing zone was recorded. 

GW050147 located approximately 750 metres from the site, north of the Gwydir Highway.  

The bore was drilled to 15.20 metres. No water bearing zone was recorded.  

Both bores were drilled in the early 1960’s.  Their location is shown on Figure 9‐3. 

9.2.2 Potential impacts 

Construction and decommissioning 

During  construction, earthworks would  take place within and near  to  (within 40 metres)  the drainage 

depression.  Most of the works would be limited to the driving of steel posts into the ground but there may 

be some additional activities such as the excavation works to level a pad for the concrete foundation of the 

PCB’s or for trenching works to connect the solar panel arrays to the PCB’s. The PCB’s would not be located 

in the drainage depressions. 

Advice from the NSW Office of Water (pers. comm. Bob Brittan, Senior Water Regulation Officer, DPI 11 

February 2012), confirmed that the depression does not meet the definition of a river for the purposes of 

defining waterfront land in the Water Management Act 2000.  No CAA would be required for these works.   

There is potential however for sediment to be generated during the works to install the infrastructure, and 

for that sediment to be mobilised if a rainfall event occurs.  Containment of sediment is one of the goals of 

the erosion and sediment control plan.  Mitigation measures are included in the draft Erosion and Sediment 

Control Plan (refer Appendix G). 

The  solar  farm would be constructed on gently  sloping  land.   The WRSF Development Envelope  is not 

located within  an  area  that  is  the  subject  of  a  floodplain management  plan  and  no  flood  prone  land 

mapping is available for the WRSF Development Envelope. Land within the WRSF Development Envelope 

would however, be subject  to sheet water  flow during and after significant  rainfall events.   The  risk of 

flooding has been assessed as low given the small catchment, gently sloping topography and lack of debris 

on fences crossing drainage depression which suggest low flow levels. 

The WRSF  Project would  remove  vegetation  for  the  construction  of  a  gravel  access  track.    The  site 

compound area would be levelled and spread with crushed gravel to provide a hard surface for machinery 

and site offices.  Introducing impervious surfaces into a vegetated area can change water flow across the 

site, altering direction and  increasing velocity.   During  construction,  runoff  control would be managed 

Page 122: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  101   

 

through the implementation of the erosion and sediment control plan.  Measures are detailed in the draft 

plan that is included as Appendix G.  The farm dam that is located on the proposed south‐west boundary 

of  the solar  farm development would  intercept some of  the water  that would  flow down  the  ridgeline 

before it entered the construction site. 

Water usage during construction would be mainly for dust suppression on unsealed roads.  Dependant on 

landowners consent, the water would be extracted from local farm dams.  The volume required is likely to 

vary dramatically depending on temperature and rainfall.  

Under normal  climatic  conditions, and when used  for  stock watering only,  the existing dam would be 

unlikely to go dry.  However, under extended drought conditions, and with the extraction of water for dust 

control during construction, it is possible that the dam could go dry.  A nearby tank also draws water from 

further east on the property. The tank currently supplies watering troughs used by grazing stock within the 

WRSF Development Envelope. Restriction of stock in this area during construction will temporarily reduce 

the water supply requirements for stock and existing sources may be able to supply all or part of the needs 

during WRSF  construction.  If  additional  water  supply  is  required  during  construction,  this  would  be 

addressed at the necessary time.    It may  include bringing water to the site  in trucks or pumping from a 

more distant location.   

No concrete batching,  requiring  large volumes of water, would be undertaken onsite.   Concrete would 

most likely be supplied from Glen Innes and be brought to site in concrete agitator trucks via the Gwydir 

Highway and WRWF northern site entry point. The volume of concrete required for WRSF is expected to 

be low relative to that needed for WRWF and retention of a batch plant used for WRWF is unlikely. 

Based on the type of construction proposed and the relatively flat and stable landforms, the above water 

impacts are considered to be of low risk and highly manageable. 

Impacts on soil during decommissioning would be similar to those during construction. Removal of pile 

driven posts and other  infrastructure would cause  some disturbance  to  soil. All areas of  soil disturbed 

during decommissioning would be rehabilitated. Site rehabilitation is considered in more detail in Section 

8.1.  Risks to soil and water during decommissioning are considered highly manageable.  

Operation 

Water use volumes during operation would be minimal. Water is not required for toilets, as the staff will 

use the wind farm facilities. PV panel cleaning is required. The frequency of cleaning is dependent on the 

amount of soiling and the rain fall experienced. Water would be sourced from onsite sources such as roof 

drainage and, if required, offsite or from rainwater tanks on the wind farm site. 

Concentrated runoff from the PV modules could lead to increased soil erosion below the modules during 

significant rain events.  Surface water would flow to the drainage depression area and water flows in this 

area could increase.  There may be an increased erosion risk through scouring around the support posts in 

these instances.  

During operation, the gravel track providing access to and from the solar farm would remain. Impacts to 

water flow as a result of this increased area of hard surface would be minor when considered in the context 

of the vegetation within the existing WRSF Development Envelope and downslope of the road.  Drainage 

controls would be installed along the access track particular for the short sections on steeper slopes. 

There is low potential for oil spills to occur during maintenance works associated with vehicles or plant.  It 

is unlikely that any oil or fuel would be stored on site other than at the WRWF Operations and Maintenance 

area and  in that case,  it would be stored appropriately  in the bunded containers.   A spill response plan 

Page 123: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  102   

 

would be  incorporated  into  the Operational Environmental Management Plan and  spill  kits  carried on 

vehicles. 

Operational risks to soil and water resources are considered highly manageable with the implementation 

of mitigation measures. 

9.2.3 Environmental safeguards 

The following mitigation measures would be implemented to reduce the impacts to water: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

WA 1  Drainage  controls  to  deal with  any  concentrated  flows  off panels, if required. 

C     

WA 2  Ongoing consultation with landowners in relation to the use of water from farm dams. 

C  O   

9.3 TRAFFIC, TRANSPORT AND ROAD SAFETY 

9.3.1 Existing Environment 

The WRSF Development Envelope is located immediately south of the Gwydir Highway approximately 20 

km west of Glen Innes.  The site is located partly within and adjacent to the WRWF boundary.  It would be 

accessed from the highway via the upgraded site entry approved by Roads and Maritime Services (RMS) 

and internal access track constructed as part of the WRWF Project.   

The Gwydir Highway is a State Highway Road that is owned and maintained by the Roads and Maritime 

Services.    It  is 567 kilometres  long and runs  in an east‐west direction through the New England Region.  

Towns serviced by the Gwydir Highway include Moree, Inverell, Glen Innes and Grafton. Gwydir Highway 

is an approved route for High Mass Limit (HML) B‐double vehicles of 25/26m. The intersection point of the 

Highway and the WRWF access track would be upgraded as part of the WRWF development in accordance 

with Roads and Maritime requirements and well before commencement of WRSF construction.   

Glen Innes is located on the New England Highway which is part of the National Land Transport Network, 

a defined network of important road and rail infrastructure links and their intermodal connections, defined 

under the National Land Transport Act 2014.  The highway links Glen Innes with the ports of Brisbane and 

Newcastle and performs a vital role in servicing key regional centres, servicing key industries and for the 

distribution of regional freight.  The highway would be used as the major transport haulage route for the 

delivery of materials for the construction of the WRWF and the WRSF. 

9.3.2 Traffic and the WRWF Project 

Traffic management and access requirements  for the WRWF have been  initially assessed as part of the 

development application for the WRWF and more recently as part of pre‐construction planning for WRWF 

Stage 1.  A Construction Traffic and Access Management Plan (CTAMP) has been prepared as part of the 

approved WRWF Stage 1 Construction Environmental Management Plan for that project.   

Many of the traffic issues raised in the WRWF Stage 1 CTAMP (ERM 2015) for the WRWF are relevant for 

the WRSF, but the WRSF would involve a lesser volume of transport vehicles and does not require transport 

of long loads ( greater than 60m).  As required by the SEARs, a draft WRSF Traffic Management Plan (TMP) 

Page 124: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  103   

 

has been prepared and is attached as Appendix H. Construction and operation of the WRSF would utilise 

the northern transport route and access point that will be used for the WRWF (Appendix H, Figure 1).   

9.3.3  Potential impacts 

Construction 

Traffic generation 

Key traffic and transport impacts for the WRSF Project mostly relate to the generation of additional traffic 

on the external road network.   

WRSF Project activities with the potential to generate traffic include the following: 

Construction  of  a  new  access  track  between  the WRWF  internal  track  and  the WRSF 

Development Envelope.   

Delivery of the site compound materials, temporary buildings and compound set up. 

Delivery of construction materials  including PV modules, posts, mounting frames, cabling 

and inverter substations and fencing. 

Delivery of materials, e.g. gravel, jute mesh, etc. 

Dust suppression activities involving use of a water cart. 

Foundation excavation and construction activities. 

Worker and staff personnel access to the site. 

 

Table 9‐1 estimates the number and type of vehicle movements during the peak construction period (3 

months). Build period is assumed for 3 months from the end of August 2017.  

Table 9‐1 Predicted traffic management volumes during construction 

Item  No.  Duration Average per day 

Timing  during build 

Vehicle  Notes. 

Compound Setup 

8  2 days  4 Start & End 10m rigid 

Provision  if  additional compound is required or if  WRWF  compound  is unable to be used. 

Access Tracks 

113  3 weeks  7Start & Mid 

Build10m  tipper trucks 

Access  track construction at the start of  the  build  plus  any repairs  required  during the build. 

Mounting Frame 

70  3 weeks  5 Early15.4m articulated 

Once  laydown established. 

PV Modules  110  3 weeks  7 Mid

15.4m articulated or Class 2 (B‐Double)  19‐25m 

Assuming  28  modules per pallet, 26 pallets per shipping  container, approx. 80000 modules. 

Cabling  20  2 weeks  2 Mid15.4m articulated 

 

Page 125: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  104   

 

Item  No.  Duration Average per day 

Timing  during build 

Vehicle  Notes. 

Foundation excavation and construction 

10  1 week  2 Mid 10m rigid 

For  inverter  substations and  any  monitoring equipment  required onsite. 

Power Conversion Block Modules 

9  1 week  2 Late15.4m articulated 

PCBs  would  be  located onsite by either a crane mounted on the delivery truck  (hiab)  or  a separate crane unit. 

Workers and site staff 

3600  3 months  40  Duration Light vehicles 

Bearing in mind that site staff will peak  at  times, up  to  a max of  approx. 100 staff at peak  times, less at other times. Staff would be encouraged to car pool where possible. 

Dust suppression 

30 As required 

2  As required 

8.8m  service vehicle (water tanker) 

Main  dust  creating activities  would  be access  track construction  and  piling, water tankers to be used as  required  to  suppress any dust. 

 

The number of vehicle movements is considered to include a return trip.  A total of 400 vehicle movements 

(ranging from trucks to light vehicles) is estimated as a result of construction activities over a three month 

‘peak’ construction period.  Another 3600 movements accounting for site personnel entering and exiting 

the site is also expected.   Increased vehicle numbers on the public road network during the WRSF Project’s 

construction phase could potentially result in impacts to: 

Traffic efficiency including:  

o Disruption to existing public transport services  including school bus routes along the 

Gwydir Highway. 

o Minor delays to trip times caused by movements of vehicles through Glen  Innes and 

along the major transport routes. 

o Delays as a result a result of road closures.  It should be noted that no road closures are 

currently planned during construction and decommissioning of the WRSF.  

Safety, particularly increased collision risks with other vehicles, cyclists, pedestrians, stock 

and wildlife. 

Amenity, associated noise and dust (where traffic is on unsealed roads) may adversely affect 

nearby  residents,  however  closest  neighbours  are  greater  than  550m  distant  from  the 

works. 

Road pavement life or damage to local road infrastructure is avoided as deliveries are on 

State Highways. 

Page 126: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  105   

 

Measures to mitigate traffic and transport impacts are included in the Draft Traffic Management Plan which 

is attached as Appendix H of this EIS.    Impacts are considered manageable with the  implementation of 

these controls.     

Traffic routes 

The Traffic Impact Study (Epuron 2011) and the WRWF CTAMP (ERM 2015) identify the transport routes 

that would be utilised during construction of  the WRWF Stage 1.   The proposed accessed  routes were 

considered in terms of providing safe access of construction and operational vehicles associated with the 

WRWF  project,  having  appropriate  sight  distances  at  intersection  points,  having  suitable  capacity  for 

carrying over‐mass or over‐dimensional  transport and  for  safety with other  road users.   The  transport 

routes were deemed suitable for use for the WRWF and are considered suitable for the WRSF operations.  

The WRWF CTAMP also outlines the work required to upgrade roads and road infrastructure along these 

routes.  These upgrade works would have been undertaken prior to the construction works for the solar 

farm commencing.  As a result, the capacity of the roads to manage the additional traffic generated by the 

solar farm is considered to be sufficient.   

The draft WRSF Traffic Management Plan  is consistent with the CTAMP  for the WRWF Stage 1.   Traffic 

impact  types  for  the WRSF would  be  similar  to  those  assessed  for  the WRWF,  but  overall  impact  is 

considered to be less given the following: 

Shorter construction period and smaller size of  the WRSF Project which would generate 

smaller volumes of additional traffic. 

There would be no  requirement  for  the  transportation of  loads greater  than 60 metres. 

Solar  farm  infrastructure would be  transported  to  site via  standard articulated vehicles. 

Impacts  associated with  the  transportation  of  long  loads  such  as  road  safety  and  road 

capacity are not relevant to the WRSF Project.   

The co‐use of the WRWF substation means that an additional 33 kV/132 kV transformer is 

not required to be transported to the site. 

Operation 

During solar farm operations, it is expected an additional two workers on a weekly basis, would access the 

property to operate and maintain the solar farm. These are likely to be staff employed at the operational 

wind farm and therefore may not require additional traffic numbers.  In any case, traffic volumes for the 

operational period will be low. 

There may be the occasional requirement for delivery trucks to access the site, to replace equipment or 

deliver supplies.  Additionally, security personnel may also access the site. 

The anticipated volume of staff would result in a very minimal increase in traffic flow on local roads, if any. 

It is considered highly unlikely that operational traffic would obstruct public or private access. Risks to road 

safety from operational traffic would be very minimal and no additional safeguards are proposed. 

Decommissioning 

Decommissioning would  involve  the  removal  of  all  infrastructure  associated with  the  solar  farm  and 

rehabilitation of  the  site.   Traffic generated during decommissioning and associated  impacts would be 

similar  to  the  construction  phase.  Mitigation  measures  would  be  addressed  in  a  Decommissioning 

Environmental Management Plan (DEMP) including traffic management measures.  

   

Page 127: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  106   

 

9.3.4 Environmental safeguards 

The following measures would be incorporated in the WRSF Project implementation: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

TT 1  Preparation  of  a  traffic management  plan  (based  on  draft provided in Appendix H) 

C    D 

TT 2  Ongoing consultation with stakeholders including Roads and Maritime  Services,  GISC,  local  landholders,  emergency services, business owners,  school bus  companies  to  inform them  of  changes  to  road  use  and  conditions  during construction and decommissioning. 

C    D 

TT 3  Availability of a direct contact phone number to enable any issues or concerns to be rapidly identified and addressed. 

C  O  D 

 

9.4 HEALTH AND SAFETY 

9.4.1 Electromagnetic interference 

Background 

Electromagnetic fields (EMFs) consist of electric and magnetic fields and are produced whenever electricity 

is used. EMFs also occur naturally in the environment, e.g., from a build‐up of electric charge in thunder 

storms and Earth’s magnetic field (WHO 2012).  

Electric fields are produced by voltage whereas magnetic fields are produced by current. When electricity 

flows, EMFs exist close to the wires that carry electricity and close to electrical devices and appliances while 

operational  (WHO  2007).  Electric  and magnetic  field  strengths  reduce  rapidly with  distance  from  the 

source, and while electric fields are insulated by air and insulation material, magnetic fields are not.  

Fields of different frequencies interact with the body in different ways. EMF field sources to which people 

may be exposed are predominately in three frequency ranges. The Extremely Low Frequency (ELF) range 

of 0‐300 Hz  incorporates the 50 and 60 Hz frequencies of the electric power supply and of electric and 

magnetic fields generated by transmission lines and other electrical devices and infrastructure (Repacholi 

2003). 

Over decades of EMF research, no major public health risks have emerged but uncertainties remain (WHO 

undated). While it is accepted that short‐term exposure to very high levels of electromagnetic fields can 

be harmful to health, the  International EMF Project, established by the World Health Organisation, has 

thus far concluded that there are no substantive health consequences from exposure to ELF electric fields 

at the low levels generally encountered by the public (WHO 2007), such as those that would be produced 

by electricity generation at the WRSF.  

Exposure to ELF magnetic fields is mostly considered to be harmless, however a policy of prudent avoidance 

has been taken as a result of any doubt.  The Australian Radiation Protection and Nuclear Safety Agency 

(ARPANSA 2015) advises that ‘the scientific evidence does not establish that exposure to ELF EMF found 

near power lines is a hazard to human health’. 

Page 128: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  107   

 

The  International  Commission  on  Non‐Ionizing  Radiation  Protection  (ICNPR)  published  Guidelines  for 

limiting exposure to time‐varying electric, magnetic and electromagnetic fields (up to 300GHz) in 1998.  The 

guidelines were updated in 2010.  The objective of the paper was to establish guidelines for limiting EMF 

exposure that will provide protection against known adverse health effects.   To prevent health‐relevant 

interactions with Low Frequency fields, ICNIRP recommends limiting exposure to these fields so that the 

threshold at which the interactions between the body and the external electric and magnetic field causes 

adverse effects inside the body is never reached. The exposure limits, called basic restrictions, are related 

to  the  threshold  showing  adverse  effects,  with  an  additional  reduction  factor  to  consider  scientific 

uncertainties pertaining to the determination of the threshold. They are expressed in terms of the induced 

internal electric field strength  in V/m. The exposure  limits outside the body, called reference  levels, are 

derived from the basic restrictions using worst‐case exposure assumptions, in such a way that remaining 

below  the  reference  levels  (in  the air)  implies  that  the basic  restrictions will also be met  (in  the body) 

(ICNIRP 2016).  Reference levels for occupational and general public exposure are shown in Table 9‐2. 

Table 9‐2 ICNIRP reference levels (ICNIRP 2010) 

Exposure characteristics Electric field strength 

(kVolts per metre ‐ kV/m)  Magnetic flux density (microteslas 

‐ µT)  

Occupational  10   1000 

General public  5  200 

 

Research into electric and magnetic fields undertaken at utility scale photovoltaic installations in California6 

by Chang and Jennings (1994), indicated that magnetic fields were significantly less for solar arrays than 

for household applications. Chang and Jennings (1994) found magnetic fields from solar arrays were not 

distinguishable from background levels at the site boundary, suggesting the health risk of EMFs from solar 

arrays is minimal. 

Potential impacts 

Potential  for  EMF  impacts occurs only during  the operational phase of  the  solar  farm when  electrical 

infrastructure  is  capable  of  generating  EMFs.  Due  to  the  type  and  configuration  of  the  solar  farm 

infrastructure proposed, the electromagnetic fields would vary in different locations onsite, as discussed 

below. 

Underground 33 kV cable 

The WRSF Project would require the installation of an underground 33 kV cable to link the solar farm output 

to the WRWF collections circuits.    

Cables used in the 33 kV onsite reticulation cabling would contain three core conductors in trefoil (three 

lobed) arrangements to reduce the effects of magnetic fields from adjacent conductors.   

Results of an electromagnetic field assessment undertaken for a cable, considered to be indicative of what 

would be used at the WRSF, indicate the electric and magnetic fields produced by the cable are much lower 

than the ICNIRP reference levels.  The modelled results indicate that the magnetic field on the surface of 

the ground directly above the cable is expected to be approximately 4.7µT, which is significantly less than 

the ICNIRP 200µT exposure limit for general public. The magnetic field strength is inversely proportional to 

                                                              

6 Note the U.S.A electricity supply operates at 60 Hz frequency. 

Page 129: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  108   

 

the distance from the conductor squared and as such the magnetic field is expected to decay to zero with 

increased distance from the conductor (UGL 2016).  The electric field produced is contained in the cable 

between the core and the metallic screen and does not affect the surrounding environment.   

Based on these results, the electromagnetic interference as a result of the 33 kV underground cable are 

considered to be negligible and well within the ICNIRP reference levels.  

Inverters  

Typically eight PCBs with a  total output 20 MW  (AC) would be  installed as part of  the solar  farm.   The 

inverters would have an AC power frequency range between 47 and 63 Hz and fall into the Extremely Low 

Frequency (ELF) range of 0‐300 Hz.  Within this range, the EMFs are not considered to be a hazard to human 

health.  In addition, the PCBs would be located within the fenced solar farm site with no public access and 

would  operate  only  during  the  day  time  reducing  the  total  time  that  EMFs  are  generated  by  the 

infrastructure.  

Substation 

The WRWF substation at the approved  location would be utilised.   Connection of the solar  farm to the 

substation would  require minimal  additional  infrastructure  in  this  substation  that would  increase  the 

electromagnetic effect from the substation. In any event, the fenced exclusion area around the substation 

components is sufficient to reduce the EMF to negligible levels. 

Solar array 

The WRSF Project would require installation of DC wiring between panels and the PCBs.  This cabling would 

be underground and would conduct about 6.85A at between 30 and 50 V.   Electromagnetic interference 

as a result of the underground cable are considered to be negligible.   

Receptors – public safety 

There are two residences located between 550 metres and one kilometre of the solar farm site.  The areas 

proposed for  installation of the solar farm  infrastructure would have no public access. Access would be 

restricted to appropriately trained and qualified maintenance staff.  Property owners accessing the sites 

for ongoing agricultural use would have no  reason  to  spend extended periods near  the  infrastructure, 

which has been located at a distance from frequent use areas such as sheds, yards and residences. Should 

property  owners  require  access  to  control  building  or  other  solar  farm  infrastructure,  they would  be 

accompanied by an appropriately trained and qualified maintenance staff member.  

Receptors – electrical devices 

The PCB’s to be used for the WRSF Project would behave similar to other typical electrical and household 

devices.   Additionally,  they  are designed  to  reduce  all possible  interference emissions  via  the  circuit’s 

technical avoidance of high frequency currents, the deployment of filters and the use of grounded metal 

housings. 

Summary of impacts 

Acute impacts are not anticipated as a consequence of the low exposure rates in combination with the low 

likelihood that people or stock would be within range of high exposure levels for extended periods. 

Onsite, underground cabling with conductors in a trefoil (three lobed) arrangement would be used where 

practicable which would assist in shielding EMFs. Use of an existing substation would result in negligible 

additional emissions from this structure and would ensure that the EMF exposure to receptors including 

Page 130: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  109   

 

the public, property owners and workers are well below the 200µT  levels considered prudent for public 

health. 

Overall research has not shown to date that long‐term low‐level low frequency exposure has detrimental 

effects on health. Using the Principle of Prudent Avoidance to design and site this infrastructure, exposure 

to EMFs and potential for adverse health impacts can be avoided or reduced. Adverse health impacts from 

EMFs are therefore unlikely as a result of the proposal.   

Environmental safeguards 

The following mitigation measures would be implemented to reduce the impacts from EMFs. 

No.  Environmental Safeguard  Solar farm 

C  O  D 

EMF 1  All  electrical  equipment  would  be  designed  in  accordance with  relevant codes and  industry best practice standards  in Australia. 

C     

9.4.2 Aviation 

Existing environment 

Glen Innes Airport is located 16.5 km north‐east of the WRSF Development Envelope, 9.3 km north‐west 

of Glen Innes.  The airport is a small airport that is used by light aircraft, the Glen Innes hospital and two 

freight companies.  A development application for an international aviation flying college was approved in 

2012.  Construction for the development has not yet begun. 

A  local  grassy  airstrip,  600  m  in  length,  is  located  approximately  300  m  south‐east  of  the  WRSF 

Development  Envelope.    The  airstrip  is  on  land  that  is  owned  by  the WRSF  Development  Envelope 

landowner.  It is predominately used by agricultural aircraft for the purposes of crop protection activities. 

Potential impacts 

The identified risk to aviation from the WRSF Project is glint and glare. Glint is a quick reflection that occurs 

when the sun is reflected on a smooth surface.  Glare is a longer reflection.   

Onsite infrastructure that may cause glare or reflections depending on the sun angle, include: 

Solar panels. 

Steel array mounting ‐ array mounting would be steel or aluminium.  

Temporary construction site buildings. 

 

The potential for glint or glare associated with non‐concentrating PV systems which do not involve mirrors 

or lenses is relatively limited. PV solar panels are designed to absorb as much solar energy as possible in 

order to generate the maximum amount of electricity or heat.  As such, they reflect only around 2% of the 

light received (Spaven Consulting 2011).   

A comparative reflection analysis against other surfaces is shown in Figure 9‐4.  The figure shows that in 

relation to water and snow, a solar panel (with a reflectivity coating) reflects a much lower percentage of 

light.  In addition, The Department of Planning (2010) in their discussion paper on planning for renewable 

energy generation, stated that solar panels will not generally create noticeable glare compared with an 

existing roof or building surfaces. This issue is also discussed in Appendix D. 

Page 131: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  110   

 

Figure 9‐4  Comparative reflection analysis (Spaven 2011) 

With regard to aviation, the largest glare hazard is the sun (Spaven 2011).   

For other infrastructure on site such as the buildings and steel support posts, impacts from glint and glare 

is considered minor due to their small size and low surface area.  Careful design and colour schemes can 

further reduce any potential reflection problems.   

Impacts of glare and glint on aviation as a result of the WRSF Project infrastructure are considered to be 

minor and can be effectively managed with the implementation of the mitigation measure outlined below. 

Environmental safeguards 

The following mitigation measures would be implemented to reduce aviation impacts. 

No.  Environmental Safeguard  Solar farm 

C  O  D 

AV 1  The materials and colour of onsite infrastructure (other than the solar panels) will, where practical, be non‐reflective and in keeping with the materials and colouring of the landscape. 

C     

9.4.3 Bushfire 

The solar farm would be located on gently sloping land at an elevation between 970 and 980 m ASL.  The 

land is currently grazed and cropped and has been largely cleared of overstorey vegetation.   

Treed corridors exist to the north of the site along the southern boundary of the Gwydir Highway.  Several 

isolated stands of trees are located on the adjoining property within 500 m of the site.   

The western boundary of the WRSF Development Envelope is defined by a ridgeline with moderately steep, 

mostly  treeless  slopes which  grade  into  the  valley where  the  proposed  solar  farm would  be  located. 

Woodland vegetation is present on the eastern side of this ridge.  

The WRSF Project is not located on land mapped as Bushfire Prone Land (pers comm Greg Doman, Manager 

of Regulatory and Planning Services, Glen Innes Severn Council, 11 February 2016).  The bushfire danger 

for the WRSF Development Envelope and wider region is generally between 1 October and 31 March, but 

can  vary  subject  to  local  conditions.  Summer  conditions  can  be  dry  and  hot with  high wind  speeds 

Page 132: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  111   

 

producing local grassfires (Epuron 2011).  Ignition sources for the site could include machinery movement 

in long grass, hay storage, lightning strikes, storage of fuel and farm chemicals, and cigarette butts thrown 

from cars travelling along the Gwydir Highway.  

All NSW Fire Brigade  fire  stations are equipped with  trained personnel and  resources  for dealing with 

hazmat incidents. The closest NSW fire brigades to the site are Glen Innes Fire Station (23 km from the site) 

and Inverell Fire Station (44 km from the site). 

Potential impacts 

Construction and decommissioning 

Activities associated with construction that may cause or increase the risk of bush fire include: 

Smoking and careless disposal of cigarettes on site. 

Hot works activities such as welding, soldering, grinding and use of a blow torch. 

Use of petrol powered tools.  

Operating a petrol, LPG or diesel powered motor vehicle over land containing combustible 

material. 

Operating plant fitted with power hydraulics on land containing combustible material. 

Electrical faults during testing and commissioning. 

Storage of chemicals and hazardous materials. 

Considering the sparse and fragmented nature of the woodland and forest remnants flanking the WRSF 

Development Envelope, it is considered unlikely that the WRSF Project would pose a significant bush fire 

risk.  Bush fire hazards associated with the activities listed above are considered highly manageable and 

would be minimised through the implementation of fire and bush fire mitigation measures outlined below.  

In  addition,  site  access would  be  formalised  at  the  beginning  of  the  construction  phase which would 

increase the ability to access and suppress any fire onsite or on adjoining sites if required.   

Potential  impacts  from  decommissioning  activities would  be  similar  to  those  for  construction.  As  for 

construction and operation activities (below), any bush fire risk associated with decommissioning of the 

WRSF Project would be highly manageable. 

Operation 

In  addition  to  the  activities  listed  above,  which  also  apply  to  the  operational  phase,  repairs  and 

maintenance activities could increase bush fire risk.  

All electrical components would be designed to minimise potential  for  ignition.   Asset protection zones 

would also be maintained around buildings at the site.  

Bush fire risks during operation of the solar farm are considered highly manageable.  A managed grazing 

regime would assist in reducing fuel loads at the site. 

   

Page 133: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  112   

 

9.4.4 Environmental safeguards 

The following mitigation measures would be implemented to reduce bushfire impacts: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

BF 1  All  electrical  equipment  would  be  designed  in  accordance with all applicable codes and industry best practice standards in Australia. 

C     

BF 2  Buildings would comply with  the Building Code of Australia (BCA). 

C     

BF 3  Safety management  processes  to  highlight  to  all  staff  and contractors  through  an  induction  process  the  potential hazards of activities onsite. This  should  include preparation and  compliance  with  job‐specific  WMSs  and  emergency preparation/response drills. 

C  O  D 

BF 4  The NSW RFS be provided with a contact point for the WRSF Project, during construction and operation. 

C  O  D 

BF 5  Designation  of  a  WRSF  onsite  safety  representative responsible for ensuring  implementation of safeguards. This representative  would  also  regularly  consult  with  the  local NSW  RFS  to  ensure  familiarity with  the WRSF  Project  and assist the RFS and emergency services as much as possible if there is a fire on‐site during construction of the WRSF Project. 

C  O  D 

BF 6  Basic training of all staff in the use of fire‐fighting equipment.  C  O  D 

BF 7  Appropriate fire‐fighting equipment would be held on site to respond  to  any  fires  that  may  occur  at  the  site  during construction of the WRSF Project. This equipment will include fire extinguishers, a 1000 litre water cart retained on site as a precautionary basis, particularly during blasting and welding operations.    Equipment  lists  would  be  detailed  in  Work Method Statements (WMS’s). 

C  O  D 

BF 8  Slashing  of  vegetation  on  construction  site  before construction starts and as required to manage fuel loads. 

C  O  D 

BF 9  Maintain vegetation (eg. allow sheep to graze) to a low level amongst solar panels to control vegetation on the solar farm site. 

  O   

BF 10  All access and egress tracks on the site would be maintained and kept free of parked vehicles to enable rapid response for firefighting crews and to avoid entrapment of staff in the case of bush fire emergencies.   

C  O   

BF 11  Confirm agreement of local property owners to use dams on site as water sources in the event of fire. 

C  O  D 

BF 12  The use of a Hot Works Permit system to ensure a number of pre‐requisites are satisfied prior to works commencing. Fire extinguishers would be present during all hot works. 

C  O   

BF 13  Where  possible  restrict  the  performance  of  Hot Works  to specific areas (such as the Construction Compound temporary workshop areas). 

C  O   

BF 14  Adequate  site  communications  to  ensure  a  fire  event  is communicated quickly. Measures would include:  

o Use of mobile phones. 

C  O   

Page 134: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  113   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

o Use of two‐way radios.

o Fire Danger Warning signs  located at the entrance to the site compounds. 

BF 15  Specific  management  activities/controls  for  hot  works, vehicle use, smoking, use of flammable materials, blasting. 

C  O  D 

BF 16  The BRMP will  include consultation with the NSW Rural Fire Service during construction, operation and decommissioning. 

C  O  D 

9.5 RESOURCE USE AND WASTE GENERATION 

9.5.1 Existing environment 

Resource use 

Key resources and estimated quantities (pending the completion of the detailed project design) required 

to construct the WRSF Project include: 

Structural  metal  components  for  mounting  system,  PV  boxes  and  delivery  system 

containers, fencing and site buildings. 

Masonry products, including concrete for slabs and footings.   

Glass for panels. 

Packing for transporting solar panels. 

Aluminium for underground cables  and inter‐panel wiring. 

Fuels and lubricants associated with operation of machinery and motor vehicles minimal. 

Gravel for work and service tracks and backfill. 

Sand for burying cables. 

Water, for cleaning and dust suppression.  

During operation and decommissioning, resources used would be associated with maintenance activities 

and use of machinery and vehicles.  

Lifecycle analysis 

Life cycle analysis  (LCA) assesses and quantifies  the energy and material  flows associated with a given 

process to identify the resource impacts of that process and potential for resource recovery. LCA estimates 

of energy and emissions based on the total life cycle of materials used for a project, i.e., the total amount 

of energy consumed  in procuring, processing, working up,  transporting and disposing of  the  respective 

materials (Schleisner 2000).  

A life cycle inventory of polycrystalline PV panels has been undertaken by European and US photovoltaic 

module  manufacturing  companies  over  the  2005/2006  period.    The  ‘energy  payback  time’  for 

polycrystalline PV modules has been estimated at 2 years for a solar installation in Southern Europe.  This 

is  consistent  with  the  estimation  that  the  WRSF  Project  would  have  an  energy  payback  period  of 

approximately  two years  (refer 2.1.2).   Over  the panels 30 year  lifetime  is expected  to produce 28g of 

greenhouse gas per kWh generated (Fthenakis et al, 2011).  

The purification of the silicon, which is extracted from quartz, accounts for 30% of the primary energy to 

produce the module. This stage also produces the largest amount of pollutants with the use of electricity 

Page 135: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  114   

 

and natural gas for heating (Fthenakis et al, 2011). The waste produced during production of the modules 

which can be  recycled  include graphite crucibles,  steel wire and waste  slurry  (silicon and polyethylene 

glycol).  However,  silicon  crystals  cannot  be  recycled  during  this  stage  (Fthenakis  et  al,  2011).  The 

production of the frames and other system components including cabling would also produce emissions 

and waste but less than the production of modules. 

Solar  farms are  favourable  in a number of aspects when compared  to  the major electricity generating 

methods employed in Australia: 

CO2 emissions generated per kilowatt hour of energy produced. 

Short energy payback time in comparison to the life span of the WRSF Project. 

Potential to reuse and recycle component parts. 

Waste generation 

Legal requirements for the management of waste are established under the Protection of the Environment 

Operations  (POEO)  Act  1997  and  the  POEO  (Waste)  Regulation  2005.  Unlawful  transportation  and 

deposition of waste is an offence under section 143 of the POEO Act.  

The  Waste  Avoidance  and  Resource  Recovery  Act  2001  establishes  a  hierarchy  for  which  resource 

management options should be considered against.  The order of this hierarchy is as follows: 

Avoidance of unnecessary resource consumption, 

Resource recovery (including reuse, reprocessing, recycling and energy recovery), 

Disposal. 

Adopting the above principles would encourage the most efficient use of resources, and reduce costs and 

environmental harm in accordance with the principles of ecologically sustainable development.   

Construction 

Solid waste  is one of  the major pollutants caused by construction. A number of different construction 

activities would produce solid wastes, such as: 

Packaging materials. 

Excess building materials. 

Scrap metal and cabling materials. 

Plastic and masonry products. 

Vegetation clearing. 

Waste from toilets on site (pump out and transport to Council treatment facility). 

Overall, volumes of waste would be low, short term and manageable. 

Operation 

During operation the solid waste streams would be associated with maintenance activities and presence 

of employees. Some materials  such as,  fuels and  lubricants, metals may  require  replacement over  the 

operational life of the WRSF Project. WRSF will use WRWF amenities at the Operations and Maintenance 

Building. 

   

Page 136: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  115   

 

Decommissioning 

Decommissioning of the site would involve the recycling or reuse of materials including: 

Solar panels and mounting system. 

Metals from posts, cabling, fencing. 

Buildings  and  equipment  such  as  the  inverters,  transformers,  switch  gear  and  similar 

components would be removed for resale or reuse, or for recycling as scrap. 

Items that cannot be recycled or reused, such as excess of above, would be disposed of in accordance with 

applicable regulations and to appropriate facilities. All above ground infrastructure would be removed from 

the site during decommissioning. 

9.5.2 Potential impacts  

Construction and decommissioning  

Resources  

While  increasing  scarcity of  resources  and  environmental  impacts  are  emerging  from  the use of non‐

renewable resources, the supply of the materials required for the WRSF Project are not currently limited 

or restricted.  In the volumes required, the WRSF Project  is unlikely to place significant pressure on the 

availability of  local or regional resources. The use of the required resources  is considered reasonable  in 

light of benefits of offsetting fossil fuel electricity generation. 

Temporary water supplies would be required during construction for activities including watering of roads. 

Water use is considered in Section 9.2.2. 

Waste and applicable Guidelines 

In accordance with definitions in the POEO Act and associated waste classification guidelines, most waste 

generated  during  the  construction  and  decommissioning  phases  would  be  classified  as  building  and 

demolition waste within  the  class  general  solid waste  (non  putrescibles). Ancillary  facilities  in  the  site 

compound would also produce sanitary wastes classified as general solid waste (putrescibles) in accordance 

with the POEO Act.  

During decommissioning, all infrastructure and materials would be removed from the site and recycled or 

otherwise disposed of at approved facilities. The WRSF Project is considered highly reversible in its ability 

to return to the pre‐existing land use or alternative land use. 

Operation 

Electricity production using photovoltaics emits no pollution, produces no greenhouse gases, and uses no 

finite  fossil‐fuel  resources  (US Department  of  Energy,  2004). Only  limited  amounts  of  fuels would  be 

required for maintenance vehicles during operation of the solar farm. Operational waste streams would be 

very low as a result of low maintenance requirements of the solar farm. 

Some balance of system electrical components (e.g., PCB’s, transformers, electrical cabling) would  likely 

need replacement over the proposed life of the solar farm, requiring further use of metal and plastic based 

products. Repair or replacement of  infrastructure components would result  in some waste during plant 

operations; however, such activities would occur very infrequently and there would be a high potential for 

recycling or reuse of such items. 

   

Page 137: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  116   

 

9.5.3 Environmental Safeguards 

The following mitigation measures would be implemented to reduce the impacts on resource use and the 

generation of waste: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

RW 1  Waste and energy management would be  incorporated  into the  Construction  Environmental Waste Management  Plan, this would cover the risks associated with construction of the WRSF. 

C     

9.6 HISTORIC HERITAGE 

9.6.1 Approach 

A  desktop  study was  undertaken  to  identify  any  historic  heritage  (non‐Aboriginal)  items  or  places  in 

proximity to the WRSF Development Envelope.    In Australia, there are heritage registers protecting places 

of heritage significance at the Commonwealth, State and local levels.  Heritage databases were searched 

on 2 February 2016 as part of this assessment and included: 

The NSW State Heritage Inventory (includes heritage items such as State Heritage Register, Interim 

Heritage Orders, State Agency Heritage Registers and LEPs) to identify any items currently listed 

within or adjacent to the WRSF Development Envelope.  The Glen Innes Severn LGA was searched. 

The Australian Heritage Database (includes  items on the National and Commonwealth Heritage 

Lists) to identify any items that are currently listed within or adjacent to the WRSF Development 

Envelope. 

Heritage schedule of the Glen Innes Severn LEP for locally listed heritage items that are within or 

adjacent to the WRSF Development Envelope.  

9.6.2 Existing environment 

The  results of  the heritage searches  listed above  indicate  that no known historic  items or places occur 

within the WRSF Development Envelope. The results of the heritage searches are shown in Table 9‐3. 

Table 9‐3 Summary of total heritage listings. 

Name of register  Number of listings 

World Heritage  1 

National Heritage List  1 

Commonwealth heritage List  1 

NSW State Heritage Register   8 

NSW State Agency Heritage Register (Section 170)  23 

Glen Innes Severn Local Environment Plan  194 

 

Page 138: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  117   

 

World heritage 

The Gondwana Rainforests of Australia is the only World Heritage item that is listed within the Glen Innes 

Severn Council LGA.  The Washpool and Gibraltar Range, comprising the Gibraltar National Park and the 

Washpool National Park  is  included  in this  listing.   The Washpool and Gibraltar Range  is  located 53 km 

north‐east of Glen Innes, well outside the WRSF Development Envelope.  

National Heritage List 

The Myall Creek Massacre and Memorial site is the closest item to the WRSF Development Envelope that 

is listed on the National Heritage List.  This item is located west of Inverell, approximately 60 km from the 

WRSF Development Envelope. 

Commonwealth Heritage  

The Glen  Innes Post Office  is the closest  item to the WRSF Development Envelope that  is  listed on the 

Commonwealth Heritage list.  The post office is located within the town of Glen Innes, approximately 20 

km from the WRSF Development Envelope. 

State heritage 

Eight items are listed on the NSW State Heritage Register within the Glen Innes Severn LGA. None of these 

items are located close to the WRSF Development Envelope.   

Section 170 NSW State agency heritage registers 

A search of places listed by State Agencies under s.170 of the NSW Heritage Act 1977 identified 23 listed 

heritage  items  in the Glen  Innes Severn LGA. These  items  include  fire stations, bridges, power stations, 

railway stations and police stations, located within Glen Innes and the towns of Deepwater, Dundee and 

Emmaville. 

All of the items are located outside of the WRSF Development Envelope. 

Local heritage 

The majority of local heritage items listed in the Glen Innes Severn Council LGA are buildings, churches and 

residences that are located within the towns and villages.  Some items such as homesteads, cemeteries, 

weirs, tramlines, ruins and bridges are found within the more rural areas of the LGA.   The closest  listed 

item to the WRSF Development Envelope is the Balaclava Station and station gardens which is located at 

Lot 14, DP 753319, approximately 3.5 kilometres south‐east of WRSF Development Envelope.  

The Gibraltar Range National Park, Guy Fawkes River National Park and Washpool National Park, all located 

to the east of Glen Innes, are also listed are heritage items in the Glen Innes Severn Council LEP. 

9.6.3 Potential impacts 

Construction and decommissioning 

A number of local heritage items were identified from the desktop study.  The majority of these items are 

located  within  the  townships  and  villages  of  the  LGA,  and  are  located  well  outside  of  the  WRSF 

Development Envelope.  

Page 139: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  118   

 

The  increased number of heavy vehicles on roads during the construction and decommissioning phases 

may  increase  levels of dust and  vibration  impacts at heritage places  that are  located along  the major 

transport route. This is not expected to be a significant issue given the capacity of the transport routes to 

handle large volumes of traffic and the temporary nature of the works.  

The construction works would take place within 3.5 km of the Balaclava Station for which the landowner is 

the same as for WRSF.  The property would not be directly impacted, but noise and dust generated during 

the works could potentially be a nuisance.  Given the distance of the property to the WRSF Development 

Envelope  and  the measures  that  would  be  implemented  to manage  noise  and  dust  impacts  during 

construction works, no indirect impact on this heritage item would result. 

The WRSF Project is not likely to have a significant impact on heritage items listed on the Commonwealth, 

State and local heritage registers during construction. No heritage approvals are required. 

Operation 

No impacts are considered likely during the operational phase.  No heritage approvals are required.  

9.6.4 Environmental safeguards 

To appropriately manage the historic heritage issues identified above during the construction phase, the 

following measure is recommended: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

HH 1  In  the  event  of  an  item  of  heritage  significance  being uncovered  within  the  WRSF  Development  Envelope  after works  commence,  the  NSW  Heritage  Division  should  be contacted  prior  to  further  work  being  undertaken  at  the particular location. 

C     

9.7 CLIMATE AND AIR QUALITY 

9.7.1 Existing environment 

Air quality 

Air quality within the Glen Innes Severn LGA is generally considered to be good (GISC 2015).  A combination 

of a relatively small and diffuse population, a lack of major pollution generating industries and a regular 

rainfall pattern helps control the output of air pollution within the LGA.   

Local air quality within the LGA can be affected by agriculture, mining, transport, residential development 

and burning (GISC 2015).  At the WRSF Development Envelope, agriculture and transport fumes from the 

Gwydir  Highway  are  the  primary  air  polluting  activities.    These  activities  can  lead  to  emissions  of 

greenhouse gases, vehicle emissions, dust, odours, spray drift of pesticides and herbicides and emissions 

of pollutants such as nitrogen and phosphorus.  The closest facility that is required to report their emissions 

as part of the National Pollution Inventory is located over 30 km away (Australian Government 2016). 

There are two non‐involved residences north and east of the WRSF Development Envelope that are within 

two kilometres of the site. Dust or exhaust emissions, if they were excessive could reduce local air quality. 

Page 140: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  119   

 

Climate 

The New England Tableland bioregion lies mainly in the temperate to cool temperate climate zone of NSW, 

which is characterised by warm summers, with uniform rainfall generally occurring in summer (OEH 2011).   

The  following  climate  data7  for  the  Glen  Innes  Airport  Weather  Station  (the  closest  to  the  WRSF 

Development Envelope, elevation 1044m) is available from the Bureau of Meteorology: 

The mean maximum  temperature  is 20.2°C with a  range between 26.3° C  (January) and 

13.2°C (July). 

The mean minimum temperature is 6.0°C with a range between 12.8° C (January) and ‐1.1°C 

(July). 

The annual mean rainfall is 886.5 mm (decreases slightly to the west toward Inverell). 

Highest rainfalls generally occur during November and average 127.2 mm.  Lowest rainfalls 

occur during the winter months, particularly May and August and average 46.5 mm. 

Wind  speeds  average  between  15  and  20  km  per  hour  at  9am,  generally  increasing  to 

between 18 and 22 km per hour at 3pm. 

In addition, regular frosts and occasional snow occurs in the region during the coldest months.  The most 

recent snowfalls occurred in 13 July 2015 with 8 cm recorded within the region. 

Climate change 

Climate change refers to the warming of temperatures and altered climatic conditions associated with the 

increased concentration of greenhouse gases in the atmosphere.  Climate change projections for Australia 

includes more frequent and hotter hot days and fewer frost days, rainfall declines  in southern Australia 

and more extreme weather events  including  intense  rainfall,  severe drought and harsher  fires  (CSIRO, 

2015). 

It  is now  generally  accepted  that  the  release of  certain  gases  including, most notably  carbon dioxide, 

contribute  to  global  climate  change.    These  gases  are  collectively  referred  to  as  ‘greenhouse  gases’. 

Construction  and maintenance  activities where  plant  and  equipment  uses  diesel,  gasoline  and  other 

hydrocarbons,  result  in greenhouse gas emissions and are  likely  to  contribute  to  climate  change.   The 

construction, operation and decommissioning of the WRSF Project would produce minimal CO2 emissions 

when compared to conventional coal and gas fired powered stations; refer to Table 9‐4.  

Table 9‐4  Comparison of CO2 equivalent emissions produced per kilowatt hour 

Generation method  Emissions  produced (grams CO2 equivalent per kWh) 

Source 

Solar PV plant  19‐59  Wright and Hearps (2010) 

Coal‐fired power station   800‐1000   Wright and Hearps (2010) 

Combined cycle gas turbine  400   Alsema et al. (2006) 

 

Operation of the WRSF would help reduce greenhouse gas emissions and move towards cleaner electricity 

generation.  Approximately 36,900 tonnes of CO2 equivalent per annum would be avoided while the WRSF 

Project is operational, as compared to fossil‐fuel based energy generation. 

                                                              

7 Available data is between 1996‐2015 

Page 141: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  120   

 

9.7.2 Potential impacts  

Construction 

Dust is likely to be generated from excavation activities and other earthworks as well as the movement of 

trucks and work vehicles along the unsealed access track.  Earthworks associated with construction would 

be relatively minor and mostly involve levelling the ground to construct the access road and laydown area, 

and trenching works for cable installation.  Posts for the solar array framework would be pile driven into 

the ground and generate little dust.  No extensive cut and fill earthworks are proposed.   

Air  emissions  would  be  generated  from  the  use  of  construction  machinery  including  earth‐moving 

equipment,  diesel  generators,  trucks,  cranes  and  pile  driving  equipment.   Vehicles  accessing  the  site, 

including the daily construction labour force and haulage traffic delivering construction components, would 

also generate air emissions. 

Dust and air emissions can be a nuisance to nearby receivers including residences, farm workers and traffic.  

The degree of impact can be influenced by weather and climate.  Works carried out during long periods of 

dry weather and high winds have greater potential to generate dust which can  impact air quality.   The 

WRSF Development Envelope is located within a region that tends to experience the lowest rainfall during 

the winter months  but  rates  of  evaporation  are  lower.    Construction works  during  times when  site 

conditions are drier may require greater dust suppression measures to manage any increased impacts.   

The construction phase  is expected to  last approximately six to nine months with a peak period  lasting 

three months.  Given the location of the WRSF Project within a rural setting (only two residences within a 

two km setting) and a set back from the Gwydir Highway by approximately 700 m, the impacts of the WRSF 

Project during the construction and decommissioning phases are considered manageable with regard to 

air quality.  Mitigation strategies that would be employed during these phases to manage the potential for 

adverse air quality impacts are presented in the section below.  

Construction  activities  for  the  solar  farm would  not  impact  on  climate. Haulage  traffic  and  plant  and 

equipment would generate emissions however, the short duration of the work and the scale of the WRSF 

Project suggests this contribution would be negligible in a local or regional context.  Intense storm events 

with strong winds and/or rain during periods of earthworks increase risk of erosion through dust or surface 

water flows. 

Operation 

Operation of the WRSF would require daily traffic movements on the access track and tracks internal to 

the solar arrays mostly due  to maintenance staff accessing and working on  the site.   Occasional  trucks 

delivering supplies and equipment may also access the site.  No solar farm infrastructure would generate 

emissions  that  would  impact  air  quality  in  operation.  Therefore,  negligible  air  quality  impacts  are 

anticipated to be generated during the operational phase of the solar farm. 

The WRSF Project would make a positive contribution to the reduction  in greenhouse gas emissions by 

providing an alternative to electricity sourced from fossil fuels.  This constitutes the chief environmental 

benefit  of  the WRSF  Project.      The WRSF  Project would  represent  a  renewable method  of  electricity 

generation  to meet  increasing demand of non‐greenhouse gas producing electricity generation.   Given 

stable  demand,  every  megawatt‐hour  of  electricity  generated  by  the  solar  farm  could  prevent  one 

megawatt‐hour of electricity being generated at a coal fired power station, as well as potentially preventing 

losses within the electricity transmission system.  

Page 142: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  121   

 

9.7.3 Environmental safeguards 

The following mitigation measures would be implemented to reduce the impacts to air quality and climate: 

No.  Environmental Safeguard  Solar farm 

C  O  D 

CA 1  The CEMP would  include protocols  to minimise and control dust.  Measures may include:  

o Use of a water cart (truck) to wet the access track and exposed dusty  surfaces as appropriate  to  the conditions of the site. 

o Stabilisation of any disturbed areas that expose soil and increase erosion risks. 

C    D 

CA 2  The CEMP and DEMP would include protocols to guide vehicle and  construction  equipment  use  to  minimise  emissions produced on the site.   

C    D 

9.8 SOCIOECONOMIC AND COMMUNITY 

9.8.1 Existing environment 

Industries 

The  regional  economy  of  the  New  England  North West  region  has  traditionally  been  dominated  by 

agriculture. The region is one of the most productive agricultural areas in Australia with a large variety of 

agricultural commodities produced (DPI 2012). 

The Strategic Regional Land Use Plan  (DPI 2012)  for the region states the agricultural  industry  is worth 

around $1.8 billion annually  to  the  regional economy, with sheep and cattle grazing, broad acre cereal 

crops,  irrigated cotton,  intensive  livestock and plant agriculture and poultry production being  the main 

contributors.    30,000 people  are directly or  indirectly  employed  as  a  result of  agriculture  in  the New 

England North West region.  This equates to 42 percent of the region’s employment.  

Other  industries providing  employment  in  the  region  include  education, health  care,  food processing, 

tourism, manufacturing, transport and logistics.  Coal and coal seam gas extraction are emerging industries, 

as discussed in Section 8.5.1.  The renewable energy industry is also an emerging industry.  In addition to 

the WRWF, there are two other approved wind farms (Glen Innes and Sapphire Wind Farms) and the Ben 

Lomond wind farm proposal in proximity to the WRSF Development Envelope (refer Figure 9‐5). 

Renewable energy solar projects and the Glen Innes Severn LGA community 

Research  indicates  there  is widespread  support  for  solar  energy  as  a  source  of  energy  for  electricity 

generation in Australia (ARENA n.d); 78% of respondents are in favour of large scale solar energy facilities 

and 87% are in favour of domestic installations.  The large scale solar energy sector is still at a relatively 

early stage of development in Australia, however.  While most members of the community are aware of 

large  scale  solar  energy, many  do  not  know  a  great  deal  about  their  impacts  (ARENA  n.d.).    This  EIS 

addresses the associated impacts and mitigation measures to reduce the impact on the local community 

and the environment.  

 

Page 143: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  122   

 

 

Figure 9‐5   Renewable energy projects  in proximity  to  the WRSF Development Envelope  (base map: Epuron 2011)

Community feedback on the Project 

A Community Engagement Plan has been prepared  for  the WRSF  to guide all  community engagement 

activities (refer Section 5).  To date, response from the community regarding the WRSF Project has been 

positive.  This is consistent with the overall community response for the WRWF Project which has generally 

been received very well within the community. 

9.8.2 Potential impacts 

Construction 

The local area is predominantly rural with no large scale industries. The introduction of WRWF and then 

WRSF would  change  the  character of  the  locality  to a  rural  landscape with electricity generation  from 

renewable energy sources. The WRSF site would be briefly visible to the people travelling in vehicles along 

the Gywdir Highway during construction and operation.  

The  WRSF  Project  would  represent  a  local  economic  and  direct  economic  benefit  to  some.    The 

construction of the WRSF Project would utilise up to 100 staff at peak construction.  Many of these could 

be drawn  from  the  local area. Additional workers moving  to  the area  temporarily may  stimulate  local 

economic activity. Accommodation and retail services would be stimulated.   Conversely, the temporary 

Project Area 

Page 144: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  123   

 

influx may  place  pressures  on  local  services  such  as  accommodation  and  health  services.  Additional 

demands  for accommodation  and  additional  traffic may present  an  adverse effect on  local  tourism,  if 

coinciding with local festivals for example. Additional traffic may be noticeable along with the additional 

hazards that accompany construction traffic (refer to Section 9.3).  Mitigation strategies to address these 

impacts  centre  on  consultation with  the  community,  so  that  benefits  can  be maximised  and  conflicts 

resolved where possible. 

Operation and decommissioning  

The development of rural land uses compatible with agricultural activities, such as solar power generation, 

have  potential  to  provide  increased  economic  security  to  rural  economies  through  diversification  of 

employment opportunities and income streams.  The New England North West Strategic Land use plan (DPI 

2012) recognises that importance of identifying opportunities that can, in the short and medium term, help 

to diversify the regional economy, making it more resilient to change in the longer term.  The development 

of the WRSF would not be in conflict with this plan. 

Considering  the  local economy  is dominated by agriculture,  it  is  relevant  to note  that projected global 

warming will increase potential evaporation and water demand, potentially reducing the capacity of the 

arable land.  

The website ‘AdaptNSW’ maintained by OEH shows forecast changes to various climate characteristics. For 

the New England Region, indications are generally as follows: 

Table 9‐5  Forecast changes to various climate characteristics within New England Region 

Parameter  2030  2070 

Max temps  +0.7  +2.2 

Rainfall  +0‐5%  +5‐10% 

Cold nights (<2oC)  ‐10  ‐20 

Source: Modified from http://www.climatechange.environment.nsw.gov.au/ 

Pittock (AGO, 2003) observed that a significant proportion of Australian exports are agricultural products 

sensitive  to  global warming  impacts.  Federal Government publications note  that  failure  to  adequately 

mitigate increases in emissions will lead to greater costs for adaptation to consequences of climate change.  

Minimal impacts are anticipated during operation and decommissioning. During operation, maintenance 

staffing  and  activities would  be  at  low  levels.  The  additional  accommodation  and  traffic  impacts  of  a 

number of operational staff are not likely to be noticeable. 

Decommissioning is likely to require less staff onsite than for construction. It would offer similar economic 

benefits to construction  in terms of opportunities for  local staff and  industries.  It may also  include  local 

recycling of infrastructure components.    

Page 145: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  124   

 

9.8.3 Environmental safeguards 

The following mitigation measures would be implemented to reduce the socio‐economic impacts that may 

arise from the Project. 

No.  Environmental Safeguard  Solar farm 

C  O  D 

SOE 1  Community consultation would be undertaken in accordance with the WRSF Project’s specific Community Engagement Plan (refer Section 5. 

C  O  D 

9.9 CUMULATIVE IMPACTS 

9.9.1 Existing environment 

Cumulative  impacts,  for  the  purpose  of  this  assessment,  relate  to  the  combined  potential  effects  of 

different impact areas of the WRSF Project (i.e. construction traffic combined with visual impact) as well as 

the potential interaction with other projects  in the  local area (e.g. the combined effects of the adjacent 

wind  farm,  during  construction,  operation  and  decommissioning).  Cumulative  impacts  can  occur 

concurrently or sequentially.  

In terms of cumulative impacts, the most relevant interaction for the WRSF, is the WRWF Stage 1. The wind 

farm  construction  is  scheduled  to begin  in March 2016.   Commencement of  construction on WRSF  is 

proposed to begin in the first quarter of 2017, when the construction of WRWF is expected to be nearing 

completion and construction activities are scaling down (refer Section 4.12). WRSF is a smaller scale project 

than WRWF but construction of WRSF  is condensed  into a  relatively short period. Specific  impacts are 

discussed below. 

9.9.2 Potential impacts 

Construction 

Visual impact 

In the early stages of construction during the overlap period with the WRWF, the WRSF Project would result 

in additional machinery and construction activities that would be noticeable to people travelling in vehicles 

along the Gywdir Highway and to the neighbouring properties.  The level of impact would depend on the 

duration of overlap with the construction schedule of the WRWF and the visibility of those works to the 

highway and neighbouring property. Due  to  the different phases of  construction activities  for  the  two 

projects, the cumulative effect is unlikely to be of such magnitude to result in any significant impacts.  

Noise impact 

Noise  impacts  through  the use of plant machinery and vehicles would be heightened during  the early 

construction phase when  the works would be undertaken  concurrently with  the works  at  the WRWF.  

However, WRWF works would be well advanced with all access tracks and site clearing works complete.  

Noise generation in the later part of the WRWF construction would be expected to be a lower impact as a 

result of less plant machinery. For the WRSF, plant would be limited to a small number of mobile plant and 

light vehicles.  Overall, cumulative noise impacts are expected to be minor and would be managed within 

Page 146: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  125   

 

a Noise Management  Plan,  that  considers  both  the  solar  and wind  farm  construction  process, where 

relevant. 

Biodiversity 

The clearing of native vegetation, which  is a key threatening process at both State and Commonwealth 

level,  is considered a major  factor  in  the  loss of biological diversity.   At  least 61 per cent of the native 

vegetation  in  NSW  has  been  cleared  or  highly  modified  since  European  settlement  (NSW  Scientific 

Committee 2001), and the removal of vegetation for this WRSF Project is contributing to this process.  The 

cumulative  impact of  similar  renewable  energy projects, particularly where  EECs  are  involved,  can be 

considerable given that many poorly‐conserved vegetation communities have a substantial portion of their 

extents represented on private land where the majority of renewable energy projects are proposed.  Small 

losses of such communities, which may be  insignificant at a project  level, may accumulate over time to 

cause a significant reduction in the extent of remnant patches.   

Cumulative  impacts are considered best addressed by avoiding and minimising. Where avoidance  is not 

possible,  the  impacts  of  each  contributing  project  is  assessed  on  a  case  by  case  basis.  Long  term 

mechanisms  like offsetting through the BioBanking assessment methodology, are structured to address 

the ongoing  impacts of multiple projects  in a cohesive manner. For  this WRSF Project, no credits were 

generated through the BCC, therefore offsetting of biodiversity impacts is not considered necessary for the 

WRSF Project.   

Traffic impacts 

Cumulative traffic impacts are only relevant to the early WRSF construction phase when the construction 

may  overlap  with  WRWF  construction  and  transport  phases.    During  this  time,  increased  vehicle 

movements associated with  the WRSF Project may place additional pressure and contribute additional 

traffic risks to the local road network.  No vehicles carrying long loads (greater than 60 metres) are required 

for the WRSF Project and all traffic that is associated with the WRSF Project would be managed through 

the Construction Traffic Management Plan (refer Appendix H for draft).  By coordinating the WRSF Project 

transport activities to avoid peak phases of WRWF transport activities, minimal cumulative traffic impacts 

are anticipated.  

Economic and resource impacts 

There  is potential for positive cumulative economic effects of the WRSF Project during the construction 

phase.  The WRSF Project would potentially generate more jobs for local residences and income for local 

business suppliers.  The cumulative impacts are expected to be favourable to the local community but it is 

noted that the peak construction period for WRSF is a relatively short period. 

Operation 

During operation of the WRSF, cumulative impacts would be minimal.  Impacts are identified as follows: 

Visual 

The VIA determined the WRSF to have an overall  low  level of visual  impact.   Cumulative visual  impacts 

resulting from the operation of WRSF are therefore also considered to be low.  The WRWF would be more 

prominent in the landscape due to the height of the wind turbine structures. Both developments would 

form the White Rock Renewable Energy precinct and are compatible  in development type.   The hybrid 

wind/solar  arrangement  avoids  additional  grid  connection  works  and  the  visual  impacts  that  would 

otherwise be associated with the WRSF. 

Page 147: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  126   

 

Noise 

Noise impacts during operation of the solar farm would be minimal.  Noisy equipment is restricted to the 

PCB’s and predicted noise levels comply with the criteria conservatively established in accordance with the 

NSW Industrial Noise Policy 2000 without any specific acoustic treatment.  Cumulative impacts as a result 

of operational noise are not expected for this WRSF Project. 

Biodiversity  

The solar farm would pose minimal operational risks to biodiversity; specifically, no  impacts to bird and 

bats during the solar farm operation are anticipated; this being the key wind farm operational impact on 

biodiversity.  Cumulative impacts to biodiversity would not be significant. 

Economic impacts 

The solar farm would result in additional staff being employed within the White Rock Renewable Energy 

Precinct.  Impacts would be minor with the generation of two or more additional jobs but that would be 

favourable through the expanded workforce and diversification of skill set of operational staff. 

Greenhouse gas emissions and air quality impacts 

For each megawatt‐hour of electricity generated by a renewable energy generator, coal fired generation is 

reduced by approximately 1 megawatt‐hour. Every megawatt‐hour of electricity generated by the solar 

farm would prevent one megawatt‐hour of electricity being generated at a coal fired power station, as well 

as preventing losses within the electricity transmission system.  

The cumulative impact of additional renewable energy generator in the region would have positive impacts 

for NSW in terms of provision of electricity to meet increasing demand as well as the reduction of coal fired 

electricity generation with the associated environmental benefits. This is a key benefit of the WRSF Project. 

   

Page 148: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  127   

 

10 ENVIRONMENTAL MANAGEMENT 

10.1 ENVIRONMENTAL FRAMEWORK 

The environmental risks associated with the WRSF Project would be managed by implementing a project‐

specific suite of mitigation measures detailed in Sections 8 and 9 and summarised in Section 10.2 of this 

EIS.  

All  commitments  and  environmental  safeguards would be managed  through  the  implementation of  a 

Project Environmental Management Plan  (PEMP) adapted  to  the phase of development  (construction, 

operation, decommissioning).   

These plans would detail the environmental management responsibilities of specific staff roles, reporting 

requirements,  monitoring  requirements,  environmental  targets  and  objectives,  auditing  and  review 

timetables,  emergency  responses,  induction  and  training,  environmental  work  method  statements, 

complaint  response  procedures  and  adaptive  management  mechanisms  to  encourage  continuous 

improvement.  

A CEMP has been prepared for the WRWF which addresses many issues and management measures which 

would  be  also  be  relevant  to  the WRSF  Project.    The WRWF  project  and  the WRSF  Project may  be 

constructed by different contractors and, while the WRSF CEMP may draw on some of the management 

processes  developed  for WRWF,  it will  focus  on  the  specific  risks  and  identified mitigation measures 

applicable to the WRSF Project. Nevertheless it is expected that the management of environmental impacts 

for the two projects will be undertaken in a consistent manner.   

10.2 ENVIRONMENTAL SAFEGUARDS 

The  construction  and  operational  environmental management  plans  and  subplans  required would  be 

finalised reflecting both the risks identified in this EIS and the final infrastructure layout.  

Note, where a measure is relevant to more than one EIS section, it is mentioned only at the first occurrence, 

to minimise duplication. 

No.  Environmental Safeguard  Solar farm 

C  O  D 

8.1  Biodiversity       

BIO 1  Preparation of  Flora and  Fauna Management Plan  (FFMP) that would  incorporate mitigation  strategies  below.    The FFMP  would  form  part  of  the  White  Rock  Solar  Farm Construction Environmental Management Plan.    

C     

BIO 2  Areas to be retained (indicated areas of EEC and  indicated trees) would be delineated (fencing or other method), and construction activities would be excluded from these areas. Clearing  and  construction  contractors  would  be  given inductions that make clear the importance of these features. 

C     

Page 149: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  128   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

BIO 3  A  ‘Clearing  and Grubbing  Plan’ would  be  developed.  This would  include  best  practice methods  for  the  removal  of woody  vegetation  and  non‐woody  vegetation  including provision for: 

o Mulch  reuse  onsite,  particularly  to  stabilise disturbed areas 

o An unexpected threatened species finds procedure 

C     

BIO 4  Stockpile and  compound  sites would be  located using  the following criteria: 

o Within the WRSF Development Envelope. o At  least  40  metres  away  from  the  nearest 

waterway. o In areas of low ecological conservation significance 

(i.e. pasture land). 

C     

BIO 5  The location of the underground power cable from the solar farm to the wind farm would be micro‐sited to avoid hollow bearing trees. 

C     

BIO 6  Use non barbed‐wire on exterior fencing, unless required for public safety.  

C     

BIO 7  Rehabilitation would be undertaken  in  all  areas disturbed during construction. In native areas, it would include species that  are  representative  of  the  EECs  occurring  within  the WRSF Development Envelope to increase the diversity of the existing vegetation, as well as  to  improve  the connectivity between patches in the landscape. 

C     

BIO 8  Prepare a weed management plan that; o Is  consistent  with  DPI’s  Prime  Fact  1063 

Infrastructure proposals on rural land (DPI 2013)  o Allows for management of declared noxious weeds 

in accordance to the requirements stipulated by the Noxious Weeds Act 1993  

o Develops a protocol for weed hygiene in relation to plant,  machinery  and  importation  and management of fill. 

     

BIO 9  Vegetation groundcover, particularly beneath the low edge of the panels, would be monitored and any bare areas or erosion addressed  (ie.planting,  jute mesh  armouring  etc.)  to  resist erosion and weed infestation. 

  O   

BIO 10  Carry out refuelling of plant and equipment, chemical storage and decanting at  least 50 m away  from aquatic habitats  in impervious  bunds.  Ensure  that  dry  and  wet  spill  kits  are readily available 

C     

BIO 11  Dust control measures (ie. water cart) would be implemented in response to visual cues to prevent dust spreading to nearby habitats. 

C     

BIO 12  If night work is unavoidable, ensure lights are directed away from wildlife or habitat corridor (biodiversity links). 

C     

BIO 13  Develop a pest management plan drawing on the White Rock Wind  Farm  Stage  1  Construction  Flora  and  Fauna Management Plan, to cover all pest management issues at the WRSF site. 

C  O   

Page 150: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  129   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

8.2  Aboriginal heritage       

AH 1  If removal of mature trees in relation to installation of the 33 kV cable is required, these would be checked for scars prior to removal, and if present  the  scar  should  then be examined by a qualified heritage practitioner and RAPs to assess if the scar is cultural.   

If any culturally  scarred  trees are  identified by  the above process, avoidance by redesign of the cable alignment should be undertaken.  

C     

AH 2  WRSFPL  would  prepare  a  Cultural  Heritage  Management  Plan (CHMP)  to  address  the  potential  for  finding  Aboriginal  artefacts during  the  construction  of  the WRSF.    The  CHMP will  outline  an unexpected  finds  protocol  to  deal  with  construction  activity.  Preparation of the CHMP should be undertaken in consultation with the RAPs.  

C     

AH 3  In the unlikely event that human remains are discovered during the construction,  all work must  cease.   OEH,  the  local police  and  the appropriate LALC should be notified.  Further assessment would be undertaken  to  determine  if  the  remains  are  Aboriginal  or  non‐Aboriginal. 

C     

AH 4  Continued consultation with the RAPs for the WRSF Project should be undertaken.   RAPs should be  informed of any major changes  in project design or scope, further investigations or finds. 

C     

8.3  Visual impact       

VIA 1  In the final design and  layout of the proposal, the following should be considered; 

o minimise bulk and height of proposed structures, where possible. 

o selection  and  location  for  replacement  tree  planting which may provide partial screening or backdrop setting for constructed elements  

o review  of  materials  and  colour  finishes  for  selected components including the use of non‐reflective finishes to structures where possible 

C     

VIA 2  Retention of grass cover wherever possible.  C     

VIA 3  During operation the facility would be maintained in a manner that  ensures  the  constructed  elements,  and  on‐site vegetation are maintained to an appropriate visual standard. 

  O   

8.4  Noise impact       

NO 1  Preparation of a final noise management plan based on the Draft  Plan  provided with  this  EIS  and  the  final  design  and arrangements for construction and operation.  

C     

NO 2  Adherence  to standard construction hours,   unless  they do not  cause  noise  emissions  to  be  audible  at  any  nearby residences  not  located  on  the  site  or  are  otherwise approved. 

C     

8.5  Land use       

LU 1  Continued  consultation  with  the  landowner  regarding  the WRSF Project including potential impacts to farm operations and risks to livestock. 

C  O   

Page 151: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  130   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

LU 2  Construction and operations personnel would drive carefully and  below  the  designated  speed  limit,  to  minimise disturbance  to  livestock,  crops  and  pasture,  and  dust generation. 

C  O  D 

LU 3  Rehabilitation of  the  site  following decommissioning of  the WRSF Project. 

    D 

9.1  Soils and landforms       

SL 1  Preparation of an erosion and sediment control plan for the site  (based on  the draft plan  in Appendix G) which  includes measures for flood management at the site. 

C     

SL 2  Preparation of a Spill Response Plan consistent with the Spill Response Plan for the WRWF to: 

o Manage  the storage of any potential contaminant onsite 

o Mitigate the effects of soil contamination by fuels or other chemicals (including emergency response and EPA notification procedures). 

o Prevent  contaminants  affecting  adjacent  pasture and dams. 

C  O  D 

9.2  Water       

WA 1  Drainage  controls  to  deal with  any  concentrated  flows  off panels, if required. 

C     

WA 2  Ongoing consultation with landowners in relation to the use of water from farm dams. 

C  O   

9.3  Traffic, transport and road safety       

TT 1  Preparation  of  a  traffic management  plan  (based  on  draft provided in Appendix H).  

C    D 

TT 2  Ongoing consultation with stakeholders including Roads and Maritime,  GISC,  local  landholders,  emergency  services, business  owners,  school  bus  companies  to  inform  them  of changes to road use and conditions during construction and decommissioning. 

C    D 

TT 3  Availability of a direct contact phone number to enable any issues or concerns to be rapidly identified and addressed. 

C  O  D 

9.4  Health and safety       

EMF 1 BF 1 

All  electrical  equipment  would  be  designed  in  accordance with  relevant codes and  industry best practice standards  in Australia. 

C     

AV 1  The materials and colour of onsite infrastructure (other than the solar panels) will, where practical, be non‐reflective and in keeping with the materials and colouring of the landscape. 

C     

BF 2  Buildings would comply with  the Building Code of Australia (BCA). 

C     

BF 3  Safety management  processes  to  highlight  to  all  staff  and contractors  through  an  induction  process  the  potential hazards of activities onsite. This  should  include preparation and  compliance  with  job‐specific  WMSs  and  emergency preparation/response drills. 

C  O  D 

Page 152: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  131   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

BF 4  The NSW RFS be provided with a contact point for the WRSF Project, during construction and operation. 

C  O  D 

BF 5  Designation  of  a  WRSF  onsite  safety  representative responsible for ensuring  implementation of safeguards. This representative  would  also  regularly  consult  with  the  local NSW  RFS  to  ensure  familiarity with  the WRSF  Project  and assist the RFS and emergency services as much as possible if there is a fire on‐site during construction of the WRSF Project. 

C  O  D 

BF 6  Basic training of all staff in the use of fire‐fighting equipment.  C  O  D 

BF 7  Appropriate fire‐fighting equipment would be held on site to respond  to  any  fires  that  may  occur  at  the  site  during construction of the WRSF Project. This equipment will include fire extinguishers, a 1000 litre water cart retained on site as a precautionary basis, particularly during blasting and welding operations.    Equipment  lists  would  be  detailed  in  Work Method Statements (WMS’s). 

C  O  D 

BF 8  Slashing  of  vegetation  on  construction  site  before construction starts and as required to manage fuel loads. 

C  O  D 

BF 9  Maintain vegetation (eg. allow sheep to graze) to a low level amongst solar panels to control vegetation on the solar farm site. 

  O   

BF 10  All access and egress tracks on the site would be maintained and kept free of parked vehicles to enable rapid response for firefighting crews and to avoid entrapment of staff in the case of bush fire emergencies.   

C  O   

BF 11  Confirm agreement of local property owners to use dams on site as water sources in the event of fire. 

C  O  D 

BF 12  The use of a Hot Works Permit system to ensure a number of pre‐requisites are satisfied prior to works commencing. Fire extinguishers would be present during all hot works. 

C  O   

BF 13  Where  possible  restrict  the  performance  of  Hot Works  to specific areas (such as the Construction Compound temporary workshop areas). 

C  O   

BF 14  Adequate  site  communications  to  ensure  a  fire  event  is communicated quickly. Measures would include:  

o Use of mobile phones. 

o Use of two‐way radios. 

o Fire Danger Warning signs  located at the entrance to the site compounds. 

C  O   

BF 15  Specific  management  activities/controls  for  hot  works, vehicle use, smoking, use of flammable materials, blasting. 

C  O  D 

BF 16  The BRMP will  include consultation with the NSW Rural Fire Service during construction, operation and decommissioning. 

 

 

 

 

 

 

C  O  D 

Page 153: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  132   

 

No.  Environmental Safeguard  Solar farm 

C  O  D 

9.5  Resource use and waste generation       

RW 1  Waste and energy management would be  incorporated  into the  Construction  Environmental Waste Management  Plan, this would cover the risks associated with construction of the WRSF.  

 

 

 

C     

9.6  Historic heritage        

HH 1  In  the  event  of  an  item  of  heritage  significance  being uncovered  within  the  WRSF  Development  Envelope  after works  commence,  the  NSW  Heritage  Division  should  be contacted  prior  to  further  work  being  undertaken  at  the particular location. 

C     

9.7  Climate and air quality       

CA 1  The CEMP would  include protocols  to minimise and control dust.  Measures may include:  

o Use of a water cart (truck) to wet the access track and exposed dusty  surfaces as appropriate  to  the conditions of the site. 

o Stabilisation of any disturbed areas that expose soil and increase erosion risks. 

C    D 

CA 2  The CEMP and DEMP would include protocols to guide vehicle and  construction  equipment  use  to  minimise  emissions produced on the site.   

C    D 

9.8  Socioeconomic and community       

SOE 1  Community consultation would be undertaken in accordance with the WRSF Project’s specific Community Engagement Plan (refer Section 5. 

C  O  D 

   

Page 154: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  133   

 

11 CONCLUSION The WRSF would be  located  in the New England Tablelands of NSW, approximately 20 km west of Glen 

Innes, about 500 km north of Sydney and about 400 km south‐west of Brisbane.   

The WRSF would have a nominal capacity of up to approximately 20 megawatts (MW) (AC) and would be 

developed  as  a  hybrid  wind/solar  facility,  exporting  electricity  generated  to  the  grid  through  the 

infrastructure  to be constructed  for  the WRWF.   The objective of  the WRSF Project  is  to maximise  the 

amount  of  renewable  electricity  through  a  cost  effective  hybrid  wind/solar  project  that  shares 

infrastructure and reduces the overall impact of the two operations.   

NGH Environmental has prepared this EIS on behalf of the proponent, WRSFPL. This EIS has assessed the 

broader WRSF Development Envelope  (150ha) where  infrastructure may be  located,  to allow  for some 

flexibility  in  the  solar  farm design. When quantifying  impacts  in  this  assessment,  the  indicative WRSF 

Development Footprint of approximately 50 ha has been used. Infrastructure within the  includes the solar 

panel arrays, associated inverter, transformer and monitoring equipment, 33 kV cabling and access tracks.  

Development of the solar farm would also make use of infrastructure that will be installed for WRWF and 

that have been separately assessed for Project Approval MP10_160.  

Overall, WRSF will  represent  a  further  contribution,  at  this  locality,  to  Australia’s  transition  to  a  low 

emission energy generation economy.  The WRSF Project is considered compatible with existing land uses 

and highly reversible upon decommissioning, returning the site to its previous agricultural capacity.  

The key environmental risks have been investigated through specialist investigations: 

Biodiversity  impacts – the BA concluded that no significant  impacts to threatened species and 

ecological communities would result and no offsets would be required. No referrals under the 

EPBC or TSC Act are considered to be required. 

Aboriginal heritage impacts – the ACHAR concluded the WRSF Project should be able to proceed 

with no additional archaeological investigations.  No areas of potential archaeological deposits or 

scarred trees have been identified within the WRSF Development Envelope and the potential for 

Aboriginal heritage objects within the WRSF Development Envelope has been assessed as low. A 

CHMP will be developed for WRSF. 

Visual impact ‐   the VIA concluded that the construction, activities and operations would have a 

very  low visual  impact on  the majority of people  living  in or  travelling  through  the  landscape 

surrounding the proposed solar farm. A landscape plan is not considered to be required for WRSF. 

Noise  impacts  –  the  noise  assessment  concluded  that  noise  impacts  during  construction, 

operation  and  decommissioning  would  generally  be  within  the  accepted  noise  criterion. 

Occasional noise exceedances may occur during construction and will be managed under a Noise 

Management Plan. A draft Noise Management Plan is provided with this EIS). 

A suite of management measures have been developed  to address environmental  impacts and  risks  to 

these and other physical, social and environmental impact areas.  Key management strategies centre on 

the development of management plans and protocols minimise impacts and manage identified risks.  This 

EIS includes draft management plans for noise, traffic and erosion and sediment control. Final management 

plans, reflecting the final project layout, mitigation measures within this EIS and all conditions of approval, 

would be submitted to the DP&E, prior to construction. 

The impacts and risks identified are considered manageable with the effective implementation of the 

measures stipulated in this EIS.  Impacts are considered justifiable and acceptable.   

Page 155: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  134   

 

12 REFERENCES 

Acil Allen Consulting (2015) Electricity Bill Benchmarks for residential customers. Report prepared for the 

Australian Energy Regulator 

http://www.aer.gov.au/system/files/ACIL%20Allen_%20Electricity%20Benchmarks_final%20report

%20v2%20‐%20Revised%20March%202015.PDF accessed 17 February 2016. 

Alsema, E.A. de Wild‐Scholten, M.J, Fthenakis, V.M, (2006). Environmental Impacts of PV Electricity 

Generation ‐ A Critical Comparison of Energy Supply Options. 21st European Photovoltaic Solar 

Energy Conference, Dresden, Germany, 4‐8 September 2006. 

ARENA (n.d) Establishing the social licence to operate large scale solar facilities in Australia: insights from 

social research for industry http://apo.org.au/files/Resource/ipsos‐arena_solarreport.pdf accessed 

18 February 2016. 

Australian Bureau of Statistics (ABS) (2012). Australian Household Energy Survey 2012. 

http://www.abs.gov.au/ausstats/[email protected]/Lookup/4670.0main+features100052012  accessed 17 

February 2016 

Australian Energy Market Operator (AEMO) (2015). National Electricity Forecasting Report ‐ For the 

National Electricity Market (NEM) 2015, 

http://www.aemo.com.au/Electricity/Planning/Forecasting/National‐Electricity‐Forecasting‐

Report, accessed January 2016. 

Australian Greenhouse Office (AGO). (2003). Climate change: An Australian Guide to the Science and 

Potential Impacts. Australian Greenhouse Office, edited by B Pittock, 2003. 

Australian Government (2016) National Pollutant Inventory 

http://www.npi.gov.au/npidata/action/load/map‐search;jsessionid=50A28D3D44C5AA 

19C4BEA62526871D7F, accessed 10 February 2016 

Australian Radiation Protection and Nuclear Safety Agency (ARPANSA) (2015). Fact Sheet: Electricity and 

health, http://www.arpansa.gov.au/RadiationProtection/Factsheets/is_electricity.cfm accessed 28 

February 2016. 

Chang, G.J. and Jennings, C. (1994). Magnetic Field Survey at PG&E Photovoltaic Sites, 

http://www.osti.gov/bridge/servlets/purl/82309‐WOEtJb/webviewable/82309.pdf, accessed 

3 August 2012. 

Clean Energy Regulator (2015) Renewable Energy Target, Annual targets webpage, 

http://www.cleanenergyregulator.gov.au/RET/About‐the‐Renewable‐Energy‐Target/The‐

certificate‐market/The‐renewable‐power‐percentage/Annual‐targets, accessed 25 January 2016 

CSIRO.  (2015).  Climate  Change  in  Australia.  Accessed  January  2016  from 

http://www.climatechangeinaustralia.gov.au/en/ 

NSW Agriculture (2003), The Graziers guide to pastures, 

http://www.dpi.nsw.gov.au/__data/assets/pdf_file/0006/87270/graziers‐guide‐pastures‐full‐version.pdf 

accessed 10 February 2016 

Department of Environment (DoE) (2014), The Quarterly update of the National Greenhouse Gas 

Inventory: March 2014. https://www.environment.gov.au/system/files/resources/7d5f76fe‐3128‐

44dd‐bef1‐f6fa008f686f/files/nggi‐quarterly‐update‐mar‐2014_0.pdf  accessed 12 February 2016. 

Page 156: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  135   

 

Department of Environment and Climate Change (DECC) (2008a). Managing Urban Stormwater: Soils and 

Construction Volume 2A –Installation of Services. DECC, Sydney South. 

Department of Environment and Climate Change (DECC) (2008b). Managing Urban Stormwater: Soils and 

Construction Volume 2C –Unsealed Roads, DECC, Sydney South. 

Department of Environment and Climate Change (DECC) (2009). Interim Construction Noise Guidelines. 

Sydney. 

Department of Climate Change and Energy Efficiency (DCCEE) (2010) Impacts of climate change, 

webpage, http://www.climatechange.gov.au/climate‐change/impacts.aspx, accessed 23 January 

2016 

Department of Industry, Resources and Energy (2016)  MinView home page, 

http://www.resourcesandenergy.nsw.gov.au/miners‐and‐explorers/geoscience‐

information/services/online‐services/minview#_features‐of‐_min_view accessed 23 January 2016 

NSW Department of Planning (2010). Discussion Paper On Planning For Renewable Energy Generation  ‐ 

Solar Energy, prepared April, 2010. 

Department of Planning and Infrastructure (DP&I) (2012a) Strategic Plan Regional Land Use Plan, 

http://www.nsw.gov.au/sites/default/files/initiatives/strategicregionallandusepolicy‐

brochure_sd_v01.pdf accessed 5 February 2016 

Department of Planning and Infrastructure (DP&I) (2012b) New England North West Strategic Plan 

Regional Land Use Plan, http://www.nsw.gov.au/sites/default/files/initiatives/newengnw‐

strategic‐plan_sd_v01.pdf accessed 5 February 2016 

Department of Primary Industries (DPI) (2013) Prime Fact, Infrastructure proposals on rural land. 

http://www.dpi.nsw.gov.au/__data/assets/pdf_file/0020/359030/infrastructure‐proposals‐on‐

rural‐land.pdf accessed 6 February 2016. 

Department of Primary Industries (DPI)(2016) Key Fish Habitat 

http://www.dpi.nsw.gov.au/fisheries/habitat/publications/protection/key‐fish‐habitat‐maps 

accessed 14 February 2016 

Epuron (2011) White Rock Wind Farm Environmental Assessment prepared for Goldwind 

ERM 2015, White Rock Wind Farm Stage 1 Construction Environmental Management Plan 

Fraunhofer Institute for Solar Energy Systems (ISE). (2015). Photovoltaics Report. Accessed 26 November 

2015, from https://www.ise.fraunhofer.de/de/downloads/pdf‐files/aktuelles/photovoltaics‐report‐

in‐englischer‐sprache.pdf 

Fthenakis, V.M. (2003). Life cycle impact analysis of cadmium in CdTe PV production Renewable & 

Sustainable Energy Reviews No. 8, p. 303‐334. 

Fthenakis, V.M., Kim, H.C. and Alsema, E. (2008). Emissions from Photovoltaic Life Cycles Environment 

Science & Technology, 2008, 42 (6), pp 2168–2174, 

http://pubs.acs.org/doi/full/10.1021/es071763q, accessed 12 February 2016. 

Fthenakis, V., Kim, H.C., Frischknecht, R., Raugei, M., Sinha, P., Stucki, M. (2011). Life Cycle Inventories 

and Life Cycle Assessment of Photovoltaic Systems, International Energy Agency (IEA) PVPS Task 

12, Report T12 ‐ 02:2011 

Page 157: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  136   

 

Glen Innes Severn Council (2015) State of the Environment Report 2015, 

http://www.gisc.nsw.gov.au/sites/gleninnes/files/public/images/documents/gisc/council/Council

%20Meetings/2015‐11/Annexure%20C%20‐

%20State%20of%20the%20Environment%20Report%202015.pdf accessed 10 February 2010 

RPS Australia East Pty Ltd (2015) White Rock Wind Farm Stage 1, Construction Flora and Fauna 

Management Plan, 

Intergovernmental Panel of Climate Change (IPCC) (2013) : Summary for Policymakers. In: Climate Change 

2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report 

of the Intergovernmental Panel on Climate Change [Stocker, T.F., D. Qin, G.‐K. Plattner, M. Tignor, 

S.K. Allen, J. Boschung, A. Nauels, Y. Xia, V. Bex and P.M. Midgley (eds.)]. Cambridge University 

Press, Cambridge, United Kingdom and New York, NY, USA. 

International Commission on Non‐Ionizing Radiation Protection (ICNRP 1998) ICNRP Guidelines for 

limiting exposure to time ‐ varying electric, magnetic and electromagnetic fields (up to 300 ghz) 

http://www.icnirp.org/cms/upload/publications/ICNIRPemfgdl.pdf accessed 14 February 2016. 

International Commission on Non‐Ionizing Radiation Protection (ICNRP 2010) Fact Sheet on the 

Guidelines for limiting exposure to time ‐ varying electric, magnetic and electromagnetic fields (1hz 

to 100kHz) http://www.icnirp.org/cms/upload/publications/ICNIRPFactSheetLF.pdf accessed 28 

February 2016. 

International Commission on Non‐Ionizing Radiation Protection (ICNRP 2016) Low Frequency 1Hz to 

100kHz webpage http://www.icnirp.org/en/frequencies/low‐frequency/index.html accessed 28 

February 2016 

Mitchell , P (2002).   Descriptions for NSW (Mitchell) Landscapes.  Report prepared  for the NSW National 

Parks and Wildlife Service.  

http://www.environment.nsw.gov.au/resources/conservation/LandscapesDescriptions.pdf 

accessed 10 February 2016. 

NSW Environment Protection Authority (2016) Contaminated lands register. 

https://www.epa.nsw.gov.au/prclmapp/searchregister.aspx accessed 10 February 2016 

NSW Government (2011) NSW 2021: A plan to make NSW Number one, accessed 19 January 2016 

http://www.ipc.nsw.gov.au/sites/default/files/file_manager/NSW2021_WEBVERSION.pdf 

NSW Land and Property Information (2016) Six Maps https://maps.six.nsw.gov.au/ accessed between 

December and March 2016. 

NSW Government (2013) NSW Renewable Energy Action Plan, accessed 19 January 2016. 

NSW Government Planning and Environment (DP&E)(2016) Planning portal. 

https://www.planningportal.nsw.gov.au/find‐a‐

property/property/1861427_459_Kelleys_Road_99_Maybole_DP753292/99/dp753292/ , accessed 

27/01/2016 

NSW Government Planning and Environment (DP&E)(2015) Safeguarding our Agricultural Land 

http://www.planning.nsw.gov.au/Policy‐and‐Legislation/Mining‐and‐Resources/Safeguarding‐our‐

Agricultural‐Land accessed 27 January 2016 

Page 158: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  137   

 

NSW Trade and investment (NSW T&I) (2015). Electricity generation, webpage, 

http://www.resourcesandenergy.nsw.gov.au/energy‐consumers/energy‐sources/electricity 

accessed 19 January 2016.  

NSW  Office  of  Environment  and  Heritage  (OEH)  (2011a)  New  England  Tableland  maps,  webpage, 

http://www.environment.nsw.gov.au/resources/nature/newEnglandTableland.pdf  accessed  2  February 

2016 

NSW Office of Environment and Heritage  (OEH)  (2011b) New England Tableland –  landform webpage, 

http://www.environment.nsw.gov.au/bioregions/NewEnglandTableland‐Landform.htm  accessed  10 

February 2016 

Office  of  Environment  and  Heritage  (OEH)(2011c)  The  New  England  Tableland  Bioregion 

http://www.environment.nsw.gov.au/resources/nature/newEnglandTableland.pdf    accessed  1  February 

2016 

Office of Environment and Heritage (OEH) (2016). Record of EPA notices website 

https://www.epa.nsw.gov.au/prclmapp/searchresults.aspx?&LGA=52&Suburb=&Notice=&Name=

&Text=&DateFrom=&DateTo= accessed 22 January 2016 

NSW Office of Water (2016) Groundwater monitoring page, 

http://allwaterdata.water.nsw.gov.au/water.stm accessed 10 February 2016. 

Repacholi M (2003) An overview of WHO’s EMF Project and the Health Effects of EMF Exposure 

http://www.who.int/peh‐emf/meetings/archive/en/keynote4repacholi.pdf accessed 11 January 

2016 

RPS Australia East Pty Ltd (2015) White Rock Wind Farm Stage 1, Construction Flora and Fauna 

Management Plan. 

Schleisner L. (2000). Life cycle assessment of a wind farm and related externalities Renewable Energy, vol. 

20, pp. 279‐288.  

Soil and Landscape Grid of Australia, http://www.clw.csiro.au/aclep/soilandlandscapegrid/ViewData‐

Portal.html accessed 10 February 2016. 

UGL (2016) 33 kV Cable Electromagnetic Field Assessment.  Prepared by UGL for Goldwind Capital 

Australia. 

U.S. Department of Energy (2004). PV FAQs, http://www.nrel.gov/docs/fy04osti/35489.pdf, accessed 3 

August 2012. 

Weisser, D (n.d) A guide to life‐cycle greenhouse gas (GHG) emissions from electric supply technologies. 

International Atomic Energy Agency, 

https://www.iaea.org/OurWork/ST/NE/Pess/assets/GHG_manuscript_pre‐

print_versionDanielWeisser.pdf accessed 25 January 2016. 

White Rock Wind Farm Pty Limited (WRWFPL)( 2015) Bushfire Risk Management Plan, prepared for the 

White Rock Wind Farm Stage 1 

World Health Organisation (WHO) (2007). Electromagnetic fields and public health: Exposure to extremely 

low frequency fields, Fact sheet N°322, June 2007. 

http://www.who.int/mediacentre/factsheets/fs322/en/index.html, accessed 01 August 2012. 

Page 159: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  138   

 

World Health Organisation (WHO) (2012). Electromagnetic Fields http://www.who.int/peh‐

emf/about/WhatisEMF/en/, accessed May and August 2012. 

World Health Organisation (WHO) (undated). The International EMF Project brochure, 

http://www.who.int/peh‐emf/about/emf_brochure_webversion.pdf, accessed 01 August 2012.  

Wright, M. and Hearps, P. (2010). Australian Sustainable Energy Zero Carbon Australia Stationary Energy 

Plan, University of Melbourne Energy Research Institute‐ Beyond Zero Emissions. 

 

 

 

 

 

Page 160: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  A‐I   

APPENDIX A SEARS 

Page 161: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  B‐I   

APPENDIX B BIODIVERSITY ASSESSMENT 

Page 162: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  C‐I   

APPENDIX C ARCHAEOLOGICAL ASSESSMENT

Page 163: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  D‐I   

APPENDIX D VISUAL IMPACT ASSESSMENT

Page 164: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  E‐I   

APPENDIX E NOISE IMPACT ASSESSMENT

Page 165: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  F‐I   

APPENDIX F DRAFT NOISE MANAGEMENT PLAN 

Page 166: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  G‐I   

APPENDIX G DRAFT EROSION AND SEDIMENT 

CONTROL PLAN

Page 167: Environmental Impact Statement · Project Title: White Rock Solar Farm Environmental Impact Statement Project Number: 6589 Project File Name: White Rock Solar Farm EIS final v1 3

Environmental Impact Statement White Rock Solar Farm 

6589 Final v1.3  H‐I   

APPENDIX H DRAFT TRAFFIC MANAGEMENT PLAN