Page 1: WIND FARM PROJECT

WIND FARMS IN PAKISTAN

WE ARE HEADING TO THE NEW ERA

Page 2: WIND FARM PROJECT

STARTED FROMWIND FARM PROJECT.

Turbine N100 2.5MW

Page 3: WIND FARM PROJECT

DESCON WIND FARM PROJECT It is a 150 MW project (METRO, YUNUS, GUL AHMED) with 60 turbines. Each turbine has a capacity of 2.5 MW .

Equipment detail

Stationary equipment N100 R80 MT 5.1

Tower bottom section Height :-16.51 m / Weight :- 63.8 Ton

Tower Mid 0ne section Height :-20.86 m / Weight :- 58.2 Ton

Tower Mid Two section Height :-17.88 m / Weight :- 36.9 Ton

Tower Top section Height :-21.66 m / Weight :- 31.3 Ton

Rotary Equipment

Nacelle (N 100) Weight :- 53 Ton

Drive train Weight :- 41.5 Ton

Hub Weight :- 27.5 Ton

Blades Weight :- 9.8 x 3 = 29.4 Ton

Page 4: WIND FARM PROJECT

STARTED FROM HERE

02

Page 5: WIND FARM PROJECT

COMPLETED FOUNDATION WORK

Page 6: WIND FARM PROJECT

NOW ITS TIME TO MOVE ON TO THE NEXT LEVELTRANSPORTATION OF THE EQUIPMENT

Page 7: WIND FARM PROJECT

AT PORT QASIM

Page 8: WIND FARM PROJECT

RECEIVED AT SITE

Page 9: WIND FARM PROJECT

ERECTION OF PAKISTAN'S FIRST 2.5 MW WIND TURBINEN 100

Page 10: WIND FARM PROJECT

ERECTION OF TOWER SECTION MID 0NE

Page 11: WIND FARM PROJECT

ERECTION OF MID 2

Page 12: WIND FARM PROJECT

ERECTION TOP SECTION

Page 13: WIND FARM PROJECT

ERECTION OF NACELLE

Page 14: WIND FARM PROJECT

ERECTION OF DRIVE TRAIN

Page 15: WIND FARM PROJECT

ASSEMBLING OF STAR

Page 16: WIND FARM PROJECT

STAR ERECTION

Page 17: WIND FARM PROJECT

STAR ERECTION

Page 18: WIND FARM PROJECT

STAR ERECTION

Page 19: WIND FARM PROJECT

COMPLETED THE ERECTION FIRST TURBINE AT WTG # 17

Page 20: WIND FARM PROJECT

STILL LONG WAY TO GO

Will be successful